DRAFT STANDARD PROCEDURES DOCUMENT FOR PREPARING FRAMEWORK AGREEMENTS PUBLIC PROCUREMENT REGULATORY AUTHORITY (PPRA) OCTOBER 2018

Size: px
Start display at page:

Download "DRAFT STANDARD PROCEDURES DOCUMENT FOR PREPARING FRAMEWORK AGREEMENTS PUBLIC PROCUREMENT REGULATORY AUTHORITY (PPRA) OCTOBER 2018"

Transcription

1 DOC 6 DRAFT STANDARD PROCEDURES DOCUMENT FOR PREPARING FRAMEWORK AGREEMENTS PUBLIC PROCUREMENT REGULATORY AUTHORITY (PPRA) OCTOBER 2018 Page 1 of 38

2 PREFACE 1. This Standard Tender Document (STD) document has been prepared by the Public Procurement Regulatory Authority (PPRA) for use by Procuring Entities (PEs) for preparing Framework Agreements for procurement of, goods, works, and services (Consulting, Non- Consulting, Management and Maintenance) following Competitive Tendering Methods as defined in the Public Procurement and Asset Disposal Act (2015). The procedures and practices presented in this STD reflect the requirements in the said Act and its Regulations. This STD will be used by Procuring Entities on a mandatory basis. Lack of its use could be basis for challenging decision on contract award. 2. A Framework Agreement (FA) is an agreement (essentially a contract) established with firms or individuals (suppliers, contractors, service providers or consultants), to provide goods, works or services as required over a specified period of time, and in specified locations. The FA sets out terms and conditions under which goods, works or services can be provided competitively throughout the term of the agreement, by means of call-off contracts. A call-off contract is a contract awarded under a Framework Agreement itself. It does not need to be advertised and tendered for, as that will have been done to come up with a Framework Agreement. Framework Agreements are appropriate for the recurring needs for procurement of goods, works or services or to consolidate requirements when different entities of a Procuring Entity or different Procuring Entities need to procure the same types of goods, works or services. For further details see Annex to this Preface on Framework Agreements. 3. The process for procurement under Framework Agreements follows the appropriate Standard Tender Documents for procurement of goods, works or services, and in each case the process is modified as provided for in this Standard Tender Document for Framework Agreements. In the case of normal contracts for goods, works and services, delivery and payments are one-off activities. Under Framework Agreements, the Procuring Entity is given the option of signing a contract on basis of periodic orders and the goods, works and services are delivered and paid for on basis of call-off orders made from time to time within the agreed contract period. The Framework Agreement (contract) indicates the estimated maximum quantities of goods, works or services that the Procuring Entity will require within the contract period, from which the call-offs would be made. Framework Agreements normally go up to three years with a possibility of a two-year extension, depending on performance. Framework agreements are also referred to as Term Contracts given the term of contract within which calloffs are made. 4. The following STD will be modified appropriately to suit a Framework Agreement. The following is the List of Standard Tender Documents to be modified to suit Framework Agreements. Other types of Contracts are not deemed suitable for Framework Agreements. Doc No. 1 Doc No. 4 Doc No. 5 Standard tender document for procurement of works (buildings and associated civil engineering works) Standard tender document for procurement of small works Standard tender document for procurement of goods Page 2 of 38

3 Doc No. 6 Standard tender document request for proposals (selection of consultants) Doc No. 7 Standard tender document for procurement of non-consultancy services Doc No. 12 Standard tender document for Maintenance Services Doc No. 14 Standard tender document for Procurement of Specialized Goods Text Books and Reading Materials Doc No. 15 Standard tender document for Procurement of Specialized Goods - Health Sector Goods (pharmaceuticals, vaccines and condoms) 5. The STD is comprised of the parts indicated on the Table of Contents. Before using this STD, the User is advised to or should be familiar with the Act and its Regulations and any manuals prepared and issued by PPRA to guide public officials in the conduct of the public procurement process. 6. The Public Procurement Regulatory Authority welcomes any comments from the Users of this STD which will assist in revising (if need be) and improving the structure and contents of the STD. Director General Public Procurement Regulatory Authority (PPRA) P.O. Box Nairobi, Kenya. Page 3 of 38

4 APPENDIX TO THE PREFACE 1. A Framework Agreement (FA) is an agreement between a Procuring Entity with one or more supplier, contractor, service provider, or consultant (referred to herein as a Firm) that establishes the terms and conditions that will govern any contract awarded during the term of the FA. More than one Procuring Entity may, if so desired, benefit from one FA. The terms and conditions will usually include the price rates, pricing and payment mechanisms, timings, delivery destinations and works locations. FAs may be established for the procurement of goods, works and services (Consulting, Non-Consulting, Management and Maintenance) as and when required, over a specified period of time. An FA does not commit a Procuring Entity to procure, nor a Firm to supply. Once established, an FA provides a fast and efficient way to procure Goods, Works and Services. An FA allows a Procuring Entity to select from a number of firms, helping to ensure that each procurement represents best value for money. FAs may be appropriate under the following circumstances: (a) (b) (c) (d) frequent reordering is based on the same, or similar requirements, or set of specifications; where different Procuring Entities procure the same goods, works and nonconsulting Services, including maintenance services and where aggregating the demand could lead to volume discounts; planning for emergency situations; or no single firm is considered to have sufficient capacity to carry out the required works or provide goods. 2. When setting up a Framework Agreement, the Procuring Entity should include in the contract documents as many of the terms as possible which will apply to the call-off contracts so that the firms party to the FA are clear as to their risks in relation to the call-off terms. 3. It is possible to enter into a framework agreement with a single supplier. There is no set limit for the number of firms that can be in one FA. Although a Procuring Entity can enter into a Framework Agreement with more than one firm (supplier, contractor, service provider, or consultant), in practice FAs with a large number of suppliers may become difficult to manage, as Procuring Entity may have to approach each supplier appointed to the framework in relation to a proposed call-off. 4. A Framework Agreement will generally allow a Procuring Entity more flexibility around the goods, works or services to be contracted for under the framework, both in terms of volume and also the detail of the relevant goods, works and services. It allows a contracting authority to select from a number of suppliers for its requirements, helping to ensure that each purchase represents best value. 5. When several Procuring Entities establish an FA together, a lead Procuring Entity is appointed to act on behalf of the group of Procuring Entities. Each Procuring Entity in the Page 4 of 38

5 group is identified in the invitation to Tender Documents at the time of going to the market. Each individual Procuring Entity shall be specified in each call-off contract. 6. In order to establish an FA, the Procuring Entity shall use appropriate procurement method with appropriate Invitation for Tenders. Once an FA is established, the Procuring Entity does not need to openly advertise individual contract opportunities to be awarded as call-offs. 7. The additional information in the invitation for tenders or proposals shall include as a minimum: (a) (b) (c) (d) a description of the Goods, works and Services that the FA is intended to cover; an estimate of the total volume/scope of the Goods, Works and Services for which call-off contracts may be placed and, as far as possible, the volume/scope and frequency of the call-off contracts to be awarded under the FA; qualification and evaluation criteria and, evaluation methodology; the terms and conditions of contract that will apply to call-offs under the FA, which shall include the following information: (i) (ii) (iii) a statement that the fees, charge rate or pricing mechanism, and any other associated costs shall be agreed with each firm, and be valid for the term of the FA; a statement that explains that the Procuring Entity will engage FA firms as required, through call-off contracts; a statement that the FA is: a closed panel (which should normally be the case), and the constitution of the panel shall remain unchanged during the term of the FA (other than firms being removed from the panel, no additional or replacement firms may be added); or an open panel and an outline of the process for selection. (iv) statement that there is no guarantee of being awarded a call-off contract, and no commitment will be made with regard to possible volume of Goods, Works and Services; (v) a statement that the FA is not an exclusive agreement and that the Procuring Entity reserves the right to procure the same or similar Goods, Works and Services from non-fa firms; Page 5 of 38

6 (v) a description of the circumstances that may lead to a firm being removed from the FA, and the process to be used in securing the removal; (vi) there will be no secondary procurement method or methods the Procuring Entity shall use to select a firm (the call-off process); (vii) the contractual method the Procuring Entity will use to secure the call-off contract (for example, a statement of work or purchase order); and (viii) the duration of the FA, including any option to extend. 8. FAs shall be established for a maximum period of three (3) years, with the option to extend by up to a further two (2) years, if the initial engagement has been satisfactory. 9. The Procuring Entity shall issue a Notification of Intention to conclude an FA (in conformance with Paragraphs 5.72 to 5.77 (Notification of Intention to Award), and a Standstill Period shall apply at the time when the winning firm in the FA is established. A public notice (Contract Award Notice) of the conclusion of the FA shall be published when the FA is signed. The notice shall list the names of all firms that have been included in the FA. 10. Call-off Contracts 10.1 For each procurement under an FA, a firm shall be selected from the panel using the secondary procurement process, or one of the processes, described in the FA The secondary procurement for the call-offs shall be a direct selection from the list of the firms on the FA, but based on an objective criterion such as the location where call-off contracts are awarded to the firm that is best able to deliver based on their location and the location where the Goods, Works, Services are to be delivered As part of the call-off process, firms shall be given a description of the scope of supply/tasks/services that they will be expected to provide. The statement of goods, work or service order to be issued as part of the call-off process shall specify the objectives, tasks, deliverables, timeframes and price or price mechanism. The price for individual call-off contracts shall be based on the prices detailed in the FA. Page 6 of 38

7 TABLE OF CONTENTS THE LIST OF STANDARD TENDER DOCUMENTS TO BE MODIFIED TO SUIT FRAMEWORK AGREEMENTS. Doc No. 1 Standard tender document for procurement of works (buildings and associated civil engineering works) Doc No. 4 Standard tender document for procurement of small works Doc No. 5 Standard tender document for procurement of goods Doc No. 6 Standard tender document request for proposals (selection of consultants) Doc No. 7 Standard tender document for procurement of non-consultancy services Doc No. 12 Standard tender document for Maintenance Services Doc No. 14 Standard tender document for Procurement of Specialized Goods Text Books and Reading Materials Doc No. 15 Standard tender document for Procurement of Specialized Goods - Health Sector Goods (pharmaceuticals, vaccines and condoms) Page 7 of 38

8 Doc No. 1 STANDARD TENDER DOCUMENT FOR PROCUREMENT OF WORKS (BUILDINGS AND ASSOCIATED CIVIL ENGINEERING WORKS) 1. INVITATION TO TENDER, Paragraph 2, Add: Tenders will be awarded on basis of a Framework Agreement. 2. SECTION I - INSTRUCTIONS TO TENDERERS (a) (b) (c) Substitute the word Contract Agreement with Framework Agreement. ITT 35.1; Insert as a Second sentence the words The evaluation and award of contracts will be based on Packages. Section III - Evaluation and Qualification Criteria Omit Para 5, 6 and 7 on Multiple Contracts since evaluation will be made on basis of package and call-offs will also be on package basis. (d) PART II WORKS REQUIREMENTS (i) Insert before Bills of Quantities: Packages involved in the Framework Agreement The Works shall consist of the following packages, and each package shall be described in full as per Section-Bills of Quantities. No. Package Description 1 E.g. Primary School of six classrooms and associated facilities ETC. Locations where the Package will be constructed Any Place within the County of the Procuring Entity Likely Number of Packages Period Construction of 10 Within the FA Period. (ii) BILLS OF QUANTITIES; insert a preamble: The Bills of Quantities shall be prepared for each Package separately. (iii) Revise the GRAND SUMMARY as follows: Page 8 of 38

9 PACKAGE SUMMARY (complete one for each Package) SUMMARY ITEMS From Page Amount Bill No. 1: Preliminary Items Bill No. 2: Work Items Bill No 3: Daywork Summary Bill No 4: Provisional Sums Subtotal of Bills No 1-4 Allow for any Discounts i TOTAL TENDER PRICE for Package No Carried forward to GRAND SUMMARY GRAND SUMMARY SUMMARY ITEMS From Page Amount ETC. Subtotal of Packages 1 to 4 ETC. Allow for any Discounts I TOTAL TENDER PRICE Carried forward to Form of Tender 3. CONDITIONS OF CONTRACT (a) Omit the whole of Clause 1.6 and insert the following. 1.6 Framework Agreement The Parties shall enter into a Framework Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless the Particular Conditions establish otherwise. The Framework Agreement shall be based upon FORM No. 3 FRAMEWORK AGREEMENT annexed to the Particular Conditions of Contract. The costs of stamp duties and similar charges (if any) imposed by law in connection with entry into the Framework Agreement shall be borne by the Procuring Entity The Framework Agreement establishes the terms and conditions that will govern the contract awarded during the term of the Framework Agreement. The Framework Agreement establishes for the procurement works by package as and when required, over the specified period of time. The Framework Agreement does not commit a Procuring Entity to procure, nor a firm to supply. The Framework Agreement allows the Procuring Entity to call the Contractor Page 9 of 38

10 to commence the works on a particular package in a specified location within the duration of the agreement This Framework Agreement does not guarantee the contractor of being called for a contract to start and no commitment is made with regard to possible number of packages to carried out This Framework Agreement does exclude the Procuring Entity from the right to procure the same Works from other firms This Framework Agreement does not stop the Procuring Entity from removing the contractor from the same Agreement The Procuring Entity may with the Consent of the Contractor extend this Agreement for a further two (2) years, if the initial engagement has been satisfactory Call-off Contracts; for work on a package to start, the Procuring Entity shall issue a notice of acceptance of a particular package requesting the contractor to furnish a Performance Security and to start the works thereafter, and providing the contractor with details of location where the works, are to be carried out. The call-off statement shall specify the objectives, tasks, deliverables, timeframes and price or price mechanism. The price for individual call-off contracts shall be based on the prices detailed in the Framework Agreement If the contractor fails to provide a performance security and commence the works as instructed, the Procuring Entity may declare the Tenderer ineligible to be awarded a contract by the Procuring Entity for a period of time as stated in the TDS. (b) FORM No 1: NOTIFICATION OF INTENTION TO AWARD Omit the whole of Para 4. And substitute as follows. 4. Request a debriefing in relation to the evaluation of your tender by submitting a Procurement-related Complaint in relation to the decision to award the contracts as follows: (i) The successful tenderers: Name of successful Tenderer Page 10 of 38 Address of the successful Tenderer Contract price of the successful Tenderer

11 (ii) Other Tenderers Names of all Tenderers that submitted a Tender. If the Tender s price was evaluated include the evaluated price as well as the Tender price as read out. Name of Tenderer Address of the Tenderer Tender price evaluated price (c) FORM NO 2: NOTIFICATION OF AWARD - LETTER OF ACCEPTANCE. (i) Amend first Paragraph omit the for the Accepted Contract Amount [amount in numbers and words] [name of currency], as corrected and modified in accordance with the Instructions to Tenderers, is hereby accepted by (name of Procuring Entity). And insert the words for contract Package No (amount...), Packages No (amount...), Packages No (amount...). etc. are hereby accepted by (name of Procuring Entity. (ii) Omit the whole of para reading You are. Tender Document and Insert the words You are requested to arrange to sign the Framework Agreement within 28 days in accordance with the Conditions of Contract. On being instructed to commence the contract on any of the packages you have won, by a call-off notification, you will be requested to furnish for the particular package a Performance Security within 28 days in accordance with the Conditions of Contract, and for that purpose, using one of the Performance Security Forms included in Section VIII, Contract Forms, of the Tender Document. Page 11 of 38

12 DOC NO. 4 -STANDARD TENDER DOCUMENT FOR PROCUREMENT OF SMALL WORKS 1. INVITATION TO TENDER, Paragraph 2, Add: Tenders will be awarded on basis of Framework Agreement. 2. SECTION I - INSTRUCTIONS TO TENDERERS (a) Substitute the word Contract and Contract Agreement with Framework Agreement. (b) ITT 35.1; Insert as a second sentence the words The evaluation and award of contracts will be based on Packages. (c) Section III - Evaluation and Qualification Criteria Omit Para 5, 6 and 7 on Multiple Contracts since evaluation will be made on basis of package and call-offs will also be on package basis. (d) SCHEDULES - Bill of Quantities Insert before Bills of Quantities: (i) Packages involved in the Framework Agreement The Works shall consist of the following packages, and each package shall be described in full as per Section-Bills of Quantities. No. Package Description Locations where the Package will be constructed 1 E.g. Primary tar Road 15 Any Place KM stretch between ABKO within the and KAM ETC. County of the Procuring Entity Likely Number Packages of Period of Construction 6 Within the FA Period. (ii) BILLS OF QUANTITIES; insert a preamble: The Bills of Quantities shall be prepared for each Package separately. Page 12 of 38

13 (iii) Revise the Sample Bill of Quantities as follows: PACKAGE SUMMARY (complete one for each Package) SUMMARY ITEMS Bill No. 1: Preliminary Items Bill No. 2: Work Items Bill No 3: Daywork Summary Bill No 4: Provisional Sums Subtotal of Bills No 1-4 Allow for any Discounts i TOTAL TENDER PRICE for Package No Carried forward to GRAND SUMMARY GRAND SUMMARY SUMMARY ITEMS ETC. Subtotal of Packages 1 to 4 ETC. Allow for any Discounts I Total Tender Price Carried forward to Form of Tender From Page From Page Amount Amount (g) FORM OF TENDER (i) Item (5) (vi) should read: Total price of all Packages (sum of all packages -list all packages, indicate price of each package tendered for and their total) [insert the total price of all lots in words and figures)];. Substitute Lot for Package. 3. CONDITIONS OF CONTRACT (a) Insert as Clause 12.4 the following Framework Agreement Page 13 of 38

14 The Parties shall enter into a Framework Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless the Particular Conditions establish otherwise. The Framework Agreement shall be based upon FORM No. 3 FRAMEWORK AGREEMENT annexed to the Particular Conditions. The costs of stamp duties and similar charges (if any) imposed by law in connection with entry into the Framework Agreement shall be borne by the Procuring Entity The Framework Agreement establishes the terms and conditions that will govern the contract awarded during the term of the Framework Agreement. The Framework Agreement establishes for the procurement works by package as and when required, over the specified period of time. The Framework Agreement does not commit a Procuring Entity to procure, nor a Firm to supply. The Framework Agreement allows the Procuring Entity to call the Contractor to commence the works on a particular package in a specified location within the duration of the agreement This Framework Agreement does not guarantee the contractor of being called for a contract to start and no commitment is made with regard to possible number of packages to carried out This Framework Agreement does exclude the Procuring Entity from the right to procure the same Works from other firms This Framework Agreement does not stop the Procuring Entity from removing the contractor from the same Agreement The Procuring Entity may with the Consent of the Contractor extend this Agreement for a further two (2) years, if the initial engagement has been satisfactory Call-off Contracts; for work on a package to start, the Procuring Entity shall issue a notice of acceptance of a particular package requesting the contractor to furnish a Performance Security and to start the works thereafter, and providing the contractor with details of location where the works, are to be carried out. The call-off statement shall specify the objectives, tasks, deliverables, timeframes and price or price mechanism. The price for individual call-off contracts shall be based on the prices detailed in the Framework Agreement If the contractor fails to provide a performance security and commence the works as instructed, the Procuring Entity may declare the Tenderer ineligible to be awarded a contract by the Procuring Entity for a period of time as stated in the TDS. (b) FORM No 1: NOTIFICATION OF INTENTION TO AWARD Omit the whole of Para 4. And substitute as follows. Page 14 of 38

15 4. Request a debriefing in relation to the evaluation of your tender by submitting a Procurement-related Complaint in relation to the decision to award the contracts as follows: (i) The successful tenderers: Name of successful Tenderer Address of the successful Tenderer Contract price of the successful Tenderer (ii) Other Tenderers Names of all Tenderers that submitted a Tender. If the Tender s price was evaluated include the evaluated price as well as the Tender price as read out. Package No. Name of Tenderer Address of the Tenderer Tender price evaluated price (c) FORM NO 2: NOTIFICATION OF AWARD - LETTER OF ACCEPTANCE. (ii) Amend first Paragraph omit the for the Accepted Contract Amount [amount in numbers and words] [name of currency], as corrected and modified in accordance with the Instructions to Tenderers, is hereby accepted by (name of Procuring Entity). And insert the words for contract Package No (amount...), Packages No (amount...), Packages No (amount...). etc. are hereby accepted by (name of Procuring Entity. (ii) Omit the whole of para reading You are. Tender Document and Page 15 of 38

16 Insert the words You are requested to arrange to sign the Framework Agreement within 28 days in accordance with the Conditions of Contract. On being instructed to commence the contract on any of the packages you have won, by a call-off notification, you will be requested to furnish for the particular package a Performance Security within 28 days in accordance with the Conditions of Contract, and for that purpose, using one of the Performance Security Forms included in Section VIII, Contract Forms, of the Tender Document. Page 16 of 38

17 DOC NO. 5 - STANDARD TENDER DOCUMENT FOR PROCUREMENT OF GOODS 1. INVITATION TO TENDER, Paragraph 2, Add: Tenders will be awarded on basis of Framework Agreement. 2. SECTION I - INSTRUCTIONS TO TENDERERS (a) Substitute the word Contract Agreement with Framework Agreement. (b) ITT 34.1; Insert as a second sentence the words The evaluation and award of contracts will be based on Packages. (e) Section III - Evaluation and Qualification Criteria Omit Para 2.2 and insert the following 4. Multiple Contracts (ITT 34.4) Tenders are invited for individual lots, the contract will be awarded to the tenderer offering a substantially responsive Tender(s) and the lowest evaluated cost for individual lots, subject to the selected tenderer(s) meeting the required qualification criteria (this Section III, Sub-Section ITT 36 Qualification Requirements) for each lot. In determining tenderer that offer the lowest evaluated cost to the Procuring Entity for each lot, the Procuring Entity shall apply the following steps in sequence: (a) evaluate individual lots to determine the substantially responsive Tenders and corresponding evaluated costs; (b) (c) (d) for each lot, rank the substantially responsive Tenders starting from the lowest evaluated cost for the lot; apply to the evaluated costs listed in (b) above, any applicable discounts/price reductions offered by a tenderer (s) for the award of each Lot based on the discounts and the methodology for their application offered by the respective Tenderer; and determine contract award on the basis of the lots that offer the tender offers each of which has the lowest evaluated cost to the Procuring Entity. (f) SCHEDULES of Requirement, Table of Price Schedule, change on Column 1 the words Line Item N Omit to Lot N.. (g) FORM OF TENDER Omit whole Item (e) Tender Price and substitute with (e) The total price of our Tender, excluding any discounts offered in item (f) below Page 17 of 38

18 s as per listed Lots (list each lot with its price and then the total of all tendered for lots) [insert the prices of the Tender in words and figures, indicating the various amounts for lots and the respective currencies]; 3. CONDITIONS OF CONTRACT (a) Insert as Clause the following. 2.4 Framework Agreement The Parties shall enter into a Framework Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless the Particular Conditions establish otherwise. The Framework Agreement shall be based upon FORM No. 3 FRAMEWORK AGREEMENT annexed to the Particular Conditions. The costs of stamp duties and similar charges (if any) imposed by law in connection with entry into the Framework Agreement shall be borne by the Procuring Entity The Framework Agreement establishes the terms and conditions that will govern the contract awarded during the term of the Framework Agreement. The Framework Agreement establishes for the procurement works by package as and when required, over the specified period of time. The Framework Agreement does not commit a Procuring Entity to procure, nor a Firm to supply. The Framework Agreement allows the Procuring Entity to call the Contractor to commence the works on a particular package in a specified location within the duration of the agreement This Framework Agreement does not guarantee the contractor of being called for a contract to start and no commitment is made with regard to possible number of packages to carried out This Framework Agreement does exclude the Procuring Entity from the right to procure the same Works from other firms This Framework Agreement does not stop the Procuring Entity from removing the contractor from the same Agreement The Procuring Entity may with the Consent of the Contractor extend this Agreement for a further two (2) years, if the initial engagement has been satisfactory Call-off Contracts; for work on a package to start, the Procuring Entity shall issue a notice of acceptance of a particular package requesting the contractor to furnish a Performance Security and to start the works thereafter, and providing the contractor with details of location where the works, are to be carried out. The call-off statement shall specify the objectives, tasks, deliverables, timeframes and price or price mechanism. The price for individual call-off contracts shall be based on the prices detailed in the Framework Agreement. Page 18 of 38

19 If the contractor fails to provide a performance security and commence the works as instructed, the Procuring Entity may declare the Tenderer ineligible to be awarded a contract by the Procuring Entity for a period of time as stated in the TDS. (b) FORM No 1: NOTIFICATION OF INTENTION TO AWARD Omit the whole of Para 4. And substitute as follows. 4. Request a debriefing in relation to the evaluation of your tender by submitting a Procurement-related Complaint in relation to the decision to award the contracts as follows: (i) The successful tenderers: Name of successful Tenderer Address of the successful Tenderer Contract price of the successful Tenderer (ii) Other Tenderers Names of all Tenderers that submitted a Tender. If the Tender s price was evaluated include the evaluated price as well as the Tender price as read out. Package No. Name of Tenderer Address of the Tenderer Tender price evaluated price (c) FORM NO 2: NOTIFICATION OF AWARD - LETTER OF ACCEPTANCE. (iii) Amend first Paragraph omit the for the Accepted Contract Amount [amount in numbers and words] [name of currency], as corrected and modified in Page 19 of 38

20 accordance with the Instructions to Tenderers, is hereby accepted by (name of Procuring Entity). And insert the words for contract Lot No (amount...), Lot No (amount...), Lot No (amount...). etc. are hereby accepted by (name of Procuring Entity. (ii) Omit the whole of para reading You are. Tender Document and Insert the words You are requested to arrange to sign the Framework Agreement within 28 days in accordance with the Conditions of Contract. On being instructed to commence the contract on any of the packages you have won, by a call-off notification, you will be requested to furnish for the particular package a Performance Security within 28 days in accordance with the Conditions of Contract, and for that purpose, using one of the Performance Security Forms included in Section VIII, Contract Forms, of the Tender Document. Page 20 of 38

21 DOC NO. 6 -STANDARD TENDER DOCUMENT REQUEST FOR PROPOSALS (SELECTION OF CONSULTANTS) 1. REQUEST FOR PROPOSALS; Before Paragraph 1, Add: Please note that the selected Consultant shall be requested to sign a Framework Agreement so that the whole of services could be duplicated and provided in more than one location and to more than one Procuring Entity over the period of the Framework Agreement. 2. SECTION 4. FINANCIAL PROPOSAL - STANDARD FORMS (a) FORM FIN-1, FINANCIAL PROPOSAL SUBMISSION FORM; Insert after first sentence the words We understand that the contract may be duplicated by a further number of assignments within the Republic of Kenya, subject to negotiations on any additional costs that may be incurred as a result of performing the assignment in different locations. (b) FORM OF CONTRACT Insert after first sentence the words We understand that the contract may be duplicated by a further number of assignments within the Republic of Kenya, subject to negotiations on any additional costs that may be incurred as a result of performing the assignment in different locations. 3. CONDITIONS OF CONTRACT Insert as Appendix E to the Conditions of Contract, both Time-based and Lumpsum. 1. Appendix E - Framework Agreement 1.1 The Parties shall enter into this contract as a Framework Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless the Particular Conditions establish otherwise. The Framework Agreement shall be based upon FORM No. 3 FRAMEWORK AGREEMENT annexed to the Particular Conditions. The costs of stamp duties and similar charges (if any) imposed by law in connection with entry into the Framework Agreement shall be borne by the Procuring Entity. 1.2 The Framework Agreement establishes the terms and conditions that will govern the contract awarded during the term of the Framework Agreement. The Framework Agreement establishes for the procurement works by package as and when required, over the specified period of time. The Framework Agreement does not commit a Procuring Entity to procure, nor a Firm to supply. The Framework Agreement allows the Procuring Entity to call the Contractor to commence the works on a particular package in a specified location within the duration of the agreement. Page 21 of 38

22 1.3 This Framework Agreement does not guarantee the contractor of being called for a contract to start and no commitment is made with regard to possible number of packages to carried out. 1.4 This Framework Agreement does exclude the Procuring Entity from the right to procure the same Works from other firms. 1.5 This Framework Agreement does not stop the Procuring Entity from removing the contractor from the same Agreement The Procuring Entity may with the Consent of the Contractor extend this Agreement for a further two (2) years, if the initial engagement has been satisfactory. 1.6 Call-off Contracts; for work on a package to start, the Procuring Entity shall issue a notice of acceptance of a particular package requesting the contractor to furnish a Performance Security and to start the works thereafter, and providing the contractor with details of location where the works, are to be carried out. The call-off statement shall specify the objectives, tasks, deliverables, timeframes and price or price mechanism. The price for individual call-off contracts shall be based on the prices detailed in the Framework Agreement. 1.7 If the contractor fails to provide a performance security and commence the works as instructed, the Procuring Entity may declare the Tenderer ineligible to be awarded a contract by the Procuring Entity for a period of time as stated in the TDS. Page 22 of 38

23 DOC NO. 7 - STANDARD TENDER DOCUMENT FOR PROCUREMENT OF NON- CONSULTANCY SERVICES 1. INVITATION TO TENDER, Paragraph 2, Add: Tenders will be awarded on basis of Framework Agreement. 2. SECTION I - INSTRUCTIONS TO TENDERERS (a) Substitute the word Contract Agreement with Framework Agreement. (b) ITT 35.1; Insert as a Second sentence the words The evaluation and award of contracts will be based on each Service Number. (c) Section III - Evaluation and Qualification Criteria Omit the entire Item 1.2 (a) and insert the following: 1.2 (a) Award Criteria for Multiple Contracts [ITT 35.4]: Tenderers have the option to Tender for any one or more Service Lines/Lots. Tenders will be evaluated lot-wise, taking into account discounts offered, if any. The contract(s) will be awarded to the Tenderer or Tenderers offering the lowest evaluated cost to the Procuring Entity for each Service Line or Service Lot, subject to the selected Tenderer(s) meeting the required qualification criteria for lot or combination of lots as the case may be. (d) SECTION IV- TENDERING FORMS Form of tender: Omit Option 1 and Adopt Option 2 with following amendment: In case of multiple Service Lines or Service Packages (a) Total price of each Service Line or Package [insert the total price of each in words and figures, indicating the various amounts and the respective currencies]; and (b) Total price of all Service Lines and Packages [insert the total price in words and figures, indicating the various amounts and the respective currencies]; (e) SECTION IV- TENDERING FORMS - Notification of Intention to Award Omit the whole of Item 1. And insert the following: 1. The successful Tenderers No. Description and No. of Service Line or Package [insert name of successful Tenderer] [insert Address successful Tenderer] of Tender price Evaluated Tender price (if applicable) Page 23 of 38

24 Other Tenderers [INSTRUCTIONS: insert names of all Tenderers that submitted a Tender. If the Tender s price was evaluated include the evaluated price as well as the Tender price as read out.] No Description and No. of Service Line or Package [insert name of Tenderer] [insert Address of Tenderer] Tender price Evaluated Tender price (f) SECTION IV- TENDERING FORMS - Notification of Award - Letter of Acceptance. (iv) Amend first Paragraph omit the for the Accepted Contract Amount [amount in numbers and words] [name of currency], as corrected and modified in accordance with the Instructions to Tenderers, is hereby accepted by (name of Procuring Entity). And insert the following words and a completed Table: for the Accepted Contract Amounts [amount in numbers and words] [name of currency], as corrected and modified in accordance with the Instructions to Tenderers, are hereby accepted by (name of Procuring Entity). for each Service Line or Package listed on the Table below. No. Description and Number of Service Line or Package [insert accepted Tender Price] [insert completion period] (ii) Omit the whole of para reading Page 24 of 38

25 You are. Tender Document and Insert the words You are requested to arrange to sign the Framework Agreement within 28 days in accordance with the Conditions of Contract. On being instructed to commence the contract on any of the packages you have won, by a call-off notification, you will be requested to furnish for the particular Service Line or Package a Performance Security within 28 days in accordance with the Conditions of Contract, and for that purpose, using one of the Performance Security Forms included in Section VIII, Contract Forms, of the Tender Document. 3. CONDITIONS OF CONTRACT Insert as Appendix E to the Conditions of Contract, both Time-based and Lumpsum. 1. Appendix E - Framework Agreement 1.1 The Parties shall enter into this contract as a Framework Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless the Particular Conditions establish otherwise. The Framework Agreement shall be based upon FORM No. 3 FRAMEWORK AGREEMENT annexed to the Particular Conditions. The costs of stamp duties and similar charges (if any) imposed by law in connection with entry into the Framework Agreement shall be borne by the Procuring Entity. 1.2 The Framework Agreement establishes the terms and conditions that will govern the contract awarded during the term of the Framework Agreement. The Framework Agreement establishes for the procurement works by package as and when required, over the specified period of time. The Framework Agreement does not commit a Procuring Entity to procure, nor a Firm to supply. The Framework Agreement allows the Procuring Entity to call the Contractor to commence the works on a particular package in a specified location within the duration of the agreement. 1.8 This Framework Agreement does not guarantee the contractor of being called for a contract to start and no commitment is made with regard to possible number of packages to carried out. 1.9 This Framework Agreement does exclude the Procuring Entity from the right to procure the same Works from other firms This Framework Agreement does not stop the Procuring Entity from removing the contractor from the same Agreement The Procuring Entity may with the Consent of the Contractor extend this Agreement for a further two (2) years, if the initial engagement has been satisfactory. Page 25 of 38

26 1.11 Call-off Contracts; for work on a package to start, the Procuring Entity shall issue a notice of acceptance of a particular package requesting the contractor to furnish a Performance Security and to start the works thereafter, and providing the contractor with details of location where the works, are to be carried out. The call-off statement shall specify the objectives, tasks, deliverables, timeframes and price or price mechanism. The price for individual call-off contracts shall be based on the prices detailed in the Framework Agreement If the contractor fails to provide a performance security and commence the works as instructed, the Procuring Entity may declare the Tenderer ineligible to be awarded a contract by the Procuring Entity for a period of time as stated in the TDS. Names of all Service Lines and Packages awarded to the Tenderer. Description and No of Service Line or Package Name of Tenderer Address of the Tenderer Awarded Tender price Page 26 of 38

27 DOC NO. 12 STANDARD TENDER DOCUMENT FOR MAINTENANCE SERVICES 1. INVITATION TO TENDER, Paragraph 2, Add: Tenders will be awarded on basis of Framework Agreement. 2. SECTION I - INSTRUCTIONS TO TENDERERS (a) Substitute the word Contract Agreement with Framework Agreement. (b) ITT 35.1; Insert as a Second sentence the words The evaluation and award of contracts will be based on each Service Number. (c) Section III - Evaluation and Qualification Criteria Omit the entire Item 1.2 (a) and insert the following: 1.3 (a) Award Criteria for Multiple Contracts [ITT 35.4]: Tenderers have the option to Tender for any one or more Service Lines/Lots. Tenders will be evaluated lot-wise, taking into account discounts offered, if any. The contract(s) will be awarded to the Tenderer or Tenderers offering the lowest evaluated cost to the Procuring Entity for each Service Line or Service Lot, subject to the selected Tenderer(s) meeting the required qualification criteria for lot or combination of lots as the case may be. (d) SECTION IV- TENDERING FORMS Form of tender: Omit Option 1 and Adopt Option 2 with following amendment: In case of multiple Service Lines or Service Packages (a) Total price of each Service Line or Package [insert the total price of each in words and figures, indicating the various amounts and the respective currencies]; and (b) Total price of all Service Lines and Packages [insert the total price in words and figures, indicating the various amounts and the respective currencies]; (e) SECTION IV- TENDERING FORMS - Notification of Intention to Award Omit the whole of Item 1. And insert the following: 3. The successful Tenderers No. Description and No. of Service Line or Package [insert name of successful Tenderer] [insert Address successful Tenderer] of Tender price Evaluated Tender price (if applicable) Page 27 of 38

28 Other Tenderers [INSTRUCTIONS: insert names of all Tenderers that submitted a Tender. If the Tender s price was evaluated include the evaluated price as well as the Tender price as read out.] No Description and No. of Service Line or Package [insert name of Tenderer] [insert Address of Tenderer] Tender price Evaluated Tender price (f) SECTION IV- TENDERING FORMS - Notification of Award - Letter of Acceptance. (v) Amend first Paragraph omit the for the Accepted Contract Amount [amount in numbers and words] [name of currency], as corrected and modified in accordance with the Instructions to Tenderers, is hereby accepted by (name of Procuring Entity). And insert the following words and a completed Table: for the Accepted Contract Amounts [amount in numbers and words] [name of currency], as corrected and modified in accordance with the Instructions to Tenderers, are hereby accepted by (name of Procuring Entity). for each Service Line or Package listed on the Table below. No Description and No. of Service Line or Package [insert accepted Tender Price] [insert completion period] Page 28 of 38

29 (ii) Omit the whole of para reading You are. Tender Document and Insert the words You are requested to arrange to sign the Framework Agreement within 28 days in accordance with the Conditions of Contract. On being instructed to commence the contract on any of the packages you have won, by a call-off notification, you will be requested to furnish for the particular Service Line or Package a Performance Security within 28 days in accordance with the Conditions of Contract, and for that purpose, using one of the Performance Security Forms included in Section VIII, Contract Forms, of the Tender Document. 3. CONDITIONS OF CONTRACT Insert as Appendix E to the Conditions of Contract, both Time-based and Lumpsum. 1. Appendix E - Framework Agreement 1.1 The Parties shall enter into this contract as a Framework Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless the Particular Conditions establish otherwise. The Framework Agreement shall be based upon FORM No. 3 FRAMEWORK AGREEMENT annexed to the Particular Conditions. The costs of stamp duties and similar charges (if any) imposed by law in connection with entry into the Framework Agreement shall be borne by the Procuring Entity. 1.2 The Framework Agreement establishes the terms and conditions that will govern the contract awarded during the term of the Framework Agreement. The Framework Agreement establishes for the procurement works by package as and when required, over the specified period of time. The Framework Agreement does not commit a Procuring Entity to procure, nor a Firm to supply. The Framework Agreement allows the Procuring Entity to call the Contractor to commence the works on a particular package in a specified location within the duration of the agreement This Framework Agreement does not guarantee the contractor of being called for a contract to start and no commitment is made with regard to possible number of packages to carried out This Framework Agreement does exclude the Procuring Entity from the right to procure the same Works from other firms This Framework Agreement does not stop the Procuring Entity from removing the contractor from the same Agreement The Procuring Entity may with the Consent of the Contractor extend this Agreement for a further two (2) years, if the initial engagement has been satisfactory. Page 29 of 38

30 1.16 Call-off Contracts; for work on a package to start, the Procuring Entity shall issue a notice of acceptance of a particular package requesting the contractor to furnish a Performance Security and to start the works thereafter, and providing the contractor with details of location where the works, are to be carried out. The call-off statement shall specify the objectives, tasks, deliverables, timeframes and price or price mechanism. The price for individual call-off contracts shall be based on the prices detailed in the Framework Agreement If the contractor fails to provide a performance security and commence the works as instructed, the Procuring Entity may declare the Tenderer ineligible to be awarded a contract by the Procuring Entity for a period of time as stated in the TDS. Names of all Service Lines and Packages awarded to the Tenderer. Description and No of Service Line or Package Name of Tenderer Address of the Tenderer Awarded Tender price Page 30 of 38

31 DOC NO STANDARD TENDER DOCUMENT FOR PROCUREMENT OF SPECIALIZED GOODS TEXT BOOKS AND READING MATERIALS 1. INVITATION TO TENDER, Paragraph 2, Add: Tenders will be awarded on basis of Framework Agreement. 2. SECTION I - INSTRUCTIONS TO TENDERERS (a) Substitute the word Contract Agreement with Framework Agreement. (b) ITT 34.1; Insert as a second sentence the words The evaluation and award of contracts will be based on Packages. (c) Section III - Evaluation and Qualification Criteria Omit Para 4. and insert the following 4. Multiple Contracts (ITT 34.4) Tenders are invited for individual lots, the contract will be awarded to the tenderer offering a substantially responsive Tender(s) and the lowest evaluated cost for individual lots, subject to the selected tenderer(s) meeting the required qualification criteria (this Section III, Sub-Section ITT 36 Qualification Requirements) for each lot. In determining tenderer that offer the lowest evaluated cost to the Procuring Entity for each lot, the Procuring Entity shall apply the following steps in sequence: (f) (g) (h) (i) evaluate individual lots to determine the substantially responsive Tenders and corresponding evaluated costs; for each lot, rank the substantially responsive Tenders starting from the lowest evaluated cost for the lot; apply to the evaluated costs listed in (b) above, any applicable discounts/price reductions offered by a tenderer (s) for the award of each Lot based on the discounts and the methodology for their application offered by the respective Tenderer; and determine contract award on the basis of the lots that offer the tender offers each of which has the lowest evaluated cost to the Procuring Entity. (d) SCHEDULES of Requirement, Table of Price Schedule, change on Column 1 the words Line Item N to Lot N.. (e) FORM OF TENDER Omit whole Item (e) Tender Price and substitute with Page 31 of 38

32 (f) The total price of our Tender, excluding any discounts offered in item (f) below is as per listed Lots (list each lot with its price and then the total of all tendered for lots) [insert the prices of the Tender in words and figures, indicating the various amounts for lots and the respective currencies]; 3. CONDITIONS OF CONTRACT (a) Insert as Clause the following Framework Agreement The Parties shall enter into a Framework Agreement within 28 days after the Contractor receives the Letter of Acceptance, unless the Particular Conditions establish otherwise. The Framework Agreement shall be based upon FORM No. 3 FRAMEWORK AGREEMENT annexed to the Particular Conditions. The costs of stamp duties and similar charges (if any) imposed by law in connection with entry into the Framework Agreement shall be borne by the Procuring Entity The Framework Agreement establishes the terms and conditions that will govern the contract awarded during the term of the Framework Agreement. The Framework Agreement establishes for the procurement works by package as and when required, over the specified period of time. The Framework Agreement does not commit a Procuring Entity to procure, nor a Firm to supply. The Framework Agreement allows the Procuring Entity to call the Contractor to commence the works on a particular package in a specified location within the duration of the agreement This Framework Agreement does not guarantee the contractor of being called for a contract to start and no commitment is made with regard to possible number of packages to carried out This Framework Agreement does exclude the Procuring Entity from the right to procure the same Works from other firms This Framework Agreement does not stop the Procuring Entity from removing the contractor from the same Agreement The Procuring Entity may with the Consent of the Contractor extend this Agreement for a further two (2) years, if the initial engagement has been satisfactory Call-off Contracts; for work on a package to start, the Procuring Entity shall issue a notice of acceptance of a particular package requesting the contractor to furnish a Performance Security and to start the works thereafter, and providing the contractor with details of location where the works, are to be carried out. The call-off statement shall specify the objectives, tasks, deliverables, timeframes and price or price mechanism. The price for individual call-off contracts shall be based on the prices detailed in the Framework Agreement. Page 32 of 38

STANDARD TENDER DOCUMENTS FOR PROCUREMENT OF WORKS (MINOR CONTRACTS)

STANDARD TENDER DOCUMENTS FOR PROCUREMENT OF WORKS (MINOR CONTRACTS) STANDARD TENDER DOCUMENTS FOR PROCUREMENT OF WORKS (MINOR CONTRACTS) National Competitive Tendering (NCT) VOLUME I Tender Reference:. Issue Date: Day/Month/Year Public Procurement Authority Accra, Ghana

More information

THE KENYATTA INTERNATIONAL CONVENTION CENTRE PO BOX NAIROBI BILLS OF QUANTITIES

THE KENYATTA INTERNATIONAL CONVENTION CENTRE PO BOX NAIROBI BILLS OF QUANTITIES THE KENYATTA INTERNATIONAL CONVENTION CENTRE PO BOX 30746 00100 NAIROBI BILLS OF QUANTITIES FOR PROPOSED REFUBISHMENT OF COURTYARD AND DRIVEWAY (PHASE 1) TENDER NO. KICC/27/2017-2018 1 TABLE OF CONTENTS

More information

STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS

STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS PLANT STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS PROCUREMENT OF PLANT DESIGN, SUPPLY AND INSTALLATION Japan International Cooperation Agency (JICA) February 2013 Version 1.1 i Preface These Standard

More information

SAMPLE REQUEST FOR PROPOSALS UNDER JAPANESE ODA LOANS

SAMPLE REQUEST FOR PROPOSALS UNDER JAPANESE ODA LOANS CONSULTANTS SAMPLE REQUEST FOR PROPOSALS UNDER JAPANESE ODA LOANS SELECTION OF CONSULTANTS Japan International Cooperation Agency (JICA) September 2009 version 1.0 CONTENTS Preface... i Section 1. Letter

More information

NAIROBI CITY COUNTY PROPOSED CONSTRUCTION OF MULTI PURPOSE HALL AT MADARAKA NAIROBI WEST WARD

NAIROBI CITY COUNTY PROPOSED CONSTRUCTION OF MULTI PURPOSE HALL AT MADARAKA NAIROBI WEST WARD NAIROBI CITY COUNTY Telephone: 020 344194 web: www.nairobi.go.ke City Hall, P. O. Box 30075-00100, Nairobi, KENYA. TENDER NO.NCC /WDF/SS/T/113/2016/2017 PROPOSED CONSTRUCTION OF MULTI PURPOSE HALL AT MADARAKA

More information

Standard Request for Proposals Selection of Consultants

Standard Request for Proposals Selection of Consultants STANDARD PROCUREMENT DOCUMENTS Standard Request for Proposals Selection of Consultants Caribbean Development Bank October 2011 Foreword 1. This Standard Request for Proposals ( SRFP ) has been prepared

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3909 YF Public Disclosure Authorized Development Credit Agreement (Transport Rehabilitation Project) Public Disclosure Authorized between SERBIA

More information

Procurement of Health Sector Goods

Procurement of Health Sector Goods STANDARD TENDER DOCUMENTS Procurement of Health Sector Goods (Pharmaceuticals, Vaccines, and Condoms) Public Procurement Board Accra, Ghana March 2004 INTRODUCTION AND INSTRUCTIONS These Standard Tender

More information

Standard Tender Documents Procurement of Works. User Guide

Standard Tender Documents Procurement of Works. User Guide Standard Tender Documents Procurement of Works User Guide November 2017 Standard Tender Document: Procurement of Works - User Guide Standard Tender Documents Procurement of Works User Guide TABLE OF CONTENTS

More information

ANNEX VIII a STANDARD FORMATS AND TEMPLATES

ANNEX VIII a STANDARD FORMATS AND TEMPLATES ANNEX VIII a STANDARD FORMATS AND TEMPLATES STANDARD BID EVALUATION FORMAT FOR THE PROCUREMENT OF GOODS 1 Preface 1. This standard tender evaluation format for the procurement of Goods has been prepared

More information

ANNEX VIII b STANDARD FORMATS AND TEMPLATES

ANNEX VIII b STANDARD FORMATS AND TEMPLATES ANNEX VIII b STANDARD FORMATS AND TEMPLATES STANDARD BID EVALUATION FORMAT FOR THE PROCUREMENT OF CIVIL WORKS 1 Preface 1. This standard tender evaluation format for the procurement of Civil Works has

More information

REPUBLIC OF KENYA MINISTRY OF LAND AND PHYSICAL PLANNING PROPOSED ERECTION AND COMPLETION OF LAND REGISTRY AT BOMET, BOMET COUNTY

REPUBLIC OF KENYA MINISTRY OF LAND AND PHYSICAL PLANNING PROPOSED ERECTION AND COMPLETION OF LAND REGISTRY AT BOMET, BOMET COUNTY REPUBLIC OF KENYA MINISTRY OF LAND AND PHYSICAL PLANNING PROPOSED ERECTION AND COMPLETION OF LAND REGISTRY AT BOMET, BOMET COUNTY TENDER DOCUMENTS (Main Works) W.P ITEM NO. D111/RV/BOT/1501 JOB NO.10053A

More information

WEST BENGAL MAJOR IRRIGATION & FLOOD

WEST BENGAL MAJOR IRRIGATION & FLOOD PROCUREMENT PLAN WEST BENGAL MAJOR IRRIGATION & FLOOD MANAGEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IRRIGATION &

More information

General Assembly. United Nations A/CN.9/WG.I/XIII/CRP.2

General Assembly. United Nations A/CN.9/WG.I/XIII/CRP.2 United Nations A/CN.9/WG.I/XIII/CRP.2 General Assembly Distr.: Limited 25 February 2008 Original: English United Nations Commission on International Trade Law Working Group I (Procurement) Thirteenth session

More information

SPECIAL CONDITIONS OF TENDER

SPECIAL CONDITIONS OF TENDER Page 1 SPECIAL CONDITIONS OF TENDER A. INTRODUCTION The following documents are available on http://emits.esa.int/ under "Reference Documentation" --> "Administrative Documents": ESA Procurement Regulations

More information

REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING AND URBAN DEVELOPMENT

REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING AND URBAN DEVELOPMENT REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING AND URBAN DEVELOPMENT STATE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PROPOSED CIVIL SERVANTS HOUSING SCHEME AT EMBU TOWN, EMBU COUNTY

More information

WEST BENGAL MAJOR IRRIGATION & FLOOD

WEST BENGAL MAJOR IRRIGATION & FLOOD PROCUREMENT PLAN WEST BENGAL MAJOR IRRIGATION & FLOOD MANAGEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IRRIGATION &

More information

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD-023-2017 TENDER FOR DESIGN, MANUFACTURE, FACTORY TRAINING AND TESTING, DELIVERY, SUPERVISION OF ASSEMBLY, INSTALLATION, TESTING AND COMMISSIONING OF

More information

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4745 - CHA Public Disclosure Authorized Project Agreement Public Disclosure Authorized (Hubei Shiman Highway Project) between INTERNATIONAL BANK

More information

Procurement Approval Form (Refer to OpsPedia for forms appropriate to requested action)

Procurement Approval Form (Refer to OpsPedia for forms appropriate to requested action) Procurement Approval Form (Refer to OpsPedia for forms appropriate to requested action) Request for -Objection on Bid Evaluation Report {Give a brief statement of the matter requiring Procurement Committee

More information

ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5

ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5 Appendix 4 to ESA ITT AO/1-8266/15/NL/MP Page 1/15 ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5 [COVER LETTER] From:... (Tenderer to insert name of the company/institute

More information

REPUBLIC OF KENYA LAKE VICTORIA SOUTH WATER SERVICES BOARD LAKE VICTORIA WATER SUPPLY AND SANITATION PROGRAM PHASE TWO (LVWATSAN II)

REPUBLIC OF KENYA LAKE VICTORIA SOUTH WATER SERVICES BOARD LAKE VICTORIA WATER SUPPLY AND SANITATION PROGRAM PHASE TWO (LVWATSAN II) REPUBLIC OF KENYA LAKE VICTORIA SOUTH WATER SERVICES BOARD LAKE VICTORIA WATER SUPPLY AND SANITATION PROGRAM PHASE TWO (LVWATSAN II) Tender for Supply and Delivery of 7 No. Tractors Through National Competitive

More information

ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5

ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5 Page 1 ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5 [COVER LETTER] From:... (Tenderer to insert name of the company/institute submitting the tender) Date:...

More information

GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL. SELECTION OF CONSULTANTS- Individual

GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL. SELECTION OF CONSULTANTS- Individual GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS- Individual Introduction This Standard Procurement Documentation has been prepared by the NPTA for use by the Procuring Entities

More information

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4705-CHA Public Disclosure Authorized Public Disclosure Authorized Project Agreement (Shanghai Urban Environment Project) between INTERNATIONAL BANK

More information

Mini-bid Guidelines For Certain Service & Technology Contracts Established by the State of New York Office of General Services

Mini-bid Guidelines For Certain Service & Technology Contracts Established by the State of New York Office of General Services Mini-bid Guidelines For Certain Service & Technology Contracts Established by the State of New York Office of General Services Issued: May 2001 Updated: August 2009 Purpose: This document provides general

More information

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD-06-2017 TENDER FOR ASBESTOS REMOVAL AND ROOFING OF MATENDENI STAFF HOUSES & 7- FORKS PRIMARY. (EXCLUSIVE TO FIRMS OWNED BY THE WOMEN ). Kenya Electricity

More information

PROPOSED REHABILITATION AND CONSTRUCTION OF RUIRU STADIUM - KIAMBU

PROPOSED REHABILITATION AND CONSTRUCTION OF RUIRU STADIUM - KIAMBU COUNTY GOVERNMENT OF KIAMBU DIRECTORATE OF PUBLIC WORKS PROPOSED REHABILITATION AND CONSTRUCTION OF RUIRU STADIUM - KIAMBU AT TENDER NO. KCG/YASC/STADIUM/001/2015/2016 TENDER DOCUMENTS ISSUED BY: PREPARED/CHECKED

More information

PROPOSED REHABILITATION AND CONSTRUCTION OF RUIRU STADIUM - KIAMBU

PROPOSED REHABILITATION AND CONSTRUCTION OF RUIRU STADIUM - KIAMBU COUNTY GOVERNMENT OF KIAMBU DIRECTORATE OF PUBLIC WORKS PROPOSED REHABILITATION AND CONSTRUCTION OF RUIRU STADIUM - KIAMBU AT TENDER NO. KCG/YASC/STADIUM/005/2015/2016 TENDER DOCUMENTS ISSUED BY: PREPARED/CHECKED

More information

4. A bid Security of US $1, must be submitted along with the bid.

4. A bid Security of US $1, must be submitted along with the bid. i Invitation for Bids (IFB) Cooperative Republic of Guyana Tender Specification Number GPL - PI - 018-2014 Engineering, Procurement and Construction of a water treatment system at Vreed-en-Hoop 1. The

More information

LEGAL ADVERTISEMENT CITY OF WINTER GARDEN REQUEST FOR QUALIFICATIONS (RFQ) RFQ #EN DESIGN CRITERIA PROFESSIONAL SERVICES

LEGAL ADVERTISEMENT CITY OF WINTER GARDEN REQUEST FOR QUALIFICATIONS (RFQ) RFQ #EN DESIGN CRITERIA PROFESSIONAL SERVICES LEGAL ADVERTISEMENT CITY OF WINTER GARDEN REQUEST FOR QUALIFICATIONS (RFQ) RFQ #EN13-004 DESIGN CRITERIA PROFESSIONAL SERVICES REQUEST FOR QUALIFICATIONS (RFQ) NO. EN13-004 FOR A DESIGN CRITERIA PROFESSIONAL

More information

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7882-CN Public Disclosure Authorized Loan Agreement (Shandong Ecological Afforestation Project) Public Disclosure Authorized between PEOPLE S REPUBLIC

More information

ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE

ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE ENVIRONMENTAL ASSESSMENT OFFICE ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE Version # Date (yyyy-mm-dd) Modifications 1 2016-12-01 N/A 2 2017-01-18 IEM condition and plan development conditions

More information

Standard Bidding Documents. Procurement of Goods. The World Bank

Standard Bidding Documents. Procurement of Goods. The World Bank Standard Bidding Documents Procurement of Goods The World Bank January 1995 Revised March 2000, January 2001, March 2002, and March 2003 This revised March 2000 edition of the SBD accounts for editorial

More information

Administrative Policy for Procurement, Bidding, Bid Specifications, Consulting, Request For Qualifications (RFQ), and Evaluation Criteria

Administrative Policy for Procurement, Bidding, Bid Specifications, Consulting, Request For Qualifications (RFQ), and Evaluation Criteria CITY OF LARAMIE Policy Title: Administrative Policy for Procurement, Bidding, Bid Specifications, Consulting, Request For Qualifications (RFQ), and Evaluation Criteria Policy Number: 2014-01 Page 1 of

More information

for Job Order Contract Washington State University

for Job Order Contract Washington State University for Job Order Contract Issued 1/12/2018 For Washington State University By Facilities Services, Capital Statement of Qualifications Deadline: February 15th, 2018, 3:00 pm Issued 1/12/2018 Page 1 of 11

More information

Contract HSE Management/Part I

Contract HSE Management/Part I Contract HSE Management/Part I HEALTH, SAFETY AND ENVIRONMENT PROCEDURE Contract HSE Management/Part I DOCUMENT ID - PR-10-POGC-001 REVISION - 1.0 Pages 9 Revision 1.0 Contract HSE Management/Part II Document

More information

Project Agreement. Public Disclosure Authorized CREDIT NUMBER 1482 UV. Public Disclosure Authorized

Project Agreement. Public Disclosure Authorized CREDIT NUMBER 1482 UV. Public Disclosure Authorized Public Disclosure Authorized CREDIT NUMBER 1482 UV Public Disclosure Authorized Public Disclosure Authorized Project Agreement (Perkoa Mining Exploration and Technical Assistance Project) between INTERNATIONAL

More information

Master Bidding Documents Procurement of Goods and User s Guide

Master Bidding Documents Procurement of Goods and User s Guide Master Bidding Documents Procurement of Goods and User s Guide This Master Bidding Document for Procurement of Goods and User s Guide have been prepared through the joint efforts of the Multilateral Development

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE COMISSAO NACIONAL DE APROVISIONAMENTO Rua dos Direitos Humanos, Dili, Timor Leste REQUEST FOR PROPOSALS CONSULTING SERVICES FOR CONSTRUCTION SUPERVISION FOR THE UPGRADING

More information

SUPPLY of LED POWER LIGHTS WITH STAND FOR THE GOVERNMENT FILM UNIT

SUPPLY of LED POWER LIGHTS WITH STAND FOR THE GOVERNMENT FILM UNIT SUPPLY of LED POWER LIGHTS WITH STAND FOR THE GOVERNMENT FILM UNIT BIDDING DOCUMENT DEPARTMENT OF GOVERNMENT INFORMATION BID No: DI/PRO/04/19/2016/TEC 05 Bids will be closed at 1100 hours on.01.08.2018

More information

Request for Qualifications RFQ # Continuing Services Contracts for Professional Engineering Services

Request for Qualifications RFQ # Continuing Services Contracts for Professional Engineering Services Request for Qualifications RFQ #13-001 Continuing Services Contracts for Professional Engineering Services City of Winter Garden 300 West Plant Street Winter Garden, FL 34787 (407) 656-4111 LEGAL ADVERTISEMENT

More information

RULES APPLICABLE TO PROSPECTIVE CONTRACTORS

RULES APPLICABLE TO PROSPECTIVE CONTRACTORS RULES APPLICABLE TO PROSPECTIVE CONTRACTORS SUMMARY: THIS DOCUMENT CONTAINS ARMSCOR S RULES APPLICABLE TO PROSPECTIVE CONTRACTORS. DATE OF APPROVAL OF THIS ISSUE: 21 APRIL 2014 ISSUE: 002 Page 1 of 13

More information

Envelop Year Employer Description of Works Amount Contractor s Responsibility (%) Total

Envelop Year Employer Description of Works Amount Contractor s Responsibility (%) Total Envelop - 01 Envelop - 01 (i) (ii) (iii) Schedule A4 Construction Experience in last five years (enclose this schedule in envelope marked, Envelope 1 General Information) If pre-qualification is done the

More information

SERVERS & COPIERS,DESKTOP COMPUTERS & PRINTERS, LAPTOPS & COMPUTER ACCESSORIES, OFFICE EQUIPMENT, ENGINEERING EQUIPMENT & SOFTWARE.

SERVERS & COPIERS,DESKTOP COMPUTERS & PRINTERS, LAPTOPS & COMPUTER ACCESSORIES, OFFICE EQUIPMENT, ENGINEERING EQUIPMENT & SOFTWARE. i REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING & URBAN DEVELOPMENT PRINCIPAL SECRETARY STATE DEPARTMENT OF INFRASTRUCTURE (WORKS HOUSE) P.O.BOX 30260-00100 NAIROBI, KENYA CREDIT NO:

More information

OKEECHOBEE COUNTY PROCUREMENT POLICY

OKEECHOBEE COUNTY PROCUREMENT POLICY OKEECHOBEE COUNTY PROCUREMENT POLICY I. SCOPE Purchasing authority is vested in the Office of the County Administrator, subject to limitations prescribed herein. This policy applies to expenditure(s) of

More information

UNICEF MOLDOVA United Nations Children s Fund Telephone Date: 15 November UNICEF Moldova. Potential Supplier.

UNICEF MOLDOVA United Nations Children s Fund Telephone Date: 15 November UNICEF Moldova. Potential Supplier. UNICEF MOLDOVA United Nations Children s Fund Telephone 373 22 22 00 45 131, 31 August 1989 Str., Facsimile 373 22 22 02 44 UN House, Chisinau chisinau@unicef.org Republic of Moldova www.unicef.md Date:

More information

Guidelines for the Employment of Consultants. under Japanese ODA Loans

Guidelines for the Employment of Consultants. under Japanese ODA Loans Guidelines for the Employment of Consultants under Japanese ODA Loans March 2009 1 TABLE OF CONTENTS Part I Page PART I GENERAL... 1 Section 1.01. Introduction...1 Section 1.02 Need for Employment of a

More information

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7277-PAK Public Disclosure Authorized Project Agreement (Taunsa Barrage Emergency Rehabilitation and Modernization Project) Public Disclosure Authorized

More information

Request for Qualifications RFQ Continuing Services Contracts for Professional Engineering Services

Request for Qualifications RFQ Continuing Services Contracts for Professional Engineering Services Request for Qualifications RFQ 19-001 Continuing Services Contracts for Professional Engineering Services City of Winter Garden 300 West Plant Street Winter Garden, FL 34787 (407) 656-4111 LEGAL ADVERTISEMENT

More information

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD-024-2017 TENDER DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TEST AND COMMISSIONING OF DELUGE FIRE PROTECTION SYSTEMS FOR GENERATOR TRANSFORMERS AND STATION

More information

REQUEST FOR PROPOSALS FINANCIAL STATEMENT AUDIT SERVICES. Cumberland Mountain Community Services Board RFP#: AUDIT Issue Date April 23, 2018

REQUEST FOR PROPOSALS FINANCIAL STATEMENT AUDIT SERVICES. Cumberland Mountain Community Services Board RFP#: AUDIT Issue Date April 23, 2018 REQUEST FOR PROPOSALS FINANCIAL STATEMENT AUDIT SERVICES Cumberland Mountain Community Services Board RFP#: AUDIT2018-2020 Issue Date April 23, 2018 Cumberland Mountain Community Services requests qualified

More information

STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS

STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS GOODS STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS PROCUREMENT OF GOODS Japan International Cooperation Agency (JICA) May 2013 Version 1.1 i Preface These Standard Bidding Documents for Procurement

More information

BIDDING DOCUMENT TEHSIL HEADQUARTER HOSPITAL DASKA FOR THE YEAR PRIMARY AND SECONDARY HEALTH CARE DEPARTMENT GOVERNMENT OF THE PUNJAB.

BIDDING DOCUMENT TEHSIL HEADQUARTER HOSPITAL DASKA FOR THE YEAR PRIMARY AND SECONDARY HEALTH CARE DEPARTMENT GOVERNMENT OF THE PUNJAB. BIDDING DOCUMENT FOR THE PURCHASE OF SURGICAL DISPOSABLE ITEMS & PATHOLOGY LAB ITEMS. TO BE PROCURED FOR TEHSIL HEADQUARTER HOSPITAL DASKA FOR THE YEAR 2017-18. PRIMARY AND SECONDARY HEALTH CARE DEPARTMENT

More information

Framework agreements. Framework agreement. Figure 1: Call-offs over the term of a framework contract. Package / batch /

Framework agreements. Framework agreement. Figure 1: Call-offs over the term of a framework contract. Package / batch / Framework agreements The Standard for Infrastructure Procurement and Delivery Management includes provisions for framework agreements. Framework agreements have similarities with term service and transversal

More information

Issued in 28 th March, 2018

Issued in 28 th March, 2018 i REPUBLIC OF KENYA THE PRESIDENCY EXECUTIVE OFFICE OF THE PRESIDENT DEPARTMENT OF DEVELOPMENT OF ARID AND SEMI-ARID REGIONS (DASAR) KENYA DEVELOPMENT RESPONSE TO DISPLACEMENT IMPACTS PROJECT (KDRDIP)

More information

Procurements by states General procurement standards.

Procurements by states General procurement standards. e-cfr data is current as of June 2, 2017 200.317 Procurements by states. When procuring property and services under a Federal award, a state must follow the same policies and procedures it uses for procurements

More information

COUNTY GOVERNMENT OF NYERI BILLS OF QUANTITIES

COUNTY GOVERNMENT OF NYERI BILLS OF QUANTITIES COUNTY GOVERNMENT OF NYERI DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT PROPOSED CONSTRUCTION OF GUMBA GICHAGI FOOTBRIDGE IN RUGI WARD CGN/INF/62/16-17 BILLS OF QUANTITIES ISSUED BY: COUNTY WORKS OFFICER COUNTY

More information

The vendor will provide at least one day of training at each location.

The vendor will provide at least one day of training at each location. SPECIFICATIONS The bid must include the price on a flat cost-per-copy basis. The cost to the school/district will be determined by multiplying the number of copies made by the quoted cost per copy. Copy

More information

Request for Qualifications RFQ # Continuing Services Contracts for Professional Surveying Services

Request for Qualifications RFQ # Continuing Services Contracts for Professional Surveying Services Request for Qualifications RFQ #18-001 Continuing Services Contracts for Professional Surveying Services City of Winter Garden 300 West Plant Street Winter Garden, FL 34787 (407) 656-4111 LEGAL ADVERTISEMENT

More information

OKEECHOBEE COUNTY ROAD STRIPING AND MARKING SERVICES

OKEECHOBEE COUNTY ROAD STRIPING AND MARKING SERVICES OKEECHOBEE COUNTY ROAD STRIPING AND MARKING SERVICES RFP 2017-17 Due September 27, 2017 Room 123 304 NW 2 nd Street Okeechobee, FL 34972 1 INSTRUCTIONS TO BIDDERS In order to be considered responsive,

More information

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT OFFICIAL DMIUMTS LOAN NUMBER 8131-CN Loan Agreement (Zhanghu Railway Project) between PEOPLE'S REPUBLIC OF CHINA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated 8,2012 LOAN AGREEMENT AGREEMENT

More information

Subpart Indefinite-Delivery Contracts

Subpart Indefinite-Delivery Contracts Page 1 of 12 Subpart 16.5 -- Indefinite-Delivery Contracts 16.500 -- Scope of Subpart. (a) This subpart prescribes policies and procedures for making awards of indefinite-delivery contracts and establishes

More information

In accordance with 61 O.S. 108 and 115, a sworn statement shall accompany any competitive bid submitted for a public construction contract.

In accordance with 61 O.S. 108 and 115, a sworn statement shall accompany any competitive bid submitted for a public construction contract. State of Oklahoma Capital Assets Management Construction and Properties Bid Affidavits In accordance with 61 O.S. 108 and 115, a sworn statement shall accompany any competitive bid submitted for a public

More information

NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT PROJECT ID: CR KE SUPPLY, DELIVERY AND INSTALLATION OF FLEET MANAGEMENT SYSTEM

NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT PROJECT ID: CR KE SUPPLY, DELIVERY AND INSTALLATION OF FLEET MANAGEMENT SYSTEM Telephone: +254-0709932000 Email: procurement@ntsa.go.ke Website: www.ntsa.go.ke Hill Park Plaza 5 th Floor P.O. Box 3602-00506 Nairobi, Kenya NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT PROJECT ID: CR.5140

More information

KENYA SAFARI LODGES AND HOTELS LIMITED (KSLH) TENDER DOCUMENT FOR REFURBISHMENT WORK AT MOMBASA BEACH HOTEL TENDER NO. MBH/RW/001(A)/

KENYA SAFARI LODGES AND HOTELS LIMITED (KSLH) TENDER DOCUMENT FOR REFURBISHMENT WORK AT MOMBASA BEACH HOTEL TENDER NO. MBH/RW/001(A)/ MOMBASA Beach Hotel NGULIA Safari Lodge VOI Safari Lodge KENYA SAFARI LODGES AND HOTELS LIMITED (KSLH) TENDER DOCUMENT FOR REFURBISHMENT WORK AT MOMBASA BEACH HOTEL TENDER NO. MBH/RW/001(A)/2017-2018 KENYA

More information

Gozo Channel Company Limited The Brokerage, Level 2, St. Martha Street, Victoria, Gozo

Gozo Channel Company Limited The Brokerage, Level 2, St. Martha Street, Victoria, Gozo DEPT. REF: CONCESSION FOR THE PROVISION OF ADVERTISING SERVICES ON COMPANY PRE-PRINTED FERRY TICKETS Date Published: 7 November 2014 Closing Date: 5 December 2014 at 10:00am CET IMPORTANT: Free of Charge

More information

MASTER PROCUREMENT DOCUMENTS

MASTER PROCUREMENT DOCUMENTS MASTER PROCUREMENT DOCUMENTS Master Document for Procurement of Plant Design, Supply, and Installation This Master Document has been prepared through the joint efforts of the Multilateral Development Banks

More information

BANGLADESH RURAL ELECTRIFICATION BOARD (BREB) Package No.: DH-4-PDLS

BANGLADESH RURAL ELECTRIFICATION BOARD (BREB) Package No.: DH-4-PDLS ISO 9001:2008 Certified BANGLADESH RURAL ELECTRIFICATION BOARD (BREB) TENDER DOCUMENT FOR THE DESIGN, SUPPLY, INSTALLATION, DISMANTLING, TESTING & COMMISSIONING OF 33KV & BELOW LINES OF TEGHORIA TO DHOLESHARI

More information

WORLD TRADE ORGANIZATION

WORLD TRADE ORGANIZATION WORLD TRADE ORGANIZATION IP/C/41 6 December 2005 (05 5806) Council for Trade Related Aspects of Intellectual Property Rights IMPLEMENTATION OF PARAGRAPH 11 OF THE GENERAL COUNCIL DECISION OF 30 AUGUST

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS The Lorain County Board of Commissioners is seeking proposals from qualified interested parties to serve as CONSTRUCTION MANAGER for the review of bidding documents, contract

More information

Part 2 Employer s preliminary notice of Fair Payment requirements 3. Part 4 Suggested modifications to SBCC Main Contracts 5

Part 2 Employer s preliminary notice of Fair Payment requirements 3. Part 4 Suggested modifications to SBCC Main Contracts 5 Contents Part 1 Introduction Page 1 Part 2 Employer s preliminary notice of Fair Payment requirements 3 Part 3 Incorporation of modifications 4 Part 4 Suggested modifications to SBCC Main Contracts 5 Standard

More information

Quality Assurance Agreement (QAA)

Quality Assurance Agreement (QAA) Quality Assurance Agreement (QAA) between GAUDLITZ GmbH Callenberger Straße 42 96450 Coburg as well as all enterprises associated with GAUDLITZ GmbH - hereinafter called GAUDLITZ or Ordering Party - and

More information

Subsection Policies (policy #)

Subsection Policies (policy #) Section Finance CAPITAL REGIONAL DISTRICT LEGISLATIVE POLICY Subsection Policies (policy #) Title 1. POLICY PROCUREMENT POLICY AND PROCEDURES This policy will ensure that all goods, services and construction

More information

UNITED REPUBLIC OF CAMEROON

UNITED REPUBLIC OF CAMEROON Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1245 T-CM Public Disclosure Authorized Public Disclosure Authorized LOAN AGREEMENT (Third Education Project) between UNITED REPUBLIC OF CAMEROON

More information

EAST AFRICAN COMMUNITY CIVIL AVIATION SAFETY AND SECURITY OVERSIGHT AGENCY

EAST AFRICAN COMMUNITY CIVIL AVIATION SAFETY AND SECURITY OVERSIGHT AGENCY EAST AFRICAN COMMUNITY CIVIL AVIATION SAFETY AND SECURITY OVERSIGHT AGENCY REQUEST FOR PROPOSALS CONSULTANCY FOR THE DEVELOPMENT OF THE CASSOA RISK MANAGEMENT FRAMEWORK (CAS/SRVCS/001/2017-2018) The Civil

More information

Total Cost per Unit and Wall Mount including Installation Total Cost per Unit and Wall Mount not including Installation

Total Cost per Unit and Wall Mount including Installation Total Cost per Unit and Wall Mount not including Installation *** Invitation to Submit a Bid Proposal for Taylorsville Elementary School s LED Full HD Interactive Multi-Touch Flat Panel Display for 55 (Fifty-five) Units*** The Spencer County Board of Education is

More information

Bangladesh Power Development Board

Bangladesh Power Development Board Bangladesh Power Development Board Tender Document for Procurement of 33/11KV, 10/13.33 MVA Power Transformer (International) Open Tendering Method (As per CPTU STD PG-4) International Tender No. [insert

More information

b) Annex II: Proposal Submission Form, to be completed and returned with your proposal; and

b) Annex II: Proposal Submission Form, to be completed and returned with your proposal; and Dear Sir/Madam, Subject: Request for Proposals for [Provision of Cash Delivery Services] Project no. Multiple 1. The United Nations Office for Project Services (UNOPS) is seeking qualified offers for the

More information

Maricopa County Policy/Contract Template Reference. Procurement Standards (http://www.ecfr.gov/cgi-bin/text-idx?node=2: )

Maricopa County Policy/Contract Template Reference. Procurement Standards (http://www.ecfr.gov/cgi-bin/text-idx?node=2: ) 200.317 Procurements by states. When procuring property and services under a Federal award, a state must follow the same policies and procedures it uses for procurements from its non-federal funds. The

More information

New Jersey LFN Packet Check List

New Jersey LFN Packet Check List New Jersey LFN 2012-10 Packet Check List Contract Documents Screenshot Page from solicitation that indicates Lead Agency and issuance of solicitation on behalf of themselves, U.S. Communities and agencies

More information

Cycling South Africa. Invitation to Tender. For. Official Apparel and Team Kit Supplier

Cycling South Africa. Invitation to Tender. For. Official Apparel and Team Kit Supplier Cycling South Africa Invitation to Tender For Official Apparel and Team Kit Supplier Contents Glossary.[3] 1 INTRODUCTION AND BACKGROUND.. [4] 2 PURPOSE AND SCOPE OF THIS DOCUMENT....[4] 3 PROCUREMENT

More information

State Government Procurement

State Government Procurement The following excerpts from the Arizona Revised Statutes are laws ACEC of Arizona initiated and secured for our industry. For further details regarding laws in the State of Arizona, go to http://www.azleg.gov

More information

Lead Agency Procurement Self-Certification March 2017

Lead Agency Procurement Self-Certification March 2017 Lead Agency Procurement Self-Certification March 2017 Uniform Grant Guidance 200.324 200.317 Procurements By States When procuring property and services under a Federal award, a state must follow the same

More information

TABLE OF CONTENTS CHAPTER 1 PROCUREMENT THRESHOLDS AND PROCEDURES...

TABLE OF CONTENTS CHAPTER 1 PROCUREMENT THRESHOLDS AND PROCEDURES... TABLE OF CONTENTS CHAPTER 1 THRESHOLDS AND PROCEDURES... 2 SECTION 1.1 OVERVIEW... 2 SECTION 1.2 METHODS OF... 2 Subsection 1.2.a Micro-purchases... 2 Subsection 1.2.b Small Purchase Procedures... 3 Subsection

More information

PROCUREMENT IN WORLD BANK INVESTMENT PROJECT FINANCE BORROWER S PROCUREMENT PROCEDURES (DRAFT)

PROCUREMENT IN WORLD BANK INVESTMENT PROJECT FINANCE BORROWER S PROCUREMENT PROCEDURES (DRAFT) PROCUREMENT IN WORLD BANK INVESTMENT PROJECT FINANCE BORROWER S PROCUREMENT PROCEDURES (DRAFT) JULY 8, 2014 Draft Borrower s Procurement Procedures ACRONYMS BAFO BOO BOOT BOT CD CDD CPs CQS DC EOI FA IBRD

More information

Heads of Terms of the Design Agreement for the Moscow Kazan Section of the Moscow Kazan Ekaterinburg High-Speed Railway Line

Heads of Terms of the Design Agreement for the Moscow Kazan Section of the Moscow Kazan Ekaterinburg High-Speed Railway Line Heads of Terms of the Design Agreement for the Moscow Kazan Section of the Moscow Kazan Ekaterinburg High-Speed Railway Line October 2013 Moscow Key Information These heads of terms (the Heads of Terms)

More information

MINISTRY OF TRANSPORT, ROADS, PUBLIC WORKS & ENERGY

MINISTRY OF TRANSPORT, ROADS, PUBLIC WORKS & ENERGY COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF PUBLIC WORKS, ROADS, TRANSPORT, ENERGY. P.O. BOX PRIVATE BAG 50400 BUSIA, KENYA MINISTRY OF TRANSPORT, ROADS, PUBLIC WORKS & ENERGY PROPOSED Erection and Completion

More information

Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2

Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2 CA-01-04-2018 Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2 in scope of the LIFE project Baltic pilot cases on reduction

More information

Resources. Standard Bidding Documents: International Competitive Bidding Procurement of Goods (February 2000).

Resources. Standard Bidding Documents: International Competitive Bidding Procurement of Goods (February 2000). Resources We have walked through the main steps and predictable hurdles of World Bank procurement in a very general manner. For readers who would like additional information, we recommend the three-volume

More information

STD: Supply and Installation (05/07) STANDARD TENDER DOCUMENTS. Supply and Installation of Plant and Equipment

STD: Supply and Installation (05/07) STANDARD TENDER DOCUMENTS. Supply and Installation of Plant and Equipment STD: Supply and Installation (05/07) STANDARD TENDER DOCUMENTS Supply and Installation of Plant and Equipment May 2007 This edition includes a number of amendments as summarised in the following table.

More information

(e-procurement System)

(e-procurement System) B I D D I N G D O C U M E N T For Procurement of Design, Supply, Installation and commissioning of Transmission Substations and Lines - (AFD) Project (e-procurement System) IPC No: KP1/6A.1/PT/1/18/A69

More information

PART I PRELIMINARY 1. These Regulations may be cited as the Public Procurement and Disposal (Preference and Reservations) Regulations, 2011.

PART I PRELIMINARY 1. These Regulations may be cited as the Public Procurement and Disposal (Preference and Reservations) Regulations, 2011. Legal Notice No. 58 PUBLIC PROCUREMENT AND DISPOSAL ACT, 2005 (No. 3 of 2005) IN EXERCISE of the powers conferred by section 140 of the Public Procurement and Disposal Act, 2005, the Minister for Finance

More information

THE PROVISION OF CRACK SEAL MATERIAL 2017/2018 NOTICE TO BIDDERS. This entire Bid Package, which includes the following:

THE PROVISION OF CRACK SEAL MATERIAL 2017/2018 NOTICE TO BIDDERS. This entire Bid Package, which includes the following: THE PROVISION OF CRACK SEAL MATERIAL 2017/2018 NOTICE TO BIDDERS This entire Bid Package, which includes the following: Notice Inviting Bids, Bid Proposal Forms, and County of Inyo Standard Contract No.

More information

STANDARD BIDDING DOCUMENTS FOR LOW VALUE PURCHASE

STANDARD BIDDING DOCUMENTS FOR LOW VALUE PURCHASE Tel : 0832-2285381,2284678 & 679, Fax : 0832 2285649 STANDARD BIDDING DOCUMENTS FOR LOW VALUE PURCHASE Tender Enquiry No. 3(2)/Ani.Sci./AICRP-ADMAS/2016-17-Stores Dated: 12.01.2017 (Last Date for Submission

More information

Purchasing Policy. The Mayor & Council of Middletown 19 West Green Street Middletown, DE 19709

Purchasing Policy. The Mayor & Council of Middletown 19 West Green Street Middletown, DE 19709 Town of Middletown Policy Library: Policy 1.3.1 Volume I Financial Management: Chapter 3 Expenditure Management Responsible Executives: Mayor and Council of Middletown, Delaware Responsible Office: Purchasing

More information

, UN

, UN Date: 10 February 2017 From: To: UNICEF Moldova Potential Supplier Pages: 7 Subject: REQUEST FOR QUOTATION LRFQ-DSU-2017-9130093 Air conditioners for office use UNITED NATION CHILDREN S FUND (UNICEF) wishes

More information

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7928-MK Public Disclosure Authorized Public Disclosure Authorized Loan Agreement (Real Estate Cadastre and Registration Project Additional Financing)

More information

The following amendments have been made to the June 2005 edition deleted: and of notified early warning matters

The following amendments have been made to the June 2005 edition deleted: and of notified early warning matters AMENDMENTS JUNE 2006 The following amendments have been made to the June 2005 edition. Page Clause Line 10 32.1 4 deleted: and of notified early warning matters 17 70.4 2 otherwise inserted after stated

More information

Ministry of Physical Infrastructure and Transport BIDDING DOCUMENT. For. Construction of Railway Track Bed

Ministry of Physical Infrastructure and Transport BIDDING DOCUMENT. For. Construction of Railway Track Bed Government of Nepal Ministry of Physical Infrastructure and Transport Department of Railways Rail and Metro Development Project Battisputali, Kathmandu BIDDING DOCUMENT For Construction of Railway Track

More information