1 L O G I C A L F R A M E W O R K A P P R O A C H June 10 th, 2015 / Ankara, Turkey
2 ANALYSIS PHASE 1. Problem Analysis 2. Stakeholder Analysis 3. Objective Analysis 4. Strategy Analysis PLANNING PHASE 1. Log-frame Matrix 2. Activity Plan 3. Budget 2
3 The LOGFRAME MATRIX is a participatory Planning, Monitoring & Evaluation tool whose power depends on the degree to which it incorporates the full range of views of intended beneficiaries and others who have a stake in the program design. It is a tool for summarising the key features of a project and is best used to help project designers and stakeholders 3
4 LFA is a systematic planning procedure for a complete project cycle management It is a problem solving approach which takes into account the views of all stakeholders It also agrees on the criteria for project success and lists the major assumptions 4
5 Scope of project Objectively verifiable indicators Sources of verification Assumptions Goal Purpose Outputs Activities Tools/Resources Cost/Budget Presuppositions 5
6 GENERAL GOALS PURPOSE OF THE PROJECT OUTPUTS ACTIVITIES 6
7 ACTIVITIES Tasks to be implemented as part of the project to produce the results of your project Use of resources based on the defined budget and time. Production of the results that will allow you to reach the project objectives. 7
8 GENERAL GOALS PURPOSE OF THE PROJECT OUTPUTS ACTIVITIES 8
9 OUTPUTS The products of the activities Sub-targets need to be defined in a measurable and achievable manner in order to realise your objectives. 9
10 GENERAL GOALS PURPOSE OF THE PROJECT OUTPUTS ACTIVITIES 10
11 PURPOSE OF THE PROJECT The main purpose of your project in terms of providing sustainable benefits for the target group Realised/achieved at the end of your project. Purposes should be unique, measurable, attainable, realistic and defined depending on a specific time and place. 11
12 GENERAL GOALS PURPOSE OF THE PROJECT OUTPUTS ACTIVITIES 12
13 GENERAL GOALS The higher level objectives that your project is going to contribute Ideal realised in the long term 13
14 Assumptions Risks: all the negative effects and external factors which we refer to as important for the success of your project. Assumptions : positively expression of the external factors that influence or determine the success of your project Presuppositions: conditions that must be overcomed before activities start 14
15 Indicators of Success What is it? It is a tool that allow you to measure the operational objectives and performance of the project, monitor every stage of the project. give brief information about the quality, quantity, time and place of intervention. How Does It Benefit? Clarify overall objectives, the project purpose and the results of the characteristics. Allow you to manage projects more objective manner. Form a basis for performance measurement, monitoring and evaluation. 15
16 Sources of Verification Verification Resources are documents, reports, and other resources that will provide the necessary information for controlling the indicators Verification resources should also be specified simultaneously with the identification of indicators. Verification resources should provide the following information : Format for information to be provided (ex: progress reports, project accounts, project records, official statistics etc.) Who will provide information Which frequency the information will be provided (ex: monthly, quarterly, annually, etc.) 16
17 Intervention Logic -Scope of project Objectively verifiable indicators Sources of verification Assumptions Goal Purpose Outputs Activities Tools/Resources (optional) Cost/Budget (optional) 17
18 After the Coffee Break Workshop for Preliminary Project Proposals (6 discussion groups) Simple project fiche Project Budget Duration: 1:45 hours more info: pcm.comcec.org June 10 th, 2015 / Ankara, Turkey 18
Brief Introduction. To Completing the Logframe Matrix
Brief Introduction To Completing the Logframe Matrix Introduction Formulating a project plan and completing the logical framework matrix requires some understanding of the logical framework approach to
More informationPROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI
PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI Objectives of the training Understand the definition of project and
More informationProject Cycle Management and How To Write A Good Proposal. Eng. Suhail and Ayman Sultan Palestine Polytechnic University Ramallah April
Project Cycle Management and How To Write A Good Proposal Eng. Suhail and Ayman Sultan Palestine Polytechnic University Ramallah April 9 2006 Project Cycle Management Programming phase: Analyzing the situation
More informationBasic Introduction to Project Cycle. Management Using the. Logical Framework Approach
Basic Introduction to Project Cycle Management Using the Logical Framework Approach Developed and Presented by: Umhlaba Development Services Umhlaba Development Services Noswal Hall, Braamfontein, Johannesburg,
More informationNEPAD/Spanish Fund for African Women s empowerment
NEPAD/Spanish Fund for African Women s empowerment Project Proposal Format Annex 0 1 P age Proposal Format Proposal Cover Page: PROPOSAL TO THE NEPAD- SPANISH FUND FOR AFRICAN WOMEN s EMPOWERMENT Organization
More informationJKUAT RESEARCH GUIDELINES Format and Guidelines for Writing a Research Proposal ANNEX IV
36 JKUAT RESEARCH GUIDELINES Format and Guidelines for Writing a Research Proposal ANNEX IV 1.0 Cover Page The project document must bear the standard official cover page for JKUAToriginated research proposals.
More informationElements of the CYCLE OF OPERATIONS and Introduction to the Logical Framework approach
Elements of the CYCLE OF OPERATIONS and Introduction to the Logical Framework approach TAO training workshop "programminng and implementation of the 11th EDF for OCTs Unit DEVCO 06 Session A (9:45 11:15)
More informationPROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011
PROJECT PROPOSAL WRITING (A Tool for Resource Mobilization and Effective Attainment of Organization Objectives) OJI OGBUREKE, PhD November 2011 OBJECTIVES OF THE PRESENTATION By the end of the presentation,
More informationProject number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.
` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT
More informationJKUAT RESEARCH GUIDELINES. Format and Guidelines for Writing a Research Proposal ANNEX IV
JKUAT RESEARCH GUIDELINES Format and Guidelines for Writing a Research Proposal ANNEX IV 1.0 Cover Page The project document must bear the standard official cover page for JKUAT-originated research proposals.
More informationStandard Summary Project Fiche IPA centralised programmes Project Fiche: 18
Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 1. Basic information 1.1. CRIS Number: 2010/022-154 1.2. Title: Technical Assistance and Project Preparation Facility (TA&PPF)
More informationPROGRAMME MANUAL. Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC
PROGRAMME MANUAL Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC 2014-2020 Published by the Managing Authority Publication date 30 January
More informationPROGRAMME MANUAL. Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC
PROGRAMME MANUAL Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC 2014-2020 HOW TO USE THIS MANUAL This Programme Manual is designed
More informationDevelopment Cooperation Development Education Partnership Fair. Writing a successful co financing application
Development Cooperation Development Education Partnership Fair Writing a successful co financing application 3 sessions to guide project preparation Session 1: Deciding on stakeholders and defining problems/issues.
More informationProject Fiche IPA National programmes IPA 2012/Component I
Project Fiche IPA National programmes IPA 2012/Component I 1 IDENTIFICATION Project Title Strengthening the capacity of the Central Financing and Contracting Unit (CFCU) for efficient implementation of
More informationProject management guidelines. November 2013
p r o j e c t m a n a g e m e n t g u i d e l i n e s N O V E M B E R 2 0 1 3 T e l e c o m m u n i c a t i o n D e v e l o p m e n t S e c t o r Project management guidelines November 2013 Please consider
More information1.2 Title: Project Preparation and Support Facility (PPF)
FINAL VERSION 1. Basic information 1.1 CRIS Number: 2009/021-665 1.2 Title: Project Preparation and Support Facility (PPF) 1.3 ELARG Statistical code: 4.40 1.4 Location: Skopje Implementing arrangements:
More informationCross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support
Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme 2003 2006 2005 Project Fiche for Programme Support 1. Basic Information 1.1 CRIS Number: BG 2005/017-455.01;04 1.2 1.2 Title:
More informationE-Training on GDP Rebasing
1 E-Training on GDP Rebasing October, 2018 Session 3: Rebasing national accounts (Part I) Economic Statistics and National Accounts Section ACS, ECA Content of the presentation Rebasing national accounts
More informationModule 4. College of Development Communication
Module 4 Follows a systematic process that involves: Determining the needs and problems, Planning Implementing Evaluating It entails ensuring that the resources needed for all project activities are available
More informationGood Practice when Preparing a Project Proposal. 15 February 2005
Good Practice when Preparing a Project Proposal II 15 February 2005 Before applying Familiarise yourself with the programmes Web site, FAQs, past projects Review open Call for Proposals and associated
More informationUTILIZING COMCEC PROJECTFUNDING
UTILIZING COMCEC PROJECTFUNDING Deniz Göle Program Manager October 31 st, 2017 INSTRUMENTS OF THE COMCEC STRATEGY Working Groups Regular meetings (twice a year) Research Reports Policy Recommendations
More information[Project Title] Project Scope Statement
[Project Title] Project Scope Statement Prepared by: Version: Date: Project Sponsor: Project Manager: Senior Manager: Approval Signatures Project Sponsor Project Manager Senior Manager/s Other Stakeholder
More informationCompare the Earned Value Management with the Project Cycling Managememt
Compare the Earned Value Management with the Project Cycling Managememt Kornélia Gönczi West Hungarian University Faculty of Economics, Sopron Erzsébet utca 9, gonczi.kornelia@telekom.hu Abstract: Nowadays
More informationPresentation of the course: EU project design process and implementation of environmental policy
Presentation of the course: EU project design process and implementation of environmental policy Tirana - Shqiperi - Albania 15-17 April 2014 Context The ENV.net is a network of seven organisations from
More information1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary
Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity
More informationModernization of WBC universities through strengthening of structures and services for knowledge transfer, research and innovation
Internal Monitoring Report Project Acronym: WBCInno strengthening of Project full title: structures and services for knowledge transfer, research and innovation Project No: 530213-TEMPUS-1-2012-1-RS-TEMPUS-JPHES
More informationProject Cycle Management (PCM) Guidebook
Project Cycle Management (PCM) Guidebook New Revised Version 2017 PCM Guidebook 1 LIST OF ABBREVIATIONS CEGSTAR Center for Effective Governance System and Territorial Arrangement Reform CPA Critical Path
More informationInfo Session EU programs and funds Welcome!
Balkan Security Network Info Session EU programs and funds Welcome! Introduction... Boško Nektarijević BBA - Bachelor of Business Administration - Paris, France 99 MBA - Master of Business Administration
More informationThis action is funded by the European Union
This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual
More informationFinancial Monitoring of a Development Project by FMSF - A Concept Note
Financial Monitoring of a Development Project by FMSF - A Concept Note Section 1 About Monitoring 1.1 What is Monitoring? Monitoring is. To check that things are going as per plan. Monitoring is the systematic
More informationUNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN
UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN Approved Version April 2014 Contents Contents... 2 1. Key Elements of Results Based Management in
More informationHow to Prepare Grant Proposals. Presented by. Kirk Brown, Senior Grant Advisor. September 2011
How to Prepare Grant Proposals Presented by Kirk Brown, Senior Grant Advisor September 2011 1 Purpose of this session To provide an overview of how to prepare a grant proposal: Grant proposal content:
More informationEN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006
Rural Development 2007-2013 HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK Guidance document September 2006 Directorate General for Agriculture and Rural Development EN 1 EN CONTENTS 1. A more
More informationIPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV
IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components
More informationProject Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP
Project Management for the Professional Professional Part 3 - Risk Analysis Michael Bevis, JD CPPO, CPSM, PMP What is a Risk? A risk is an uncertain event or condition that, if it occurs, has a positive
More informationH2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018
H2020 proposal preparation RI-Links2UA Horizon 2020 Info Day 8 June, 2018 Acknowledgement Slides, prepared by Gorazd Weiss are used in this presentation Today s topics 1. INTRODUCTION FROM IDEA TO IMPLEMENTATION
More informationInternational Labour Organization Evaluation Unit Guidance Note 2
MIDTERM EVALUATIONS THIS GUIDANCE COVERS INDEPENDENT MIDTERMS, INCLUDING A SHORT BRIEF ON THE ROLE OF INTERNAL, SELF-EVALUATIONS AND ANNUAL REFIEWS Midterm evaluations (MTEs) aim to assess the continued
More informationHow to Develop High-Quality Full Application Writing a Winning Proposal
How to Develop High-Quality Full Application Writing a Winning Proposal Information and Training Workshop Presentations held at the Country Workshops in Moldova, Ukraine and Georgia Day 1 Day!One!!!! Workshop
More informationSI-JOINT 2020 Formats
SI-JOINT 2020 Formats 12 March 2019 Wannes Verbeeck, Programme Manager Implementation of indirect development cooperation reform Royal Decree 2014 and law and Royal Decree 2016 => renewed M&E approach
More informationJob Safety Analysis Preparation And Risk Assessment
Job Safety Analysis Preparation And Risk Assessment Sample Only Reference CPL_PCR_JSA_Risk_Assessment Revision Number SAMPLE ONLY Document Owner Sample Date 2015 File Location Procedure Revision Date Major
More informationAnnual Implementation Report 2015
Annual Implementation Report 215 of the INTERREG V-A SLOVAKIA-HUNGARY COOPERATION PROGRAMME Content 1. Identification of the annual implementation report... 4 2. Overview of the implementation... 4 3.
More informationAppendix B: Glossary of Project Management Terms
Appendix B: Glossary of Project Management Terms Assumption - There may be external circumstances or events that must occur for the project to be successful (or that should happen to increase your chances
More informationStandard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05
Standard Summary Project Fiche 1. Basic Information Project number: TR 0204.04 Twinning number: TR02-JH-05 1.1 Desiree Number 2.1 Title Strengthening the Fight against Money Laundering 3.1 Sector AD 4.1
More informationStandard Summary Project Fiche Project No. TR Twinning No. TR/2004/IB/EC/06
Standard Summary Project Fiche Project No. TR 0402.03 Twinning No. TR/2004/IB/EC/06 1. Basic Information 1.1 Title: Strengthening the Ministries of Health, Environment and Forests, and Agriculture and
More informationANNUAL DEVELOPMENT ACCOUNT PROGRESS REPORT
ANNUAL DEVELOPMENT ACCOUNT PROGRESS REPORT Note: The progress reports are part of the monitoring of the projects and will be used by the Programme Manager in the reporting to the General Assembly. The
More informationDRAFT GUIDANCE FICHE FOR DESK OFFICERS VERSION 3-28/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION INTEGRATED TERRITORIAL INVESTMENT (ITI)
DRAFT GUIDANCE FICHE FOR DESK OFFICERS INTEGRATED TERRITORIAL INVESTMENT (ITI) VERSION 3-28/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION Regulation Articles Article 36 - Integrated territorial investment
More informationFundamentals of Project Risk Management
Fundamentals of Project Risk Management Introduction Change is a reality of projects and their environment. Uncertainty and Risk are two elements of the changing environment and due to their impact on
More informationIII. modus operandi of Tier 2
III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and
More informationLinking Country Level Monitoring and Evaluation to FCPF Progress Reporting
1 Forest Carbon Partnership Facility Linking Country Level Monitoring and Evaluation to FCPF Progress Reporting September 26, 2013 Aim of this presentation Explain how the various monitoring and evaluation
More informationCosting National Agriculture Investment Plans (NAIPs)
Capacity Development Project for Investment and Policy - CDPIP Costing National Agriculture Investment Plans (NAIPs) Introduction and Guide to the NAIP Costing Template for National Technical Commissions
More informationAdvanced Operational Risk Modelling
Advanced Operational Risk Modelling Building a model to deliver value to the business and meet regulatory requirements Risk. Reinsurance. Human Resources. The implementation of a robust and stable operational
More informationStandard Summary Project Fiche IPA centralised programmes Project Fiche: 9
Standard Summary Project Fiche IPA centralised programmes Project Fiche: 9 1. Basic information 1.1 CRIS Number: 2009/021-170 1.2 Title: Strengthening the management and control systems for EU financial
More informationFICHE 21 MODEL OF DELEGATED ACTS SETTING OUT STANDARD SCALES OF UNIT COSTS VERSION 2-21 OCTOBER Version
Version 2-21.10.2013 FICHE 21 MODEL OF DELEGATED ACTS SETTING OUT STANDARD SCALES OF UNIT COSTS AND LUMP SUMS DEFINED BY THE COMMISSION VERSION 2-21 OCTOBER 2013 Regulation Article European Social Fund
More informationMid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies
Mid Term Review of Project 00059714 Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Final Evaluation Report Date of Report: 8 August 2013 Authors of Report:
More informationProject Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean
Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean 2014 2020 CCI 2014TC16M4TN003 22/06/2015 Version 1.0 Balkan-Mediterranean is co-financed by European Union and
More informationProject Title: INFRASTRUCTURE AND INTEGRATED TOOLS FOR PERSONALIZED LEARNING OF READING SKILL
Project Title: INFRASTRUCTURE AND INTEGRATED TOOLS FOR PERSONALIZED LEARNING OF READING SKILL Project Acronym: Grant Agreement number: 731724 iread H2020-ICT-2016-2017/H2020-ICT-2016-1 Subject: Dissemination
More informationCOMMISSION DECISION. of
EUROPEAN COMMISSION Brussels, 25.11.2016 C(2016) 7553 final COMMISSION DECISION of 25.11.2016 modifying the Commission decision of 7.3.2014 authorising the reimbursement on the basis of unit costs for
More informationGuidelines for the AF DSP call for proposals
Guidelines for the AF DSP call for proposals A stream of cooperation edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2018 Programme co-funded by the European Union Table of content
More informationVANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants
VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure
More informationStrenghtening the Court Management System FINAL Standard Summary Project Fiche IPA decentralized National programmes
Standard Summary Project Fiche IPA decentralized National programmes 1.1 CRIS Number: TR080102 1.2 Title: Strengthening the Court Management System (Phase II of TR 06.01.04.) 1.3 Sector: 36- Political
More informationStandard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes)
Standard Summary Project Fiche IPA decentralised National programmes (maximum 12/15 pages without the annexes) 1. Basic information 1.1 CRIS Number: TR2010/0327.02 1.2 Title: Implementation of by-law on
More informationActualtests.PRINCE2Foundation.120questions
Actualtests.PRINCE2Foundation.120questions Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version: 4.8 http://www.gratisexam.com/ PRINCE2 Foundation PRINCE2 Foundation written Exam 1. Dump
More informationDollars to $ense Energy Efficiency Financing Mini-Workshop
Dollars to $ense Energy Efficiency Financing Mini-Workshop February 11, 2014 The International Centre Workshop Learning Objectives To increase awareness and skill in obtaining financing for energy efficiency
More informationDollars to $ense. Energy Efficiency Financing Mini-Workshop. February 11, 2014 The International Centre
Dollars to $ense Energy Efficiency Financing Mini-Workshop February 11, 2014 The International Centre Workshop Learning Objectives To increase awareness and skill in obtaining financing for energy efficiency
More informationPAC Guidelines for Project Progress Report
PAC Guidelines for Project Progress Report Version 1.0 September 2017 A stream of cooperation Programme co-funded by the European Union Content List of abbreviations... 5 Introduction... 6 PART I TECHNICAL
More informationMulti-country European Integration Facility
1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries
More informationPRINCE2-PRINCE2-Foundation.150q
PRINCE2-PRINCE2-Foundation.150q Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 6.0 Exam PRINCE2-Foundation Version: 6.0 Exam A QUESTION 1 What process ensures focus on
More informationMonitoring and Evaluation of Budget Performance CPA John Kauta Partner, Ariska Associates March 31, 2017
Monitoring and Evaluation of Budget Performance CPA John Kauta Partner, Ariska Associates March 31, 2017 Outline Introduction Monitoring Budget Performance Evaluating Budget Performance Conclusion 2 Introduction
More informationWSSCC, Global Sanitation Fund (GSF)
Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in
More informationPROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS
Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Joint Call on applied
More informationTHE METHODOLOGY OF PROJECT MANAGEMENT OF SOFTWARE DEVELOPMENT AT THE NATIONAL BANK OF SERBIA
Impact of Internet on Business activities in Serbia and Worldwide Uticaj Interneta na poslovanje u Srbiji i svetu doi: 10.15308/SInteZa-2014-530-536 THE METHODOLOGY OF PROJECT MANAGEMENT OF SOFTWARE DEVELOPMENT
More informationRecommendation of the Council on Good Practices for Public Environmental Expenditure Management
Recommendation of the Council on for Public Environmental Expenditure Management ENVIRONMENT 8 June 2006 - C(2006)84 THE COUNCIL, Having regard to Article 5 b) of the Convention on the Organisation for
More informationMango Training Course Outline
Mango Training Course Outline Course code: Course Title: Duration: For: ES2 [formerly FM11] Building on the basics 2 days Those who have previously attended Mango s Getting the basics right (ES1) course
More informationAn investigation of risk management strategies in projects
Marketing and Branding Research 2(2015) 89-100 MARKETING AND BRANDING RESEARCH WWW.AIMIJOURNAL.COM INDUSTRIAL MANAGEMENT INSTITUTE An investigation of risk management strategies in projects Zahra Asadi
More informationAnnex 1 Citizen s summary 1
Programming process Annex 1 Citizen s summary 1 The process of preparation of the Cooperation Programme was coordinated by the Managing Authority (Ministry of Regional Development and EU Funds of the Republic
More informationContacts: Anastasija Trajkovska, Head of Sector, telephone: (0)
Project fiche 2.1: Support to the Agency for Supervision of Fully Funded Pension Insurance (MAPAS) 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Support to the Agency for Supervision of
More informationBudget & Finances. Interreg Europe Secretariat. 23 March 2016 Lead applicant workshop. Sharing solutions for better regional policies
European Union European Regional Development Fund Sharing solutions for better regional policies Budget & Finances Interreg Europe Secretariat 23 March 2016 Lead applicant workshop Session content 1. Preliminary
More informationStandard Summary Project Fiche for the Transition Facility
Standard Summary Project Fiche for the Transition Facility 1 Basic Information 1.1 CRIS Number: 2006/01/-176.05.01 1.2 Title: Unallocated IB envelope 1.3 Sector: Other IB actions 1.4 Location: Hungary*
More informationMulti-country European Integration Facility
1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries
More informationTERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND
TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND Type of Position: Local consultant Sustainable finance expert Location: Ulaanbaatar, Mongolia Type of Contract: Individual contract Expected
More informationFRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES
GEF/C.8/4 GEF Council October 8-10, 1996 Agenda Item 6 FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES RECOMMENDED DRAFT COUNCIL DECISION The Council reviewed document
More informationFund for Gender Equality Monitoring and Evaluation Framework Executive Summary
Fund for Gender Equality Monitoring and Framework Executive Summary Primary Goal of the Monitoring and Framework The overall aim of this Monitoring and (M&E) Framework is to ensure that the Fund for Gender
More informationPROJECT COST ESTIMATING,
PROJECT COST ESTIMATING, Budgeting and Value Engineering Skills H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: The decision to proceed with
More information11. The project funding can be utilized for the following purposes, amongst others:
Pre-DTIS Projects Pre-DTIS project objectives, amount and duration 8. The pre-dtis phase, where needed, aims at setting up the conditions for the EIF Country to make the arrangements for the DTIS to be
More informationEXTERNAL END OF PROJECT PERFORMANCE EVALUATION
EXTERNAL END OF PROJECT PERFORMANCE EVALUATION 1. Background TERMS OF REFERENCE PT. Rainforest Alliance (RA) is leading a consortium group in implementing the Cocoa Revolution: High-Yielding Climate Smart
More informationSOCIAL SECURITY COMMISSION DEVELOPMENT FUND (SSC-DF) PROPOSAL WRITING GUIDE FOR EMPLOYMENT & TRAINING SCHEMES
SOCIAL SECURITY COMMISSION DEVELOPMENT FUND (SSC-DF) PROPOSAL WRITING GUIDE FOR EMPLOYMENT & TRAINING SCHEMES These guidelines are designed to assist applicants in preparing a funding proposal for submission
More informationProject Monitoring and Reporting Workshop for Interreg programmes
Project Monitoring and Reporting Workshop for Interreg programmes Who, why, how? 21-22 April 2016 Sofia, Bulgaria Interact is co-financed by the European Regional Development Fund (ERDF) Responsibilities
More informationProject Management and Financial Reporting
Horizon 2020 and ERC Project Management and 11-13 April 2018 Brussels Horizon 2020 Project Management and AGENDA DAY 1 08:30 09:00 Registration 09:00 09:30 Event opening 09:30 10:30 How to Coordinate and
More informationTemplate for submitting data for the consideration of the Commission (Article 14(1) ESF)
EUROPEAN COMMISSION European Social Fund Template for submitting data for the consideration of the Commission (Article 14(1) ESF) Version of June 2015 Please consult http://ec.europa.eu/esf/sco for possible
More informationBraindumps.PRINCE2-Foundation.150.QA
Braindumps.PRINCE2-Foundation.150.QA Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 29.1 http://www.gratisexam.com/ I was a little apprehensive at first about an online
More informationTiverton EUE Access Draft Benefits Realisation Plan and Monitoring and Evaluation Plan
Draft Benefits Realisation Plan and Monitoring and Evaluation Plan October 2014 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD Contents 1 Scheme Background and Context... 3 1.1 Description
More informationSeptember Preparing a Government Debt Management Reform Plan
September 2012 Preparing a Government Debt Management Reform Plan Introduction Preparing a Government Debt Management Reform Plan The World Bank supports the strengthening of government debt management
More informationMango Training Course Outline
Mango Training Course Outline Course code: Course Title: Duration: For: ST1 [formerly FM2] Planning for financial sustainability 2 days Non-finance managers, finance managers and Board members of local
More informationSTANDARD SUMMARY PROJECT FICHE
STANDARD SUMMARY PROJECT FCHE 1. Basic nformation 1.1 CRS Number: Twinning Light Envelope Comp. 1 2003004-979-08-04 LV2003BTL 1.2 Title: nstitution Building Facility 1.3 Sector: Various 1.4 Location: Latvia
More informationTerms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues
Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment 3 1.3
More informationBrief course information Strategic planning and project selection Project integration management Project scope management
Brief course information Strategic planning and project selection Project integration management Project scope management Total Quality Project Management 2 This is an individual work. Each student prepares
More informationImplementing arrangements: 1.5 Implementing Agency:
Standard Summary Project Fiche IPA decentralised National programmes (Maximum 12/15 pages without the annexes) 1. Basic information 1.1 CRIS Number: TR2010/0136.01 1.2 Title: Improved Strategic Management
More informationEuropean Commission Directorate General for Development and Cooperation - EuropeAid
European Commission Directorate General for Development and Cooperation - EuropeAid Practical guide to procedures for programme estimates (project approach) Version 4.0 December 2012 CONTENTS 1. INTRODUCTION...
More informationTABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities
IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council
More information