TERMS OF REFERENCE. 02 National Consultants. Consultancy: Vietnam (Ha Noi and selected provinces) Locality of Assignment:

Size: px
Start display at page:

Download "TERMS OF REFERENCE. 02 National Consultants. Consultancy: Vietnam (Ha Noi and selected provinces) Locality of Assignment:"

Transcription

1 TERMS OF REFERENCE Assignment Title: Consultancy: Support CEMA to review and identify the communes and villages of extremely difficulty to be subjected under investment of Program 135, period National Consultants Locality of Assignment: Vietnam (Ha Noi and selected provinces) 1) General background The Project Support the implementation of Resolution No. 80/NQ-CP on directions for sustainable poverty reduction ( ) and the National Targeted Program on Sustainable Poverty Reduction ( ) (hereafter referred as PRPP), which is funded by UNDP and cofunded by Irish Aid, aims at supporting Ministry of Labour, Invalids and Social Affairs (MOLISA) the National implementing partner (NIP) and other Co-implementing partners (CIPs) to monitor the management and implementation of Resolution No. 80 of the Government of Vietnam and National Target Program on Sustainable Poverty Reduction (NTP-SPR ). The Project contributes to accelerate poverty reduction in the poorest ethnic minority, mountainous and coastal areas through achievement of the specific outputs: (i) the poverty reduction policies under the responsibility of line ministries are streamlined, and poverty reduction is mainstreamed into line ministries plans and policies;(ii) National Targeted Program on Sustainable Poverty Reduction (NTP-SPR) is designed and implemented effectively, contributing to rapid poverty reduction in the poorest district, communes and village, and groups of ethnic minority people through the application of innovative and gender sensitive modalities and approaches;(iii) System for monitoring and analysis of multi-dimensional poverty and vulnerability and high level policy dialogues on poverty and vulnerability contribute to inclusive, equitable and pro-poor development outcomes. The project is implemented in close cooperation and coordination with other UN and development partner agencies within the One UN Initiative and the Joint GOVN-Development Partners Partnership to Support the implementation of Resolution 80 and NTP-SPR. With the objective to implement effectively general poverty reduction policies and specific poverty reduction policies under Resolution No.80/NQ-CP to synchronize and focus the resource poverty reduction in over the country, the National Targeted Program on Sustainable Poverty Reduction Program focuses on the following 4 projects : 1. Project to support construction of infrastructures in the poor district, the extremely difficult communes in coastal areas and islands. 1

2 2. Project to support construction of infrastructures in the extremely difficult communes, frontier communes, safety zone areas and the extremely difficult villages. 3. Project to develop and replicate poverty reduction model. 4. Project to strengthen the capacity for poverty reduction, communication and monitoring and evaluation of the implementation. On the 4 th April 2013, the Prime Minister had issued Decision No 551/QĐ-TTg approved Programme 135 on infrastructure investment support and production support for the communes of extremely difficulties, frontier communes, safety zones areas, and villages of extremely difficult condition, in which, CEMA has been assigned to preside and coordinate with relevant ministries and provinces for management and implementation of the Programme 135 in the period including the task to review and identify the communes and villages of extremely difficulty to be subjected under investment of the Program in the new period; the list of communes and villages will be submitted for approval by the Prime Minister. To support CEMA to fulfill the above tasks, Sub PRPP Project of CEMA needs to recruit 02 National Consultants to do the work: Review and identify the list of communes and villages of extremely difficulty to be subjected under investment of Program 135, period This will support CEMA in identification of communes, villages of extremely difficulty under investment of P135 to be in accordance with the local actual conditions and the balance of state budget for investment for extremely difficult areas, period ) Objectives and main tasks of consultancy Support CEMA in researching, reviewing and synthesizing to identify the list of communes and villages of extremely difficulty to be subjected under investment of Program 135, period , on the basis of enhancing empowerment, participation and encouragement to apply the innovative approach, the lessons learned from program 135 in the second phase, , in harmonization with the existing management document and the general guidelines of the NTP-SPR under Resolution 80/NQ-CP. The main consultancy tasks include: - Research and reviewing the decisions: (i) Decision 164/2006/QD-TTg dated 11/7/2006 of the Prime Minister approving the list of communes with extremely difficulties, communes of borderlines, safety zones to be subject under investment of Program 135 Phase II, (ii) Decision 113/2007/QD-TTg dated 20/7/2007 of the Prime Minister, approving additional communes and villages to be covered by Program 135 Phase II, Decision No. 69/2008/QD-TTg dated 28/05/2008, Decision 1105/QD-TTg dated 28/07/2009 of the Prime Minister approving the additional list of extremely difficulties, communes of borderlines, safety zones to be subject under investment of 2

3 Program 135 Phase II and the list of communes that exited/got out off Program 135-II investment. On the basis of the criteria for identification of communes under investment of program 135- II, period , review and determine the list of communes that had completed and those had not completed/achieved the goals of P135 -II until 2012; - Identify the communes of extremely difficulties of Region III, border communes, communes of safety zones, the villages of extremely difficulties in Region II after having the results of classification of 3 areas/regions according to their development levels, period Pursuant to Decision 551/QD-TTg dated of the Prime Minister and the results of above reviewing/researching, summarize and determine the list of communes and villages to be subject under investment of P135, period and support CEMA in the consultation process with related ministries and stakeholders for finalization the list of P135-II communes to be submitted to Primer Minister for consideration and approval. 3) Scope of work To support CEMA to fulfill the above tasks, Sub PRPP Project of CEMA needs to recruit 02 National Consultants to do the work: Review and identify the list of communes and villages of extremely difficulty to be subjected under investment of Program 135, period The consultants will work closely with Sub-PMU, P 135 Office, EM Policy Department of CEMA and UNDP official to clarify the requirement and tasks of the consultancy; discuss and agree on implementation plans, methodologies, tools as well as the time frame of the services; establish mechanism for information exchange and report between the consultants, Sub-PMU and related stakeholders. The draft research and proposal of the list of communes to be subject under investment of P135, will be finalized and submitted after thorough consultation and comments by specialists and policy makers form P 135 Office and related ministries, provinces and development partners. The draft and final reports will be product of CEMA s ownership and will be presented by CEM at the meeting/ consultant workshops. 4) Duration of the assignment Total of working days for each consultant to accomplish the required tasks, tentatively from the middle of August 2013 and to be completed in 3 months from the date of signing contract. The cost for researching and field trip in provinces will be supported by Sub-PMU PRPP as UN-EU 2012 cost norm. 3

4 5) Required Products:: a) Final product: - Technical report enclosed with proposed list of communes and villages to be subject under investment of P135, period ; - Summary of research report/executive summary (maximum 3 pages) consolidating the research results of the above report b) Intermediary products: - Research outline/plan/proposal; - Presentation at technical meeting and consultation workshop. Consultants are expected to deliver final and intermediary products in soft and hard copies in both Vietnamese and English with above requirements. 6) Consultant monitoring and control: The Team Leader will work frequently and closely with Sub-PMU, P 135 Office, EM Policy Department (CEMA) and UNDP, Irish Aid to ensure consultancy outputs are met according to planned objectives and requirements of the Sub-PMU/UNDP, CEMA. National Consultants will implement the assignment under the direct supervision of recruiting agency Sub-PMU PRPP and UNDP. National consultants will report to the Sub-PMU in documents on assignment progress as expectation below: No. Activity Product and time schedules 1. There should be a technical meeting on working requirement, research detail and time schedule to submit the output product between the consultants, Sub PMU-PRPP and UNDP. Complete the detailed plan for working implementation 2 - Research and reviewing the decisions: (i) Decision 164/2006/QD-TTg dated 11/7/2006; (ii) Decision 113/2007/QD- TTg dated 20/7/2007; Decision No. 69/2008/QD-TTg dated 28/05/2008; Decision 1105/QD-TTg dated 28/07/2009 of the Prime Minister; On the basis of the criteria for identification of communes under investment of program 135-II, period , review and determine the list of communes that had completed and those had not completed/achieved the goals of P135 -II until 2012; - Basing on the results of classification of 3 areas/regions according to development levels, period , identify the communes of extremely difficulties of Region III, border communes, communes of safety zones, the villages of extremely difficulties in Region II to be subject under investment of P135, Pursuant to Decision 551/QD-TTg dated of the Prime Minister and the results of above reviewing/researching, summarize and determine the list of communes and villages to be subject under investment of P135, period The detailed plan for working implementation will be submit to Sub-PMU in 01 week from the date of signing contract. Draft list of communes and villages of extremely difficulties submitted to Sub PRPP, CEMA (Tentatively at the end of 9/2013) 4

5 3 Support CEMA in the consultation process with related ministries, provinces and stakeholders for finalization of the list of P135-II communes and villages 4. Complete Final report with the final proposed list of communes and villages of extremely difficulties, period to be submitted to CEMA for further approval by Prime Minister. List of communes and villages to be invested under P135 for consultation (Tentatively in 10/2013) Tentatively in 11/2013. A group of technical advisers from CEMA, UNDP and other technical experts will participate in developing the research activity. The consultants should share the working results/progress and the draft report/product with Sub-PRPP, CEMA and UNDP thought out the assignment process. 7) Required qualification for consultants: - Master degree or above on public policy management, economic development or other related fields; - Knowledgeable in qualitative research with using sociology methodology ; - At least 5 years of experience in related field in term of policy researching, developing research, in which practical experience on policies, program, project related to poverty reduction for ethnic minorities and mountainous areas especially Program 135 is of advantages; - Experience in working with Government Agencies (CEMA, MOLISA, MoF, MPI etc); Experiences and skills in consultation and working with the central and local officials; Experience in working with development partner on poverty reduction in Viet Nam. - Ability of analysis and critical thinking, skills of support, good skills of Vietnamese and English communication; - Sound researching and common computer skills. 8) Support The Project will provide necessary support for the recruited consultants to fulfill this assignment including provision of related materials such as followed: 1. The summarized and evaluated report of Program 135, phase II and poverty reduction policy for ethnic minorities period ; 2. NTP-SPR Document; 3. Resolution No.80 on directions for sustainable poverty reduction from ; 4. Implementation program for Resolution No.80; 5. P 135 Document, period (Project 2-NTP-SPR); 6. Decision 164/2006/QD-TTg dated 11/7/2006; (ii) Decision 113/2007/QD-TTg dated 20/7/2007; Decision No. 69/2008/QD-TTg dated 28/05/2008; Decision 1105/QD-TTg dated 28/07/2009 of the Prime Minister and Decision No.551/QD-TTg approved Programme 135 on infrastructure investment support and production support for the communes of extremely difficulties, border lines, safety zones, and villages of extremely difficult condition; 7. Other related materials. 5

6 9) Payment terms Payment for consultants will be made based on workday under UNDP cost norms and the completion of assignment and the delivery of qualified and on-time products according to following three main installments: - First installment: 30% of the contract value once the consultant submit assignment implementation proposal; - Second installment: 40% of the contract value upon submission of all drafts of research report and proposal of Circular for Guidelines on implementing P 135, period ; - Third installment: Remaining 30% of the contract value on submission of all final product (revised drafts with comments in documents or form meetings), endorsed by the Sub-PMU of PRPP and CEMA. 10) Working types of consultants NONE PARTIAL INTERMITTENT FULL-TIME 6

DECISION on approval of the National Target Program to respond to climate change THE PRIME MINISTER DECIDES:

DECISION on approval of the National Target Program to respond to climate change THE PRIME MINISTER DECIDES: THE PRIME MINISTER No: 158/2008/QD-TTg THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, 2 December 2008 DECISION on approval of the National Target Program to respond to climate

More information

Terms of Reference. External monitoring mission for the Project Mid-Term Review

Terms of Reference. External monitoring mission for the Project Mid-Term Review I- BACKGROUND Project: Supporting Citizens Access to Justice Terms of Reference External monitoring mission for the Project Mid-Term Review a) Standard UNDP M&E requirements The UNDP M&E (monitoring and

More information

Increasing efficiency and effectiveness of Cash Transfer Schemes for improving school attendance

Increasing efficiency and effectiveness of Cash Transfer Schemes for improving school attendance MINISTRY OF PLANNING AND INVESTMENT Increasing efficiency and effectiveness of Cash Transfer Schemes for improving school attendance Lessons from a Public Expenditure Tracking Survey of the implementation

More information

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist I. Introduction With the support of UNDP, the Single Project Implementation Unit (SPIU) of the Ministry of Disaster Management

More information

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment PMR Project Implementation Status Report (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Socialist Republic of Vietnam Reporting Period: From 08/20/2017 to 04/03/2018 Report Date:

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Social Assistance System Strengthening Project (P123960) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

SOCIAL PROTECTION IN VIETNAM: Successes and obstacles to progressively

SOCIAL PROTECTION IN VIETNAM: Successes and obstacles to progressively SOCIAL PROTECTION IN VIETNAM: Successes and obstacles to progressively Dao Quang Vinh, Director General Institute of Labour Science and Social Affairs, Ministry of Labour, Invalids and Social Affairs,

More information

THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness. No. 504/QD-TTg Hanoi, 21 April 2010

THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness. No. 504/QD-TTg Hanoi, 21 April 2010 THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM ----- Independence Freedom Happiness -------------------------------- No. 504/QD-TTg Hanoi, 21 April 2010 DECISION On Approval of the National Mine

More information

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy,

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy, Terms of Reference International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy, 2011-2020 1. Summary Title Terms of Reference for an international consultant in Nutrition

More information

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 49400-001 Policy and Advisory Technical Assistance (PATA) January 2017 Policy Coordination and Planning of Border Economic Zones of the People's Republic of

More information

The Provincial People s Committees of Thanh Hóa, Quảng Bình, Thừa Thiên - Huế, Quảng Nam, and Quảng Ngãi Province. To:

The Provincial People s Committees of Thanh Hóa, Quảng Bình, Thừa Thiên - Huế, Quảng Nam, and Quảng Ngãi Province. To: MINISTRY OF CONSTRUCTION THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness No: /BXD-QLN Subject: Guidelines on the implementation of Project s Component 1 funded by Green Climate Fund (GCF):

More information

PROJECT INVESTMENT PROPOSAL

PROJECT INVESTMENT PROPOSAL PROJECT INVESTMENT PROPOSAL PROJECT ON TECHNICAL ASSISTANCE USING ODA FROM UNFPA Name of the Line Agency - National Partner: Ministry of Labour, Invalids and Social Affairs (MOLISA) Name of the Agency

More information

INTRODUCTION INTRODUCTORY COMMENTS

INTRODUCTION INTRODUCTORY COMMENTS Statement of Outcomes and Way Forward Intergovernmental Meeting of the Programme Country Pilots on Delivering as One 19-21 October 2009 in Kigali (Rwanda) 21 October 2009 INTRODUCTION 1. Representatives

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT Advertised on behalf of: TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT POST TITLE: National Consultant to formulate the upgraded guideline packages of the District Development Fund (DDF) AGENCY/PROJECT

More information

GOVERNMENT OF SIERRA LEONE

GOVERNMENT OF SIERRA LEONE GOVERNMENT OF SIERRA LEONE TERMS OF REFERENCE Position International Consultant for the Evaluation of the LGED-JP Location Freetown and Target Local Councils Type of Contract Individual Contract Duration

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

GOVERNMENT OF THE SOCIALIST REPUBLIC OF VIETNAM UNITED NATIONS DEVELOPMENT PROGRAMME (UNDP) Project

GOVERNMENT OF THE SOCIALIST REPUBLIC OF VIETNAM UNITED NATIONS DEVELOPMENT PROGRAMME (UNDP) Project GOVERNMENT OF THE SOCIALIST REPUBLIC OF VIETNAM UNITED NATIONS DEVELOPMENT PROGRAMME (UNDP) Project Strengthening the Capacities for Budgetary Decision and Oversight of People s Elected Bodies in Vietnam

More information

Parliament of the Republic of Macedonia. Law on Balanced Regional Development

Parliament of the Republic of Macedonia. Law on Balanced Regional Development Parliament of the Republic of Macedonia Law on Balanced Regional Development Skopje, May 2007 0 LAW ON BALANCED REGIONAL DEVELOPMENT I. GENERAL PROVISIONS Content of the Law Article 1 (1) This Law regulates

More information

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$ GOOD PRACTICES INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH In this brief: Country context The whole of society approach Institutional arrangements for achieving the SDGs The Development Results

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

Financial Sector Deepening Program RECONCILIATION OF THE ORIGINAL SUBPROGRAM 2 TO THE REVISED SUBPROGRAM 2

Financial Sector Deepening Program RECONCILIATION OF THE ORIGINAL SUBPROGRAM 2 TO THE REVISED SUBPROGRAM 2 Financial Sector Deepening Program, (RRP VIE: 44251-034) Financial Sector Deepening Program RECONCILIATION OF THE ORIGINAL SUBPROGRAM 2 TO THE REVISED SUBPROGRAM 2 1. 2. 3. 4. 5. 6. 7. 8. 9. 1.1.3 Output

More information

Road and Transport Management Project Phase II SAU/10/51658

Road and Transport Management Project Phase II SAU/10/51658 UNITED NATIONS DEVELOPMENT PROGRAMME United Nations Department of Social and Economic Affaires (UNDESA) Project of the Government of the Kingdom of Saudi Arabia Ministry of Transport (MOT) Road and Transport

More information

Policy Brief. Reforming commune-level planning, investment decision making and community empowerment for sustainable poverty reduction 1

Policy Brief. Reforming commune-level planning, investment decision making and community empowerment for sustainable poverty reduction 1 Policy Brief Reforming commune-level planning, investment decision making and community empowerment for sustainable poverty reduction 1 December 2014 Key messages Reforming commune-level planning, decentralization

More information

SOCIALIST REPUBLIC OF VIETNAM CONSTRUCTION. Independence - Freedom - Happiness

SOCIALIST REPUBLIC OF VIETNAM CONSTRUCTION. Independence - Freedom - Happiness THE MINISTRY OF SOCIALIST REPUBLIC OF VIETNAM CONSTRUCTION Independence - Freedom - Happiness -------- --------------- No. 1/213/TT-BXD Hanoi, February 8 th 213 CIRCULAR GUIDING THE CALCULATION AND MANAGEMENT

More information

Terms of Reference (ToR)

Terms of Reference (ToR) Terms of Reference (ToR) Mid -Term Evaluations of the Two Programmes: UNDP Support to Deepening Democracy and Accountable Governance in Rwanda (DDAG) and Promoting Access to Justice, Human Rights and Peace

More information

THE PRIME MINISTER ------- No. 71/2010/QD-TTg SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- Hanoi, November 09, 2010 DECISION PROMULGATING THE REGULATION ON PILOT INVESTMENT

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Redefining UN role and engagement in MIC Viet Nam Concept Note: April 2015

Redefining UN role and engagement in MIC Viet Nam Concept Note: April 2015 Redefining UN role and engagement in MIC Viet Nam Concept Note: April 2015 A. Introduction and background In preparation of the new (2017 2021) UN-Viet Nam Strategic Cooperation Framework (One UN Strategic

More information

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG) UNDP Initiation Plan to programme the project preparation grant received from the GEF (otherwise called GEF PPG) effective for all PIFs approved as of GEF November work programme 2017 A. Background: The

More information

DECREE No. 108/2006/ND-CP OF SEPTEMBER 22, 2006, DETAILING AND GUIDING THE IMPLEMENTATION OF A NUMBER OF ARTICLES OF THE INVESTMENT LAW THE

DECREE No. 108/2006/ND-CP OF SEPTEMBER 22, 2006, DETAILING AND GUIDING THE IMPLEMENTATION OF A NUMBER OF ARTICLES OF THE INVESTMENT LAW THE DECREE No. 108/2006/ND-CP OF SEPTEMBER 22, 2006, DETAILING AND GUIDING THE IMPLEMENTATION OF A NUMBER OF ARTICLES OF THE INVESTMENT LAW THE GOVERNMENT Pursuant to the December 25, 2001 Law on Organization

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. International Public Financial Management Specialist

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. International Public Financial Management Specialist TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: International Public Financial Management Specialist Governance of Climate Change Finance team, UNDP Bangkok

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Expert meeting 2. Developing SSPARS and Integration into NSDS. Challenges & Best Practices

Expert meeting 2. Developing SSPARS and Integration into NSDS. Challenges & Best Practices Expert meeting 2 Developing SSPARS and Integration into NSDS Challenges & Best Practices Key Challenges: Background Decentralized statistical systems agriculture statistics produced under Ministry of Agriculture

More information

DRAFT LAW ON DEVELOPMENT POLICY AND PLANNING

DRAFT LAW ON DEVELOPMENT POLICY AND PLANNING DRAFT LAW ON DEVELOPMENT POLICY AND PLANNING NATIONAL FORUM 19 FEBRUARY 2014 LEARNING FROM INTERNATIONAL EXPERIENCES SAURABH SINHA SENIOR ECONOMIST UNDP MONGOLIA 1 CHANGES IN APPROACH TO PLANNING 2 A.

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Program Country: Socialist Republic of Viet Nam Program: Support Program to Respond to Climate Change (VI) Loan Agreement: March

More information

TERMS OF REFERENCE. Consultant for the Conduct of Climate Change and Disaster Risk Reduction Public Expenditure and Institutional Review

TERMS OF REFERENCE. Consultant for the Conduct of Climate Change and Disaster Risk Reduction Public Expenditure and Institutional Review TERMS OF REFERENCE Consultant for the Conduct of Climate Change and Disaster Risk Reduction Public Expenditure and Institutional Review A. Project Title Project Climate Twin Phoenix Resilience and Preparedness

More information

Perspective on Gender-Responsive Budgeting in Cambodia

Perspective on Gender-Responsive Budgeting in Cambodia Perspective on Gender-Responsive Budgeting in Cambodia Regional Forum on Gender-Responsive Budgeting in Asia and the Pacific 18-19 July 2017, UN-ESCAP Perspectives from Cambodia 1. Key gender and finance

More information

ToR for the National Experience Sharing Forum (NESF II) Facilitation

ToR for the National Experience Sharing Forum (NESF II) Facilitation EC SHARE - ETHIOPIA PROGRAMME Accelerating Resilience Capacity in Southern and Eastern Ethiopia (ARCE) STRENGTHENING INSTITUTIONALIZED SUBNATIONAL COORDINATION STRUCTURES AND HARMONIZATION MECHANISMS Project

More information

Beyond national targets:

Beyond national targets: Beyond national targets: Implementing commune-level planning reform, delegation of investment decisions, and community empowerment for poverty reduction Synthesis report of surveys in Lao Cai, Hoa Binh,

More information

EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage

EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage EU- WHO Universal Health Coverage Partnership: Supporting policy dialogue on national health policies, strategies and plans and universal coverage Year 1 Report Oct. 2011 Dec. 2012 Abbreviations AFRO/IST

More information

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Republic of Albania Country Office January 2018 Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Albania Country Office (2017/24) 2 Summary

More information

TERMS OF REFERENCE Project Mid Term Evaluation

TERMS OF REFERENCE Project Mid Term Evaluation 1. Project Summary Project Title: TERMS OF REFERENCE Project Mid Term Evaluation PIMS 2091 Coastal and Marine biodiversity conservation and sustainable use in the Con Dao islands region Project ID: 00049728

More information

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda. Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda 21 July, 2017 Introduction: The Ministry of Water and Environment (MWE) is implementing

More information

European Commission United Nations Development Programme International IDEA

European Commission United Nations Development Programme International IDEA European Commission United Nations Development Programme International IDEA Joint Training on Effective Electoral Assistance DAY 4 Brussels, 22-26 October 2007 UNDP Delivery Methods in Electoral Assistance

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Public Financial Management Expert (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) & BIOFIN Reports to: UNDP

More information

STANDARD PROJECT FICHE

STANDARD PROJECT FICHE STANDARD PROJECT FICHE 1. Basic Information 1.1 CRIS Number : 2004-016-919.04 1.2 Title: Preparation for Extended Decentralized Implementation System (EDIS) in the management of pre-accession funds in

More information

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Background Context Draft Terms of Reference Mozambique Climate Change Technical Assistance

More information

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 1. Introduction Having reliable data is essential to policy makers to prioritise, to plan,

More information

LESSONS LEARNT FROM EX-POST EVALUATION AND A JOINT-EVALUATION FRAMEWORK BETWEEN JICA VIETNAM OFFICE AND MINISTRY OF PLANNING AND INVESTMENT

LESSONS LEARNT FROM EX-POST EVALUATION AND A JOINT-EVALUATION FRAMEWORK BETWEEN JICA VIETNAM OFFICE AND MINISTRY OF PLANNING AND INVESTMENT 1 LESSONS LEARNT FROM EX-POST EVALUATION AND A JOINT-EVALUATION FRAMEWORK BETWEEN JICA VIETNAM OFFICE AND MINISTRY OF PLANNING AND INVESTMENT JICA VIETNAM OFFICE Tran Mai Anh November 23 rd 2016 2 Contents

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

Information Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support.

Information Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support. EUROPEAN COMMISSION Neighbourhood and Enlargement Negotiations A - STRATEGY AND TURKEY A.5 TURKEY Secretariat of the EU Facility for Refugees In Turkey Information Session on the Calls for Expression of

More information

We recommend the establishment of One UN at country level, with one leader, one programme, one budgetary framework and, where appropriate, one office.

We recommend the establishment of One UN at country level, with one leader, one programme, one budgetary framework and, where appropriate, one office. HIGH-LEVEL PANEL ON UN SYSTEM WIDE COHERENCE Implications for UN operational activities at Country Level: What s new and what has already been mandated? Existing mandates and progress report HLP recommendations

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

MINISTRY OF PLANNING AND INVESTMENT PUBLIC EXPENDITURE TRACKING SURVEY REPORT

MINISTRY OF PLANNING AND INVESTMENT PUBLIC EXPENDITURE TRACKING SURVEY REPORT MINISTRY OF PLANNING AND INVESTMENT PUBLIC EXPENDITURE TRACKING SURVEY REPORT (On the implementation of the Prime Minister s Decision 112/2007/QĐ-TTg of 20 July 2007: Policies to Support Services, Improve

More information

BSPS Phasing-Out Support Business Sector Programme Support ( )

BSPS Phasing-Out Support Business Sector Programme Support ( ) Ministry of Foreign Affairs Danida Government of Vietnam Programme Support Document BSPS Phasing-Out Support Business Sector Programme Support (2011 2013) Ref. No. 104.Vietnam.809.200 November 2010 COVER

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of Reference GENERAL INFORMATION Title: Event Management Consultant Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports to: National Programme Manager Duty

More information

Accelerating Progress toward the Economic Empowerment of Rural Women (RWEE) Multi-Partner Trust Fund Terms of Reference UN WOMEN, FAO, IFAD, WFP

Accelerating Progress toward the Economic Empowerment of Rural Women (RWEE) Multi-Partner Trust Fund Terms of Reference UN WOMEN, FAO, IFAD, WFP Accelerating Progress toward the Economic Empowerment of Rural Women (RWEE) Multi-Partner Trust Fund Terms of Reference UN WOMEN, FAO, IFAD, WFP March 2013 TABLE OF CONTENTS I. Introduction II. Programme

More information

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Mid Term Review of Project 00059714 Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Final Evaluation Report Date of Report: 8 August 2013 Authors of Report:

More information

PROPOSING MRV SYSTEM FOR NAMAS AND PREPARATION FOR MONITORING OF GHG EMISSION IN VIETNAM

PROPOSING MRV SYSTEM FOR NAMAS AND PREPARATION FOR MONITORING OF GHG EMISSION IN VIETNAM The Asia LEDS Forum Ho Chi Minh City, 06 December 2017 PROPOSING MRV SYSTEM FOR NAMAS AND PREPARATION FOR MONITORING OF GHG EMISSION IN VIETNAM Department of Climate Change Ministry of Natural Resources

More information

with GIZ for the Kingdom of Thailand 3 July 2015 NDA Strengthening & Country Programming

with GIZ for the Kingdom of Thailand 3 July 2015 NDA Strengthening & Country Programming with GIZ for the Kingdom of Thailand 3 July 2015 NDA Strengthening & Country Programming PAGE 1 OF 14 ver. 19 August Readiness and Preparatory Support Proposal How to complete this document? - A short

More information

UN-REDD Viet Nam Phase II Multi-Partner Trust Fund: Terms of Reference

UN-REDD Viet Nam Phase II Multi-Partner Trust Fund: Terms of Reference UN-REDD Viet Nam Phase II Multi-Partner Trust Fund: Terms of Reference 30 November 2012 List of Acronyms AA AWP BDS CIPS CSO DARD EG FAO FCPF FIPI FPD GoV HACT HPPMG ICD LoA M&E MARD MARD/DoF MARD/FPD

More information

SPECIFIC TERMS OF REFERENCE. Fee-based service contract. TA support to the PFM Working Group Chair

SPECIFIC TERMS OF REFERENCE. Fee-based service contract. TA support to the PFM Working Group Chair SPECIFIC TERMS OF REFERENCE Fee-based service contract TA support to the PFM Working Group Chair FWC BENEFICIARIES 2013 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/132633/C/SER/multi

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: Regional Public Finance Capacity Development Specialist (Consultant) UNDP/Bangkok Regional Hub/Governance

More information

TERMS OF REFERENCE Final evaluation consultant AUP Project, Kayin State, Myanmar

TERMS OF REFERENCE Final evaluation consultant AUP Project, Kayin State, Myanmar TERMS OF REFERENCE Final evaluation consultant AUP Project, Kayin State, Myanmar 1. Background The European Union approved a project (February 2013 to April 2017) implemented by a consortium of HelpAge

More information

TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME

TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME 2016-2020 I. BACKGROUND Established in 1975, the ASEAN Labour Ministers

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 47291-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2014 Enhancing Roles of Supreme Audit Institutions in Selected Association of

More information

NATIONAL STATISTICS SYSTEM A BETTER COORDINATION

NATIONAL STATISTICS SYSTEM A BETTER COORDINATION Ministry of Planning and Investment GENERAL STATISTICS OFFICE NATIONAL STATISTICS SYSTEM A BETTER COORDINATION Ethiopia, 29/7-2/8/2013 2/8/2013 Vietnam statistics system General statistics office Statistics

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME

TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME 2016-2020 I. BACKGROUND Established in 1975, the ASEAN Labour Ministers

More information

English translations of. network and our international practice

English translations of. network and our international practice January 2013 edition contents SBV eases restrictions 2 on lending in foreign currency Economic sector and 4 CPC codes - obstacles for business registration New regulations for 6 fund management companies

More information

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project FINAL EVALUATION VIE/033 Climate Adapted Local Development and Innovation Project PROJECT SUMMARY DATA Country Long project title Short project title LuxDev Code Vietnam Climate Adapted Local Development

More information

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Guidance Paper United Nations Development Group 19 MAY 2006 TABLE OF CONTENTS Introduction A. Purpose of this paper... 1 B. Context...

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

TERMS OF REFERENCE Social protection technical support, Myanmar

TERMS OF REFERENCE Social protection technical support, Myanmar TERMS OF REFERENCE Social protection technical support, Myanmar HelpAge is seeking a consultant to carry out two separate but interrelated assignments related to social protection cash transfers in Myanmar.

More information

Ladies and Gentlemen

Ladies and Gentlemen Speech of Mr Achim Schaffert, Head of Section, Delegation of the European Union in Mauritius for the workshop on the validation of the Recommendations of the Study on Special Education Needs Domaine Les

More information

MAKING BUDGETS AND AID WORK

MAKING BUDGETS AND AID WORK MAKING BUDGETS AND AID WORK 1 st QUARTERLY PROJECT PROGRESS REPORT 2015 UNITED NATIONS DEVELOPMENT PROGRAMME DONORS Ministry of Finance, Government of Afghanistan PROJECT INFORMATION Project ID: 00047111

More information

Terms of Reference. ANTI-MONEY LAUNDERING SPECIALIST For the GOVERNMENT of PAPUA NEW GUINEA

Terms of Reference. ANTI-MONEY LAUNDERING SPECIALIST For the GOVERNMENT of PAPUA NEW GUINEA Terms of Reference ANTI-MONEY LAUNDERING SPECIALIST For the GOVERNMENT of PAPUA NEW GUINEA Duty Station: Duration: Home based, with ten in-country visits to Papua New Guinea. (The consultant, with UNDP

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness. General Provisions

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness. General Provisions GOVERNMENT No. -2006-ND-CP Draft 1653 SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, [ ] 2006 DECREE PROVIDING GUIDELINES FOR IMPLEMENTATION OF LAW ON INVESTMENT Pursuant to the

More information

TERMS OF REFERENCE. November, 2018 December, 2018 (40 effective person days) BACKGROUND

TERMS OF REFERENCE. November, 2018 December, 2018 (40 effective person days) BACKGROUND TERMS OF REFERENCE Project Name Short title of Assignment: Duty station: Type of Contract: Duration of Contract: Strengthening capacities for sustainable development finance in the CIS region (00107048)

More information

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level. ` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT

More information

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode ANNEX 1. IDTIFICATION Title Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode DAC-code 15010 Project approach Partially decentralised management.

More information

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acronyms List AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acquired immunodeficiency syndrome Country Coordinating Mechanism,

More information

Old Age Financial Security of Women in Viet Nam. The Office of Vietnam National Committee on Ageing (VNCA) Singapore, 10-11/10/2016

Old Age Financial Security of Women in Viet Nam. The Office of Vietnam National Committee on Ageing (VNCA) Singapore, 10-11/10/2016 Old Age Financial Security of Women in Viet Nam The Office of Vietnam National Committee on Ageing () Singapore, 10-11/10/2016 1. Introduction Vietnam National Committee on Aging () a government body with

More information

Vietnam Public Expenditure Review and Integrated Fiduciary Assessment Table of Recommendations

Vietnam Public Expenditure Review and Integrated Fiduciary Assessment Table of Recommendations Executive Summary xv Vietnam Public Expenditure Review and Integrated Fiduciary Assessment Table of Recommendations Issue/Sector (numbers correspond to chapters) 1: Public Expenditure Review 2. Fiscal

More information

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY,

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY, MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2014-2021 between THE KINGDOM OF NORWAY, hereinafter referred to as Norway and THE REPUBLIC OF, hereinafter referred

More information

ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam

ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam Ha Noi 28 June 2017 Outline of Presentation Part I ADB RCI Strategy and GMS overview Part II BEZ Experiences: History and Lessons Part

More information

Summary Document. Low carbon transition in the energy efficiency sector. Vietnam

Summary Document. Low carbon transition in the energy efficiency sector. Vietnam Ministry of Industry and Trade (MOIT), Vietnam Ministry of Construction (MOC), Vietnam Ministry of Foreign Affairs, (Danida), Denmark Ministry of Climate, Energy and Buildings (MCEB), Denmark Summary Document

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/80/51 17 October 2017 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE

More information

THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 31/2015/QD-TTg Hanoi, August 4, 2015 DECISION

THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 31/2015/QD-TTg Hanoi, August 4, 2015 DECISION THE PRIME MINISTER ------- THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 31/2015/QD-TTg Hanoi, August 4, 2015 DECISION ALLOWANCE OF BAGGAGE, MOVABLES, GIFTS,

More information

Islamic Republic of Afghanistan Ministry of Finance. Terms of Reference. Ministry of Finance, Directorate General Budget

Islamic Republic of Afghanistan Ministry of Finance. Terms of Reference. Ministry of Finance, Directorate General Budget Islamic Republic of Afghanistan Ministry of Finance Terms of Reference Position Information: Post Title: Organization: Type of Appointment: Level: Duration: Duty Station: Closing Date: Senior GRB Specialist

More information

DRR Mainstreaming and Decentralization: Case of Indonesia

DRR Mainstreaming and Decentralization: Case of Indonesia REPUBLIC OF INDONESIA MINISTRY OF VILLAGE, DISADVANTAGED REGION AND TRANSMIGRATION DRR Mainstreaming and Decentralization: Case of Indonesia DR. SUPRAYOGA HADI DIRECTOR GENERAL FOR VILLAGE DEVELOPMENT

More information

CALL FOR PROPOSAL. Title: Improving Tenure Security of Smallholder Farmers in Select Areas in the Philippines

CALL FOR PROPOSAL. Title: Improving Tenure Security of Smallholder Farmers in Select Areas in the Philippines CALL FOR PROPOSAL The purpose of the Call for Expression of Interest is to solicit interest from regional or national not for profit rural civil society organizations as Implementing Partners that wish

More information

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630 ANNEX ACTION FICHE GEORGIA PI AAP 2008 1. IDTIFICATION Title Total cost 16 M Aid method / management mode Support to the reform of criminal justice system in Georgia - CRIS N PI/2008/19630 Sector Policy

More information