Action Fiche for Mongolia. EU contribution: EUR

Size: px
Start display at page:

Download "Action Fiche for Mongolia. EU contribution: EUR"

Transcription

1 Action Fiche for Mongolia IDENTIFICATION Title/Number Support to Technical and Vocational Education and Training (TVET) Programme DCI-ASIE/2011/ Total cost EUR Aid method / Method of implementation EU contribution: EUR Project approach centralised (direct) DAC-code Sector TVET RATIONALE Sector context Mongolia s Gross Domestic Product (GDP) is expected to grow substantially throughout as a result of the revenues from the mining sector. In parallel, there will be an increase in the demand for skilled labour and urgent need for the Technical and Vocational Education and Training (TVET) sector to meet the requirements of a market-driven economy, particularly in the service sectors and the processing industry with emphasis on food production, infrastructure and construction. A Labour Market Study produced by the main existing project in the sector, notably the US-funded Millennium Challenge Account (MCA), notes that the predominant occupations are found within agriculture, the second largest sector is trade with 12% of total employment, while the mining sector absorbs 2-3% of the labour force. Unemployment rates, particularly for the youth, are significantly high. Stakeholders recognize the lack of an adequately qualified and trained workforce and the need to develop a national human resource capacity to achieve Mongolia s goals of economic diversification and industrialization. The provision of TVET is deemed to be insufficiently able to meet local market requirements and the equipment and professional expertise of the TVET system are outdated and limited. This often results in the import of skilled labour from China despite the high rate of unemployment of Mongolian youths. The proportion of TVET students has doubled since 2005, due to the government policy of granting a monthly allowance (approximately EUR 30) to students in order to subsidize what is considered a strategic sector. However, the percentage of students at TVET schools that are enrolled after graduating the complete secondary education is only 30% of the total students in It seems that most students see TVET schools as a way to complete secondary education before entering university, by taking advantage of the government monthly allowances. Furthermore, there is wide discrepancy between the level of training, the quality of qualifications achieved and the certification system in the various training centres/institutes (a total of 64 of which 44 are State run and 20 are private training institutions; 26 are located in Ulaanbaatar City and 38 in provinces). The Government of Mongolia has undertaken a series of measures to address these issues through a revised Law of Mongolia on Vocational Education and Training (2009), the establishment of a National Council for TVET, composed by private and public stakeholders (e.g. ministries, business intermediate organizations, universities) with responsibility for coordination and strategic policy 1

2 orientation as well as the Agency for Vocational Education and Training (AVET) with responsibility for the implementation of the national TVET strategy. An ambitious Action Plan for Implementing Technical and Vocational Education and Training ( ) formulated by the Agency for TVET indicates the main objective to successfully establish competency-based training in TVET institutions. The government has committed to match its reform ambitions in the sector by increasing the budget allocated to the sector (and to the AVET), which has doubled since 2008 and amounts to more than EUR 35 million in A major project funded by the MCA (USD 46 million) is currently supporting the sector at different levels and will provide external technical and financial assistance until 2013 when all activities will be terminated and the unspent funds recovered. One could expect a major risk of systemic stand-off once this project ends, and the momentum of reform will need to be maintained to ensure the creation of a real competence-based TVET sector. Lessons learnt Lessons learnt from other capacity-building initiatives in Mongolia indicate the importance of closely tying projects to the Government of Mongolia's programmes and priorities. Awareness of other donor activities and development projects is also important in order to ensure that activities complement the broad TVET reform agenda. One should further consider that the different line Ministries with a stake in TVET (e.g. Education, Labour, Agriculture and Light Industries, etc.) must be involved at all stages of the project in order to ensure coherence in the country policies. Projects implemented in the field have usually been disconnected from the national government strategy and from other external donors initiatives, thus creating a very fragmented scenario in which no single quality and assessment framework exist. The findings of the formulation mission indicate that there is need to develop the leadership and management qualities of the AVET to ensure that its operations are managed in a coordinated manner, in line with its own strategic roadmap. Furthermore, it is crucial that the Agency will be enabled to promote the decision-making capacities of the Government of Mongolia through the National and Sector Councils as well as via promote public-private partnerships. The proposed EU project builds upon the Action Plan of the AVET and is thus consistent with the reform priorities of the Government of Mongolia. It will also be instrumental in developing institutional and human capacities to deliver vocational qualifications to nationally (and internationally) recognized standards. The need to ensure national quality standards and a uniform assessment system with concomitant need for an effective Quality Assurance system will seek to obviate the present tendency to promote short-term skills development in isolation of a wider national focus. A crucial aspect of the EU project will be the programme based approach adopted with other major donors active in the sector, under the framework of a common dashboard with results, indicators and activities agreed with the Government, and a single reporting and monitoring system, to the national authorities (both the Agency and the Council). Complementary actions The EU has so far been focusing its bilateral cooperation with Mongolia on rural development with a contribution to the World Bank Sustainable Livelihood Programme and through the Animal Health and Livestock Marketing Programme (AHLM), which is being implemented through the Ministry of Food, Agriculture and Light Industries. In addition, a EUR 4 million Support for Small and Medium Enterprises (SME) Development in Mongolia project implemented by the European Bank for Reconstruction and Development (EBRD) 2

3 will start in This programme addresses key areas of weakness of the local business sector and can contribute to an integrated sector-wide approach by creating synergies with local SMEs. The USA Millennium Challenge Account (MCA) is the most substantial donor investment in the TVET sector in Mongolia (USD 46 million), due to end in There have been delays with regard to delivery in terms of its original expectations and most activities, including the provision of an important amount of supplies and infrastructures, will be launched this year. The software component of the project includes elements such as the development of a National Vocational Qualifications Framework, training of the trainers and capacity building for the AVET. These activities are of crucial importance for the sustainability of the sector reform and the EU project will complement and fill the gaps left by the MCA programme by timely launching its activities at the same time of the US fund withdraw from the sector. The Swiss Agency for Development Cooperation (SADC) is formulating a bilateral TVET programme (approx EUR 5 million for ) targeted to the Western Region of Mongolia. The programme is to improve the capacity of 7 vocational training schools through curriculum development and teacher training, with a strong focus on practical training to improve the income generating capacity of herders through traditional activities. The programme seeks to facilitate market linkages between the institutes and the potential employers in the region. The EU Delegation has coordinated closely with the SADC during the formulation of its project and has agreed to adopt a programme approach with common logical framework elaborated with the Government and Joint reporting methodologies. The German International Cooperation (GIZ) currently engages mainly in urban construction skills upgrading, and small enterprise skills development in selected regions in the country. TVET is a component of a wider investment support project. GIZ has received the request from the government to focus more deeply into TVET and is considering a project in the sector based on its previous field experience. The Delegation has agreed with the local GIZ office that an eventual project launched in the sector would be included in the above mentioned programme approach developed with SADC. Canada and Australia have economical interests in Mongolia related to mining and are considering sector interventions in the TVET sector. While their programmes are not yet defined, one could reasonably expect that, in presence of a coordinated sector approach by other donors, new interventions would be incorporated in the same scheme. Other small interventions exist in the field. They are not very relevant to the TVET system reform process but can be eventually considered as reference experiences for possible replication of best practices: CARITAS CZ implements a 6-month project to start mid 2011 for 8 schools. The project will train teachers in the use of the new agriculture curricula being developed by the MCA and will provide teaching materials. The project will also provide pedagogic training at the Darkhan Regional Methodology Centre (RMC). The Mongolian National Chamber of Commerce (MNCCI) runs skills training courses through its own established training centers, but these do not match any nationally agreed standards. It also supports a privately funded agricultural college to train teachers. Singapore Polytechnic has trained 56 teachers in the design and development of competence based module templates which provide a useful platform for further curricula development and reform. Donor coordination The Government of Mongolia and donors working in the field of TVET have been closely involved in the identification and formulation process, notably by identifying the sector of intervention. There are currently bi-annual donor meetings organized by the Ministry of Finance and the World Bank and there are 5 sectoral working groups led by the Government of Mongolia and co-chaired by a 3

4 donor. The Asian Development Bank (ADB) and the Japan International Cooperation Agency (JICA) co-chair the working group on Education, but with no specific focus on TVET. Donor coordination in the TVET sector issues is through a TVET working group, which is chaired by the Government of Mongolia and currently co-chaired by GIZ, and which includes the main donor programmes (e.g. MCA, SADC, etc.). Information received indicates that the sectoral working groups meet infrequently and the coordination remains extremely poor. A key aspect of the EU project, and the main conditionality posed to the Government, will be the elaboration of a national strategy, including milestones and result indicators, which the EU project (but also the Swiss Agency for Development Cooperation and eventually GIZ) will dovetail. A senior expert, funded by the MCA project, will provide technical assistance (and relevant logical framework) for the drafting of the national strategy starting from September 2011 for the next 18 months. Additional measures to strengthen the AVET to support aid coordination to ensure alignment by donor programmes to the Government of Mongolia s strategic implementation plan for TVET will form part of the overall activities of the EU project. 3 DESCRIPTION 3.1 Objectives The overall objective is to support the economic development and human capital potential of the Mongolian government and population by enabling key stakeholders to provide Technical and Vocational Education and Training in a way that is responsive to the needs of a rapidly changing labour market. The specific objective is to strengthen and consolidate the work of the AVET to establish and initiate: an efficient, sustainable and demand driven TVET sector with attention to rural areas, an appropriate quality assurance procedures for assessment and certification Expected results and main activities Main expected results are as follows: Strengthened leadership capacities of the AVET and support to the National Council on Vocational Education and Training (NCVET) and Sector Councils to ensure an effective and coherent TVET modernization process which is consonant with the reform agenda of Government of Mongolia, alignment of donor funded projects, and inclusion of private investors. Strengthened capacities of TVET schools to meet the qualification requirements of an expanding and diversifying labour market through the nation-wide implementation of competence-based programmes and quality assurances processes. Increased coverage of the TVET best practices in the rural development sector and strengthened implementation capacities of TVET rural development programmes to benefit rural economies. An overall work plan will be drafted by the implementing partner during the inception phase in consultation with local public and private stakeholders and in close coordination with the donors already active in this field. The work plan will be coupled with a global assessment of the level of progress made by the Government of Mongolia and the respective donor agencies with regard to initiatives in the TVET sector to determine gaps and/or the need for additional/alternative activities. The work plan will have to be coherent with the Government Strategy Plan, its specific objectives and indicators of results in order to have a sector programme approach, coordinated with other major donors active in the sector (e.g. SDCA, GIZ, Canada), under the overall responsibility of the AVET. 4

5 A national strategy is currently being elaborated by the AVET, with the support of the MCA project. The alignment of the project with this Government strategic policy and roadmap will be the priority for the inception phase of the project, which will consider the possible additional contribution required for the adoption of a national TVET reform strategy. The possibility of providing assistance to the Mongolian TVET system to adopt European principles, norms and standards, in coherence with article 7 of the EU-Mongolia Partnership and Cooperation Agreement (PCA), will also be considered during the inception phase. Activities will mainly involve technical assistance, training of trainers and curricula development. At this stage, the indicative list of activities is the following: Provide technical assistance to AVET for the creation of problem-solving and strategic decision-making capacities in order to enhance and institutionalize private-public partnership at national, regional and sector level and TVET school level through: Assistance to AVET to support the strengthening of the NCVET as the highest authority for coordination between TVET and employers, particularly for strategic discussion and decisionmaking through. Special emphasis should be given to achieve an appropriate financing of the TVET sector and the revenue-generating capacities from TVET schools; Assistance to AVET to foster improved donor coordination to ensure alignment by donor programmes to the Government of Mongolia s strategic implementation plan for TVET, its specific objectives, milestones and indicators of results; Familiarization of AVET personnel with regard to EU (e.g. European Foundation for Quality Management) and other models to provide a framework for assessing and improving organisations at different stages of their development Support AVET or a relevant institution to set-up a leadership programme with the objective of creating a critical number of managers and TVET staff who are competent to manage and to promote a demand-led TVET system: Identify with stakeholders priorities in leadership, management and private-public partnership that are related to issues for modernizing the current TVET system and to develop pilot training modules; Implement training programme for key staff members from the TVET agency, related institutions and principals from VET schools to improve the quality of management and cost effectiveness of TVET training institutions leading to a Professional Development Award qualification and link, if possible, to a reward structure; Assess the training programme for replication by AVET or an outsourced training agency. Conditions for enrollment of AVET and other government staff into the leadership programme should be agreed during the implementation phase and included in the overall work plan. The commitment to work in the TVET sector in Mongolia for a defined period after completion of the programme should be ensured Strengthening the quality assurance system to ensure uniformity of acceptance of qualifications provided, with emphasis on the fine-tuning and implementation of the proposed National Vocational Qualifications Framework (NVQF) through: Capacity building and technical assistance to enable AVET to initiate and establish its operational and administrative short-term and long-term responsibilities with regard to the validation of qualifications, accreditation of providers and assessment groups, the external quality assurance of assessments leading to issuance of qualifications and to appeal procedures; Technical Assistance to AVET to support to the design/review process of the implementation roadmap for a National Qualifications Framework (NQF) and implementation strategy with regard to the incorporation of the NVQF and TVET-related components; 5

6 Assistance to AVET to promote partnerships between business and the TVET sector to develop occupational standards Technical Assistance to AVET to support the Regional Methodological Centres (RMCs) task of facilitating the implementation of new curricula and embedding competency-based modularized training: Technical Assistance to support the National Learning Resource Centre (NLRC) to serve as a national forum to disseminate new curricula programmes, to act as centre to distribute training and learning resources to TVET schools and to conduct research on issues of technical education and the development of new technology. Technical Assistance to support the RMCs programmes to provide initial pedagogical training to new trainers in student-centered training approaches and assessments, and to gain practical experience Support for AVET and other relevant stakeholders at regional and provincial level to replicate and up-scale best practices experienced in Mongolia to develop new curricula and implementation materials related to the rural development sector focused on developing the economy/livelihood of rural areas. This activity will be defined during the implementation of the project and will be implemented through a separate service contract. Terms of Reference of the contract will be drafted in coordination with the AVET and the other partner donors in the programme, in order to ensure that best practices developed at micro/local TVET institutes by other projects can be replicated and institutionalized. In scope of the project implementation, the Delegation will facilitate the communication with the Directorate-General for Education and Culture and the EU Agency for Vocational Education and Training, as to ensure that the Mongolian Beneficiaries, through the Technical Assistance Team, will benefit from the experience and advice that can be obtained through these channels. On a request basis, the Delegation will further facilitate the networking with similar EU funded project in the Region Risks and Assumptions Risks The programme will require assurance by the Government of Mongolia that AVET will obtain the necessary funding required to implement its activities. Moreover, the following risks can be identified at this stage: The identification of a national fit-for-purpose TVET system is still at an experimental stage. The internal logic of change within the present TVET system indicates that the implementation capacities of the whole TVET-related institutional framework need to be strengthened. To mitigate this risk, the project is expected to focus on capacity building of the main TVET institutions, notably the AVET and the NCVET. The current situation is still fragile and unpredictable given the high turn-over of staff within the ministries and various government agencies. Moreover, the political landscape for reform could change with the coming elections in To mitigate this risk, the project will request to the government counterpart guarantees on the mid-term permanence of trained beneficiaries in their posts. Tensions exist between AVET and the Ministry of Education. The Agency reports directly to the Prime Minister but derives its budget from the Ministry of Education. As such, there appears to be no clear distinction in terms of accountability. To mitigate this risk, the Project Steering Committee will include all relevant ministries involved in the process. Assumptions 6

7 This project proposal is based on the following assumptions: There will be stable economic development and growth throughout , based on the predicted economic forecasts and that the demand for skilled employable labour and the need for an improved TVET sector will remain a high priority; The AVET, supported by MCA project international technical assistance, will draft a national strategy including milestones and indicators of results, which the project will dovetail, in coordination with other donors; The AVET will have sufficient personnel to provide counterparts to the Technical Assistance Team so as to be fully engaged in the project s work, to help to build the capacity of staff on a continuing basis and to provide continuity in the future; Continuous support by relevant ministries and institutions as well as social partners, in order to achieve the project s anticipated results including a smooth transition of MCA project activities to AVET; Active participation of all schools and stakeholders at national, regional and local levels in the project s activities; Supply of necessary equipment to TVET schools to meet the new curricula requirements will be provided either by the Government or through Public-Private Partnership or donor grants as the EU project will not provide equipment Crosscutting Issues Issues of good governance (transparency and accountability) are given extensive focus in the capacity-building of the AVET and the proposed support accorded to the NCVET and Sector Council for Agriculture; The project gives focus to disadvantaged rural groups through its activities in the agriculture sector, which is consonant with an EU policy of support to the very poor and vulnerable people; The development of new curricula for training programmes related to rural development will give attention to issues of environmental sustainability; There will be equal opportunity principles and practices to ensure equal gender participation in the project. 3.5 Stakeholders The following actors have been identified and will be further defined during the inception phase: The AVET is the main beneficiary, responsible for the operational implementation of the sector reforms. It coordinates TVET policy and is directly responsible for the public vocational schools and institutes (curricula, standards etc) and for the agreements with all the private schools officially cooperating with the state in the provision of TVET; NCVET - 8 representatives from those State Ministries that have an active interest in education and in particular TVET and 8 representatives from business and trade union organisations; The National Learning Resource Centre, to be established by the currently ongoing MCA funded project, which is anticipated to disseminate resource materials and to provide continuous professional development for regional and local schools; The 6 Regional Methodological centers, which should serve as link between the national and local level for the implementation of the national policies; Technical and vocational education institutions (64 institutions 44 public and 20 private) with some 45,971 students ( ) and 2,062 trainers; The Ministry of Education, Culture and Science, which was instrumental in the establishment of the Agency for the Vocational Education and Training which is part of its annual budget; Ministry of Social Welfare and Labour, targeting the people who are below the poverty line with very specific trainings to enable them to become self-employed. It delivers 150 vocational training sessions every year; 7

8 Ministry of Food, Agriculture & Light Industries, providing non-formal training on livestock management skills and grassland management; Mongolian National Chamber of Commerce and Industry (MNCCI) - the main business representative body of Mongolian business community and the Mongolian Employers Federation (MONEF) a nationwide organisation with 21 regional employers association, 12 sectoral associations and representing some 8,100 businesses. The Mongolian Employers Federation and the Chamber of Commerce are active at the local level in working with TVET schools to ensure that the required numbers of trained workers are produced by the schools. The partnerships allow companies to transmit their needs to the schools and also to provide students with practical experience through a non-official internship system; National Development and Innovation Committee established by Parliament to formulate Government action plan strategies, economic development policies, technology and innovation concepts, and to evaluate the implementation of the Millennium Development Goals. 4 IMPLEMENTATION ISSUES 4.1 Method of implementation The project will be implemented by the EU Delegation to China and Mongolia through direct centralized management. A Financing Agreement will be signed with the Ministry of Finance of Mongolia covering the whole project.. Following the launching of tender procedures two service contracts will be signed by the European Commission within three years following the entry into force of the Financing Agreement. The provision of technical cooperation will be guided by local ownership and be demand driven. A National Strategy, representing the logical framework for the project and for other donors projects included in the sector programme, will be drafted by the AVET prior to the signature of the Financing Agreement. Technical assistance provided will be embedded in the agency and no parallel project implementation units are foreseen. The project will be implemented through two separate service contracts: One service contract to provide technical assistance to the TVET Agency resulting from the launch of an international restricted service tender. The Call for Tenders will be launched by the EU Delegation to China and Mongolia. One service contract to support the AVET and other relevant stakeholders at regional and provincial level to replicate and up-scale best practices experienced in Mongolia in order to ensure employment opportunities in the labour market and partnership with the private sector. This tender is expected be launched in the second year of the implementation of the project to allow the AVET and other relevant stakeholders to identify the best practices and to define jointly the Terms of Reference on the basis of the needs and experiences in the field. A Call for Tender will be launched by the EU Delegation. The technical assistance team will coordinate with and report regularly to the AVET. A joint Project Steering Committee will be established on a programme level to coordinate and review EU/Swiss (possibly additional donors) TVET interventions. The Project Steering Committee will be held twice a year under the leadership of AVET. The EU Delegation will be a voting member of the Project Steering Committee. One of the Project Steering Committee meetings each year shall be combined with a dialogue on progress at policy/strategy level, led by NCVET (National Council for Vocational Education and Training). 4.2 Procurement and grant award procedures All contracts implementing the action must be awarded and implemented in accordance with the procedures and standard documents laid down and published by the Commission for the implementation of external operations, in force at the time of the launch of the procedure in question. 8

9 Participation in the award of contracts for the present action shall be open to all natural and legal persons covered by the Development Cooperation Instrument (DCI). Further extensions of this participation to other natural or legal persons by the concerned authorising officer shall be subject to the conditions provided for in articles 31(7) and (8) Development Cooperation Instrument. 4.3 Budget and calendar The total cost of the project is estimated at EUR , of which a maximum of EUR will be covered by the general budget of the European Union. The contribution from the Government will only be in kind, notably through provision of office space to accommodate the Technical Assistance Team and support staff seconded from to counterpart. The table below summarizes the estimated project budget. The breakdown of the budget is indicative and may be adjusted according to the need and subject to prior written agreement between the Beneficiary and the European Commission. Project Breakdown Categories (In Euro) EU contribution Total Contracting/Paying Authority 1. Services Service contract European Commission 1.2 Service contract European Commission 1.3 Monitoring, External Evaluation and Audit European Commission 1.4 Contingencies European Commission TOTAL The operational duration of the project is set at 60 months as from signature of the Financing Agreement. 4.4 Performance monitoring Adequate day-to-day project monitoring will be carried out by the project. The projects will be subject to both internal and external Result Oriented Monitoring (ROM). Performance of the overall action will be monitored according to indicators jointly established with the AVET and will be monitored with reference to standard performance indicators in the TVET sectors relevant to the action and to be determined during the Inception phase. 9

10 4.5 Evaluation and audit Independent mid-term and final external evaluations and, possibly an ex-post evaluation will be funded by the project. These evaluations will be carried out by independent consultants recruited directly by the Commission, in accordance with EU rules and procedures on specifically established terms of reference. Government and European Commission joint decisions (if any) would be taken on the follow-up actions and necessary adjustments, including, if indicated, the reorientation of the programme. 4.6 Communication and visibility The programme will follow the visibility guidelines of the Commission and visibility will form part of the communication strategy and regular bulletins, which will include all stakeholders. The terms of reference of the service contractors will make provision for ensuring the visibility of EU contribution, in all relevant activities and in appropriate forms, in coordination with the Delegation of the European Union. 10

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I)

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I) Action Fiche for Syrian Arab Republic 1. IDTIFICATION Title/Number Support to the EU-Syria Association Agreement Programme (SAAP I) Total cost EU contribution: EUR 5 000 000 Beneficiary contribution: tbc

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

Action Fiche for Lebanon

Action Fiche for Lebanon Action Fiche for Lebanon 1. IDENTIFICATION Title/Number Facility in support of SMEs energy efficiency investments Total cost EU Contribution : 15,000,000 Aid method / Method of implementation Project approach

More information

Action Fiche for Libya

Action Fiche for Libya Action Fiche for Libya 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Public administration capacity-building facility (ENPI/2011/276-708) EU contribution: EUR 4.5 million

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Action Fiche for West Bank and Gaza Strip. PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million.

Action Fiche for West Bank and Gaza Strip. PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million. Action Fiche for West Bank and Gaza Strip 1. IDENTIFICATION Title/Number Total cost PEGASE: Private Sector Development CRIS: 2010/22476 EU Contribution: EUR11 million. Aid method / Method of implementation

More information

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode ANNEX 1. IDTIFICATION Title Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode DAC-code 15010 Project approach Partially decentralised management.

More information

Action Fiche for Armenia Sector Multi Sector

Action Fiche for Armenia Sector Multi Sector Action Fiche for Armenia 1. IDENTIFICATION Title Total cost Aid method / Management mode DAC-code Twinning Projects between 3 or 4 Armenian administrations and their equivalent in EU Member States to foster

More information

DAC-code Sector Public Sector Policy and Administrative Management

DAC-code Sector Public Sector Policy and Administrative Management ANNEX 1 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementatio n Framework Programme in support of EU-Ukraine Agreements CRIS: ENPI/2012/23714

More information

ANNEX 1. of the Commission Implementing Decision on. Action Document for Support to SME Development in Armenia

ANNEX 1. of the Commission Implementing Decision on. Action Document for Support to SME Development in Armenia ANNEX 1 of the Commission Implementing Decision on the Annual Action Programme 2014 in favour of Armenia to be financed from the general budget of the European Union Action Document for Support to SME

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

Empowerment of non state actors in Botswana

Empowerment of non state actors in Botswana Annex: Empowerment of non state actors in Botswana 1. IDENTIFICATION Title/Number Empowerment of non state actors in Botswana BW/FED/022-316 Total cost EUR 10 000 000 European Union contribution : EUR

More information

EN AIDCO/ (2010) EN EN

EN AIDCO/ (2010) EN EN EN AIDCO/ (2010) 87827 EN EN Annex 1. Identification Title/Number Total cost Aid method / Method of implementation DAC-code Support to the Greenland Education and Vocational Training Sector 2010, CRIS

More information

Project approach - Decentralised management. DAC-code Government Administration

Project approach - Decentralised management. DAC-code Government Administration ANNEX Annex1 ACTION FICHE FOR SYRIAN ARAB REPUBLIC / ENPI / LOCAL DEVELOPMENT 1. IDENTIFICATION Title/Number Promoting Decentralisation and Local Development (DLD) Total Cost EC contribution 20,000,000

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/ EN 1 EN ACTION FICHE FOR ARMENIA - ENPI AAP 2008 1. IDENTIFICATION Title Total cost Aid method / Management mode Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation

More information

Evaluation of the European Union s Co-operation with Kenya Country level evaluation

Evaluation of the European Union s Co-operation with Kenya Country level evaluation "FICHE CONTRADICTOIRE" Evaluation of the European Union s Co-operation with Kenya Country level evaluation Recommendations Responses of Services: Follow-up (one year later) GENERAL RECOMMENDATIONS 1 Give

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI Annex I Action Fiche for West Bank and Gaza Strip/ ENPI 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation PEGASE: Support to Recurrent Expenditures of the PA EUR 158,500,000

More information

New Zealand Vanuatu. Joint Commitment for Development

New Zealand Vanuatu. Joint Commitment for Development New Zealand Vanuatu Joint Commitment for Development 2 The Joint Commitment for Development between the Governments of New Zealand and Vanuatu establishes a shared vision for achieving long-term development

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual

More information

ANNEX 14 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument. Action Fiche for Public Diplomacy

ANNEX 14 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument. Action Fiche for Public Diplomacy ANNEX 14 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for Public Diplomacy 1. IDENTIFICATION Title of the action Country(ies)/

More information

Action Fiche for the West Bank and Gaza Strip

Action Fiche for the West Bank and Gaza Strip Action Fiche for the West Bank and Gaza Strip 1. IDENTIFICATION Title/Number Land development and basic infrastructure in Area C (ENPI/2012/023-776) Total cost EU contribution: EUR 7,000,000 Aid method

More information

Cross-border Cooperation Action Programme Montenegro - Albania for the years

Cross-border Cooperation Action Programme Montenegro - Albania for the years ANNEX 1 Cross-border Cooperation Action Programme Montenegro - Albania for the years 2015-2017 1 IDENTIFICATION Beneficiaries CRIS/ABAC Commitment references Union Contribution Budget line Montenegro,

More information

Action Fiche for NEPAL. DAC-code 11200, Sector: Basic Education

Action Fiche for NEPAL. DAC-code 11200, Sector: Basic Education Action Fiche for NEPAL 1. Identification Title/Number Total cost School Sector Reform (SSR), Nepal. DCI-ASIE/2009/21209 Total cost of the project : 1 969 520 000 1 (approx.) Total EC Contribution: 26 353

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP EUROPEAN COMMISSION EUROPEAN EXTERNAL ACTION SERVICE VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP ***LAST UPDATE 24 SEPTEMBER 2010*** Table of Contents PART I An Overview of the Eastern

More information

ANNEX Action Fiche for Technical Cooperation Facility II for Palau

ANNEX Action Fiche for Technical Cooperation Facility II for Palau ANNEX Action Fiche for Technical Cooperation Facility II for Palau 1. IDENTIFICATION Title Technical Cooperation Facility CRIS no. FED/2013/024-369 Total cost 180,000 (6.2% of NIP A envelope) EDF contribution

More information

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR Annex of the Commission Decision on the individual measure in favour of Tanzania to be financed from the 11 th European Development Fund Action Document for 11 th EDF Support to the Office of the NAO 1

More information

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group

More information

Progress on the Strengthening of the European Integration Structures

Progress on the Strengthening of the European Integration Structures TENTH MEETING OF THE STABILISATION AND ASSOCIATION PROCESS TRACKING MECHANISM CONCLUSIONS PRISTINA, 14 JULY 2006 The tenth meeting of the Stabilisation and Association Process Tracking Mechanism was held

More information

Action Fiche Trinidad and Tobago

Action Fiche Trinidad and Tobago Action Fiche Trinidad and Tobago 1. Identification Title/Number Accompanying Measures for Sugar Protocol Countries, Trinidad and Tobago 2011-2013 CRIS Number: 023-150 Total cost EU Contribution: EUR 31

More information

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630 ANNEX ACTION FICHE GEORGIA PI AAP 2008 1. IDTIFICATION Title Total cost 16 M Aid method / management mode Support to the reform of criminal justice system in Georgia - CRIS N PI/2008/19630 Sector Policy

More information

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000 Annex II Action Fiche for West Bank and Gaza Strip/ENPI 1. IDENTIFICATION Title/Number Total cost 10,500,000 Aid method / Method of implementation PEGASE: Governance and Social Development [note: No co-financing

More information

EN 20 EN ACTION FICHE FOR EGYPT. Annex IDENTIFICATION Title

EN 20 EN ACTION FICHE FOR EGYPT. Annex IDENTIFICATION Title Annex 3 ACTION FICHE FOR EGYPT 1. IDENTIFICATION Title Total cost Aid method / management mode Education Sector Policy Support Programme Additional Commitment EUR 20 000 000 (EC contribution) Sector Policy

More information

Action Fiche for Syrian Arab Republic. EUR Beneficiary contribution: tbd Project approach partly decentralised management

Action Fiche for Syrian Arab Republic. EUR Beneficiary contribution: tbd Project approach partly decentralised management Action Fiche for Syrian Arab Republic 1. IDENTIFICATION Title/Number Reforming and Modernising the Judiciary Total cost Aid method / Method of implementation EUR 5 000 000 Beneficiary contribution: tbd

More information

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MULTI-COUNTRY Support to Western Balkans Infrastructure Investment Projects for 2014 Action Summary This Action will allow financing Technical

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

Follow-up by the European Commission to the EU-ACP JPA on the resolution on private sector development strategy, including innovation, for sustainable

Follow-up by the European Commission to the EU-ACP JPA on the resolution on private sector development strategy, including innovation, for sustainable Follow-up by the European Commission to the EU-ACP JPA on the resolution on private sector development strategy, including innovation, for sustainable Development. The European External Action Service

More information

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level. ` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid Evaluation of Budget Support Operations in Morocco Summary July 2014 Development and Cooperation EuropeAid A Consortium of ADE and COWI Lead Company: ADE s.a. Contact Person: Edwin Clerckx Edwin.Clerck@ade.eu

More information

«FICHE CONTRADICTOIRE»

«FICHE CONTRADICTOIRE» «FICHE CONTRADICTOIRE» Evaluation of the Commission s External Cooperation with Angola (Country level evaluation) (*For details on the recommendations please refer to the main report) Recommendations STRATEGIC

More information

Vanuatu. Vanuatu is a lower-middle-income country with a gross national income (GNI) of

Vanuatu. Vanuatu is a lower-middle-income country with a gross national income (GNI) of 00 Vanuatu INTRODUCTION Vanuatu is a lower-middle-income country with a gross national income (GNI) of USD 2 620 per capita (2009) and a population of 240 000 (WDI, 2011). Net official development assistance

More information

Recommendations on what the EC can do to promote uptake of EFSI by the social services sector

Recommendations on what the EC can do to promote uptake of EFSI by the social services sector Recommendations on what the EC can do to promote uptake of EFSI by the social services sector Commissioned, monitored and guided in 2015 by EASPD Researched and Written in 2015 by Diesis Coop and Sefea

More information

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews The DAC s main findings and recommendations Extract from: OECD Development Co-operation Peer Reviews Luxembourg 2017 Luxembourg has strengthened its development co-operation programme The committee concluded

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information

This action is funded by the European Union

This action is funded by the European Union EN This action is funded by the European Union ANNEX 2 of the Commission Implementing Decision on the Annual Action Programme 2015 part II in favour of the Republic of Lebanon Action Document for "Technical

More information

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201 ANNEX to Commission Implementing Decision adopting an Annual Action Programme for Turkey under the Instrument for Pre-accession Assistance (IPA II) for the year 2017 1. IDENTIFICATION Beneficiary CRIS/ABAC

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

Draft COMMISSION DECISION

Draft COMMISSION DECISION Draft COMMISSION DECISION of on the 2008 Annual Action Programme of Accompanying Measures for Sugar Protocol Countries in favour of Trinidad and Tobago to be financed under Article 21.060300 of the general

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX of the Commission Implementing Decision on the individual measure in favour of South Africa to be financed from the general budget of the European Union

More information

Annex 1. IDENTIFICATION

Annex 1. IDENTIFICATION 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Annex DAC-code 15112 Sector Ghana Decentralisation Support Programme - GDSP- Component I CRIS ref. GH/FED/022-108 EUR 5 000

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

UN-OHRLLS COUNTRY-LEVEL PREPARATIONS

UN-OHRLLS COUNTRY-LEVEL PREPARATIONS UN-OHRLLS COMPREHENSIVE HIGH-LEVEL MIDTERM REVIEW OF THE IMPLEMENTATION OF THE ISTANBUL PROGRAMME OF ACTION FOR THE LDCS FOR THE DECADE 2011-2020 COUNTRY-LEVEL PREPARATIONS ANNOTATED OUTLINE FOR THE NATIONAL

More information

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE Annex to Government Decision 21 December 2017 (UD2017/21053/IU) Guidelines for strategies in Swedish development

More information

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

ANNEX 6 of the Commission Implementing Decision on the 2016 Annual Action programme for the Partnership Instrument

ANNEX 6 of the Commission Implementing Decision on the 2016 Annual Action programme for the Partnership Instrument EN ANNEX 6 of the Commission Implementing Decision on the 2016 Annual Action programme for the Partnership Instrument Action Fiche for the support to the development of an India-EU Water Partnership (IEWP)

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID

EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID EU FORDERUNG FUR MIGRANTEN ORGANISATIONEN UND TRAGER DER PARTICIPATIONS UND INTEGRATIONS ARBEIT IN BERLIN MOVE GLOBAL 25 October 2014, Berlin About

More information

Proposed Luxembourg-WHO collaboration: Supporting policy dialogue on national health policies, strategies and plans in West Africa

Proposed Luxembourg-WHO collaboration: Supporting policy dialogue on national health policies, strategies and plans in West Africa Proposed Luxembourg-WHO collaboration: Supporting policy dialogue on national health policies, strategies and plans in West Africa I. INTRODUCTION Effective national health systems require national health

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance

More information

No formal poverty-reduction strategy (PRS) currently exists in Morocco. The

No formal poverty-reduction strategy (PRS) currently exists in Morocco. The 8 MOROCCO The survey sought to measure objective evidence of progress against 13 key indicators on harmonisation and alignment (see Foreword). A four-point scaling system was used for all of the Yes/No

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

Maldives: Developing the Revenue Administration Management Information System

Maldives: Developing the Revenue Administration Management Information System Completion Report Project Number: 44414-012 Technical Assistance Number: 7946 July 2015 Maldives: Developing the Revenue Administration Management Information System This document is being disclosed to

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 26 May 2015 Original: English 2015 session 21 July 2014-22 July 2015 Agenda item 7 Operational activities of the United Nations for international

More information

COMMISSION IMPLEMENTING DECISION. of adopting a

COMMISSION IMPLEMENTING DECISION. of adopting a EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9352 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Montenegro- Albania for the years 2014-2020 and

More information

Country: Serbia. Initiation Plan. Development of Youth Employment Bond

Country: Serbia. Initiation Plan. Development of Youth Employment Bond United Nations Development Programme Country: Serbia Initiation Plan Project Title: Expected CP Outcome(s): Development of Youth Employment Bond By 2020, there is an effective enabling environment that

More information

Mongolia The SCD-CPF Engagement meeting with development partners September 1 and 22, 2017

Mongolia The SCD-CPF Engagement meeting with development partners September 1 and 22, 2017 Mongolia The SCD-CPF Engagement meeting with development partners September 1 and, 17 This is a brief, informal summary of the issues raised during the meeting. If you were present and wish to make a correction

More information

Action Fiche for Eastern Neighbourhood Civil Society Facility 2012 and 2013

Action Fiche for Eastern Neighbourhood Civil Society Facility 2012 and 2013 Action Fiche for Eastern Neighbourhood Civil Society Facility 2012 and 2013 1. IDENTIFICATION Title/Number Special measure: Eastern Neighbourhood Civil Society Facility 2012 and 2013 CRIS: 2012/024-279

More information

EN AIDCO/ (YYYY) D/NNN EN EN

EN AIDCO/ (YYYY) D/NNN EN EN EN AIDCO/ (YYYY) D/NNN EN EN ANNEX 1. IDENTIFICATION Title/Number St. Kitts and Nevis Accompanying Measures for Sugar Protocol Countries Allocation 2010 CRIS Number: 022-412 Budget heading Budget line

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance Ex-ante Evaluation 1. Name of the Project Country: Mongolia Project: Two-Step Loan Project for Small and Medium-Scale Enterprises Development and Environmental Protection (Loan Agreement: March 28, 2006;

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 BOSNIA AND HERZEGOVINA European Integration Facility Action Summary The Action is designed to provide support to institutions in Bosnia and Herzegovina

More information

1. Project Description

1. Project Description Mongolia Ex-Post Evaluation of Japanese ODA Loan Social Sector Support Program (I) (II) External Evaluator: Naomi Murayama, OPMAC Corporation 0. Summary The objective of this program (hereinafter referred

More information

STRATEGIC PROJECT SUPPORT TO EU ASSISTANCE IN THE CONTEXT OF EU EXTERNAL POLICIES

STRATEGIC PROJECT SUPPORT TO EU ASSISTANCE IN THE CONTEXT OF EU EXTERNAL POLICIES STRATEGIC PROJECT SUPPORT TO EU ASSISTANCE IN THE CONTEXT OF EU EXTERNAL POLICIES IMPLEMENTATION PLAN - WP2018 1. Summary The ETF provides support to the EC services and the EU Delegations (EUD) in its

More information

Screening report Montenegro

Screening report Montenegro Screening report Montenegro Chapter 22 Regional policy and coordination of Structural Instruments Date of screening meetings: Explanatory meeting: 14-15 November 2012 Bilateral meeting: 18 December 2012

More information

Foreword. The Bank of Mongolia (The Central Bank) Public Education and Information Center

Foreword. The Bank of Mongolia (The Central Bank) Public Education and Information Center Foreword Financial market stability is defined by the level of fulfillment of interrelated objectives such as to secure individuals trust and confidence in financial markets, improve their financial literacy,

More information

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Suggested elements for the post-2015 framework for disaster risk reduction

Suggested elements for the post-2015 framework for disaster risk reduction United Nations General Assembly Distr.: General 16 June 2014 A/CONF.224/PC(I)/6 Original: English Third United Nations World Conference on Disaster Risk Reduction Preparatory Committee First session Geneva,

More information

EN Official Journal of the European Union L 77/77

EN Official Journal of the European Union L 77/77 15.3.2014 EN Official Journal of the European Union L 77/77 REGULATION (EU) No 234/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 establishing a Partnership Instrument for cooperation

More information

Solidar EU Training Academy. Valentina Caimi Policy and Advocacy Adviser. European Semester Social Investment Social innovation

Solidar EU Training Academy. Valentina Caimi Policy and Advocacy Adviser. European Semester Social Investment Social innovation Solidar EU Training Academy Valentina Caimi Policy and Advocacy Adviser European Semester Social Investment Social innovation Who we are The largest platform of European rights and value-based NGOs working

More information

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT PROPOSAL PAGE 1 OF 10 Country

More information

ANNEX. Aid method / Method of implementation. Trade policy and administrative management 2. RATIONALE Sector context

ANNEX. Aid method / Method of implementation. Trade policy and administrative management 2. RATIONALE Sector context ANNEX 1. IDENTIFICATION Title EU-Philippines Trade Related Technical Assistance Project 3 (TRTA 3) Republic of the Philippines / Trade Related Technical Assistance DCI-ASIE/2012/023-158 Total cost Total

More information

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS Informal Consultation 7 December 2015 World Food Programme Rome, Italy PURPOSE 1. This update of the country strategic planning approach summarizes the process

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 ALBANIA European Union Integration Facility Action summary The Action will strengthen the capacity and accountability of the Albanian public administration

More information

JAES Action Plan : Cross-cutting issues

JAES Action Plan : Cross-cutting issues JAES Action Plan 2011-13: Cross-cutting issues Both sides agree on the following options on cross-cutting issues to enhance the effectiveness of the Action Plan and to improve its working methods. Introduction

More information

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness SURVEY GUIDANCE 2011 Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness This document explains the objectives, process and methodology agreed for the 2011 Survey on

More information

EUROPEAN COUNCIL Brussels, 26 March Delegations will find attached the conclusions of the European Council (25/26 March 2010).

EUROPEAN COUNCIL Brussels, 26 March Delegations will find attached the conclusions of the European Council (25/26 March 2010). EUROPEAN COUNCIL Brussels, 26 March 2010 EUCO 7/10 CO EUR 4 CONCL 1 COVER NOTE from : General Secretariat of the Council to : Delegations Subject : EUROPEAN COUNCIL 25/26 MARCH 2010 CONCLUSIONS Delegations

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

«FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh. (*For details on the recommendations please refer to the main report)

«FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh. (*For details on the recommendations please refer to the main report) Ref. Ares(2016)5406779-16/09/2016 «FICHE CONTRADICTOIRE» Joint Country Level Evaluation of Bangladesh (*For details on the recommendations please refer to the main report) Recommendations Response of Commission

More information