1 The UN Peacebuilding Fund (PBF) Donor Update Briefing 15 January 2009 Financing for Peacebuilding Branch (FPB) - Peacebuilding Support Office (PBSO) Overview of Presentation I. Financial Update Key Portfolio Indicators Approvals, Disbursements & Expenditures II. Projects III. Programmatic Issues Evaluation: Conclusions & Emerging Recommendations Review of PBF Terms of Reference PBSO Reconfiguration and Services 1
2 I. Financial Update Key Portfolio Indicators Total Pledges: New Pledges: Commitments: Deposits: Number of Donors: US$ 278 million US$ 6.8 million US$ 271 million (more than initial target) US$ 248 million (95.4% of commitments) 44 (8 donors account for 80% of Pledges) 2 PBF Portfolio (US$ million) PBF Overview (in US$ millions, as of Dec. 2008) (As of 30 December 2008) $300 $250 $200 $150 $100 Sep-07 Mar-08 Jun-08 Sep-08 Dec-08 $50 $0 Pledges Deposits Commitments Allocations Approvals 3 Fund activities
3 Peacebuilding Multi-Donor Trust Fund (MDTF) Resource Utilization Indicators Progress over past 12 months - indicative Jan Jan Countries receiving PBF funding : 8 W I: 2 W II: 2 WIII: 4 11 W I: 4 W II: 5 WIII: 7 Funds Allocated: (per approved PP) $73 million 37% of total deposits $122 million 50 % of total deposits Approved Projects (as per NSC s) $47 million 24% of total deposits $99 million 40% of deposits 80% of country allocations Approved projects: 26 WI: 22 WII: - WIII: 4 WI: 46 WII: 16 WIII: Combined delivery 5 70 II. Projects PBF Countries. Allocation by Window Haiti $800,000 Guinea $963,284 Guinea $TBD Nepal $10 million Guinea-Bissau $6 million Kenya $ 1 million Sierra Leone $35 million CAR $10 million CAR $801,975 Liberia $788,644 Cote d Ivoired $1 million Liberia $15 million Côte d Ivoire d $5 million Window I Window II Window III Burundi $35 million Comoros $TBD Burundi $1 million 5
4 Window I Summary Country # of projects PBF Funding Envelope Value Approved Estimated Delivery of approved Remarks Burundi 17 35,000,000 32,836,315 53% Implementation underway Sierra Leone 14 35,000,000 32,669,828 61% Implementation underway Guinea Bissau 4 6,000,000 5,686,889 CAR 11 10,000,000 6,039,060 1 at 100% others starting All newly approved 4 projects approved based on Interim Priority Plan & 1 st trance allocation. Election project completed PBC agenda country now, Priority Plan approved with 1 st tranche allocation. Project formulation and approval now underway. Total W I 46 86,000,000 77,232,092 6 Window II Summary Country # projects PBF Funding Envelope Value Approved Liberia 14 15,000,000 10,300,000 Côte d Ivoire 2 5,000,000 5,000,000 Estimated Delivery (% of approved) 2 at 100%. Others starting 1 at 59%. Other n/a Remarks Includes Dec approvals by JSC Economic reintegration project at 59%, dialogue recently initiated.. Nepal n/a 10,000, Priority Plan approved 29 July. Plans to channel PBF through common Fund being considered. Guinea n/a n/a n/a n/a Declared eligible in June Priority Plan preparations underway. Comoros n/a n/a n/a n/a Declared eligible in June Priority Plan submitted late December 2008 for PBSO approval. Total WII 16 30,000,000 15,300,000 n/a 7
5 Window III (Emergency) Summary Country Type of projects Value Approved Estimated Delivery (% of approved) Remarks Burundi Peace agreement support 1,000,000 30% Initial allocation topped up with US$ 493,000 Dec CAR Inclusive Political Dialogue 801,975 75% CAR now on PBC agenda (WI). Final political dialogue held in December. Côte d Ivoire Guinea Kenya Haiti Liberia TOTAL Support to Direct Dialogue in Ouagadougou National dialogue Emergency Volunteer Scheme Enhancing Civil prison security Reconciliation / dialogue in Nimba County 1,000, ,284 1,000, , ,644 6,353,903 Est. 50% 100% 75% 25% 100% Project completed. Continued support to dialogue from WII. Initial dialogue completed; new political reality requires review of needs to allot balance. Training of UNVs completed, community project running Design phase completed, implementation delayed to relocate the neighborhood Completed Oct Review of pilot reconciliation model done 8 III. Programmatic Issues PBF Evaluation Conclusions & Emerging Recommendations 9
6 Evaluation: Conclusions & Emerging Recommendations Conclusions Clear role / niche for Peacebuilding exists Inherent tensions in operations need to be recognized Fund management challenges more remains to be done Need for more focus on strategic results at all levels Catalytic role of the Fund to realized Project Implementation challenges pace of expenditure Despite challenges notable early results on the ground 10 Recommendations Clarify PBSO s role with partners Strategic internal resource assessment for PBSO Improved tools, guideline and procedures Strengthen Fund accountability Address delays in project implementation Systematic lessons across countries, in office, with partners 11
7 PBF Terms of Reference Review May Oct. 2008: Independent evaluation of the PBF. [completed] Oct. 2008: PBSO consults with PBF Advisory Group on findings / recommendations. Secretary-General reviews PBF progress with AG [done] Nov. 2008: PBSO presents issues paper on the revision of TORs to OC [done] Dec. 2008: OIOS submits final evaluation report to PBSO [done] Nov.08 -Jan. 09: Consultations with stakeholders on PBF review process initiated, firstly with beneficiaries & PBC. [ongoing] Jan. 2009: PBSO Management Response letter [near completion] Jan.-Feb. 2009: Second phase of consultations initiated [ongoing] March 2009: Submission of SG Report on the revision of TOR [pending] May 2009: SG submits revised TOR to the GA [pending] 12 PBSO Functional Structure 13
8 Financing for Peacebuilding Branch Functional areas / tasks Products and Services (some examples) Guidance on PBF programme design. Oversee allocations and reporting (with MDTF office). Programmatic & financial PBF stewardship Monitor, evaluate and report on PBF Leverage new funds & mobilize resources Manage Donor relations Analyse funding gaps & track financing for PB Links to academic institutions / best practices. Helping the UN learn conflict transformation. Set up in-country M&E systems, focus on impact of fund. Work with UNCT s identifying in-country interest / possible resources: eg. Worldbank. Joint programme support. Donor Briefings, Appeals Support to incountry Appeals Mapping Resources & Gaps for Peacebuilding. Support UNCT sto manage information, analysis 14 Thank you Any questions? PBSO Contacts: Patrice Chiwota FPB Peacebuilding Programmes chiwota@un.org Jonathan Andrews FPB Partnerships / Donor Relations andrews2@un.org Ihab Moustafa PBC Support Branch, Member States moustafai@un.org
Executive Summary - 3 -
Report of the Office of Internal Oversight Services on the Independent Evaluation of the Peacebuilding Fund: Fund Fills Clear Niche and Has Seen Early Results, But Must Become Speedier, More Efficient
More informationGeneral Assembly Security Council
United Nations A/63/218 General Assembly Security Council Distr.: General 4 August 2008 Original: English General Assembly Sixty-third session Item 103 of the provisional agenda* Report of the Secretary-General
More informationSecond Consolidated Annual Progress Report on Activities Implemented under the Peacebuilding Fund
Second Consolidated Annual Progress Report on Activities Implemented under the Peacebuilding Fund Report of the Administrative Agent of the Peacebuilding Fund for the Period 1 January to 31 December 2008
More informationGeneral Assembly Security Council
United Nations A/64/217 General Assembly Security Council Distr.: General 3 August 2009 Original: English General Assembly Sixty-fourth session Item 108 of the provisional agenda* Report of the Secretary-General
More information2008 SENIOR MANAGER S COMPACT
2008 SENIOR MANAGER S COMPACT Between Assistant Secretary-General for Peacebuilding Support, Ms. Carolyn McAskie, and the Secretary-General, Mr. Ban Ki-moon DEPARTMENT/OFFICE: Peacebuilding Support Office
More informationArrangements for the revision of the terms of reference for the Peacebuilding Fund
United Nations A/63/818 General Assembly Distr.: General 13 April 2009 Original: English Sixty-third session Agenda item 101 Report of the Secretary-General on the Peacebuilding Fund Arrangements for the
More informationPeacebuilding Fund Board
Peacebuilding Fund Board Inaugural Meeting SRI LANKA 29 January 2016 Outline 1) Peacebuilding fund 2) Peacebuilding facilities Immediate response facility Peacebuilding and recovery facility 3) Initiatives
More informationConsolidated Annual Financial. Report of the Administrative Agent. for. the Peacebuilding Fund
Consolidated Annual Financial Report of the Administrative Agent for the Peacebuilding Fund for the period 1 January to 31 December 2016 Multi-Partner Trust Fund Office Bureau for Management Services United
More informationTitle: Fragile States: Funding opportunities under UN funding mechanisms. Raky Kane 22 April 2015
Title: Fragile States: Funding opportunities under UN funding mechanisms Raky Kane 22 April 2015 Fragile states Funding opportunities under UN funding mechanisms Types of pooled funding in the UN system
More informationConsolidated Annual Financial Report of the Administrative Agent of the Peacebuilding Fund
PEACEBUILDING FUND CONSOLIDATED ANNUAL FINANCIAL REPORT 2014 Consolidated Annual Financial Report of the Administrative Agent of the Peacebuilding Fund for the period 1 January to 31 December 2014 Multi-Partner
More informationConsolidated Annual Financial. Report of the Administrative Agent. of the Peacebuilding Fund
Consolidated Annual Financial Report of the Administrative Agent of the Peacebuilding Fund for the period 1 January to 31 December 2015 Multi-Partner Trust Fund Office Bureau of Management United Nations
More informationREGIONAL MATTERS ARISING FROM REPORTS OF THE WHO INTERNAL AND EXTERNAL AUDITS. Information Document CONTENTS BACKGROUND
2 June REGIONAL COMMITTEE FOR AFRICA ORIGINAL: ENGLISH Sixty-seventh session Victoria Falls, Republic of Zimbabwe, 28 August 1 September Provisional agenda item 19.9 REGIONAL MATTERS ARISING FROM REPORTS
More informationINTERNAL AUDIT DIVISION AUDIT REPORT 2013/091. Audit of the United Nations Peacebuilding Support Office
INTERNAL AUDIT DIVISION AUDIT REPORT 2013/091 Audit of the United Nations Peacebuilding Support Office Overall results relating to the effective support of the Peacebuilding Support Office to the Peacebuilding
More informationGPEI Financing
GPEI Financing 2013-18 funding, gap & flexibility 2013 budget vs. spend (WHO) cashflow 2014 what is/isn't included in FRRs? status of pledges 1 GPEI Funding Gap Funding Gap USD millions 2013-2018 Feb 2013
More informationIFAD s participation in the Heavily Indebted Poor Countries Debt Initiative. Proposal for the Comoros and the 2010 progress report
Document: EB 2010/101/R.16 Agenda: 12 Date: 16 November 2010 Distribution: Public Original: English E IFAD s participation in the Heavily Indebted Poor Countries Debt Initiative Proposal for the Comoros
More informationArrangements for establishing the Peacebuilding Fund
United Nations A/60/984 General Assembly Distr.: General 22 August 2006 Original: English Sixtieth session Agenda items 46 and 120 Integrated and coordinated implementation of and follow-up to the outcomes
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE IC/2012/026 TOR - CONSULTANCY Date: 16 April 2012 Position: Consultant - RESOURCE MOBILISATION STRATEGY 2012-2015 for UNCT ETHIOPIA Duty Station: Addis Ababa, Ethiopia
More informationCommission Participation in the HIPC Initiative 2008 Status Report
EUROPEAN COMMISSION AIDCO C4/AT D(2009) Commission Participation in the HIPC Initiative 2008 Status Report EUROPEAID December 2008 C:\Documents and Settings\tshiaau\Local Settings\Temporary Internet Files\OLKE\2008
More informationUnited Nations Peacebuilding Fund (PBF) Guidelines on application and use of funds April 2014
United Nations Peacebuilding Fund (PBF) Guidelines on application and use of funds April 2014 1. Introduction... 2 2. What is Peacebuilding?... 4 2.1 Definitions and Policy Development...4 2.2 Resources
More informationReport to the Board June 2017
14-15 June 2017 SUBJECT: Agenda item: Category: CONSENT AGENDA: REVIEW OF COLD CHAIN EQUIPMENT OPTIMISATION PLATFORM 02f For Decision Section A: Introduction In June 2015 the Gavi Board approved the creation
More informationUPDATE FROM THE SECRETARIAT, INCLUDING STRATEGY, INDICATORS AND KPIs
UPDATE FROM THE SECRETARIAT, INCLUDING 206-2020 STRATEGY, INDICATORS AND KPIs GAVI BOARD MEETING Seth Berkley 4 June 207, Geneva www.gavi.org Second update on the 206 2020 strategy Systematic, data-driven
More informationSubject: UNESCO Reformed Field Network in Africa
The Director-General DG/note/14/2 3 January 2014 Original: English Deputy Director-General Assistant Directors-General Directors of Bureaux, Offices and Divisions at Headquarters Directors and Heads of
More informationFINAL 26 February PARTNERSHIP FOR PROGRESS: UN Civil Society Fund
PARTNERSHIP FOR PROGRESS: UN Civil Society Fund 1 I. Introduction The UN s current policy towards civil society stems from the Millennium Declaration of 2000, which includes the commitment by member states
More informationCommission Participation in the HIPC Initiative 2004 Status Report
EUROPEAN COMMISSION DEV/B/2*2 D(03) Commission Participation in the HIPC Initiative 2004 Status Report DG DEV DG RELEX EUROPAID 1. Background The Highly Indebted Poor Countries (HIPC) Initiative was proposed
More informationOperational Effectiveness of the UN MDTF Mechanism
Operational Effectiveness of the UN MDTF Mechanism FINAL REPORT Charles Downs 5/31/2011 Operational Effectiveness of the UN MDTF Mechanism Table of Contents Executive Summary... 4 Introduction... 7 Origin
More informationPurpose of this Framework. Financial Management. Guiding Principles and Definitions
STRATEGIC PLAN 2016-2018 Financial Framework, Updated for 2016 Purpose of this Framework This Financial Framework is intended to serve as a bridge between the Williamsburg Regional Library s (WRL) Strategic
More informationREPORT 2015/095 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2015/095 Review of recurrent issues identified in recent internal audit engagements for the Office for the Coordination of Humanitarian Affairs 8 September 2015 Assignment
More informationUnited Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)
United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.
More informationIntroduction to the Global Financing Facility (GFF)
Introduction to the Global Financing Facility (GFF) Supriya Madhavan Senior Health Specialist World Bank Dec 2017 GFF objective: bridging the funding gap for women s, adolescents, and children s health
More informationReview of Registered Charites Compliance Rates with Annual Reporting Requirements 2016
Review of Registered Charites Compliance Rates with Annual Reporting Requirements 2016 October 2017 The Charities Regulator, in accordance with the provisions of section 14 of the Charities Act 2009, carried
More informationSUN Movement Meeting of the Network of Country Focal Points: Report of the 16 th Meeting- 3 rd to 6 th of November 2014
SUN Movement Meeting of the Network of Country Focal Points: Report of the 16 th Meeting- 3 rd to 6 th of November 2014 The 16 th meeting of the SUN Movement Network of Country Focal Points took place
More informationto Debt Management Capacity Building in LICs
A Programmatic Approach to Debt Management Capacity Building in LICs Sudarshan Gooptu Sector Manager, Economic Policy and Debt Department (PRMED) The World Bank October 26, 2010. 1 Outline I. Unique debt
More informationSouth Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR)
South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) 14 February 2012 List of Acronyms AA Administrative Agent AB Advisory Board CAP Consolidated Appeal Process CHF Common Humanitarian
More informationGlobal Agriculture and Food Security Program Trust Fund Public Sector Window
Global Agriculture and Food Security Program Public Sector Window Financial Report Prepared by the Trustee As of December 31, 2016 Table of Contents Table of Contents Introduction... 3 Financial Summary
More informationImplementation of the Integrated Road Map
Integrated Road Map Implementation of the Integrated Road Map 7 February 2018 2018 Informal Consultations 13 17 November 2017 Second Regular Session [Approval of Update on the Integrated Road Map: interim
More informationREPORT 2016/038 INTERNAL AUDIT DIVISION. Audit of the Office for the Coordination of Humanitarian Affairs operations in South Sudan
INTERNAL AUDIT DIVISION REPORT 2016/038 Audit of the Office for the Coordination of Humanitarian Affairs operations in South Sudan Overall results relating to the effective management of operations in
More informationPARIS CLUB RECENT ACTIVITY
PARIS CLUB RECENT ACTIVITY 1/13 OUTLINE 1. Quick review of Paris Club recent activity 2. Prepayment by Russia of its Paris Club debt 2/13 Key events in June 2006-May 2007 1. Implementation of the HIPC
More informationUpdate on the Integrated Road Map: proposed interim governance arrangements
Integrated Road Map 0 Update on the Integrated Road Map: proposed interim governance arrangements Informal Consultation 7 September 2017 Objective Integrated Road Map The purpose of today s consultation
More informationBiennial programme of work of the Executive Board ( )
Executive Board Second Regular Session Rome, 26 29 November 2018 Distribution: General Date: 27 November 2018 Original: English Agenda item 9 WFP/EB.2/2018/9-A/Rev.2 Organizational and procedural matters
More informationREPORT 2015/174 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2015/174 Audit of management of selected subprogrammes and related capacity development projects in the United Nations Economic and Social Commission for Asia and the Pacific
More informationFourth United Nations Conference on the Least Developed Countries
United Nations A/CONF.219/IPC/1/Rev.1 Fourth United Nations on the Least Developed Countries Distr.: General 9 December 2010 Istanbul, Turkey 9-13 May 2011 Original: English Intergovernmental Preparatory
More informationBiennial programme of work of the Executive Board ( )
Executive Board First Regular Session Rome, 25 27 February 2019 Distribution: General Date: 22 February 2019 Original: English * Reissued for technical reasons on 25 February 2019 Agenda item 9 WFP/EB.1/2019/9-A*
More informationPUNTLAND GOVERNMENT OF SOMALIA MINISTRY OF HEALTH. Health Financing Strategic Plan - DRAFT
PUNTLAND GOVERNMENT OF SOMALIA MINISTRY OF HEALTH Health Financing Strategic Plan - DRAFT January 2016 December 2017 PREFACE The Health Financing Strategic Plan (HFSP) is an important step towards building
More informationWork Program Integration Initiative (WPII)
Florida Department of TRANSPORTATION Work Program Integration Initiative (WPII) Florida PALM Executive Steering Committee Meeting February 27, 2019 Florida Department of Transportation Agenda Overview
More informationNEPAD-OECD AFRICA INVESTMENT INITIATIVE
NEPAD-OECD AFRICA INVESTMENT INITIATIVE 1 Presentation outline 1. CONTEXT 2. GOALS & DESIGN 3. ACTIVITIES & WORK METHODS 4. EXPECTED IMPACT 5. GOVERNANCE 2 1. CONTEXT Investment is a driver of economic
More informationThe EM Budget. Intergovernmental Meeting with the US Department of Energy December 12-14, Terry Tyborowski
The EM Budget Intergovernmental Meeting with the US Department of Energy December 12-14, 2012 Terry Tyborowski Office of Environmental Management Deputy Assistant Secretary for Program Planning and Budget
More informationT h e F r a g i l e S t a t e s F a c i l i t y. A sound education system strongly contributes to countries social and economic recovery.
AfDB T h e F r a g i l e S t a t e s F a c i l i t y The African Development Bank Group established the Fragile States Facility (FSF) and its implementation arm, the Fragile States Unit (OSFU, in March
More informationBusiness Cycle Index July 2010
Business Cycle Index July 2010 Bureau of Trade and Economic Indices, Ministry of Commerce, Tel. 0 2507 5805, Fax. 0 2507 5806, www.price.moc.go.th Thailand economic still expansion. Medium-run Leading
More informationLCRP Steering Committee Meeting 3 JULY 2018
LCRP Steering Committee Meeting 3 JULY 2018 Agenda Opening speech by H.E. Minister of Social Affairs, Pierre Bou Assi Welcome note by the UN RC/HC, Philippe Lazzarini Overview of the LCRP 2017: funding,
More informationTove Strauss. Research Associate Overseas Development Institute. 203 Blackfriars Road, London, SE1 8NJ, UK
Tove Strauss Research Associate Overseas Development Institute 203 Blackfriars Road, London, SE1 8NJ, UK Tel: t.strauss@odi.org.uk Fax: Nationality: Swedish KEY EXPERIENCE Country Experience: Liberia,
More informationAppendix 3 Official Debt Restructuring
. Appendix 3 Official Debt Restructuring Restructuring with official creditors THIS APPENDIX REVIEWS OFFICIAL DEBT REstructuring agreements concluded since the publication of Global Development Finance
More informationBACKGROUND PAPER ON COUNTRY STRATEGIC PLANS
BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS Informal Consultation 7 December 2015 World Food Programme Rome, Italy PURPOSE 1. This update of the country strategic planning approach summarizes the process
More informationBiennial programme of work of the Executive Board ( )
Executive Board First regular session Rome, 26 28 February 2018 Distribution: General Date: 20 February 2018 Original: English *Reissued for technical reasons on 27 February 2018 Agenda item 7 WFP/EB.1/2018/7*
More informationTERMS OF REFERENCE FOR THE FINANCE AND AUDIT COMMITTEE
I. PURPOSE A. The primary function of the Finance and Audit Committee (the Committee ) is to assist the Board in fulfilling its oversight responsibilities by reviewing: i) the accuracy of financial information
More informationBiennial programme of work of the Executive Board ( )
Executive Board Annual session Rome, 18 22 June 2018 Distribution: General Date: 11 June 2018 Original: English Agenda item 9 WFP/EB.A/2018/9 Organizational and procedural matters For information Executive
More informationCERF and Country-Based Pooled Funds Stocktaking
CERF and Country-Based Pooled Funds Stocktaking CERF secretariat, April 2013 1. Introduction The present paper provides an overview of the main findings regarding complementarity at country level between
More informationEstablished in July 1989, extended, current closing date July 31, 2017.
DEBT REDUCTION FACILITY (DRF) and external commercial debt buyback operations Annual Meeting of Multilateral Development Banks on Debt Issues Washington, DC - July 10-11, 2012 THE WORLD BANK Plan 1. DRF
More informationFUNDING TO FINANCING UNDAF CAMPANION GUIDANCE UNDAF COMPANION GUIDANCE: FUNDING TO FINANCING
FUNDING TO FINANCING UNDAF CAMPANION GUIDANCE 1! TABLE OF CONTENTS 1. INTRODUCTION... 3 2. THE CONCEPT... 4 3. MOVING FROM THEORY TO PRACTICE... 5 3.1 Step 1: Mapping the Financial Landscape... 5 3.2 Step
More informationBusiness & Financial Services December 2017
Business & Financial Services December 217 Completed Procurement Transactions by Month 2 4 175 15 125 1 75 5 2 1 Business Days to Complete 25 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 217 Procurement
More informationKCB INVESTOR PRESENTATION Q317 GROUP FINANCIAL RESULTS NOVEMBER 2017 JOSHUA OIGARA GROUP CEO & MD LAWRENCE KIMATHI GROUP CFO
KCB INVESTOR PRESENTATION Q317 GROUP FINANCIAL RESULTS NOVEMBER 2017 JOSHUA OIGARA GROUP CEO & MD LAWRENCE KIMATHI GROUP CFO Macro-Economic Highlights: Kenya GDP Anchored by Non-Agriculture GDP Growth
More informationWSSCC, Global Sanitation Fund (GSF)
Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in
More informationStatus report on arrears in principal, interest and service charge payments
Document: EB 2007/90/R.26 Agenda: 12(c) Date: 7 March 2007 Distribution: Public Original: English E Status report on arrears in principal, interest and service charge payments Executive Board Ninetieth
More informationHUD NSP-1 Reporting Apr 2010 Grantee Report - New Mexico State Program
HUD NSP-1 Reporting Apr 2010 Grantee Report - State Program State Program NSP-1 Grant Amount is $19,600,000 $9,355,381 (47.7%) has been committed $4,010,874 (20.5%) has been expended Grant Number HUD Region
More informationH. R. To provide for the cancellation of debts owed to international financial institutions by poor countries, and for other purposes.
[0hih]... (Original Signature of Member) 0TH CONGRESS ST SESSION H. R. To provide for the cancellation of debts owed to international financial institutions by poor countries, and for other purposes. IN
More informationIMPROVING REGENTS OVERSIGHT OF THE SMITHSONIAN BUDGET: STEPS REQUIRED TO IMPLEMENT GOVERNANCE RECOMMENDATION 22
IMPROVING REGENTS OVERSIGHT OF THE SMITHSONIAN BUDGET: STEPS REQUIRED TO IMPLEMENT GOVERNANCE RECOMMENDATION 22 Recommendation 22: The Finance and Investment Committee, working with the Secretary and the
More informationBackground Note on Prospects for IDA to Become Financially Self-Sustaining
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Background Note on Prospects for IDA to Become Financially Self-Sustaining International
More informationCOMMON BUDGETARY FRAMEWORK
STANDARD OPERATING PROCEDURES for COUNTRIES ADOPTING the DELIVERING AS ONE APPROACH August 2014 GUIDE TO THE COMMON BUDGETARY FRAMEWORK The Common Budgetary Framework, with all planned and costed UN programme
More informationSecond Consolidated Annual Progress Report on Activities Implemented under the Sierra Leone Multi Donor Trust Fund
Second Consolidated Annual Progress Report on Activities Implemented under the Sierra Leone Multi Donor Trust Fund Report of the Administrative Agent of the Sierra Leone Multi Donor Trust Fund for the
More informationKCB GROUP PLC INVESTOR PRESENTATION. FY17 FINANCIAL RESULTS
KCB GROUP PLC INVESTOR PRESENTATION. FY17 FINANCIAL RESULTS JOSHUA OIGARA GROUP CEO & MD LAWRENCE KIMATHI GROUP CFO KCB Group at a glance 6,483 staff 15.7M Customers 153,431 shareholders Market Capitalization
More informationE Distribution: GENERAL ORGANIZATIONAL AND PROCEDURAL MATTERS. Agenda item 11 BIENNIAL PROGRAMME OF WORK OF THE EXECUTIVE BOARD ( )
Executive Board Second Regular Session Rome, 8 11 November 2010 ORGANIZATIONAL AND PROCEDURAL Agenda item 11 For approval BIENNIAL PROGRAMME OF WORK OF THE EXECUTIVE BOARD (2011 2012) E Distribution: GENERAL
More informationWorking Effectively in Conflict-affected and Fragile Situations
A DFID practice paper Briefing MARCH 2010 Working Effectively in Conflict-affected and Fragile Situations Briefing Paper F: Practical Coordination Mechanisms DAC Principle 8: Agree practical coordination
More informationThe Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual
Review of the main purpose and added value of the GAI 1 The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action Operations Manual This Operations Manual describes
More informationZambia s poverty-reduction strategy paper (PRSP) has been generally accepted
15 ZAMBIA The survey sought to measure objective evidence of progress against 13 key indicators on harmonisation and alignment (see Foreword). A four-point scaling system was used for all of the Yes/No
More informationPwC Tax Calendar 2016
www.pwc.com/ng PwC Tax Calendar 2016 The PwC experience Our brand The PwC brand is the major unifying force for our network across the world. A clear indication of the value and reputation of the global
More informationPublic Disclosure Copy. Name Previous Rating Current Rating
Public Disclosure Authorized AFRICA Kenya Social Protection & Labor Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 8 ARCHIVED on 30-Oct-2017 ISR28662 Implementing Agencies: Department for
More informationThe Property Franchise Group. Half Year Results September 2016
The Property Franchise Group Half Year Results September 2016 Agenda 2 Overview Ian Wilson, Chief Executive Officer Financial performance David Raggett, Chief Financial Officer Operational performance
More informationFinancial and Budget Update
Financial and Budget Update Accommodating Additional Costs within the $5.5 Billion 'Endgame' Envelope (2013-18) Discussion of IMB Recommendation on Budget and Finance Polio Partners Group (PPG) Meeting,
More informationUNDP New Deal Support Facility: Implementation overview
UNDP New Deal Support Facility: Implementation overview Second quarter 2014 In the second quarter of 2014, UNDP continued to operationalize the New Deal support facility after its launch at the beginning
More information64 th SESSION Proposed programme budget for the biennium
64 th SESSION Proposed programme budget for the biennium Course on UN Reform: Organized Jointly by UNITAR and the Permanent Mission of Switzerland to the United Nations Jun Yamazaki, Controller United
More informationUN BHUTAN COUNTRY FUND
UN BHUTAN COUNTRY FUND Terms of Reference Introduction: 1. The UN system in Bhutan is implementing the One Programme 2014-2018. The One Programme is the result of a highly consultative and participatory
More informationTHE ENHANCED INTEGRATED FRAMEWORK: SUPPORTING LDCS TO DEVELOP TRADE
THE ENHANCED INTEGRATED FRAMEWORK: SUPPORTING LDCS TO DEVELOP TRADE Least-Developed Countries Donor Community and Other Development Partners Integrated Framework Cadre Intégré Marco Integrado www. integratedframework.org
More informationKCB INVESTOR AND MEDIA PRESENTATION 2012 FULL YEAR GROUP AUDITED FINANCIAL RESULTS
KCB INVESTOR AND MEDIA PRESENTATION 2012 FULL YEAR GROUP AUDITED FINANCIAL RESULTS 1 Outline 1. East Africa Macroeconomic View 2. The Bank at a Glance 3. 2012 full year KCB group Financial Results 4. Future
More informationP o l i c y i m p l e m e n t a t i o n
P o l i c y i m p l e m e n t a t i o n p l a n For supporting the implementation of Socfin s Group policy on responsible management, Socfin and Earthworm (EF, previously known as TFT ) have de velope
More informationQUESTION 2. QUESTION 3 Which one of the following is most indicative of a flexible short-term financial policy?
QUESTION 1 Compute the cash cycle based on the following information: Average Collection Period = 47 Accounts Payable Period = 40 Average Age of Inventory = 55 QUESTION 2 Jan 41,700 July 39,182 Feb 18,921
More informationPilot Watersheds Plan Development: Work Plan
Pilot Watersheds Plan Development: Work Plan This Work Plan outlines tasks for the development of watershed-based plans consistent with the One Watershed, One Plan vision and program grant requirements.
More informationE Distribution: GENERAL ORGANIZATIONAL AND PROCEDURAL MATTERS. Agenda Item 10 BIENNIAL PROGRAMME OF WORK OF THE EXECUTIVE BOARD ( )
Executive Board First Regular Session Rome, 18 19 February 2013 ORGANIZATIONAL AND PROCEDURAL Agenda Item 10 For information* BIENNIAL PROGRAMME OF WORK OF THE EXECUTIVE BOARD (2013 2014) E Distribution:
More informationUpdate on Multilateral Debt Relief Initiative (MDRI) and Grant Compensation
Update on Multilateral Debt Relief Initiative (MDRI) and Grant Compensation Discussion Paper ADF-11 Replenishment: Third Consultation September 2007 Bamako, Mali AFRICAN DEVELOPMENT FUND Executive Summary
More informationChallenges and opportunities of LDCs Graduation:
Challenges and opportunities of LDCs Graduation: UNDP as a Strategic Partner in the Graduation Process Ayodele Odusola, PhD Chief Economist and Head Strategy and Analysis Team UNDP Regional Bureau for
More informationADF-14 Resource Allocation Framework. ADF-14 Second Replenishment Meeting June July, 2016 Abidjan, Côte d Ivoire
ADF-14 Resource Allocation Framework ADF-14 Second Replenishment Meeting June July, 2016 Abidjan, Côte d Ivoire Allocated Resources under ADF-13 Share, by Regions* Central 15% West 38% Allocation by Regions
More informationThe Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action. Operations Manual
The Global Acceleration Instrument (GAI) for Women Peace and Security and Humanitarian Action Operations Manual 1 This Operations Manual describes the rules and procedures applicable to the GAI. It describes
More informationIntroduction to the GFF
Introduction to the GFF September 2017 Two trends led to the creation of the GFF Insufficient progress on maternal and child health (worst among MDGs), and traditional sources of financing are not enough
More informationThe Global Acceleration Instrument for Women, Peace & Security and Humanitarian Action
The Global Acceleration Instrument for Women, Peace & Security and Humanitarian Action TERMS OF REFERENCE February 2016 Bangui National Forum, Central African Republic. UN Photo/Catianne Tijerina OVERVIEW
More informationFinancial & Business Highlights For the Year Ended June 30, 2017
Financial & Business Highlights For the Year Ended June, 17 17 16 15 14 13 12 Profit and Loss Account Operating Revenue 858 590 648 415 172 174 Investment gains net 5 162 909 825 322 516 Other 262 146
More informationEthiopia One UN Fund Terms of Reference
Ethiopia One UN Fund Terms of Reference I Introduction 1. The One UN process in Ethiopia was initiated in mid 2008. It was in part based on the General Assembly s: "Triennial comprehensive policy review
More informationRedefining UN role and engagement in MIC Viet Nam Concept Note: April 2015
Redefining UN role and engagement in MIC Viet Nam Concept Note: April 2015 A. Introduction and background In preparation of the new (2017 2021) UN-Viet Nam Strategic Cooperation Framework (One UN Strategic
More informationLong-Term Financial Integrity of the ADF
Long-Term Financial Integrity of the ADF Discussion paper ADF-11 Replenishment : Second Consultation Meeting June 2007 Tunis, Tunisia AFRICAN DEVELOPMENT FUND TABLE OF CONTENTS 1. INTRODUCTION 1 2. FINANCIAL
More informationUNCTAD s Seventh Debt Management Conference. Capacity Building Needs: Response from the World Bank. Ms. Gallina A. Vincelette
UNCTAD s Seventh Debt Management Conference 9-11 November 2009 Capacity Building Needs: Response from the World Bank by Ms. Gallina A. Vincelette Senior Economist Economic Policy and Debt Department The
More informationSession 3: Analysis of available draft plans so far from priority countries
Session 3: Analysis of available draft plans so far from priority countries Lea Hegg Chair, TMG Country Planning Task Team Transition Independent Monitoring Board London, 2 November 2017 1 Nigeria Polio
More informationCAADP MDTF: NEPAD Planning and Coordinating Agency (NPCA) Child Trust Fund (P121914)
Public Disclosure Authorized AFRICA Africa Agriculture Global Practice Recipient Executed Activities Specific Investment Loan FY 2011 Seq No: 4 ARCHIVED on 28-Dec-2015 ISR22333 Implementing Agencies: Public
More informationEcobank: Banking for the Bottom Billions. Kigali, March 15, 2012
Ecobank: Banking for the Bottom Billions Kigali, March 15, 2012 «WE DO NOT HAVE AN AFRICAN STRATEGY 2 AFRICA IS OUR STRATEGY» - Arnold Ekpe, Ecobank s Group CEO 3 Contents I Financially Excluded Bottom
More information