Report by Finance and Administration Committee (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary
|
|
- Steven Wilkinson
- 6 years ago
- Views:
Transcription
1 Report by Finance and Administration Committee (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: Resolution: Yes No TITLE: Amendment to FY2015 Capital Budget PRESENTATION SUMMARY: Following guidance provided by FTA regarding the eligibility of costs, staff is requesting approval of an FY2015 capital budget amendment to transfer existing capital budget authority to the Railcar Rehabilitation project(cip0063) in order to seek FTA reimbursement of additional eligible labor and parts costs for railcar component rehabilitation. PURPOSE: To request Board adoption of an FY2015 capital budget amendment to transfer existing capital budget authority to the Railcar Rehabilitation Program (CIP0063). DESCRIPTION: Key Highlights: Metro has received favorable guidance from FTA regarding eligibility of certain FY2015 railcar rehabilitation costs for capital grant reimbursement. An FY2015 Capital Budget amendment to transfer budget authority to the Railcar Rehabilitation project is required to maximize FTA reimbursements. No additional jurisdictional capital funding is required to accommodate this budget change and the transfer of these eligible costs to the capital program will provide relief to the FY2015 operating budget and year-end net subsidy position. Background and History: Metro s Railcar Rehabilitation Program provides the labor and parts necessary to rebuild and replace railcar components that are utilized in heavy overhauls of Metro s railcar fleet. These overhauls are necessary to maintain the vehicles in a state of good repair, improve reliability, ensure safe operations, and maximize the useful life of the asset. Approximately one-fifth of the fleet, or about 225 cars, are subject to heavy overhaul annually. Components replaced during a major heavy overhaul include, but are not limited to, wheels, brake systems, traction motors, and truck overhauls. Discussion: Metro is working closely with the Federal Transit Administration (FTA) to confirm the eligibility of costs for FTA grant reimbursement, and substantial progress has been
2 made in recent months. During the fourth quarter of FY2015, FTA approved $224 million in reimbursements, including several reimbursements for force account labor costs totaling $130 million. FTA has also reviewed parts that are used for the repair and rehabilitation of vehicles and equipment and has determined that certain parts are eligible for grant reimbursement. FTA s Financial Management Oversight (FMO) review and subsequent internal reviews performed by Metro had identified potential concerns regarding the eligibility of certain Metro costs for FTA grant reimbursement. The principal areas of concern included 1) force account labor costs, due to timekeeping methodology and record keeping weaknesses, and 2) parts acquired for use in the repair and rehabilitation of vehicles and equipment, due to the methodologies used to procure the parts. In light of the concerns and to avoid putting grant funds at risk, most of Metro s FY2015 railcar rehabilitation labor and parts costs were initially charged to the FY2015 operating budget rather than the FTA program, until such time as FTA eligibility could be established. Based on guidance from FTA, Metro has identified approximately $45.7 million of FY2015 railcar rehabilitation costs that are expected to be eligible for FTA capital grant funding, which is $14.0 million more than previous estimates. To accommodate the additional eligible costs in the Railcar Rehabilitation capital project (CIP0063), staff recommends Board adoption of an amendment to the FY2015 capital budget to transfer budget authority to this project from existing projects with reduced costs and/or projects that are behind schedule. The FY2015 budget for the Railcar Rehabilitation project budget would increase from $31.7 million to $45.7 million. While there will be no change to the amount of railcar rehabilitation work performed, this action is necessary in order to maximize federal reimbursements for eligible railcar rehabilitation costs. To accommodate the budget increase for CIP0063, the FY2015 budgets for Bus Rehabilitation (CIP0005) and Bus Repairables (CIP0008) would be reduced by $8.0 and $6.0 million, respectively. These projects underspent in FY2015. Following Board adoption of the amendment, staff will work with FTA to revise grant agreements as needed, transfer the eligible capital costs to the Railcar Rehabilitation project, and submit the required supporting documentation to FTA for reimbursement. No additional jurisdictional capital funding is required to accommodate this budget change; existing capital funding sources will be reallocated among projects to support the amendment. The transfer of these eligible capital costs to the capital program will provide relief to the FY2015 operating budget and will improve the year-end net subsidy position. FUNDING IMPACT: No additional jurisdictional capital funding is required to accommodate this change as existing capital funding sources will be reallocated among projects to support this amendment. Project Manager: Thomas Webster Project
3 Department/Office: OMBS TIMELINE: Previous Actions Anticipated actions after presentation May Board adoption of FY2015 Capital Budget. July/August Revision of FTA grants, transfer of eligible expenses, and request for FTA reimbursement. RECOMMENDATION: Recommend Board adoption of an FY2015 capital budget amendment to transfer existing capital budget authority to the Railcar Rehabilitation Program (CIP0063) to accommodate FTA grant eligible railcar rehabilitation costs.
4 PRESENTED AND ADOPTED: July 23, 2015 SUBJECT: AMENDMENT TO FISCAL YEAR (FY) 2015 CAPITAL BUDGET RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY WHEREAS, As a result of the findings in the Federal Transit Administration's (FTA) 2014 Financial Management Oversight (FMO) report, as well as internal compliance reviews and feedback received during the manual grant reimbursement process, the Washington Metropolitan Area Transit Authority (WMATA) has been working closely with FTA over the past year to ensure that only grant-eligible costs are charged to FTA grants; and WHEREAS, Following FTA guidance, WMATA has identified grant-eligible FY2015 costs for railcar component rehabilitation totaling $14.0 million that were charged to the FY2015 operating budget to ensure that they would not be inappropriately charged to an FTA grant; and WHEREAS, An amendment to increase the FY2015 project budget for the Railcar Rehabilitation project (CIP0063) is required in order for WMATA to seek FTA reimbursement of these additional grant-eligible costs; and WHEREAS, To accommodate the budget increase to CIP0063 while keeping the total FY2015 capital budget unchanged, budget reductions must be made to other projects that have available FY2015 budget authority; and WHEREAS, The FY2015 budget for CIPOOOS (Bus Rehabilitation) can be reduced by $8.0 million and the FY2015 budget for CIP0008 (Bus Repairables) can be reduced by $6.0 million to offset the additional grant-eligible costs in CIP0063; and WHEREAS, The transfer of these grant-eligible costs from the operating budget to the capital budget is made in order to advance the reimbursement of costs identified by WMATA as grant-eligible costs in accordance with guidance received from FTA; now, therefore be it RESOLVED, That the FY2015 capital budget is amended and revised to increase the budgeted expenditures in CIP0063 by $14.0 million and to decrease the budgeted expenditures for CIPOOOS by $8.0 million and for CIP0008 by $6.0 million, such that the total capital budget for FY2015 is unchanged; and be it finally Motioned by Mr. Euille, seconded by Ms. Tregoning Ayes: 8 - Mr. Downey, Mr. Goldman, Mr. Euille, Mr. Bulger, Ms. Tregoning, Ms. Harley, Mr. Corcoran and Mr. Dormsjo
5 RESOLVED, That this Resolution shall be effective immediately in order for staff to timely prepare FY2015 year-end close out actions. Reviewed as to form and legal sufficiency, ~ Mark R. Pohl Acting General Counsel r WMATA File Structure No Fiscal Year Budgets 2
Administrative Item (D) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Administrative Item (D) 12-17-2015 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201699 Resolution: Yes No TITLE: New Year's Eve Free Rides
More informationState of Good Repair Review
Finance & Administration Committee Action Item IV-D October 9, 2014 State of Good Repair Review Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
More informationReport by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Report by Finance and Administration Committee (B) 06-25-2015 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201605 Resolution: Yes No TITLE:
More informationReport by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Report by Finance and Administration Committee (B) 01-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201701 Resolution: Yes No TITLE:
More informationReport by Finance and Administration Committee (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Report by Finance and Administration Committee (A) 01-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201691 Resolution: Yes No TITLE:
More informationFY2017 Budget Discussion
Finance & Administration Committee Information Item IV-B November 5, 2015 FY2017 Budget Discussion Page 70 of 116 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationEvaluation of Alternative Funding Mechanisms
Finance & Administration Committee Information Item IV-B March 12, 2015 Evaluation of Alternative Funding Mechanisms Page 48 of 58 Washington Metropolitan Area Transit Authority Board Action/Information
More informationApproval to Submit TIFIA Loan Application
Finance & Administration Committee Action Item III-G September 16, 2010 Approval to Submit TIFIA Loan Application Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationConsent Item (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Consent Item (A) 02-20-2015 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201339 Resolution: Yes No TITLE: Indemnificaiton of Fairfax County
More informationConsent Item (C) Washington Metropolitan Area Transit Authority
Consent Item (C) 10-24-2013 Washington Metropolitan Area Transit Authority Action Information MEAD Number: 200367 Resolution: Yes No TITLE: Local 922 Memorandum of Understanding PRESENTATION SUMMARY: To
More informationLines of Credit Renewal
Finance & Administration Committee Action Item III-A February 11, 2016 Lines of Credit Renewal Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
More informationConsent Item (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Consent Item (A) 07-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201766 Resolution: Yes No TITLE: Renewal of Virginia PRIIA Funding
More informationFY2017 Year-End Financial Update
Finance Committee Information Item III-A September 14, 2017 FY2017 Year-End Financial Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
More informationFY2020 Budget Outlook
Finance and Capital Committee Information Item IV-A October 11, 2018 FY2020 Budget Outlook 35 of 60 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD
More informationNext Capital Funding Agreement
Finance & Administration Committee Action Item III-C May 13, 2010 Next Capital Funding Agreement Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD
More informationApproval of Reimbursable Project for Purchase of Buses for DC Circulator
Finance & Administration Committee Action Item III-A March 13, 2014 Approval of Reimbursable Project for Purchase of Buses for DC Circulator Page 3 of 14 Washington Metropolitan Area Transit Authority
More informationFY2017 Budget Guidance
Finance & Administration Committee Information Item IV-D September 10, 2015 FY2017 Budget Guidance Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD
More informationAdditional Staff Positions for the Capital Program
Finance & Administration Committee Action Item III-D April 14, 2011 Additional Staff Positions for the Capital Program Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201690 Resolution: Yes No TITLE: FY 2015 External Audit Deliverables PRESENTATION SUMMARY:
More informationStatus Report Performance Based Budgeting. Budget Committee December 8, 2005
Status Report Performance Based Budgeting Budget Committee December 8, 2005 1 Budget Process Improvement Board Resolution #2005-43 approved on September 22, 2005 is the guiding document calling for budget
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201958 Resolution: Yes No TITLE: Second Quarter Capital Program Update PRESENTATION SUMMARY:
More informationFY2014 Budget Amendment for Bus Services State of Good Operations
Finance & Administration Committee Action Item III-B December 5, 2013 FY2014 Budget Amendment for Bus Services State of Good Operations Page 38 of 125 Washington Metropolitan Area Transit Authority Board
More informationCustomer Service and Operations Committee. Board Action Item III-A. July 10, 2014
Customer Service and Operations Committee Board Action Item III-A July 10, 2014 FY2015 Bus Service Adjustments Request For Public Hearings Page 3 of 52 Washington Metropolitan Area Transit Authority Board
More informationApproval to Amend the FY2013 Operating Reimbursable Budget for Federal FY2012 Security Grants
Finance & Administration Committee Action Item III-A October 11, 2012 Approval to Amend the FY2013 Operating Reimbursable Budget for Federal FY2012 Security Grants Washington Metropolitan Area Transit
More informationHuntington Parking Garage Budget Adjustments
Finance, Administration and Oversight Committee Information Item VII-D November 5, 2009 Huntington Parking Garage Budget Adjustments Washington Metropolitan Area Transit Authority Board Action/Information
More informationQuarterly Capital Progress Update
Finance & Administration Committee Information Item IV-A September 13, 2012 Quarterly Capital Progress Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationConsent Item (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary
Consent Item (A) 10-23-2014 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201057 Resolution: Yes No TITLE: Indemnification of Harris Bank
More informationFinance, Administration and Oversight Committee FY08 Budget Review Item V-C April 12, 2007 Living Wage Policy
Finance, Administration and Oversight Committee FY08 Budget Review Item V-C April 12, 2007 Living Wage Policy Washington Metropolitan Area Transportation Authority Board Action/Information Summary Action
More informationApprove Neutral Host Reimbursable Capital Project
Finance, Administration and Oversight Committee Action Item III-D May 14, 2009 Approve Neutral Host Reimbursable Capital Project Washington Metropolitan Area Transit Authority Board Action/Information
More informationPotomac Yard Metrorail Station TIIF Allocation
Planning, Development and Real Estate Committee Board Action Item III-B February 26, 2009 Potomac Yard Metrorail Station TIIF Allocation Washington Metropolitan Area Transit Authority Board Action/Information
More informationPolicy on Reserve Balance for Claims
Finance, Administration and Oversight Committee FY08 Budget Review Item V-B April 12, 2007 Policy on Reserve Balance for Claims Washington Metropolitan Area Transportation Authority Board Action/Information
More informationNext Capital Funding Agreement
Finance & Administration Committee Action Item III-C May 13, 2010 Next Capital Funding Agreement Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD
More informationJul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
REVENUE AND RIDERSHIP 4th Quarter FY2014 REVENUE (in Millions) $90M $85M $80M $75M $70M $65M $60M $55M $50M 79 77 74 74 72 70 FY2013 Actual FY2014 Budget FY2014 Actual 79 85 78 78 77 67 66 70 59 67 65
More informationFY2018 Third Quarter Financial Update
Finance and Committee Information Item IV-A May 10, 2018 Third Quarter Financial Update Page 30 of 53 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationFY2014 Operating Budget Performance Report
Finance & Administration Committee Information Item IV-C September 11, 2014 FY2014 Operating Budget Performance Report Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationEstablish Reimbursable Project Regional Travel Training Initiative
Finance, Administration and Oversight Committee Action Item VII-A November 5, 2009 Establish Reimbursable Project Regional Travel Training Initiative Washington Metropolitan Area Transit Authority Board
More informationNotice of Public Hearing Washington Metropolitan Area Transit Authority
Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B18-01: Proposed FY2019 Operating Budget and Docket B18-02: Proposed FY2019 Capital Improvement Program and Federal FY2018
More informationPublic Hearing on Peak Fares for Peak Service
Finance and Capital Committee Action Item II-B September 13, 2018 Public Hearing on Peak Fares for Peak Service Page 287 of 463 Washington Metropolitan Area Transit Authority Board Action/Information Summary
More informationFY2017 Budget Work Session
Finance & Administration Committee Information Item IV-B January 14, 2016 FY2017 Budget Work Session Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD
More informationFY2018 Second Quarter Financial Update
Finance and Committee Information Item III-A February 8, 2018 Second Quarter Financial Update 4 of 52 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationResponses to Committee Requests
Finance, Administration and Oversight Committee Information Item III-E April 10, 2008 Responses to Committee Requests Washington Metropolitan Area Transportation Authority Board Action/Information Summary
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201786 Resolution: Yes No TITLE: FY2016 External Audit Deliverables PRESENTATION SUMMARY:
More informationReport by the External Auditors
Finance, Administration and Oversight Committee Information Item IV-A January 8, 2009 Report by the External Auditors Page 1 of 2 Washington Metropolitan Area Transit Authority Board Action/Information
More informationCapital Improvement Program Update
Finance & Administration Committee Information Item III-A May 12, 2011 Capital Improvement Program Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationSafety and Operations Committee. Information Item III-B. January 24, 2019
Safety and Operations Committee Information Item III-B January 24, 2019 Overnight Maintenance Window and Work Hours Page 54 of 75 Washington Metropolitan Area Transit Authority Board Action/Information
More informationApproval of FY2017 Capital Budget and FY Capital Improvement Program
Finance Committee Action Item III-B April 14, 2016 Approval of FY2017 Capital Budget and FY2017-2022 Capital Improvement Program Page 23 of 68 Washington Metropolitan Area Transit Authority Board Action/Information
More informationCapital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session
Capital & Strategic Planning Committee Item III - A January 25, 2018 FY2019 Capital Budget Work Session Page 4 of 29 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationGM/CEO s Proposed FY2020 Budget
Finance and Capital Committee Information Item IV-A November 1, 2018 GM/CEO s Proposed FY2020 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD
More informationKeeping Metro Safe, Reliable and Affordable
Finance Committee Information Item III-B September 14, 2017 Keeping Metro Safe, Reliable and Affordable Washington Metropolitan Area Transit Authority Keeping Metro Safe, Reliable and Affordable 1 Purpose
More informationStaff Report on Public Hearing to Increase Charter Fees
Finance, Administration and Oversight Committee Action Item III-A November 6, 2008 Staff Report on Public Hearing to Increase Charter Fees Washington Metropolitan Area Transit Authority Board Action/Information
More informationMETRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):
METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit
More informationPUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET
PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET Before the Committee on Public Works and the Environment Council of the District of Columbia The Honorable Jim Graham,
More informationGetting Metro Back on Track
NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board This forum is sponsored by the Northern Virginia Transportation Commission. It is separate and distinct
More informationFY2017 Third Quarter Financial Update and CIP Amendment
Finance Committee Action Item III-A May 11, 2017 FY2017 Third Quarter Financial Update and CIP Amendment Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationWASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000)
TIP ID: 5853 Agency ID: Title: Rail Cars - Replacement, Rehabilitation, Expansion, & Enhancements Local 0/0/100 11,629 e 5,380 e 5,600 e 10,980 PRIIA 50/0/50 265,887 e 154,860 e 246,189 e 158,438 e 141,875
More informationArlington County, Virginia
Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed
More informationPROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority.
PROPOSED FISCAL YEAR 2011 BUDGET Testimony of Richard Sarles, General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia Committee on Public Works and
More informationAward of Performance Energy Engineering Services Contract
Finance, Administration and Oversight Committee Action Item III-E September 13, 2007 Award of Performance Energy Engineering Services Contract Washington Metropolitan Area Transportation Authority Board
More informationChairman Milde and the VRE Operations Board
Agenda Item 10-B Action Item To: From: Chairman Milde and the VRE Operations Board Doug Allen Date: January 17, 2014 Re: Purchase of Expansion Rail Cars Recommendation: The VRE Operations Board is being
More informationWest Falls Church Station Canopy Lighting
Finance & Administration Committee Action Item III-B September 16, 2010 West Falls Church Station Canopy Lighting Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationRequested Budget Analysis: Operating Contingency Reserve
Budget Committee Fiscal 2008 Budget Review Item V - A2 January 11, 2007 Requested Budget Analysis: Operating Contingency Reserve Washington Metropolitan Area Transportation Authority Board Action/Information
More informationWashington Metropolitan Area Transportation Authority Board Action/Information Summary. MEAD Number: 99808
Washington Metropolitan Area Transportation Authority Board Action/Information Summary Action Information MEAD Number: 99808 Resolution: Yes No PURPOSE To obtain Board approval to modify the MetroAccess
More informationApprove Electricity Swap Agreements
Finance, Administration and Oversight Committee Action Item III-A May 14, 2009 Approve Electricity Swap Agreements Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationFinance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update
Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
More informationWashington Metropolitan Area Transit Authority Metro Budget Overview
Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power
More informationApproval of FY Capital Improvement Program and CFA Extension
Finance Committee Action Item III-A March 23, 2017 Approval of FY2018-2023 Capital Improvement Program and CFA Extension Washington Metropolitan Area Transit Authority Board Action/Information Summary
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 22, 2008 DATE: July 15, 2008 SUBJECT: Approval of Resolutions and Questions to include in the 2008 Bond Referenda C. M. RECOMMENDATION:
More informationFY2017 PROPOSED BUDGET
S A F E T Y, S E R V I C E A N D F I N A N C I A L R E S P O N S I B I L I T Y PROPOSED BUDGET EFFECTIVE JULY 1, 2016 FOCUSING ON THE CUSTOMER W A S H I N G T O N M E T R O P O L I TA N A R E A T R A N
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201433 Resolution: Yes No TITLE: Improving Safety Through Fare Enforcement PRESENTATION SUMMARY:
More informationMEETING: DATE: TYPE OF ACTION: STAFF CONTACT:
RESOLUTION NO. R2017-28 Amending the Adopted 2017 Annual Budget for Sounder Procurements MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Board 8/24/2017 Final Action Bonnie Todd, Executive Director of Operations
More informationBOARD OF DIRECTORS MEETING
Revised 12/10/14 See Item No. 11 SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY BOARD OF DIRECTORS MEETING FRIDAY, DECEMBER 12, 2014 10:00a.m. LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (METRO)
More informationFinance and Capital Committee Information Item III-A November 15, 2018 Budget Work Session
Finance and Capital Committee Information Item III-A November 15, 2018 Budget Work Session 5 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
More informationMetro 2025 Alternative Funding and Financing
Finance & Administration Committee Information Item IV-A June 12, 2014 Metro 2025 Alternative Funding and Financing 37 of 100 Washington Metropolitan Area Transit Authority Board Action/Information Summary
More informationSUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM
PRESENTED AND ADOPTED: SUBJECT: APPROVAL OF FISCAL 2007 2012 CAPITAL IMPROVEMENT PROGRAM RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSPORTATION AUTHORITY WHEREAS, The Board
More informationOPERATING BUDGET REPORT
OPERATING BUDGET REPORT OPERATING BUDGET ($ in Millions) MTD Nov-FY2012 Nov-FY2013 Actual Actual Budget $ Percent Revenue $ 63.0 $ 65.7 $ 68.3 $ (2.7) -3.9% Expense $ 107.6 $ 124.8 $ 129.8 $ 5.0 3.8% Subsidy
More informationFY2014 Capital and Operating Budget Discussion
Finance & Administration Committee Information Item III-B December 6, 2012 FY2014 Capital and Operating Budget Discussion Page 18 of 44 Washington Metropolitan Area Transit Authority Board Action/Information
More informationGetting Metro Back on Track
NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board @NovaTransit This forum is sponsored by the Northern Virginia Transportation Commission. Learn more about
More informationAGENDA ITEM 2 A Action Item. Motor Coach Industries Procurement Funding
AGENDA ITEM 2 A Action Item MEMORANDUM DATE: April 5, 2018 TO: FROM: SUBJECT: Julie Petersen, Finance Manager Motor Coach Industries Procurement Funding REQUESTED ACTION: BY MOTION, 1. Approve the engagement
More informationProviders of Public Transportation Individual Targets
APPENDIX Providers of Public Transportation Individual Targets The following letters, presentation slides, and other data were provided by the individual reporting entities, and are posted on the MWCOG
More informationFISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING
FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING Testimony of John B. Catoe, Jr. General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia s Committee
More informationWHEREAS, The Board of Directors has been engaged in a comprehensive review of its governance policies; and
PRESENTED AND ADOPTED: January 24, 2013 SUBJECT: APPROVAL OF TRAVEL AND MISCELLANEOUS EXPENSE POLICY FOR BOARD MEMBERS 2013-01 RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSIT
More informationCHAPTER 7: Financial Plan
CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...
More informationCustomer Service and Operations Committee. Board Information V-D. September 10, 2015
Customer Service and Operations Committee Board Information V-D September 10, 2015 MetroAccess Sustainability Study Page 90 of 104 Washington Metropolitan Area Transit Authority Board Action/Information
More informationAmend FY 2006 Infrastructure Renewal Program
Washington Metropolitan Area Transit Authority Amend FY 2006 Infrastructure Renewal Program Budget Committee December 8, 2005 Purpose That the Budget Committee approve and forward to the Board for approval
More informationFiscal 2007 Proposed Budget Briefing Division of Planning, Development, Engineering and Construction
FY2007 Proposed Budget Fiscal 2007 Proposed Budget Briefing Division Planning, Development, Engineering Construction Budget Committee January 26, 2006 1 Division Planning! Development! Engineering! Construction
More informationNorthern Virginia Transportation Commission: 2018 Legislative and Policy Agenda
Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia s economic growth and global competitiveness are directly tied to the region s transit network. Transit
More informationCompany Car Guidelines
December 2017 Company Car Guidelines As year end approaches, it is time to start thinking about preparing W-2 s. One commonly asked question is How should employees personal use of company automobiles
More informationCustomer Service, Operations and Security Committee. Information Item III-A. June 8, 2017
Customer Service, Operations and Security Committee Information Item III-A June 8, 2017 Fair Share Pilot Page 3 of 71 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action
More informationFinancial Update for the Period Ended April 7, 2018
For Information Financial Update for the Period Ended April 7, 2018 Date: June 12, 2018 To: TTC Board From: Chief Financial Officer Summary The purpose of this report is to provide the Board with the operating
More informationFinancial Management Report... 3
November 13, 2013 Table of Contents Financial Management Report... 3 OPERATING FUNDS STATEMENT OF REVENUES & EXPENSES... 3 METROPOLITAN COUNCIL INVESTMENT PERFORMANCE SHORT-TERM PORTFOLIO... 4 METROPOLITAN
More informationOperating Budget Report
Operating Budget Report MTD Operating Budget ($ in Millions) Oct-FY2012 Oct-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 70 $ 79 $ (8)
More informationApproval of FY2013 Budget
Finance & Administration Committee Action Item III-A May 10, 2012 Approval of FY2013 Budget Page 3 of 126 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationThe Potomac and Rappahannock Transportation Commission (PRTC) is a multijurisdictional agency representing Prince William, Stafford and Spotsylvania
Planning and Development Development Services, Department of Economic Development, Department of Housing and Community Development, Office of Planning Prince William County/ Manassas Convention and Visitors
More informationChairman Skinner and the VRE Operations Board. Authorization to Issue a Request for Proposals for Federal Legislative Services
Agenda Item 8-A Consent Item To: From: Chairman Skinner and the VRE Operations Board Doug Allen Date: February 19, 2016 Re: Authorization to Issue a Request for Proposals for Federal Legislative Services
More informationAmend FY07 System Access Program for Artwork
Item: 10 Amend FY07 System Access Program for Artwork 55 of 75 Board Budget Committee July 6, 2006 EXECUTIVE SUMMARY Budget Committee Meeting July 6, 2006 Request for Board approval to amend the fiscal
More informationWashington Metropolitan Area Transit Authority. TRIENNIAL DBE GOAL SETTING AND METHODOLOGY FEDERAL FISCAL YEARS (FFYs)
Washington Metropolitan Area Transit Authority TRIENNIAL DBE GOAL SETTING AND METHODOLOGY FEDERAL FISCAL YEARS (FFYs) 2017-2019 I. GOAL RECOMMENDATION WMATA has adopted a 22% DBE goal f or Federal Fiscal
More informationSUBJECT: Capital Program and 10-Year Capital Forecast
MEETING DATE: October 23, 2002 SUBJECT: 2003-2007 Capital Program and 10-Year Capital Forecast RECOMMENDATION It is recommended that the Commission: 1. Approve the 2003-2007 Capital Program in the amount
More informationTransportation Committee Meeting date: January 23, 2017 For the Metropolitan Council meeting of February 8, 2017
Business Item No. 201735 JT Transportation Committee Meeting date: January 23, 2017 For the Metropolitan Council meeting of February 8, 2017 Subject: 2017 Unified Budget Amendment District(s), Member(s):
More informationappearance of conflicts by Board Members, their household members and business
PRESENTED AND ADOPTED: July 21, 2011 SUBJECT: APPROVAL OF CODE OF ETHICS FOR WMATA BOARD OF DIRECTORS 2011-38 RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 12 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Adopting the SFMTA s Fiscal Year (FY) 2019 2023 Capital
More information