LOMBOK TENGAH IN DECENTRALIZATION: INITIAL EXPERIENCES AND EMERGING CHALLENGES *

Size: px
Start display at page:

Download "LOMBOK TENGAH IN DECENTRALIZATION: INITIAL EXPERIENCES AND EMERGING CHALLENGES *"

Transcription

1 INTERNATIONAL SYMPOSIUM ON INDONESIA S DECENTRALIZATION POLICY: PROBLEMS AND POLICY DIRECTIONS LOMBOK TENGAH IN DECENTRALIZATION: INITIAL EXPERIENCES AND EMERGING CHALLENGES * SEPTEMBER 4-5, 2003 SHANGRI-LA HOTEL, JAKARTA, INDONESIA NORIO USUI a AND CATUR SUGIANTO b I. INTRODUCTION 1. This report focuses on the Central Lombok district (Kabupaten Lombok Tengah) in West Nusa Tenggara (Nusa Tenggara Barat: NTB) province. The team comprising the authors and a district surveyor 1 conducted two field surveys in 2002 and The first field survey, which was conducted from 18 to 28 August 2002, started with a focus group meeting led by an Assistant for local government s secretary (Sekwilda) and attended by heads of key local government bureaus (Dinas, Bagian, Kantor), following which the team conducted a series of interviews with government officials, local parliament staff, community leaders, university researchers, NGOs, and staffs of NTB provincial government. Preliminary results of the survey were discussed in the Tokyo Symposium held on 31 January and 1 February 2003, and the Socialization Workshop held in Malang on 31 March Second field survey was conducted from 27 July to 2 August 2003, to update developments and clarify remaining topics and emerging challenges after the first field survey. 2. Before fielding Lombok Tengah, the team prepared a concept paper to establish a clear consensus within the team on topics to be covered in the study. (Usui, N., 2002). Further, based on the concept paper, detailed questionnaires were prepared for the both field surveys (Catur Sugiyanto and Awaluddin, 2002 and 2003). Major topics to be covered in this study are: 1) development planning; 2) budgeting; 3) organizational structure; and 4) service deliveries in health, education, and agriculture. In the second field survey, the team focused on: a) roles of sub-districts (Kacamatan) and villages (Desa) in local planning and budgeting processes; b) local responses to the Circular Letter (Surat Edaran) MOHA No.050/987/SJ on participatory planning; c) readiness to adopt the new local financial management system stipulated in the Ministerial Decree (Kepmen) MOHA No.29/2002; d) local revenue mobilizing efforts and nuisance tax; e) local perspective on the matching grant (DAK) projects; f) possible impacts of the Government Regulation (PP) No.8/2003 on local government organizational structure; and g) innovations and challenges in education, health, and agricultural sectors. 3. Lombok Tengah is one of the poorest local governments (Kabupaten/Kota) in Indonesia with limited human and natural resources. Its territory is dominated by rural area with 745,433 people. Lombok Tengah consists of 12 sub-districts (Kacamatan) 2, 131 * The authors greatly appreciate the government officials and social leaders of Lombok Tengah and staffs of Development Planning Board (BAPPEDA) of NTB province for their strong supports to this study. The views, interpretations, and conclusions expressed in this paper, however, are solely those of the authors, and should not be attributed to Lombok Tengah and NTB provincial governments, other team members of this project, the Government of Japan, and the Government of Indonesia. Preliminary results of the first field survey were presented at Tokyo Symposium, which was held on 31 January and 1 February, 2003, under the title of Development Planning, Budgeting, and Service Deliveries: A Case of Lombok Tengah. a Norio Usui: Associate Professor, Faculty of Economics, Kansai University: nusui@ipcku.kansai-u.ac.jp b Catur Sugiyanto: Director, Center for Economic and Public Policy Studies, Gadjah Mada University: catur@paue.ugm.ac.id 1 The authors thank Mr. Awaluddin L. (Gadjah Mada University), research assistant for the field surveys, for his firm commitment to this study. 2 Before the decentralization, there existed nine sub-districts (Kacamatan) in Lombok Tengah. However, after the decentralization, the government established three new sub-districts to improve its service deliveries.

2 villages (Desa), and 991 sub-villages (Dusun/Lingkungan). The economy heavily depends on agricultural sector, which takes up 37.5 percent of regional GDP in 2000 (Figure 1). About 48 percent of labor forces belong to tree crop sector, which followed by 8 percent to plantation and 5 percent to service sector. After experiencing negative 2.0 percent growth in 1998, the economy showed gradual recovery with 1.2 percent and 2.0 percent growths in 1999 and 2000, respectively. Although impacts of the 1997 economic crisis were limited, Lombok Tengah is still facing many difficulties in its human resource development. Lombok Tengah was ranked 288 th of total 294 local governments in its Human Development Index (HDI) in Further, its HDI remained at the lowest level within NTB province (Table 1). More than 30 percent of total population lives below the poverty line. Among the target local governments covered in this project, Lombok Tengah is the poorest local government (Annex 1). Figure 1 Sectoral GDP (%, 2000) Agriculture (37.5%) Others (25.9%) Mining (3.1%) Manufacturing (6.0%) Construction (10.3%) Trade, Restaurants & Hotels (17.2%) Source: BPS and BAPPEDA NTB (2001) Life Expectancy (years) Table 1 Human Development Index (HDI) Adult Literacy Rate (%) Mean Year of Schooling (years) Real Per Capita Expenditures ( 000 Rp.) HDI HDI Rank Poverty Rate (%) Lombok Tengah / NTB Province / Indonesia Source: BPS, BAPPENAS and UNDP, Major purposes of this report are to: 1) show some innovative moves made by Lombok Tengah with its own initiatives; and 2) clarify remaining and emerging challenges for Lombok Tengah. The report covers major findings of the second field survey. The paper is organized as follows: section 2 discusses development planning process; section 3 analyzes budgeting practices and budget structures; section 4 describes organizational structure and the transfer of personnel; section 5 outlines services deliveries in health, education, and agriculture; and final section summarizes key findings and recommendations. 2

3 II. DEVELOPMENT PLANNING 5. Indonesia s local development planning system has been a mixture of top-down and bottom-up approaches. The top down approach started with national policy guideline (GBHN) and followed by five-year development plan (REPELITA, currently known as PROPENAS), strategic development plans (RENSTRA), and annual development plan (REPETA). Regional governments, both at provincial and local levels, were also required to produce corresponding planning documents: POLDA; PROPEDA; RENSTRA; and REPETADA, based on the central planning documents. 6. It was expected that people s needs and aspirations could be identified through a series of development coordination meetings. The process started from development coordination meeting at sub-village level (Musbangdus), followed by similar coordinating meeting at village level (Musbangdes), sub-district level (UDKP), district level (Rakorbang Kabupaten/Kota), provincial level (Rakorbang Propinsi), and finally national level (Rakorbangnas). It was also assumed that synchronization of development activities and budgets at all government levels can be guaranteed through the bottom-up and top-down processes. 7. However, in reality, local development activities were dominated by center inspired projects, and did not necessarily meet people s needs and aspirations. Many bottom-up projects were filtered out at coordinating meetings at higher levels. This accentuation of top-down planning could not be avoided since, before the decentralization, a major part of development funds for regions came from the central government through central line ministries development budgets (DIP) and regional development funds (INPRES). 8. After the decentralization, local governments are required to shift from the old development planning practice to a new planning system which can effectively absorb people s needs by fostering active civil society participation. This is a key challenge for all local governments. At the same time, decentralization requires local governments to make a good coordination with both higher levels of government and neighboring governments. Even after the decentralization, local planning and budgeting requires both vertical (with higher levels of government) and horizontal (with neighboring same level governments) linkages. Development Planning in Lombok Tengah 9. After decentralization, development planning process in Lombok Tengah has experienced some changes. It still follows the old practice consisting of Musbangdus, Musbangdes, UDKP, and Rakorbang, however, compared with before the decentralization, stakeholders participation became more active. A new participatory planning model (MPP) has pilot tested in three sub-districts in FY2002, and expanded to all districts in FY2003. Further, the newly released guideline for participatory planning (SE MOHA No.050/987/SJ) provides a new planning procedure at local level Musbangdes (Village Level): Programs or activities proposed by villages were dominated by those decided by village head (Kepala Desa) before the decentralization. However, after the decentralization, programs can be selected based on real local needs. Stakeholder participation at village level becomes very active. Participatory planning brings about the development program closer to the people. This is mainly due to reorganization of village governments. After decentralization, village representative council (Badan Perwakilan Desa/BPD), which replaced former village assembly (LMD) and its members are elected by local people, has strengthened its power to control and supervise decisions made by village head. At present, all decision-makings should go through discussion with BPD and other village institutions such as LKMD (village 3 Usui, N., and Armida Alisjahbana (2003b). 3

4 community resilience board). Further, selection system of LKMD members has been changed. Although they were dominated by relatives of village head in the past, all members need to be selected by people s opinion. This change also strengthened the supervising function of LKMD on village government performance. 11. However, we received an impression that fragmented views of the participants may result in a smaller size of project, minimum (low) scale and less beneficial programs because externalities in some sectors can not be exploited at village level. Technical bureaus at district level (Dinas) need to make some adjustments to resolve the issue. Desa Mujur Kepala Desa was elected in Before the decentralization, village assembly (LMD) consisted of 13 members (one each from 13 sub-villages (Desun)). However, after the decentralization LMD was replaced by village representative council (BPD) and its 15 members were elected by local people (17 years old and more) in FY2001. In the election process, each Desun selected two candidates (total candidates were twenty six). Elected BPD members include: community leaders, religious leaders, and youth leaders. BPD members elected do not include former LMD members. Head of LKMD is still Kepala Desa. Kepala Desa selected candidates of LKMD members and discussed at BPD. LKMD members selected are: school teachers, a Kacamatan staff, community leaders, religious leaders, retired military staff, and house wife. BPD becomes powerful and Kepala Desa needs to be accountable to BPD. In Musbangdes, which was held in the early June 2003, intensive discussion was made to set priority for proposal to UDKP. Discussion continued to reach a consensus among participants without utilizing voting. 12. UDKP (Sub-district Level): All proposals from village level are discussed at subdistrict (Kacamatan) level to select priority projects for the discussion at district level. However, roles of UDKP are not necessarily clear. At all levels of government except Kacamatan, there exists separation of powers between the executives and legislative. However, there is no legislative body at this level, and all staffs, including its head (Camat), are local government employees. Echelon position of Camat (III/B) is below that of head of technical bureau (Kepala Dinas) at district level (III/A), which makes it difficult for Camat to convey the proposals to district government if they contradict with Dinas ideas. Bupati (head of local government) fully realizes the difficult position of Camat and trys to resolve the problem by inviting all Camat at regular meetings as the same status with Kepala Dinas. Further, Bupati considers delegating some of Bupati s functions to Camat to strengthen its position. Kacamatan Praya Timur Camat is a former staff of finance bureau (Bagian Keuangan) and got the current post in FY2003. There are 22 staffs including Camat, which does not include KCD (sub-district branches of local technical bureaus) staff. UDKP was held on 24 June Desas joined the meeting. Priority was set based on number of Desa proposed the similar type of project (if five Desa proposed road project, road project became a priority sector). In this system, Kacamatan can not pick up a certain project which is really needed for a certain Desa. However, Camat mentioned that, despite the limitation, this system is the best system in this stage. Position of Camat is not clear. He is a staff of Kabupaten, but he needs to hear local opinions. Camat mentioned that he always see people, not Dinas. Even his Echelon position is below Kepala Dinas, he needed to fight with Kepala Dinas at Rakorbang Meeting. However, he also mentioned that other Camats are not necessarily like him. There are some old type Camats. 4

5 13. Rakorbang Kabupaten (District Level): Before decentralization, the key task of Rakorbang (Kabupaten) meeting was to synchronize programs and projects amongst the different levels of government. However, it becomes an important meeting, because it helps: 1) to focus the mission statement of all stakeholders especially in setting the priorities, strategy and direction of the five year development plan; 2) to gather aspirations and solutions suggested by all parties outside the government, including businessmen, NGOs, associations and other public figures; 3) to share the development programs and projects between the province and the district. Table 2 Planning and Budgeting Calendar: Lombok Tengah FY2002 and FY2003 FY2002 FY2003 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Musbagdes (Desa) UDKP (Kacamatan) Rakorbang (Kabupaten) Rakorbang Province FY2002 (APBD FY2003) RAPBN Rakorbang National RAPBD Province APBN RAPBD Province RAPBD Kab. APBD Kab. FY2003 (APBD FY2004) Musbagdes (Desa) UDKP (Kacamatan) Pre-Rakorbang Kabupaten Rakorbang (Kabupaten) Rakorbang Province Rakorbang National RAPBN Targets APBN RAPBD Kabupaten APBD Kabupaten 14. Scoring Sheet: Following the guideline by the central government (SE MOHA No.050/987/SJ), Lombok Tengah has started utilizing a scoring sheet system for Rakorbang meeting since FY2003. Local planning board (BAPPEDA) prepared a scoring sheet taking account of: 1) consistency with development strategies of provincial and central governments; 2) consistency with local development strategy; 3) actions to negative impacts of projects; 4) benefits; 5) local needs and aspirations; and 6) technical evaluation by Dinas (Annex 2). Scoring sheets were prepared by sectors (for each Dinas) to set a priority list for each sector. All projects were discussed based on the scores at Rakorbang meeting. 15. SE MOHA No.050/987/SJ divides Rakorbang meeting into three sequent stages: 1) Pre-Rakorbang meeting; 2) Rakorbang meeting; and 3) Post-Rakorbang meeting. A 5

6 week before the Rakorbang meeting, Pre-Rakorbang Meeting was held. Kepala Dinas and Camat were invited. The steering committee consisting of Assistant, BAPPEDA, Bagian Keuangan (finance office), and Bagian AP (development administration office) briefed the newly introduced scoring system and overall process of Rakorbang. One day before the Rakorbang meeting, the steering committee finalized scores of all projects proposed both by all Kacamatan and Dinas. Rakorbang Kabupaten was held on 2 to 5 July 2003, where all stakeholders discussed to set priorities based on the scoring sheets prepared by the steering committee. Based on the discussion, scores for some projects were changed. In the original plan, before the Rakorbang Province, Post-Rakorbang Kabupaten was scheduled to finalize the priority list of Kabupaten. However, it was not possible, since Rakorbang Province was held just three days after the Rakorbang Kabupaten (8 to 9 July 2003), although Rakorbang Province was originally scheduled on 10 July Planning Schedule: SE MOHA No.050/987/SJ set an earlier local planning calendar: 1) Musbangdes (last two weeks of April); 2) UDKP (by the first week of May); and 3) Rakorbang (Pre-Rakorbang by third week of May; Rakorbang by the second week of June; and Post-Rakorbang sometime before finalizing local budget). This earlier planning schedule intends closer linkages between planning and budgeting at local level. However, as local officials mentioned, it become much more difficult to reflect financial conditions into the plan, since earlier planning calendar makes it more difficult to get budget information of higher levels of government. 17. Block Transfers to Kacamatan and Desa: To make public services more responsible to people s needs, Lombok Tengah government has started distributing a block grant to villages since FY2001. In the past two years (FY2001 and FY2002), the funds allocated to each village were Rp. 10 million and Rp. 12 million, respectively. In FY2003, the amount drastically increased to Rp. 50 million. In addition, the government introduced the similar grant to sub-districts to support development activities at village level. The transferred grant needs to be allocated to development activities (60 percent) and routine activities (40 percent) at both levels, however, allocation within the two categories can be determined at village and sub-district discretions. II. BUDGETING PROCESS AND BUDGETS 18. Decentralization has changed regional financial management practices including budgeting one. The vertical accountability was replaced by the horizontal accountability, which requires further stakeholder involvement. However, there are many regions which have not ready to implement the new budgeting practice (PP No. 105/2000 and Kepmen MOHA No.29/2002), which stipulates that regions need to adopt performance based budgeting (Annex 3). Budgeting Process in Lombok Tengah 19. Budgeting process in Lombok Tengah has not yet drastically changed: 1) in September, finance office (Bagian Keuangan) with revenue office (Dispenda), prepares revenue estimates for the coming fiscal year. Dispenda takes a responsibility to prepare local own revenue projections. All local offices (Dinas, Badan, Kantor) are requested to write down their budget proposals both for development and routine expenses; 2) in the early October, proposals from all spending units are assessed by Bagian Keuangan (routine expenses) and BAPPEDA (development expenses), based on fund availability and priorities set at Rakorbang meeting; 3) in the early November, local budget team (Komite Anggaran) reviews both revenue and expenditure programs to finalize budget proposal (RAPBD) for approval by Bupati; 4) in last half of November, the executive deliver RAPBD to local parliament (DPRD); and 5) by the end of December, DPRD 6

7 finalizes local budget (APBD). Approved local budget is legalized by issuing local law (Perda). 20. However, Lombok Tengah could not finalize its budgets by the end of December due mainly to the delayed approvals of higher level governments budgets. FY2003 central and provincial budgets were approved by respective legislatives in December As a result, Lombok Tengah could not finalize its FY2003 budget before the fiscal year started: RAPBD was submitted to DPRD in the early March 2003, and it was approved by DPRD at the end of March One of difficulties Lombok Tengah has been facing is lack of information of deconcentration funds. Since deoncentration funds are allocated from central line ministries to respective Dinas via provincial Dinas, local planning board (BAPPNDA) can not get information on deconcentration funds, which is highly required for local budgeting processes. BAPPEDA contacted with local Dinas and also provincial BAPPEDA to get the information. However, due to slow information flow from higher levels of government, BAPPEDA could not receive information even after DPRD approved APBD. 21. Performance Budgeting: Lombok Tengah has shifted to the new budget format consisting of revenue, expenditure, and financing components since FY2003 budget, which is stipulated in Kepmen MOHA No.29/2002 (Annex 4). However, as local officials mentioned, the government is still facing difficulties in setting up clear performance targets. Although indicative targets have been set for infrastructure sector, those for social sectors have not yet been well prepared. Dinas and BAPPEDA utilize logical framework and try to produce performance indicators for social sectors. Local officials referred to the extreme difficulties to set quantitative, not qualitative, indicative targets for some social sectors to adopt performance based budgeting 4. Lombok Tengah Budgets Table 3 Summary of Lombok Tengah Budgets Before Decentralization After Decentralization (Rp. billion) FY99/00 FY2000 # Ave. Share (%) FY2001 FY2002 Ave. Share (%) Revenues Previous Year's Surplus Local Own Revenues Balanced Funds Tax Sharing Non-Tax Sharing DAU/(SDO until FY2000) DAK/(INPRES until FY2000) Local Gov. Borrowing Others Expenditures Routine Expenditure Personnel Expenditure Non-Personnel Expenditure Development Expenditure Note : # annualized. Source : APBDs Lombok Tengah Local officials mentioned that accounting system is still based on old practice, i.e., cash basis, due mainly to lack of local staff capacities and unclear central guideline. There are two different accounting systems proposed by MOHA and MOF. Local officials are still confusing which system they have to adopt. 7

8 22. Revenues: Table 3 summarizes budgets of Lombok Tengah before and after the decentralization. In FY2001, total revenues jumped up by 94 percent from FY2000, which means that its budget became about twice bigger than that before the decentralization. As many other regions, increased central transfer, in particular general purpose grant (DAU), is the driving factor explaining this drastic revenue increase. Although the government is recognized the importance of revenue mobilizing efforts, its local own revenues (PAD) is still limited to less than five percent of total revenues. As a result, its dependency on central transfers still remains as high as more than 90 percent. 23. DAU calculation data for FY2003 (PKPD, MOF) also shows the limited revenue mobilization capacity of Lombok Tengah. In the DAU calculation system, potential local revenue, which can be derived as a result of simple regression analysis, is taken into account as a part of local fiscal capacity. Lombok Tengah s actual local revenues remained about 60 percent of its potential revenues in FY2001 (Figure 2). Figure 2 Local Own Revenues and DAU allocations: Lombok Tengah FY2001 PAD PAD (Local Own Revenues) 1000 PAD= *GRDPS R= Rp. billion ) 50% of Potential PAD 2) PPh+PBB+BPHTB 3) 75% of SDA FY2003 DAU DAU Fiscal Gap: Lombok Tengah Actual: Rp billion Potential: Rp billion GRDPS (Service Sector GDP) 0 Fiscal Capacity Fiscal Needs Fiscal Capacity + DAU Source: PKPD, MOF. DAU FY2003 data. 24. Local Own Revenues (PAD): Local own revenues consists of four categories: 1) local taxes; 2) user charges and levies; 3) profits from local own enterprises; 4) other local revenues. In FY2002 budget, local taxes and user charges and levies take up 32 percent, and 23 percent of total local own revenues, respectively (Table 4). There are six local taxes (including newly created inter-island commodity trade tax), however, hotel and restaurant tax and street light tax take up about 75 percent of local tax revenues. There are as many as 16 user charges and levies (including newly introduced user charge on irrigation), however, about 80 percent of total revenues comes from health services, identification card, market and local products. Other 12 user charges and levies make minor contributions to local budget. User charges and levies are managed and collected by respective technical bureaus. In FY2002, health bureau (Dinas Kesehatan) raised the tariff for rural clinic (Puskesmas), a biggest component of user charge and levy revenues, from Rp. 2,000 to Rp. 5, As of the end July 2003, Lombok Tengah considers introducing the following new taxes or levies: 1) leges (administrative fees for obtaining licenses, such as business license and other services to people); 2) kartu ternak (livestock card); 3) diving activity; 8

9 and 4) fishing. Dispenda (revenue office) officials mentioned that, Dispenda fully considers revenue potential and expected tax administration costs including socialization ones for new taxes and levies. If expected cost is bigger that 50 percent of potential revenue, Dispanda will not create the tax or levy. A key constraint is lack of qualified officials. Head of Dispenda mentioned that the capacity of Dispenda officials is very limited: only five personnel have background in economics, nine in administration, two in agriculture, and two in laws. Local Own Revenue (PAD) Table 4 Local Own Revenues: FY2002 (Rp. million) (%) (Rp. million) (%) (Rp. million) (%) 12, , , Ref. PAD share to Total Revenue: 4.2 % 1 Hotels and Restaurants 1, Health Services 1, Street Light 1, Identfication Card Mining (Category C) Market Advertisement Local Products Entertainment Irrigation Source : APBD Lombok Tengah FY Inter Island Commodity Trade Local Taxes of which User Charges and Levies Other 11 Levies Sub-Total Sub-Total Inter-Island Commodity Trade Tax: New local tax and levy law (Law No.34/2000) allows regional governments to create new taxes as long as they do not violate some criteria subject to the central government s approval. Lombok Tengah government has introduced a tax on inter-island commodity trade (export) in coordination with neighboring local governments (Kab Lombok Barat, Kab Lombok Timur, Kota Mataram) in FY2001 (Perda No.5/2001). Main targets of the tax are law materials and agricultural commodities. Tax rate is set at five percent of basic prices of target commodities, which are determined together with the neighboring local governments, and are written as joint local laws (Perda No.11/2000, No.15/2001, No.317/2001, and No.434/2001). This joint decrees contained details of target commodities, basic prices, and types or units. There are six main categories: 1) forest products (11 commodities); 2) another forest products (37 commodities); 3) mining products (63 commodities); 4) cattle/animal products (23 commodities); 5) industrial products (20 commodities); and 6) other natural products (10 commodities). The basic prices can be adjusted continually based on their market prices. This tax is clearly against the local tax criteria. Local government officials acknowledged that the tax, which was once prohibited by Law No.18/1997, was re-introduced in FY Lombok Tengah government received letters from PKPD, MOF (18 December 2002) and MOHA (14 February 2003) requesting cancellation of the tax. In response to the letters, the government, with other three local governments, sent two letters to the central government (8 January 2003 and 14 March 2003) inquiring reasons of the central government s decision. Dispenda officials mentioned that the proposed tax is not against the local tax criteria, since its major target is law materials or agricultural commodities, which are not covered by value added tax (VAT). Further, the officials insisted that Dispenda has not received any complaint against the tax, and that it is not clear why the central government reached the decision after more than one year after Lombok Tengah submitted the proposal to the central government. Dispenda officials mentioned that the tax is still collected in FY2003 (since the Perda has not yet cancelled by DPRD), and that there still remains a possibility that the tax will be collected in FY

10 28. Transfers of Property-related Taxes: Currently, total 53 staff work in Dispenda, of which 17 staff for local tax, 14 staff for local levies, and 12 staff for central property tax (Land and Building Tax or PBB, and Transfer of Land and Building Tax or BPHTB), and 10 staff for others. Staffs for central property taxes works mainly to encourage local people to pay the taxes. As for possible transfers of PBB and BPHTB to local governments, Dispenda official mentioned that expected administration cost is too high to accept the transfers. Finance office (Bagian Keuangan) staffs also mentioned that they do not desire the transfers. If the taxes will be transferred, expected revenues Lombok Tengah can collect will be smaller than the amounts it enjoys under the current sharing systems. Under the current system, 65 percent of central share of PBB and all central share of BPHTB are equally allocated to all local governments irrespective of its derivations. Local governments with weak tax bases for PBB and BPHTB, like Lombok Tengah, enjoy larger revenues due to this arrangement. 29. Expenditures: Total expenditures also drastically jumped in FY2001. Routine budgets take up about 70 percent, in which personnel expenditures makes up more than 80 percent. It mainly comes from the transfers of former central government officials. A major part of DAU was allocated to personnel expenses. Moreover, in FY2001, specifically in June or July, the central government announced civil servant salary raise (retroactive to January 2001). This decision worsened the financial condition of Lombok Tengah where the local budget could not afford to pay the increase in salary. The measures taken by the government was to postpone a number of development projects which were budgeted in FY2001. In this way, the funds initially allocated to the projects were then diverted to expected increase of salary payments. However, since the government could receive contingent funds from the central government later, postponement of the projects was cancelled. Sector Figure 3 Sectoral Allocations of Development Expenditures (%) (%) FY2002 FY2001 FY2000 FY99/00 security & public order politics & information civil servants law science & technology religion dwelling health demograpghy & welfare education environment regional development tourism mining & energy transportation trade & cooperatives manpower water resource agriculture industry Source: APBDs Lombok Tengah. 10

11 30. In FY2001, a share of development expenditures increased to 31 percent from 24 percent in FY2000. Allocated amount to development expenses was about 2.5 times bigger than that in the previous year. This means that, at least in the budgeting stage, there was an enough fund for development activities, even though government officials repeatedly complained the lack of revenues to finance increased personnel expenditures. Sectoral allocation of development expenditures was also drastically changed. In FY2001, allocations to trade, education, and health sectors, which are priority sectors of the government, became nine times, 2.8 times, and 6.7 times bigger than those in FY2000 (Figure 3). 31. DAK Projects: As of the end of July 2003, Lombok Tengah government has not yet initiated any DAK project. Major reasons are: 1) delayed approval of FY2003 Budget by DPRD; and 2) lack of understanding of DAK project management procedures by local officials. Since Dinas staffs had worked so long for DIP (central) projects, they need do understand details of DAK project management system. Bagian Keuagan is now preparing a new local law (Perda) regarding management of DAK projects for discussion at DPRD. Counterpart funds (10 percent of total project costs) for FY2003 DAK are budgeted in FY2003 budget. III. ORGANIZATIONAL STRUCTURE AND TRANSFER OF PERSONNEL 32. With the implementation of decentralization, about two million of central officials were transferred to regions in FY2001. Since the transfer was conducted without any needs assessments at local level, local governments faced difficulties both in staff allocation within the government organization, and also in financing additional salary payments for them. Since local governments were not allowed to lay them off, they were required to reorganize their organizational structure to accommodate the personnel. In many regions, local governments established new technical bureaus (Dinas and Badan) just to absorb the transferred staff. Lombok Tengah 33. Staff Transfer: Lombok Tengah received 7,530 former central staffs consisting of 6,630 school teachers and 1,170 non-school teachers (Figure 4). After the decentralization, education backgrounds of local officials becomes: 205 workers with primary background, 468 workers with junior high background, 2,792 with senior high background, 898 workers with three-year diploma background, 2,366 workers with twoyear diploma background, 78 workers with one-year diploma background, 2,094 with undergraduate degree, and 25 workers with graduate degree. 34. After the decentralization, total structural posts (Echelon) increased from 959 to 1,030: consisting of one post for Echelon II/A, 20 posts for Echelon II/B, 121 posts for Echelon III/A, 12 posts for Echelon III/B, 523 posts for Echelon IV/A, 339 posts for Echelon IV/B and 14 posts for Echelon V/B. In addition, most Echelon positions of local officials were upgraded, which resulted higher budget allocation to personnel expenses in the local budget (Table 5). 35. Reorganization: Lombok Tengah carried out reorganization based on the government regulations (PP) No.84/2000 concerning regional government organizations in FY2000 (Perda No.11/2000). The government currently consists of: 1) regional secretary (Sekda) which comprises local secretary, three assistants and 10 units (Bagian); while the secretary of local council (DPRD) includes secretary of council and three units; 2) 14 local agencies (housings and settlement, regional infrastructure (Prasarana), health, agriculture and livestock, forest and estate, industry and commerce, communications, lands, cooperative and small and medium enterprises, tourism, education and culture, social and labour, fisheries and sea, population migration and community empowerment, 11

12 and regional revenue); and 3) local technical institutions consist of monitoring board, regional planning board, office for capital investment and living environment control, office of nation unity and community protection, office for mining and energy, regional public hospital (RSUD), and organizations at sub-district (Kecamatan) and village (Kelurahan) levels Figure 4 Staff Transfers to Lombok Tengah Non-School Teachers Total Transfer: 7530 School Teachers Before Decentralization After Decentralization Source: BPD Lombok Tengah. Echelon Level II III IV V Table 5 Echelon Positions and Benefits Major Posts A Sekda ,000 2,500,000 B Kepala Dinas/Bagian ,000 1,500,000 A Kepala Kantor , ,000 B Camat , ,000 A Kepala KCD , ,000 B , ,000 A ,000 eliminated B ,000 eliminated Total 959 1,030 Source: BPD Lombok Tengah. Staff Numbers Before Decent. After Decent. Position Benefits Before Decent. After Decent. 36. To provide better public services to people, Lombok Tengah government created a new institution called KCD (sub-district office of technical bureaus). Lombok Tengah is spread out geographically that requires the government move closer to their people. While there were only one KCD in each sub-district in education and agricultural sectors before the decentralization, currently almost all technical bureaus (Dinas) have KCD in every Kecamatan (Annex 5). In general, heads of KCD are the transferred personnel, while local personnel are promoted as section heads (Kepala Seksi). This also intends to enable more effective absorption of local aspiration by putting local officials close to people. However, it is not clear that KCD can pick up local demands effectively, since KCD belong to Dinas. Kepala KCD and all other staffs are still Kabupaten officials. 12

13 37. PP No.8/2003: In FY2003, the central government replaced PP No.84/2000 with PP No.8/2003, which stipulates that organizational position of local government unit: Dinas, Badan, Kantor etc., needs to be determined based on the scoring system. Units with lower scores can not exist as separate institutions or need to be downgraded to lower positions. Lombok Tengah government is currently working on how to restructure its organization again in line with the new regulation. Local organization office (BPD) has already finished first scoring exercise for all units based on the criteria set by the regulation. However, there is a strong complaint at local level that the new regulation does not consider local priorities at all. For example, in Lombok Tengah, agriculture is the main sector where the people depend on their lives, but, under the new regulation, current farming and husbandry agency (Dinas Pertanian dan Prternakan) should be downgraded to Kantor. 38. Lombok Tengah government has 14 Dinas, three Badan, and three Kantor, which numbers are below the maximums set by PP No.8/2003. However, scoring results show that only three Dinas, whose scores are more than 750, can maintain its current position, and others should be downgraded to Kantor. Since Echelon position of Kepala (head) Kantor is III/A, below II/B of Kepala Dinas, reorganization based on the new regulation will require drastic adjustment of Echelon structure within the government. Staff level also can be affected by the reorganization. Local officials mentioned that the reorganization should be finished by the end of FY2004. Table 6 Local Government Organization Institution/ Office Sekretaris Daerah Dinas Badan Kantor Kecamatan Kelurahan Perda Lombok Tengah No.11/ Assistants to District Secretary 3-4 Parts (Bagian) 3-4 Sub-Parts (Sub-Bagian) 14 Dinas 1 Administration (Bagian Tata Usaha (TU) Max 5 Sub-Dinas Sub-Administration: each Max 4 Sub-Bagian Sub-Dinas Max 4 Sections 1 TU Max 4 Sub-Bagian Max 5 Bidang each Bidang Max 4 Sub-Bidang 1 Sub-Bagian TU Max 4 Seksi (Section) 1 Sekretaris Max 5 Seksi a group of functional position (kelompok jabatan fungsional) 1 Sekretaris Kelurahan Max 3 Seksi a group of functional position PP No.8/2003 Max 3 Assistants to District Secretary Max 4 Parts Max 3 Sub-Parts Max 14 Dinas 1 Administration (TU) 4 Bidang Sub-Administration: each Max 2 Sub-Bagian Each Bidang Max 2 Sub-Bidang 1 TU Max 2 Sub-Bagian Max 3 Bidang each Bidang Max 2 Sub-Bidang 1 Sub-Bagian TU Max 3 Seksi 1 Sekretaris Max 5 Seksi kelompok jabatan fungsional 1 Sekretaris Kelurahan Max 4 Seksi 39. Other problems the new regulation can create include: 1) lesser number of position (jabatan) will influence around 40 percent of the total position (1,064). For example, Dinas and Badan have currently four sections (Seksi), while the new regulation allows only two sections; 2) KCD (sub-district office of technical bureaus) is not mentioned in PP No.8/2003, so their status are not clear. Lombok Tengah seems to consider that KCD will 13

14 survive as technical unit in sub-districts (Unit Pelaksana Teknis or UPT) 5 ; 3) once KCD serve as UTP at sub-district level, structure and functions of Camat (head of sub-district) needs to be changed to enable better management of KCD; 4) a problem can arise at Echelon III and IV levels. For example, in the new system, Echelon position of Camat will be upgraded to III/A from the current III/B. In addition, while Echelon IV/B is allocated at KCD level (as head of section) under the current system, the new regulation stipulates that Echelon IV/B should be at village level; 5) coordination with neighboring local governments will become difficult if same functions will be managed by different level of Echelon (Dinas or Kantor); 6) downgrading of Dinas and Badan will make it difficult to select new heads of Kantor. There are more than 100 personnel in Echelon III and IV, while the maximum number of position will be less than 30. Health Sector V. SERVICE DELIVERIES 40. Improvement of local health condition is a key challenge for Lombok Tengah. After the decentralization, health sector becomes one of top priority areas in its development strategy. Health service programs get broader supports within the government and also local societies. Decentralization provided a very good opportunity to better serve the people because Dinas Kesehatan (health agency) knows exactly what kinds of program and service that should be delivered to people. 41. Coordination within health sector becomes better than before decentralization. Kepala Dinas (agency head) has regular monthly meeting with Ketua Puskesmas (head of rural clinic). In the meeting, Ketua Puskesmas can convey their concerns and requests directly to Kepala Dinas (there is not KCD in health sector). The Dinas develops a reliable mobile Puskesmas and increase facilities in Puskesmas Pembantu (sub-rural clinic) to enable them to provide first stage helps and beds for patients stay. However, coordination with neighboring Dinas has not yet well developed. A more active encouragement by provincial Dinas is required to this end. Table 7 Medical Staff Shortage: Medical Staff to Population Ratio 2002 Kacamatan Doctor Medical Specialist Dentist Total Ratios Praya Praya Tengah Praya Barat Praya Barat Daya Praya Timur Janapria Kopang Batukliang Batukliang Utara Pringgarata Jonggat Pujut Lombok Tengah NTB Province Indonesia Note : Ratio=medical staff/population*100,000. Source : Dinas Kesehatan Lombok Tengah. 5 PP No.8/2003 allows that lembaga teknis to establish UPT. 14

15 42. Medical Staff Shortage: However, Lombok Tengah is still facing a serious shortage of medical staffs both in quantity and quality. Medical staff to population ratio is far below the provincial and national levels (Table 7). In FY2003, the central government provides seven additional staffs, and Lombok Tengah recruited five additional doctors with its own funds. Now, all Puskesmas have two doctors. Ideally, each Puskesmas should have three doctors: one to give medical services to patients, one for administrative jobs, and one for the mobile health service. In addition, Lombok Tengah needs dentists and special doctors. The Dinas promotes coordination with a university (in Denpasar, Bali) to recruit fresh graduate special doctors. The government also provides additional benefits such as house and vehicle to attract doctors. 43. Medicine Procurements: Procurement system of medicines becomes better than before decentralization. Prior to decentralization, medicine supply was managed by the central government, and, if the local government needs some specific medicines, they were required to prepare a list of what medicines they need. Medicines provided by the central government included some unneeded ones, and sometimes reached their expired dates. After the decentralization, Lombok Tengah government introduced tendering system in medicine procurement in FY2001. However, prices of medicine increased due to collusion by suppliers. Moreover, it took five months to procure medicines. In FY2003, the Dinas decided to make a contract with one supplier that can meet the requirement prices set by the central government. To reduce KKN (collusion, corruption, and nepotism) with the Dinas, the Dinas is not allowed to involve the selection process of the supplier. Bupati established a special committee consisting of Sekda, BAPPEDA, Kepala Dinas Kimpraswill (public service), manpower, transmigration, and family planning office (previously BKKBN) to evaluate suppliers. Based on the discussion at the committee, the government made a contract with one supplier. Since standard prices of medicine can be provided from the central ministry every year, the Dinas can check the offer prices from the contractor. 44. Tariff Hike: Rural clinic (Puskesmas) tariff was increased from Rp. 2,000 to Rp. 5,000 from April 2002, which includes necessary medicine costs. This tariff increase was intended to raise local revenues. In Lombok Tengah, 64 percent of population have JPS (social safety net) card and another six percent has ASKES (medical insurance for government employees), which implies that only 30 percent of population actually pay the tariff. Number of patient visited Puskesmas dropped by 30 percent just after the tariff hike, but now the number has returned to normal level. Further, the Dinas has not yet received any complaint from local people. 45. The Dinas is currently promoting merger of Polides (village midwife clinic) and Puskesmas Pembantu (sub-rural clinic). The former mainly targets pregnant women with financial supports from the central government (JPS fund), while the latter covers all other general patients. Sometimes, if pregnant women go to Puskesmas Pembantu, staff advises them to go to Polides. Based on the discussion at the regular monthly meeting, agency head proposed the merger to Bupati. 46. Buku KIA: On the initiative of Bupati, the government is currently encouraging all pregnant women to hold Buku KIA (Maternal and Child Health Handbook), with support by Japan International Cooperation Agency (JICA). A JICA resident expert has stayed for three years for this project. This project is well accepted by local people. 47. DAK: Dinas Kesehatan was informed total amount of FY2003 DAK to health sector in May Currently, agency staff is processing DAK projects. Staff has already checked procedure of DAK projects by reading a guideline from the central government. 15

16 48. SPM: So far, the Dinas still utilizes health service standard from the central ministry. Minimum service standards (SPMs) are still under processing and the Dinas sent its staff for training in Jakarta. Agricultural Sector 49. Reorganization: After decentralization, food farming agency, husbandry agency, and other two related institutions, were merged into farming and husbandry agency (Dinas Pertanian dan Prternakan). The similar reorganization was conducted at provincial level. Several new directorate general posts were created at central level which relate with local farming and husbandry agency. This makes it difficult for local government to coordinate with higher levels of government: coordination system becomes more complex and requires longer time. In addition, coordination with neighboring districts became not easy, since each district has its own structure. Kepala Dinas (agency head) proposed a regular meeting (once every three months) with his counterparts of neighboring local governments to foster inter-regional cooperation. However, Kepala Dinas doubts that such a regular meeting can be realized continuously due to limited supports from provincial Dinas. Coordination within the local government becomes much better, since Bupati (head of local government) initiates morning coffee meeting (once a week), where all heads of technical bureaus are invited, to facilitate inter-bureau coordination. 50. Extension Service: Reorganization after the decentralization created various problems in agricultural sector: 1) under the new organization system, each sub-agency is allowed to have maximum four sections, however, there are some sub-agencies that have heavier tasks compared with other sub-agencies; 2) although agricultural extension service was handled by farming information and guidance office before the reorganization, it was divided into sub-sectors (food, husbandry, farm and fishery). Divided extension service into sub-sectors lengthens service deliveries to farmers. Pooling extension information into one office increase effectiveness of extension service, and further, makes it easy to get budget allocations. 51. The Dinas is facing a serious problem in its funds for extension service. Funds allocated from the central government drastically dropped after the decentralization. The central government only provides the funds, if a local government has institutions such as farming information office or office for food defense. This central policy discriminates regions that do not have those institutions even though they have similar units for extension service. Kepala Dinas mentioned that the central fund transfer is based on the existence of institutions, and not on the functions. This policy is further against the local government initiative to streamline its organizational structure. 52. PP No.8/2003: Kepala Dinas feels that PP No.8/2003 is not consistent with regional autonomy. According to the PP, Dinas whose score is below the required figure should be downgraded to Kantor, even though the Dinas manages priority sector of local government. In Lombok Tengah, more than 60 percent labors work in agriculture, and also a majority of agricultural workers are poor. PP No.8/2003 does not consider local conditions. In addition, there is a possibility that all extension officers will be integrated into one office, separate from the Dinas. Unless a very close coordination with the Dinas is built, quality of extension service delivered to farmers may be worsened since the Dinas s program may not inline with extension office program. 53. People Empowering Program (SPSLT): The Dinas has initiated Sistem Penggaduhan Sapi Lombok Tengah (SPSLT) since FY2000. The program is designed to support farmers by giving them a ready for calving (pregnant) cow. The farmers have to found a group which consists of farmers. The farmer keeps the cow until it will calve and calve will become six months old. After the third month of the calf age, the cow will inseminate such that ready for calving again. At the third month of pregnancy, the cow will be given to the next farmer (member), while the calf is owned by the first farmer. The 16

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)

More information

PRACTICAL GUIDELINES for Preparing a Public Expenditure Review for Education at the District Level

PRACTICAL GUIDELINES for Preparing a Public Expenditure Review for Education at the District Level Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 53286 PRACTICAL GUIDELINES for Preparing a Public Expenditure Review for Education at

More information

Kecamatan Development Program M a y 2002

Kecamatan Development Program M a y 2002 Kecamatan Development Program Brief Overview M a y 2002 Introduction The Kecamatan Development Program (KDP) is a Government of Indonesia effort to alleviate poverty in rural communities and improve local

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:INO 34147 TECHNICAL ASSISTANCE (Cofinanced by the Government of the United Kingdom) TO THE REPUBLIC OF INDONESIA FOR INTEGRATION OF POVERTY CONSIDERATIONS IN DECENTRALIZED EDUCATION

More information

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND Public Disclosure Authorized Loan Agreement CONFORMED COPY LOAN NUMBER 4100 IND Public Disclosure Authorized (Second Village Infrastructure Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities Country Partnership Strategy: Indonesia, 2012 2014 SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Draft 6 January 2008 A Note on the Indonesian Sub-National Government Surplus, 2001-2006

More information

NORIO USUI ** KANSAI UNIVERSITY

NORIO USUI ** KANSAI UNIVERSITY 45 TH KANSAI CONVENTION: JAPAN SOCIETY OF INTERNATIONAL ECONOMICS 7 JUNE, 2003 KOBE INTERNATIONAL UNIVERSITY NEW INTERGOVERNMENTAL TRANSFERS IN DECENTRALIZED INDONESIA: KEY CHALLENGES * NORIO USUI ** KANSAI

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

FISCAL DECENTRALIZATION IN INDONESIA

FISCAL DECENTRALIZATION IN INDONESIA FISCAL DECENTRALIZATION IN INDONESIA Bambang Brodjonegoro The Institute of Economics and Social Research and The Graduate Program of Economics, University of Indonesia Law 22/1999 and law 25/1999 are the

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities State Accountability Revitalization Project (RRP INO 38354) Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

Loan Agreement. (Bengkulu Regional Development Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Bengkulu Regional Development Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4290 IND Public Disclosure Authorized Loan Agreement (Bengkulu Regional Development Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

REPUBLIC OF INDONESIA GOVERNMENT REGULATION NUMBER 43 YEAR 2014 REGARDING IMPLEMENTING REGULATION FOR OF LAW NUMBER 6 OF 2014 REGARDING VILLAGES

REPUBLIC OF INDONESIA GOVERNMENT REGULATION NUMBER 43 YEAR 2014 REGARDING IMPLEMENTING REGULATION FOR OF LAW NUMBER 6 OF 2014 REGARDING VILLAGES Disclaimer This translation has been commissioned by the World Bank s Jakarta Office. The World Bank cannot guarantee the accuracy and correctness of the translation. REPUBLIC OF INDONESIA GOVERNMENT REGULATION

More information

[Symbol] THE PRESIDENT OF THE REPUBLIC OF INDONESIA

[Symbol] THE PRESIDENT OF THE REPUBLIC OF INDONESIA [Symbol] THE PRESIDENT OF THE REPUBLIC OF INDONESIA LAW OF THE REPUBLIC OF INDONESIA NUMBER 25 YEAR 1999 CONCERNING FINANCIAL BALANCE BETWEEN THE CENTRAL & REGIONAL GOVERNMENT WITH THE BLESSING OF THE

More information

Colleen McNally-Murphy Nanis Sakti Ningrum Rabindra Surya Sarah Smith. 06 August 2015

Colleen McNally-Murphy Nanis Sakti Ningrum Rabindra Surya Sarah Smith. 06 August 2015 Colleen McNally-Murphy Nanis Sakti Ningrum Rabindra Surya Sarah Smith 06 August 2015 WEBSITE kopernik.ngo TWITTER @thekopernik FACEBOOK facebook.com/thekopernik 1 TABLE OF CONTENTS 1. Executive Summary

More information

1. Introduction The cost of provision may differ substantially from the value of the benefit to the recipient.

1. Introduction The cost of provision may differ substantially from the value of the benefit to the recipient. 1. Introduction 1. The purpose of this paper is to analyse the composition of the Indonesian civil service formal wage bill. The immediate goal is to provide the basis of a financial model of the service

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

INEY IPF Component. Strengthening National and Subnational Capacity

INEY IPF Component. Strengthening National and Subnational Capacity TERMS OF REFERENCE INEY IPF Component Strengthening National and Subnational Capacity to Implement the National Strategy to Accelerate Stunting Reduction (StratNas Stunting) Background Stunting is a condition

More information

AGENCY FOR INTERNATIONAL DEVELOPMENT PPC/CDIE/DI REPORT PROCESSING FORM

AGENCY FOR INTERNATIONAL DEVELOPMENT PPC/CDIE/DI REPORT PROCESSING FORM AGENCY FOR INTERNATIONAL DEVELOPMENT PPC/CDIE/DI REPORT PROCESSING FORM ENTER INFORMATION ONLY IF NOT INCLUDED ON COVER OR TITLE PAGE OF DOCUMENT 1. Project/Subproject Number 2. Contract/Grant Number 3.

More information

UGANDA: Uganda: SOCIAL POLICY OUTLOOK 1

UGANDA: Uganda: SOCIAL POLICY OUTLOOK 1 UGANDA: SOCIAL POLICY OUTLOOK Uganda: SOCIAL POLICY OUTLOOK 1 This Social Policy Outlook summarises findings published in two 2018 UNICEF publications: Uganda: Fiscal Space Analysis and Uganda: Political

More information

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized CIA LOAN NUMBER 3888-IND Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Village Infrastructure Project for Java) between REPUBLIC OF INDONESIA and

More information

ASIAN DEVELOPMENT BANK TAR:INO 35144

ASIAN DEVELOPMENT BANK TAR:INO 35144 ASIAN DEVELOPMENT BANK TAR:INO 35144 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SUPPORT TO STATE AUDIT REFORM PROJECT May 2003 2 CURRENCY EQUIVALENTS

More information

Development Credit Agreement. (Urban Poverty Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION. Dated May 28, 1999

Development Credit Agreement. (Urban Poverty Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION. Dated May 28, 1999 Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3210 IND Public Disclosure Authorized Development Credit Agreement (Urban Poverty Project) between REPUBLIC OF INDONESIA and Public Disclosure

More information

Capacity Developement of Minimum Service Standards (MSS) Costing and Implementation

Capacity Developement of Minimum Service Standards (MSS) Costing and Implementation Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 68433 Capacity Developement of Minimum Service Standards (MSS) Costing and Implementation

More information

PNPM SUPPORT FACILITY (PSF) Project Proposal

PNPM SUPPORT FACILITY (PSF) Project Proposal PNPM SUPPORT FACILITY (PSF) Project Proposal Project Title: Objective: Executing Agency: Estimated Duration: Estimated Budget: Geographic Coverage: Implementation Arrangements: PNPM Mandiri Revolving Loan

More information

Loan Agreement. (Maluku Regional Development Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Maluku Regional Development Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4306 IND Public Disclosure Authorized Loan Agreement (Maluku Regional Development Project) between REPUBLIC OF INDONESIA and Public Disclosure Authorized

More information

Indonesian government implements

Indonesian government implements PERSISTENCE OF INDONESIAN LOCAL GOVERNMENT PERFORMANCES: EVALUATION OF EKPPD Dwi Martani Universitas Indonesia Panggah Tri Wicaksono Universitas Indonesia ABSTRACT This study focuses on the consistency

More information

Development Credit Agreement. (Decentralized Agricultural and Forestry Extension Project) between REPUBLIC OF INDONESIA. and

Development Credit Agreement. (Decentralized Agricultural and Forestry Extension Project) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3280 IND Public Disclosure Authorized Development Credit Agreement (Decentralized Agricultural and Forestry Extension Project) between REPUBLIC

More information

FINAL REPORT EXECUTIVE SUMMARY

FINAL REPORT EXECUTIVE SUMMARY No. 2 Japan International Cooperation Agency (JICA) National Development Planning Agency (BAPPENAS) THE SUPPORT PROGRAM FOR AGRICULTURE AND FISHERIES DEVELOPMENT IN THE REPUBLIC OF INDONESIA FINAL REPORT

More information

The White Paper on the DAK: Arguments and Possible Solutions

The White Paper on the DAK: Arguments and Possible Solutions Working Paper #2 The White Paper on the DAK: Arguments and Possible Solutions Unlike in the past when the DAK (Dana Alokasi Khusus) was an important element of fiscal decentralization policy in Indonesia,

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh 2 o o PROJECT DOCUMENT Creating Jobs: Capacity Building for Local Resourcebased Road Works in Selected Districts in NAD UNDP/ILO Project INS/51/071 Phase III Capacity Building for the Management of Road

More information

PRELIMINARY IMPACT OF GLOBAL CRISIS IN INDONESIA

PRELIMINARY IMPACT OF GLOBAL CRISIS IN INDONESIA PRELIMINARY IMPACT OF GLOBAL CRISIS IN INDONESIA 1 Preliminary Impacts Up to January 2009, some economic indicators still showed strong results while others started to reflect impact at early stage GDP

More information

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Program Name

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

Box 1. Indonesia: The Economic Program for Sustaining Recovery

Box 1. Indonesia: The Economic Program for Sustaining Recovery Reform Area 2000-2002 Box 1. Indonesia: The Economic Program for Sustaining Recovery 2000 Strategic Objective Main Objectives Measures Implemented Since May MEFP Main Areas of Progress Expected in August-

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized NEGOTIATED TEXT June 2, 2003 CREDIT NUMBER -IND Public Disclosure Authorized Development Credit Agreement (Third Kecamatan Development Project) between Public Disclosure Authorized

More information

Developing Institutional Framework for Regulatory Reform: Indonesian Experience

Developing Institutional Framework for Regulatory Reform: Indonesian Experience Developing Institutional Framework for Regulatory Reform: Indonesian Experience B. Raksaka Mahi Special Advisor to the Coordinating Minister of Economic Affairs and Vice Secretary of National Team for

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34149 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SECOND DECENTRALIZED HEALTH SERVICES PROJECT November 2001

More information

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government

More information

Poverty Profile. Executive Summary. Mongolia

Poverty Profile. Executive Summary. Mongolia Poverty Profile Executive Summary Mongolia February 2001 Japan Bank for International Cooperation Chapter 1 Poverty in Mongolia 1-1 Poverty Line In 1991, the government of Mongolia officially established

More information

INDONESIA DEVELOPMENT UP DATE DECENTRALIZATION THAT DELIVERS. Frederico Gil Sander, Lead Economist December 14, 2017

INDONESIA DEVELOPMENT UP DATE DECENTRALIZATION THAT DELIVERS. Frederico Gil Sander, Lead Economist December 14, 2017 INDONESIA DEVELOPMENT UP DATE DECENTRALIZATION THAT DELIVERS Frederico Gil Sander, Lead Economist December 14, 2017 Recent economic developments and outlook Decentralization that delivers How did the Indonesian

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

Dodik Siswantoro, Tien Mulyanthi. Universitas Indonesia, Depok, Indonesia

Dodik Siswantoro, Tien Mulyanthi. Universitas Indonesia, Depok, Indonesia Chinese Business Review, ISSN 1537-1506 July 2012, Vol. 11, No. 7, 620-626 D DAVID PUBLISHING Analysis of Affecting Factors to the Regional Growth and Poverty Rate in Indonesia: Applying the Heterogeneous

More information

INDONESIA. Figure 1. Less affected by shocks (Rupiah exchange rate before and after bombings) I. Recent Economic and Social Developments.

INDONESIA. Figure 1. Less affected by shocks (Rupiah exchange rate before and after bombings) I. Recent Economic and Social Developments. INDONESIA The next few months are crucial to Indonesia s mediumterm economic picture. A new economic policy package and early implementation steps by the new government would draw further attention from

More information

Financing Natura 2000

Financing Natura 2000 GuideGuidelines workshop evaluation 0 Financing Natura 2000 Workshop report NETHERLANDS Prepared by: Stichting Natuur en Milieu Arjan Berkhuysen 3 July 2006 Stichting Natuur en Milieu July 2006 Workshop

More information

GUIDELINES FOR FUNDING OF CENTRAL AND LOCAL GOVERNMENT COMMON AFFAIRS ON POVERTY ERADICATION BY THE GRACE OF THE ONE ALMIGHTY GOD

GUIDELINES FOR FUNDING OF CENTRAL AND LOCAL GOVERNMENT COMMON AFFAIRS ON POVERTY ERADICATION BY THE GRACE OF THE ONE ALMIGHTY GOD COPY REGULATION OF THE FINANCE MINISTER NUMBER 168/ PMK.07/ 2009 ON GUIDELINES FOR FUNDING OF CENTRAL AND LOCAL GOVERNMENT COMMON AFFAIRS ON POVERTY ERADICATION BY THE GRACE OF THE ONE ALMIGHTY GOD THE

More information

Communication Program to Support Fiscal Reform and Decentralization in Mongolia. Stakeholder Mapping Analysis (Summary of the report)

Communication Program to Support Fiscal Reform and Decentralization in Mongolia. Stakeholder Mapping Analysis (Summary of the report) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. INTRODUCTION Background Communication Program to Support Fiscal Reform and Decentralization

More information

Survey on Financial Inclusion and Access (SOFIA) Focus Note on Selected Districts

Survey on Financial Inclusion and Access (SOFIA) Focus Note on Selected Districts Survey on Financial Inclusion and Access (SOFIA) Focus Note on Selected Districts Implemented by About the SOFIA Focus Notes The SOFIA Focus Notes are a series of papers that explore particular subjects,

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 3305 IND Public Disclosure Authorized (Yogyakarta Upland Area Development Project) between Public Disclosure Authorized REPUBLIC OF INDONESIA and

More information

IPP91 V. 2. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

IPP91 V. 2. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IPP91 V. 2 D:\Adobe\Acrobat 4.0\PDF Output\IPP9102.doc i TABLE OF CONTENT EXECUTIVE SUMMARY...

More information

Scholars Journal of Economics, Business and Management e-issn

Scholars Journal of Economics, Business and Management e-issn DOI: 10.21276/sjebm Scholars Journal of Economics, Business and Management e-issn 2348-5302 Sch J Econ Bus Manag, 2017; 4(6):368-376 p-issn 2348-8875 SAS Publishers (Scholars Academic and Scientific Publishers)

More information

Republic of South Sudan. Ministry of Finance and Economic Planning

Republic of South Sudan. Ministry of Finance and Economic Planning Republic of South Sudan Ministry of Finance and Economic Planning 2014/15 Second Quarter Macro-Fiscal Report February 2015 1 Contents 2014/15 Second Quarter & Half-Year Overview... 3 Summary of Q2... 4

More information

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296)

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Operation Name: URBAN SECTOR DEVELOPMENT

More information

Project Appraisal Document

Project Appraisal Document Date: April 18, 2005 Sector Manager/Director: Mark D. Wilson Country Manager/Director: Andrew D. Steer Project ID: P076174 Lending Instrument: Specific Investment Loan (SIL) INDONESIA Initiatives for Local

More information

PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS

PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS 1 PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS July 20, 2007 2 Introduction and Background 3 Background: 14 large government community

More information

Analyzing Local Revenue in Local Otonomy Implementation towards Self-Reliance of Samarinda Municipality

Analyzing Local Revenue in Local Otonomy Implementation towards Self-Reliance of Samarinda Municipality ISSN:2229-6247 H. Abd. Rachim A.F International Journal of Business Management and Economic Research(IJBMER), Vol 6(6),2015,436-441 Analyzing Local Revenue in Local Otonomy Implementation towards Self-Reliance

More information

Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174)

Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174) Operation Name: Initiatives

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity PROGRESS REPORT THE PREPARATION

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity PROGRESS REPORT THE PREPARATION Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity PROGRESS REPORT ON THE PREPARATION OF THE NATIONAL POVERTY ERADICATION PROGRAMME (NPEP) Prepared by The National Committee

More information

Indonesia National Health Accounts 2016 Presented in INAHEA 5 th Conference Jakarta, 31 October 2 November 2018

Indonesia National Health Accounts 2016 Presented in INAHEA 5 th Conference Jakarta, 31 October 2 November 2018 Indonesia National Health Accounts 2016 Presented in INAHEA 5 th Conference Jakarta, 31 October 2 November 2018 Total Area (km 2 ) = 1,913,578.68 Number of Islands = 17,504 Indonesia in Brief Population

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

Report Regional Microfinance Development Project NTB The Household Survey. By Ketut Budastra National Consultant

Report Regional Microfinance Development Project NTB The Household Survey. By Ketut Budastra National Consultant Report Regional Microfinance Development Project NTB The Household Survey By Ketut Budastra National Consultant GTZ-PROFI PROGRAM (PN 2004.2578.9-001.00) August 2005 1. Introduction The household survey

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Politics of Budgeting in Indonesia: A Quest for Transparency and Accountability

Politics of Budgeting in Indonesia: A Quest for Transparency and Accountability Politics of Budgeting in Indonesia: A Quest for Transparency and Accountability Wahyudi Kumorotomo, PhD Dept of Public Policy and Management Gadjah Mada University Indonesia 2018 kumoro@ugm.ac.id Topics

More information

Reducing Poverty. Indonesia: Ideas for the Future

Reducing Poverty. Indonesia: Ideas for the Future Indonesia: Ideas for the Future Reducing Poverty Indonesia s Poverty Challenge Over 110 million Indonesians live on less than US$2 a day equivalent to the entire populations of Malaysia, Vietnam, and Cambodia

More information

The Case of Education and Health

The Case of Education and Health Public Disclosure Authorized 103721 Public Disclosure Authorized Public Disclosure Authorized UNDERSTANDING AND MONITORING SERVICE DELIVERY IN A DECENTRALIZING ENVIRONMENT IN MONGOLIA: The Case of Education

More information

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296)

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Operation Name: URBAN SECTOR DEVELOPMENT

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID6725 Project Name Indonesia-Urban Poverty Project (+) Region Sector Project

More information

INVESTMENT PROMOTION MODELS OF LUANG PRABANG PROVINCE LAO PEOPLE S DEMOCRATIC REPUBLIC

INVESTMENT PROMOTION MODELS OF LUANG PRABANG PROVINCE LAO PEOPLE S DEMOCRATIC REPUBLIC INVESTMENT PROMOTION MODELS OF LUANG PRABANG PROVINCE LAO PEOPLE S DEMOCRATIC REPUBLIC Mr. Sithalone Siphoxay 1, Dr. Patthira Phon-ngam 2 1 Ph.D. student in Regional Development Strategies. Loei Rajabhat

More information

ECONOMIC IMPACT ANALYSIS OF KECAMATAN DEVELOPMENT PROGRAM INFRASTRUCTURE PROJECTS

ECONOMIC IMPACT ANALYSIS OF KECAMATAN DEVELOPMENT PROGRAM INFRASTRUCTURE PROJECTS ECONOMIC IMPACT ANALYSIS OF KECAMATAN DEVELOPMENT PROGRAM INFRASTRUCTURE PROJECTS Prepared by: Anthony Torrens Email: toro1@pacific.net.id January, 2005 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...1

More information

REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT

REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT World Bank PNPM Support Facility (PSF) Gedung Bursa Efek Indonesia Tower 1, lantai 9 Jl. Jenderal Sudirman Kav. 52-53, Jakarta 12190 Ph:

More information

Human Settlements Improvement Project (2)

Human Settlements Improvement Project (2) INDONESIA Human Settlements Improvement Project (2) Report Date: March 2000 1 Project Summary and Japan s ODA Loan This project aimed to provide water supply systems, environmental sanitation facilities,

More information

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The

More information

PNPM Incidence of Benefit Study:

PNPM Incidence of Benefit Study: PNPM Incidence of Benefit Study: Overview findings from the Household Social Economic Survey 2012 (SUSETI) Background PNPM-Rural programs for public infrastructure and access to credit have attempted to

More information

Community-Based SME For Road Maintenance

Community-Based SME For Road Maintenance Community-Based SME For Road Maintenance Insights from the W.B and IADB-Peruvian Rural Roads maintenance contracts Project & Poverty Reduction Presented by Jacob Greenstein (EGAT) Scope of Presentation

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

Poverty Profile Executive Summary. Azerbaijan Republic

Poverty Profile Executive Summary. Azerbaijan Republic Poverty Profile Executive Summary Azerbaijan Republic December 2001 Japan Bank for International Cooperation 1. POVERTY AND INEQUALITY IN AZERBAIJAN 1.1. Poverty and Inequality Measurement Poverty Line

More information

TERMS OF REFERENCE. Technical Working Group on the extension of social security to the informal economy

TERMS OF REFERENCE. Technical Working Group on the extension of social security to the informal economy TERMS OF REFERENCE Technical Working Group on the extension of social security to the informal economy Financing social security coverage to informal construction workers in Zambia: design of a social

More information

INDONESIA S DECENTRALIZATION POLICY AFTER SEVENTEEN YEARS : TWO CONTENDING APPROACHES

INDONESIA S DECENTRALIZATION POLICY AFTER SEVENTEEN YEARS : TWO CONTENDING APPROACHES INDONESIA S DECENTRALIZATION POLICY AFTER SEVENTEEN YEARS : TWO CONTENDING APPROACHES Cecep Effendi University of Muhammadiyah Jakarta, Indonesia cecep.effendi12@gmail.com Abstract Decentralization policy

More information

Summary report. Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals

Summary report. Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals Summary report Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals Lilongwe, Malawi, 26-27 September 2017 1 1. Introduction

More information

New Zealand Vanuatu. Joint Commitment for Development

New Zealand Vanuatu. Joint Commitment for Development New Zealand Vanuatu Joint Commitment for Development 2 The Joint Commitment for Development between the Governments of New Zealand and Vanuatu establishes a shared vision for achieving long-term development

More information

INDONESIA. The Real Economy

INDONESIA. The Real Economy INDONESIA Macroeconomic stability is strengthening in Indonesia. The external environment is likely to be supportive for the economy. This positive trend is reflected in the recent upgrade of Indonesia

More information

NOTICE OF THE 63rd ORDINARY GENERAL MEETING OF SHAREHOLDERS

NOTICE OF THE 63rd ORDINARY GENERAL MEETING OF SHAREHOLDERS This document has been translated from the Japanese original for the convenience of non-japanese shareholders. In the event of any discrepancy between this document and the Japanese original, the original

More information

Validation Report. Indonesia: Second Decentralized Health Services Project. Independent Evaluation Department

Validation Report. Indonesia: Second Decentralized Health Services Project. Independent Evaluation Department Validation Report Reference Number: PVR-428 Project Number: 34149 Loan Numbers: 2074 and 2075 November 2015 Indonesia: Second Decentralized Health Services Project Independent Evaluation Department ABBREVIATIONS

More information

(PBK) FASE KEDUA PROJECT COMPLETION REPORT LAPORAN AKHIR PROYEK

(PBK) FASE KEDUA PROJECT COMPLETION REPORT LAPORAN AKHIR PROYEK Republik The Republic Indonesia of Indonesia National Badan Development Perencanaan Planning Pembangunan Agency (BAPPENAS) Nasional THE REPUBLIK REPUBLIC INDONESIA OF PLANNING REFORMASI AND PERENCANAAN

More information

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions.

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions. Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14905 1. Project Data: Date Posted: 06/02/2016 Public Disclosure Authorized Public Disclosure Authorized Public

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS Informal Consultation 7 December 2015 World Food Programme Rome, Italy PURPOSE 1. This update of the country strategic planning approach summarizes the process

More information

Loan Agreement. (Third National Program for Community Empowerment in Rural Areas) between REPUBLIC OF INDONESIA. and

Loan Agreement. (Third National Program for Community Empowerment in Rural Areas) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7867-ID Public Disclosure Authorized Loan Agreement (Third National Program for Community Empowerment in Rural Areas) between Public Disclosure Authorized

More information

TARGETING MECHANISMS OF THE SOCIAL SAFETY NET SYSTEMS IN THE COMCEC REGION COUNTRY EXPERIENCE: CAMEROUN

TARGETING MECHANISMS OF THE SOCIAL SAFETY NET SYSTEMS IN THE COMCEC REGION COUNTRY EXPERIENCE: CAMEROUN TARGETING MECHANISMS OF THE SOCIAL SAFETY NET SYSTEMS IN THE COMCEC REGION COUNTRY EXPERIENCE: CAMEROUN I- INTRODUCTION With a surface area of 475,000 km2 and a population of around 22 million people,

More information

Staffing the EU Institutions

Staffing the EU Institutions Staffing the EU Institutions Page 1 Staffing the EU Institutions Introduction This paper looks at the nature and structure of the staffing of EU institutions. This is a topical subject, as debates are

More information

"Rehabilitation and sustainable development of fisheries and aquaculture affected by the tsunami in Aceh Province, Indonesia" FINAL PROJECT EVALUATION

Rehabilitation and sustainable development of fisheries and aquaculture affected by the tsunami in Aceh Province, Indonesia FINAL PROJECT EVALUATION "Rehabilitation and sustainable development of fisheries and aquaculture affected by the tsunami in Aceh Province, Indonesia" (Project OSRO/INS/601/ARC) FINAL PROJECT EVALUATION 29 March 11 May 2010 Response

More information

Council of the European Union Brussels, 23 April 2018 (OR. en) Eugen Orlando Teodorovici, Minister of Public Finance, Ministry of Public Finance

Council of the European Union Brussels, 23 April 2018 (OR. en) Eugen Orlando Teodorovici, Minister of Public Finance, Ministry of Public Finance Council of the European Union Brussels, 23 April 2018 (OR. en) 8257/18 ECOFIN 354 UEM 125 COVER NOTE From: date of receipt: 23 April 2018 To: Subject: Eugen Orlando Teodorovici, Minister of Public Finance,

More information

INDONESIA EMPLOYMENT POLICIES: PROBLEMS AND CHALLENGES

INDONESIA EMPLOYMENT POLICIES: PROBLEMS AND CHALLENGES INDONESIA EMPLOYMENT POLICIES: PROBLEMS AND CHALLENGES Rahma Iryanti Deputy Minister for Poverty, Labor, and SMEs National Development Planning Agency 24 February 2015 BACKGROUND From 2005 to 2014, Indonesia

More information

Global Journal of Business and Social Science Review journal homepage:

Global Journal of Business and Social Science Review journal homepage: Global Journal of Business and Social Science Review journal homepage: www.gjbssr.org ISSN 2289-8506 The Evaluation of Effectiveness on Management Transfer of Land and Building Tax for Rural and Urban

More information

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 4643 IND Loan Agreement (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated January 22,

More information

BUDGET STATISTICS MINISTRY OF FINANCE REPUBLIC OF INDONESIA

BUDGET STATISTICS MINISTRY OF FINANCE REPUBLIC OF INDONESIA BUDGET STATISTICS 2005 MINISTRY OF FINANCE REPUBLIC OF INDONESIA CONTENTS Table 1 : Macroeconomic Assumptions, 2005. 1 Table 2 : Summary, 2005.. 2 Table 3 : Revenues, 2005. 3 Table 4 : Central Government

More information