1 Republic of Albania UKT Tirana Water LENDER S MONITOR TERMS OF REFERENCE 1. BACKGROUND Ujesjelles Kanalizime Tirane ( UKT, the Company and Client ) is a municipal utility company which provides water supply and sewage for the municipalities of Tirana, Vora and Kamza. The Company is majority owned by the Municipality of Tirana with 82.5 per cent. The Municipality of Kamza owns 14.6 per cent and the Municipality of Vora owns the remaining 2.9 per cent. The Company serves around 0.7 million customers. UKT was established in In 2016, the Company operated the water distribution network of 1,800 km covering approximately 200 thousand of end users (households and companies) and wastewater network of 590 km. The Company produced 106 million m 3 of potable water but the annual volume of water billed amounts to 31 million m 3. The existing UKT Tirana service area is supplied from different sources of water sources: natural springs originating in the mountains, a large impound reservoir, groundwater wells and river pumping stations. The Company s water network is in a poor condition and is characterised by a high rate of failures disrepair which causes an unacceptably high level of interruptions in water supply (on average 8 hours per day) and poor water quality. In addition, poor infrastructure results in high physical water losses in the distribution network (nonrevenue water accounted for 68 per cent as of 2015). The Client supported by the Municipality of Tirana (the Municipality ) approached the European Bank for Reconstruction and Development (the EBRD, or the Bank ) with a request to finance priority investments that will improve the municipal water services in Tirana. As a result, the Bank has signed a loan of up to EUR 15 million to UKT to finance the following components the Project : Component 1: construction of a new water pipeline that will transfer water from Bovilla Water Treatment Plant to the western part of the City of Tirana by gravity. Currently, UKT's customers in the western part of Tirana are served by depleting, pumped groundwater supplies; and, Component 2: extension of the capacity of Bovilla Water Treatment Plant ("WTP") from around 57,000 million m 3 /year to 76,000 million m 3 / year. Currently, the water flows by gravity, from the dam at Bovilla Reservoir an abundant resource - to Bovilla WTP through a transmission pipe which will soon be duplicated. The duplication of the transmission pipe will be financed by the Italian Corporation, and would allow more raw water to be fed to the WTP. 1

2 The duplication of the transmission line is an associated component of the Project as Components 1 & 2 will rely on the additional capacity provided by it. The Project aims to assist the Company in: i) providing a more resilient water system, reaching its objective of providing a 24 hour water supply by 2021, ii) reducing the Company's operational costs by supplying water by gravity versus the high cost of pumping groundwater, and iii) increasing sustainability by removing/reducing the Company s reliance on depleting and polluted wells to supply Berxull. The works contracts to be financed from the proceeds of the Bank s loan in accordance with Albanian National Procurement Law. 2. OBJECTIVES The objectives of this assignment are to assist the EBRD to monitor implementation of the contracts related to different components of the Project and to ensure that investments are implemented within time and budget, and in accordance with the Project legal agreements. To this end, the Consultant will identify any key problems which may threaten implementation and advise the Bank, on remedial measures so that corrective action can be taken. 3. SCOPE OF WORK The Consultant should provide the following services: 3.1 Implementation Arrangements The Consultant will review the implementation arrangements in place to ensure that they are sufficient to support successful implementation. To this end, the Consultant will observe, assess and report on: a) the overall performance of the project management team and site staff, commenting on the effectiveness of co-ordination between and performance of all project parties, including consultants, contractors, suppliers and other parties involved in the implementation of the investments, commenting on compliance with their respective obligations and duties; b) the project implementation arrangements including the project organisation, staffing, project management systems, arrangements for construction, identification and management, and contract management; c) quality control/assurance systems, confirming that there is no evidence of any material problems with current or expected future quality and that the investments are likely to meet the specified technical performance requirements at the date of operation. 3.2 Progress and costs against schedule and budget The Consultant will review, evaluate and comment on progress and costs against schedule and budget. To this end, the Consultant will undertake the following tasks: 2

3 a) monitor and report on project progress including progress in design, procurement and construction. Verify and confirm that an adequate progress control system is in place and functioning properly. Report on actual progress versus the original plan. Highlight the implications for meeting the overall target completion dates and confirm whether or not dates and deadlines are likely to be kept/achieved. Where possible provide quantitative measurements (e.g. per cent complete ) and use appropriate presentation formats (e.g. tables, Gantt charts, S-curves, etc.); b) monitor and report on project cost. Confirm that adequate cost control systems are in place and working properly. Present a cost report showing the original budget, revised outcome estimate and variance for each budget item, highlight any actual or expected variance in the overall Project cost and confirm whether or not the Project is likely to become operational within the given budget. An appropriate presentation would be a table format with columns for: i) item; ii) budget; iii) estimated final cost; and iv) variance; c) review, evaluate and comment on any progress reports as well as other relevant technical material prepared by the project parties. 3.3 Project documentation and reporting The Consultant will review and comment on all relevant project documentation and reports. To this end, the Consultant will: a) review procurement documentation for contracts. Monitor payments for works, goods and services. b) Review the procurement carried out through shopping method to ensure that value for money has been achieved and that the contracts have not been artificially split for the purpose of circumventing the application of more competitive tendering procedures. c) confirm that all relevant Project documents, including as built drawings, manuals, etc., have been properly assembled, collated, indexed and handed over; d) review, on a sample basis, payment certificates, test results, and other relevant project documentation. Compare the project documentation with the actual works carried out on site, as necessary. Special attention shall be to given contracts awarded through shopping method where the sampling shall cover at least 50% of all payments certificates. 3.4 Matters of material interest The Consultant will alert the EBRD to any emerging problems, be they of a contractual, technical, or financial nature, which have the potential to jeopardise the achievement of the project objectives and advise the EBRD on timely appropriate corrective action. In particular, the Consultant will advise the EBRD on any proposed waivers or amendments to legal agreements and interpret any other matters of material interest to the EBRD. If necessary, the Consultant will assist the EBRD in negotiations to achieve the required corrective action. 3.5 Project Completion 3

4 The Consultant will countersign the Borrower s notice to the EBRD that Project Completion as stipulated in the Loan Agreement has been met, thereby certifying that all performance tests have been completed and passed successfully. The Consultant will monitor the start-up period and advise the EBRD on remedial measures to be undertaken in case any problems of contractual, technical or financial character arise. 4. IMPLEMENTATION ARRANGEMENTS AND REPORTING The assignment will have a duration of 24 months. It is anticipated that the Consultant will visit Project locations as and when required, but at least quarterly throughout the project implementation, to conduct site inspections and hold discussions with project partners, as necessary. The assignment will require quarterly visits approximately to the project sites over the duration of the period of contracting (minimum 4 visits per year). i) Progress reports At the end of each field mission, the Consultant will provide a field mission reports by in English and Albanian language (using Microsoft software). These reports should provide an overview of the Consultant s key comments with respect to the tasks described in the scope of work above. The Consultant will also produce Working Papers on specific topics as and when required. During the construction phase, the Consultant will provide a written quarterly reports addressing: (a) (b) (c) (d) (e) (f) Project progress versus the overall Programme Cost incurred versus budget Quality and performance Payments and cash flow Claims; and Matters of material interest. ii) Project completion report The Consultant will provide a Project Completion Report in English and Albanian language (1 hard copy plus softcopy using Microsoft software in each language), within 1 month of completion of all the contracts. iii) Ad-hoc information In addition, the Consultant will provide the EBRD with a range of information on an ad-hoc basis, as required by project circumstance, including brief inspection reports and any other documents the EBRD may require in association with project implementation matters. iv) Visibility measures Given the assignment is funded through the EBRD s donor funded technical cooperation programme, the Consultant will be required to support the client to ensure 4

5 visibility of these resources. Support on these visibility aspects can be obtained from the Bank s Communications Department. Measures could include but not be limited to: All documents produced by the Consultant should mention donor support and bear the logo of the donor, when appropriate. Donor support to the project should be acknowledged in any public communication (press releases, launch of facilities) Local representatives of donors should be invited to any public event organised to promote the project (press conferences, inaugurations, possibly stakeholder participation programmes) 5. CONSULTANT PROFILE The Consultant shall be responsible for the mobilisation of qualified engineers, technicians and other professional staff with proven experience in the administrative management, procurement, design and supervision of similar construction works and acquiring the equipment for the projects in comparable climatic and geological conditions. It is anticipated that the Consultant s team shall include the following expertise with short-term support as required in other disciplines: Project Manager International Engineer/ Water Specialist Mechanical Engineer Procurement Specialist Auditor Junior Water Expertise Experts shall have: a) a minimum of 7 years of professional experience in similar positions (except for the Junior Water Expertise) as the ones they are nominated in the contract b) relevant university degree and hold the necessary professional qualifications and certificates to enable them to exercise the role they are nominated in the contract c) proficiency in Albanian and English d) the needed IT skills to enable them to perform the role they are nominated in the contract 5

OFFICIAL USE. Terms of Reference

OFFICIAL USE. Terms of Reference Terms of Reference STEG Development and Improvement of the Trading Room and Training on the management of foreign exchange rate, interest rates and commodity pricing. I. CONTEXT The European Bank for Reconstruction

More information

Treasury Management Policy. Treasury Management Policy. Working Together. August Borders College 24/10/2011.

Treasury Management Policy. Treasury Management Policy. Working Together. August Borders College 24/10/2011. Working Together Treasury Management Policy Treasury Management Policy August 2011 Borders College 24/10/2011 1 Working Together 1.0 Introduction 1.1 Treasury Management is defined as The management of

More information

Presentation of the course: EU project design process and implementation of environmental policy

Presentation of the course: EU project design process and implementation of environmental policy Presentation of the course: EU project design process and implementation of environmental policy Tirana - Shqiperi - Albania 15-17 April 2014 Context The ENV.net is a network of seven organisations from

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

TERMS OF REFERENCE. Cross-Regional: Provision of research coverage for selected listed SMEs - Preparation of investment research reports

TERMS OF REFERENCE. Cross-Regional: Provision of research coverage for selected listed SMEs - Preparation of investment research reports TERMS OF REFERENCE Cross-Regional: Provision of research coverage for selected listed SMEs - Preparation of investment research reports 1. BACKGROUND The Technical Cooperation (TC) project is taking place

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MULTI-COUNTRY Support to Western Balkans Infrastructure Investment Projects for 2014 Action Summary This Action will allow financing Technical

More information

COMMISSION DECISION. C(2007)6376 on 18/12/2007

COMMISSION DECISION. C(2007)6376 on 18/12/2007 COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo

More information

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws 216-RICR-50-05-7 TITLE 216 DEPARTMENT OF HEALTH CHAPTER 50 ENVIRONMENTAL HEALTH SUBCHAPTER 05 - WATER QUALITY PART 7 Clean Water Infrastructure Plans 7.1 AUTHORITY A. These rules and regulations are promulgated

More information

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms 2014-2021 Table of Contents 1. Introduction... 3 1.1 Objectives

More information

The Insurance Sector Education and Training Authority (INSETA)

The Insurance Sector Education and Training Authority (INSETA) The Insurance Sector Education and Training Authority (INSETA) Request for Bid: INSETA QMS Project Tender: IPO/06/2007 Date issued: 20 May 2007 Closure date: 22 June 2007 at 11:00 INDEX Tender number:

More information

TERMS OF REFERENCE FOR A JUNIOR CONSULTANT TO SUPPORT SOMALIA WORK PROGRAMME

TERMS OF REFERENCE FOR A JUNIOR CONSULTANT TO SUPPORT SOMALIA WORK PROGRAMME REQUEST FOR EXPRESSIONS OF INTEREST African Development Bank Group Eastern Africa Regional Development and Business Delivery Office (RDGE) Khushee Towers, Longonot Road Plot 11, Upper Hill P.O Box 4861-00200

More information

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until EUROPEAN COMMISSION Job Description Form Job description version2 (Active) Job no.273628 in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until Job Holder Name Job Profile Position CONTRACT AGENT FGIV

More information

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4705-CHA Public Disclosure Authorized Public Disclosure Authorized Project Agreement (Shanghai Urban Environment Project) between INTERNATIONAL BANK

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Islamic Republic of Afghanistan Ministry of Finance. Terms of Reference. Ministry of Finance, Directorate General Budget

Islamic Republic of Afghanistan Ministry of Finance. Terms of Reference. Ministry of Finance, Directorate General Budget Islamic Republic of Afghanistan Ministry of Finance Terms of Reference Position Information: Post Title: Organization: Type of Appointment: Level: Duration: Duty Station: Closing Date: Senior GRB Specialist

More information

CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING. Article 1 - Explanatory Statement

CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING. Article 1 - Explanatory Statement CENTRAL FINANCE AND CONTRACTS UNIT (CFCU) POLAND MEMORANDUM OF UNDERSTANDING Article 1 - Explanatory Statement The Establishment of a Central Finance and Contracts Unit (CFCU) is to be seen against the

More information

Request For Proposals General Information Assignment Project Activity

Request For Proposals General Information Assignment Project Activity Request For Proposals General Information Assignment Short Term Consultancies* Project Caribbean Emergency Legislation Project (CELP) Activity Assessment of national legal and institutional frameworks

More information

Page 1 of 5. APPROVED e-requisition

Page 1 of 5. APPROVED e-requisition United Nations Development Programme GENERAL INFORMATION Title: Senior Technical Officer for Secretariat in Directorate General Communicable Diseases Control (National Consultant) Project Name: Health

More information

INTERREG III B CADSES. Payment Claim Manual

INTERREG III B CADSES. Payment Claim Manual INTERREG III B CADSES Payment Claim Manual 1) Background / Description of involved actors The following chapters give a short overview about the actors involved in the PIC Interreg III B Cadses, their

More information

OFFICIAL USE SLOVENIA. Assistance to the Bank of Slovenia for the Development and Implementation of Risk Appetite Guidelines for Banks

OFFICIAL USE SLOVENIA. Assistance to the Bank of Slovenia for the Development and Implementation of Risk Appetite Guidelines for Banks SLOVENIA Assistance to the Bank of Slovenia for the Development and Implementation of Risk Appetite Guidelines for Banks Technical Assistance Project Terms of Reference 1. BACKGROUND 1. Interplay between

More information

The Insurance Sector Education and Training Authority (INSETA)

The Insurance Sector Education and Training Authority (INSETA) The Insurance Sector Education and Training Authority (INSETA) Request for Bid: Development of a Better Business Toolkit for SMME brokerages Tender: IPO/13/2007 Date issued: 18 November 2007 Closure date:

More information

VACANCY ANNOUNCEMENT

VACANCY ANNOUNCEMENT VACANCY ANNOUNCEMENT Financial Management Officer, P-3 Administrative Services (AS) Programme Deadline for application Announcement number Expected date for entry on duty Duration of appointment Duty Station

More information

VACANCY ANNOUNCEMENT

VACANCY ANNOUNCEMENT VACANCY ANNOUNCEMENT The Central Bank of Liberia (CBL) invites applications from competent and experienced individuals for the below listed positions in its Regulation & Supervision Department (RSD). 1.

More information

Nordic Energy Efficiency & Humanitarian Support Initiative for Ukraine Facility for Energy Saving Credits in Ukraine

Nordic Energy Efficiency & Humanitarian Support Initiative for Ukraine Facility for Energy Saving Credits in Ukraine Nordic Energy Efficiency & Humanitarian Support Initiative for Ukraine Facility for Energy Saving Credits in Ukraine Framework Contract for Consulting Services on Project Preparation & Implementation Support

More information

SPECIAL CONDITIONS OF TENDER

SPECIAL CONDITIONS OF TENDER Page 1 SPECIAL CONDITIONS OF TENDER A. INTRODUCTION The following documents are available on http://emits.esa.int/ under "Reference Documentation" --> "Administrative Documents": ESA Procurement Regulations

More information

Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS)

Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS) Annex I Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS) (Planning and Budget Management Division) 1. Position Description Post Title: Level: Project: Supervisor:

More information

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK 01 B.P.

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK 01 B.P. REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK Avenue Joseph Anoma, 01 B.P. 1387, Abidjan, CÔTE D'IVOIRE Programming and Budget Department (SNPB) E-mail: a.maquengo@afdb.org / b.mugova@afdb.org

More information

EBRD and Italy. European Bank for Reconstruction and Development

EBRD and Italy. European Bank for Reconstruction and Development EBRD and Italy 2013 European Bank for Reconstruction and Development 2010 www.ebrd.com Italy and EBRD joint cooperation Total value of projects with Italian-EBRD involvement: 50.58 billion (which includes

More information

linked to the Australian National University s Work health and safety policy and is one of the procedures within the WHS Management System.

linked to the Australian National University s Work health and safety policy and is one of the procedures within the WHS Management System. Purpose This procedure describes how the Australian National University evaluates and monitors contractors work health and safety for all activities performed at the University. This procedure ensures

More information

New Zealand Clearing Limited. Clearing and Settlement Procedures

New Zealand Clearing Limited. Clearing and Settlement Procedures New Zealand Clearing Limited Clearing and Settlement Procedures 6 May 2016 Contents Section A: Interpretation and Construction 7 Section 1: Introduction and General Provisions 8 Amendment Procedure 8 1.1

More information

Clearing and Settlement Procedures. New Zealand Clearing Limited. Clearing and Settlement Procedures

Clearing and Settlement Procedures. New Zealand Clearing Limited. Clearing and Settlement Procedures Clearing and Settlement Procedures New Zealand Clearing Limited Clearing and Settlement Procedures 3 August 2010 Contents Section A: Interpretation and Construction 6 Section 1: Introduction and General

More information

Approved by the State Duma on December 6, 1995 Approved by the Federation Council on December 19, Chapter I. General Provisions

Approved by the State Duma on December 6, 1995 Approved by the Federation Council on December 19, Chapter I. General Provisions FEDERAL LAW NO. 225-FZ OF DECEMBER 30, 1995 ON PRODUCTION SHARING AGREEMENTS (with the Amendments and Additions of January 7, 1999, June 18, 2001, June 6, 2003, June 29, December 29, 2004) Approved by

More information

The Warm Front Scheme

The Warm Front Scheme The Warm Front Scheme LONDON: The Stationery Office 14.35 Ordered by the House of Commons to be printed on 2 February 2009 REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 126 Session 2008-2009 4 February

More information

Official Journal of the European Union DECISIONS

Official Journal of the European Union DECISIONS L 17/40 23.1.2018 DECISIONS COUNCIL DECISION (CFSP) 2018/101 of 22 January 2018 on the promotion of effective arms export controls THE COUNCIL OF THE EUROPEAN UNION, Having regard to the Treaty on European

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7277-PAK Public Disclosure Authorized Project Agreement (Taunsa Barrage Emergency Rehabilitation and Modernization Project) Public Disclosure Authorized

More information

Common Safety Methods CSM

Common Safety Methods CSM Common Safety Methods CSM A common safety method on risk evaluation and assessment Directive 2004/49/EC, Article 6(3)(a) Presented by: matti.katajala@safetyadvisor.fi / www.safetyadvisor.fi Motivation

More information

Management. Highlights in 2013 MANAGEMENT 63

Management. Highlights in 2013 MANAGEMENT 63 Management Highlights in 2013 Increase in collection rates of the assessed contributions Further increase in numbers of female staff in the Professional category Further progress in implementation of an

More information

INVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS)

INVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS) INVITATION TO TENDER: CONSULTANCY SERVICES TO DEVELOP A FINANCIAL MODEL FOR THE LESOTHO-BOTSWANA WATER TRANSFER SCHEME (LBWTS) I am pleased to inform you that your organisation is invited to take part

More information

THE CORPORATION OF THE CITY OF WINDSOR POLICY

THE CORPORATION OF THE CITY OF WINDSOR POLICY THE CORPORATION OF THE CITY OF WINDSOR POLICY Service Area: Office of the Chief Administrative Officer Policy No.: CR252/2014 Department: Approval Date: October 6, 2014 Division: Corporate Initiatives

More information

SIGMA Support for Improvement in Governance and Management A joint initiative of the OECD and the European Union, principally financed by the EU

SIGMA Support for Improvement in Governance and Management A joint initiative of the OECD and the European Union, principally financed by the EU SIGMA Support for Improvement in Governance and Management A joint initiative of the OECD and the European Union, principally financed by the EU KOSOVO PUBLIC INTERNAL FINANCIAL CONTROL (PIFC) ASSESSMENT

More information

PR19 Business Plan. Water Resources RCV Allocation Submission January 2018

PR19 Business Plan. Water Resources RCV Allocation Submission January 2018 PR19 Business Plan Water Resources RCV Allocation Submission January 2018 Introduction... 3 Overview of Company Water Resources... 3 Ofwat s Technical Guidance on Issues to Consider... 4 1. Definition

More information

WATER Operations in EASTERN EUROPE. Athens European Week. Jean-Patrice POIRIER November 22, 2013

WATER Operations in EASTERN EUROPE. Athens European Week. Jean-Patrice POIRIER November 22, 2013 WATER Operations in EASTERN EUROPE Athens European Week Jean-Patrice POIRIER November 22, 2013 Plan of Presentation Main drivers for the water market in Eastern Europe Case studies: Bucharest (& Prague)

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

Aquasol Pty Ltd. Water Services (Operating) Licence. Operational Audit and Asset Management System Effectiveness Review. Report 18 September 2018

Aquasol Pty Ltd. Water Services (Operating) Licence. Operational Audit and Asset Management System Effectiveness Review. Report 18 September 2018 Aquasol Pty Ltd (Operating) Licence Operational Audit and Asset Management System Effectiveness Review Report 18 September 2018 Perth Melbourne Sydney September 2018 Final Version Liability limited by

More information

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

Request for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion

Request for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion Page 1 of 11 Request for Qualifications for Owner s Program Management Services For Wilton Police Headquarters Renovation and Expansion The Town of Wilton (the Town) will receive sealed qualifications

More information

Loan Agreement. (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and ELECTROSTOPANSTVO NA MAKEDONIJA

Loan Agreement. (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and ELECTROSTOPANSTVO NA MAKEDONIJA Public Disclosure Authorized LOAN NUMBER 4284 MK CONFORMED COPY Public Disclosure Authorized Loan Agreement (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

More information

Disbursement Handbook for Public Sector Loans. January 2017

Disbursement Handbook for Public Sector Loans. January 2017 Disbursement Handbook for Public Sector Loans January 2017 1. INTRODUCTION 1 1.1 SOME TERMS EXPLAINED... 3 1.2. SOME CALCULATIONS AND PROCEDURES EXPLAINED... 5 Definition of interest period and number

More information

Code of Practice. The principles, standards of behaviour and service delivery requirements for all FPA Australia Corporate Members

Code of Practice. The principles, standards of behaviour and service delivery requirements for all FPA Australia Corporate Members Code of Practice The principles, standards of behaviour and service delivery requirements for all FPA Australia Corporate Members Fire Protection Association Australia Life Property Environment Introduction

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

MEGAPROJECT Case Study

MEGAPROJECT Case Study SECTION 1 - BASIC PROJECT INFORMATION MEGAPROJECT Case Study Case compiled by: Milen Baltov Contact details: mbaltov@bfu.bg Basic Project Information 1 Project Title Location Purpose Scope Total Project

More information

Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000, (Act No.

Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000, (Act No. Page 1 BOARD NOTICE 30 OF 2007 Engineering Council of South Africa Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000, (Act No.46 of

More information

APPOINTMENT OF AN AUDITOR RESPONSIBLE FOR AUDITING THE ACCOUNTS OF CREDENDO SHORT-TERM EU RISKS PUBLIC TENDERING PROCESS 1

APPOINTMENT OF AN AUDITOR RESPONSIBLE FOR AUDITING THE ACCOUNTS OF CREDENDO SHORT-TERM EU RISKS PUBLIC TENDERING PROCESS 1 APPOINTMENT OF AN AUDITOR RESPONSIBLE FOR AUDITING THE ACCOUNTS OF CREDENDO SHORT-TERM EU RISKS RFP Auditor Credendo Short-Term EU risks úvěrová pojišťovna, a.s. PUBLIC TENDERING PROCESS 1 CREDENDO SHORT-TERM

More information

CBIB. 2 nd STEERING COMMITTEE MEETING. Belgrade 14/02/2007. The European Union's CARDS Regional Programme

CBIB. 2 nd STEERING COMMITTEE MEETING. Belgrade 14/02/2007. The European Union's CARDS Regional Programme The European Union's CARDS Regional Programme 2 nd STEERING COMMITTEE MEETING Belgrade 14/02/2007 Cross - Border Institution Building, a project implemented by BDPA in association with EWC / MDF / CEU

More information

ESCO projects how to commercially finance energy efficiency investments with the help of Energy Performance Contracting

ESCO projects how to commercially finance energy efficiency investments with the help of Energy Performance Contracting ESCO projects how to commercially finance energy efficiency investments with the help of Energy Performance Contracting Conference on 14 November 2013 Toivo Miller European Bank for Reconstruction and

More information

Contract Modifications

Contract Modifications Brief 38 Public Procurement September 2016 Contract Modifications CONTENTS Introduction Permitted or non-substantial modifications of contracts during their term no procurement procedure required o Modifications

More information

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection

More information

Elk Point / St. Paul Regional Water System Business Plan

Elk Point / St. Paul Regional Water System Business Plan Elk Point / St. Paul Regional Water System Business Plan Draft 5.0 August 5, 2011 With Revisions to Adjust timing of the Development of the System Presented to Member Municipalities for Approval Member

More information

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE)

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) FWC BENEFICIARIES 2009 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/127054/C/SER/multi 1. BACKGROUND

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS 702 KAR 4:160 KENTUCKY DEPARTMENT OF EDUCATION REQUEST FOR PROPOSALS for CONSTRUCTION MANAGEMENT SERVICES School District: Project: Boyle County Boyle County Middle School RFP Date: June 20 30, 2016 CONTENTS

More information

MEMORANDUM OF UNDERSTANDING BETWEEN THE BANK OF ALBANIA AND THE BANKING AND PAYMENTS AUTHORITY OF KOSOVO

MEMORANDUM OF UNDERSTANDING BETWEEN THE BANK OF ALBANIA AND THE BANKING AND PAYMENTS AUTHORITY OF KOSOVO MEMORANDUM OF UNDERSTANDING BETWEEN THE BANK OF ALBANIA AND THE BANKING AND PAYMENTS AUTHORITY OF KOSOVO CONCERNING THEIR CO-OPERATION IN THE FIELD OF SUPERVISION OF BANKS TABLE OF CONTENTS Competent authorities

More information

Send or hand-deliver proposals to: City of Alhambra - Utilities Department Attention: Dennis Ahlen 111 South First Street Alhambra, California

Send or hand-deliver proposals to: City of Alhambra - Utilities Department Attention: Dennis Ahlen 111 South First Street Alhambra, California April 27, 2017 Subject: Request for Proposals Engineering Design Services and Construction Management for the Sewer Lining Project on Cypress, Essexfells, Vega, and Florentina. The City of Alhambra is

More information

Guidelines for the Employment of Consultants. under Japanese ODA Loans

Guidelines for the Employment of Consultants. under Japanese ODA Loans Guidelines for the Employment of Consultants under Japanese ODA Loans March 2009 1 TABLE OF CONTENTS Part I Page PART I GENERAL... 1 Section 1.01. Introduction...1 Section 1.02 Need for Employment of a

More information

INVESTIGATIONS & ENFORCEMENT CAREER OPPORTUNITIES Job Descriptions. Chief Manager, Investigations (1 position) Grade: 7

INVESTIGATIONS & ENFORCEMENT CAREER OPPORTUNITIES Job Descriptions. Chief Manager, Investigations (1 position) Grade: 7 INVESTIGATIONS & ENFORCEMENT CAREER OPPORTUNITIES Job Descriptions Job Title: Chief Manager, Investigations (1 position) Grade: 7 Organization: Department: Division: Kenya Revenue Authority Investigations

More information

OECD guidelines for pension fund governance

OECD guidelines for pension fund governance DIRECTORATE FOR FINANCIAL AND ENTERPRISE AFFAIRS OECD guidelines for pension fund governance RECOMMENDATION OF THE COUNCIL These guidelines, prepared by the OECD Insurance and Private Pensions Committee

More information

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1674 PA. Public Disclosure Authorized

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1674 PA. Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized Project Agreement LOAN NUMBER 1674 PA Public Disclosure Authorized (Livestock and Agricultural Development Project) between INTERNATIONAL

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 20.4.2016 C(2016) 2471 final COMMISSION DECISION of 20.4.2016 on the fourth complementary financing Decision of the Neighbourhood Investment Facility to be financed from the

More information

Who s who in Zambian mining?

Who s who in Zambian mining? Ministry of Mines and Minerals Development Who s who in Zambian mining? A short guide to the actors in Zambia s mining sector and their roles The Mineral Production Monitoring Support Project www.mineralproductionmonitoring.co.zm

More information

1 SCOPE AND OBJECTIVES 1 2 RISK MANAGEMENT 1 3 DECISION MAKING AND ANALYSIS 1 4 APPROVED INSTRUMENTS, METHODS AND TECHNIQUES 1

1 SCOPE AND OBJECTIVES 1 2 RISK MANAGEMENT 1 3 DECISION MAKING AND ANALYSIS 1 4 APPROVED INSTRUMENTS, METHODS AND TECHNIQUES 1 University of Lincoln TREASURY MANAGEMENT POLICY CONTENTS Section Page 1 SCOPE AND OBJECTIVES 1 2 RISK MANAGEMENT 1 3 DECISION MAKING AND ANALYSIS 1 4 APPROVED INSTRUMENTS, METHODS AND TECHNIQUES 1 5 ORGANISATION

More information

The contract period will run from January 1, 2018 through December 31, 2020.

The contract period will run from January 1, 2018 through December 31, 2020. Request for Proposal RFP for ISO-NE Consulting Support RFP Release Date: 10/25/2017 Bidder Questions Due: 11/8/2017 Answers Posted: 11/15/2017 Proposals Due: 11/29/2017 Summary The Vermont Energy Investment

More information

Treasury Management Policy

Treasury Management Policy Treasury Management Policy December 2015 Approving authority: Court Consultation via: Finance Committee Approval date: December 2015 Effective date: December 2015 Review period: 2020 Responsible Executive:

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

HOW TO REGISTER ON THE OECD ESOURCING PORTAL

HOW TO REGISTER ON THE OECD ESOURCING PORTAL HOW TO REGISTER ON THE OECD ESOURCING PORTAL Bidder - User Guide OECD all rights reserved Create your Organisation Profile Access the esourcing Portal following the link: https://oecd.bravosolution.com

More information

DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA

DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA REPORT ON THE INVITATION TO THE PUBLIC TO COMMENT 1. Overview of the public consultation process The objective of this

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Law No. 06/L 032 ON ACCOUNTING, FINANCIAL REPORTING AND AUDITING Assembly of the Republic of Kosovo, Based on Article

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS RELOCATION SERVICES FORMER MANITOU COMMUNITY CENTER 4806 South 66 th Street, Tacoma WA Page 1 RFP AT A GLANCE: PROJECT TITLE: ADDRESS: PROJECT DESCRIPTION: Manitou Relocation 4806

More information

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP EUROPEAN COMMISSION EUROPEAN EXTERNAL ACTION SERVICE VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP ***LAST UPDATE 24 SEPTEMBER 2010*** Table of Contents PART I An Overview of the Eastern

More information

Incorporation of Publicly Owned Enterprises in Kosovo. Frequently Asked Questions

Incorporation of Publicly Owned Enterprises in Kosovo. Frequently Asked Questions Incorporation of Publicly Owned Enterprises in Kosovo Frequently Asked Questions What is incorporation? In legal terms, incorporation literally means the creation of a company or a new legal entity. It

More information

How to Develop High-Quality Full Application Writing a Winning Proposal

How to Develop High-Quality Full Application Writing a Winning Proposal How to Develop High-Quality Full Application Writing a Winning Proposal Information and Training Workshop Presentations held at the Country Workshops in Moldova, Ukraine and Georgia Day 1 Day!One!!!! Workshop

More information

Loan Agreement CONFORMED COPY LOAN NUMBER 1146 JM INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT THE WATER COMMISSION, KINGSTON, JAMAICA

Loan Agreement CONFORMED COPY LOAN NUMBER 1146 JM INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT THE WATER COMMISSION, KINGSTON, JAMAICA Public Disclosure Authorized LOAN NUMBER 1146 JM CONFORMED COPY Public Disclosure Authorized Loan Agreement (Kingston Sewerage and Water Supply Project) Public Disclosure Authorized BETWEEN INTERNATIONAL

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Designing an Assurance Process

Designing an Assurance Process Construction Sector Transparency Initiative October 2013 / V1 Guidance Note: 7 Designing an Assurance Process Introduction The aim of CoST is to increase the transparency and accountability of publicly

More information

Appendix B - Treasury Management Policy 2019/20

Appendix B - Treasury Management Policy 2019/20 Appendix B - Treasury Management Policy 2019/20 B.1 Definition The Council adopts the CIPFA definition of Treasury management as: The management of the organisation s investments and cash flows, its banking,

More information

JASPERS Networking Platform

JASPERS Networking Platform JASPERS Networking Platform Supporting investments in Smart Grids in 2014-2020 Background and Introduction Massimo Marra, Senior Officer JASPERS Networking and Competence Center Brussels, 25 March 2015

More information

13. What banking business in foreign currency is permitted to use foreign currency?

13. What banking business in foreign currency is permitted to use foreign currency? FREQUENTLY ASKED QUESTIONS BANK INDONESIA CIRCULAR NO. 17/11/DKSP /DKSP DATED 1 JUNE 2015 CONCERNING MANDATORY USE OF RUPIAH WITHIN THE TERRITORY OF THE REPUBLIC OF INDONESIA A. GENERAL REVIEW 1. What

More information

Procedure for Post Contract Progress And Cost Control. Procedure No. 012

Procedure for Post Contract Progress And Cost Control. Procedure No. 012 Procedure for Post Contract Progress And Cost Control Procedure No. 012 Print Name Title Date Prepared by J.G. MacNamara Section Officer / T.S.O. 01/03/05 Reviewed by Clodagh Hanratty C.A.T.S.O. 01/03/05

More information

ANNEX Action Fiche for Technical Cooperation Facility II for Palau

ANNEX Action Fiche for Technical Cooperation Facility II for Palau ANNEX Action Fiche for Technical Cooperation Facility II for Palau 1. IDENTIFICATION Title Technical Cooperation Facility CRIS no. FED/2013/024-369 Total cost 180,000 (6.2% of NIP A envelope) EDF contribution

More information

As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013

As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013 Paper title: OUTCOMES FROM A SEWER MAINTENANCE BACKLOG INVESTIGATION As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013 Morné Pienaar a a Aurecon Port Elizabeth,

More information

Tajikistan Road Maintenance Development Project. Tajikistan Road Maintenance

Tajikistan Road Maintenance Development Project. Tajikistan Road Maintenance Tajikistan Road Maintenance Development Project OSCE Conference, Dushanbe October 23, 2007 BACKGROUND The length of Tajikistan s public road network is approximately 26.300 km, comprising 4.978 km of republican

More information

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL

PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.2 REPORTING TEMPLATES & E-TOOL Joint Call on applied geoscience

More information

IPA National Programme 2010 for Albania Project Fiche 09 "Support to the Food Safety Infrastructure "

IPA National Programme 2010 for Albania Project Fiche 09 Support to the Food Safety Infrastructure IPA National Programme 2010 for Albania Project Fiche 09 "Support to the Food Safety Infrastructure " 1. Basic information 1.1 CRIS Number: 2010/022-530 1.2 Title: Support to the food safety infrastructure

More information

ANNEX. to the COMMISSION DECISION

ANNEX. to the COMMISSION DECISION EUROPEAN COMMISSION Brussels, 15.12.2017 C(2017) 8512 final ANNEX 1 ANNEX to the COMMISSION DECISION on the adoption of a financing decision for 2017 and 2018 for the pilot project "Pilot project - Rare

More information

Project 2.9 Guidance on best practices in river basin planning

Project 2.9 Guidance on best practices in river basin planning Common Strategy for the Implementation of the Water Framework Directive Project 2.9 Guidance on best practices in river basin planning Information supply Consultation Active involvement Introduction Common

More information

CONSTRUCTION INDUSTRY DEVELOPMENT REGULATIONS. GN 692 in GG of 9 June as amended by

CONSTRUCTION INDUSTRY DEVELOPMENT REGULATIONS. GN 692 in GG of 9 June as amended by CONSTRUCTION INDUSTRY DEVELOPMENT REGULATIONS Act Published under GN 692 in GG 26427 of 9 June 2004 as amended by GN R1333 in GG 26991 of 12 November 2004 GN 751 in GG 27831 of 22 July 2005 GN 842 in GG

More information

PROVIDING CLARIFICATION / INTRODUCTION OF AMENDMENTS

PROVIDING CLARIFICATION / INTRODUCTION OF AMENDMENTS PROVIDING CLARIFICATION / INTRODUCTION OF AMENDMENTS Project: Odra Vistula Flood Manage Project Contract: 3B.1 Flood protection Sandomierz Procedure: ICB Concerns: Prequalification Docu Date: 9.11.2015

More information