1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date: November 12,29 Country: Kingdom of Cambodia Project Name: Trade Facilitation and Competitiveness Project Project ID: PO PROJECT PAPER DATA SHEET FOR CAMBODIA: TRADE FACILITATION AND COMPETITIVENESS PROJECT Fiscal Year Annual 3.9 Cumulative 3.9 Board approved -E RVP approved - Task Team Leaders: Stephane Guimbert & Huot Chea Sector Director: Vikram Nehru Country Director: Annette Dixon Environmental category: C Does the restructured project require any exceptions to Bank policies? Have these been approved by Bank management? Is approval for any policy exception sought from the Board? Revised project development objective/outcomes [If applicable] Project Development Objective remains unchanged. Source Local Foreign Recipient..33 IDA. 1. Others.. Total Yes El3 IZlYes -No - Modified Outcome Indicator: Focus on general investors to mean trading and trade-related companies and investors and perceptions to be centered on performance of customs. Does the restructured project trigger any new safeguard policies? NO Total

2

3 Cambodia: Trade Facilitation and Competitiveness Project (TFCP) Project Paper Supporting the Restructuring of the Grant H165-KH I. Introduction 1. This Project Paper seeks the approval of the Executive Directors to introduce the following changes in the Cambodia Trade Facilitation and Competitiveness Project: IDA Grant No.HI 65-KH, PO89196 and accompanying amendments to the project s legal documents. 2. The proposed restructuring would mainly reallocate resources from the subcomponent on the electronic Single Window (US$3.6 million) to (i) a further extension of the customs automated system; (ii) automation of Certificates of Origin (C/O) issuance; and (iii) creation of a Trade Information Website (TIN ). Early during project implementation, the Government indicated its decision not to proceed with the institutional model initially envisaged for the creation of a Single Window. However, it remained committed to offering much of the functionality initially envisaged under such a Single Window, building on the platform of the customs automated system supported by the TFCP (the Automated System for Customs Data, or ASYCUDA). The proposed restructuring supports this new approach through redeploying resources that will support further deployment of the customs automated system (US$2.5 million), the automation of C/O (one of the critical trade-related processes, especially for the garment industry, US$.2 million), and the dissemination of trade-related information on a new TIW (US$.7 million). Other resources are being redeployed to continue support to trade-related labor standards in the garment industries ( Better Factories Cambodia ) and additional training. 3. The proposed restructuring would not affect the Project Development Objective (PDO). The combination of the extended Customs automated system, the automation of C/O processes, and the TlW will create much of the practical functionality of the Single Window, hence assist in establishing the necessary foundations upon which the Single Window could ultimately be achieved, while at the same time delivering meaningful benefits for the trading community. Hence these activities contribute to achieve the original PDO, albeit at a different pace and with a different institutional setup than with the original concept of a Single Window. However, the reformulation (and more focused scope) of the main indicators used to measure the PDO, as well as several of the project indicators, is deemed necessary to better monitor project implementation and impact and to better align indicators with project outputs and activities. The reformulation will also require an extension of the closing date from December 1, 29 to June 1, 212 to allow for adequate time to successfully complete the activities covered by the restructuring. 11. Background and Reasons for Restructuring Project status and performance to date 4. The project was approved by the Board on June 2, 25, and became effective on December 12, 25. The total IDA Grant amounts to SDR 6.62 million (US$lO.O million), of which SDR 2.61 million has been disbursed to date (excluding the Designated Account Balance). The original project objective is to promote economic growth by reducing transaction costs associated with trade and investment, introducing transparency in investment processes, and facilitating access of enterprises to export markets. The project comprises four components: (i) trade facilitation; (ii) export market access hd; (iii) private participation in infrastructure and investment promotion; and (iv) legal transparency. 2

4 5. The most recent supervision (October 29) concluded that progress was satisfactory along the four components. Key concerns have continued to be focused on achievement of the ambitions envisaged under the initial single window concept. Early in project implementation, the Government decided not to proceed with the original design of the Electronic Single Window. Initial project implementation was also slow given the project s complexity. However, the mid-term review (May 28) of the TFCP found overall encouraging progress on customs automation (component 1) and risk management (with support from the Japan International Cooperation Agency and Australian Aid), in particular with the launch of ASYCUDA at the Port of Sihanoukville on May 1, 28. The mid-term review concluded that the PDO and its outcomes remained relevant and a minor restructuring was agreed to lay the ground for this proposed restructuring. The minor restructuring, effective in August 28, consisted of a reallocation: (i) to conduct a Trade Information Website (TIW) / MoC automation masterplan plan study under Component 1; and (ii) to further support Better Factory Cambodia (BFC) under Component 2. After this minor restructuring, in March 29, and given concerns about the long term sustainability of the customs automated system as implemented, the General Department of Customs and Excise (GDCE) requested Bank support to undertake a detailed review of ASYCUDA implementation: concerns about implementation quality have since been largely addressed and a baseline evaluation has been conducted in October 29, the conclusions and lessons of which feed into the rationale for this restructuring. Rationale for restructuring 6. The rationale for the restructuring is to reflect lessons learned from initial implementation and to better reflect more realistic and achievable ambitions for the project. One of the major goals of the project was to reduce the time and transaction costs associated with complying with import and export regulations and controls. Among a number of activities identified toward this objective was to be the introduction of a single window facility to integrate and automate regulatory functions o f 6 ministries and agencies, as well as ports and financial institutions, through a shared electronic trade network. The expectation was that this would eliminate duplication, increase speed and accuracy of the clearance process and reduce opportunities for rent seeking. While the original implementation plan envisaged some phasing in of the single window, there was no explicit plan for immediately building stakeholder commitment at the agency, sub-agency and individual level, leaving the risk of poor adoption and undermining of the technology unaddressed. Initial implementation activities identified a number of institutional and environmental constraints that made the achievement of such an ambitious strategy unrealistic and it was agreed that a more gradual approach, building on upgrading existing and planned systems (computerizing them, simplifying them, making them more transparent), would have more chances of success and would be more sustainable in the medium term, while at the same time malung a meaningful contribution to the ultimate achievement of the full single window if and when the constraints could be overcome. 7. The restructuring builds on some initial success in ASYCUDA implementation. Indeed, Customs automation, through the implementation of the ASYCUDA system, is now operational at the Port of Sihanoukville (accounting for more than 4% of import declarations) and is expected to be implemented in the Phnom Penh International Airport and Phnom Penh dry ports by the end of 29 (accounting for a further 25% of import declarations). The system has also facilitated the initial implementation of the RGC s risk management strategy and has sharply reduced the number of containers physically inspected from almost 1 percent at the time of project inception to less than 2 percent now. Nevertheless ASYCUDA implementation falls short of the original design, since (i) the system will only be implemented in three of the five locations originally envisaged; (ii) the system has not been setup as a centralized system operating through a wide-area network (instead through separate local-area networks); (iii) key 3

5 functional modules such as manifest and transit are yet to be enabled and implemented (although the functional capability has been installed as part of the ASYCUDA application suite); and (iv) initial configuration of the system was based on a hybrid system. 8. Hence the proposed restructuring builds on insights learned from ASYCUDA implementation - and its challenges - about the management of such a complex Information and Communication Technology (ICT) project: (i) the lead agency (GDCE) needs strong support in project management (including setting up and managing a performance monitoring framework; developing quality control mechanisms); (ii) the sustainability of the system depends on the ICT capacity of the recipient (GDCE in the case of ASYCUDA, especially its latest version, which is deployed in Cambodia and employs a more advanced technology); (iii) technical design needs to factor in Cambodia s capacity constraints (e.g. the lack of a costeffective solution for a wide-area network until recently); (iv) procurement packaging requires careful design to allow for the emerging, but weak capacity of the local ICT industry and the risk of integrated software / hardware contracts to not deliver value for money; and (v) contract design requires attention to performance management given the risks of delays in such complex project. 9. The proposed restructuring also provides a vehicle for allowing exporters and importers to acquire information on and better comply with regulations on an incremental basis. First, the further roll-out of the customs automated system combined with the automation of C/O will contribute to the original goal, since the Royal Government Cambodia intends to build its single window around the customs automated system platform. Second, based on the review of ASYCUDA implementation to date, the proposed restructuring supports the development of a more sustainable IT function within the GDCE as well as supporting a stronger project management and quality assurance capacity, to strengthen the long term sustainability of the ambitions articulated in the PDO. Third, the RGC proposes to introduce a Trade Information Website which would provide in a user friendly and easily accessible way all of the key information necessary for importers and exporters to comply with regulatory requirements. The TJN would also assist Cambodia to comply with changes to GATT Article X currently being discussed as part of the WTO Trade Facilitation negotiations, which will likely require all WTO members to make all relevant import, export and transit information (including laws, regulations, procedures, penalties, fees and charges etc) available and easily accessible to the public via dedicated trade information websites. In addition, the RGC requested that the proposed restructuring supports continued to BFC, which is critical at a time of a severe downturn in the garment industry. 1. The new approach would achieve a similar development objective, at a slower pace but on a more sustainable basis. The expected result of this new approach remains a reduction in documents and time (and, as a corollary, private costs and rents) required to process trade transactions. Gains would be achieved at a more modest rate that originally proposed (as most of the progress would be linked to GDCE and the customs automated system plus one additional process - C/O issuance -, rather than a Single Window connecting all trade-related processes). An additional benefit, however, would be that changes that occurred in practices, approaches, and elimination of redundancies would have been internalized and would be more sustainable. Another benefit will be the significant experience gained by GDCE - and the government more generally - in implementing large-scale ITC projects, a precursor for the Single Window under the ASEAN framework. The National Single Window Steering Committee established in 28 will develop the vision for Cambodia s National Single Window, building among other things on the achievements and experience learned through the activities financed under this component. 4

6 111. Proposed Changes Proposed changes to main outcome indicator and component indicators 11. While the overall project development objective (PDO) remains unchanged, the main indicator has been slightly reformulated to focus on the perceptions of trading and traderelated companies (rather than general investors ) and to focus on the performance of customs (rather than the overall trade process which includes variables outside Customs control). During restructuring discussions with the RGC, it was also felt that some indicators needed improvements, either because they are not currently measured or no objective measurement methodology exists (e.g. response time to investors) or because adjustments in project design require some changes to better align with project inputs. The proposed revised and sharpened indicators of progress are summarized in the table attached in Annex 1. Proposed changes in project scope COMPONENT 1 : TRADE FACILITATION 12. The restructuring would shift resources from the original design of the electronic Single Window to further roll-out of ASYCUDA and automation of C/Os. The project originally provided for the implementation of ASYCUDA in the GDCE, as well as the implementation of a Single Window. With restructuring, the Single Window would be dropped. Component 1 would instead finance a wider and more sustainable rollout of the Customs automated system, its implementation in a number of additional sites, its networking via secure communications infrastructure, together with support for the implementation of the full suite of functional modules including, as a priority, the transit and manifest modules. In addition, and as identified during the mid-term review and strongly reinforced by the in-depth review of ASYCUDA implementation, additional resources will be directed to developing the ICT support function within the GDCE to ensure long term sustainability of the project s ICT-related deliverables. More attention will be paid to project management and quality assurance as well, including through a more output-based contract and through building GDCE s capacity to manage this ambitious project. The in-depth review also recommended to: (i) separate out the hardware and IT capacity development from the main contract of services for the implementation of the customs automated system; and (ii) strengthen the management capacity of the National Project Team under the direction of the National Project Director. This restructured component will also include the automation of certificates of origin in the Ministry of Commerce (MoC). 13. While the restructured project would devote significant resources to improving the sustainability of the ASYCUDA system as well as extending its deployment to new locations and increasing its technical functionality, the technical assistance contracts to provide this support would be open to international competitive tendering as opposed to the previous sole source arrangements. Such an approach will facilitate closer supervision of project deliverables by the client and will mitigate implementation risks significantly. At the same time additional technical assistance will be provided to the GDCE and the MoC via the complementary multi-donor financed Trade Development Support Facility to assist the GDCE to develop long term options for further deployment o f ICT to achieve the Government s trade facilitation objectives. COMPONENT 2: EXPORT MARKET ACCESS FUND 14. The Better Factory Cambodia (BFC) project continues to monitor compliance with labor standards in the garment industry. In September 27, the RGC requested an extension of the ILO support until 21. BFC, with support from the IFC, is now developing a transition 5

7 ... Expenses 1,25,266 strategy to (i) shift from its original compliance approach to a service (in part fee-based) approach of monitoring, training, and good practice sharing in the area of work conditions and (ii) shift to an independent Cambodian management (without ILO direct support). BFC has reported satisfactory progress on the use of its resource envelope (beyond the portion financed by TFCP). In this context, it was agreed to finance an additional $.5 million (beyond the $.6m in the original procurement plan and the $.2 million agreed during the minor restructuring and disbursed in early 29). COMPONENT 3 : PRIVATE PARTICIPATION INFRASTRUCTURE AND INVESTMENT (PPI) 15. No changes are proposed under the restructuring for Component 3. COMPONENT 4: LEGAL TRANSPARENCY 16. This component will include a new activity, the Trade Information Website (TIW). To respond to a consistent concern of the Cambodian Private sector - the lack of access to traderelated information covering, inter alia, regulations, procedures, fee schedules, penalties and necessary forms to be used - the TIW will be created, linlung a number of existing or to be created websites (and ensuring their updating) to create an exhaustive collection of regulations, processes, fees, etc for traders. Building on lessons learned during ASYCUDA implementation, the TIW will be part of the Ministry of Commerce ICT masterplan to ensure sustainability. Cost Comparison with Original Project 17. Overall project costs would remain unchanged (in SDR terms) as a result of the proposed modification. However, re-allocation of financing within component interventions and categories are warranted. The summary is shown hereafter (details are summarized in Annex 2). Proiect costs fus$i J PROJECT A CTI WTIES.. 1. Trade facilitation 2. EMAF 3. Investment 4. Legal... transparency Project Coordination PPF Original ~ Remaining Needs for New Total PAD 1 asof Balance existing proposed needs Sept 9 activities activities a. b c=a-b d e f=d+e 6,15, 2,324,592 3,825,48, 27,996 2,97,44 2,935,436 2,1, 1,95,494 1,4,56 ~ 5, 1,75,266 8, 126, ,25 28,293 66, 346,292 4, 134, , ,784 5, 648, ~ 58, 158, ,73 I 3, 1 171, ,74 ; 27,75 69, ,254, Proposed new allocation... I=b+f 5,26,28 2,845,76 473, , ,

8 FIDUCIARY 19. Financial Management. The overall financial management (FM) performance is considered to be satisfactory. The submissions of quarterly FMRs and annual audited reports have been timely. The auditor s opinion on the financial statements of the Project for FY 28 is unqualified (clean). The existing FM and disbursement arrangement for the Project will be continued to operate for the proposed restructure, including flow of funds, Designated Account and FM procedures, structure and controls. 2. Disbursement Status and Forward Projection. As of September 3, 29, the cumulative disbursements excluding the outstanding Designated Account advance amount to SDR2.61 million or 39.5 percent of total grant of SDR 6.62 million after almost 4 years of implementation. The slow disbursement rate in part reflects that 36 percent of the total grant (or SDR million equivalent) was allocated to the non-implementing activities on the Single Window. The proposed restructuring will result in a redistribution of funds between disbursement categories and components toward full utilization of the undisbursed balance within the next two years (see Annex 2 for details). 21. Procurement. The International Procurement Agent (PA) will continue to carry out all procurement under the restructured TFCP, with the exception of small value and simple procurement falling below the thresholds agreed between the Bank and Ministry of Economy and Finance, and also excluding any Direct Contracting, Procurement from UN Agencies, SingleBole Source Selection and selection of NGOs. To strengthen MoC s capacity to effectively carry out those procurement not requiring the PA under the restructured TFCP, it has been agreed that the services of the international procurement consultant who is currently being engaged by MoC under the multi-donor financed Trade Development Support Project, will also be used on a parttime/shared basis for the TFCP. Furthermore, the applicable procurement methods have been revised to meet the needs of the remaining procurement under the restructured project. This includes (i) the application of the Bank s latest Procurement and Consultant Guidelines (May 24, revised October 26), (ii) the addition of National Competitive Bidding (NCB) as a permissible method for procurement of goods accompanied with an NCB-Annex including reference to the Government s Procurement Sub-decreemanual for Externally financed projects and stipulating the further NCB improvements required thereto, (iii) harmonizing the thresholds for use of the various procurement methods consistent with the Government s Procurement Subdecreemanual, and (iv) updating IDA S review requirements. 22. The Good Governance Framework (GGF, Annex 4) had been reviewed as part of supervision missions and showed good progress on all dimensions, including strong leadership by the MoC. An updated version has been agreed in May 29 to reflect lessons learned with the TFCP and other projects and is effective since June 26,29. Proposed amendments to the Development Grant Agreement 23. It is proposed to extend the closing date by thirty months from December 1, 29 to June 1, 212. This would be the first extension. The extended closing date reflects a realistic timeframe to implement the TIW and the roll out of the customs automated system, with other activities proposed under the restructuring expected to be completed in a shorter time frame. 24. Other amendments include: (i) a revision of the results indicators (Annex 1); (ii) a revision of Schedule 1 to reflect the changes in category allocation (Annex 2); and (iii) a revision to the procurement arrangements (Annex 3). 7

9 IV. Analysis Economic and Financial 25. The proposed approach to trade facilitation will lead to benefits largely similar to the originally designed single window approach. The roll-out of the customs automated system will bring more benefits than originally planned in terms of customs automation. The automation of C/O will bring more limited benefits in terms of non-customs process automation than the original design. Finally, the TIW will bring the transparency in information as originally planned. In addition, the new approach, which builds on the Royal Government of Cambodia s own initial experience with customs automation, will be more sustainable, with stronger ownership and much better attention to ICT and project management capacity. Hence, overall the restructuring will not significantly alter the basic economic benefits accruing to the project. It is expected that that the measures to facilitate trade would still ultimately yield reduced smuggling, increased voluntary compliance with regulations and the tax regime (and reduce the opportunities for rent-talung), and improve Cambodian trade competiveness, anticipated from the original project design. Hence the ERR and FRR, originally calculated at 216% and 144% respectively, would be somewhat lower, but still very much significant. Technical, Social and Environmental 26. Modifications proposed do not alter the social or environmental impact of the project. 27. The proposed changes will not change the environmental category and will not trigger new safeguards policies. 28. The modifications proposed do not require changes in World Bank policies. V. Expected Outcomes 29. The PDO of the TFCP remains to promote economic growth by reducing transaction costs associated with trade and investment, introducing transparency in investment processes, and facilitate access of enterprises to export markets. The components outcome indicators have been somewhat adjusted to reflect changes in design or lessons learned during initial implementation about monitoring and evaluation (Annex 1). VI. Benefits and Risks 3. Benefits of the restructured project would broadly remain as those anticipated in the original project design, at a slower pace but on a more sustainable basis. These include a significant enhancement in the efficacy and efficiency of Cambodia s trade regime. This is a major contributory factor in the RGC s growth and poverty reduction strategies. The relevance of these benefits has become all the more apparent as Cambodia is facing the global economic crisis. A major transmission channel is through exports. In a dollarized economy, with little flexibility for adjustment, trade facilitation is a major instrument for the competitiveness of existing industries and for the gradual diversification of the economic base. 31. The project PDO would continue to face substantial risks following restructuring. The experience so far has confirmed the original risk assessment of substantial risks. The proposed restructuring would somewhat reduce the risks of weak political commitment and resistance to change, since it builds on a technical and institutional solution developed and owned by the RGC during the first phase. The risk of limited technical and project management capacity has 8

10 materialized and will be mitigated in the proposed restructuring by additional support to GDCE to manage the customs automation project. An additional risk relates to the sustainability of the technical solution used for customs automation (in particular to ensure it can be employed as a component of the National Single Window) and the technical capacity to operate this system. Ongoing support through a Multi-Donor Trust Fund on Trade Related Assistance - financed by DANIDA, the EC, and UNIDO and administered by the Bank - will also help mitigate some of the risks through (i) support to institutional capacity development of the Ministry of Commerce; (ii) support to the Ministry of Commerce overall ICT infrastructure and capacity; and (iii) to assist the GDCE to explore long term options for ICT deployment in support of trade facilitation. 32. As originally planned, the restructured project will continue supporting GDCE s efforts to develop and implement its integrity strategy, in support to other projects including the Multi- Donor Trust Fund on Trade Related Assistance. The cost of unofficial fees indeed continues to threaten the achievements of the project objectives. In the context of its response to the economic crisis, the RGC has committed to further streamline these fees and processes to help private sector cope with the difficult external environment and, with resources from the Multi-Donor Trust Fund and building on synergies with the FC, the Bank team is supporting the dialog between the RGC and private sector business associations to diagnose these fees and processes and streamline them. 9

11 Y F: a,.3 4 M os 3 %% m # $8 z f w 3 ai ri L o c d.c e Q) L \9 m N U 3 L 3 u.& B c3 s w m 3 d a

12 8 E d 2 z w a, gg P c" a, gs P O e" w gg P cw m m g m m m 3.. Y d

13 8 B m 'g Y V n V U F ) E 3 3 m z E$ z w U G L 6 z z $.i c,.3 Y E Y I

14 t-- P) - t k a (A m i t t -

15 Annex 2: Proposed reallocation Status of uses of Funds by Disbursement Category as at September 3,29 (in SDR) and Proposed reallocation No Category I I Disbursed as of Allocated (SW Sept 3,9 including advances to UN (SDK) Goods 3,58, Consultants' Services under Part A,B,C.2 and D of 1,3, 455,934 the Project under Part C. 1 of 4, the Project 25,8 Training, I I workshops and incremental operating costs Sub - grants Refunding of Project Preparation Advance Total 9, 1,15, 37, 37, , ,62, 2,612,789 New proposed allocation under restructured project (SDR) 2,834, 1,788, 1,47 1, 82,665 6,62, 94 of expenditures to be financed 1% 1% 125, 1% 319,335 I 1% 1% of subgrants amounts disbursed Amount due pursuant to Section 2.2 (C) of the Grant Agreement 14

16

17 Annex 3: Procurement Arrangements CAMBODIA: TRADE FACILITATION AND COMPETITIVENESS PROJECT A. General 1. Procurement for the Restructured Trade Facilitation and Competiveness Project (TFCP) will be carried out in accordance with the World Bank s Guidelines: Procurement Under IBRD Loans and IDA Credits dated May 24, revised October 26 and Guidelines: Selection and Employment of Consultants by World Bank Borrowers dated May 24, revised October 26. The general description of various items under different expenditure categories is given below. For each contract to be financed by the Project, the procurement methods or consultant selection methods, the need for prequalification or post-qualification, estimated cost, prior review requirements and time frame have been agreed between the Recipient and the International Development Association (IDA) in the Procurement Plan for restructuring. The Procurement Plan will be updated annually or as required to reflect the actual project implementation needs and improvements in institutional capacity. 2. Procurement of Goods: Goods procured under this restructured project would primarily include IT equipment, printed materials, office furniture, and office equipment, as well as further requirements emerging from an information system that is currently under development. Goods estimated to cost the equivalent of US$lOO,OOO or more per contract shall be procured through the International Competitive Bidding (ICB) method; and the procedures set forth in the IDA S Procurement Guidelines and using the IDA S applicable Standard Bidding Documents (SBDs), and Domestic Preference will also be allowed to eligible national bidders. Goods estimated to cost less than US$lOO,OOO equivalent per contract may be procured through the National Competitive Bidding (NCB) method and the procedures set forth in the Sub-Decree 14 on Promulgating of the Standard Procedure for Implementing the World Bank and the Asian Development Bank Assisted Projects dated February 26, 27 and relevant provisions of the Royal Government of Cambodia Externally Assisted Project Procurement Manual for Goods, Works and Services, subject to the improvements listed in the Annex to the Grant Agreement. Goods estimated to cost less than US$2, equivalent per contract may be procured through the Shopping method and the procedures set forth in the aforesaid Sub-Decree and Procurement Manual. The methods of Direct Contracting and Procurement fi-om UN Agencies may be used subject to the circumstances described respectively in paragraphs 3.6 and 3.9 of the Procurement Guidelines. 3. Procurement of Works: No civil work contract is foreseen under this Restructured Project. 4. Selection of Consultants: Consultant services financed through this restructured project are expected in the following areas: Capacity building, Development of the CED IT Support Capacity and IT Strategic Plan, Pilot Private Participation in Infrastructure Projects etc. Services requiring hiring of firms would generally be procured through Quality-and Cost-based Selection (QCBS) method. However, when consultant firms and non-for-profit organizations are expected to be included in the same short-list, and if the value of the contract is estimated to cost US$5, or more, Quality-Based Selection (QBS) method shall be used. For assignments estimated to cost less than US$5, equivalent per contract the method Selection Based on Consultants Qualifications (CQS) may be used, and for external audit assignments the Least Cost Selection Method may be used. Services for tasks under circumstances which meet the requirements of paragraph 3.1 of the Consultant Guidelines may, with the IDA S prior 15

18 agreement, be procured through the Single Source Selection method. Services requiring hiring of individual consultants may be procured in accordance with the provisions of Section V of the Consultant Guidelines, whereas Sole Source Selection of individual consultants may be done only with the IDA S prior agreement and under the circumstances described in paragraph 5.4 of the Consultant Guidelines. Shortlists of consultants for consulting services estimated to cost less than US$lOO,OOO equivalent per contract may be composed entirely of national consultants. 5. EMAF Matching Grant Sub-Grant: Matching Grant i s expected to finance 5 percent of cost of provision of technical assistance to exporters. Some procurement of goods and consulting services have been included in the proposals of some sub-grantees of EMAF. The IDA and the implementing agency agreed that all procurement using the funds from the EMAF s subgrants are required to follow the IDA S Procurement and Consultant Guidelines as stipulated in the Project s Grant Agreement and also in the EMAF Manual. Since the maximum sub-grant amount is only USD25,, there are no large value procurement packages foreseen under the sub-grants, and it is expected that the procurement of goods would comprise of packages less than USD5,OOO per contract which may be procured through Shopping method in accordance with paragraph 3.5 of the Procurement Guidelines, and consultant services are expected to comprise of mainly individual consultants, which may be procured through the individual consultant selection procedures under Section V of the Consultant Guidelines. All the procurement packages under the sub-grants shall be subject to IDA S post review. The IDA informed the implementing agency, Ministry of Commerce (MoC), to keep all relevant procurement documents for the Bank s post review. The procurement arrangement for the sub grant will also be specified in each sub grant agreement. B. Assessment of the agency s capacity to implement procurement 6. The procurement capacity of the implementing agency MOC was assessed by IDA during the original project preparation and procurement risk was determined to be high and it was agreed that a national procurement consultant would be engaged to strengthen the capacity of MoC for carrying out the procurement under the original Project, and the national procurement consultant was subsequently engaged. For the purpose of restructuring, the procurement capacity of MoC was reviewed again to verify its adequacy for carrying out the remaining procurements under the restructured project that fall below the threshold requiring international procurement agent. Currently, there is one government procurement staff assigned to this Project and one national individual procurement consultant was also engaged as the procurement coordinator and they are responsible for assisting MoC in carrying out the procurement and serving as the focal point for coordination and follow-up of procurement activities between MoC s line agencies which have activities financed by the TFCP, and the International Procurement Agent (PA), MEF, and the IDA. Procurement expertise is still very much under-developed in Cambodia and there is a shortage of qualified procurement professionals in the country, including in the private sector where national procurement consultants with adequate slulls and experience in procurement in general and in WE3 procurement procedures in particular, are not readily available. IDA is engaged at a broader level with the Government to encourage the development and implementation of a procurement capacity building program in the country for both the public and private sector, but this is a medium term objective. In the meantime, procurement capacity of project implementing agencies in many cases continues to rely on external support of procurement consultants along with some periodic training of project staff. Some project procurement staff as well as national procurement consultants have moved from one project and organization to another for better prospects and this has adversely affected the implementation and procurement knowledge-transfer of some projects. TFCP also experienced the loss of a national procurement consultant for a period of time before the current national procurement consultant was engaged. The present procurement skills, knowledge and experience of the current 16

19 government staff and also the national procurement consultant under the Project in the application of the IDA S procurement procedures were assessed to be limited and not sufficient for effectively carrying out the remaining procurement under the restructured Project and the procurement capacity of the Project still remains weak. The quality and timeliness of procurement processing can be improved through hrther capacity strengthening to build the procurement knowledge and skills of MOC staff for effectively carrying out the remaining procurement under the restructured procurement in accordance with IDA S procurement procedures, as well as to strengthen procurement management systems as a whole within MOC. 7. The assessment has also taken into consideration of a substantial fiduciary risk associated with the overall weak governance environment in Cambodia which impacts procurement. Specific issues are the general risk of collusion during the bidding process, biased bid evaluations, and supplier/contractor offering informal payments as incentives for favorable treatment. Three IDA-financed projects were suspended and misprocurement declared in 26 after allegations of corruption led to investigations in Cambodia by the IDA Department of Institutional Integrity. However, TFCP was not included in or affected by the fiduciary review and investigation of Following the aforesaid misprocurement, the Borrower proposed and agreed by the IDA to use the International Procurement Agent (PA) for all the IDA-financed projects including this restructuring project and the P A was engaged by the Borrower in December 27. In December 28, the Government and the IDA also agreed to exclude specified small value and simple competitive procurement packages from the PA requirement and to allow these to be procured by the project implementing agencies themselves as it was not practically and economically feasible for these to be procured through the PA. 9. Based on the result of the assessment, the procurement risk under the project was determined to remain High. However, this risk will be mitigated through the wide range of strengthening measures that are being incorporated in the restructure of the Project and Grant Agreements. With the incorporation of the capacity strengthening measures and the extensive requirements for improving governance, including transparency and accountability in the procurement process, as listed in Section F and detailed in the Good Governance Framework (GGF) provided in Annex 4, the residual procurement risk under the Restructured Project is determined to be substantial. C. Procurement Plan 1. The procurement plan, which forms the basis for the procurement methods, has been agreed between the Borrower and IDA and will be available in.the database of the IA. It will also be available in the World Bank s external website. The Procurement Plan will be updated in agreement with the project team at least annually or as required to reflect the actual project implementation needs. The procurement plan for the restructured project is included in this Project Paper-Annex. D. Frequency of Procurement Supervision 11. In addition to the prior review supervision to be carried out by IDA, the procurement capacity assessment of the IA recommends that procurement supervision missions, including expost review, be conducted bi-annually. Furthermore, procurement and financial management staff are expected to conduct joint ex-post procurement reviews and Statement of Expenditure (SOE) reviews in order to broaden the perspective, including checking for compliance with agreed 17

20 procedures, capacity issues, adequacy of documentation and record keeping arrangements, indicators of collusion, and verification of deliverables and end-usage. E. IDA Review Requirement 12. The following contracts will be subject to prior review by IDA: (i) each contract for goods estimated to cost the equivalent of US$lOO,OOO or more; (ii) each contract for goods procured under Direct Contracting and under Procurement from UN Agencies; (iii) each contract for consultants services for employment of a firm estimated to cost the equivalent of US$lOO,OOO or more; (iv) each contract for the employment of individual consultants estimated to cost the equivalent of US$5, or more; (v) each contract involving Single-Source Selection of firms or Sole-Source Selection of individual consultants, irrespective of value; and (vi) the contract for external financial audit provided by a firm procured through Least Cost Selection, irrespective of value. All other contracts shall be subject to ex-post review by IDA. The percentage to apply for contracts subject to ex-post review is 2 percent. F. Agreed Actions to strengthen procurement capacity and mitigate procurement risks Capacity-related Strengthening Measures: 13. The IPA will continue to carry out all procurements under the restructured project, except for procurement through the methods of direct contracting, procurement from UN agencies, single source for consulting firm, selection of individual consultants (regardless of value), hiring of NGOs, and procurement of goods estimated to cost less than $5, per contract. 14. A qualified international procurement consultant experienced in IDA procurement procedures and terms of reference satisfactory to IDA, has been agreed to be engaged by MOC under the Trade Development Support Project (TDSP) and the selection process is at an advance stage and the consultant is expected to be appointed by November 29. This international procurement consultant, who is expected to be hired and contracted with MOC, will also provide part-time procurement support for the restructured TFCP. The services of the international procurement consultant will be used on a part-timehhared basis for the restructured TFCP. The consultant will be responsible for supporting and enabling MOC procurement staff to effectively carry out in accordance with IDA procedures all procurement packages for goods and consulting services falling below the IPA requirement under the restructured Project, from preparation of bidding documents up to signing of contract,. The consultant will also assess and propose measures for strengthening the procurement management system of MOC, including roles, responsibilities and accountabilities of staff involved in procurement, formation of bid evaluation committees, review and approval requirements and associated accountabilities, complaints and disclosure mechanisms, procurement audits and record keeping arrangements, with a view to streamline and strengthen the integrity of the procurement management system. To build capacity of MOC staff, the international procurement consultant will develop and conduct a program for structured and hands-on training, which would also build linkages to the broader procurement capacity building program being initiated under the public financial management program at the country level. 15. It has been agreed that MOC would support capacity building efforts to strengthen the procurement capacity of its staff. These capacity building efforts will be coordinated with the Government-wide Public Finance Management Reform Program (PFMRP). 16. Furthermore, IDA will provide procurement training at least once a year. 18

21 Governance-related Strengthening Measures: 17. In addition to IPA requirement for carrying out the procurement above the specified thresholds and also an international procurement consultant to assist, on a shared basis with TDSP, in carrying out the procurement under TFCP below the IPA thresholds and to build procurement systems and capacity of MOC, a Good Governance Framework (GGF) has been adopted by MOC (Annex 4). The GGF includes various elements for improving transparency and accountability through strengthened procurement arrangements, strengthened financial management, enhanced public disclosure, involvement of civil society, a complaints mechanism, a code of ethnic conduct, sanctions, and by addressing project-specific implementation risks. 18. The Government s Standard Procurement Manual for Externally Financed Projects, including standard bidding documents, which has been agreed by IDA for use in NCB and Shopping procurement under IDA-financed projects in Cambodia will also be applicable under the restructured TFCP. This Manual includes numerous measures for further enhancing competition, transparency and accountability in the procurement process, including defined roles of government staff, integrity pledges, and additional provisions for wider publicity of bidding opportunities and procurement information including contract awards, involvement of beneficiaries, complaints handling and de-briefing requirements, etc. 19. It has been agreed to rationalized thresholds for use of ICB, NCB and Shopping methods. Under the original TFCP, there was no provision for NCB, and as a result ICB was required for procurement of goods exceeding the specified Shopping threshold of US$5, per contract, which was unrealistic for attracting international bidders. This has now been corrected with the revision of the thresholds to also allow use of the NCB method for procurement of goods ranging between US$2,-$1, per contract, and making all the thresholds consistent with the Government s Procurement Manual for Externally Financed Projects and in-line with other Bankfinanced projects in Cambodia. 2. It has also been agreed to expand the scope of ex-post procurement reviews by the Bank to include checks for indicators of collusion and end-use deliveries in addition to verifying procedural compliance, as well as integrated procurement and FM/SOE reviews IDA will carry out at least two supervision missions per year, including ex-post reviews. IDA will also conduct workshop for project agencies staff as well as for private sector suppliers and contractors to disseminate the IDA S procurement procedures with specific attention to the provisions against fraud and corruption. G. Details of the Procurement Arrangements for the Implementation of the Restructured Project 22. Goods and Non Consulting Services (a) List of contract packages to be procured following ICB and direct contracting: 19

22 1 - Ref. No. 2 Contract (Description) Estimated Cost (USD) Procure ment Method 1 Customs Automation Expansion (hardware & software may be split) 1,6, ICB P-Q - No Computers Equipments for CO Automation 2 345, ICB No Processing & TIW (hardware + Maintenance) - IT System 3 Development (Investor 115, ICB Tracking system) 4 Telecommunicati on firm to provide WAN connection for 18 mths & all connections fiber cable No h Review Expected by Contract Bank Signing (Prior I Date Post) Domestic Preferen ce (yesfno) Yes Prior June 1 Yes Yes Prior June 1 Prior Nov. 9 4, ICB No Yes Prior June 1 Comments to be confirmed after completion of preparation of technical specificatio ns Invitation for Bid has been is sued. The bid submission deadline is Oct. 13, Consulting Services (a) List of consulting assignments with short-list of international firms and SSS Review Ref. Description of Estimate Selection by Bank No. Assignment d Method (Prior f cost Post) Design and implement 3 Automation of Certificate of Origin Processing Trade Information 15, 2, QCBS QCBS Prior Prior 6 7 Expected --t--- Contract Comments Signing June 1 I Nov 1 I

23 - 1 2 Ref. No. 4 Description of Assignment Website & Couc hing/training Annual Financial audit for the whole project period Review Expected Estimate d Selection by Bank Contract Comments Method (Prior I Signing cost Post) Date Part of Bundled Audit 33,99 LCS Prior April 1 procured by MEF (TDSP) 21

24 National Competitive Bidding Procedures The procedure to be followed for National Competitive Bidding shall be those set forth in the Sub-decree 14 on Promulgating of the Standard Procedure for Implementing the World Bank and the Asian Development Bank Assisted Programs dated February 26, 27 and relevant provisions of the Royal Government of Cambodia Externally Assisted Program Procurement Manual for Goods, Works and Services with modifications set forth below in order to ensure economy, efficiency and transparency and broad consistency with the provisions of Section I of the Guidelines for Procurement under IBRD Loans and IDA Credits published by the BanWAssociation in May 24 and revised in October 26 (the Guidelines) as required by paragraph 3.3 and 3.4 of the Guidelines. 1. Eligibility The eligibility of bidders shall be as defined under Section I of the Guidelines; accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Association for reasons other than those provided in Section I of the Guidelines. Foreign bidders shall not be asked or required to form joint ventures with national bidders in order to submit a bid. Bidders located in the same province or city as the procuring entity shall not be given preference over bidders located outside that city or province. 2. Qualification Criteria The assessment of the qualification of a bidder shall be conducted separately from the technical and commercial evaluation of the bid and in strict adherence to the qualification criteria that shall be clearly specified in the bidding documents. Such assessment shall only take into account a bidder s capacity and resources to perform the contract, specifically its experience and past performance on similar contracts, capabilities with respect to personnel, equipment and construction and manufacturing facilities, and financial capacity. 3. Bid Submission; Bid Opening and Bid Evaluation The evaluation of a bid shall be made in strict adherence to the criteria that shall, be clearly specified in the bidding documents and quantified in monetary terms for evaluation criteria other than price; merit points shall not be used in bid evaluation. No bidder shall be rejected on the basis of a comparison with the Recipient s estimate and budget ceiling without the Association s prior concurrence. A copy of the minutes of the public bid opening shall be promptly provided to all bidders and to the Association with respect to contracts subject to prior review. Neither shall all bids be rejected nor shall new bids invited without the Association s prior written concurrence. 4. Complaints by Bidders and Handling of Complaints The Recipient shall implement the complaint handling mechanism in accordance with Section 7 of the above mentioned Procurement Manual. 22

Procurement. OP January 2011 Page 1 of 10. Revised July 1, 2014

Procurement. OP January 2011 Page 1 of 10. Revised July 1, 2014 Page 1 of 10 "OP/BP11:00 "Procurement, were revised on July 2014 to take into account the recommendations in " World Bank Group A New Approach to Country Engagement" (R2014-0089), which were approved by

More information

PROJECT APPRAISAL DOCUMENT ON A PROPOSED GRANT IN THE AMOUNT OF US$12.35 MILLION EQUIVALENT TO THE THE GOVERNMENT OF CAMBODIA FOR A

PROJECT APPRAISAL DOCUMENT ON A PROPOSED GRANT IN THE AMOUNT OF US$12.35 MILLION EQUIVALENT TO THE THE GOVERNMENT OF CAMBODIA FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank PROJECT APPRAISAL DOCUMENT ON A PROPOSED GRANT IN THE AMOUNT

More information

Joint Partnership Arrangement

Joint Partnership Arrangement Joint Partnership Arrangement Concerning Common Arrangements for Joint Support to the Health Strategic Plan 2008-2015 between the Royal Government of Cambodia and the 2nd Health Sector Support Program

More information

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7928-MK Public Disclosure Authorized Public Disclosure Authorized Loan Agreement (Real Estate Cadastre and Registration Project Additional Financing)

More information

Implementation Status & Results Cambodia Cambodia Trade Facilitation and Competitiveness (Julian Clark co-ttl) (P089196)

Implementation Status & Results Cambodia Cambodia Trade Facilitation and Competitiveness (Julian Clark co-ttl) (P089196) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cambodia Cambodia Trade Facilitation and Competitiveness (Julian Clark co-ttl) (P089196) Operation

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7888-HR Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Justice Sector Support Project) between REPUBLIC OF CROATIA and

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H732 -AF Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Financial Sector Rapid Response Project) between ISLAMIC

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MDTF GRANT NUMBER TF013825 Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program

More information

Outreach Seminar: Business Opportunities in World Bank-Funded Projects FY 2014

Outreach Seminar: Business Opportunities in World Bank-Funded Projects FY 2014 Outreach Seminar: Business Opportunities in World Bank-Funded Projects FY 2014 Lending, Trends, and Project Development Cycle Data as of Oct 2014 Fiscal Year 2014 = July 1, 2013 to June 30, 2014 339 Operations

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3909 YF Public Disclosure Authorized Development Credit Agreement (Transport Rehabilitation Project) Public Disclosure Authorized between SERBIA

More information

AFRICAN DEVELOPMENT BANK GROUP

AFRICAN DEVELOPMENT BANK GROUP AFRICAN DEVELOPMENT BANK GROUP Rules and Procedures for the Use of Consultants Procurement and Fiduciary Services Department (ORPF) May 2008 Edition TABLE OF CONTENTS I. INTRODUCTION --------------------------------------------------------------------------------

More information

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS)

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) OPERATIONS POLICY AND COUNTRY SERVICES APRIL 2, 2002 FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) CONTENTS Page I. Introduction..1 II.

More information

DOCU MENTS FOFFRCIAL71?

DOCU MENTS FOFFRCIAL71? Public Disclosure Authorized FOFFRCIAL71? DOCU MENTS The.World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD

More information

PROCUREMENT PLAN. Implementing Agency: N/A

PROCUREMENT PLAN. Implementing Agency: N/A PROCUREMENT PLAN Basic Data Project Name: Central Asia Regional Economic Cooperation Corridors 3 and 5 Enhancement Project Project : 46543-002 Approval : 0356 Country: Tajikistan Project Financing Amount:

More information

Multi-Donor Health Results Innovation Trust Fund Grant Agreement

Multi-Donor Health Results Innovation Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS MDTF-HRI GRANT NUMBER TF019258 Public Disclosure Authorized Public Disclosure Authorized Multi-Donor Health Results Innovation Trust Fund Grant Agreement

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4807-UA Public Disclosure Authorized Loan Agreement (Social Assistance System Modernization Project) Public Disclosure Authorized between UKRAINE

More information

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and

Country Practice Area(Lead) Additional Financing Finance, Competitiveness and Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020839 Public Disclosure Authorized Public Disclosure Authorized Project ID P108080 Project Name XK

More information

FINAL PFMRP PROCUREMENT PLAN. Zambia Public Financial Management Reform Program Phase I (P147343)

FINAL PFMRP PROCUREMENT PLAN. Zambia Public Financial Management Reform Program Phase I (P147343) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL PFMRP PROCUREMENT PLAN Zambia Public Financial Management Reform Program Phase I (P147343) 1. General:The project

More information

ACTIVITY COMPLETION SUMMARY (ACS)

ACTIVITY COMPLETION SUMMARY (ACS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized ACTIVITY COMPLETION SUMMARY (ACS) Azerbaijan: Mainstreaming EITI Implementation (ID: P162544) Azerbaijan

More information

Project development objective/outcomes

Project development objective/outcomes Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799

More information

PROCUREMENT IN WORLD BANK INVESTMENT PROJECT FINANCE BORROWER S PROCUREMENT PROCEDURES (DRAFT)

PROCUREMENT IN WORLD BANK INVESTMENT PROJECT FINANCE BORROWER S PROCUREMENT PROCEDURES (DRAFT) PROCUREMENT IN WORLD BANK INVESTMENT PROJECT FINANCE BORROWER S PROCUREMENT PROCEDURES (DRAFT) JULY 8, 2014 Draft Borrower s Procurement Procedures ACRONYMS BAFO BOO BOOT BOT CD CDD CPs CQS DC EOI FA IBRD

More information

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL OCUMENTS CREDIT NUMBER 5152-UZ Public Disclosure Authorized Financing Agreement (Additional Financing for the Second Rural Enterprise Support Project) between Public

More information

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7882-CN Public Disclosure Authorized Loan Agreement (Shandong Ecological Afforestation Project) Public Disclosure Authorized between PEOPLE S REPUBLIC

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Ebola Recovery and Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER: TFOA1023 Public Disclosure Authorized Ebola Recovery and Reconstruction Trust Fund Grant Agreement (LABOR-INTENSIVE PUBLIC WORKS TO MITIGATE

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 59553-KH PROPOSED PROJECT

More information

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC.

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC. Public Disclosure Authorized CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Emergency Recovery Project)

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

WEST BENGAL MAJOR IRRIGATION & FLOOD

WEST BENGAL MAJOR IRRIGATION & FLOOD PROCUREMENT PLAN WEST BENGAL MAJOR IRRIGATION & FLOOD MANAGEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IRRIGATION &

More information

Multi-Donor Trust Fund for Aceh and North Sumatra Grant Agreement

Multi-Donor Trust Fund for Aceh and North Sumatra Grant Agreement Public Disclosure Authorized CONFORMED COPY MDTF GRANT NUMBER TF055353 IND Public Disclosure Authorized Multi-Donor Trust Fund for Aceh and North Sumatra Grant Agreement Public Disclosure Authorized (Reconstruction

More information

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT OFFICIAL DMIUMTS LOAN NUMBER 8131-CN Loan Agreement (Zhanghu Railway Project) between PEOPLE'S REPUBLIC OF CHINA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated 8,2012 LOAN AGREEMENT AGREEMENT

More information

Vietnam: IMF-World Bank Relations *

Vietnam: IMF-World Bank Relations * -1- Vietnam: IMF-World Bank Relations * Partnership in Vietnam s Development Strategy The government of Vietnam s development strategy is set forth in its Comprehensive Poverty Reduction and Growth Strategy

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION

INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H324-KH Public Disclosure Authorized Financing Agreement (Poverty Reduction and Growth Operation) Public Disclosure Authorized between KINGDOM OF

More information

Financing Agreement CREDIT NUMBER 5404-PG CREDIT NUMBER 4931-PG INDEPENDENT STATE OF PAPUA NEW GUINEA INTERNATIONAL DEVELOPMENT ASSOCIATION

Financing Agreement CREDIT NUMBER 5404-PG CREDIT NUMBER 4931-PG INDEPENDENT STATE OF PAPUA NEW GUINEA INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CREDIT NUMBER 5404-PG CREDIT NUMBER 4931-PG Public Disclosure Authorized Financing Agreement (Additional Financing for Road Maintenance and Rehabilitation Project H) (and Amendment

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT ) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Department Southeast Asia Country Management Unit East Asia and

More information

Implementation Support Workshop February 06-10, 2012 Ankara The World Bank

Implementation Support Workshop February 06-10, 2012 Ankara The World Bank REVISION OF PROCUREMENT AND CONSULTANT GUIDELINES January 2011 Implementation Support Workshop February 06-10, 2012 Ankara The World Bank Background The Guidelines have evolved over the years to reflect

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021272 Public Disclosure Authorized Public Disclosure Authorized Operation ID P159774 Country Fiji Operation Name Fiji Post-Cyclone Winston

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

OFFICIALi\At,w. WUMEN4TS 2

OFFICIALi\At,w. WUMEN4TS 2 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIALi\At,w. WUMEN4TS 2 The World Bank 30th Floor, Siam Toer Telephone: (66) 0 26868300

More information

WEST BENGAL MAJOR IRRIGATION & FLOOD

WEST BENGAL MAJOR IRRIGATION & FLOOD PROCUREMENT PLAN WEST BENGAL MAJOR IRRIGATION & FLOOD MANAGEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized IRRIGATION &

More information

CLIMATE INVESTMENT FUNDS

CLIMATE INVESTMENT FUNDS CLIMATE INVESTMENT FUNDS CTF/TFC.1/4 November 03, 2008 First Meeting of the CTF Trust Fund Committee Washington, D.C. November 17-18, 2008 CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES

More information

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II Introduction This Project proposal has been prepared by the HLCM Procurement Network (PN)

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 7971-BY Loan Agreement (Road Upgrading and Modernization Project) between REPUBLIC OF BELARUS and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated November 19, 2010

More information

Dated: 0 VltA r. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Dated: 0 VltA r. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DOCUMENT OFFIClIL The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

New Development Bank Procurement Policy

New Development Bank Procurement Policy New Development Bank Procurement Policy Owner: Operations Division Version: 2015 V4 Revision Date: [10] March 2016 Procurement Policy All rights reserved. Any unauthorized use, duplication or disclosure

More information

Science and Information Resources Division

Science and Information Resources Division MINISTRY OF NATURAL RESOURCES Science and Information Resources Division The mandate of the Ministry of Natural Resources is to achieve the sustainable development of the province s natural resources,

More information

Consolidated Procurement Plan

Consolidated Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Consolidated Procurement Plan 2. Project information: ZIMBABWE The Zimbabwe PFM Enhancement Project responds

More information

Project Costs (US$M):

Project Costs (US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 10/05/2015 Report Number: ICRR14849 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054

Country Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021115 Public Disclosure Authorized Public Disclosure Authorized Project ID P118737 Project Name ENERGY

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment PMR Project Implementation Status Report (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Socialist Republic of Vietnam Reporting Period: From 08/20/2017 to 04/03/2018 Report Date:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT

More information

FSDRP I PROCUREMENT PLAN 2013/2014 October 2, 2013

FSDRP I PROCUREMENT PLAN 2013/2014 October 2, 2013 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. GENERAL 1. PROJECT INFORMATION: FSDRP I PROCUREMENT PLAN 2013/2014 October 2, 2013

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT. Operations Policy and Country Services

PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT. Operations Policy and Country Services PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT These interim guidance notes are intended for internal use by Bank staff to provide a framework to conduct assessments

More information

US$M): US$M): (US$M. Cofinancing (US$M US$M):

US$M): US$M): (US$M. Cofinancing (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14162 1. Project Data: Date Posted : 05/20/2014 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Guideline for strengthened bilateral relations. EEA and Norway Grants

Guideline for strengthened bilateral relations. EEA and Norway Grants Guideline for strengthened bilateral relations EEA and Norway Grants 2009 2014 Adopted by the Financial Mechanism Committee 29.03.2012, amended on 28 January 2016 Contents 1 Purpose of the guideline...

More information

BENIN: COUNTRY FINANCING PARAMETERS

BENIN: COUNTRY FINANCING PARAMETERS BENIN: COUNTRY FINANCING PARAMETERS BENIN: COUNTRY FINANCING PARAMETERS May 5, 2005 Summary 1. This note provides the supporting analysis and background for the country financing parameters under the new

More information

INSTITUTIONAL SUPPORT

INSTITUTIONAL SUPPORT Danish Ministry of Foreign Affairs Danida Road Sector Programme Support Phase 2, 2007-2012 INSTITUTIONAL SUPPORT Reformulated Component Description Document ZAMBIA This report contains restricted information

More information

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3381 IND Public Disclosure Authorized Development Credit Agreement (Provincial Health Project) between REPUBLIC OF INDONESIA and Public Disclosure

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized LOAN NUMBER 4753 -IN Public Disclosure Authorized Loan Agreement (Rural Roads Project) between Public Disclosure Authorized INDIA and INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.07A Page 1 of 4 PROJECT COMPLETION REPORT FOR SOVEREIGN OPERATIONS 1 A. Objective and Scope 1. The main objective of a project completion report (PCR) 1 is to

More information

Program-for-Results Financing 1

Program-for-Results Financing 1 Operational Manual BP 9.00 - Program-for-Results Financing These procedures were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. BP 9.00 February, 2012

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3993 STP Development Credit Agreement (Governance Capacity Building Technical Assistance

More information

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M):

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14437 1. Project Data: Date Posted : 09/22/2014 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and CONFORMED COPY LOAN NUMBER 4674 HR Loan Agreement (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated September

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,300, Original Commitment 30,400,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,300, Original Commitment 30,400, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020110 Public Disclosure Authorized Project ID P107311 Country Mozambique Project Name MZ-Nat'l Dec

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4078-IND Public Disclosure Authorized Development Credit Agreement (Initiatives for Local Governance Reform Project) between Public Disclosure

More information

Sustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda

Sustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda Sustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda Marko Markov, St. John`s, 23 February 2016 1 WHAT IS SIRFF Special Fund established under the EPMA Independent

More information

NCF 7 Project Implementation Manual

NCF 7 Project Implementation Manual NCF 7 Project Implementation Manual November 2017 Table of Contents 1 INTRODUCTION... 4 2 GRANTEES RESPONSIBILITIES... 4 3 PROGRESS REPORTING... 4 3.1 Progress report... 4 3.2 Project completion report...

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2014-2021 Adopted by the EEA Financial Mechanism Committee pursuant to Article 10.5 of Protocol 38c to the EEA Agreement on 8 September 2016 and confirmed

More information

Project Agreement. (Integrated Modern Agriculture Development Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT GANSU PROVINCE

Project Agreement. (Integrated Modern Agriculture Development Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT GANSU PROVINCE Public Disclosure Authorized LOAN NUMBER 8321-CN Public Disclosure Authorized Public Disclosure Authorized Project Agreement (Integrated Modern Agriculture Development Project) between INTERNATIONAL BANK

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Public Disclosure Authorized OFFICIAL~ DOCUMENTS (

Public Disclosure Authorized OFFICIAL~ DOCUMENTS ( Public Disclosure Authorized OFFICIAL~ DOCUMENTS ( Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Trust Fund Administration Agreement between the Royal Norwegian

More information

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2 Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14712 1. Project Data: Date Posted: 06/16/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Clean Technology Fund Loan Agreement

Clean Technology Fund Loan Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS CTF LOAN NUMBER TF016327 Public Disclosure Authorized Clean Technology Fund Loan Agreement Public Disclosure Authorized (Ukraine District Heating Energy

More information

1. Paragraph (D) of the Preamble to the GEF Grant Agreement is deleted and the succeeding paragraph re-numbered accordingly.

1. Paragraph (D) of the Preamble to the GEF Grant Agreement is deleted and the succeeding paragraph re-numbered accordingly. Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL DEVELOPMENT

More information

I. Key development issues and rationale for Bank involvement

I. Key development issues and rationale for Bank involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2491 Project Name Bangladesh Tax Administration Modernization Project Region SOUTH ASIA Sector Other industry (100%) Project ID P083781 Borrower(s)

More information

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and CONFORMED COPY LOAN NUMBER 7716-ME Loan Agreement (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated May

More information

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and Public Disclosure Authorized OFFIAL DOCUMENTS LOAN NUMBER 8229-AM Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Lifeline Road Network Improvement Project) between REPUBLIC OF

More information

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice

Country Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice Public Disclosure Authorized 1. Project Data Report Number : ICRR0021284 Public Disclosure Authorized Public Disclosure Authorized Project ID P111577 Project Name ID-Local Government and Decentralization

More information

PROPOSED FINANCING PRODUCTS, TERMS AND CONDITIONS FOR PUBLIC SECTOR OPERATIONS OF THE CLEAN TECHNOLOGY FUND 1 2

PROPOSED FINANCING PRODUCTS, TERMS AND CONDITIONS FOR PUBLIC SECTOR OPERATIONS OF THE CLEAN TECHNOLOGY FUND 1 2 CIF/DM.1/Inf. 4 February 28, 2008 First Donors Meeting on Climate Investment Funds Paris, March 4-5, 2008 PROPOSED FINANCING PRODUCTS, TERMS AND CONDITIONS FOR PUBLIC SECTOR OPERATIONS OF THE CLEAN TECHNOLOGY

More information

Topics to be covered

Topics to be covered Procurements under World Bank Funded Projects Topics to be covered Brief Introduction of Funding Agencies WORLD BANK ASIAN DEVELOPMENT BANK (ADB) JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) Conditions

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMBODIA EDUCATION SECTOR SUPPORT SCALE UP ACTION PROGRAMME (TF092097)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMBODIA EDUCATION SECTOR SUPPORT SCALE UP ACTION PROGRAMME (TF092097) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING

More information

Financing Agreement. (Environmental and Social Capacity Building for the Energy Sector Project) between THE REPUBLIC OF CAMEROON.

Financing Agreement. (Environmental and Social Capacity Building for the Energy Sector Project) between THE REPUBLIC OF CAMEROON. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4477-CM Public Disclosure Authorized Financing Agreement (Environmental and Social Capacity Building for the Energy Sector Project) Public Disclosure

More information

REPORT 2016/081 INTERNAL AUDIT DIVISION

REPORT 2016/081 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2016/081 Audit of selected subprogrammes and related technical cooperation projects in the Economic and Social Commission for Western Asia Overall results relating to the

More information

Financing Agreement,.

Financing Agreement,. OJFFlo0AL- SOC MEN CREDIT NUMBER 5445-LK Financing Agreement,. (Additional Financing for Dam Safety and Water Resources Planning Project) between DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA and INTERNATIONAL

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT

More information