For personal use only

Size: px
Start display at page:

Download "For personal use only"

Transcription

1 DECEMBER 2011 QUARTERLY REPORT Equatorial Resources Limited ( Equatorial or the Company ) is pleased to present its quarterly report for the period ended 31 December HIGHLIGHTS Drilling continued at Equatorial s 100% owned MayokoMoussondji Iron Project in the Republic of Congo ( ROC ) with a total of 8,849m drilled at the project at 31 December The Company was granted two new Prospecting Authorisations (permits) for iron ore in the ROC. The permits are both contiguous to Equatorial s MayokoMoussondji Iron Project and confirm Equatorial s position as the dominant land holder in the region. A combined team of consultants from SRK and Genivar completed the scoping study phase of the Environmental and Social Impact Assessment ( ESIA ) work at MayokoMoussondji and a detailed Terms of Reference for the full ESIA for submission for approval to the Ministry of Environment, the Ministry of Forestry and the Ministry of Mines. The Company contracted Professor John Clout as Metallurgical Consultant for all its iron ore projects. Professor Clout was Head of Resource Strategy for Fortescue Metals Group between On 11 January 2012 Exxaro made a conditional off market allcash takeover offer for African Iron Limited in which Equatorial owns a 19.81% equity interest. An extensive geological mapping campaign was completed by SRK Consulting at the Company s 100% owned Badondo Iron Project in the ROC. The work lead to the identification of extensive hematite mineralisation up to 50m thick and the definition of numerous high priority drill targets for a scout drilling campaign that will commence at Badondo in the first quarter of MAYOKOMOUSSONDJI IRON PROJECT MayokoMoussondji is located in the southwest region of the ROC and has an estimated global exploration target of between 2.3 and 3.9 billion tonnes¹ of iron mineralisation at an expected grade of 30% to 65% Fe. The project has access to an existing railway line running directly to the deepwater port of PointeNoire, where the Company s administrative office is located. Drilling Program Equatorial s current exploration strategy at MayokoMoussondji is to identify shallow hematite iron mineralisation with the potential to host direct shipping ore ( DSO ). Drilling to date has been focused on the Makengui Prospect at MayokoMoussondji. Makengui is 12km long, up to 2km wide and lies 500m from an existing, operational bulk haulage railway line (see Figure 1 overleaf). 1 Exploration Target: The estimates of exploration target sizes mentioned in this announcement should not be misunderstood or misconstrued as estimates of Mineral Resources. The potential quantity and grade of the exploration targets are conceptual in nature and there has been insufficient exploration to define a Mineral Resource in accordance with the JORC Code (2004) guidelines. Furthermore, it is uncertain if further exploration will result in the determination of a Mineral Resource. Equatorial Resources Limited Level 2, BGC Centre, 28 The Esplanade, Perth, WA, Australia 6000 Phone: Fax: ABN

2 Figure 1: Drill Hole Location Plan Diamond drilling commenced at Makengui in April 2011 with one diamond drill rig contracted by Partners Drilling International ( PDI ) and has recently been accelerated with the addition of two further drill rigs (one multipurpose reverse circulation ( RC ) and diamond drill rig and one specialist diamond drill rig) contracted by Wallis Drilling Pty Limited ( Wallis ). Equatorial has contracted SGS Mineral Services ( SGS ) to provide assay services to the Company and to procure and run an onsite sample preparation laboratory at MayokoMoussondji. The laboratory, which has arrived at the Pointe Noire port, will be the first of its kind in the Mayoko region and is expected to become operational during the March 2012 quarter. The current drilling program at Makengui will comprise approximately 33,000 metres of drilling and is expected to be completed during The program is designed to define the extent and grade of the hematite and magnetite mineralisation at Makengui with specific focus on the potential for high grade DSO material. Makengui is over 12km long and is one of five main prospects at MayokoMoussondji that total over 46km of identified iron strike. As at the end of December 2011 a total of 8,849 metres of diamond and RC drilling in 54 holes had been completed over a section of Makengui of approximately 5km in length. Drilling progress in the December 2011 quarter was hampered by a 5 week labour dispute and wet weather, however the drilling that was completed identified extensive hematite mineralisation in the eastern part of Makengui. Due to a shutdown of the assay laboratory, assay results from this drilling are still pending. Geophysical Surveys Planning for a ground resistivity and magnetics program was completed, which is scheduled for February The initial program will consist of 6 traverses across the Makengui prospect and is designed to aid the targeting of drill holes into the more prospective areas of hematite mineralisation. The resistivity method has proved very successful at the Zanaga iron ore project in the ROC, which has very similar mineralisation to Mayoko. 2

3 If the trial is successful, a full survey of 800m spaced traverses will immediately follow the trial survey over the entire Makengui prospect. Metallurgical Program Highly experienced iron ore consultant Dr John Clout has been engaged as a Metallurgical Consultant. The Principal of John Clout and Associates, Dr Clout has over 19 years of experience in iron ore characterisation, beneficiation, process plant flowsheet design, sintering, lump quality for the blast furnace, pelletising as well as iron ore technical marketing. Dr Clout has worked for the CSIRO conducting industryfocused projects and more recently played a leading role in the development of Fortescue Metals Group as Head of Resource Strategy and General Manager R & D. Dr Clout is well known to many steel mills in Asia and elsewhere, particularly in China where he has had a heavy involvement in iron ore product and sintering technology development over the last 19 years. Dr Clout was awarded the Australian Technological Sciences and Engineering Clunies Ross award in May 2011 for his major contribution over the years to the Australian Iron Ore Industry. Davis Tube Recovery testing of an initial batch of 33 composite magnetite samples from the Makengui prospect has commenced at SGS Lakefield Oretest ( SGS Lakefield ) in Perth Australia, with results expected early in the March 2012 quarter. Testing has also commenced on a batch of 3 bulk samples of colluvial hematite mineralisation from the Makengui prospect at SGS Lakefield, with initial results expected early in the March 2012 quarter. A large diameter metallurgical diamond drill hole is planned for completion at the Makengui prospect in January This hole will collect in situ hematite mineralisation for initial beneficiation testing at SGS Lakefield. Infrastructure Progress During the quarter the company continued development of infrastructure for the Mayoko project as follows: Construction of a log bridge over a river at Makengui; Completion of access roads to drill sites on the eastern side of Makengui; Repairs to public roads and bridges in the Mayoko district; Construction of a mess building, two houses and first aid post at the Mayoko base camp; The Wallis Drilling workshop was completed at the new DibaDiba infrastructure site; An alternative bridge site for crossing the Loesse River was identified, involving a shorter distance from DibaDiba and a narrower river crossing; and A suitable laterite source was identified for the sheeting of the Mayoko airstrip and hiring of construction equipment for the completion of the airstrip upgrade was finalised. New Tenements The Company, through its 100% owned ROC subsidiary, Congo Mining Ltd, has been granted two new Prospecting Authorisations for iron ore in the ROC. The Oubouéssé Prospecting Authorisation of 1,218km 2 and the Moussondji Prospecting Authorisation of 1,481km 2 are both contiguous to MayokoMoussondji.and increase the Company s landholding in the prospective Mayoko region to over 4,500km 2. An initial reconnaissance exploration program of geological mapping and rock chip sampling is scheduled to commence on both tenements in February 2012 (refer Figure 2 overleaf and ASX announcement dated 8 December 2011 for details). 3

4 BADONDO IRON PROJECT Figure 2: Mayoko Region Permit Location Map The Badondo Iron Project, in the northwest region of ROC, has an estimated global exploration target of between 1.3 and 2.2 billion tonnes¹ of iron mineralisation at a grade of 30% to 65% Fe (refer ASX announcement 28 March 2011). The project is located within a regional cluster of worldclass iron ore exploration projects including Sundance Resources Ltd s (ASX:SDL) Mbalam and Nabeba projects. Figure 3: Equatorial Resources Project Location Plan Figure 4: Badondo Iron Project location 1 Exploration Target: The estimates of exploration target sizes mentioned in this announcement should not be misunderstood or misconstrued as estimates of Mineral Resources. The potential quantity and grade of the exploration targets are conceptual in nature and there has been insufficient exploration to define a Mineral Resource in accordance with the JORC Code (2004) guidelines. Furthermore, it is uncertain if further exploration will result in the determination of a Mineral Resource. 4

5 Figure 5: Badondo Iron Project Exploration Target SRK Mapping During November 2011, SRK Consulting (Perth) completed geological and structural mapping of the Badondo and Belinga North prospects. This mapping identified an extensive blanket of potentially high grade hematite mineralisation up to 50m thick in outcrop overlying magnetite banded iron formation ( BIF ), extending over the entire 7km strike length of the Badondo prospect and over 4km of strike at the Belinga prospect. In addition, extensive canga deposits of recemented colluvial hematite mineralisation were identified at the Badondo prospect. As part of the mapping exercise, SRK have identified 21 high priority drill targets at the Badondo prospect that will be the focus of the maiden drilling campaign. Maiden Drilling Campaign During the quarter Equatorial finalised the acquisition of a 2100 helicopter transportable drill rig from EVH Drill Engineering Pty Ltd in Perth, Australia for use during the Company s maiden drilling campaign at Badondo. Construction of the drill rig has now been completed in Australia. The rig will be operated by Wallis Drilling and will be shipped to Badondo after extensive field trials in Australia, with drilling expected to commence in the coming months. 1 Exploration Target: The estimates of exploration target sizes mentioned in this announcement should not be misunderstood or misconstrued as estimates of Mineral Resources. The potential quantity and grade of the exploration targets are conceptual in nature and there has been insufficient exploration to define a Mineral Resource in accordance with the JORC Code (2004) guidelines. Furthermore, it is uncertain if further exploration will result in the determination of a Mineral Resource. 5

6 ENVIRONMENT & COMMUNITY RELATIONS Completion of Environmental Scoping and Baseline Studies Equatorial is committed to the highest global standards of social responsibility and sustainable development. The Company submitted its Sustainable Development Charter to the ROC Government in December 2010 and has been working closely with the Ministry of Mines, Ministry of Forestry, the Ministry of Sustainable Development, Economic Forestry and Environment, departmental authorities in Dolisie (or Niari region) as well as local community leaders and companies to ensure stakeholders are aware and supportive of the Company s development plans and that operations are carried out with transparency and respect for the various stakeholder needs. Equatorial has partnered with local environmental consulting firm EcoDurable to carry out environmental monitoring and management during exploration, with permanent representatives now active on site at Mayoko. The Company awarded a tender to a joint bid by SRK Consulting (UK) Ltd ( SRK ) and Genivar, including Ecodurable, for Scoping studies for the ESIA for the proposed mining project in the coming months. During early October 2011, the consultant team conducted a 10 day Site Visit, including the proposed port site, rail corridor and mine site, that lead to the preparation of a Stakeholder Engagement Plan and the ESIA Scoping Report. In addition to these key documents, the team prepared detailed Terms of Reference for the full environmental and social Baseline which will be submitted to the ROC Government for approval in early Prior to submission, the Terms of Reference were disclosed and discussed with stakeholders through a public consultation process in December 2011, to ensure that all relevant issues of concern were included in the Baseline studies. Detailed Baseline studies will commence as soon as the Terms of Reference are approved by the Government. CORPORATE Exxaro makes all cash takeover bid for African Iron Limited On 11 January 2012, Exxaro announced a conditional all cash offmarket takeover bid for all of African Iron Limited ( African Iron ) ordinary shares and options. Exxaro is offering A$0.51 per share, which will be increased to A$0.57 per share if Exxaro acquires at least 75% of African Iron (on a fully diluted basis).the offer at the increased consideration price of A$0.57 per share values African Iron at approximately A$338 million on a fully diluted basis. The offer will be open until 14 February 2012 (unless extended). Equatorial owns 99,400,000 shares (19.81%) in African Iron. Based on the maximum cash offer price of A$0.57 per African Iron share, Equatorial s investment in African Iron would be valued at A$56.7 million. Exxaro is one of South Africa s largest diversified mining companies with a current market capitalisation of approximately A$7.7 billion. Exarro s announced takeover offer for African Iron confirms the significant exploration and development potential of iron projects in the Mayoko region and highlights the advantages of the investment friendly jurisdiction of the ROC. Equatorial welcomes Exxaro s interest in the Mayoko region. Cash Position and Shareholder Information As at 31 December 2011 the Company had cash reserves of over A$41 million. The Company is in a strong position with no debt and combined cash and listed securities of over A$98 million (based on Exxaro s maximum cash offer price of A$0.57 per share). As at 31 December 2011 the Company had 1,767 shareholders and 114,348,553 ordinary fully paid shares on issue with the top 20 shareholders holding 77.6% of the total issued capital. 6

7 Management Appointments Equatorial has made several new senior management appointments including: Mr Henri de Dinechin has been appointed as Equatorial s Country Manager in the ROC and will be responsible for all of the Company s incountry activity including finance, logistics, human resources, operations, and government relations. Mr de Dinechin s previous position was Chairman and Chief Executive Officer of AREVA in the Central African Republic ( CAR ). In this role he controlled all aspects of AREVA s business in CAR including managing over 250 employees and overseeing annual budgets of more than $35M. His exploration teams completed an average of 60,000 meters per year of RC and Diamond Drilling and successfully doubled the size of the geological resources. Mr de Dinechin has extensive commercial management experience in Africa (Zambia, Kenya, ROC, Mali, Ghana, Central Africa) and has a Master s degree in Business & Administration. Professor John Clout has been appointed as Chief Metallurgical Consultant. Professor Clout will be responsible for overseeing the Company s metallurgical test work and technical marketing. Professor Clout was previously Head of Resource Strategy for Fortescue Metals Group Ltd where he was directly responsible for the design of the Rocket fines and Special Fines products with more than 110Mt of these materials now exported to customers. Professor Clout will define the scope, schedule, budget and deliverables for the staged metallurgical testwork programs for hematite and magnetite mineralisation at MayokoMoussondji. He will be Equatorial s Competent Person for of all metallurgical testwork results. Mr Ian Cooper has been appointed as Exploration Manager of Equatorial s 100% owned Mayoko Moussondji Iron Project and will be responsible for the management of the Company s exploration drilling programs. Mr Cooper has over 25 year's professional experience as an Exploration Manager and Geologist. Prior to joining Equatorial Mr Cooper was the District Geologist Mainland Papua New Guinea with Barrick and previously Exploration Manager at AngloGold Ashanti s Sadiola & Yatela gold operations in Mali where in 2010 he successfully completed over 200,000 metres of drilling under budget. He has worldwide experience in a number of commodities including iron ore, gold, base metals, and industrial minerals. Mr Thierry Banyols has been appointed as Logistics Manager. Mr Banyols was previoulsy at AREVA in CAR where he worked as Logistics Manager for the past 4 years. At AREVA Thierry was responsible for the purchasing (locally and off shore), importation and transport activities between the companies head office and its exploration camp in Bakouma for all of AREVA s operations. Thierry has over 30 years of logistics management experience in Africa including 10 years in ROC. Mr Andrew Steers has been appointed as Chief Financial Offer following the resignation of Mr Brendan Morton. Prior to joining Equatorial, Andrew was the CFO (and for a period of time the acting CEO) of ASX listed multi commodity explorer and iron ore producer, IMX Resources Limited. During 2009 Andrew was part of the Executive team responsible for the C$665million merger of Moto Goldmines Limited (with its significant gold exploration project in the Democratic Republic of Congo) and Randgold Resources. Andrew brings a balanced commercial, financial and corporate resume, with particular exposure to international mining projects in the African region. Change in Registered Office The Company s Principal and Registered Office is now located at: Level 2 28 The Esplanade Perth WA 6000 Postal Address: GPO Box 2519 Perth WA 6001 Telephone number: Facsimile number:

8 For all enquiries please contact: John Welborn Managing Director & CEO Telephone: info@equatorialresources.com.au Web: 8

9 ABOUT EQUATORIAL RESOURCES Equatorial Resources Limited (ASX:EQX), is focused on the exploration and development of two 100% owned potentially largescale iron ore projects located in the politically stable and investment friendly Republic of Congo ( ROC ) in the emerging global iron ore province of Central West Africa. The MayokoMoussondji Iron Project, located in the southwest region of the ROC, has an estimated global exploration target of between 2.3 and 3.9 billion tonnes 1 of iron mineralisation at a grade of 30% to 65% Fe. The project has access to a rail line running directly to the deepwater port of PointeNoire, where the Company s operational office is located. The Badondo Iron Project, in the northwest region of ROC, has an estimated global exploration target of between 1.3 and 2.2 billion tonnes 1 of iron mineralisation at a grade of 30% to 65% Fe. The project is located within a regional cluster of worldclass iron ore exploration projects including Sundance Resources Mbalam and Nabeba projects. For further information contact: John Welborn Managing Director & CEO Telephone: info@equatorialresources.com.au Web: 1 Exploration Target: The estimates of exploration target sizes mentioned in this announcement should not be misunderstood or misconstrued as estimates of Mineral Resources. The potential quantity and grade of the exploration targets are conceptual in nature and there has been insufficient exploration to define a Mineral Resource in accordance with the JORC Code (2004) guidelines. Furthermore, it is uncertain if further exploration will result in the determination of a Mineral Resource. The information in this announcement that relates to Geophysical Exploration Results is based on information compiled by Mr Mathew Cooper (B.App.Sc (Geophysics) Hons.) of Resource Potentials Pty Ltd, who was engaged by Equatorial Resources Limited to provide geophysical consulting services. Mr Cooper is a member of The Australian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cooper consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this report that relates to Exploration Results, other than Geophysical Exploration Results, is based on information compiled by Mr Sean Halpin, who is a member of the Australian Institute of Geoscientists. Mr Halpin is a full time employee of Equatorial Resources Limited. Mr Halpin has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Halpin consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 9

10 Appendix 5B Mining exploration entity quarterly report Appendix 5B Rule 5.3 Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Equatorial Resources Limited ABN Quarter ended ( current quarter ) December 2011 Consolidated statement of cash flows Cash flows related to operating activities 1.1 Receipts from product sales and related debtors Current quarter $A 000 Year to date (6 months) $A Payments for: (a) exploration & evaluation (b) development (c) production (d) administration (6,269) (1,622) (10,111) (3,217) 1.3 Dividends received 1.4 Interest and other items of a similar nature received 914 1, Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other (provide details if material) Business development (12) (25) Net Operating Cash Flows (6,989) (11,851) Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (805) (517) (1,405) (2,141) (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) Net investing cash flows (1,322) (3,546) 1.13 Total operating and investing cash flows (carried forward) (8,311) (15,397) + See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 1

11 Appendix 5B Mining exploration entity quarterly report 1.13 Total operating and investing cash flows (brought forward) (8,311) (15,397) Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (provide details if material): Capital raising expenses (1) (36) Net financing cash flows Net increase (decrease) in cash held (7,912) (14,891) 1.20 Cash at beginning of quarter/year to date 49,319 56, Exchange rate adjustments to item 1.20 (30) Cash at end of quarter 41,377 41,377 Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities Current quarter $A' Aggregate amount of payments to the parties included in item Aggregate amount of loans to the parties included in item Explanation necessary for an understanding of the transactions Payments include directors fees, superannuation, company secretarial services and provision of a fully serviced office. Noncash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows Not applicable 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest Not applicable + See chapter 19 for defined terms. Appendix 5B Page 2 30/9/2001

12 Appendix 5B Mining exploration entity quarterly report Financing facilities available Add notes as necessary for an understanding of the position. Amount available Amount used $A 000 $A Loan facilities 3.2 Credit standby arrangements Estimated cash outflows for next quarter $A Exploration and evaluation 7, Development 4.3 Production 4.4 Administration 1,360 Total 8,759 Reconciliation of cash Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. Current quarter $A 000 Previous quarter $A Cash on hand and at bank 2,555 3, Deposits at call 38,822 45, Bank overdraft 5.4 Other (provide details) Total: cash at end of quarter (item 1.22) 41,377 49,319 Changes in interests in mining tenements 6.1 Interests in mining tenements relinquished, reduced or lapsed Tenement reference Not applicable Nature of interest (note (2)) Interest at beginning of quarter Interest at end of quarter 6.2 Interests in mining tenements acquired or increased Not applicable + See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 3

13 Appendix 5B Mining exploration entity quarterly report Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. Total number Number quoted Issue price per security (see note 3) Amount paid up per security (see note 3) 7.1 Preference + securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buybacks, redemptions Ordinary securities 114,348, ,348,553 N/A N/A 7.4 Changes during quarter (a) Increases through issues 800, , , ,000 $0.25 $0.40 $0.25 $0.40 (b) Decreases through returns of capital, buybacks Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options (description and conversion factor) 100, , , ,000 1,500,000 3,400,000 3,900, , Issued during quarter 7.9 Exercised during quarter 800, , Expired during quarter Exercise price $2.835 $2.00 $3.00 $4.00 $0.25 $0.40 $0.60 $0.82 $0.25 $0.40 Expiry date 31 Dec Jul Jul Jul Jun Jun Dec Oct 2012 $0.25 $ Debentures (totals only) 7.12 Unsecured notes (totals only) + See chapter 19 for defined terms. Appendix 5B Page 4 30/9/2001

14 Appendix 5B Mining exploration entity quarterly report Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4). 2 This statement does /does not* (delete one) give a true and fair view of the matters disclosed. Sign here:... Date: 31 January 2012 (Director/Company secretary) Print name: Greg Swan Notes 1 The quarterly report provides a basis for informing the market how the entity s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. == == == == == + See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 5

For personal use only

For personal use only MARCH 2011 QUARTERLY REPORT Equatorial Resources Limited ( Equatorial or the Company ) is pleased to present its quarterly report for the period ended 31 March 2011. HIGHLIGHTS Drilling commenced at the

More information

EXXARO MAKES ALL CASH TAKEOVER BID FOR AFRICAN IRON LIMITED

EXXARO MAKES ALL CASH TAKEOVER BID FOR AFRICAN IRON LIMITED ASX: EQX 11 January 2012 ASX RELEASE EXXARO MAKES ALL CASH TAKEOVER BID FOR AFRICAN IRON LIMITED Equatorial Resources Limited ( Equatorial or Company ) (ASX:EQX) notes the announcement released today (refer

More information

JUNE 2014 QUARTERLY REPORT

JUNE 2014 QUARTERLY REPORT JUNE 2014 QUARTERLY REPORT ASX: EQX 31 JULY 2014 ASX RELEASE HIGHLIGHTS MayokoMoussondji Iron Project Progression of the PreFeasibility Study being prepared by WorleyParsons and Orelogy. The PreFeasibility

More information

QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2012

QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2012 QUARTERLY ACTIVITIES REPORT For the Quarter ended 31 March 2012 Liontown Resources Limited ABN 39 118 153 825 HIGHLIGHTS Jubilee Reef Joint Venture Project (Northern Tanzania) 7,000 metre drilling program

More information

Quarterly Report Period to 31 March 2014

Quarterly Report Period to 31 March 2014 ASX Release 30 April 2014 HIGHLIGHTS Quarterly Report Period to 31 March 2014 New Madagascar Prime Minister, Mr Roger Kolo. Submission process of the ESIA started. Environmental Social Impact Assessment

More information

Consolidated Tin Mines Limited

Consolidated Tin Mines Limited Snapshot: Registered Office: 395 Lake Street, Cairns North, QLD, 4870 Ph: (07) 4032 3319 Current CSD Share Price: $0.08 Current LME Tin Price: $28,775 Detailed information at www.csdtin.com.au JUNE QUARTER

More information

For personal use only

For personal use only 31st March 2013 Quarterly Report March 2012 Forte Energy NL ( Forte Energy or the Company ) (ASX/AIM: FTE) is an emerging international uranium company focused on the exploration and development of a portfolio

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 30 June 2012 SUMMARY High grade gold intersected in aircore drilling programme at Four Eagles Gold Project. Very high grade gold mineralisation in diamond

More information

ASX Release ASX Code: RLC

ASX Release ASX Code: RLC Reedy Lagoon Corporation Limited ABN 41 006 639 514 ASX Release ASX Code: RLC 29 January 2016 Quarterly Report for the period ended 31 December 2015 HIGHLIGHTS Cassilis gold project assessment for acquisition

More information

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2009 HIGHLIGHTS

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2009 HIGHLIGHTS 45 Ventnor Avenue, West Perth WA 6005 PO Box 829, West Perth WA 6872 (08) 9389 4450 Fax: (08) 9389 4400 0418 928 180 wayne@eagleeyemetals.com ABN 11 113 931 105 30 October 2009 The Company Announcements

More information

For personal use only

For personal use only Quarterly Report & Appendix 5B Exalt Resources Ltd 31 December 2014 Exploration General The Company has continued to explore opportunities for the quarter ended 31 December 2014. In particular, the Company

More information

For personal use only

For personal use only 29 July 2016 QUARTERLY REPORT For the Period Ending 30 June 2016 Redstone Resources Limited (ASX Code: RDS) ( Redstone or the Company ) presents its quarterly report for the period ending 30 June 2016

More information

Appendix 5B. Quarter ended ( current quarter ) December Receipts from product sales and related debtors - -

Appendix 5B. Quarter ended ( current quarter ) December Receipts from product sales and related debtors - - Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10. Name of entity

More information

Quarterly activities report For Qtr ended 30 June 2013 OPERATIONS

Quarterly activities report For Qtr ended 30 June 2013 OPERATIONS Quarterly activities report For Qtr ended 30 June 2013 ASX:AWV Anova Metals Limited ABN 20 147 678 779 OPERATIONS 26 July 2013 Directors Jon Parker Chairman & NED Tim Dobson Managing Director Bill Fry

More information

Mining exploration entity quarterly report

Mining exploration entity quarterly report Appendix 5B Mining exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Predictive Discovery Ltd ABN 11 127

More information

Appendix 5B. Brazilian Metals Group Limited. Quarter ended ( current quarter ) March 2011

Appendix 5B. Brazilian Metals Group Limited. Quarter ended ( current quarter ) March 2011 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Brazilian

More information

Appendix 5B. Quarter ended ( current quarter ) June 2011

Appendix 5B. Quarter ended ( current quarter ) June 2011 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity AusNiCo Limited

More information

Quarterly Activities Report For the three months ending 30 June 2013 HIGHLIGHTS

Quarterly Activities Report For the three months ending 30 June 2013 HIGHLIGHTS Aeon Metals Ltd (formerly Aussie Q Resources Limited) ABN 91 121 964 725 Level 3, Suite 11, 88 Pitt St, Sydney NSW 2000, Australia PO Box 8155, Gold Coast MC Qld 9726, Australia P: 61 7 5574 3830 F: 61

More information

CORPORATE PRESENTATION. Enclosed is the corporate presentation David Sumich delivered at the Africa Down Under conference in Perth this week.

CORPORATE PRESENTATION. Enclosed is the corporate presentation David Sumich delivered at the Africa Down Under conference in Perth this week. 4 September 2009 ASX Code: DMM Company Announcements Office ASX Limited Exchange Centre 20 Bridge Street SYDNEY NSW 2000 Via e lodgement CORPORATE PRESENTATION Enclosed is the corporate presentation David

More information

For personal use only

For personal use only Top End Minerals Ltd 31 January 2013 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2012 Top End Minerals

More information

Quarterly Report for the Period Ended 31 December 2013

Quarterly Report for the Period Ended 31 December 2013 ABN 63 124 706 449 Address: Postal: Phone: Fax: Email: Level 1, 95 Canning Highway South Perth, WA 6151, Australia PO Box 6731, East Perth WA 6892, Australia 61 8 9221 6813 61 8 9474 9304 admin@nexmetals.com

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2011

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2011 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity BERKELEY RESOURCES

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

Strengthening of board with the appointment of Dr Allan Trench as a Non-executive Director

Strengthening of board with the appointment of Dr Allan Trench as a Non-executive Director Highlights Corporate Strengthening of board with the appointment of Dr Allan Trench as a Non-executive Director Land Acquisition Substantial increase to Productora uranium-copper-gold project with the

More information

Quarterly Report. For the Quarter ended 31 December Highlights ASX ANNOUNCEMENT. We find it. We prove it. We make it possible. 25 JAN.

Quarterly Report. For the Quarter ended 31 December Highlights ASX ANNOUNCEMENT. We find it. We prove it. We make it possible. 25 JAN. ASX ANNOUNCEMENT We find it. We prove it. We make it possible. ABN : 63 095 117 981 ASX : CAP 25 JAN. 2016 ABOUT CARPENTARIA: Carpentaria is an emerging producer of iron ore in eastern Australia. The company

More information

Appendix 5B. Mining exploration entity quarterly report

Appendix 5B. Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 1/6/10, 17/12/10 Rule 5.3 SOUTHERN CROSS EXPLORATION N.L. QUARTER ENDED ("Current Quarter") : 31st MARCH 2016 Consolidated Statement

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 30 September 2013 SUMMARY Data review confirms shallow gold potential beneath Hayanmi and Boyd s Dam Prospects at Four Eagles Gold Project 2014 drilling

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 14 AUGUST 2015 APOLLO FINALISES JV AND COMMENCES DRILLING AT KANGO NORTH IRON PROJECT, WEST AFRICA HIGHLIGHTS Apollo has finalised an earn-in joint venture with a diversified middle eastern

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 31 December 2015 SUMMARY January 2016 drilling and gravity geophysical programme finalised for Four Eagles Joint Venture Up to 24,000 metres of Aircore

More information

Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2012

Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2012 Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity ASCOT RESOURCES LIMITED ABN Quarter ended ( current ) 85 146 530 378 31

More information

Appendix 5B. Quarter ended ( current quarter ) September Receipts from product sales and related debtors - -

Appendix 5B. Quarter ended ( current quarter ) September Receipts from product sales and related debtors - - Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity REGALPOINT

More information

For personal use only

For personal use only ASX QUARTERLY REPORT MARCH 216 Quarterly Report March 216 Highlights 29 April 216 Maiden JORC resource of 131.1Mt @7.9% TGC at the Mahenge Project including 37.6Mt @1.2% TGC or 16.7Mt@ 11.1% TGC Largest

More information

QUARTERLY ACTIVITIES REPORT For the period ended 30 September 2015

QUARTERLY ACTIVITIES REPORT For the period ended 30 September 2015 30 October 2015 QUARTERLY ACTIVITIES REPORT For the period ended 30 September 2015 COMPANY OVERVIEW Regalpoint Resources Limited was formed to use the best available science to explore the Australian continent

More information

For personal use only

For personal use only Mount Magnet South NL ABN 93 096 635 246 Quarterly Activities & Cashflow Report 30 September 2011 Summary Upgraded Mineral Resource Estimate at Kirkalocka finalised increasing Indicated category by 13%

More information

(Incorporated and registered in Australia and registered as an external company in the Republic of South Africa)

(Incorporated and registered in Australia and registered as an external company in the Republic of South Africa) Ferrum Crescent Limited (Previously Washington Resources Limited) (Incorporated and registered in Australia and registered as an external company in the Republic of South Africa) (Registration number A.C.N.

More information

For personal use only

For personal use only (Formerly Fission Energy Ltd) ACN 119 057 457 ASX QUARTERLY REPORT FOR PERIOD ENDED 30 TH JUNE 2013 Mt Thirsty Cobalt Nickel Oxide Project positive results continue Highlights Further metallurgical test

More information

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

For personal use only

For personal use only Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity

More information

RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER

RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER Activities Report Quarter Ended 30 September 2010 21 October 2010 Company Announcements Office ASX Limited RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2010 As part of its expansion

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: IVG Date: 29 July 2011 Number: 013/290711 JUNE 2011 QUARTERLY REPORT SUMMARY Market Cap A$3.78 m ($0.105 p/s) Issued Capital 36,000,006 First pass and infill soil geochemistry surveys

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2009

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2009 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity Axiom Mining Ltd ARBN

More information

Argent Minerals Limited

Argent Minerals Limited ASX ANNOUNCEMENT 28 January 2010 QUARTERLY ACTIVITIES REPORT FOR QUARTER ENDED 31 st DECEMBER 2009 HIGHLIGHTS Kempfield Scoping Study The Scoping Study into the Kempfield silver project is expected to

More information

For personal use only

For personal use only Mining exploration entity ly report Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Australian

More information

For personal use only

For personal use only ASX: CYL Quarterly Activities Report Quarter ended 31 March 2015 SUMMARY Catalyst secures up to $4.2 million private funding for Four Eagles Gold Project Four Eagles Gold Project tenement EL4525 renewed

More information

Scoping study (assuming toll milling) estimates $A24M (US$17M) operating surplus

Scoping study (assuming toll milling) estimates $A24M (US$17M) operating surplus 30 th April 2009 March December 2009 Quarterly Quarterly Report Report 2008 Highlights Akoko Project 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Pit optimisation

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity

Appendix 5B. Mining exploration entity and oil and gas exploration entity Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

For personal use only

For personal use only ASX Announcement 31 January 2013 QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE PERIOD ENDING 31 DECEMBER 2012 Kaboko Mining Limited ( Kaboko or the Company ) the manganese exploration, development

More information

For personal use only

For personal use only European Metals Holdings Limited ARBN 154 618 989 Level 4, 66 Kings Park Road West Perth WA 6005 PO Box 52 West Perth WA 6872 Phone + 61 8 6141 3500 Fax + 61 6141 3599 Website: www.europeanmet.com Directors

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 30 September 2011 SUMMARY Drilling due to commence on Four Eagles Gold Project before the end of October 2011 after no drilling activity during the September

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 MARCH 2015

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 MARCH 2015 Canyon Resources Limited ACN 140 087 261 353 Rokeby Road Subiaco WA 6008 www.canyonresources.com.au 30 April 2015 ACTIVITIES REPORT FOR THE QUARTER ENDED 31 MARCH 2015 HIGHLIGHTS: Completed exploration

More information

Mining exploration entity and oil and gas exploration entity quarterly report

Mining exploration entity and oil and gas exploration entity quarterly report Rule 5.5 Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name

More information

For personal use only

For personal use only Quarterly Report FOR PERIOD ENDING 30 SEPTEMBER 2013 ASX Code: FAS Contact Details Unit 3, 136 Main Street, Osborne Park WA 6017 PO Box 1520 Osborne Park WA 6916 T: 08 9242 5111 F: 08 9242 5677 E: admin@fairstarresources.com

More information

Haoma Mining NL A.B.N

Haoma Mining NL A.B.N Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: 411 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250

More information

June 2016 Quarterly Report

June 2016 Quarterly Report 29 July 2016 June 2016 Quarterly Report GUNUNG ROSA HIGH GRADE GOLD, SILVER AND BASE METAL PROJECT WEST JAVA PROVINCE, INDONESIA Map 1: The Gunung Rosa IUP is located in Indonesia s West Java Province,

More information

For personal use only

For personal use only Quarterly Activities Report - period ending April 2012 Havilah Resources (ASX: HAV) Havilah Resources NL aims to become a significant new producer of copper, gold, cobalt and molybdenum from its 100% owned

More information

Quarterly Activities Report For the three months ending 30 September 2013 HIGHLIGHTS

Quarterly Activities Report For the three months ending 30 September 2013 HIGHLIGHTS Aeon Metals Ltd (formerly Aussie Q Resources Limited) ABN 91 121 964 725 Level 3, Suite 11, 88 Pitt St, Sydney NSW 2000, Australia PO Box 8155, Gold Coast MC Qld 9726, Australia P: 61 7 5574 3830 F: 61

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity

More information

Appendix 5B. Mining exploration entity quarterly report

Appendix 5B. Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 1/6/10, 17/12/10 Rule 5.3 SOUTHERN CROSS EXPLORATION N.L. QUARTER ENDED ("Current Quarter") : 30th September 2015 Consolidated

More information

Quarterly Activities Report - For Quarter Ended 30 September 2013

Quarterly Activities Report - For Quarter Ended 30 September 2013 Quarterly Activities Report For Quarter Ended 30 September 2013 HIGHLIGHTS AND ACHIEVEMENTS Company Announcements Office Australian Securities Exchange 31 October 2013 Mt Kare Gold/Silver Project PNG ASX:IDC

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) June 2014

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) June 2014 Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity NIUMINCO GROUP LIMITED ABN 44 009 163 919 30 June 2014 Quarter ended ( current ) Consolidated statement

More information

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2015

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2015 30 April 2015 QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2015 COMPANY OVERVIEW Regalpoint Resources Limited was formed to use the best available science to explore the Australian continent

More information

Quarterly Cash Flow Report

Quarterly Cash Flow Report Quarterly Cash Flow Report 30 April 2012 Company Announcements Office Australian Securities Exchange Limited Quarterly Cash Flow Report The Company s Appendix 5B Quarterly Cash Flow Statement for the Quarter

More information

For personal use only

For personal use only ASX ANNOUNCEMENT We find it. We prove it. We make it possible. ABN : 63 095 117 981 ASX : CAP 24 OCTOBER 2016 ABOUT CARPENTARIA: Carpentaria is an emerging producer of iron ore in eastern Australia. The

More information

QUARTERLY REPORT. 30 September 2004 Highlights

QUARTERLY REPORT. 30 September 2004 Highlights QUARTERLY REPORT 30 September 2004 Highlights AUSTRALIA TELFER, WESTERN AUSTRALIA GOLD EXPLORATION, Deep diamond drilling currently being conducted by Barrick Gold of Australia Limited MOUNT ELVIRE, WESTERN

More information

TRAKA RESOURCES LTD (A.B.N )

TRAKA RESOURCES LTD (A.B.N ) TRAKA RESOURCES LTD (A.B.N. 63 103 323 173) Quarterly Activity Report for the three months ended 30 th June 2008 Suite 2 Ground floor, 43 Ventnor Avenue, West Perth Western Australia 6005 Telephone: (+61)

More information

DECEMBER 2013 QUARTERLY REPORT

DECEMBER 2013 QUARTERLY REPORT 30 January 2014 ASX ANNOUNCEMENT DECEMBER 2013 QUARTERLY REPORT The Board of Paringa Resources Ltd ( Paringa or the Company ) (ASX:PNL) is pleased to present its quarterly report for the period ending

More information

Appendix 5B. Mindax Limited. Quarter ended ( current quarter ) June 2012

Appendix 5B. Mindax Limited. Quarter ended ( current quarter ) June 2012 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Mindax Limited

More information

For personal use only

For personal use only We find it. We prove it. We make it possible. ABN : 63 095 117 981 ASX : CAP 25 JANUARY 2017 ABOUT CARPENTARIA: Carpentaria is an emerging producer of iron ore in eastern Australia. The company has a majority

More information

ASX Release ASX Code: RLC

ASX Release ASX Code: RLC Reedy Lagoon Corporation Limited ABN 41 006 639 514 ASX Release ASX Code: RLC September 2013 Quarterly Report for the period ended 30 September 2013 SUMMARY Bullamine Joint venture Magnetite iron ore (WA):

More information

Haoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2010 HIGHLIGHTS

Haoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2010 HIGHLIGHTS Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

For personal use only

For personal use only Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of

More information

For personal use only

For personal use only QUARTERLY ACTIVITIES REPORT For the Quarter to 30 September 2015 CORPORATE BMG strategic priority to identify and secure new investment opportunities Completed assessment of the potential acquisition of

More information

Activities Report for the Quarter Ending 30 September Highlights

Activities Report for the Quarter Ending 30 September Highlights Activities Report for the Quarter Ending 30 September 2007 Highlights Anomalous rock chip results confirm the presence of a potential new copper-gold mineralized zone paralleling the interpreted Tanami

More information

QUARTERLY ACTIVITIES REPORT QUARTER ENDED 30 JUNE 2018

QUARTERLY ACTIVITIES REPORT QUARTER ENDED 30 JUNE 2018 QUARTERLY ACTIVITIES REPORT QUARTER ENDED 30 JUNE 2018 Chesser Resources Limited ( Chesser or the Company ) is pleased to present its Quarterly Activities Report for the period ending 30 June, 2018. During

More information

ANNUAL REPORT 2016 ABN

ANNUAL REPORT 2016 ABN ANNUAL REPORT 2016 ABN 50 009 188 694 CORPORATE DIRECTORY DIRECTORS Ian Middlemas Chairman Robert Behets Director Mark Pearce Director John Welborn Director COMPANY SECRETARY Mr Greg Swan REGISTERED OFFICE

More information

For personal use only

For personal use only Newfield Resources Limited 79 Broadway Nedlands WA 6009 Telephone: +61 8 6389 2688 Facsimile: +61 8 6389 2588 Email: info@newfieldresources.com.au Website: www.newfieldresources.com.au Quarterly Report

More information

For personal use only

For personal use only Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,

More information

QUARTERLY REPORT JUNE 2015

QUARTERLY REPORT JUNE 2015 ASX RELEASE 29 JULY 2015 ASX:BKY QUARTERLY REPORT JUNE 2015 The Nuclear Safety Council issued a favourable report for the grant of the Initial Authorisation of the proposed process plant as a radioactive

More information

For personal use only

For personal use only ASX Announcement April 2013 QUARTERLY REPORT 3 Months Ending 31 March 2013 Heads of Agreement signed for third joint venture with Chinese, special dividend to reward shareholders, business development

More information

For personal use only

For personal use only ABN: 31 008 402 391 Level 8, 210 George Street Sydney NSW 2000 GPO Box 225 Sydney NSW 2001 Tel: 61 2 9191 4543 Fax: 61 2 8247 7999 Website: www.gatewaymining.com.au Email: info@gatewaymining.com.au 29

More information

Quarterly Report to 31 December 2013

Quarterly Report to 31 December 2013 ASX Announcement 28 January 2014 ASX Code: VKA Quarterly Report to 31 December 2013 During the three months to 31 December, 2013, Perth-based Viking Ashanti completed a number of reviews of projects and

More information

For personal use only

For personal use only MARCH 2012 QUARTERLY REPORT PERTH, Western Australia, April 30, 2012: Coalspur Mines Limited ( Coalspur or Company ) (ASX: CPL, TSX: CPT) is pleased to present its quarterly report for the three months

More information

For personal use only

For personal use only ABN 93 104 757 904 Suite 4, 213 Balcatta Road, BALCATTA WA 6021 PO Box 572, BALCATTA WA 6914 T: 61 8 9240 4111 F: 61 8 9240 4054 W: www.australasiaconsolidated.com.au E: admin@australasiaconsolidated.com.au

More information

For personal use only

For personal use only 29 January 2016 December 2015 Quarterly Report GUNUNG ROSA HIGH GRADE GOLD, SILVER AND BASE METAL PROJECT WEST JAVA PROVINCE, INDONESIA Map 1: The Gunung Rosa IUP is located in Indonesia s West Java Province,

More information

For personal use only

For personal use only Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)

More information

April 2014 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 31 MARCH 2014 HIGHLIGHTS

April 2014 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 31 MARCH 2014 HIGHLIGHTS ++++ 30 April 2014 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 31 MARCH 2014 HIGHLIGHTS Successful commissioning of Company owned RC/Diamond drill rig; Maiden Drilling Program of 4,000m RC/diamond

More information

For personal use only

For personal use only QUARTERLY REPORT TO 30 SEPTEMBER 2013 HIGHLIGHTS Acquisition of the Bullendale Gold Project, New Zealand Siburan has acquired EP 52889 which contains historic underground mine workings located near Arrowtown

More information

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2016

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2016 29 April 2016 QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2016 COMPANY OVERVIEW Regalpoint Resources Limited (Company or ASX:RGU) currently holds projects in Queensland and Northern Territory,

More information

For personal use only

For personal use only Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,

More information

Mining exploration entity and oil and gas exploration entity quarterly report

Mining exploration entity and oil and gas exploration entity quarterly report Rule 5.5 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10, 01/05/2013

More information

Marmota Energy. QUARTERLY REPORT Quarter ending 30 September Significant large oil-bearing carbonaceous shale body discovered on Ambrosia.

Marmota Energy. QUARTERLY REPORT Quarter ending 30 September Significant large oil-bearing carbonaceous shale body discovered on Ambrosia. QUARTERLY REPORT Quarter ending 30 September 2008 Marmota Energy Highlights Three and a half month targeted 4,375 metre drilling program completed on Ambrosia and Mulgathing. Positive uranium results returned

More information

For personal use only

For personal use only Quarterly Activities Report for the period ended 30 September 2018 ASX ANNOUNCEMENT 31 October 2018 Highlights Manono Scoping Study confirms potential for a world-class, high margin, long life mining project

More information

$120,000 received from exercising put option. East Kambalda (Aztec Dome) tenement application granted.

$120,000 received from exercising put option. East Kambalda (Aztec Dome) tenement application granted. ASX Announcement 30 July 2014 Quarterly Report: June 2014 ABN: 45 116 153 514 ASX: TMX HIGHLIGHTS $120,000 received from exercising put option. East Kambalda (Aztec Dome) tenement application granted.

More information

June 2016 Quarterly Activity Report. Makabingui Gold Project Permit Update. Moura Permit Konkoutou Gold Project. Corporate

June 2016 Quarterly Activity Report. Makabingui Gold Project Permit Update. Moura Permit Konkoutou Gold Project. Corporate Bassari Resources Limited is an Australian ASXlisted company focused on discovering and developing multimillion ounce gold deposits in the Birimian Gold Belt, Senegal, West Africa. FAST FACTS ASX Code

More information

Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2013

Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2013 Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity ASCOT RESOURCES LIMITED ABN Quarter ended ( current ) 85 146 530 378 31

More information

For personal use only

For personal use only 25 July 2013 ASX Code: BAB, AIM Code: BGL QUARTERLY ACTIVITY REPORT FOR THE THREE MONTHS ENDED 30 JUNE 2013 Highlights Exploration and Resource Development Resources upgraded at the Gryphon and Edwards

More information

For personal use only

For personal use only A.B.N.: 67 060 319 119 Company Announcements Office Australian Securities Exchange 20 Bridge Street Sydney NSW 2000 31 st July 2014 Dear Sirs Report on Activities and June Quarter 2014 The Company provides

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 APRIL 2015 QUARTERLY UPDATE FOR PERIOD ENDING 31 MARCH 2015 Waratah Resources Limited (ASX: WGO) ( Waratah or the Company ), is pleased to announce its quarterly activities report for

More information

For personal use only

For personal use only ABN QUARTERLY ACTIVITIES REPORT MARCH 2013 SUMMARY Drilling to commence at Mayfield and Porters Mount The Company announced to the ASX on 23 April 2013 proposed drilling and exploration programs for the

More information