1 Cambridgeshire Energy Performance Contracting: Portfolio Analysis Version 3 Presenter s name: Presented to: Duncan Price and Daniel Jones Cambridgeshire County Council Date: 17/02/2014 Energy and carbon advisory services

2 What is Energy Performance Contracting? Energy Performance Contracting (EnPC) is a model for identifying and delivering energy efficiency improvements to buildings A contractor will identify opportunities, deliver the works and provide an energy savings guarantee that can be used to underpin a business case for investment by the LA or to secure third party bank finance

3 Verco desktop opportunity analysis Purpose is to identify investment potential to inform MLEI business case Used building portfolio data provided by Cambridgeshire: Building type Floor areas Annual gas and electricity consumption Energy costs Removed buildings/properties out of scope (e.g. housing) or with anomalous data Compared energy consumption per unit floor area against benchmark figures Assumed lifetime cost of typical energy efficiency measures is 120/tonne CO 2 Energy efficiency package selected to give 7 year simple payback (approximately 25% energy saving) Typical measures include: Controls adjustments Pipework insulation Variable speed drives on motors Also modelled potential for solar PV and biomass boilers

4 What is the breakdown of energy consumption in Cambridgeshire? Electricity and gas consumption (2012/13 data) Electricity Gas 25,000,000 Energy consumption, kwh/yr 20,000,000 15,000,000 10,000,000 5,000,000 Schools are the highest consumers by a significant margin. Offices and cultural activities (libraries and museums) also make up a significant portion of the total 0 General office Schools and seasonal public buildings Cultural activities Long term residential Restaurant Storage facility Workshop Public buildings with light usage

5 What is the energy saving potential in Cambridgeshire under EnPC? Electricity and gas saving potential (2012/13 consumption) Electricity Gas 4,000,000 3,500,000 Energy saving potential, kwh/yr 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 Schools, offices and libraries offer greatest energy saving potential. Electricity saving potential is greater than gas. 500,000 0 General office Schools and seasonal public buildings Cultural activities Long term residential Restaurant Storage facility Workshop Public buildings with light usage

6 Top 20 electricity saving opportunities Rank Building name Elec consumption (kwh/yr) Potential saving (kwh/yr) Percentage Shire Hall Site (Shire Hall including the 1 Octagon) 2,378,178 1,382,354 58% 2 Comberton Village College 1,236, ,232 60% 3 Neale Wade Community College 1,010, ,093 52% 4 Impington Village College 1,038, ,951 48% 5 Longsands Community College 1,023, ,190 48% 6 St Neots Community College 565, ,920 85% 7 Linton Village College 645, ,924 74% 8 Cottenham Village College 760, ,689 59% 9 Thomas Clarkson Community College 973, ,155 45% 10 Manor Community College 728, ,261 57% 11 Cambridge Catering Centre 485, ,076 86% 12 Chesterton Community College 808, ,860 46% 13 Sawston Village College 852, ,026 43% 14 Hinchingbrooke School 1,054, ,401 32% 15 Bottisham Village College 717, ,870 44% 16 Sir Harry Smith Community College 686, ,397 41% 17 Coleridge Community College 466, ,173 51% 18 Cambridge Central Library 584, ,081 40% 19 Meadowgate School 325, ,782 71% 20 City of Ely Community College 669, ,456 34%

7 Top 20 gas saving opportunities Rank Building name Gas consumption (kwh/yr) Potential saving (kwh/yr) Percentage 1 St Neots Community College 1,440,598 1,117,498 78% 2 Impington Village College 2,906, ,440 30% 3 Bottisham Village College 2,274, ,632 34% 4 Sir Harry Smith Community College 2,216, ,990 32% 5 Meadowgate School 955, ,936 63% 6 Sawston Village College 2,257, ,748 19% 7 Melbourn Village College 1,558, ,476 27% 8 Spring Common School 1,033, ,594 39% 9 Castle School 936, ,813 42% 10 Hinchingbrooke School 3,058, ,684 12% 11 Linton Village College 985, ,749 35% 12 Mayfield Primary School 447, ,343 77% 13 Horizon Resource Centre 524, ,679 62% 14 St Peter's School 2,285, ,787 14% 15 Manor Community College 1,480, ,148 21% 16 Chesterton Community College 1,939, ,714 15% 17 Longsands Community College 2,273, ,319 13% 18 Parkside Community College 989, ,136 29% 19 Clarkson Infant School 461, ,303 60% 20 Roger Ascham Site 336, ,762 78%

8 Typical energy efficiency measures below threshold cost

9 Overview of the potential Energy efficiency Renewables Investment potential NPV to project owner (4% discount rate) Scenario number Academies, special schools, schools with a pool 100% 50% 25% 25% 10% Other schools 100% 10% 10% 10% 10% Public buildings 100% 50% 50% 25% 10% Solar PV 100% 28% 18% 17% 10% Biomass 100% 47% 24% 24% 10% Academies, special schools, schools with a pool 5,527,033 2,763,517 1,381,758 1,381, ,703 Other schools 2,310, , , , ,007 Public buildings 1,524, , , , ,456 Energy efficiency total 9,361,666 3,756,804 2,375,045 1,993, ,167 Solar PV 17,146,805 4,800,684 3,028,814 2,871,932 1,714,681 Biomass 2,174,276 1,027, , , ,428 Total (incl. renewables) 28,682,747 9,584,901 5,925,032 5,387,010 2,868,275 Project IRR 8% 8% 9% Self fund (4% interest rate) 10,103,981 2,180,164 1,137,163 Third party investment (8% interest rate) 1,835, , ,346 County fund (6% interest rate) 1,344, ,729 NPV to project owner (6% discount rate) County fund (6% interest rate) 1,039, ,835

10 Funding options Public sector finance direct to project owner e.g. via Public Works Loan Board Low cost of finance (4%) over a longer term (15 year loan term assumed) Transfer of installation/delivery risk to ESCO supports Prudential Code requirements (prudent, affordable, sustainable) Possible re-investment of capital receipts e.g. property transformation programmes ESCO finance For BSP procurement, Honeywell has identified several finance providers Finance contract would be between Honeywell and the finance provider Higher cost of finance (8%) over shorter term (10 year loan term assumed) No capital investment required from LA except establishing and running a contract Expert opinion required as to whether funding would be on or off balance sheet but BSP have tried to maximise the chances of this through the structure of the framework

11 Funding options County fund County Council borrows from PWLB at 4% interest rate and on-lends to project at 6% interest rate, including margin for risk and development unit 15 year loan terms assumed Transfer of installation/delivery risk to ESCO supports Prudential Code requirements (prudent, affordable, sustainable)

12 Scenario 3: Cumulative cash flow if self-funded through reserves 4,000,000 Pre-financing NPV i.e. self-funded from reserves 3,000,000 2,000,000 Net Present Value ( ) 1,000,000 - (1,000,000) (2,000,000) (3,000,000) (4,000,000) (5,000,000) (6,000,000) (7,000,000) Investment by project owner of 6m in year 0 Energy savings start to repay investment Discounted payback of 9 years NPV is 2.18m

13 Scenario 3: Cumulative cash flow if borrowing from PWLB Post-financing NPV i.e. funded from PWLB borrowing 2,500,000 Net Present Value ( ) 2,000,000 1,500,000 1,000, , PWLB advances funding for the project at 4% interest rate Project generates an 8% internal rate of return so net surplus savings accumulate Energy savings are guaranteed for first 10 years but assumed to decline after contract finish (years 11-15) as a worst case scenario PV revenue guaranteed for 20 years NPV is 2.18m Year

14 Cumulative cash flow if borrowing from ESCO Post-financing NPV i.e. funded from PWLB borrowing Net Present Value ( ) 1,500,000 1,000, ,000 - (500,000) (1,000,000) (1,500,000) (2,000,000) Year Project owner makes no capital investment but incurs cost of managing contract ESCO secures finance (8% interest rate) and repays loan over first 10 years from unitary charge levied on the authority or building user Energy savings are insufficient to cover annual loan repayments in early years so would need to lengthen loan term or reduce target payback period to avoid negative cashflow NPV is 975k

15 Cumulative cash flow if borrowing from County fund County advances funding for the project at 6% interest rate Project generates an 8% internal rate of return so net surplus savings accumulate Energy savings are guaranteed for first 10 years but assumed to decline after contract finish (years 11-15) as a worst case scenario PV revenue guaranteed for 20 years NPV is 1.34m

16 Business case summary Portfolio analysis suggests there is significant capital investment potential of 29m Central deployment potential (Scenario 3) is 6m Annual savings / revenue start at 700k, rising with inflation Simple payback of 7 years for energy efficiency measures Discounted payback of 9 years using 4% discount rate Self-fund NPV to project owners is 2.18m PWLB funded NPV to project owners is 2.18m ESCO funded NPV to project owners is 975k County funded NPV to project owners is 1.34m Energy efficiency, solar PV and biomass boilers included Based on measures which cost 120/tonnes CO 2 saved over the lifetime of the measure Schools and offices offer greatest energy saving potential Electricity saving potential appears to be greater than gas

17 Business case summary OJEU compliant procurement process available to use by local authorities Access fee included in modelling and justified by savings Reduces emissions, reduces exposure to rising energy prices, improves building management, protects asset values, reduces regulatory risk

18 Key risks and mitigation Securing sufficient buy-in from schools modelled in scenarios Contractual complexity mitigated by use of standard frameworks Data quality and availability offset by input from ESCO at early stage Establishing energy consumption baseline use standard protocols Agreeing project scope and savings requires collaboration and dialogue with ESCO Concluding commercial negotiations need expert support to review opportunity assessment and investment grade proposals Monitoring and verification need to manage contracts effectively

Section 4 C: Corporate and Managed Services Overview. Services to be provided

Section 4 C: Corporate and Managed Services Overview. Services to be provided Section 4 C: Corporate and Managed Services Overview Services to be provided Customer Service and Transformation is focused on fuelling the change that the Council is going through. We deliver some of

More information

The service level budgetary control report for Commercial and Investment for the end of the financial year can be found in C&I appendix 1.

The service level budgetary control report for Commercial and Investment for the end of the financial year can be found in C&I appendix 1. Appendix A Commercial and Investment Finance and Performance Report Final Report 1. SUMMARY 1.1 Finance Previous Status Amber Green Category Income and Expenditure Capital Programme Target Balanced year

More information

The service level budgetary control report for Commercial and Investment for February can be found in C&I appendix 1.

The service level budgetary control report for Commercial and Investment for February can be found in C&I appendix 1. Appendix A Commercial and Investment Finance and Performance Report February 2018 1. SUMMARY 1.1 Finance Previous Status Amber Green Category Income and Expenditure Capital Programme Target Balanced year

More information

The business case for a Cambridgeshire low carbon investment fund and development unit

The business case for a Cambridgeshire low carbon investment fund and development unit The business case for a Cambridgeshire low carbon investment fund and development unit 1 MLEI Business case for Cambridgeshire low carbon investment and delivery model Document type: Client: Client contact:

More information

Cambridgeshire County Council Business Plan

Cambridgeshire County Council Business Plan Cambridgeshire County Council Business Plan 2017-22 Finance Tables Finance Tables Section 3 Section 3 C: Corporate and Managed Services Services to be provided plans in place for the continuation of service

More information

Financing Energy Efficiency in the Tertiary Sector. Paolo Michele Sonvilla Creara SEI Forum Madrid, 15 June 2017

Financing Energy Efficiency in the Tertiary Sector. Paolo Michele Sonvilla Creara SEI Forum Madrid, 15 June 2017 Financing Energy Efficiency in the Tertiary Sector Paolo Michele Sonvilla Creara SEI Forum Madrid, 15 June 2017 www.trustepc.eu 21/06/2017 1 FINANCING ENERGY EFFICIENCY We have money, but cannot find good

More information

The service level budgetary control report for Commercial and Investment Committee for July can be found in C&I appendix 1.

The service level budgetary control report for Commercial and Investment Committee for July can be found in C&I appendix 1. Appendix A Commercial and Investment Finance and Performance Report July 2017 1. SUMMARY 1.1 Finance Previous Status N/A N/A Category Income and Expenditure Capital Programme Target Balanced year end position

More information

The service level budgetary control report for Commercial and Investment for January can be found in C&I appendix 1.

The service level budgetary control report for Commercial and Investment for January can be found in C&I appendix 1. Appendix A Commercial and Investment Finance and Performance Report January 2018 1. SUMMARY 1.1 Finance Previous Status Amber Green Category Income and Expenditure Capital Programme Target Balanced year

More information

The service level budgetary control report for Commercial and Investment for November can be found in C&I appendix 1.

The service level budgetary control report for Commercial and Investment for November can be found in C&I appendix 1. Appendix A Commercial and Investment Finance and Performance Report November 2017 1. SUMMARY 1.1 Finance Previous Status Amber Green Category Income and Expenditure Capital Programme Target Balanced year

More information

Balanced year end position Remain within overall resources. Monthly Indicators Red Amber Green Total Year-end actual (Number of.

Balanced year end position Remain within overall resources. Monthly Indicators Red Amber Green Total Year-end actual (Number of. Appendix A Assets and Investment Finance and Performance Report Final Report 2016/17 1. SUMMARY 1.1 Finance Previous Status N/A N/A Category Income and Expenditure Capital Programme Target Balanced year

More information

MLEI Cambridgeshire low carbon investment and delivery model

MLEI Cambridgeshire low carbon investment and delivery model MLEI Cambridgeshire low carbon investment and delivery model 1 MLEI Cambridgeshire low carbon investment and delivery model Document type: Client: Client contact: Report Cambridgeshire County Council Sheryl

More information

Balanced year end position Remain within overall resources

Balanced year end position Remain within overall resources Appendix A Commercial and Investment Finance and Performance Report December 2018 1. SUMMARY 1.1 Finance Previous Status Red Green Category Income and Expenditure Capital Programme Target Balanced year

More information

Section 6 Capital Strategy

Section 6 Capital Strategy Capital Strategy Section 6 Section 6 Capital Strategy Contents 1: Introduction 2: Vision and priorities 3: Operating framework 4: Capital expenditure Appendix 1: Allowable capital expenditure Appendix

More information

Promoting Energy Efficiency in the UK Landscape and Considerations

Promoting Energy Efficiency in the UK Landscape and Considerations EXTERNAL Promoting Energy Efficiency in the UK Landscape and Considerations Sustainable Energy Investment Forum, Dublin Ioannis Orfanos Business Partner, Commercial & Corporate Finance Advisory Sounding

More information

Port Authority of the City of Saint Paul Property Assessed Clean Energy Program (PACE OF MN) ADMINISTRATIVE GUIDELINES

Port Authority of the City of Saint Paul Property Assessed Clean Energy Program (PACE OF MN) ADMINISTRATIVE GUIDELINES Port Authority of the City of Saint Paul Property Assessed Clean Energy Program () ADMINISTRATIVE GUIDELINES Saint Paul Port Authority 850 Lawson Commons 380 St. Peter Street Saint Paul, MN 55102 (651)

More information

Balanced year end position Remain within overall resources

Balanced year end position Remain within overall resources Appendix A Commercial and Investment Finance and Performance Report June 2018 1. SUMMARY 1.1 Finance Previous Status Amber Green Category Income and Expenditure Capital Programme Target Balanced year end

More information

Energy Efficiency (EE) Financing Strategies and Considerations in Commercial Real Estate

Energy Efficiency (EE) Financing Strategies and Considerations in Commercial Real Estate Energy Efficiency (EE) Financing Strategies and Considerations in Commercial Real Estate Ioannis Orfanos Director, Green Value Associates Head of ULI Greece & Cyprus Sustainability Council 25 OCTOBER 2018

More information

FAQ : Guaranteed Energy Savings Program (GESP) Cities, Counties, Schools. General Program Questions. Q: Is GESP a grant program?

FAQ : Guaranteed Energy Savings Program (GESP) Cities, Counties, Schools. General Program Questions. Q: Is GESP a grant program? FAQ : (GESP) Cities, Counties, Schools Clean Energy Resource Teams 1 General Program Questions Q: Is GESP a grant program? A: No. GESP is state technical assistance, administered by the Department of Commerce

More information

Solar PV where the sun doesn t shine: Estimating the economic impacts of support schemes for residential PV with detailed net demand profiling

Solar PV where the sun doesn t shine: Estimating the economic impacts of support schemes for residential PV with detailed net demand profiling Sources: www.engineersjournal.ie; www.investopedia.com; www.theguardian.com Solar PV where the sun doesn t shine: Estimating the economic impacts of support schemes for residential PV with detailed net

More information

Minnesota's Guaranteed Energy Savings Program (GESP)

Minnesota's Guaranteed Energy Savings Program (GESP) Minnesota's Guaranteed Energy Savings Program (GESP) Division of Energy Resources & CERTs Roles Energy Savings Performance Contracting The Power of Bundling Energy Conservation Measures Minnesota s new

More information

Sustainable Energy Handbook

Sustainable Energy Handbook Sustainable Energy Handbook Module 6.1 Simplified Financial Models Published in February 2016 1 Introduction to simplified financial models The simplified financial model is a tool that enables to understand

More information

ESCO projects how to commercially finance energy efficiency investments with the help of Energy Performance Contracting

ESCO projects how to commercially finance energy efficiency investments with the help of Energy Performance Contracting ESCO projects how to commercially finance energy efficiency investments with the help of Energy Performance Contracting Conference on 14 November 2013 Toivo Miller European Bank for Reconstruction and

More information

CORPORATE OVERVIEW AND SCRUTINY PANEL 24 JANUARY 2019

CORPORATE OVERVIEW AND SCRUTINY PANEL 24 JANUARY 2019 CORPORATE OVERVIEW AND SCRUTINY PANEL 24 JANUARY 2019 CAPITAL STRATEGY 1. INTRODUCTION 1.1. The Capital Strategy is a high level document, giving an overview of how capital expenditure, capital financing

More information

Software Economics. Introduction to Business Case Analysis. Session 2

Software Economics. Introduction to Business Case Analysis. Session 2 Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements

More information

Table of Contents. Capital - 2

Table of Contents. Capital - 2 CAPITAL OVERVIEW Table of Contents 2018-2020 Budget Summary CAP-3 2018 Funding Breakdown CAP-4 2018-2020 Development Charge Reserve Projections CAP-5 Asset Management CAP-6 2018 Cash Flow Projection CAP-8

More information

Comprehensive Energy Conservation & Solar Performance Contracts. City Hall, Public Safety and Solar Projects

Comprehensive Energy Conservation & Solar Performance Contracts. City Hall, Public Safety and Solar Projects Comprehensive Energy Conservation & Solar Performance Contracts City Hall, Public Safety and Solar Projects Budget, Finance and Audit Committee January 6, 2014 Agenda Project Projects background Current

More information

Business Plan Section 3 Finance Tables

Business Plan Section 3 Finance Tables Business Plan 2017-22 Section 3 Finance Tables Cambridgeshire County Council Business Plan 2017-22 Finance Tables Finance Tables Section 3 Section 3 Finance Tables Introduction There are six types of

More information

Energy Efficiency Insurance. Global & Indian scenario

Energy Efficiency Insurance. Global & Indian scenario Energy Efficiency Insurance Global & Indian scenario International Energy Efficiency Insurance Product Scenario Some international products studied were: 1. Energy Savings Insurance Implementing Agency:

More information

Software Economics. Introduction to Business Case Analysis. Session 2

Software Economics. Introduction to Business Case Analysis. Session 2 Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements

More information

The service level budgetary control report for Commercial and Investment for December can be found in C&I appendix 1.

The service level budgetary control report for Commercial and Investment for December can be found in C&I appendix 1. Appendix A Commercial and Investment Finance and Performance Report December 2017 1. SUMMARY 1.1 Finance Previous Status Amber Green Category Income and Expenditure Capital Programme Target Balanced year

More information

Worcestershire County Council 2020 Vision Concept Paper - Self-Sufficient Council

Worcestershire County Council 2020 Vision Concept Paper - Self-Sufficient Council Worcestershire County Council 2020 Vision Concept Paper - Self-Sufficient Council Theme and Overview: Self-Sufficient Council Support Requirements In addition to internal resources, the workstreams will

More information

Haringey Green Deal Pilot

Haringey Green Deal Pilot Haringey Green Deal Pilot Background Investment in energy efficiency can provide long term cost savings to householders, as well as increased thermal comfort. However, many people lack the up front capital

More information

Scaling-up energy efficiency investment in buildings. Part of the Investor Confidence Project Europe Presentation for UK stakeholders 17 June, 2015

Scaling-up energy efficiency investment in buildings. Part of the Investor Confidence Project Europe Presentation for UK stakeholders 17 June, 2015 Scaling-up energy efficiency investment in buildings Part of the Investor Confidence Project Europe Presentation for UK stakeholders 17 June, 2015 Agenda Introduction UK market need and current status

More information

Section 7 Capital Strategy

Section 7 Capital Strategy Capital Strategy Section 7 Section 7 Capital Strategy Contents 1: Introduction 2: Vision and priorities 3: Operating framework 4: Capital expenditure Appendix 1: Allowable capital expenditure Appendix

More information

Presentation in Delhi. Lieven Vanstraelen Managing Director. IEA DSMIV Task XVI National Implementation Activities - Belgium

Presentation in Delhi. Lieven Vanstraelen Managing Director. IEA DSMIV Task XVI National Implementation Activities - Belgium Presentation 11.11.2008 in Delhi IEA DSMIV Task XVI National Implementation Activities - Belgium Lieven Vanstraelen Managing Director Ⅰ Content Ⅰ Recall of Fedesco s activities Framework and energy usage

More information

ENERGY EATING INTO EBIT

ENERGY EATING INTO EBIT A Power Efficiency White Paper ENERGY EATING INTO EBIT A report on the board-level need for energy representation THE SOLUTION This paper provides an insight into the issues which senior directors will

More information

Dorset Council Capital Strategy Report 2019/20

Dorset Council Capital Strategy Report 2019/20 Introduction This capital strategy is a new report for, giving a high-level overview of how capital expenditure, capital financing and treasury management activity contribute to the provision of local

More information

Business Plan Section 6 Capital Strategy

Business Plan Section 6 Capital Strategy Business Plan 2017-22 Section 6 Capital Strategy Business Plan 2017-22 Capital Strategy Capital Strategy Section 6 Section 6 Capital Strategy Contents 1: Introduction 2: Vision and priorities 3: Operating

More information

Outline Capital Investment Strategy

Outline Capital Investment Strategy Outline Capital Investment Strategy INDEX FOREWORD 1. INTRODUCTION 2. PURPOSE 3. SUMMARY 4. INFLUENCES ON CAPITAL INVESTMENT 5. CURRENT CAPITAL EXPENDITURE 6. COMMERCIAL PROPERTY INVESTMENT STRATEGY 7.

More information

Scottish Futures Trust

Scottish Futures Trust Scottish Futures Trust Energy Efficiency Measures Part B - Technical Guidance on Commercial and Accounting impacts 22 January 2013 Contents 1. Basis of Report 2 1.1 Background 2 1.2 Purpose of this report

More information

Energy Efficiency Insurance. Product overview

Energy Efficiency Insurance. Product overview Energy Efficiency Insurance Product overview High energy prices and evolving legislation, combined with a desire to reduce CO2 emissions, have seen increasing investment in green energy initiatives. With

More information

USA Palm Desert Energy Independence Program

USA Palm Desert Energy Independence Program USA Palm Desert Energy Independence Program Context Palm Desert Energy Independence Program is one of a number of Property Assessed Clean Energy (PACE) Schemes implemented in the United States. Under these

More information

Title of report: Leeds City Region Energy Saving Scheme

Title of report: Leeds City Region Energy Saving Scheme Name of meeting: CABINET Date: 9 APRIL 2013 Title of report: Leeds City Region Energy Saving Scheme Providing Energy Efficiency Green Deal Loans and Energy Company Obligation Grants for Private Sector

More information

Dollars to $ense Energy Efficiency Financing Mini-Workshop

Dollars to $ense Energy Efficiency Financing Mini-Workshop Dollars to $ense Energy Efficiency Financing Mini-Workshop February 11, 2014 The International Centre Workshop Learning Objectives To increase awareness and skill in obtaining financing for energy efficiency

More information

Dollars to $ense. Energy Efficiency Financing Mini-Workshop. February 11, 2014 The International Centre

Dollars to $ense. Energy Efficiency Financing Mini-Workshop. February 11, 2014 The International Centre Dollars to $ense Energy Efficiency Financing Mini-Workshop February 11, 2014 The International Centre Workshop Learning Objectives To increase awareness and skill in obtaining financing for energy efficiency

More information

Section 7 Capital Strategy

Section 7 Capital Strategy Capital Strategy Section 7 Section 7 Capital Strategy Contents 1: Introduction 2: Vision and priorities 3: Operating framework 4: Capital expenditure Appendix 1: Allowable capital expenditure Appendix

More information

Green Banks: Financing Residential Energy Efficiency

Green Banks: Financing Residential Energy Efficiency Green Banks: Financing Residential Energy Efficiency Promoting Energy Efficiency Finance: Examples of Tools and Best Practices DOE / Clean Energy Solutions Center Webinar Carolina Herrera Jáuregui November

More information

Math Camp. September 16, 2017 Unit 3. MSSM Program Columbia University Dr. Satyajit Bose

Math Camp. September 16, 2017 Unit 3. MSSM Program Columbia University Dr. Satyajit Bose Math Camp September 16, 2017 Unit 3 MSSM Program Columbia University Dr. Satyajit Bose Unit 3 Outline Financial Return Assessment Payback NPV IRR Capital Structure Equity/Mezzanine/Debt Math Camp Interlude

More information

PACE Financing. J. Caleb Bell, Partner Bricker & Eckler LLP

PACE Financing. J. Caleb Bell, Partner Bricker & Eckler LLP PACE Financing J. Caleb Bell, Partner Bricker & Eckler LLP 614.227.2384 jbell@bricker.com PACE Financing PACE = Property Assessed Clean Energy Ohio s PACE Law Energy SID A special type of financing district

More information

The Covenant of Mayors: Energy efficiency and Local Authorities, How to finance it?

The Covenant of Mayors: Energy efficiency and Local Authorities, How to finance it? The Covenant of Mayors: Energy efficiency and Local Authorities, How to finance it? Paolo Bertoldi European Commission Joint Research Centre www.jrc.ec.europa.eu Serving society Stimulating innovation

More information

U. S. Department of Housing and Urban Development Office of Public and Indian Housing

U. S. Department of Housing and Urban Development Office of Public and Indian Housing U. S. Department of Housing and Urban Development Office of Public and Indian Housing Special Attention of: NOTICE: PIH-2011-36 (HA) Public Housing Agencies; Issued: July 8, 2011 HUD Directors of Public

More information

Lecture in Energy Economics: Life Cycle Cost Analysis for Bankable Projects in Sustainable Energy

Lecture in Energy Economics: Life Cycle Cost Analysis for Bankable Projects in Sustainable Energy Lecture in Energy Economics: Life Cycle Cost Analysis for Bankable Projects in Sustainable Energy INOGATE Programme New ITS Project, Ad Hoc Expert Facility (AHEF) Task AM-54-55-56 Slides prepared by: Ali

More information

Maximising Business Opportunities for Local Authorities: Assistant Mayor Cllr Gary Millar

Maximising Business Opportunities for Local Authorities: Assistant Mayor Cllr Gary Millar Maximising Business Opportunities for Local Authorities: Assistant Mayor Cllr Gary Millar Contact: Twitter garymillar Email gary.millar@liverpool.gov.uk Session Overview This session is centred around

More information

INTRODUCTION. What Is Energy Performance Contracting?

INTRODUCTION. What Is Energy Performance Contracting? 1 INTRODUCTION What Is Energy Performance Contracting? Across the country, energy performance contracting (EPC) is offered by Energy Service Companies (ESCOs) as a practical way for public sector entities

More information

Renewable Energy Guidance

Renewable Energy Guidance NewClimate Institute, Verra Renewable Energy Guidance Guidance for assessing the greenhouse gas impacts of renewable energy policies May 2018 How to describe the policy or action being assessed 5. DESCRIBING

More information

Minnesota's Guaranteed Energy Savings Program (GESP)

Minnesota's Guaranteed Energy Savings Program (GESP) Minnesota's Guaranteed Energy Savings Program (GESP) Division of Energy Resources Role Energy Savings Performance Contracting The Power of Bundling Energy Conservation Measures Minnesota s new Guaranteed

More information

Barrow Borough Council s Efficiency Support Grant Business Case

Barrow Borough Council s Efficiency Support Grant Business Case 1 Barrow Borough Council s Efficiency Support Grant Business Case 2011 2015 1. About Barrow 1.1: Barrow Borough is a relatively small community at the end of the Furness peninsula. It has land borders

More information

Northern Corridor Area Transport Plan. Contents

Northern Corridor Area Transport Plan. Contents Northern Corridor Area Transport Plan Page 1 of 16 Northern Corridor Area Transport Plan Contents 1. Introduction... 3 Strategic Transport Schemes... 4 2. Policy Background... 4 3. The Northern Corridor

More information

Section 3 Budget Strategy

Section 3 Budget Strategy Budget Strategy Section 3 Section 3 Budget Strategy Contents 1: Chief Finance Officer's statement 2: Revenue funding 3: Revenue costs 4: Council Tax precept 5: Capital funding and spending 6: Cash and

More information

Presenters. Cleaner Production Approach, methodology Benefits. UNEP Definition of Cleaner Production. UNEP Definition of Cleaner Production

Presenters. Cleaner Production Approach, methodology Benefits. UNEP Definition of Cleaner Production. UNEP Definition of Cleaner Production The Regional Environmental Centre for the Caucasus Promoting competitiveness and efficiency of small and medium enterprises through cleaner production in South Caucasus Cleaner Production Approach, methodology

More information

An Introduction to Capital Budgeting Methods

An Introduction to Capital Budgeting Methods An Introduction to Capital Budgeting Methods Econ 466 Spring, 2010 Chapters 9 and 10 Consider the following choice You have an opportunity to invest $20,000 in one of the following capital assets. You

More information

Meeting of the West of England Academic Health Science Network Board. Agenda Item: 4.2. WEAHSN Business Plan 2017/18

Meeting of the West of England Academic Health Science Network Board. Agenda Item: 4.2. WEAHSN Business Plan 2017/18 Meeting of the West of England Academic Health Science Network Board To be held on Wednesday 7 December 2016 commencing at 10:45 at Gloucester Rugby Club GL1 3AX Agenda Item: 4.2 WEAHSN 1. Introduction

More information

Review of Financial Analysis Terms

Review of Financial Analysis Terms Review of Financial Analysis Terms Financial Analysis Requirements Economic Evaluation of Potential TUR Techniques (310 CMR 50.46A) The TUR plan must include the discount rate, cost of capital, depreciation

More information

Business Plan Section 6 Capital Strategy

Business Plan Section 6 Capital Strategy Business Plan 2018-23 Section 6 Business Plan 2018-23 Section 6 Section 6 Contents 1: Introduction 2: Vision and priorities 3: Operating framework Appendix 1: Allowable capital expenditure Appendix 2:

More information

UK EE Financing Programmes: An Update

UK EE Financing Programmes: An Update UK EE Financing Programmes: An Update Dr. Steven Fawkes ACEEE Financing Forum 15 th May 2013 Agenda Update on: Green Deal ECO Green Investment Bank Other programmes, projects and initiatives 2 Green Deal

More information

The Business Case For Energy Efficiency Viridian Glass Australia

The Business Case For Energy Efficiency Viridian Glass Australia The Business Case For Energy Efficiency Viridian Glass Australia Presented to: #### Issued: #### Version: #### Presented by: Bruce Lee Telephone 1872 248 414 Email bl@suresense.co.uk Executive Summary

More information

Energy Saving Improvement Programs

Energy Saving Improvement Programs Introducing Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4; A-1185A Marc Pfeiffer, Deputy Director Division of Local Government Services What ESIP is All About Retrofitting public

More information

LGA 2018/19 Budget Framework

LGA 2018/19 Budget Framework LGA 2018/19 Budget Framework Purpose of report For discussion. Summary Leadership Board reviewed the LGA s Financial Strategy for 2017/18 to 2019/20 in January 2017. This report formed the basis of the

More information

Energy Efficiency Case Study: Performance Contracting

Energy Efficiency Case Study: Performance Contracting Energy Efficiency Case Study: Performance Contracting 3N 111(d) Meeting December 4, 2014 Ashley Patterson Director, Government Relations & Public Policy Ameresco Chris Hessler Partner AJW, Inc. ESCO Working

More information

WOKINGHAM BOROUGH COUNCIL

WOKINGHAM BOROUGH COUNCIL WOKINGHAM BOROUGH COUNCIL Treasury Management Report 2017-18 Page 1 65 Contents 1. Introduction...3 2. Economic Review...3 3. The Council s Capital Expenditure and Financing...3 4. The Council s Overall

More information

Life Cycle Analysis Money... and More

Life Cycle Analysis Money... and More Life Cycle Analysis Money... and More Dorothy McCarty, AIA, LEED AP Lakeisha Lindsey October 15, 2015 listen engage advise deliver Factors affecting decision making Goals of the organization Market-driven

More information

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner Contents 1. The restriction of subsidies and policy priorities. 2.

More information

Contents. Businesses Can Benefit From On-Site Solar. Shortfalls with Common Methods of Financing. C-PACE: A New Financing Option for Solar Buyers

Contents. Businesses Can Benefit From On-Site Solar. Shortfalls with Common Methods of Financing. C-PACE: A New Financing Option for Solar Buyers Contents Businesses Can Benefit From On-Site Solar Shortfalls with Common Methods of Financing C-PACE: A New Financing Option for Solar Buyers Access to C-PACE Across the U.S. Comparison: C-PACE vs. Conventional

More information

Innovative Internal and External Financing for Energy Projects. September 2016

Innovative Internal and External Financing for Energy Projects. September 2016 Innovative Internal and External Financing for Energy Projects September 2016 Building On Earlier Topics The goal of this workshop is to: 1. Change the way energy projects are financed internally 2. Understand

More information

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016 The Economics and Financing of Distributed Generation Investment Budapest, Hungary November 17, 2016 Topics to Cover How to Finance Distributed Generation Investments 1 Importance of financial aspects

More information

105. PROFILE ON THE PRODUCTION OF INDUSTRIAL FILLERS

105. PROFILE ON THE PRODUCTION OF INDUSTRIAL FILLERS 105. PROFILE ON THE PRODUCTION OF INDUSTRIAL FILLERS 105-1 TABLE OF CONTENTS PAGE I. SUMMARY 105-2 II. PRODUCT DESCRIPTION & APPLICATION 105-2 III. MARKET STUDY AND PLANT CAPACITY 105-3 A. MARKET STUDY

More information

Promoting Energy Efficiency Investments for Climate Change Mitigation and Sustainable Development

Promoting Energy Efficiency Investments for Climate Change Mitigation and Sustainable Development Economic and Social Commission for Western Asia Promoting Energy Efficiency Investments for Climate Change Mitigation and Sustainable Development A Guidebook For Project Developers For Preparing Energy

More information

Balanced year end position Remain within overall resources

Balanced year end position Remain within overall resources Appendix A Commercial and Investment Finance and Performance Report November 2018 1. SUMMARY 1.1 Finance Previous Status Red Green Category Income and Expenditure Capital Programme Target Balanced year

More information

Lecture Guide. Sample Pages Follow. for Timothy Gallagher s Financial Management 7e Principles and Practice

Lecture Guide. Sample Pages Follow. for Timothy Gallagher s Financial Management 7e Principles and Practice Lecture Guide for Timothy Gallagher s Financial Management 7e Principles and Practice 707 Slides Written by Tim Gallagher the textbook author Use as flash cards for terminology and concept review Also

More information

Hereford & Worcester Fire Authority Statement of Prudential Indicators; & Minimum Revenue Provision Policy

Hereford & Worcester Fire Authority Statement of Prudential Indicators; & Minimum Revenue Provision Policy Hereford & Worcester Fire Authority Statement of Prudential Indicators; & Minimum Revenue Provision Policy Appendix 9 Introduction : Prudential Indicators The Prudential Code for Capital Finance in Local

More information

Guaranteed Energy Savings Program (GESP) February 21, CERTS Conference

Guaranteed Energy Savings Program (GESP) February 21, CERTS Conference Guaranteed Energy Savings Program (GESP) February 21, 2013 2013 CERTS Conference Facility Issues Growing Deferred Maintenance Occupant Comfort and Productivity Health, Safety and Environmental Energy Price

More information

London Borough of Hackney Pension Fund. Investment Strategy Statement

London Borough of Hackney Pension Fund. Investment Strategy Statement London Borough of Hackney Pension Fund Investment Strategy Statement Investment Strategy Statement (Published 01/04/2017) 1. Introduction The London Borough of Hackney is the Administering Authority for

More information

ANNUAL UPDATE ON REGION OF PEEL'S FINANCIAL CONDITION. Stephen VanOfwegen, Commissioner of Finance and Chief Financial Officer

ANNUAL UPDATE ON REGION OF PEEL'S FINANCIAL CONDITION. Stephen VanOfwegen, Commissioner of Finance and Chief Financial Officer 8.2-1 REPORT Meeting Date: 2017-04-27 Regional Council For Information DATE: April 12, 2017 REPORT TITLE: FROM: 2017 ANNUAL UPDATE ON REGION OF PEEL'S FINANCIAL CONDITION Stephen VanOfwegen, Commissioner

More information

Senate Bill No. 146 Senator Spearman

Senate Bill No. 146 Senator Spearman Senate Bill No. 146 Senator Spearman CHAPTER... AN ACT relating to energy; requiring certain electric utilities in this State to file with the Public Utilities Commission of Nevada a distributed resources

More information

Financing Energy Efficiency Projects:

Financing Energy Efficiency Projects: Financing Energy Efficiency Projects: Blending ARRA Funds with Commercial Finance March 7, 2011 Presented by: John MacLean Energy Efficiency Finance Corp. on behalf of USDOE financial advisory team jmaclean@eefinance.net

More information

ELEMENTS OF A WELL-DESIGNED C-PACE STATUTE AND PROGRAM TO ATTRACT PRIVATE CAPITAL AND FOSTER GREATER TRANSACTION VOLUMES JANUARY 16, 2018

ELEMENTS OF A WELL-DESIGNED C-PACE STATUTE AND PROGRAM TO ATTRACT PRIVATE CAPITAL AND FOSTER GREATER TRANSACTION VOLUMES JANUARY 16, 2018 ELEMENTS OF A WELL-DESIGNED C-PACE STATUTE AND PROGRAM TO ATTRACT PRIVATE CAPITAL AND FOSTER GREATER TRANSACTION VOLUMES JANUARY 16, 2018 OVERVIEW As more states, counties and municipalities launch Commercial

More information

Financing Public Sector Energy Efficiency Projects: U.S. Experiences and Lessons Learned

Financing Public Sector Energy Efficiency Projects: U.S. Experiences and Lessons Learned Financing Public Sector Energy Efficiency Projects: U.S. Experiences and Lessons Learned Phil Coleman, Research Associate, LBNL Jas Singh, Energy Advisor, USAID Alexander Filippov, Program Manager, ASE

More information

High Performance Schools- How do we get there? Build an Energy Team and Utilize Performance Contracting

High Performance Schools- How do we get there? Build an Energy Team and Utilize Performance Contracting High Performance Schools- How do we get there? Build an Energy Team and Utilize Performance Contracting How do we go from this to High Performance? Teamwork! 76% of all school district in the US indicated

More information

ROLE OF GUARANTEED ENERGY SERVICE PERFORMANCE CONTRACTS (ESPC S) IN ACHIEVING CANADIAN CARBON REDUCTION TARGETS SUBMISSION TO LETS TALK CLIMATE ACTION

ROLE OF GUARANTEED ENERGY SERVICE PERFORMANCE CONTRACTS (ESPC S) IN ACHIEVING CANADIAN CARBON REDUCTION TARGETS SUBMISSION TO LETS TALK CLIMATE ACTION ROLE OF GUARANTEED ENERGY SERVICE PERFORMANCE CONTRACTS (ESPC S) IN ACHIEVING CANADIAN CARBON REDUCTION TARGETS SUBMISSION TO LETS TALK CLIMATE ACTION BY ENERGY SERVICES ASSOCIATION OF CANADA July 22,

More information

To: Mayor and City Council Through: Bill Monahan, City Manager. Subject: Proceeding with the ESCO Process

To: Mayor and City Council Through: Bill Monahan, City Manager. Subject: Proceeding with the ESCO Process MILWAUKIE CITY COUNCIL STAFF REPORT Agenda Item: WS 4. Meeting Date: 9-16-14 To: Mayor and City Council Through: Bill Monahan, City Manager Subject: Proceeding with the ESCO Process From: Gary Parkin,

More information

Value Driver Modelling for Extended Mining Operations

Value Driver Modelling for Extended Mining Operations www.pwc.com Value Driver Modelling for Extended Mining Operations Executive mining breakfast 23 June 2011 Fabio Buckeridge Advisory Services Australia Return to cost efficiency Mining costs Operating and

More information

Slide 1. MITIE Group PLC. Analyst & Investor Strategy Presentation. 22 September 2011

Slide 1. MITIE Group PLC. Analyst & Investor Strategy Presentation. 22 September 2011 Slide 1 MITIE Group PLC Analyst & Investor Strategy Presentation 22 September 2011 Slide 2 Growth aspirations Ruby McGregor-Smith Chief Executive MITIE today MITIE is a strategic outsourcing and energy

More information

Energy Efficiency: EU legislative framework - Concrete actions

Energy Efficiency: EU legislative framework - Concrete actions Energy Efficiency: EU legislative framework - Concrete actions Challenges related to Energy Efficiency financing #EEFIG Lack of knowledge and information Lack of performance data High upfront investments

More information

ELEMENTS OF A WELL-DESIGNED C-PACE STATUTE AND PROGRAM TO ATTRACT PRIVATE CAPITAL AND FOSTER GREATER TRANSACTION VOLUMES JULY 2, 2018

ELEMENTS OF A WELL-DESIGNED C-PACE STATUTE AND PROGRAM TO ATTRACT PRIVATE CAPITAL AND FOSTER GREATER TRANSACTION VOLUMES JULY 2, 2018 ELEMENTS OF A WELL-DESIGNED C-PACE STATUTE AND PROGRAM TO ATTRACT PRIVATE CAPITAL AND FOSTER GREATER TRANSACTION VOLUMES JULY 2, 2018 OVERVIEW As more states, counties and municipalities launch Commercial

More information

Dipl.-Ing. Detlef Loy

Dipl.-Ing. Detlef Loy Dipl.-Ing. Detlef Loy Georg-Wilhelm-Str. 18 D-10711 Berlin Germany E-Mail: dloy@vossnet.de Advanced Lighting Components Building Control Systems Motors (for elevators, Ventilation etc.) Heating and Air

More information

Rethinking Repairs. A New Approach to Gas Procurement. Jerry Austin Executive Director for Property Sutton Housing Partnership

Rethinking Repairs. A New Approach to Gas Procurement. Jerry Austin Executive Director for Property Sutton Housing Partnership Rethinking Repairs A New Approach to Gas Procurement Jerry Austin Executive Director for Property Sutton Housing Partnership 07500 550 211 Agenda Guide to today s presentation 1. Traditional approach has

More information

Methods of Financial Appraisal

Methods of Financial Appraisal Appendix 2 Methods of Financial Appraisal The of money over time There are a number of financial appraisal techniques, ranging from the simple to the sophisticated, that can be of use as an aid to decision-making

More information

INTEGRATED RESOURCES AND PERFORMANCE REPORT FOR THE PERIOD ENDING 28 TH FEBRUARY General Purposes Committee (GPC) is recommended to:

INTEGRATED RESOURCES AND PERFORMANCE REPORT FOR THE PERIOD ENDING 28 TH FEBRUARY General Purposes Committee (GPC) is recommended to: Agenda Item No. INTEGRATED RESOURCES AND PERFORMANCE REPORT FOR THE PERIOD ENDING 28 TH FEBRUARY 2018 To: Date: From: Electoral division(s): General Purposes Committee n/a via email Chief Finance Officer

More information

HORIZON 2020 W E L C O M E. Programme Committee for specific programme. SMEs & Access to Risk Finance. in configuration

HORIZON 2020 W E L C O M E. Programme Committee for specific programme. SMEs & Access to Risk Finance. in configuration HORIZON 2020 Programme Committee for specific programme in configuration SMEs & Access to Risk Finance 11 th meeting Brussels, 8 June 2016 W E L C O M E EBRD Action 14 in ARF WP 2016-2017 Draft Components

More information

How to select, prioritize, & justify economically viable energy projects

How to select, prioritize, & justify economically viable energy projects How to select, prioritize, & justify economically viable energy projects Eileen Westervelt, Senior Energy Engineer U of I Business Presenter s Innovation name Services; Professional Naperville, Title (eg.

More information