CPSCR Review Independent Evaluation Group

Size: px
Start display at page:

Download "CPSCR Review Independent Evaluation Group"

Transcription

1 1 1. CPS Data Country: Serbia CPS Year: FY08 CPS Period: FY08 FY11 CPSCR Review Period: FY08 FY11 Date of this review: December 7, Executive Summary i. This review examines the implementation of the FY08 Serbia Country Partnership Strategy (CPS) and the FY10 CPS Progress Report (CPSPR), and evaluates the CPS Completion Report (CPSCR). The strategy was joint between IBRD, IFC and MIGA, and this review covers the joint program of the three agencies. ii. The WBG strategy was organized around three pillars: (i) encouraging private sector led growth and EU convergence; (ii) providing opportunities and broadening participation in growth; and (iii) managing emerging environmental and disaster risks. Pillar 1, growth and EU convergence, focused on improving the business environment, competitiveness and the country s infrastructure, as well as strengthening financial intermediation. Pillar 2, opportunities and participation in growth, aimed at balanced regional development, effective social protection for the vulnerable, and strengthened social services. Pillar 3, environmental and disaster risk management, sought to support improved environmental management, including risks, and enhance the efficiency in the use of natural resources. IFC and MIGA interventions aimed at developing the private sector, as well as providing guarantees to foreign banks to maintain or augment their exposure to Serbia within the context of the crisis response. iii. This was an ambitious program with modest results because of an overly optimistic strategy given the institutional capacities, compounded by the adverse effects of the global financial crisis. The overall outcome is rated moderately unsatisfactory. Under Pillar 1, WBG assistance helped strengthen competitiveness in the enterprise sector and succeeded in strengthening the financial sector. The business climate improved only marginally and there was slight progress in improving infrastructure and making it more efficient. Under Pillar 2, the efforts centered, sensibly, on regional development. But results were modest as a key project on agriculture reform performed poorly, which partly explains underachievement in this sub-objective. The WBG strategy succeeded in improving the quality of, and access to, social services. Pillar 3, less important than the other two and the weakest of the three in terms of outcomes, had modest or negligible results in improving reducing pollution coming from targeted agricultural activities, strengthening environmental management, enhancing the efficiency in the use of natural resources, and managing environmental and disaster risk. iv. IEG agrees with the CPSCR lessons and recommendations for the next CPS, particularly on the need to continue the alignment of CPS activities with the EU integration agenda, focus investment operations on a narrow set of objectives, and try to avoid involvement of multiple agencies in project management. Moreover, proposed outcomes in partnership strategies need to reflect genuine government priorities and be supported by appropriate interventions to achieve stated outcomes. IEG notes the creative way in which IBRD/IDA responded to changing circumstances, as evidenced by the policy based guarantee that it used to leverage additional resources for Serbia. CPSCR Reviewed by: Peer Reviewed by: CASCR Review Coordinator Juan Jose Fernandez-Ansola Consultant, IEGCC Albert Martinez, Consultant, IEGCC Rene Vandendries Consultant, IEGCC Steve F. Pirozzi Senior Evaluator, IEGCC Jaime Jaramillo-Vallejo, Lead Economist, IEGCR

2 2 3. CPS Summary Overview of CAS Relevance: Country Context 1. Serbia is a middle-income country that emerged from a decade of regional conflict to become a candidate for EU accession. It has, however, been slow in reducing high government employment, restructuring the large enterprise sector, and improving the adverse investment climate, due in part to political fragmentation. 2. Over the past decade, strong growth was led mostly by the non-tradable sector (e.g., financial, telecoms, retail), with heavy reliance on external borrowing. This combination left Serbia vulnerable to the 2008 global financial crisis the country s sovereign spreads soared, the exchange rate depreciated by about 20 percent against the euro over a six-month period, and the economy went into recession. Serbia has been recovering since, growing by 1 percent in 2010 and an expected 2 percent in The main challenges facing Serbia are implementing structural reforms that support balanced catch-up growth to EU income levels, strengthening its financial sector stability, securing low and stable inflation, and achieving durable fiscal adjustment that gives space for investment. 3. Serbia s priorities were consistent with its strategy for EU integration, which calls for maintaining macroeconomic stability, promoting economic growth through accelerated economic reforms, increasing employment and living standards, and balancing regional development. Objectives of WBG Strategy 4. The WBG strategy was organized around three pillars: (i) encouraging private sector led growth and EU convergence; (ii) providing opportunities and broadening participation in growth; and (iii) managing emerging environmental and disaster risks. Pillar 1, growth and EU convergence, focused on improving the business environment, competitiveness and the country s infrastructure, as well as strengthening financial intermediation. Pillar 2, opportunities and participation in growth, aimed at balanced regional development, effective social protection for the vulnerable, and strengthened social services. Pillar 3, environmental and disaster risk management, sought to support improved environmental management, including risks, and enhance the efficiency in the use of natural resources. IFC and MIGA interventions aimed at developing the private sector, as well as providing guarantees to foreign banks to maintain or augment their exposure to Serbia within the context of the crisis response. Relevance of the WBG Strategy 5. The WBG strategy addressed some of the key challenges facing Serbia, particularly on the growth, inclusion, social services and environmental management, and, at the CPSPR stage, responded flexibly to the evolving global financial crisis. In addition, the WBG strategy was well aligned with Serbia s EU integration policy. In light of uncertainties, the CPS intended to provide program flexibility, with lending in FY10 and FY11 to be identified at the time of the CPSPR based on evolving country needs. At the same time, the strategy underestimated difficulties of inter-agency and inter-ministry coordination in complex operations and the need for project preparatory work which led to significant delays in effectiveness and hindered project implementation (e.g., road corridor project). Moreover, the relevance of design was weakened by an apparent lack of government ownership regarding some of the objectives, as well as by the lack of interventions that could help bring about the expected results. The strategy also had a monitoring and evaluation framework that included results that could not or were not measured. 6. Consistent with the overall WBG strategy and congruent with market demand, both IFC and MIGA targeted private sector growth. IFC responded to changing circumstances by addressing the

3 3 financial sector s systemic stability within the context of the Joint International Financial Institution Action Plan launched in February 2009 in response to the global financial crisis. In addition, and also as part of the crisis response IFC provided long term funding as well as a capital injection to both existing and new client banks, and to leasing companies. MIGA, which had three consecutive years without new activities in Serbia, stepped in after the CPSPR and approved five new guarantees, four of them to parent banks that were providing shareholder loans to Serbian subsidiaries and the fifth to a retail trade company. 7. Interventions were well coordinated between IBRD, IFC, and MIGA, as well as with other international organizations operating in Serbia, particularly the IMF and the EU. Risk Identification and Mitigation 8. The CPS indicated that the main risks to the program were regional instability stemming from developments in Kosovo, and vulnerabilities from the widening current account deficit and rapidly growing private external debt. The 2008 global financial crisis made the external imbalance a much greater problem than was initially foreseen in the strategy. With the CPSPR, the WBG addressed this risk by providing augmented support to Serbia so that it could tackle its imbalances and maintain a strong commitment to EU integration. The WBG support was part of a joint program with the EU and the IMF, with IBRD increasing its lending program from US$ 600 million to US$ 900 million, IFC s extending support to strengthen the financial sector, and MIGA helping sustain the financial sector by guaranteeing key investments in it. Overview of CAS Implementation: Lending and Investments 9. The CPS envisaged an indicative base-case IBRD lending envelope of US$600 million, comprising a development policy loan series, and lending for railways, delivery of integrated local services, health, regional disaster preparedness, and energy generation. At CPSPR stage the authorities asked that about two thirds (US$388 million) of the original CPS envelope be allocated to help complete a major European road network (Corridor X); and the remainder to be devoted to the delivery of improved local services and health. Moreover, in response to the global financial crisis, the original CPS allocation was augmented by US$300 million allocated to development policy lending to support a joint assistance package with the IMF and EU. This increase included a policy based guarantee for US$100 million, which leveraged an additional US$300 million in lending from private sources. IFC invested US$350 million during FY08-11, about half in the financial sector and the rest in the real sector. Financial sector investments funded energy efficiency projects, expansion of leasing to agri-business, and support to medium and small enterprises. In addition, IFC invested in PPP solid waste management projects. Also in response to the crisis, MIGA issued five new guarantees during FY08-11, four of which were issued to strengthen financial institutions and the other one a retail company. 10. Performance of IBRD projects was adequate despite implementation problems and the portfolio remained healthy. The proportion of commitments at risk a measure of the likelihood that projects will not achieve their stated development objectives on time represented 8.3 percent of the portfolio, better than the average for ECA as a whole (16 percent). Slow disbursements in FY11 (Annex table 5) reflect significant delays in making projects effective; deficiency in project preparation, where client preparation of designs, feasibility studies, and bid documents began after effectiveness, as did difficulties in inter-agency and inter-ministry coordination in complex operations. Out of an active portfolio of 12 projects in March 2011 one is rated unsatisfactory. 11. IEG evaluated four IFC investment projects all approved prior to FY08 and rated them above the line for development outcome. Of the eight active projects with ratings in IFC s internal review not validated by IEG, five had weak overall development effectiveness.

4 4 Advisory and Analytical Activities and Services 12. IBRD/IDA delivered 25 analytical and advisory activities (AAA), 16 of which were not planned in either of the strategy documents. Meanwhile it dropped or did not deliver 10 activities that had been planned in the strategies. The areas covered by AAA included a Country Economic Memorandum (CEM), a Public Expenditure Review, an FSAP update, programmatic poverty assessments, as well as topics such as road financing, justice and governance, disaster risk management, education strategy, employment generation, private sector participation in social services, corporate governance, municipal enterprise restructuring, primary health centers, capital markets development, and innovation policy. 13. During the review period, four IFC advisory services (AS) were started building on previous work on alternative dispute resolution (ADR), corporate governance, international standards and technical regulations (ISTR), and solid waste management. Most of the active AS during the CPS period were started prior to FY08, including projects for reducing the regulatory burden on businesses, promoting foreign investments (originally a MIGA initiative), and providing technical assistance to targeted companies. Two of three AS evaluated by IEG were rated above the line, the third not receiving rating. Safeguards and Fiduciary Issues 14. There were no significant safeguards issues or fiduciary complaints that IEG is aware of. Overview of Achievement by Objective: Pillar 1: Encourage Private Sector Led Growth to Ensure Income Convergence with Europe 15. Under this pillar the WBG s support was to focus on (i) improving the business environment; (ii) bolstering the competitiveness of the enterprise sector; (iii) strengthening financial intermediation; and (iv) contributing to an improved, well-maintained and efficient infrastructure. 16. Improving the business environment. The World Economic Forum (WEF) identifies, among other things, the most problematic factor for doing business. For Serbia, in , the WEF identified as the most pressing factors policy instability (17 respondents), corruption (12.2 percent) and inefficient government bureaucracy (10.5 percent). By , policy instability had almost disappeared as an issue. However, concerns with corruption and government inefficiency had increased (14.2 and 15.0 percent respectively). WBG interventions did not address all of these factors directly, but helped reduce the number of days to register a business. At the same time, the WEF notes that, while the cost to obtain a construction permit decreased during the CPS period, the number of procedures did not change and the time required actually increased significantly. These numbers suggest that the business environment is still a concern in Serbia. WBG support came through the Private Financial Sector (PFS) DPL (FY09) and PFS DPL2 (FY10), an asset registration IDF grant, and targeted advisory services, particularly from IFC. IFC s AS focused on reducing regulations at the national and regional levels; improving the institutional framework for investment promotion; promoting alternative dispute resolution mechanisms, improving corporate governance, and helping the Belgrade Stock Exchange adopt a corporate governance code. 17. Bolstering the competitiveness of the enterprise sector. By end-2008, the government expected to have completed the divestiture of its portfolio of one thousand socially-owned enterprises. Companies for which privatization had not started by then would be closed. Over , 430 companies on the list were sold for 362 million; and 162 socially owned enterprises were sent into bankruptcy in The onset of the financial crisis delayed the process for the rest of the companies, and many privatization contracts had to be cancelled as private investors failed to fulfill contractual obligations. Of the large state companies, the government was able to sell a 51 percent

5 5 stake in the oil company and readied for sale the telecoms and state pharmaceutical companies. In addition the government is making progress carving out good assets of the national airline company (JAT) to create a new financially viable airline that will be offered for sale. Although privatization has slowed due to the difficult market conditions, progress made so far have curtailed subsidies in the budget from about 2 percent of GDP in 2007 to less than 1 percent of GDP last year. 18. WBG support consisted of the Private Financial Sector DPL (FY09) and DPL2 (FY10) and its related advice, as well as IFC investments and advice. IFC supported the expansion of the largest wood paneling plant (in a predominantly rural area), strengthened the financial structure of one of the largest employers and exporters in the country, and helped a food processing company implement its postprivatization investments. IFC work on International Standards and Technical Regulations (ISTR) improved export marketability of products by helping implement ISTR in food processing and other companies. Moreover, it conducted a strategic study for the restructuring of JAT airways. 19. Strengthening financial intermediation. The WBG strategy included among its objectives the divestiture of stakes in all state banks (up to minority holdings) and insurance sector holdings, as well as improving both property registration and financing. Of the four majority state-owned banks, one was sold to a foreign investor and two were merged, while a large state-owned insurer was privatized. However, the government still retains minority stakes in six banks. Nevertheless, the government strengthened the financial system by increasing the capital adequacy ratio, introducing a deposit insurance scheme, improving the bank resolution system, capitalizing those banks where the government has majority ownership, and decreasing by half the state share in the insurance sector to 35 percent of insurance premiums in These reforms helped Serbia s financial system weather the global financial crisis on a sounder footing. Evidence of stronger financial intermediation is the increase in mortgage financing of housing and commercial real estate, which went from about five percent of all property transactions in 2007 to over thirty percent of transactions in the third quarter of Interventions were supported by IBRD through the Private Financial Sector (PFS) DPL (FY09) and PFS DPL2 (FY10), the PFS Policy Based Guarantee (FY11), a cadastre project, and by IFC and MIGA through support in response to the global financial crisis (see below), and related advice. IFC engaged in a joint investment project in the financial sector with EBRD, and took minority stake in seven banks to channel lending to SMEs, agriculture and agribusiness. MIGA issued guarantees for investments in four financial institutions. 21. Contributing to improved, well-maintained and efficient infrastructure. The strategy focused on roads and the energy sector. On roads, the strategy targeted constructing the missing highway links on a major European road corridor; and increasing transport efficiency and safety on two sections of the corridor. There is little information about the improvement of transport efficiency and safety on the road corridor. On other roads, there is a reported reduction of a third in road crash related injuries, but the target of performance based contracting used in all regions was not achieved (many regions do not use it yet). Against a target of 530 km of roads rehabilitated with road roughness reduced on the international roughness index scale only 155 km were rehabilitated. Substantial delays in the implementation of the road corridor project reflected poor institutional coordination within the government, disagreements about the need to create an independent unit to manage the project, and slow preparation of technical and procurement documents. The main interventions in the transport sector were the Transport Rehabilitation Project (FY04), which is still active, and the Corridor X Highway Project (FY10). 22. On energy, the strategy focused on improving financial sustainability of the energy sector, as well as electricity market access for consumers and suppliers, and upgrading institutional capacity to participate in the regional electricity market. On the energy sector, tariffs are still below cost-recovery which impairs the financial viability and investment of the energy company (EPS). EPS s still dominant in Serbia s electricity market restructuring is delayed and there were no private investments in new generation capacity. Although these were significant partnership strategy objectives, there were no instruments in the program to support their achievement.

6 6 23. WBG assistance contributed significantly to strengthen competitiveness in the enterprise sector and succeeded in strengthening the financial sector. On the other hand, the business climate improved marginally and there was slight progress in improving infrastructure and making it more efficient. The WBG had no interventions to support the energy sector objectives of the strategy. On balance, the outcome under this pillar was moderately satisfactory. Pillar 2: Providing Opportunities and Broadening Participation in Growth 24. Under this pillar the WBG s support was to focus on (i) contributing to balanced regional development; (ii) improving effective social protection for the vulnerable; and (iii) strengthening social service quality and access in a decentralized environment. 25. Contributing to balanced regional development. The WBG strategy was to overcome significant regional disparities, as poverty is particularly evident in depressed former mining and industrial centers in Southern and Eastern Serbia (Bor region for example). The focus was on upgrading the regional infrastructure, the provision of economic incentives and roll-out of active labor market programs to ensure more balanced country-wide development. IEG has no information about the improvement of incomes in the regions. Market support of agriculture has improved, but during the CPS irrigation development made negligible progress. And the management and monitoring of agricultural systems are not operational as targeted under the CPS (EU-compliant rural development program).the main interventions were the Transitional Agriculture Reform Project (FY07), the Bor Regional Development Project (FY07), the Local Services Delivery Project (FY08), and a Public Expenditure DPL (FY10). The Transitional Agriculture Reform Project performed poorly (unsatisfactory rating) which explains in part underachievement in this sub-objective. Results were modest in the Bor region: 1200 people received employment support services (against a target of 2500) and 24 loans were provided through the microfinance program for US$110,000 (against a target of 1,000 micro-credit loans). 26. Improving effective social protection for the vulnerable. The strategy was to have a more effective and financially sustainable pension system, and better targeted social welfare programs. There was progress in pension reform despite strong headwinds from a difficult political environment, including resistance from the pensioner s party, a member of the governing coalition. However, the pension system remains unsustainable and its reform was based on a change in the indexation formula that deals with short term fiscal constraints but does not address the medium term sustainability of the system which still requires a parametric reform. The main interventions were the Consolidated Collection and Pension Administration Reform Project (FY05) still active, the Public Expenditure DPL (FY10), the Public Expenditure Review, and additional policy advice. 27. Strengthen social service quality and access in a decentralized environment. The strategy was to have an efficient, sustainable, and decentralized delivery of health, education, and social protection services. Social protection coverage improved significantly the number of beneficiaries for family and child allowances increased by over a third between 2008 and 2010 and coverage among the poorest quintile increased from 8 percent in 2008 to 9 percent in In health, patients registered in the 11 most vulnerable municipalities increased by sixty percent between 2009 and 2011 and the increase was over 70 percent in the five most vulnerable municipalities. Although IBRD prepared the relevant analysis, progress in implementing education reform and improving service delivery was effective, but very slow. Main interventions were projects on Local Services Delivery (FY08) and Health (additional financing) (FY09). 28. WBG assistance succeeded in improving the quality of and access to social services. But the WBG s contribution to balance regional development was modest and the pension system remains unsustainable. On balance, the outcome under this pillar is rated moderately unsatisfactory.

7 7 Pillar 3: Managing Emerging Environmental and Disaster Risks 29. Under this pillar the WBG s support was to focus on (i) improving environmental management; (ii) enhancing the efficiency in the use of natural resources; and (iii) strengthening the ability to prepare for, manage and mitigate environmental and disaster risks. 30. Improving environmental management. The strategy was to improve implementation and enforcement of environmental regulations controlling different pollution sources, while improving waste management, and biodiversity and natural resource management Among sources of pollution targeted were water pollution emanating from municipal and industrial sources, as well as air pollution coming from industry, thermal energy generation and transportation. The only available information on progress under this objective is that the annual decrease in the amount of nutrients (nitrogen and phosphorus) that eventually flow out of targeted farms is estimated to have declined by 44 percent for nitrogen and 100 percent for phosphorus since 2006.IBRD provided support through the Danube River Enterprise Pollution Reduction GEF Project (FY05), and an environmental compliance policy note. 31. Enhancing the efficiency in the use of natural resources. The WBG s strategy focused on a small part of this broad objective: to improve by 45 percent energy efficiency in over 200 public buildings. About 40 public buildings have been retrofitted to date and the energy efficiency achieved in them is over 40 percent. The main intervention was an Energy Efficiency Project (FY04) that is still active. 32. Strengthen the ability to prepare for, manage and mitigate environmental and disaster risks. The WBG objective was to reduce the risk of damage from flooding to land, crops, property, infrastructure, as well as reduce the risk of loss of life from flooding. Results have been modest. Sixteen flood protection programs were completed covering over 60,000 hectares (the target was 550,000 hectares), and there s no information on the number of people protected (target was 2 million). The main intervention was the regional Catastrophic Risk Insurance Facility Project approved in FY WBG assistance had modest results in all the sub-objectives of this pillar, whose outcome is rated moderately unsatisfactory. Modest progress was made in reducing the flow of water pollution from farming, in enhancing the efficiency in the use of natural resources, and in preparing for and mitigating unexpected environmental and disaster risks. In addition, there was negligible progress in remediating urgent environmental hazards, while there was unknown progress in reducing pollution flows due to non-farming activities. Objectives Pillar I: Encouraging private sector led growth to ensure income convergence with Europe Pillar II: Providing opportunities and broaden participation in growth Pillar III: Managing emerging environmental and disaster risks IEG Rating Moderately Satisfactory Moderately Unsatisfactory Moderately Unsatisfactory

8 8 4. Overall IEG Assessment Outcome: Bank Performance: IFC Performance MIGA Performance Moderately Unsatisfactory Moderately Satisfactory Moderately Satisfactory Satisfactory Overall outcome: 34. This was an ambitious program with modest results because of an overly optimistic strategy given the institutional capacities, compounded by the adverse effects of the global financial crisis. The overall outcome is rated moderately unsatisfactory. Under Pillar 1, WBG assistance helped strengthen competitiveness in the enterprise sector and succeeded in strengthening financial sector. The business climate improved only marginally and there was slight progress in improving infrastructure and making it more efficient. Under Pillar 2, the efforts centered, sensibly, on regional development. But results were modest as a key project on agriculture reform performed poorly, which partly explains underachievement in this sub-objective. The WBG strategy succeeded in improving the quality of, and access to, social services. Pillar 3, less important than the other two and the weakest of the three in terms of outcomes, had modest or negligible results in improving reducing pollution coming from targeted agricultural activities, strengthening environmental management, enhancing the efficiency in the use of natural resources, and managing environmental and disaster risk. IBRD/IDA Performance: 35. IBRD/IDA performance is rated moderately satisfactory. The WBG s strategy and program were well aligned with Serbia s development strategy, and well-coordinated between IBRD/IDA, IFC and MIGA, as well as other development partners. The lending program underwent significant changes at CPS progress report stage reflecting changing government priorities more emphasis on developing highway major European road network and coping with the adverse effects of the global financial crisis. IBRD/IDA s response was flexible and creative, as evidenced by the policy based guarantee used to leverage additional resources. The strategy was relevant touching, for the most part, on key priorities with appropriate interventions but implementation could have improved by making projects effective faster in significant sub-objectives of the strategy (e.g. infrastructure). This would have required better project preparation to improve inter-agency and inter-ministry coordination in complex operations. AAA was useful and generally well-timed. At the same time, as regards program design, it is unclear that the pillar on environment and disaster risk reflected a genuine government priority, and it appears as an add-on in the partnership strategy. As a result, its outcomes were poor. Moreover, some targeted outcomes were unrealistic because they lacked supporting instruments (e.g., energy sector), or were directly not measured (e.g. pollution flows to the Danube River due to non-agricultural sources, transport efficiency, incomes in Bor and Resavica). IFC Performance: 36. IFC performance is rated moderately satisfactory. It responded to the financial crisis by strengthening selected banks and increasing its support to the real sector. Advisory services contributed to the competitiveness and environmental management sub-objectives, in several cases building on previous advisory services projects. IFC achieved additionality mainly through provision of long term finance and capital contributions at a time when funding was scarce, as well as through collaboration with other IFIs and utilization of advisory services to support investments. However, IFC missed the opportunity to refocus advisory services towards strengthening of the financial system as envisaged in the CPSPR.

9 9 MIGA Performance: 37. MIGA performance is rated satisfactory. MIGA s work was relevant and focused, providing guarantees to five projects four in the financial sector following three years of no new projects. The guarantees were well targeted, with appropriate collaboration with IFC. MIGA s response to the financial crisis helped strengthen the banking system by enabling additional investments in financial institutions. 5. Assessment of CAS Completion Report 38. This is a well-written CPSCR. The evaluation is detailed and comprehensive for the most part, although it could have dealt more in-depth with areas of the program where things did not go well, to find out the reasons and draw lessons. 6. Findings and Lessons 39. IEG agrees with the CPSCR lessons and recommendations for the next CPS, particularly on the need to continue the alignment of CPS activities with the EU integration agenda, focus investment operations on a narrow set of objectives, and try to avoid involvement of multiple agencies in project management. Moreover, proposed outcomes in partnership strategies need to reflect genuine government priorities and be supported by appropriate interventions to achieve stated outcomes. IEG notes the creative way in which IBRD/IDA responded to changing circumstances, as evidenced by the policy based guarantee that it used to leverage additional resources for Serbia.

10

11 11 Annex Table 1: Planned and Actual Lending, FY08-11 Annex Table 2: Planned and Actual Analytical and Advisory Work, FY08-11 Annex Table 3a: IEG Project Ratings for Serbia, FY08-11 Annex Table 3b: IEG Project Ratings for Serbia and Comparators, FY08-11 Annex Table 4: Portfolio Status for Serbia and Comparators, FY08-11 Annex Table 5: IBRD/IDA Net Disbursements and Charges Summary Report for Serbia (in US$ million) Annex Table 6: Net Partnership Flows (in US$ million) Annex Table 7: Economic and Social Indicators for Serbia and Comparators, Table 8a. Serbia: IFC Investment Projects Approved During FY08-11 Table 8b. Serbia: IFC Investment Project Approved Prior To and Active During FY08-11 Table 9a. Serbia: IFC Advisory Services Projects Approved During FY08-11 Table 9b. Serbia: IFC Advisory Services Projects Approved Prior To and Active During FY08-11 Annex Table 10: Serbia Summary of Achievements of the CPS Objectives

12

13 13 Annex Table 1: Planned and Actual Lending, FY08-11 Project Project ID Proposed FY Approval FY Proposed Amount 1/ Approved Amount Programmed projects Private Financial Sector DPL P Local Services Delivery P Health Additional Financing P Railways 2008 Dropped 75.0 Dropped Private Financial Sector DPL 2 P Resavica Regional Development P Dropped 40.0 Dropped Regional Disaster Preparedness 2009 Dropped 25.0 Dropped Energy Generation Rehabilitation 2009 Dropped 55.0 Dropped Corridor X Highway Project P Public Expenditure DPL P Public Expenditure DPL 2 P PF PBG P Dropped Total Programmed projects CPS FY Non-programmed projects CRIF P Total Non-programmed projects CPS FY Grants and Special Financing Projects Danube River Enterprise Pollution Reduction GEF Project P INDJIJA Infrastructure Investment Program P YF-PFS Policy Based Guarantee P IDF-Regulatory Impact Assessment P IDF-SOE Incorporation P IDF-Serbia Asset Registry P IDF-E-Government Approaches P Total Grants and Special Financing Projects CPS FY Total projects CPS FY Source: Serbia CPS, 2010 CASPR and WB Business Warehouse Table 2a.1, 2a.4 and 2a.7 as of 10/31/ The proposed CPS amount was $600 mln, comprising $350 mln in identified projects for FY09-FY09 and an indicative amount of $250 mln for projects in FY10-11 to be identified later. At CPS progress report stage the lending program was augmented to $900 mln as reflected in last column of the table and projects identified for FY percent of IBRD guarantee for $400 mln. The rest--$300 mln is booked against a set-aside fund that pulls together IBRD capital.

14 14 Annex Table 2: Planned and Actual Analytical and Advisory Work, FY08-11 Project Proposed Delivered to Client ID FY FY Output Type Economic and Sector Work Planned (CAS FY08-11) Serbia Economic Memorandum P Forwarded to FY12 Policy Note Justice and Governance IDF 2008 Dropped Disaster Risk Mitigation and Adaptation (Regional) 2008 Dropped South East Europe Regional Higher Education Study 2008 Dropped Road financing and institutional study P Report Programmatic poverty assessments 2008 Dropped Public Investment and Expenditure Management Review P Report Employment Generation Options 2009 Dropped Private Sector Participation in Social Services (with IFC) 2009 Dropped PPP Analysis: Opportunities and Contingent Liabilities 2009 Dropped Corporate Financial Reporting IDF 2009 Dropped Municipal Enterprise Restructuring/ Privatization P Policy Note Programmatic poverty assessments 2009 Dropped Non-Planned Environmental Compliance Policy Note P Policy Note Baseline Survey Primary Health Centers P Report Public Expenditure Review P Report Policy Notes on Growth P Policy Note PER Follow up P Report FSAP Update Serbia P Report Technical Assistance Planned (CPS FY08-11) ROSC Follow-up TA YF P "How-To" Guidance Capital Markets Development TA P "How-To" Guidance Public Financial Management (SAI) TA 2009 Dropped Roundtables P Knowledge-Sharing Forum Education Strategy P "How-To" Guidance Non-Planned Road Safety Mgt Cap Review (ETWTR) P Institutional Development Plan CF ASSIST - NATL TRNG WORKSHOP-JI/GIS P Knowledge-Sharing Forum Roundtables P Knowledge-Sharing Forum Innovation Promotion TA P "How-To" Guidance YF Innovation Promotion TA 2 P "How-To" Guidance Serbia Crisis Preparedness Assessment P Client Document Review Serbia Capital Markets Development TA 2 P "How-To" Guidance Regulatory Reform: Capacity Building P Institutional Development Plan Pension TA P "How-To" Guidance Serbia Innovation Promotion TA P "How-To" Guidance Source: Serbia 2008 CPS, 2010 CASPR and WB Business Warehouse Table 2a.1, 2a.4 and 2a.7 as of 10/31/2011.

15 15 Exit FY Annex Table 3a: IEG Project Ratings for Serbia, FY08-11 Total Project Name Evaluated IEG Outcome (US$M) IEG Risk to Development Outcome * Project ID NA Closed Projects Not Evaluated by IEG Exit FY 2010 Project Name Second Programmatic Private Financial Sector Development Ongoing Projects: ISR ratings Closing FY Project Name Total Evaluated (US$M) Outcome Risk to Development Project ID Satisfactory Modest P Total Evaluated (US$M) ISR DO ISR IP ISR Date PIN 2012 Health Project (Serbia) 20.0 Satisfactory Moderately Satisfactory 1/26/2011 P Energy Efficiency Project 21.0 Moderately Satisfactory Moderately Satisfactory 5/19/2011 P Transport Rehabilitation Project (Serbia) 55.0 Satisfactory Satisfactory 3/29/2011 P Real Estate Cadastre & Registration Project (Serbia) Consolidated Collection & Pension Administration Reform Project (Serbia) Energy Community of South East Europe (APL) Program - Serbia and Montenegro Component - Serbia Project Irrigation & Drainage Rehabilitation Project (Serbia) 30.0 Satisfactory 25.0 Moderately Satisfactory Moderately Satisfactory Moderately Satisfactory 8/29/2011 P /10/2011 P Satisfactory Satisfactory 5/19/2011 P Moderately Satisfactory Satisfactory 6/6/2011 P Transitional Agriculture Reform Project 17.0 Unsatisfactory Unsatisfactory 8/27/2011 P YF BOR Reg Devt Proj 43.0 Moderately Satisfactory Moderately Satisfactory 3/27/2011 P Annex Table 3b: IEG Project Ratings for Serbia and Comparators, FY08-11 Region Total Evaluated ($M) Total Evaluated(No) Outcome % Sat ($) Outcome % Sat (No) RDO % Moderate or Lower ($) * RDO % Moderate or Lower (No) * Serbia NA Croatia Bulgaria Montenegro Albania ECA 5, World Bank 31, Source: WB Business Warehouse Table 4a.5 and 4a.6 as of as of 10/19/2011

16 16 Annex Table 4: Portfolio Status for Serbia and Comparators, FY08-11 Fiscal year Serbia # Proj # Proj At Risk % At Risk Net Comm Amt Comm At Risk % Commit at Risk Croatia # Proj Net Comm Amt # Proj At Risk % At Risk 1, , , ,007.9 Comm At Risk % Commit at Risk Montenegro # Proj Net Comm Amt # Proj At Risk % At Risk Comm At Risk % Commit at Risk Bulgaria # Proj # Proj At Risk % At Risk Net Comm Amt Comm At Risk % Commit at Risk Bosnia & Herzegovina # Proj # Proj At Risk % At Risk Net Comm Amt Comm At Risk % Commit at Risk Albania # Proj # Proj At Risk % At Risk Net Comm Amt Comm At Risk % Commit at Risk ECA # Proj # Proj At Risk % At Risk Net Comm Amt 17, , , ,535.4 Comm At Risk 2, , , ,116.9 % Commit at Risk World # Proj 1,525 1,552 1,590 1,595 # Proj At Risk % At Risk Net Comm Amt 106, , , ,248.7 Comm At Risk 18, , , ,978.5 % Commit at Risk Source: WB Business Warehouse Table 3a.4 as of 10/3/2011.

17 17 Annex Table 5: IBRD/IDA Net Disbursements and Charges Summary Report for Serbia (in US$ million) FY Disb. Amt. Repay Amt. Net Amt. Charges Fees Net Transfer Total (08-11) Source: WB Loan Kiosk, Net Disbursement and Charges Report as of 10/31/2011. Annex Table 6: Net Partnership Flows (in US$ million) Development Partners Bilaterals Germany Italy Norway Spain Switzerland United Kingdom United States DAC Countries, Total Poland Other Development Partners, Total Non-DAC Countries, Total Multilaterals IDA Multilateral Agencies, Total All Development Partners, Total Source: WB Loan Kiosk, Net Disbursement and Charges Report as of 10/31/2011.

18 18 Growth and Inflation Annex Table 7: Economic and Social Indicators for Serbia and Comparators, Series Name Serbia Serbia Croatia Montenegro Bulgaria Bosnia & Herzegovina Average Albania ECA World GDP growth (annual %) GDP per capita growth (annual %) GNI per capita, PPP (current international $) GNI, Atlas method (billions of current US$) Inflation, consumer prices (annual %) Composition of GDP (%) Agriculture, value added (% of GDP) Industry, value added (% of GDP) Services, etc., value added (% of GDP) Gross fixed capital formation (% of GDP) Gross domestic savings (% of GDP) External Accounts Exports of goods and services (% of GDP) Imports of goods and services (% of GDP) Current account balance (% of GDP) External debt, total (% of GNI) Total debt service (% of GNI) Total reserves in months of imports Fiscal Accounts /1 Revenue (% of GDP) / 26.0 Total Expenditure (and net lending, % of GDP) / 30.5 Overall Balance (% of GDP) / -4.5 Public Sector Debt (% of GDP)2/ / 56.7 Social Indicators Health

19 19 Series Name Serbia Serbia Croatia Montenegro Bulgaria Bosnia & Herzegovina Average Albania ECA World Life expectancy at birth, total (years) Immunization, DPT (% of children ages months) Improved sanitation facilities (% of population with access) Improved water source (% of population with access) Mortality rate, infant (per 1,000 live births) Population Population, total (in million) Population growth (annual %) Urban population (% of total) Education School enrollment, preprimary (% gross) School enrollment, primary (% gross) School enrollment, secondary (% gross) Source: WB World Development Indicators as of date 10/31/2011 for all indicators excluding those noted. 1/ IMF 2010 Republic of Serbia Article IV 2/ 2009 and 2010 data are IMF's projections 3/Data for 2010 are not included.

20 20 Table 8a. Serbia: IFC Investment Projects Approved During FY08-11 Project ID Approval FY Closure FY Project Status Cluster Dept LN Net Cmt EQ Net Cmt Total Net Cmt Active FM $0 $21,055 $21, Active FM $15,678 $0 $15, Closed MAS $56,406 $0 $56, Active MAS $29,786 $0 $29, Active FM $24,822 $0 $24, Active FM $49,644 $0 $49, Active FM $24,211 $0 $24, Active MAS $2,888 $0 $2, Active MAS $3,192 $0 $3, Active FM $0 $11,699 $11, Active FM $49,999 $0 $49, Active MAS $57,610 $0 $57, Active MAS $34,179 $0 $34,179 Table 8b. Serbia: IFC Investment Project Approved Prior To and Active During FY08-11 Project ID Approval FY Closure FY Project Status Cluster Dept LN Net Cmt EQ Net Cmt Total Net Cmt Active FM $23,035 $0 $23, Closed FM $4,000 $1,041 $5, Closed MAS $14,004 $3,588 $17, Closed FM $8,000 $0 $8, Closed FM $3,332 $0 $3, Closed FM $0 $0 $ Closed MAS $0 $4,082 $4, Closed FM $0 $0 $ Closed FM $1,033 $0 $1, Active FM $37,611 $0 $37, Closed FM -$2,306 $0 -$2, Closed FM -$186 $0 -$ Closed FM $13,441 $0 $24, Closed FM $40,324 $0 $40, Active FM $76,590 $48,694 $125, Active FM $25,530 $0 $25, Active FM $19,021 $0 $19,021

21 21 Project ID Table 9a. Serbia: IFC Advisory Services Projects Approved During FY08-11 Project Name Status Dept Business Line Start FY End FY Total Funds Managed by IFC as of April 30, ADR Serbia Construction Sector Active CEUBG Investment Climate 2009 $671, Integrated Solid Waste Management Program - Sustainable Business Active CEUBF Serbia Advisory 2009 $987, ISTR Serbia Ext Active CEUBG Sustainable Business Advisory 2009 $740, CorpGovSerbia-II Active CEUBG Sustainable Business Advisory 2009 $656,571 Project ID Table 9b. Serbia: IFC Advisory Services Projects Approved Prior To And Active During FY08-11 Project Name Status Dept Business Line Regulatory Impact Analysis - Improvements in efficiency and transparency of the legislative process Start FY End FY Total Funds Managed by IFC as of April 30, 2011 Active CICRS Investment Climate 2007 $809, Serbia Sub-national Competitiveness Active CEUBG Investment Climate 2007 $1,050, ProCredit Bank EE TA - Serbia Closed CF3F8 Access To Finance $133, JAT Airways Closed C3PDR Public-Priv Partnerships Transaction Advisory $520, ADR PEP SE Ser Closed CEUBG Investment Climate $1,114, CTR Tigar Closed CSBCP Sustainable Business Advisory $22, Corporate Governance Project in Serbia Closed CEUBG Sustainable Business Advisory $941, International Technical Standards and Sustainable Business Closed CEUBG Regulations Serbia Advisory $ 559, Recycling PEP SE Serbia Closed CEUBG Sustainable Business Advisory $1,342, Serbia Investment Promotion Program Closed CICIG Investment Climate $4,775, Sustainable Business Belgrade Water Closed CSEIF (TATF) Advisory $1,521, Belgrade: Municipal Solid Waste Disposal Sustainable Business Closed CASDR (TATF) Services PPP Advisory $2,000,827

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group 1. CPS Data Country: Ukraine CPS Year: FY08 FY11 CPS Period: FY 08 FY 11 CPSCR Review Period: FY 08 FY 11 Date of this review: February 9, 2012 2. Executive Summary i. This review examines the implementation

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. CPS Data Country: BULGARIA CPS Year: FY 2006 CPSCR Review CPS Period: FY07- FY09 CPSCR

More information

Turkey s World Bank Portfolio in Context. Sally Zeijlon ECA Quality Unit Manager February 6, 2012

Turkey s World Bank Portfolio in Context. Sally Zeijlon ECA Quality Unit Manager February 6, 2012 0 Turkey s World Bank Portfolio in Context Sally Zeijlon ECA Quality Unit Manager February 6, 2012 1 Turkey in the World Bank and ECA Turkey s loans are significant in the Bank s loan portfolio Commitments

More information

CASCR Review Independent Evaluation Group

CASCR Review Independent Evaluation Group 1. CAS Data CASCR Review For Official Use Only 5/30/2013 Country: Belarus CAS Year: FY08 CAS Period: FY08-FY11 CASCR Review Period: FY08-FY12 Date of this review: 5/30/2013 2. Executive Summary i. This

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group 1. CPS Data Country: Tajikistan Public Disclosure Authorized Public Disclosure Authorized CPS Year: FY10 CPS Period: FY10 FY14 Period: FY10 FY14 Date of this review: May 28, 2014 2. Executive Summary i.

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. CPS Data Country: Mozambique CPS Year: FY07 2. Executive Summary For Official Use

More information

CASCR Review Independent Evaluation Group

CASCR Review Independent Evaluation Group Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. CAS Data Country: Sri Lanka 2. Executive Summary CASCR Review CAS Year: FY08 CAS Period:

More information

CLR Review Independent Evaluation Group

CLR Review Independent Evaluation Group June 2, 2016 1. CAS/CPS Data Country: Uzbekistan CAS/CPS Year: FY12 CAS/CPS Period: FY12 FY15 CASCR/CPSCR Review Period: FY12- FY15 Date of this review: June 2, 2016 2. Ratings CLR Rating IEG Rating Development

More information

Actual Project Name : Transitional Support Credit Country: Bangladesh US$M): Project Costs (US$M Sector Board : EP Cofinancing (US$M

Actual Project Name : Transitional Support Credit Country: Bangladesh US$M): Project Costs (US$M Sector Board : EP Cofinancing (US$M IEG ICR Review Independent Evaluation Group Report Number : ICRR13360 1. Project Data: Date Posted : 03/30/2010 PROJ ID : P110167 Appraisal Actual Project Name : Transitional Support Project Costs (US$M

More information

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220

Country Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT

More information

Central government administration (80%); Sub-national government administration (20%) Operation ID

Central government administration (80%); Sub-national government administration (20%) Operation ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The

More information

INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER

INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER Country Background INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER April 26, 2006 1. Ukraine re-established its independence in 1991, after more than 70 years of

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group For Official Use Only 1. CPS Data Country: Armenia CPS Year: FY09 CPS Period: FY09 - FY13 CPSCR Review Period: FY09-FY13 Date of this review: October 24, 2013 2. Executive Summary i. This review examines

More information

PROGRAM INFORMATION DOCUMENT (PID) Appraisal stage Report No Operation Name Financial Sector Development Policy Loan Region

PROGRAM INFORMATION DOCUMENT (PID) Appraisal stage Report No Operation Name Financial Sector Development Policy Loan Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) Appraisal stage Report No. 50225 Operation Name Financial

More information

Jordan Country Brief 2011

Jordan Country Brief 2011 Jordan Country Brief 2011 CONTEXT The Hashemite Kingdom of Jordan is an upper middle income country with a population of 6 million and a per-capita GNI of US $4,390. Jordan s natural resources are potash

More information

FAST TRACK BRIEF. Uganda Country Assistance Evaluation,

FAST TRACK BRIEF. Uganda Country Assistance Evaluation, FAST TRACK BRIEF April 13, 2009 The IEG report Uganda Country Assistance Evaluation, 2001-07, was discussed by CODE on April 13, 2009 Uganda Country Assistance Evaluation, 2001-07 The World Bank and the

More information

INDONESIA Country Partnership Framework

INDONESIA Country Partnership Framework INDONESIA Country Partnership Framework 2016-2020 WHO WE ARE Established in 1944. Headquartered in Washington D.C. The World Bank Group comprises five institutions managed by their 188 member countries

More information

Annex 1: Country Profile ANTIGUA AND BARBUDA

Annex 1: Country Profile ANTIGUA AND BARBUDA ANTIGUA AND BARBUDA Annex 1: Country Profile Population: 79, (23) GNI per capita: US$9,95 (24 est. Atlas methodology) 1. Profile. Antigua and Barbuda is a three-island economy (Redonda is the third) which

More information

INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO. February 27, 2006 I. INTRODUCTION

INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO. February 27, 2006 I. INTRODUCTION INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO Joint Staff Advisory Note on the Poverty Reduction Strategy Progress Reports Prepared by the Staffs of the International

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group 1. CPS Data Country: Dominican Republic CPS Year: FY10 CPS Period: FY10 FY13 CPSCR Review Period: FY10 FY13 Date of this review: 9/8/2014 Public Disclosure Authorized Public Disclosure Authorized 2. Executive

More information

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following:

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 03/25/2015 Report Number: ICRR14675 Public Disclosure Authorized Public Disclosure Authorized Public

More information

CLR Review Independent Evaluation Group

CLR Review Independent Evaluation Group Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. CPS Data Country: Costa Rica 2. Overall IEG Assessment CLR Review CPS Year: FY11 CPS

More information

2015 Development Policy Financing Retrospective: Preliminary Findings

2015 Development Policy Financing Retrospective: Preliminary Findings 2015 Development Policy Financing Retrospective: Preliminary Findings Purpose of this Consultation Meeting on the DPF Retrospective The 2015 Retrospective will focus on the Bank s experience with Development

More information

WBG Infrastructure Response to the Crisis

WBG Infrastructure Response to the Crisis WBG Infrastructure Response to the Crisis BA April 2009 BANK FOR INTERNATIONAL WORLD BANK 1 DEVELOPMENT RECONSTRUCTION AND Outline I. Context and Background II. Infrastructure and the Crisis III.WBG Response

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

Synopsis. Challenge. More Results. Turkey-Sustained and Equitable Growth for Continued Economic Success

Synopsis. Challenge. More Results. Turkey-Sustained and Equitable Growth for Continued Economic Success Turkey-Sustained and Equitable Growth for Continued Economic Success Turkey Sustained and Equitable Growth for Continued Economic Success Synopsis Turkey is one of the greatest success stories of the global

More information

Independent Evaluation Group

Independent Evaluation Group 1. CPS Data Country: Turkey CPS Year: FY12 2. Ratings CLR Rating IEG Rating Development Outcome: Moderately Satisfactory Moderately Satisfactory WBG Performance: Good Good 3. Executive Summary CPS Period:

More information

The Big Business of Small Enterprises

The Big Business of Small Enterprises The Big Business of Small Enterprises An IEG Evaluation of WBG Experience with Targeted Support for SMEs 2006-12 Andrew H. W. Stone IEG, Private Sector JOINT MNSFP-MENA Chief Economist Seminar January

More information

Beneficiary View. Cameroon - Total Net ODA as a Percentage of GNI 12. Cameroon - Total Net ODA Disbursements Per Capita 120

Beneficiary View. Cameroon - Total Net ODA as a Percentage of GNI 12. Cameroon - Total Net ODA Disbursements Per Capita 120 US$ % of GNI Beneficiary View Cameroon - Official Development Assistance (OECD/DAC Data) Source: OECD/DAC Database by Calendar Year (as of 2/2/213) unless noted. Cameroon - Total Net ODA as a Percentage

More information

CASCR Review Independent Evaluation Group

CASCR Review Independent Evaluation Group 1. CAS Data CASCR Review Public Disclosure Authorized Public Disclosure Authorized Country: Rwanda CAS Year: FY09 CAS Period: FY09-FY13 CASCR Review Period: FY09-FY13 Date of this review: May 21, 2014

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Beneficiaries Implementing Agency Report No. PID10910 India-Andhra Pradesh Economic Reform... Loan/Credit South Asia Poverty Reduction and Economic Management

More information

PROGRAM INFORMATION DOCUMENT (PID)

PROGRAM INFORMATION DOCUMENT (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) Appraisal STAGE September 25, 2015

More information

CLR Review Independent Evaluation Group

CLR Review Independent Evaluation Group Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. CAS/CPS Data Country: Zambia CAS/CPS Year: FY13 2. Ratings For Official Use Only 1

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020620 Public Disclosure Authorized Public Disclosure Authorized Operation ID P147166 Country Haiti

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 2012 Bulgaria Country Partnership Strategy Review and Planning A knowledge-based and

More information

Press Release No. 45 October 8, Statement by the Hon. JAN KEES DE JAGER, Governor of the Bank for the KINGDOM OF THE NETHERLANDS NETHERLANDS

Press Release No. 45 October 8, Statement by the Hon. JAN KEES DE JAGER, Governor of the Bank for the KINGDOM OF THE NETHERLANDS NETHERLANDS Press Release No. 45 October 8, 2010 Statement by the Hon. JAN KEES DE JAGER, Governor of the Bank for the KINGDOM OF THE NETHERLANDS NETHERLANDS Statement by Jan Kees de Jager Minister of Finance of the

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group 1. CPS Data Country: Brazil CPS Year: FY08 (CPS), FY10 (CPSPR) CPS Period: FY08 FY11 CPSCR Review Period: FY08 FY11 Date of this review: October 26, 2011 2. Executive Summary i. This review examines the

More information

STATUS OF PROJECTS IN EXECUTION FY09 SOPE

STATUS OF PROJECTS IN EXECUTION FY09 SOPE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized STATUS OF PROJECTS IN EXECUTION FY09 SOPE COUNTRY: GUINEA Operations Policy and Country

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group For Official Use Only 1. CPS Data Country: Paraguay CPS Year: FY09 CAS/CPS Period: FY09 FY13 CPSCR Review Period: FY09 FY14 Date of this review: November 18, 2014 2. Executive Summary i. This review examines

More information

Governor's Statement No. 30 October 7, Statement by the Hon. ZHOU XIAOCHUAN, Governor of the Fund for the PEOPLE'S REPUBLIC OF CHINA

Governor's Statement No. 30 October 7, Statement by the Hon. ZHOU XIAOCHUAN, Governor of the Fund for the PEOPLE'S REPUBLIC OF CHINA Governor's Statement No. 30 October 7, 2016 Statement by the Hon. ZHOU XIAOCHUAN, Governor of the Fund for the PEOPLE'S REPUBLIC OF CHINA Statement by the Hon. ZHOU Xiaochuan, Governor of the Fund for

More information

4. Balance of Payments and Foreign Trade

4. Balance of Payments and Foreign Trade 24 4. Balance of Payments and Foreign Trade 4. Balance of Payments and Foreign Trade Current account deficit in 2014 was lower than the one realised in 2013 In the period January- November 2014, current

More information

Mauritius First Public Sector Performance Development Policy Loan Region

Mauritius First Public Sector Performance Development Policy Loan Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6561 Operation Name Mauritius

More information

REPUBLIC OF MONTENEGRO: COUNTRY FINANCING PARAMETERS

REPUBLIC OF MONTENEGRO: COUNTRY FINANCING PARAMETERS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MONTENEGRO: COUNTRY FINANCING PARAMETERS Date: 15 May 2007 Item Cost Sharing.

More information

Project Costs (US$M):

Project Costs (US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 10/05/2015 Report Number: ICRR14849 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Annex 1: Country Profile ST. LUCIA

Annex 1: Country Profile ST. LUCIA Annex 1: Country Profile ST. LUCIA Population: 161,000 (2003) GNI per capita: US$4,300 (2004 est. Atlas methodology) 1. Profile. St. Lucia is the most densely populated of the four Windward Islands. The

More information

US$M): Sector Board : FPD Cofinancing (US$M US$M): (US$M US$M):

US$M): Sector Board : FPD Cofinancing (US$M US$M): (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13644 1. Project Data: Date Posted : 07/14/2011 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Country Practice Area(Lead) Additional Financing Indonesia Water P161514

Country Practice Area(Lead) Additional Financing Indonesia Water P161514 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020651 Public Disclosure Authorized Public Disclosure Authorized Project ID P096532 Project Name ID:

More information

CLR Review Independent Evaluation Group

CLR Review Independent Evaluation Group Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. CAS/CPS Data Country: Sri Lanka CAS/CPS Year: FY12 2. Ratings CLR Review CLR Rating

More information

Mongolia The SCD-CPF Engagement meeting with development partners September 1 and 22, 2017

Mongolia The SCD-CPF Engagement meeting with development partners September 1 and 22, 2017 Mongolia The SCD-CPF Engagement meeting with development partners September 1 and, 17 This is a brief, informal summary of the issues raised during the meeting. If you were present and wish to make a correction

More information

International Monetary Fund. Not for Redistribution

International Monetary Fund. Not for Redistribution 2006 International Monetary Fund April 2006 IMF Country Report No. 06/139 January 29, 2001 January 29, 2001 January 29, 2001 January 29, 2001 January 29, 2001 Serbia and Montenegro: Poverty Reduction Strategy

More information

Session 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department

Session 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department Session 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department Introductory Course on Economic Analysis of Policy-Based Lending Operations 7 June 2007 ADB-Philippines

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former

More information

THE NEED TO ADDRESS FINANCIAL MARKETS DEVELOPMENT IN THE REGION

THE NEED TO ADDRESS FINANCIAL MARKETS DEVELOPMENT IN THE REGION SOUTH CAUCASUS AND UKRAINE INITIATIVE THE NEED TO ADDRESS FINANCIAL MARKETS DEVELOPMENT IN THE REGION Working Group on Financial Markets Development and Impact of Central Banks 17 November 2009 Warsaw,

More information

Ex post evaluation Georgia

Ex post evaluation Georgia Ex post evaluation Georgia Sector: Formal sector financial intermediaries (24030) Programme/Project: Agricultural financing programme (fiduciary holding) (BMZ No. 2011 66 552)* Implementing agency: three

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: 113653 Program

More information

Partnering with IFC. Anita Bhatia and Urkaly Isaev October 2014 THE POWER OF PARTNERSHIPS

Partnering with IFC. Anita Bhatia and Urkaly Isaev October 2014 THE POWER OF PARTNERSHIPS Partnering with IFC Anita Bhatia and Urkaly Isaev October 2014 THE POWER OF PARTNERSHIPS 1 World Bank Group 2 Twin Goals of the World Bank Group 3 4 The private sector in development 5 IFC s Three Businesses

More information

Facing the need for a sustainable growth strategy, Moldova has

Facing the need for a sustainable growth strategy, Moldova has IDA at Work Moldova: A Country Ready to Make a Great Leap Forward Facing the need for a sustainable growth strategy, Moldova has been working with the International Development Association (IDA) to address

More information

Public Information Document for Project P075192

Public Information Document for Project P075192 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Information Document for Project P075192 Project Name: Region : Sector: Project:

More information

CLR Review Independent Evaluation Group

CLR Review Independent Evaluation Group 31. CAS/CPS Data Country: Bosnia and Herzegovina CAS/CPS Year: FY12 CAS/CPS Period: FY12 FY15 CLR Period: FY12 FY15 Date of this review: December 9, 2015 2. Ratings CLR Rating IEG Rating Development Outcome:

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. CPS Data Country: Kazakhstan CPS Year: FY05 2. Executive Summary For Official Use

More information

Country Partnership Framework. for Poland

Country Partnership Framework. for Poland Country Partnership Framework for Poland 2018-2023 World Bank Group The World Bank Group (WBG) is an international financial institution (IFI) with the mission to fight poverty and support inclusive growth.

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021272 Public Disclosure Authorized Public Disclosure Authorized Operation ID P159774 Country Fiji Operation Name Fiji Post-Cyclone Winston

More information

CLR Review Independent Evaluation Group

CLR Review Independent Evaluation Group 1. CAS-ISN Data Country: Arab Republic of Egypt CAS-ISN Year: FY06-FY14 CAS-ISN Period: FY06 FY14 CLR Period: FY06 FY14 Date of this review: December 9, 2015 2. Ratings CLR Rating IEG Rating Development

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

INDEPENDENT EVALUATION GROUP EVALUATION OF THE WORLD BANK GROUP S DEVELOPMENT EFFECTIVENESS IN PERU, FY03-09 APPROACH PAPER

INDEPENDENT EVALUATION GROUP EVALUATION OF THE WORLD BANK GROUP S DEVELOPMENT EFFECTIVENESS IN PERU, FY03-09 APPROACH PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Introduction INDEPENDENT EVALUATION GROUP EVALUATION OF THE WORLD BANK GROUP S DEVELOPMENT

More information

Private Sector Facility: Working with Local Private Entities, Including Small and Medium-Sized Enterprises

Private Sector Facility: Working with Local Private Entities, Including Small and Medium-Sized Enterprises Private Sector Facility: Working with Local Private Entities, Including Small and Medium-Sized Enterprises GCF/B.09/12 5 March 2015 Meeting of the Board 24-26 March 2015 Songdo, Republic of Korea Agenda

More information

Poverty Profile Executive Summary. Azerbaijan Republic

Poverty Profile Executive Summary. Azerbaijan Republic Poverty Profile Executive Summary Azerbaijan Republic December 2001 Japan Bank for International Cooperation 1. POVERTY AND INEQUALITY IN AZERBAIJAN 1.1. Poverty and Inequality Measurement Poverty Line

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group CPSCR Review Public Disclosure Authorized 1. CPS Data Country: Guatemala CPS Year: FY09 CPS Period: FY09 FY12 CPSCR Review Period: FY09 - FY12 Date of this review: September 18, 2012 2. Executive Summary

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: Ukraine Project: Economic Reform Development Policy Loan (Ⅱ) Loan Agreement: December 4, 2015 Loan Amount: JPY

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Program Information Document (PID)

Program Information Document (PID) Program Information Document (PID) Concept Stage Date Prepared/Updated: 14-Feb-2018 Report No: 123796 Feb 14, 2018 Page 1 of 7 DETAILS-NewFin3 The World Bank BASIC INFORMATION A. Basic Project Data OPS

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND REPUBLIC OF ARMENIA Poverty Reduction Strategy Paper Second Progress Report Joint Staff Advisory Note Prepared by the Staffs of the

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7125 Project Name Argentina-Special Structural Adjustment... Loan (SSAL)

More information

The Sustainable Development Goals

The Sustainable Development Goals The Sustainable Development Goals Reality & Prospects Mahmoud Mohieldin, Senior Vice President World Bank Group Mahmoud Mohieldin March 13 th, 2017 Global Context Global Economy GDP Growth (Percent) 5

More information

Serbia Country Partnership Strategy for FYOI-FYI1 Annex 2

Serbia Country Partnership Strategy for FYOI-FYI1 Annex 2 Serbia Country Partnership Strategy for FYOI-FYI1 REPUBLIC OF SERBIA CAS COMPLETION REPORT Country: Republic of Serbia Date of CAS: November 19,2004 Period Covered by the CAS Completion Report: November

More information

Implementation Status & Results Report Niger Disaster Risk Management and Urban Development Project (P145268)

Implementation Status & Results Report Niger Disaster Risk Management and Urban Development Project (P145268) Public Disclosure Authorized AFRICA Niger Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 04-Apr-2018 ISR30085 Implementing

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: 120763 Operation

More information

STRATEGY FOR UKRAINE SUMMARY

STRATEGY FOR UKRAINE SUMMARY SYNOPSIS STRATEGY FOR UKRAINE 1995-96 SUMMARY The EBRD s principal sector priorities in Ukraine for 1995-96 are as follows: Private sector development: The EBRD will seek to support renewed privatisation

More information

IFC - WESTERN BALKANS A PARTNER TO THE WBIF. December 2014

IFC - WESTERN BALKANS A PARTNER TO THE WBIF. December 2014 IFC - WESTERN BALKANS A PARTNER TO THE WBIF December 2014 IFC: A MEMBER OF THE WORLD BANK GROUP IBRD IDA IFC MIGA ICSID International Bank for Reconstructio n and Development International Development

More information

Danube Transnational Programme

Danube Transnational Programme Summary Danube Transnational Programme 2014-2020 Summary of the Cooperation Programme Version 2.3, 20 th October 2014 Danube Transnational Programme 2014-2020 (INTERREG V-B DANUBE) Page 1 Mission of the

More information

Ukraine. Systematic Country Diagnostic

Ukraine. Systematic Country Diagnostic For Discussion Only Ukraine Systematic Country Diagnostic Discussion October 2016 1 2 OUTLINE OUTLINE 1. New WBG Country Engagement Approach: What is an SCD? 2. Growth and Sustainability in Ukraine 3.

More information

Annex A. Country Partnership Framework Template. Document of The World Bank Group FOR OFFICIAL USE ONLY

Annex A. Country Partnership Framework Template. Document of The World Bank Group FOR OFFICIAL USE ONLY Annex A. Country Partnership Framework Template Document of The World Bank Group FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT [AND/OR INTERNATIONAL DEVELOPMENT ASSOCIATION]

More information

ECONOMIC REFORM (SUMMARY) I. INTRODUCTION

ECONOMIC REFORM (SUMMARY) I. INTRODUCTION Interim Country Partnership Strategy: Myanmar, 2012-2014 ECONOMIC REFORM (SUMMARY) I. INTRODUCTION 1. This economic reform assessment (summary) provides the background to the identification of issues,

More information

The World Bank Group in Myanmar

The World Bank Group in Myanmar The World Bank Group in Myanmar The World Bank Group GOVERNMENTS PRIVATE SECTOR IBRD IDA IFC MIGA ICSID Middle Income Countries Low Income Countries Private Sector Guarantees Investment Dispute Our Goals

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5715 Project Name. Cambodia Agribusiness SME Access to Finance Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5715 Project Name. Cambodia Agribusiness SME Access to Finance Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5715 Project Name Cambodia

More information

Actual Project Name : Marmara Earthquake Emergency Reconstruction Project Country: Turkey US$M): Project Costs (US$M

Actual Project Name : Marmara Earthquake Emergency Reconstruction Project Country: Turkey US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 09/06/2007 Report Number : ICRR12684 Public Disclosure Authorized Public Disclosure Authorized Public

More information

CPSCR Review Independent Evaluation Group

CPSCR Review Independent Evaluation Group For Official Use Only 1. CPS Data Country: Morocco CPS Year: FY10 CPS Period: FY10-FY13 CPSCR Review Period: FY10-FY13 Date of this review: April 21, 2014 2. Executive Summary i. This review examines the

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF-A Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF-A Jun ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020814 Public Disclosure Authorized Public Disclosure Authorized Operation ID P156865 Country West Bank

More information

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017 Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project

More information

ANNEX F. Samoa at a Glance

ANNEX F. Samoa at a Glance ANNEX F. Samoa at a Glance 4/27/05 East Lower- POVERTY and SOCIAL Asia & middle- Samoa Pacific income 2004 Population, mid-year (millions) 0.18 1,855 2,655 GNI per capita (Atlas method, US$) 1,860 1,080

More information

The World Bank Group s Response to Economic Crises: Views from IEG Independent Evaluation Group World Bank / IFC / MIGA

The World Bank Group s Response to Economic Crises: Views from IEG Independent Evaluation Group World Bank / IFC / MIGA The World Bank Group s Response to Economic Crises: Views from IEG Independent Evaluation Group World Bank / IFC / MIGA Caroline Heider / Anjali Kumar OECD - DAC Paris, February 9, 2012 1 Crisis Support

More information

M ODERNIZING THE W OR L D B ANK S O PERATIONAL POL ICY ON G UARANTEES: A PPR OACH PAPER OPERATIONS POLICY AND COUNTRY SERVICES

M ODERNIZING THE W OR L D B ANK S O PERATIONAL POL ICY ON G UARANTEES: A PPR OACH PAPER OPERATIONS POLICY AND COUNTRY SERVICES M ODERNIZING THE W OR L D B ANK S O PERATIONAL POL ICY ON G UARANTEES: A PPR OACH PAPER OPERATIONS POLICY AND COUNTRY SERVICES Draft: January 5, 2012 ABBREVIATIONS AND ACRONYMS AFR BDM BP CAS CODE DPL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Governor's Statement No. 33 October 10, Statement by the Hon. MAREK BELKA, Governor of the Bank for THE REPUBLIC OF POLAND

Governor's Statement No. 33 October 10, Statement by the Hon. MAREK BELKA, Governor of the Bank for THE REPUBLIC OF POLAND Governor's Statement No. 33 October 10, 2014 Statement by the Hon. MAREK BELKA, Governor of the Bank for THE REPUBLIC OF POLAND 2014 Annual Meetings Statement by the Hon. Marek Belka Governor of the Bank

More information

CASCR Review Independent Evaluation Group

CASCR Review Independent Evaluation Group Public Disclosure Authorized 1. CAS/ISN Data Country: Timor-Leste CAS Year: FY06 ISN Year: FY10 CAS Period: FY06 FY08 ISN Period: FY10 - FY11 CASCR Review Period: FY06 FY11 Date of this review: March 5,

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

How many operations were planned for the

How many operations were planned for the Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 01/20/2016 Report Number: ICRR14887 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Actual Project Name : Mx Affordable Housing And Urban Poverty Reduction Development Policy Loan III Country: Mexico US$M):

Actual Project Name : Mx Affordable Housing And Urban Poverty Reduction Development Policy Loan III Country: Mexico US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 02/16/2010 Report Number : ICRR13109 Public Disclosure Authorized Public Disclosure Authorized Public

More information

OPERATION EVALUATION SUMMARY. Micro, Small & Medium Sized Enterprise Framework. ab0cd. Western Balkans. March 2012 EBRD EVALUATION DEPARTMENT

OPERATION EVALUATION SUMMARY. Micro, Small & Medium Sized Enterprise Framework. ab0cd. Western Balkans. March 2012 EBRD EVALUATION DEPARTMENT OPERATION EVALUATION SUMMARY Micro, Small & Medium Sized Enterprise Framework Western Balkans EBRD EVALUATION DEPARTMENT ab0cd This is a summary of one of 13 Operation Evaluations that was scheduled for

More information

Access to Finance for Micro, Small, and Medium-Sized Enterprises in Azerbaijan. A Demand-Side Assessment

Access to Finance for Micro, Small, and Medium-Sized Enterprises in Azerbaijan. A Demand-Side Assessment Access to Finance for Micro, Small, and Medium-Sized Enterprises in Azerbaijan A Demand-Side Assessment Angela Prigozhina Country Sector Coordinator May, 2015 Agenda Setting the Stage Main Findings of

More information