Orange Development Contributions Plan 2015

Size: px
Start display at page:

Download "Orange Development Contributions Plan 2015"

Transcription

1 Orange Development Contributions Plan 2015 Adopted by on 3 November 2015 F %

2 Orange Development Contributions Plan 2015 Prepared for By GLN Planning Pty Ltd ABN Level 10, 66 King Street Sydney NSW 2000 GPO Box 5013 Sydney NSW 2001 P [02] F [02] E W info@glnplanning.com.au glnplanning.com.au

3 GLN Planning Pty Ltd ABN Level 10, 66 King Street Sydney NSW 2000 GPO Box 5013 Sydney NSW 2001 P [02] F [02] E W info@glnplanning.com.au glnplanning.com.au Date of Final Issue: File Path: R:\Projects\10199 City of Orange Contributions Advice\2015 Contributions Plan Project\Plans\10199 Orange Contributions Plan 2015.docx Project Manager: Greg New Client: Project Number: The purpose for which this report may be used and relied upon is limited for that which it was commissioned. Copyright in the whole and every part of this document belongs to GLN Planning and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written consent of GLN Planning. Document history and status Version Issued To Qty Date Prepared by: Reviewed by: Final M McFadden 1-e 11/11/15 Greg New Greg New

4 Table of Contents 1. Overview & Summary Schedules Overview of Plan Works and contribution rate summary schedules Calculating a contribution under this Plan What are Development Contributions? Cap on monetary section 94 contributions Administration and operation of this Plan Definitions Name of this Plan Purpose of this Plan Commencement of this Plan Land to which this Plan applies Development to which this Plan applies Development exempted from contributions under this Plan Relationship to other plans and policies Local Infrastructure addressed by this Plan Contributions for Local Infrastructure may be required as a conditions of consent Monetary contributions Land contributions Calculation of contributions Allowances/credits for existing Residential Accommodation development Other contributions to be taken into account Obligations of Accredited Certifiers Complying Development Certificates Construction certificates Adjustment of contributions rates under this Plan Adjustment of contributions required by a condition imposed under this Plan Timing of payment of monetary contributions required under this Plan Policy on deferred or periodic payments Material public benefits and dedication of land offered in part or full satisfaction of contributions Offer of a Material Public Benefit made after the imposition of a Development Contribution condition under this Plan Offer of a Material Public Benefit made before the imposition of a Development Contribution condition under this Plan Matters to be considered by the Council in determining offers of Material Public Benefits Agreements to be in writing Valuation of offers of works-in-kind and other Material Public Benefits Pooling of funds Accountability and access to information Review of Plan Savings and transitional arrangements 30 i

5 3. Relationship between expected development and demand for infrastructure Local Infrastructure needs Introduction Current development and population Future development and population Local Infrastructure that will be required as a result of expected development Infrastructure schedules and costs Local Infrastructure strategy plans Open space and recreation facilities strategy Community and cultural facilities strategy Roads, traffic management and cycleway facilities strategy Stormwater management facilities strategy Waratah release area facilities strategy Ploughmans Valley and North West Orange release area facilities strategies Bloomfield urban release area facilities strategy Shiralee release area Philip Street release area Works schedules and maps 63 Tables Table 2.1: Development types and contributions required 21 Table 2.2: Assumed infrastructure demand attributable to existing Residential Accommodation developments 24 Table 3.1 Residential building approvals, Orange LGA, Table 3.2: Estimated resident population, City of Orange 32 Table 3.3: Age profile, City of Orange 33 Table 3.4: Urban residential land bank 34 Table 3.5: Sustainable Settlement Strategy population projections 35 Table 3.6: Population projections adopted for this Plan, Orange LGA 35 Table 3.7: Assumed occupancy rates in Waratah Development Contributions Plan Table 3.8: Occupancy rates for private occupied dwellings, Orange LGA, Table 3.9: Updated population projection for Waratah release area 37 Table 3.10: Household occupancy rates for Residential Accommodation development types 43 Table 3.11: Household occupancy rates for Residential Accommodation development types 45 Table 3.12: Distributor Road costs, contributions and funding existing and future 46 Table 3.13: Trip generation adjustment factors for Residential Accommodation development types 48 Table 3.14: Share of cost of road and traffic management works attributable to demand sectors 49 Table 3.15 Household occupancy rates for Residential Accommodation development types 52 Table 3.16: Waratah release area infrastructure requirements 53 Table 3.17: Household occupancy rates for Residential Accommodation development types 55 Table 3.18: Household occupancy rates for Residential Accommodation development types 56 Table 3.19: Household occupancy rates for Residential Accommodation development types 59 Table 3.20: Household occupancy rates for Residential Accommodation development types 61 Table 3.21: Household occupancy rates for Residential Accommodation development types 62 ii

6 Figures Figure 1.1: Waratah release area catchment (Plan applies to Residential Accommodation development only) 12 Figure 1.2: Ploughmans Valley release area catchment (Plan applies to Residential Accommodation development only) 13 Figure 1.3: North West Orange release area catchment (Plan applies to Residential Accommodation only) 14 Figure 1.4: DPI/Bloomfield release area catchment Plan applies to Residential Accommodation development in R2 zone only) 15 Figure 1.5: Shiralee release area catchment (Plan applies to Residential Accommodation development only) 16 Figure 1.6: Phillip Street release area catchment (Plan applies to Residential Accommodation development only) 17 iii

7 1. Overview & Summary Schedules 1.1 Overview of Plan The Orange Development Contributions Plan 2015 (the Plan) has been prepared to address anticipated demand for Local Infrastructure generated by new development up to The Plan applies to all land within the Orange Local Government Area (LGA). The Plan has been prepared following a review of Orange Development Contributions Plan 2012 (the 2012 Plan). Section 2.20 of the 2012 Plan required it to be regularly updated so that Council s infrastructure program remains on a sound financial footing, that developmentgenerated infrastructure is delivered in a reasonable time, and that contribution rates remain reasonable over time. This Plan updates the 2012 Plan by updating development assumptions, works items and costs in that plan, as well as a number of housekeeping modifications to the 2012 Plan. The type of development expected to occur in Orange, and which will impact on the demand for Local Infrastructure addressed under this Plan, is likely to include: Residential Accommodation development in release areas including Ploughmans Valley, North West Orange, Waratah, Bloomfield, Leeds Parade, Phillip Street and Shiralee; infill development through re-subdivision of lots or multi-unit and dual occupancy development in the established urban areas of Orange; infill development in the villages of Spring Hill and Lucknow; rural residential or large lot Residential Accommodation development in several localities including Clifton Grove, Ammerdown and Calare, and in the Murphys Lane area; and dispersed rural Residential Accommodation development in various rural localities. There have been various estimates of future population growth made for Orange. Projections prepared for this Plan indicate that the estimated residential population is expected to increase from 38,295 in 2009 (ABS 2009) to 43,850 in 2026, a total of 5,555 residents. The Plan estimates that the equivalent of over 3,000 standard residential lots. The projected increase in demand will give rise to the need for the Council to provide new, or augment the existing Local Infrastructure. This Plan authorises the (Council) or an Accredited Certifier to impose conditions on Development Consents or Complying Development Certificates requiring Development Contributions for the following: open space and recreation facilities; community and cultural facilities; stormwater drainage facilities; roads, traffic management and cycleways facilities; local facilities directly serving each of the release areas of Ploughmans Valley, North West Orange, Waratah, Bloomfield, Phillip Street, and Shiralee; and plan preparation and administration. 1

8 This Plan has been prepared in accordance with the requirements of the Environmental Planning and Assessment Act 1979 (the EP&A Act) and the Environmental Planning and Assessment Regulation 2000 (the EP&A Regulation). In preparing the Plan Council has had regard to practice notes issued by the NSW Department of Planning in accordance with clause 26(1) of the EP&A Regulation. This Plan sets out: the expected types of future development in the Council s area and the Local Infrastructure required to meet that development; the formulas used to determine the contribution rates provided for in this Plan; the contribution rates applying to different types of development; maps showing the location of the items of Local Infrastructure proposed to be provided by the Council supported by a works schedule setting out an estimate of their cost and staging; and the administrative and accounting procedures applying to contributions that are required by this Plan. 1.2 Works and contribution rate summary schedules The summary schedules on the following pages are included in this Plan: Contributions by area and category (including total infrastructure costs) Contributions by development type and area (including total infrastructure costs) It is stressed that these are provided as summary tables only and more details are contained in the later sections of the Plan. The contribution rates shown reflect the contribution rates at the date that the Plan commenced. Rates are regularly adjusted for inflation in accordance with the provisions of Section 2.13 of this Plan. Applicants should inquire at the Council for information on the latest contribution rates. 2

9 Residential Development Contributions Rates Summary Monetary Contribution Facility Per Resident Per Subdivided Lot or Detached Dwelling House Per 3 or more Bedroom Dwelling Per 2 Bedroom Dwelling Per 1 Bedroom Dwelling Development in Waratah urban release area Open Space and Recreation $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural $ $ $ $ $ Roads and Cycleways $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage $ - $ - $ - $ - $ - Local Area Facilities $ 3, $ 9, $ 9, $ 5, $ 4, Plan Preparation and Administration $ $ $ $ $ Total $ 7, $ 19, $ 19, $ 11, $ 8, Development in Ploughmans Valley urban release area Open Space and Recreation $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural $ $ $ $ $ Roads and Cycleways $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage $ $ $ $ $ Local Area Facilities $ 3, $ 9, $ 9, $ 5, $ 4, Plan Preparation and Administration $ $ $ $ $ Total $ 7, $ 19, $ 19, $ 11, $ 8, Development in North West Orange urban release area Open Space and Recreation $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural $ $ $ $ $ Roads and Cycleways $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage $ $ $ $ $ Local Area Facilities $ 2, $ 5, $ 5, $ 3, $ 2, Plan Preparation and Administration $ $ $ $ $ Total $ 5, $ 15, $ 15, $ 8, $ 6, Development in DPI / Bloomfield urban release area Open Space and Recreation $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural $ $ $ $ $ Roads and Cycleways $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage $ $ $ $ $ Local Area Facilities $ 1, $ 5, $ 5, $ 3, $ 2, Plan Preparation and Administration $ $ $ $ $ Total $ 5, $ 14, $ 14, $ 8, $ 6, Phillip Street Release Area Open Space and Recreation $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural $ $ $ $ $ Roads and Cycleways $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage $ $ $ $ $ Local Area Facilities $ 3, $ 9, $ 9, $ 5, $ 4, Plan Preparation and Administration $ $ $ $ $ Total $ 7, $ 19, $ 19, $ 11, $ 8, Shiralee Release Area (Full) Open Space and Recreation $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural $ $ $ $ $ Roads and Cycleways $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage $ $ $ $ $ Local Area Facilities $ 6, $ 17, $ 17, $ 10, $ 7, Plan Preparation and Administration $ $ $ $ $ Total $ 10, $ 27, $ 27, $ 16, $ 12, Shiralee Release Area (Capped) Open Space and Recreation $ $ $ 1, $ 1, Community and Cultural $ $ $ $ Roads and Cycleways $ 1, $ 1, $ 2, $ 2, Stormwater Drainage $ $ $ $ Local Area Facilities $ 17, $ 17, $ 10, $ 7, Plan Preparation and Administration $ $ $ $ Total $ 20, $ 20, $ 16, $ 12, Development in remainder of LGA Note 1 Open Space and Recreation $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural $ $ $ $ $ Roads and Cycleways $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage $ $ $ $ $ Local Area Facilities $ - $ - $ - $ - $ - Plan Preparation and Administration $ $ $ $ $ Total $ 3, $ 9, $ 9, $ 5, $ 4, Note 1: Development on land zoned RU1, RU5, E1, E2 and E3 is not required to make contributions for Roads and Cycleways and Stormwater Drainage 3

10 Contributions Schedule Development in Waratah urban release area Monetary Contribution Residential Development Facility Value of Land & Works Schedule Per Resident Per Subdivided Lot or Detached Dwelling House Per 3 or more Bedroom Dwelling Per 2 Bedroom Dwelling Per 1 Bedroom Dwelling Open Space and Recreation Land Acquisition - Future $ - $ - $ - $ - $ - $ - Works - Future $ 18,602,245 $ $ 2, $ 2, $ 1, $ 1, Land & Works - Existing $ 11,232,600 $ $ $ $ $ Sub total $ 29,834,845 $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural Land Acquisition $ 617,525 $ $ $ $ $ Works $ 718,766 $ $ $ $ $ Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 1,336,291 $ $ $ $ $ Roads and Cycleways Land Acquisition $ - $ - $ - $ - $ - $ - Works $ 30,678,408 $ 1, $ 4, $ 4, $ 2, $ 2, Land & Works - Existing $ 5,383,121 $ $ $ $ $ Sub total $ 36,061,529 $ 1, $ 5, $ 5, $ 2, $ 2, Waratah Release Area Land Acquisition $ 6,328,400 $ 3, $ 8, $ 8, $ 5, $ 3, Works $ 4,384,507 $ 2, $ 6, $ 6, $ 3, $ 2, Land & Works - Existing -$ 3,672,911 -$ 1, $ 5, $ 5, $ 3, $ 2, Sub total $ 7,039,996 $ 3, $ 9, $ 9, $ 5, $ 4, Plan Preparation and Administration Plan Preparation and Administration $ $ $ $ $ Sub total $ $ $ $ $

11 Contributions Schedule Development in Ploughmans Valley urban release area Monetary Contribution Residential Development Facility Value of Land & Works Schedule Per Resident Per Subdivided Lot or Detached Dwelling House Per 3 or more Bedroom Dwelling Per 2 Bedroom Dwelling Per 1 Bedroom Dwelling Open Space and Recreation Land Acquisition - Future $ - $ - $ - $ - $ - $ - Works - Future $ 18,602,245 $ $ 2, $ 2, $ 1, $ 1, Land & Works - Existing $ 11,232,600 $ $ $ $ $ Sub total $ 29,834,845 $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural Land Acquisition $ 617,525 $ $ $ $ $ Works $ 718,766 $ $ $ $ $ Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 1,336,291 $ $ $ $ $ Roads and Cycleways Land Acquisition $ - $ - $ - $ - $ - $ - Works $ 30,678,408 $ 1, $ 4, $ 4, $ 2, $ 2, Land & Works - Existing $ 5,383,121 $ $ $ $ $ Sub total $ 36,061,529 $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage Land Acquisition $ 68,442 $ 2.64 $ 7.26 $ 7.26 $ 4.23 $ 3.17 Works $ 6,642,886 $ $ $ $ $ Land & Works - Existing $ 543,661 -$ $ $ $ $ Sub total $ 7,254,989 $ $ $ $ $ Ploughmans Valley Release Area Land Acquisition $ 1,995,120 $ 1, $ 3, $ 3, $ 1, $ 1, Works $ 4,433,138 $ 2, $ 6, $ 6, $ 3, $ 2, Land & Works - Existing $ 437,939 -$ $ $ $ $ Sub total $ 6,866,197 $ 3, $ 9, $ 9, $ 5, $ 4, Plan Preparation and Administration Plan Preparation and Administration $ $ $ $ $ Sub total $ $ $ $ $

12 Contributions Schedule Development in North West Orange urban release area Monetary Contribution Residential Development Facility Value of Land & Works Schedule Per Resident Per Subdivided Lot or Detached Dwelling House Per 3 or more Bedroom Dwelling Per 2 Bedroom Dwelling Per 1 Bedroom Dwelling Open Space and Recreation Land Acquisition - Future $ - $ - $ - $ - $ - $ - Works - Future $ 18,602,245 $ $ 2, $ 2, $ 1, $ 1, Land & Works - Existing $ 11,232,600 $ $ $ $ $ Sub total $ 29,834,845 $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural Land Acquisition $ 617,525 $ $ $ $ $ Works $ 718,766 $ $ $ $ $ Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 1,336,291 $ $ $ $ $ Roads and Cycleways Land Acquisition $ - $ - $ - $ - $ - $ - Works $ 30,678,408 $ 1, $ 4, $ 4, $ 2, $ 2, Land & Works - Existing $ 5,383,121 $ $ $ $ $ Sub total $ 36,061,529 $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage Land Acquisition $ 68,442 $ 2.64 $ 7.26 $ 7.26 $ 4.23 $ 3.17 Works $ 6,642,886 $ $ $ $ $ Land & Works - Existing $ 543,661 -$ $ $ $ $ Sub total $ 7,254,989 $ $ $ $ $ NW Orange Release Area Land Acquisition $ 1,772,964 $ 1, $ 4, $ 4, $ 2, $ 1, Works $ 921,576 $ $ 2, $ 2, $ 1, $ 1, Land & Works - Existing $ - -$ $ 1, $ 1, $ $ Sub total $ 2,694,540 $ 2, $ 5, $ 5, $ 3, $ 2, Plan Preparation and Administration Plan Preparation and Administration $ $ $ $ $ Sub total $ $ $ $ $

13 Contributions Schedule Development in DPI / Bloomfield urban release area Monetary Contribution Residential Development Facility Value of Land & Works Schedule Per Resident Per Subdivided Lot or Detached Dwelling House Per 3 or more Bedroom Dwelling Per 2 Bedroom Dwelling Per 1 Bedroom Dwelling Open Space and Recreation Land Acquisition - Future $ - $ - $ - $ - $ - $ - Works - Future $ 18,602,245 $ $ 2, $ 2, $ 1, $ 1, Land & Works - Existing $ 11,232,600 $ $ $ $ $ Sub total $ 29,834,845 $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural Land Acquisition $ 617,525 $ $ $ $ $ Works $ 718,766 $ $ $ $ $ Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 1,336,291 $ $ $ $ $ Roads and Cycleways Land Acquisition $ - $ - $ - $ - $ - $ - Works $ 30,678,408 $ 1, $ 4, $ 4, $ 2, $ 2, Land & Works - Existing $ 5,383,121 $ $ $ $ $ Sub total $ 36,061,529 $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage Land Acquisition $ 68,442 $ 2.64 $ 7.26 $ 7.26 $ 4.23 $ 3.17 Works $ 6,642,886 $ $ $ $ $ Land & Works - Existing $ 543,661 -$ $ $ $ $ Sub total $ 7,254,989 $ $ $ $ $ Bloomfield / DPI Release Area Land Acquisition $ - $ - $ - $ - $ - $ - Works $ 2,845,000 $ 1, $ 5, $ 5, $ 3, $ 2, Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 2,845,000 $ 1, $ 5, $ 5, $ 3, $ 2, Plan Preparation and Administration Plan Preparation and Administration $ $ $ $ $ Sub total $ $ $ $ $

14 Contributions Schedule Development in Shiralee urban release area (Uncapped contribution rates) Monetary Contribution Residential Development Facility Value of Land & Works Schedule Per Resident Per Subdivided Lot or Detached Dwelling House Per 3 or more Bedroom Dwelling Per 2 Bedroom Dwelling Per 1 Bedroom Dwelling Open Space and Recreation Land Acquisition - Future $ - $ - $ - $ - $ - $ - Works - Future $ 18,602,245 $ $ 2, $ 2, $ 1, $ 1, Land & Works - Existing $ 11,232,600 $ $ $ $ $ Sub total $ 29,834,845 $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural Land Acquisition $ 617,525 $ $ $ $ $ Works $ 718,766 $ $ $ $ $ Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 1,336,291 $ $ $ $ $ Roads and Cycleways Land Acquisition $ - $ - $ - $ - $ - $ - Works $ 30,678,408 $ 1, $ 4, $ 4, $ 2, $ 2, Land & Works - Existing $ 5,383,121 $ $ $ $ $ Sub total $ 36,061,529 $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage Land Acquisition $ 68,442 $ 2.64 $ 7.26 $ 7.26 $ 4.23 $ 3.17 Works $ 6,642,886 $ $ $ $ $ Land & Works - Existing $ 543,661 -$ $ $ $ $ Sub total $ 7,254,989 $ $ $ $ $ Shiralee Release Area Land Acquisition $ 2,432,124 $ $ 1, $ 1, $ $ Works $ 30,338,352 $ 5, $ 16, $ 16, $ 9, $ 7, Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 32,770,476 $ 6, $ 17, $ 17, $ 10, $ 7, Plan Preparation and Administration Plan Preparation and Administration $ $ $ $ $ Sub total $ $ $ $ $

15 Contributions Schedule Development in Phillip Street urban release area Monetary Contribution Residential Development Facility Value of Land & Works Schedule Per Resident Per Subdivided Lot or Detached Dwelling House Per 3 or more Bedroom Dwelling Per 2 Bedroom Dwelling Per 1 Bedroom Dwelling Open Space and Recreation Land Acquisition - Future $ - $ - $ - $ - $ - $ - Works - Future $ 18,602,245 $ $ 2, $ 2, $ 1, $ 1, Land & Works - Existing $ 11,232,600 $ $ $ $ $ Sub total $ 29,834,845 $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural Land Acquisition $ 617,525 $ $ $ $ $ Works $ 718,766 $ $ $ $ $ Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 1,336,291 $ $ $ $ $ Roads and Cycleways Land Acquisition $ - $ - $ - $ - $ - $ - Works $ 30,678,408 $ 1, $ 4, $ 4, $ 2, $ 2, Land & Works - Existing $ 5,383,121 $ $ $ $ $ Sub total $ 36,061,529 $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage Land Acquisition $ 68,442 $ 2.64 $ 7.26 $ 7.26 $ 4.23 $ 3.17 Works $ 6,642,886 $ $ $ $ $ Land & Works - Existing $ 543,661 -$ $ $ $ $ Sub total $ 7,254,989 $ $ $ $ $ Phillip Street Release Area Land Acquisition $ 57,850 $ $ 1, $ 1, $ $ Works $ 392,150 $ 3, $ 8, $ 8, $ 5, $ 3, Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 450,000 $ 3, $ 9, $ 9, $ 5, $ 4, Plan Preparation and Administration Plan Preparation and Administration $ $ $ $ $ Sub total $ $ $ $ $

16 Contributions Schedule Development in remainder of LGA Note: Development on land zoned RU1, RU5, E1, E2 and E3 is not required to make contributions for Roads and Cycleways and Stormwater Drainage Monetary Contribution Residential Development Facility Value of Land & Works Schedule Per Resident Per Subdivided Lot or Detached Dwelling House Per 3 or more Bedroom Dwelling Per 2 Bedroom Dwelling Per 1 Bedroom Dwelling Open Space and Recreation Land Acquisition - Future $ - $ - $ - $ - $ - $ - Works - Future $ 18,602,245 $ $ 2, $ 2, $ 1, $ 1, Land & Works - Existing $ 11,232,600 $ $ $ $ $ Sub total $ 29,834,845 $ 1, $ 3, $ 3, $ 1, $ 1, Community and Cultural Land Acquisition $ 617,525 $ $ $ $ $ Works $ 718,766 $ $ $ $ $ Land & Works - Existing $ - $ - $ - $ - $ - $ - Sub total $ 1,336,291 $ $ $ $ $ Roads and Cycleways Land Acquisition $ - $ - $ - $ - $ - $ - Works $ 30,678,408 $ 1, $ 4, $ 4, $ 2, $ 2, Land & Works - Existing $ 5,383,121 $ $ $ $ $ Sub total $ 36,061,529 $ 1, $ 5, $ 5, $ 2, $ 2, Stormwater Drainage Land Acquisition $ 68,442 $ 2.64 $ 7.26 $ 7.26 $ 4.23 $ 3.17 Works $ 6,642,886 $ $ $ $ $ Land & Works - Existing $ 543,661 -$ $ $ $ $ Sub total $ 7,254,989 $ $ $ $ $ Public Car Parking Land & Works - Existing $ 4,248,300 Sub total $ 4,248,300 Plan Preparation and Administration Plan Preparation and Administration $ $ $ $ $ Sub total $ $ $ $ $

17 1.3 Calculating a contribution under this Plan The type and quantum of the contribution applicable to any development will relate to: the type of development proposed (refer to Section 2.6 for list of developments subject to a contribution under this Plan); the location of the development site; and the Local Infrastructure service catchments that are relevant to the development site. Note that: All Residential Accommodation development throughout the LGA that is likely to generate an increase in demand for infrastructure identified in Sections to of this Plan will be levied a contribution for all of those infrastructure categories. There are several exceptions however and these are noted in Table 2.1 and in the discussion on demand and cost apportionment in each of those sections. In addition to note 1., Residential Accommodation development situated within the Waratah, Ploughmans Valley and North West Orange, DPI/Bloomfield, Phillip Street and Shiralee release areas, as shown in Figures 1.1 to 1.6, respectively, will be required to make a contribution toward various local area items identified in Sections 3.2.5, 3.2.6, 3.2.7, and 3.2.9, respectively, of this Plan. Contribution rates for various locations, infrastructure types and development types are shown in the tables in Section 1.2 of this Plan. The total monetary contribution levied for any individual development is the sum of the contributions shown in Section 1.2, less any allowance for existing developments, if applicable (refer to Section ). The contribution rates in this Plan are the contribution rates at the date that the Plan commenced. Rates are regularly adjusted for inflation in accordance with the provisions of Section 2.13 of this Plan. Applicants should inquire at the Council for information on the latest contribution rates. 11

18 Figure 1.1: Waratah release area catchment (Plan applies to Residential Accommodation development only) 12

19 Figure 1.2: Ploughmans Valley release area catchment (Plan applies to Residential Accommodation development only) 13

20 Figure 1.3: North West Orange release area catchment (Plan applies to Residential Accommodation only) 14

21 Figure 1.4: DPI/Bloomfield release area catchment Plan applies to Residential Accommodation development in R2 zone only) 15

22 Figure 1.5: Shiralee release area catchment (Plan applies to Residential Accommodation development only) 16

23 Figure 1.6: Phillip Street release area catchment (Plan applies to Residential Accommodation development only) 17

24 1.4 What are Development Contributions? Development contributions are contributions made by those undertaking development approved under the EP&A Act toward the provision of public infrastructure. A council or an Accredited Certifier can require, through imposition of a condition or conditions on a Development Consent, Development Contributions if: the relevant council has adopted a contributions plan justifying the contribution (such as this Plan); and the contribution is imposed in accordance with the provisions of such a plan. There are two kinds of Development Contributions for Local Infrastructure that may be required by a consent authority that is a council or an Accredited Certifier. These are: contributions imposed pursuant to the provisions of section 94 of the EP&A Act and which illustrate a direct link or nexus between the development and the infrastructure; and contributions imposed pursuant to the provisions of section 94A of the EP&A Act and which need not reflect a nexus between the development and the infrastructure. Section 94A levies are simply a monetary contribution that is based on a percentage of the proposed cost of carrying out a development. However, only one of these types of contribution may be imposed on any individual Development Consent. This Plan is only concerned with section 94 contributions. 1.5 Cap on monetary section 94 contributions As part of the State Government s strategy to stimulate housing construction, increase housing supply and improve housing affordability in NSW, the Government now imposes limits on the total monetary section 94 contributions that a consent authority may impose on developments. The Minister for Planning issued a direction under section 94E of the EP&A Act effective from 21 August 2012 that restricts consent authorities from imposing conditions of consent requiring monetary section 94 contributions on Development for residential lots or dwellings in excess of the monetary cap specified by or under the Direction. The monetary cap applying to residential development on land within Orange LGA is $20,000 per lot or dwelling. Consistent with that policy, this Plan does not authorise section 94 contributions on a Residential Accommodation Development to exceed $20,000 per lot or dwelling in that Development. 18

25 2. Administration and operation of this Plan 2.1 Definitions In this Plan, the following words and phrases have the following meanings: Accredited Certifier has the same meaning as in the EP&A Act. Apportionment means the process by which the assessed demand or cost is related specifically to the development from which contributions may be sought. Apportionment seeks to ensure that new development only pays its share or portion of the cost of the facility or work for which it has created a demand. Attributable Cost means the estimated cost for each item in the works schedules set out in Section 4 of this Plan, which may differ from the final actual cost of the item. It will be the value used in determining the amount of any offset of monetary contributions related to any works-inkind proposal. Local Infrastructure means public amenities and public services but does not include water and sewerage services. Complying Development Certificate has the same meaning as in the EP&A Act. CPI means the Consumer Price Index (All Groups - Sydney) published by the Australia Statistician. Council means. Development has the same meaning as in the EP&A Act. Development Consent means consent under Part 4 of the EP&A Act to carry out development and includes, unless expressly excluded, a Complying Development Certificate. Development Contribution means the making of a monetary contribution, dedication of land or the providing of a Material Public Benefit as works in kind, or any combination of the above as referred to in the EP&A Act for the provision of public or Local Infrastructure. EP&A Act means the Environmental Planning and Assessment Act EP&A Regulation means the Environmental Planning and Assessment Regulation LGA means Local Government Area. Material Public Benefit means something provided by a person entitled to act on a Development Consent, other than the dedication of land or the payment of a monetary contribution. Plan means this contributions plan. Planning Agreement means a Planning Agreement referred to in Section 93F of the EP&A Act. 19

26 Residential Accommodation has the same meaning as in Orange Local Environmental Plan residential accommodation means a building or place used predominantly as a place of residence, and includes any of the following: (a) attached dwellings, (b) boarding houses, (c) dual occupancies, (d) dwelling houses, (e) group homes, (f) hostels, (g) multi dwelling housing, (h) residential flat buildings, (i) rural workers dwellings, (j) secondary dwellings, (k) semi-detached dwellings, (l) seniors housing, (m) shop top housing, but does not include tourist and visitor accommodation or caravan parks. Servicing Strategy means the Infrastructure Assessment: Southern Suburb Servicing Strategy prepared by Geolyse Pty Ltd in SSS means the Orange Sustainable Settlement Strategy and Local Environmental Study prepared by Parsons Brinckerhoff, October Work in kind means the undertaking of a work or provision of a facility by an applicant which is already nominated in the works schedule of a contributions plan. 2.2 Name of this Plan This contributions plan is called the Orange Development Contributions Plan Purpose of this Plan The primary purpose of the Plan is to authorise: the Council, when granting consent to an application to carry out development to which this Plan applies; or an Accredited Certifier, when issuing a Complying Development Certificate for development to which this Plan applies, to require a section 94 contribution to be made towards: the provision, extension or augmentation of Local Infrastructure only where development is likely to require the provision of or increase the demand for Local Infrastructure; and the recoupment of the cost of providing existing Local Infrastructure within the area to which this Plan applies. 20

27 Other purposes of the Plan are: to provide the framework for the efficient and equitable determination, collection and management of Development Contributions toward the provision of Local Infrastructure generated by development within the area; to determine the demand for public facilities generated by the incoming population to the area and ensure that development makes a reasonable contribution toward the provision of services and facilities that are required for that population; to ensure that the existing community is not unreasonably burdened by the provision of public infrastructure required (either partly or fully) as a result of development in the area; and to ensure Council s management of Development Contributions complies with relevant legislation and practice notes, and achieves best practice in plan format and management. 2.4 Commencement of this Plan This Plan commences on the date on which public notice was published, pursuant to clause 31(4) of the EP&A Regulation. 2.5 Land to which this Plan applies This Plan applies to all of the land in the City of Orange LGA. 2.6 Development to which this Plan applies Table 2.1 sets out the types of development that may be required under this Plan to make a contribution toward the provision of Local Infrastructure, and the contributions that the development type may be subject to. Table 2.1: Development type Development types and contributions required Development contributions required under this Plan Residential Accommodation development throughout the LGA Open space and recreation future land acquisitions future works recoupment works Community and cultural facilities future works and programs Residential Accommodation development other than: development on land zoned RU1, RU5, E1, E2 and E3 under Orange Local Environmental Plan 2011 development within the Waratah release area (Figure 1.1)* Residential Accommodation development within the Waratah release area (Figure 1.1) Stormwater drainage facilities future land acquisitions future works Roads and cycleways facilities future land acquisitions future works recoupment works Open space and recreation facilities, community and cultural facilities, paths and cycleways, 21

28 Development type Residential Accommodation development within the Ploughmans Valley release area (Figure 1.2) Residential Accommodation development within the North West Orange release area (Figure 1.3) Residential Accommodation development within the DPI / Bloomfield release area (Figure 1.4) Residential Accommodation development within the Shiralee release area (Figure 1.5) Residential Accommodation development within the Phillip Street release area (Figure 1.6) Development contributions required under this Plan stormwater drainage facilities designed to serve the Waratah release area future land acquisitions future works recoupment works Open space and recreation facilities, roads and traffic management facilities designed to serve the Ploughmans Valley release area future land acquisitions future works Open space and recreation facilities designed to serve the North West Orange release area future land acquisitions future works Roads and traffic management facilities designed to serve the DPI / Bloomfield release area future works Open space and recreation facilities, street presentation, stormwater drainage facilities, and roads and traffic management facilities designed to serve the Shiralee release area future land acquisitions future works Roads and traffic management facilities designed to serve the Phillip Street release area future works * Waratah excluded from LGA wide stormwater drainage and cycleways only; Waratah developments are required to contribute to Roads facilities Development exempted from contributions under this Plan The following types of development, or components of development, will be exempted from a requirement to make contributions under this Plan: Development for the purposes of any form of seniors housing as defined in State Environmental Planning Policy (Housing for Seniors or People with a Disability) 2004 that is provided by a social housing provider as defined in that Policy. 2.7 Relationship to other plans and policies This Plan repeals Orange Development Contribution Plan Funds collected for specific types of infrastructure under Orange Development Contribution Plan 2012 will be directed toward the provision of the same type of Local Infrastructure included in this Plan. 22

29 2.8 Local Infrastructure addressed by this Plan The types of Local Infrastructure required to meet the demands of the expected future development in the Orange LGA, and which are addressed in this Plan, are as follows: new and upgraded roads and intersections; pedestrian and cycleways; streetscape treatments; local and district sporting, recreational, cultural and social facilities including a multipurpose community centre, playgrounds and their embellishment; drainage and stormwater management works including retarding basins and channel widening; and Local Infrastructure land acquisition. 2.9 Contributions for Local Infrastructure may be required as a conditions of consent Monetary contributions This Plan authorises Council or an Accredited Certifier, when determining an application for Development or an application for a Complying Development Certificate relating to development to which this Plan applies, and subject to other provisions of this Plan, to impose a condition requiring a section 94 monetary contribution on that Development to enable the provision of Local Infrastructure identified in this Plan. This Plan also authorises the Council or an Accredited Certifier to require monetary contributions from development towards recouping the cost of the provision of existing Local Infrastructure that has been provided by the Council for or to facilitate the carrying out of development and which the Development will benefit from Land contributions This Plan authorises Council, through the imposition of a condition or conditions of Development Consent, to require in connection with any Development on land to which this Plan applies: the dedication of land for Local Infrastructure free of cost to the Council; and / or the payment of a monetary contribution to the Council for land for Local Infrastructure that is required to enable the provision of Local Infrastructure identified in this Plan. Wherever land required under this Plan is situated within a development site within an urban release area, the Council will generally require the developer of that land to dedicate the land required under this Plan free of cost. The value of any land required to be dedicated will be taken into account in determining the total monetary contributions required by the Development under this Plan. Where the area of land to be dedicated exceeds the amount that would be required for the Development, then the difference shall be reimbursed or offset against other contributions required by the Council. 23

30 Council is not obliged to reimburse contributions until such time as all of the development anticipated in this Plan has been approved Calculation of contributions Contribution rates applying to Development are shown in Section 1.2 of this Plan. The formulas used to calculate contribution rates are set out in the infrastructure strategy plans included in Section 3.2 of this Plan Allowances/credits for existing Residential Accommodation development Monetary contributions determined under this Plan will be calculated according to the estimated net increase in infrastructure demand that a particular Development is deemed to generate. For Residential Accommodation Development Contributions, Council will take into consideration the existing infrastructure demand (based on the assumed existing population) relating to the Development site for the purpose of determining the net increase, at the rates cited in Table 2.2. Table 2.2: Assumed infrastructure demand attributable to existing Residential Accommodation developments Residential Accommodation development type Assumed average household occupancy rate Dwelling houses and single vacant allotments 2.75 persons per dwelling or lot Other dwellings: 1 bedroom 1.2 persons per dwelling 2 bedroom 1.6 persons per dwelling 3 or more bedroom 2.75 persons per dwelling 2.11 Other contributions to be taken into account Council, in proposing to impose a requirement for a Local Infrastructure contribution, will take into consideration any land, money or other Material Public Benefit that the applicant has elsewhere dedicated or provided free of cost within the area (or any adjoining area) or previously paid to the consent authority, other than: a benefit provided as a condition of the grant of Development Consent under the EP&A Act, or a benefit excluded from consideration by a Planning Agreement. In order for Council to consider the previous benefits made by the applicant, details must be submitted at the time of the development application. A reduction in the contribution requirement under this Plan may be considered where it can be demonstrated by the applicant that: the land, money or other Material Public Benefit previously provided continues to provide an ongoing benefit to the community; the benefit was not required to be provided under a condition of consent or under a Planning Agreement; 24

31 the benefit offsets some of the need for Local Infrastructure identified in this Plan; whether the works schedule included this Plan would require amendment; and the financial implications for cash flow and the continued implementation of the works schedule included in this Plan (including whether the Council would need make up for any shortfall in contributions by its agreement to reduce the contribution) Obligations of Accredited Certifiers Complying Development Certificates This Plan authorises that, in relation to an application made to an Accredited Certifier for a Complying Development Certificate: the Accredited Certifier must, if a Complying Development Certificate is issued, impose a condition requiring a Development Contribution, if such a contribution is authorised by this Plan; and such contribution can only be a monetary contribution required under this Plan; and the amount of the monetary contribution that the Accredited Certifier must so impose is the amount determined in accordance with this Plan. It is the responsibility of the principal certifying authority to accurately calculate and apply the Development Contribution conditions to Complying Development Certificates. Deferred payments of contributions required by a condition of a Complying Development Certificate will not be accepted. Failure to follow this procedure may render such a certificate invalid and expose the certifier to legal action Construction certificates It is the responsibility of an Accredited Certifier issuing a construction certificate to certify that any Development Contributions required as a condition of Development Consent or Complying Development Certificate have been paid to the Council prior to the issue of the certificate. The Accredited Certifier must ensure that the applicant provides a receipt (or receipts) confirming that contributions have been fully paid and copies of such receipts must be included with copies of the certified plans provided to the Council in accordance with clause 142(2) of the EP&A Regulation. Failure to follow this procedure may render such a certificate invalid and expose the certifier to legal action. The only exceptions to the requirement are where a work in kind, material public benefit, dedication of land and/or deferred payment arrangement has been agreed by the consent authority. In such cases Council will issue a letter confirming that an alternative payment method has been agreed with the applicant Adjustment of contributions rates under this Plan The purpose of this section is to ensure that the monetary contribution rates imposed at the time of Development Consent are regularly adjusted to reflect the indexed cost of the provision of infrastructure included in this Plan. 25

32 In accordance with clause 32(3)(b) of the EP&A Regulation, Council may, without the necessity of preparing a new or amending contributions plan, make changes to the section 94 contribution rates set out in this Plan to reflect quarterly variations to the Consumer Price Index (All Groups Index) for Sydney as provided by the Australian Bureau of Statistics. Note: The contribution rate will not be less than the contribution rate specified at the date of the adoption of this Plan Adjustment of contributions required by a condition imposed under this Plan The purpose of this section is to ensure that the monetary contributions imposed on Developments at the time of Development Consent are adjusted at the time of payment to reflect the indexed cost of the provision of infrastructure included in this Plan. A Local Infrastructure Contribution required by a condition of Development Consent imposed in accordance with this Plan will be indexed between the date of the grant of the Development Consent and the date on which the contribution is paid in accordance with the Consumer Price Index (All Groups Index) for Sydney as provided by the Australian Bureau of Statistics. The current contribution rates are published by the Council and are available from the Council offices. Should the Council not validly publish the applicable contribution rates, the rate applicable will be calculated in accordance with the most recent validly published rate Timing of payment of monetary contributions required under this Plan Council s policy in relation to the timing of payments of monetary contributions required under this Plan is as follows: Development applications involving subdivision - prior to the release of the subdivision certificate. Development applications involving building work - prior to the release of the construction certificate. Development applications where no subdivision or building approval is required prior to the issue of Development Consent or release of the occupation certificate. Complying development works prior to the issue of a Complying Development Certificate Policy on deferred or periodic payments Council may accept the deferred or periodic payment of part or all of a monetary contribution required under this Plan if the applicant, or any other person entitled to act upon the relevant consent, makes a written request and can satisfy the Council that non-compliance with the payment provisions is justified. Acceptance of any request for deferred or periodic payment is entirely at the discretion of the council. Deferred or periodic payments may be permitted in any of the following circumstances: 26

Orange Car Parking Development Contributions Plan 2015

Orange Car Parking Development Contributions Plan 2015 Orange Car Parking Development Contributions Plan 2015 Adopted by F1751 0.0% Orange Car Parking Development Contributions Plan 2015 Prepared for By GLN Planning Pty Ltd ABN 39 585 269 237 Level 10, 66

More information

Canterbury Development Contributions Plan 2013

Canterbury Development Contributions Plan 2013 Canterbury Development Contributions Plan 2013 Adopted by Council: 5 December 2013 Effective from: 17 December 2013 Jim Montague PSM GENERAL MANAGER City Planning Division Contents Page Number 1. Plan

More information

Ballina Shire Car Parking Contributions Plan Prepared for: Ballina Shire Council Date: May 2014 Project No 10084

Ballina Shire Car Parking Contributions Plan Prepared for: Ballina Shire Council Date: May 2014 Project No 10084 Ballina Shire Car Parking Contributions Plan 2014 Prepared for: Date: May 2014 Project No 10084 Ballina Shire Car Parking Contributions Plan 2014 Prepared for By GLN Planning Pty Ltd ABN 39 585 269 237

More information

Oran Park and Turner Road Precincts Section 94 Contributions Plan

Oran Park and Turner Road Precincts Section 94 Contributions Plan Oran Park and Turner Road Precincts Section 94 Contributions Plan Prepared for The Council of Camden Contents Page Number 1. Summary 1 1.1 Overview of this Plan 1 1.2 Works schedule and contribution rates

More information

Upper Warrell Creek Road Developer Contributions Plan August 2013

Upper Warrell Creek Road Developer Contributions Plan August 2013 Developer Contributions Plan August 2013 Nambucca Shire Council Administration Centre 44 Princess Street Macksville Contents Part A: Introduction, Operation and Administration of the Plan 1. Introduction

More information

Gorokan District Development Contributions Plan 2013

Gorokan District Development Contributions Plan 2013 Gorokan District Development Contributions Plan 2013 September 2013 Table of Contents Contents Summary Schedules 1 1 Administration and Operation of this Plan 2 1.1 Name of this Plan 2 1.2 Area to which

More information

Development Contributions Plan MACDONALD DRIVE SHARED PEDESTRIAN / CYCLE PATH

Development Contributions Plan MACDONALD DRIVE SHARED PEDESTRIAN / CYCLE PATH Development Contributions Plan MACDONALD DRIVE SHARED PEDESTRIAN / CYCLE PATH 2013 Armidale Dumaresq Council 135 Rusden Street, Armidale New South Wales 2350 Telephone +61 2 6770 3600 Email council@armidale.nsw.gov.au

More information

Eurobodalla Local Infrastructure Contributions Plan Prepared by. newplan. Urban Planning Solutions

Eurobodalla Local Infrastructure Contributions Plan Prepared by. newplan. Urban Planning Solutions Eurobodalla Local Infrastructure Contributions Plan 2012 Prepared by newplan Urban Planning Solutions Contents Page Number 1. Introduction 1 1.1 Overview of this Plan 1 2. Administration and operation

More information

Lismore City Section 94 Contributions Plan

Lismore City Section 94 Contributions Plan 2014 Lismore City Section 94 Contributions Plan Table of contents 1. Summary of contributions... 1 1.1 Value of infrastructure... 1 1.2 Contribution rate examples... 2 2. Administration and operation...

More information

NULKABA SECTION 94 CONTRIBUTIONS PLAN Nulkaba Section 94 Contributions Plan

NULKABA SECTION 94 CONTRIBUTIONS PLAN Nulkaba Section 94 Contributions Plan NULKABA SECTION 94 CONTRIBUTIONS PLAN 2014 Nulkaba Section 94 Contributions Plan Nulkaba Section 94 Contributions Plan 2014 Produced by: Strategic Land Use Planning Unit Cessnock City Council PO Box 152,

More information

SECTION 94 DEVELOPMENT CONTRIBUTIONS PLAN NO 8 FOR PROVISION OF PATHWAY NETWORK AT BUNGENDORE

SECTION 94 DEVELOPMENT CONTRIBUTIONS PLAN NO 8 FOR PROVISION OF PATHWAY NETWORK AT BUNGENDORE SECTION 94 DEVELOPMENT CONTRIBUTIONS PLAN NO 8 FOR PROVISION OF PATHWAY NETWORK AT BUNGENDORE ADOPTED BY COUNCIL: 12 July 2007 THIS PLAN CAME INTO EFFECT ON: 18 July 2007 PAGE 1 INDEX 1. SUMMARY... 3 2.

More information

Direct (Section 94) Development Contribution Plan Amendment 8

Direct (Section 94) Development Contribution Plan Amendment 8 Direct (Section 94) Development Contribution Plan 2011 Page 1 This page has been left blank intentionally Page 2 Contents 1 Executive Summary 1.1 Fairfield 1.2 Basis of Plan 1.3 Scale of future development

More information

Development Contributions Plan

Development Contributions Plan Development Contributions Plan Canterbury Town Centre & Riverfront Precinct * Adopted by Council: 11 August 2011 Effective from: 1 September 2011 Jim Montague GENERAL MANAGER City Planning Division Canterbury

More information

Werrington Enterprise Living and Learning (WELL) Precinct S.94 Development Contributions Plan

Werrington Enterprise Living and Learning (WELL) Precinct S.94 Development Contributions Plan Werrington Enterprise Living and Learning (WELL) Precinct S.94 Development Contributions Plan Material in relation to this plan comprises: 1. Council s resolutions on implementation of the plan following

More information

Southern Lakes District Development Contributions Plan 2013

Southern Lakes District Development Contributions Plan 2013 Southern Lakes District Development Contributions Plan 2013 September 2013 Table of Contents Contents Summary Schedules 1 1 Administration and Operation of this Plan 2 1.1 Name of this Plan 2 1.2 Land

More information

Murrumbidgee Shire Council. Darlington Point & Coleambally Peripheral Area Contributions Plan

Murrumbidgee Shire Council. Darlington Point & Coleambally Peripheral Area Contributions Plan Murrumbidgee Shire Council Darlington Point & Coleambally Peripheral Area Contributions Plan UNDER SECTION 94 of the Environmental Planning and Assessment Act 1979 AND SECTION 64 of the Local Government

More information

Toukley District Development Contributions Plan No 6

Toukley District Development Contributions Plan No 6 Toukley District Development Contributions Plan No 6 September 2013 Table of Contents Contents 1 Administration and Operation of this Plan 5 1.1 Introduction 5 1.2 Relationship to Other Plans 5 1.3 Area

More information

MOONEE RELEASE AREA Development Contributions Plan 2015

MOONEE RELEASE AREA Development Contributions Plan 2015 MOONEE RELEASE AREA Development Contributions Plan 2015 TABLE OF CONTENTS PART A PLAN SUMMARY...1 1. NAME AND LEGAL BASIS OF THE PLAN... 1 2. THE AREA TO WHICH THE PLAN APPLIES... 1 3. PURPOSES OF THE

More information

Young Shire Council. Section 94 Developer Contributions Plan

Young Shire Council. Section 94 Developer Contributions Plan Young Shire Council Section 94 Developer Contributions Plan February 2016 DOCUMENT CONTROL POLICY Section 94 FILE # F154.02 (S94 Plans)) Development Contributions Plan AUTHOR Planning & Enviro REVIEW PERIOD/DATE

More information

CP26. No. 26 Shirewide Regional Open Space

CP26. No. 26 Shirewide Regional Open Space CP26 No. 26 Shirewide Regional Open Space Version 4.0.6 Adopted December 2009 Indexed July 2016 CERTIFIED IN ACCORDANCE WITH THE ENVIRONMENTAL PLANNING AND ASSESSMENT ACT 1979 AND REGULATIONS GENERAL MANAGER

More information

Development Contributions Plan

Development Contributions Plan Development Contributions Plan Adopted 12 February 2014 Notified 9 April 2014 Section 94A of the Environmental Planning & Assessment Act 1979 (The Act) contains provisions that allow a Council to impose

More information

Harden Contributions Plan for Heavy Haulage Developments. Adopted by Council Resolution No. 277/11/11 16 th November, Prepared by.

Harden Contributions Plan for Heavy Haulage Developments. Adopted by Council Resolution No. 277/11/11 16 th November, Prepared by. Harden Contributions Plan for Heavy Haulage Developments Adopted by Council Resolution No. 277/11/11 16 th November, 2011 Prepared by newplan Urban Planning Solutions ABN 16 113 272 705 Member of the Planning

More information

Section 94 Development Contributions Plan 2007 Interim Update (2014)

Section 94 Development Contributions Plan 2007 Interim Update (2014) Contents Section Page 1. Part A Summary schedules 1 2. Part B Administration and operation of the plan 6 2.1 Name of the plan 6 2.2 Area to which the plan applies 6 2.3 What is the purpose of this plan?

More information

Section 94 Development Contributions Plan

Section 94 Development Contributions Plan Section 94 Development Contributions Plan Section 94 Development Contributions Plan Open Space Rural Districts Adopted 28 October 2014 Summary Schedule of Contributions for 2014-15 (Based on Dec 2013 CPI

More information

Cessnock City Council TOURISM SECTION 94 CONTRIBUTIONS PLAN

Cessnock City Council TOURISM SECTION 94 CONTRIBUTIONS PLAN Cessnock City Council TOURISM SECTION 94 CONTRIBUTIONS PLAN CONTRIBUTIONS HAVE BEEN INDEXED TO DECEMBER 2014 Tourism Section 94 Contributions Plan Produced by: Strategic Planning Section Cessnock City

More information

Section 94A Developer Contribution Plans Land within the Menai Centre May 2008

Section 94A Developer Contribution Plans Land within the Menai Centre May 2008 s 4-20 Eton Street, SUTHERLAND NSW 2232 Tel 02 9710 0800 Fax 02 9710 0265 Email ssc@ssc.nsw.gov.au www.sutherland.nsw.gov.au Table of Contents PART A Levy Summary 3 PART B Expected Development and Demand

More information

Section 94A Development Contribution Plans Land within the Cronulla Centre May 2008

Section 94A Development Contribution Plans Land within the Cronulla Centre May 2008 s Land within the Cronulla Centre May 2008 Email ssc@ssc.nsw.gov.au www.sutherland.nsw.gov.au Table of Contents PART A LEVY SUMMARY 3 PART B EXPECTED DEVELOPMENT AND DEMAND FOR PUBLIC FACILITIES 3 1. INTRODUCTION

More information

CP11. No. 11 Tweed Shire Library Facilities

CP11. No. 11 Tweed Shire Library Facilities CP11 No. 11 Version 3.0.5 December 2009 Indexed July 2016 CERTIFIED IN ACCORDANCE WITH THE ENVIRONMENTAL PLANNING AND ASSESSMENT ACT 1979 AND REGULATIONS GENERAL MANAGER DATE: 15 December 2009 SECTION

More information

CP25. No. 25 SALT Open Space and Associated Car Parking

CP25. No. 25 SALT Open Space and Associated Car Parking CP25 No. 25 SALT Open Space and Associated Car Parking Version 3.0.6 Adopted December 2009 Indexed July 2016 CERTIFIED IN ACCORDANCE WITH THE ENVIRONMENTAL PLANNING AND ASSESSMENT ACT 1979 AND REGULATIONS

More information

Caringbah Centre Contributions Plan Amendment 1

Caringbah Centre Contributions Plan Amendment 1 Contribution Plan 01. Centre Improvements and Contributions Plan Page 02 02. Background Discussion Contribution Rates Infrastructure or Facility Nexus Apportionment 03. Works Schedule Page 04 04. Timing

More information

SECTION 94 BUSHFIRE SERVICES CONTRIBUTION PLAN

SECTION 94 BUSHFIRE SERVICES CONTRIBUTION PLAN SECTION 94 BUSHFIRE SERVICES CONTRIBUTION PLAN 1. PURPOSE OF THE PLAN The purpose of the plan is to specify Section 94 developer contributions for additional demands on bushfire services as a consequence

More information

The Entrance District Development Contributions Plan No 3

The Entrance District Development Contributions Plan No 3 The Entrance District Development Contributions Plan No 3 September 2013 Table of Contents Contents Summary Schedule 5 1 Administration and Operation of this Plan 6 1.1 Introduction 6 1.2 Relationship

More information

Section 94 Developer Contributions Plan for The Moss Vale Enterprise Corridor 2013 to 2050

Section 94 Developer Contributions Plan for The Moss Vale Enterprise Corridor 2013 to 2050 Section 94 Developer Contributions Plan for The Moss Vale Enterprise Corridor 2013 to 2050 Adopted: 14 August 2013 Effective: 28 August 2013 1 Contents 1 CONTENTS... 2 2 PART A SUMMARY SCHEDULES... 4 2.1

More information

MIRANDA CENTRE OPEN SPACE EMBELLISHMENT PLAN

MIRANDA CENTRE OPEN SPACE EMBELLISHMENT PLAN MIRANDA CENTRE OPEN SPACE EMBELLISHMENT PLAN 1.1. Summary 1.1.2 Overview This plan is designed to collect contributions from new residential development within the Miranda Centre to improve the centre

More information

Ballina Shire Roads Contribution Plan Version 4.0

Ballina Shire Roads Contribution Plan Version 4.0 Ballina Shire Roads Contribution Plan Version 4.0 Adopted: 24 September 2015 Ballina Shire Roads Contribution Plan, Version History: Version Adopted Effective Remarks Ballina Road Contribution Plan, Versions

More information

Cessnock City Council RESIDENTIAL SECTION 94 CONTRIBUTIONS PLAN

Cessnock City Council RESIDENTIAL SECTION 94 CONTRIBUTIONS PLAN Cessnock City Council RESIDENTIAL SECTION CONTRIBUTIONS PLAN CONTRIBUTIONS HAVE BEEN INDEXED TO DECEMBER 0 Residential Section Contributions Plan Produced by: Strategic Planning Section Cessnock City Council

More information

Chatswood Central Business District. Section 94A Development Contributions Plan 2011

Chatswood Central Business District. Section 94A Development Contributions Plan 2011 Chatswood Central Business District Section 94A Development Contributions Plan 2011 Willoughby City Council November 2011 TABLE OF CONTENTS 1.0 INTRODUCTION... 2 2.0 SUMMARY SCHEDULES... 3 3.0 ADMINISTRATION

More information

CONTRIBUTIONS PLAN NO. 72 CAR PARKING ETTALONG BEACH. Printed by Gosford City Council, 49 Mann Street, GOSFORD NSW 2250

CONTRIBUTIONS PLAN NO. 72 CAR PARKING ETTALONG BEACH. Printed by Gosford City Council, 49 Mann Street, GOSFORD NSW 2250 Printed by Gosford City Council, 49 Mann Street, GOSFORD NSW 2250 This Page Intentionally Left Blank LIST OF CONTENTS 1 INTRODUCTION 1.1 Purpose of Plan 1.2 Land to which Plan Applies 1.3 Operation of

More information

CP04. No. 4 Tweed Road Contribution Plan

CP04. No. 4 Tweed Road Contribution Plan CP04 No. 4 Version 6.2.5 May 2014 Indexed July 2016 CERTIFICATION: This (CP No 4 - Version 6.2.2) was adopted by Tweed Shire Council on 17 July 2014 and became effective on 30 July 2014. Pursuant to Clauses

More information

Development Contributions Policy 2018: Springvale Urban Expansion Area and Otamatea West

Development Contributions Policy 2018: Springvale Urban Expansion Area and Otamatea West Development Contributions Policy 2018: Urban Expansion Area and West 1 P a g e Development Contributions Policy 2018: Urban Expansion Area and West Originator: Damien Wood, Development Engineer Contact

More information

CONTRIBUTIONS PLAN NO. 67 CAR PARKING WOY WOY. Printed by Gosford City Council, 49 Mann Street, GOSFORD NSW 2250

CONTRIBUTIONS PLAN NO. 67 CAR PARKING WOY WOY. Printed by Gosford City Council, 49 Mann Street, GOSFORD NSW 2250 Printed by Gosford City Council, 49 Mann Street, GOSFORD NSW 2250 This Page Intentionally Left Blank LIST OF CONTENTS 1 INTRODUCTION 1.1 Purpose of Plan 1.2 Land to which Plan Applies 1.3 Operation of

More information

Section 94 Development Contributions Plan

Section 94 Development Contributions Plan Section 94 Development Contributions Plan Section 94 Development Contributions Plan Tea Gardens District Adopted 28 October 2014 Summary Schedules These are provided as indexed and updated summary tables

More information

Hill PDA. Section 94A Development Contributions Plan. Narrabri Shire Council PREPARED FOR. July 2011

Hill PDA. Section 94A Development Contributions Plan. Narrabri Shire Council PREPARED FOR. July 2011 Section 94A Development Contributions Plan PREPARED FOR Narrabri Shire Council July 2011 Hill PDA ABN 52 003 963 755 3 rd Floor 234 George Street Sydney GPO Box 2748 Sydney NSW 2001 t. +61 2 9252 8777

More information

Leichhardt Local Government Area DEVELOPER CONTRIBUTIONS PLAN NO 1. Open Space and Recreation

Leichhardt Local Government Area DEVELOPER CONTRIBUTIONS PLAN NO 1. Open Space and Recreation Leichhardt Local Government Area DEVELOPER CONTRIBUTIONS PLAN NO 1 Open Space and Recreation Effective as of 18 January 2005 Leichhardt LGA Developer Contributions Plan No.1 Open Space & Recreation Strategic

More information

Wingham. Section 94 Contributions Plan Greater Taree City Council PO Box 482 Taree NSW

Wingham. Section 94 Contributions Plan Greater Taree City Council PO Box 482 Taree NSW Wingham Section 94 Contributions Plan 2001 Greater Taree City Council PO Box 482 Taree NSW 2430 www.gtcc.nsw.gov.au Schedule of Contributions Adjusted Single Contribution Rate within the Contribution Area

More information

Reform of the Queensland infrastructure planning and charging framework

Reform of the Queensland infrastructure planning and charging framework Reform of the Queensland infrastructure planning and charging framework Ian Wright Partner Planning Government Infrastructure and Environment team Construction and Engineering group DSDIP Discussion Paper

More information

Development Contributions Guidelines

Development Contributions Guidelines Version: 5.9 Release Date: 16 June 2003 as amended March 2007 V5.9 March 2007 Page 1 of 123 Development Contributions Welcome to the Development Contributions Guidelines. What are the [Development Contributions

More information

Harrington. Section 94 Contributions Plan Greater Taree City Council PO Box 482 Taree NSW

Harrington. Section 94 Contributions Plan Greater Taree City Council PO Box 482 Taree NSW Harrington Section 94 Contributions Plan 2001 Greater Taree City Council PO Box 482 Taree NSW 2430 www.gtcc.nsw.gov.au Schedule of Contributions Adjusted Single Contribution Rate within the Contribution

More information

Campbelltown City Council. Section 94 Development Contributions Plan No.5 Planning District No.5 Blair Athol

Campbelltown City Council. Section 94 Development Contributions Plan No.5 Planning District No.5 Blair Athol Campbelltown City Council Section 94 Development Contributions Plan No.5 Planning District No.5 Blair Athol Amended April 2014 2 Section 94 Development Contributions Plan No.5 Blair Athol - 2014 Contents

More information

DEVELOPMENT CONTRIBUTIONS PLAN

DEVELOPMENT CONTRIBUTIONS PLAN DEVELOPMENT CONTRIBUTIONS PLAN Adopted by Council on 24 April 2001 to take effect from 1 July 2001 (including amendments to 1 March 2007) Preface Section 94 of the Environmental Planning & Assessment Act

More information

A Brave New World ~ NSW Planning Reforms ~

A Brave New World ~ NSW Planning Reforms ~ A Brave New World ~ NSW Planning Reforms ~ JULIE BINDON President President Planning Planning Institute Institute of of Australia Australia (NSW (NSW Division) Division) GREG WOODHAMS Vice Vice President

More information

The Education Property Tax Regulations

The Education Property Tax Regulations EDUCATION PROPERTY TAX E-4.01 REG 1 1 The Education Property Tax Regulations being Chapter E-4.01 Reg 1 (effective January 1, 2018). NOTE: This consolidation is not official. Amendments have been incorporated

More information

RECENT LAND AND ENVIRONMENT COURT DECISIONS

RECENT LAND AND ENVIRONMENT COURT DECISIONS RECENT LAND AND ENVIRONMENT COURT DECISIONS Paper given by Stephen Griffiths to Manly Council 29 June 2011 AFFORDABLE RENTAL HOUSING COMPATIBILITY WITH THE CHARACTER OF THE AREA Issue There has been considerable

More information

PEER REVIEW DRAFT BANYULE DEVELOPMENT CONTRIBUTIONS PLAN MARCH 2017 BANYULE CITY COUNCIL

PEER REVIEW DRAFT BANYULE DEVELOPMENT CONTRIBUTIONS PLAN MARCH 2017 BANYULE CITY COUNCIL PEER REVIEW DRAFT BANYULE DEVELOPMENT CONTRIBUTIONS PLAN MARCH 2017 BANYULE CITY COUNCIL Urban Enterprise Urban Planning / Land Economics / Tourism Planning / Industry Software www.urbanenterprise.com.au

More information

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES CITY OF LANCASTER FISCAL 2007-08 BUDGET REVENUE SOURCES TAXES The tax raising authority of cities has been severely limited for many years. Proposition 13 enacted in 1978 amended the California Constitution

More information

HEMSON C o n s u l t i n g L t d

HEMSON C o n s u l t i n g L t d DEVELOPMENT CHARGES BACKGROUND STUDY Town of Gravenhurst C o n s u l t i n g L t d April, 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I INTRODUCTION... 7 II A TOWN-WIDE UNIFORM CHARGE APPROACH TO ALIGN

More information

GOSFORD REGIONAL CENTRE

GOSFORD REGIONAL CENTRE GOSFORD REGIONAL CENTRE Printed by Gosford City Council, 49 Mann Street, GOSFORD NSW 2250 This Page Intentionally Left Blank LIST OF CONTENTS 1 INTRODUCTION 1.1 History of Contributions Plan Area 1.2 Name

More information

TAUSSIG DEVELOPMENT IMPACT FEE JUSTIFICATION STUDY CITY OF ESCALON. Public Finance Public Private Partnerships Urban Economics Clean Energy Bonds

TAUSSIG DEVELOPMENT IMPACT FEE JUSTIFICATION STUDY CITY OF ESCALON. Public Finance Public Private Partnerships Urban Economics Clean Energy Bonds DAVID TAUSSIG & ASSOCIATES, INC. DEVELOPMENT IMPACT FEE JUSTIFICATION STUDY CITY OF ESCALON B. C. SEPTEMBER 12, 2016 Public Finance Public Private Partnerships Urban Economics Clean Energy Bonds Prepared

More information

Section 94 Development Contributions Plan

Section 94 Development Contributions Plan Section 94 Development Contributions Plan Section 94 Development Contributions Plan Great Lakes Wide Adopted 28 October 2014 Summary Schedules These are provided as summary tables only. Details are contained

More information

Queenstown-Lakes District Housing Accord Monitoring Report

Queenstown-Lakes District Housing Accord Monitoring Report Queenstown-Lakes District Housing Accord Monitoring Report First 6 months of Accord Year 3 (24 October 2016 30 April 2017) Based on: - Building consent and new section data for the 6 month period from

More information

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES CITY OF LANCASTER FISCAL 2006-07 BUDGET REVENUE SOURCES TAXES The tax raising authority of cities has been severely limited for the past 25 years. Proposition 13 enacted in 1978 amended the California

More information

Section 5 Dollars and Cents

Section 5 Dollars and Cents Section 5 Dollars and Cents section Revenue and financing policy 5a Financial statements 5b Funding impact statement rating implications 5c Rating changes 5d Balanced budget statement 5e Financial reporting

More information

SOUTHLAND DISTRICT COUNCIL POLICY ON DEVELOPMENT AND FINANCIAL CONTRIBUTIONS

SOUTHLAND DISTRICT COUNCIL POLICY ON DEVELOPMENT AND FINANCIAL CONTRIBUTIONS SOUTHLAND DISTRICT COUNCIL POLICY ON DEVELOPMENT AND FINANCIAL CONTRIBUTIONS 20152025 This policy applies to: DOCUMENT CONTROL Policy owner: Finance Approved by: Council TRIM reference number: R/14/11/17513

More information

Napier City Council DEVELOPMENT AND FINANCIAL CONTRIBUTIONS POLICY

Napier City Council DEVELOPMENT AND FINANCIAL CONTRIBUTIONS POLICY Napier City Council DEVELOPMENT AND FINANCIAL CONTRIBUTIONS POLICY Adoption date: 29 June 2018 This policy is adopted under section 102(1) of the Local Governament Act 2002 and must be reviewed at least

More information

Section 94 Development Contributions Plan

Section 94 Development Contributions Plan Section 94 Development Contributions Plan Section 94 Development Contributions Plan Forster District Adopted 28 October 2014 Summary Schedules These are provided as summary tables only. Details are contained

More information

Piccadilly Basin Manchester

Piccadilly Basin Manchester TAIL Piccadilly Basin Manchester High profile landmark building Open A1 Retail WITH FOOD to let This map is published for convenience of identification only and although believed to be correct its accuracy

More information

Township of Georgian Bay Water & Sewer Capacity Allocation Strategy. MacTier. November, Jointly prepared by the

Township of Georgian Bay Water & Sewer Capacity Allocation Strategy. MacTier. November, Jointly prepared by the Appendix II Township of Georgian Bay 2008 Water & Sewer Capacity Allocation Strategy MacTier November, 2009 Jointly prepared by the Township of Georgian Bay and The District Municipality of Muskoka A.

More information

Development Contribution Policy

Development Contribution Policy Development Contribution Policy Policy Owner: Development Contributions Coordinator Date approved: 27 June 2018 Next review date: June 2021 Document number: 1999575 Engagement required: External 1 Introduction

More information

Comhairle Cathrach Chorcaí Cork City Council

Comhairle Cathrach Chorcaí Cork City Council Comhairle Cathrach Chorcaí Cork City Council General Development Contribution Scheme 2017-2021 & Supplementary Development Contribution Scheme - 2017-2021 (under Section 48 and Section 49, Planning and

More information

Outline of significant changes to the Development Contributions Policy 2018/19

Outline of significant changes to the Development Contributions Policy 2018/19 Outline of significant changes to the Development Contributions Policy 2018/19 Updated 4/4/2018 Hamilton City Council is updating its Development Contributions Policy ( the existing Policy ). The Council

More information

Development Contributions Policy. Development Contributions Policy

Development Contributions Policy. Development Contributions Policy 1. Background 1.1 Introduction Marlborough District is a growing region and expects continued growth in the foreseeable future. Although this is often hailed as positive for the community, growth also

More information

Presented By: L. Carson Bise II, AICP President

Presented By: L. Carson Bise II, AICP President Impact Fee Basics: Methodology and Fee Design Presented By: L. Carson Bise II, AICP President Basic Options for One-Time Infrastructure Charges Funding from broad-based revenues (general taxes) Growth

More information

XX October 2012 MAY 2014 BRISBANE ACQUISITION AND EQUITY RAISING FINANCIAL RESULTS. For the Year Ended 30 June 2012

XX October 2012 MAY 2014 BRISBANE ACQUISITION AND EQUITY RAISING FINANCIAL RESULTS. For the Year Ended 30 June 2012 XX October 2012 BRISBANE ACQUISITION 2012 AND EQUITY RAISING MAY 2014 FINANCIAL RESULTS For the Year Ended 30 June 2012 1 Presentation Outline Transaction Overview Strategic Rationale Brisbane Market Upper

More information

Taree. Section 94 Contributions Plan Greater Taree City Council PO Box 482 Taree NSW

Taree. Section 94 Contributions Plan Greater Taree City Council PO Box 482 Taree NSW Taree Section 94 Contributions Plan 2001 Greater Taree City Council PO Box 482 Taree NSW 2430 www.gtcc.nsw.gov.au Schedule of Contributions Adjusted Single Contribution Rate within the Contribution Area

More information

Napier City Council Revenue and FINANCING POLICY

Napier City Council Revenue and FINANCING POLICY Napier City Council Revenue and FINANCING POLICY Revenue and Financing Policy 1. Background Napier City Council (the Council) has reviewed the proposed funding for each activity to determine the funding

More information

Nith Peninsula, Brant County Fiscal Impact Study

Nith Peninsula, Brant County Fiscal Impact Study Fiscal Impact Study October 25, 2017 Fiscal Impact Study Prepared for: Losani Homes Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641 9500 Fax: (416) 641 9501 economics@altusgroup.com

More information

DEVELOPMENT CHARGES BACKGROUND STUDY

DEVELOPMENT CHARGES BACKGROUND STUDY DEVELOPMENT CHARGES BACKGROUND STUDY Town of New Tecumseth C o n s u l t i n g L t d. May 29, 2013 Amended June 18, 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I INTRODUCTION... 10 II THE METHODOLOGY

More information

UNDERSTANDING YOUR RATES ACCOUNT. INSTALMENT 1: Last day for payment 30 September 2016

UNDERSTANDING YOUR RATES ACCOUNT. INSTALMENT 1: Last day for payment 30 September 2016 UNDERSTANDING YOUR S ACCOUNT INSTALMENT 1: Last day for payment 30 September HOW ARE S CALCULATED? Your rates account will show the different kinds of rate that we collect. Most of them are based on the

More information

Draft Strategic Asset Management Plan

Draft Strategic Asset Management Plan Draft Strategic Asset Management Plan 2016-2026 December 2015 Revised to include Special Rate Variation Scenarios The capital works programs included in this Strategic Asset Management Plan are subjected

More information

TOWN OF GAWLER POLICY

TOWN OF GAWLER POLICY TOWN OF GAWLER POLICY Policy Section: Policy Name: Classification: 6. Finance & Corporate Services Service Range Public Council Policy Adopted: 26 May 2015 Frequency of Review: Biennial Last Review: August

More information

Draft Contributions Policy 2019 Written feedback

Draft Contributions Policy 2019 Written feedback Date: Monday, 26 November 2018 Draft Contributions Policy 2019 Written feedback Universal Homes University of Auckland The Warehouse Group Woolworths New Zealand Limited I615 Westgate

More information

Commencement 2. This Regulation commences on 31 August 1995.

Commencement 2. This Regulation commences on 31 August 1995. FAIR TRADING ACT 1987 REGULATION (Retirement Village Industry Code of Practice Regulation 1995) NEW SOUTH WALES [Published in Gazette No. 102 of 25 August 1995] HIS Excellency the Governor, with the advice

More information

REVENUE AND FINANCING POLICY

REVENUE AND FINANCING POLICY 001 Attachment 1 REVENUE AND FINANCING POLICY The purpose of this document is to set out, in accordance with Section 103 of the Local Government Act 2002, to outline Council s decision on the appropriate

More information

Darebin DCP: Audit Report and Management of Unspent Funds Final Darebin City Council March 2015

Darebin DCP: Audit Report and Management of Unspent Funds Final Darebin City Council March 2015 Darebin DCP: Audit Report and Management of Unspent Funds Final Darebin City Council March 2015 Darebin DCP Audit Report and Management of Unspent Funds FINAL 20150318 This report has been prepared for

More information

Chapter 8 Development Management & Zoning Objectives

Chapter 8 Development Management & Zoning Objectives Chapter 8 Development Management & Zoning Objectives 8.0 Introduction The Council, using its statutory powers granted under the Planning and Development Act 2000 (as amended) guides new development by

More information

ORDINANCE NO

ORDINANCE NO FULL TEXT OF MEASURE ORDINANCE NO. 2016-03 AN ORDINANCE OF THE CITY OF ALBANY ENACTING A SPECIAL PARCEL TAX TO FUND REPAIRING AND UPGRADING PUBLIC SIDEWALKS AND REMOVING OBSTRUCTIONS TO IMPROVE SAFETY

More information

Blacktown City Council. Wayne Rogers Director Corporate Services

Blacktown City Council. Wayne Rogers Director Corporate Services Blacktown City Council Wayne Rogers Director Corporate Services My experience 22 years in Local Government finance sector Since 2011 Director Corporate Services at Blacktown City Council 2005 to 2011 Manager

More information

System Development Charge Methodology

System Development Charge Methodology City of Springfield System Development Charge Methodology Stormwater Local Wastewater Transportation Prepared By City of Springfield Public Works Department 225 Fifth Street Springfield, OR 97477 November

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-01465 December 11, 2018 Consent Item 10 Title: Ordinances to Levy Special Taxes within the Greenbriar

More information

PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND ANALYSIS

PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND ANALYSIS PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND OCTOBER 2012 PREPARED BY: LEWIS YOUNG ROBERTSON & BURNINGHAM IMPACT FEE CERTIFICATION Impact Fee Facilities Plan (IFFP) Certification

More information

Revenue and Financial Policy

Revenue and Financial Policy Revenue and Financial Policy Revenue and Financing Policy The Revenue and Financing Policy sets out how the Council funds each activity it is involved in and why. The Council is required to have this Policy

More information

City of Sydney Development Contributions Plan 2015 DRAFT

City of Sydney Development Contributions Plan 2015 DRAFT ATTACHMENT A City of Sydney Development Contributions Plan 2015 DRAFT XX XXXX 2015 City of Sydney Town Hall House 456 Kent Street Sydney NSW 2000 Contents Executive summary iii 1. Background 1 1.1 Purpose

More information

OTHER GOVERNMENTAL FUNDS - SPECIAL REVENUE

OTHER GOVERNMENTAL FUNDS - SPECIAL REVENUE OTHER GOVERNMENTAL FUNDS SPECIAL REVENUE Special Revenue Funds are used to account for proceeds of specific revenue sources other than expendable trust that are legally restricted to expenditures for specific

More information

Social and Affordable Housing Projections for Australia

Social and Affordable Housing Projections for Australia Social and Affordable Housing Projections for Australia 2016-2026/36 Dr Judy Yates Honorary Associate, School of Economics, University of Sydney. 1 Social and Affordable Housing Projections for Australia

More information

Retirement Villages NSW

Retirement Villages NSW Retirement Villages NSW A Retirement Village (Village) is a managed community for seniors. Retirement Villages (NSW) What is a Retirement Village? A Retirement Village (Village) is a managed community

More information

FINDINGS. The Board of Supervisors finds that: Resolution No declaring its intention to form Community Facilities District No.

FINDINGS. The Board of Supervisors finds that: Resolution No declaring its intention to form Community Facilities District No. ORDINANCE NO. 879 AN ORDINANCE OF THE COUNTY OF RIVERSIDE AUTHORIZING THE LEVY OF SPECIAL TAXES IN IMPROVEMENT AREA NO. 2 OF COMMUNITY FACILITIES DISTRICT NO. 07-1(NEWPORT/I-215 INTERCHANGE) OF THE COUNTY

More information

2015 ASSESSMENT GROWTH BUSINESS CASE OVERVIEW REQUEST BY SERVICE PROGRAM. Funding Required for Growth ($) Program # Service Grouping

2015 ASSESSMENT GROWTH BUSINESS CASE OVERVIEW REQUEST BY SERVICE PROGRAM. Funding Required for Growth ($) Program # Service Grouping 2015 ASSESSMENT GROWTH BUSINESS CASE OVERVIEW REQUEST BY SERVICE PROGRAM Case Funding Required for Growth ($) Program # Service Grouping Operating Capital Total FTE ECONOMIC PROSPERITY Business Attraction

More information

DEVELOPMENT CHARGES BACKGROUND STUDY

DEVELOPMENT CHARGES BACKGROUND STUDY DEVELOPMENT CHARGES BACKGROUND STUDY Town of Innisfil C o n s u l t i n g L t d. July 19, 2018 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I PURPOSE OF THE DEVELOPMENT CHARGES BACKGROUND STUDY... 6 A. INTRODUCTION

More information

CITY OF SAULT STE. MARIE 2016 DEVELOPMENT CHARGES BACKGROUND STUDY. Draft for Public Circulation and Comment

CITY OF SAULT STE. MARIE 2016 DEVELOPMENT CHARGES BACKGROUND STUDY. Draft for Public Circulation and Comment CITY OF SAULT STE. MARIE 2016 DEVELOPMENT CHARGES BACKGROUND STUDY Draft for Public Circulation and Comment JUNE 8, 2016 CONTENTS Page 1. INTRODUCTION 1.1 Purpose of this Document 1-1 1.2 Development Charges

More information

Strategic Growth in the Rangeview Area Structure Plan

Strategic Growth in the Rangeview Area Structure Plan 2018 March 22 Page 1 of 8 EXECUTIVE SUMMARY Administration has received and reviewed an Outline Plan/Land Use (OP/LU) application within the Rangeview Area Structure Plan (ASP). The developer of these

More information