MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS DECEMBER 17, 1:30 P.M. HEADQUARTERS BOARD ROOM

Size: px
Start display at page:

Download "MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS DECEMBER 17, 1:30 P.M. HEADQUARTERS BOARD ROOM"

Transcription

1 MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS DECEMBER 17, 1:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: STAFF: GUEST: Frank W. Bacon (Chairman) Earl C. Currin, Jr. (Vice Chairman) Herbert E. Winn (Treasurer) Dorsey L. Drawhorn Charles J. Friedl Michael A. Lobue Kristie Martin-Wallace William T. White Christine Marston (Minute Taker) Jeffrey S. Edwards, President/CEO George A. Felts, VP of Engineering & Operations Services Danny J. Hammond, VP of Finance & Corporate Services Jean H. Morris, VP of Human Resources Allan A. Sharrett, VP of Public & Member Relations Frank F. Rennie, IV of CowanGates Dr. Frank Bacon presided and Dorsey Drawhorn gave the invocation. PREVIOUS MINUTES On motion made and seconded: The Minutes of the November 19, 2015 Board Meeting are approved as presented. ODEC REPORT The ODEC report was given by Earl Currin and Jeff Edwards. PRESIDENT/CEO S REPORT MOTION CARRIED 1. The SEC Financial and Statistical report for November 2015 was reviewed and is attached to and made a part of the Minutes. 2. The Cooperative s accounts receivable write-offs were reviewed: a. Accounts receivable write-offs from May 2015 through August 2015 equal $133, b. Year-to-date 2015 percent of write-offs is 0.34% 1

2 On motion made and seconded: The accounts receivable write-offs in the amount of $133, are approved as presented. MOTION CARRIED 3. The Institute of Electrical & Electronics Engineers (IEEE) outage data and safety report for November 2015 were reviewed in detail: IEEE Outage Data a. System Average Interruption Duration Index (SAIDI), System Average Interruption Frequency Index (SAIFI) and System Customer Average Interruption Duration Index (CAIDI) were below historical five-year values. b. There were no power supply outages during the month. Safety Report a. No lost-time injuries reported in November. b. Total lost-time accumulated in November was 0 days c. As of November 30 th, employees have worked 873 days without a lost time injury. 4. Safety Incentive Bonus: a. Tool used within safety program to encourage safe work practices b. Incident rate has increased slightly due to three recordable incidents during the year c. DART rate has remained the same with only one restricted duty incident d. Employees have worked 890 days without a lost-time injury e. Employees are to receive a.55% bonus at the end of 2015, this award is reflected in the 2016 proposed Forecast f. Up to 1% of base payroll may be awarded in 2017 if all safety goals are met in 2016 ($110,000) g. Target goal for 2016 will remain the same as the 2015 goal with a continued focus on a zero lost-time environment h. Based on current data from NRECA s Balanced Scorecard, SEC is in the 1 st quartile performance for incident rate and 2 nd quartile performance for DART 5. A Right-of-Way satisfaction analysis was completed in October. SEC will start putting efforts into increasing member contact through mailings and member visits in an effort to increase the SEC ACSI score. 6. SEC has started using an aerial tree trimming service for clearing some rights-ofway that are difficult to reach from the ground. In these cases, aerial tree trimming cost is $1,200 per mile compared $2,300 per mile by SEC ground crews. The tree trimming is much faster; 3½ days with the helicopter instead of 3 months for ground crews when clearing the same distance. 2

3 7. The Board was provided information regarding cybersecurity events during the month of November NISC system has been used at SEC for over three years. An audit of the system is currently being done to see where the program can be utilized to be more effective for employees. 9. Day in the Life of a Lineman program had 250 students attend from high schools throughout SEC s service territory. A request has been made by CFC for SEC to present the program at one of their meetings. NEW BUSINESS 1. Proposed 2016 Annual Forecast: Proposed 2016 Annual Forecast is based on normal weather patterns and typical energy use and addresses strategic initiatives set by the Board. Items of importance: - Third year with restructured rates - Meets all requirements of lenders - Built around current version of Strategic Plan - Cost of power based upon ODEC 2015 actual cost - Employee bonus based upon ACSI scores Functional variances from previous years: - High of 176 employees in 2007, low of 134 in No additional employees necessary to meet strategic goals; possibility of adding an apprentice line position mid- year - Strategic vision in adding employees Electric revenues and KWh sales forecasted to decrease in 2016; $124.5 million projected revenues and million projected kwh sales Total projected kwh purchase of million ODEC cost of power rates per kwh (8.07 cents) No margin stabilization credit from ODEC budgeted Continued focus on reliability and continued emphasis on improvement of customer service Decrease in Customer Accounting and Administrative & General expenses by 1.0%, and Operations & Maintenance expenses by 10% (vegetation management) Increase in Customer Service expenses by 1.0% and Depreciation & Interest expenses by 3.6% (additional $20 million borrowing from existing loan) Capital credit retirement of $3.0 million Projected kwh sales per rate class: - Residential million (81%) - Small Commercial 54.5 million (6%) - Large Commercial 72.7 million (8%) - Public Buildings 45.5 million (5%) 3

4 Projected revenue dollars per rate class: Residential $105.3 million (85%) Small Commercial $6.9 million (6%) Large Commercial $6.2 million (5%) Public Buildings $5.0 million (4%) Forecasted revenue from all sources $124.5 million Forecasted cost of power $77.6 million Customer Service expenses forecasted at $3.4 million Operations & Maintenance expenses forecasted at $16.0 million Administrative & General expenses forecasted at $5.9 million Customer Accounts expenses forecasted at $2.6 million Line loss of 5.2% Number of accounts 55,576 OTIER of 1.46 Operating margins $2.7 million; total margins $4.0 million Forecast breakdown: - Cost of Power $77.6 million - Fixed Expenses $16.6 million - Manageable Expenses $27.6 million - Operating Margins $2.7 million Addition of new Western District office: Land purchase agreement in place and contingent on rezoning Conceptual plan complete, rezoning activity for property underway Construction completion by June 2017 Estimated project cost of $12.7 million Hurt & Proffitt providing civil engineering designs and support MCA Architects providing architectural and construction oversight General contractor will be determined through competitive bid process Engineering & Operations goals: - Focus on safety: o Continued focus on a zero-injury culture o Continued utilization of a safety incentive bonus o Internal Safety Achievement Inspection o Improve communications from Safety Committee - Reorganization of Engineering & Operations tasks among existing supervision - Focus on improving right-of-way activity and member engagement - Focus on improving Operations efficiency for new construction and work plan construction 4

5 - Reliability improvement projects: o Monitor Reliability Improvement Plan ( ) o Complete Construction Work Plan o Amelia Powhatan 115kV construction o Center Star 115kV right-of-way o Completion of voltage conversion on Gladys, Red House and Stoddart substation o Utilize new OMS package including system automation - Contract Maintenance activities: o Right-of-Way maintenance Continued in-house management of contract resources Continuation of side-trimming program Herbicide program will be idle for 2016 (except retreatments) Continued danger tree and yard tree removals (reduced activity) Improved member contacts o Oversight and administration of Construction Work Plan contractors - Fleet Equipment o 10-pieces of replacement equipment and an addition of a UTV and trailer o Continuation of aggressive danger tree and yard tree removal program - Continued focus on improving maintenance related activities - Continued proactive approach at controlling tree-related damage to the distribution system - Continued implementation of utility best practices for substation, distribution and maintenance activities - Reliance on reliability data to validate system maintenance and construction Financial goals: - Maintain strong financial condition; by meeting RUS mortgage requirements and goals established by the Board of Directors - Provide useful financial reports for management and Board - Grow new prepay, load management and meter data management programs - Increase kiosk participation - Decrease inbound phone calls and increase outbound calls - Increase participation in existing programs Information Technology (IT) goals: - Provide and support technology applications that bring value to employees and members 5

6 - Improve use of Technology Plan and Disaster Recovery Plan - Complete Cybersecurity policies - Continue monitoring facilities through security applications - Improve microwave - Continued use of virtual servers - Improved WiFi throughout Headquarters Human Resources goals: - Attract, select and retain a strong, dedicated employee team o Competitive compensation and benefits plan o Job recruitment o Interviewing/hiring process - Promote employee learning, growth, development and education o Strengthen workforce capabilities o Offer training, education assistance, coaching and mentoring opportunities o Effective and efficient Cooperative to provide excellence in customer service o Employees may receive ¼ of 1% (up to 1.25%) of their salary for each point above the ACSI national average up to a maximum of 5% - Maintain compliance with all applicable employment laws and regulations o Remain up-to-date on employment laws/changes and revise Cooperative policies and procedures as needed o Provide supervisory training o Protection of Cooperative and employees Public & Member Relations goals: - Improve communication and satisfaction by advancing SEC s profile and image throughout the communities served, expanding social media and web presence, expanding member satisfaction surveys (four per year) and increase ACSI scores - Continued involvement in a variety of events and sponsorships throughout service territory - Strengthen connection with membership - Continued use of social media, website and video production - Advertising through brochures, flyers and billing inserts - Use of SEC-customized promotional products for events - Improve community outreach throughout service territory - Annual meeting improvements through installation of permanent outdoor sound system and replacement of incandescent bulbs with LEDs - Improve member outreach through new Member Advocacy Committee and advancement of SEC s scholarship fund 6

7 Upon motion made and seconded: The proposed 2016 Forecast is approved as presented. MOTION CARRIED 2. In preparation for the NRECA Annual meeting a selection of a voting delegate and alternate are needed: Voting Delegate: Charles J. Friedl Alternate: William T. White On motion made and seconded: The NRECA nominated. voting delegate and alternate are approved as MOTION CARRIED 3. In preparation for the NRTC member meeting a selection of a voting delegate and alternate are needed: Voting Delegate: William T. White Alternate: Charles J. Friedl On motion made and seconded: The NRTC voting delegate and alternate are approved as nominated. MOTION CARRIED 4. In preparation for the Tarheel Electric Membership Association (TEMA) Annual meeting, a voting delegate and alternate need to be appointed: Voting Delegate: Earl C. Currin, Jr. Alternate: Jeffrey S. Edwards On motion made and seconded: The TEMA voting delegate and alternate are approved as appointed. DIRECTOR EDUCATION Discussion was tabled until next month. LEGAL REPORT month. MOTION CARRIED Due to a death in Jack Boswell s family, the legal report was tabled until next EXECUTIVE SESSION AND ADJOURNMENT Recognition of five years of dedicated service as a director of the Board was presented to Michael A. Lobue. 7

8

9 STATEMENT OF GENERAL FUNDS AND OTHER ASSETS November 2015 General Fund Cash in Banks 10,821, General Funds Invested CFC - CTC's 2,186, CFC - Patronage Capital 2,079, Federated Insurance Corporation 309, TEC Trading Incorporated 622, Town of Hurt 1, Notes and Accounts Receivable Electric Consumer 6,676, Other Accounts Receivable 3,660, ,357, Material and Supplies in Stock 721, Construction Work in Progress to be Paid from Construction Funds 0.00 TOTAL 27,079, Construction Funds Available First Citizens Bank 0.00 NOTES STATISTICS CFC & FIRST CITIZENS BANK CFC RUS & FFB LINE OF CREDIT Allocation Under Notes 56,969, ,337, ,000, Advance to Date 56,969, ,337, ,000, Balance Available for Advance 26,000, Gross Obligations 58,242, ,365, ,000, Interest Paid This Year 2,213, ,071, , Page 1 of 6

10 Southside Electric Cooperative For the Month Ending November 2015 Comparative Operating Statistics Y-T-D 2014 Y-T-D 2015 Nov New Services Connected Meters Removed Meters Reinstalled Services Idle, Excluding Seasonal Number of Services Retired Total Consumers Receiving Service Total Miles Energized ,460 2, ,185 2, ,176 4,459 4, ,076 55,348 55,348 8,213 8,240 8,240 Meters Installed - New Services January February March April May June July August September October November December Total Page 2 of 6

11 SOUTHSIDE ELECTRIC COOPERATIVE Revision: /10/2015 8:07:10 am General Ledger Financial And Operating Report Electric Distribution Page: 1 INCOME STATEMENT FOR NOV Year - To - Date Period - To - Date Item Last Year This Year Budget Current Budget 1. Operating Revenue and Patronage Capital 109,632, ,897, ,626, ,233, ,463, Power Production Expense 3. Cost of Purchased Power 65,266, ,959, ,044, ,602, ,322, Transmission Expense 14, , , Regional Market Expense 6. Distribution Expense - Operation 2,747, ,230, ,456, , , Distribution Expense - Maintenance 10,120, ,556, ,408, , ,330, Customer Accounts Expense 2,097, ,009, ,014, , , Customer Service and Informational Expense 2,109, ,366, ,639, , , Sales Expense 373, , , , , Administrative and General Expense 5,267, ,560, ,411, , , Total Operation & Maintenance Expense (2 thru 11) 87,997, ,260, ,448, ,569, ,913, Depreciation & Amortization Expense 14. Tax Expense - Property & Gross Receipts 15. Tax Expense - Other 16. Interest on Long-Term Debt 17. Interest Charged to Construction - Credit 18. Interest Expense - Other 19. Other Deductions 20. Total Cost of Electric Service (12 thru 19) 21. Patronage Capital & Operating Margins (1 minus 20) 22. Non Operating Margins - Interest 23. Allowance for Funds Used During Construction 24. Income (Loss) from Equity Investments 25. Non Operating Margins - Other 26. Generation and Transmission Capital Credits 27. Other Capital Credits and Patronage Dividends 28. Extraordinary Items 29. Patronage Capital or Margins (21 thru 28) 8,580, ,585, ,782, , , ,300, ,364, ,364, , , ,691, ,372, ,862, , , , , , , , , , ,798, ,653, ,486, ,127, ,371, ,833, ,243, ,139, , , , , , , , , , , , , , , , , , , , ,168, ,767, ,186, , , Operating - Margin Non Operating - Margin Times Interest Earned Ratio - Operating Times Interest Earned Ratio - Net Times Interest Earned Ratio - Modified 7,168, ,767, ,186, , , Page 3 of /pro/rpttemplate/acct/2.34.1/gl/gl_standard_financial.xml.rpt Lynn

12 SOUTHSIDE ELECTRIC COOPERATIVE Revision: /10/2015 8:07:30 am General Ledger Financial And Operating Report Electric Distribution Page: 1 BALANCE SHEET FOR NOV 2015 Last Year This Year Variance ASSETS AND OTHER DEBITS 1. Total Utility Plant in Service 307,236, ,062, ,826, Construction Work in Progress 11,579, ,909, , Total Utility Plant (1 + 2) 318,815, ,972, ,156, Accum. Provision for Depreciation and Amort. 86,797, ,823, ,025, Net Utility Plant (3-4) 232,018, ,149, ,130, Non-Utility Property (Net) 38, , , Invest. in Subsidiary Companies Invest. in Assoc. Org. - Patronage Capital 44,077, ,008, , Invest. in Assoc. Org. - Other - General Funds 2,462, ,497, , Invest. in Assoc. Org. - Other - Nongeneral Funds Invest. in Economic Development Projects Other Investments 1,030, , , Special Funds Total Other Property & Investments (6 thru 13) 47,608, ,355, , Cash - General Funds 7,259, ,821, ,562, Cash - Construction Funds - Trustee Special Deposits Temporary Investments Notes Receivable (Net) Accounts Receivable - Sales of Energy (Net) 7,739, ,676, ,062, Accounts Receivable - Other (Net) 3,069, ,660, , Renewable Energy Credits Material and Supplies - Electric & Other 764, , , Prepayments 313, , , Other Current and Accrued Assets 6,170, ,244, , Total Current and Accrued Assets (15 thru 25) 25,317, ,523, ,205, Regulatory Assets 707, , , Other Deferred Debits 6,682, ,321, , Total Assets and Other Debits ( thru 28) 312,334, ,602, ,268, Page 4 of /pro/rpttemplate/acct/2.34.1/gl/gl_standard_financial_bal_sheet.xml.rpt Lynn

13 SOUTHSIDE ELECTRIC COOPERATIVE Revision: /10/2015 8:07:30 am General Ledger Financial And Operating Report Electric Distribution Page: 2 BALANCE SHEET FOR NOV 2015 Last Year This Year Variance LIABILITIES AND OTHER CREDITS 30. Memberships 228, , Patronage Capital 89,192, ,581, ,389, Operating Margins - Prior Years Operating Margins - Current Year 7,168, ,767, ,401, Non-Operating Margins Other Margins and Equities 92, , , Total Margins & Equities (30 thru 35) 96,681, ,663, ,982, Long-Term Debt - RUS (Net) 17,349, ,807, , Long-Term Debt - FFB - RUS Guaranteed 97,022, ,929, ,906, Long-Term Debt - Other - RUS Guaranteed Long-Term Debt - Other (Net) 58,255, ,491, ,764, Long-Term Debt - RUS Econ. Devel. (Net) Payments - Unapplied Total Long-Term Debt (37 thru 41-42) 172,627, ,228, ,601, Obligations Under Capital Leases - Noncurrent Accumulated Operating Provisions 115, , Total Other Noncurrent Liabilities ( ) 115, , Notes Payable 15,800, ,000, ,800, Accounts Payable 9,073, ,735, ,337, Consumers Deposits 2,704, ,500, , Current Maturities Long-Term Debt 6,483, ,378, , Current Maturities Long-Term Debt - Econ. Devel Current Maturities Capital Leases Other Current and Accrued Liabilities 7,180, ,596, ,583, Total Current & Accrued Liabilities (47 thru 53) 41,241, ,211, ,030, Regulatory Liabilities Other Deferred Credits 1,667, ,383, ,715, Total Liab. & Other Credits ( thru 56) 312,334, ,602, ,268, Current Assets To Current Liabilities 0.61 to to 1 Margins and Equities To Total Assets % % Long-Term Debt To Total Utility Plant % % Page 5 of /pro/rpttemplate/acct/2.34.1/gl/gl_standard_financial_bal_sheet.xml.rpt Lynn

14 CLASS OF SERVICE No. Receiving Service a. No. Minimum Bills d. Avg. No. Receiving Service e. kwh Sold Cumulative f. Amount Cumulative g. 1. Residential Sales (excl seas.) 53,124 45,263,386 7,518, , ,496,260 97,760, Residential Sales Seasonal 3. Irrigation Sales 4. Comm. & Ind 1000 KVA or Less 1,863 4,576, , ,848 54,441,486 6,885, Comm. & Ind Over 1000 KVA 15 7,294, , ,693,328 6,306, Public St. & Highway Lighting 7. Other Sales to Public Authority 346 3,213, , ,561,297 4,834, Sales for Resale - REA Borr. 9. Sales for Resale - Other PART D. CONSUMER SALES AND REVENUE DATA November 2015 THIS MONTH YEAR-TO-DATE kwh Sold b. Amount c. 10. (1 thru 9) 55,348 60,347,709 9,151, , ,192, ,787, Other Electric Revenue xxxxxxxxxxxx xxxxxxxxxxxx 81,626 xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx 1,110, Total ( ) xxxxxxxxxxxx xxxxxxxxxxxx 9,233,123 xxxxxxxxxxxx xxxxxxxxxxxx xxxxxxxxxxxx 116,897,816 ITEM PART D. CONSUMER SALES AND REVENUE DATA THIS MONTH YEAR-TO-DATE a. ITEM b. THIS MONTH a. YEAR-TO-DATE b. 1. Net kwh Generated Office Use ,212 1,988, kwh Purchased ,030, ,101, Total unaccounted For 3. Interchange kwh - Net (4 less 5 & 6), ,535,032 31,921, Total kwh (1 thru 3) ,030, ,101, Percent System Loss (7/4)x Total kwh - Sold ,347, Maximum Demand (kw) ,192, Month When Maximum Demand Occurred , ,271 February 2015 Page 6 of 6

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS JUNE 18, 1:30 P.M. HEADQUARTERS BOARD ROOM

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS JUNE 18, 1:30 P.M. HEADQUARTERS BOARD ROOM MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS JUNE 18, 2015@ 1:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: STAFF: GUEST: Frank W. Bacon (Chairman) Earl C. Currin, Jr. (Vice Chairman)

More information

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS APRIL 16, 1:30 P.M. HEADQUARTERS BOARD ROOM

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS APRIL 16, 1:30 P.M. HEADQUARTERS BOARD ROOM MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS APRIL 16, 2015 @ 1:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: Frank W. Bacon (Chairman) Earl C. Currin, Jr. (Vice Chairman) Paul S.

More information

AGENDA SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS DECEMBER 21, 1:30 P.M.

AGENDA SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS DECEMBER 21, 1:30 P.M. AGENDA SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS DECEMBER 21, 2017 @ 1:30 P.M. HEADQUARTERS BOARD ROOM I. Call to Order (Bacon) II. III. IV. Invocation (McCann) Review & Action on

More information

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS FEBRUARY 21, 12:30 P.M. HEADQUARTERS BOARD ROOM

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS FEBRUARY 21, 12:30 P.M. HEADQUARTERS BOARD ROOM MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS FEBRUARY 21, 2019 @ 12:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: STAFF: Frank W. Bacon (Chair) Earl C. Currin, Jr. (Vice Chair) Charles

More information

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS JULY 21, 1:30 P.M. HEADQUARTERS BOARD ROOM

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS JULY 21, 1:30 P.M. HEADQUARTERS BOARD ROOM MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS JULY 21, 2016 @ 1:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: STAFF: GUEST(S): Frank W. Bacon (Chairman) Earl C. Currin, Jr. (Vice

More information

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS SEPTEMBER 20, 1:30 P.M. HEADQUARTERS BOARD ROOM

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS SEPTEMBER 20, 1:30 P.M. HEADQUARTERS BOARD ROOM MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS SEPTEMBER 20, 2018 @ 1:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: STAFF: GUESTS: Frank W. Bacon (Chair) Earl C. Currin, Jr. (Vice

More information

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS SEPTEMBER 19, 1:30 P.M. HEADQUARTERS BOARD ROOM

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS SEPTEMBER 19, 1:30 P.M. HEADQUARTERS BOARD ROOM MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS SEPTEMBER 19, 2017 @ 1:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: STAFF: GUEST(S): Frank W. Bacon (Chairman) Earl C. Currin, Jr. (Vice

More information

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS MARCH 16, 1:30 P.M. HEADQUARTERS BOARD ROOM

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS MARCH 16, 1:30 P.M. HEADQUARTERS BOARD ROOM MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS MARCH 16, 2017 @ 1:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: STAFF: GUEST(S): Frank W. Bacon (Chairman) Earl C. Currin, Jr. (Vice

More information

BEARTOOTH ELECTRIC COOPERATIVE, INC. PROPOSED AMOUNT TO BE WRITTEN OFF $23, Proposed 2012 Write offs on Inactive Accounts (55 Accounts)

BEARTOOTH ELECTRIC COOPERATIVE, INC. PROPOSED AMOUNT TO BE WRITTEN OFF $23, Proposed 2012 Write offs on Inactive Accounts (55 Accounts) BEARTOOTH ELECTRIC COOPERATIVE, INC. PROPOSED AMOUNT TO BE WRITTEN OFF 212 $23,98.1 Proposed 212 Write offs on Inactive Accounts (55 Accounts) $15,474.38 Unretired Capital Credits available to offset write

More information

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS MARCH 22, 1:30 P.M. HEADQUARTERS BOARD ROOM

MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS MARCH 22, 1:30 P.M. HEADQUARTERS BOARD ROOM MINUTES SOUTHSIDE ELECTRIC COOPERATIVE MEETING OF THE BOARD OF DIRECTORS MARCH 22, 2018 @ 1:30 P.M. HEADQUARTERS BOARD ROOM PRESENT: STAFF: GUESTS: Frank W. Bacon (Chair) Earl C. Currin, Jr. (Vice Chair)

More information

(Internet version) Financial & Statistical Report November 2018

(Internet version) Financial & Statistical Report November 2018 (Internet version) Financial & Statistical Report November 2018 12/17/2018 Statement of Operations For the Period Ended November 30, 2018 (in millions) Current Month Year-to-Date Operating Revenue $ 31.4

More information

Jefferson County PUD No. 1 Narrative to Accompany Monthly Financial Statements For the Period Ending September 30, 2017

Jefferson County PUD No. 1 Narrative to Accompany Monthly Financial Statements For the Period Ending September 30, 2017 Jefferson County PUD No. 1 Narrative to Accompany Monthly Financial Statements For the Period Ending September 3, 217 Combined Income Statement Page 1 This report provides an overview of the revenues and

More information

(Internet version) Financial & Statistical Report December 2017

(Internet version) Financial & Statistical Report December 2017 (Internet version) Financial & Statistical Report December 2017 01/22/2018 Statement of Operations For the Period Ended December 31, 2017 (in millions) Current Month Year-to-Date Operating Revenue & Patronage

More information

(Internet version) Financial & Statistical Report December 2016

(Internet version) Financial & Statistical Report December 2016 (Internet version) Financial & Statistical Report December 2016 1/23/2017 Statement of Operations For the Period Ended December 31, 2016 (in millions) Current Month Year-to-Date Operating Revenue & Patronage

More information

(Internet version) Financial & Statistical Report September 2017

(Internet version) Financial & Statistical Report September 2017 (Internet version) Financial & Statistical Report September 2017 10/23/2017 Statement of Operations For the Period Ended September 30, 2017 (in millions) Current Month Year-to-Date Operating Revenue &

More information

ANNUAL REPORT Annual Report 1

ANNUAL REPORT Annual Report 1 ANNUAL REPORT 2015 2014 Annual Report 1 President and CEO Report to the Members When we think about the relationship between the Board of Directors, management and employees and Pee Dee Electric s members,

More information

ORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Q3 Financial Report Page 1 of 20

ORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Q3 Financial Report Page 1 of 20 ORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Page 1 of 20 MEMORANDUM November 09, 2018 To: Board of Directors From: Foster Hildreth, General Manager Re: OPALCO 2018 Third Quarter Financial Report

More information

Member Regulation Electric Rate Review. Board of Director s Meeting March 18, 2013

Member Regulation Electric Rate Review. Board of Director s Meeting March 18, 2013 Member Regulation Electric Rate Review Board of Director s Meeting March 18, 2013 1 Member Regulation Electric Rate Review Proposed Resolutions Resolution 2013-MR1 PSCR Factor Collection Reconciliation

More information

REGULAR MONTHLY BOARD MEETING AGENDA

REGULAR MONTHLY BOARD MEETING AGENDA March 18, 2016 1. CALL TO ORDER: 9:00 am 2. PLEDGE OF ALLEGIANCE REGULAR MONTHLY BOARD MEETING AGENDA 3. ROLL CALL/DETERMINATION OF QUORUM 4. APPROVAL OF AGENDA 5. RECOGNITION OF GUESTS 6. BUSINESS WITH

More information

2017 ANNUAL REPORT IT S THE WATER... POWERING OUR COMMUNITIES UMATILLA ELECTRIC

2017 ANNUAL REPORT IT S THE WATER... POWERING OUR COMMUNITIES UMATILLA ELECTRIC 2017 ANNUAL REPORT IT S THE WATER... POWERING OUR COMMUNITIES UMATILLA ELECTRIC C O O P E R A T I V E CELEBRATING ANOTHER YEAR OF GROWTH A Message From UEC s Board President and General Manager/CEO. We

More information

McLean Electric continues to grow

McLean Electric continues to grow JUNE 213 213 annual meeting manager s report by Martin D. Dahl, general manager/chief executive officer McLean Electric continues to grow Dahl 212 was a good year for the cooperative. The year ended with

More information

Inspection A For the 2013 calendar year, or tax year beginning, 2013, and ending, B Check if applicable: C CREWE, VA

Inspection A For the 2013 calendar year, or tax year beginning, 2013, and ending, B Check if applicable: C CREWE, VA Form 990 OMB No. 1545-0047 Return of Organization Exempt From Income Tax 2013 Under section 501(c), 527, or 4947(a)(1) of the Internal Revenue Code (except private foundations) G Do not enter Social Security

More information

2013 Annual Report. To The Membership. Eastern Maine Electric Cooperative, Inc. (207) P O Box 425 Calais ME (800)

2013 Annual Report. To The Membership. Eastern Maine Electric Cooperative, Inc. (207) P O Box 425 Calais ME (800) 2013 Annual Report To The Membership www.emec.com Eastern Maine Electric Cooperative, Inc. (207) 454-7555 P O Box 425 Calais ME 04619 (800) 696-7444 Serving Eastern and Northern Maine For 74 Years EASTERN

More information

GREAT RIVER ENERGY ANNUAL OPERATING REPORT PERIOD ENDED 12/31/16

GREAT RIVER ENERGY ANNUAL OPERATING REPORT PERIOD ENDED 12/31/16 GREAT RIVER ENERGY ANNUAL OPERATING REPORT PERIOD ENDED 12/31/16 Form 12: Certification We hereby certify that the entries in this reparÿ a re in accordance with the accounts and other records of GRE and

More information

NRECA Reliability Online Study

NRECA Reliability Online Study NRECA Reliability Online Study Survey Results June, Methodology/Response Rate 262 respondents participated in the reliability study (compared to 231 in and 299 in 2004). As in the past years, the study

More information

2018 ANNUAL MEETING. Schedule of Events. In this issue: Churches & Businesses. Eastern Illini Electric Cooperative. June 7, 2018

2018 ANNUAL MEETING. Schedule of Events. In this issue: Churches & Businesses. Eastern Illini Electric Cooperative. June 7, 2018 Eastern Illini Electric Cooperative 2018 ANNUAL MEETING June 7, 2018 June 2018 In this issue: - Annual Meeting Events - Financial Report - Chairman and President Report - Annual Meeting Activities Schedule

More information

A Message from the President,

A Message from the President, 2015 Annual Report P O Box 70 1200 West Tyler Street Gilmer, TX 75644 Main: 903.843.2536 Fax: 903.843.2736 1.800.259.2536 www.urecc.coop A Message from the President, Welcome to the 79th annual membership

More information

Your Source for Power. And Information.

Your Source for Power. And Information. Your Source for Power. And Information. Annual Report 2017 Letter to the Members From the President and CEO, and the Chairman of the Board Choptank Electric Cooperative is more than just an electric utility

More information

News from the Oklahoma Corporation Commission Matt Skinner, Public Information Phone: (405) , FAX: (405)

News from the Oklahoma Corporation Commission Matt Skinner, Public Information Phone: (405) , FAX: (405) News from the Oklahoma Corporation Commission Matt Skinner, Public Information Phone: (405) 521-4180, FAX: (405) 521-6945 m.skinner@occemail.com April 28, 2006 KEEPING THE LIGHTS ON New Commission reliability

More information

THINKING BEYOND THE BARREL IMAGINE THE POSSIBILITIES KAUA I ISLAND UTILITY COOPERATIVE ANNUAL REPORT

THINKING BEYOND THE BARREL IMAGINE THE POSSIBILITIES KAUA I ISLAND UTILITY COOPERATIVE ANNUAL REPORT THINKING BEYOND THE BARREL IMAGINE THE POSSIBILITIES KAUA I ISLAND UTILITY COOPERATIVE 20 07 ANNUAL REPORT Aloha Members of Kaua i Island Utility Cooperative, We are pleased to present our 2007 Annual

More information

A N N U A L R E P O R T

A N N U A L R E P O R T East Central Electric Cooperative 2017 ANNUAL REPORT message to our members YESTERDAY, TODAY, AND TOMORROW This year your electric co-op celebrates 80 years in business. This achievement represents the

More information

RAPPAHANNOCK ELECTRIC COOPERATIVE. Financial Statements. December 31, 2017 and 2016 Years ended December 31, 2017, 2016 and 2015

RAPPAHANNOCK ELECTRIC COOPERATIVE. Financial Statements. December 31, 2017 and 2016 Years ended December 31, 2017, 2016 and 2015 Financial Statements December 31, 2017 and 2016 Years ended Table of Contents Independent Auditor s Report 1-2 Balance Sheets - December 31, 2017 and 2016 3 Statements of Operations and Comprehensive Income

More information

Key Performance Indicators

Key Performance Indicators Key Performance Indicators 2017-2018 rev. February 2017 Purpose and Objectives The purpose of Key Performance Indicators (KPIs) is to provide an objective method for evaluating the degree of success with

More information

The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents

The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents Description Status Schedule Index All-Electric Service Active AE-17 2 Domestic Service Active D-17 3 Small Commercial

More information

20 ANNU 17 AL REPORT

20 ANNU 17 AL REPORT 2017 ANNUAL REPORT 2017 Year-End Review Letter To Our Members Being a member-owned electric cooperative, we strive for noticeably superior member services. This is not only one of our strategic goals,

More information

2013 Annual Report and Meeting Notice

2013 Annual Report and Meeting Notice 2013 Annual Report and Meeting Notice Attend Lincoln Electric s Annual Meeting of the Members March 22, 2014 Lincoln County High School Auditorium 312 9th Street East, Eureka, MT Registration begins at

More information

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DE

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DE STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities Distribution Service Rate Case DIRECT TESTIMONY OF CHRISTIAN P. BROUILLARD

More information

Report of the Board Chairman

Report of the Board Chairman Report of the Board Chairman Travis Day President The Annual Membership Meeting of Comanche Electric Cooperative, Inc., will be held August 18, 2007, at the Comanche City Park in Comanche, Texas. Registration

More information

OVERTON POWER DISTRICT NO. 5 BOARD MEETING November 28, :00 P.M. Overton, Nevada

OVERTON POWER DISTRICT NO. 5 BOARD MEETING November 28, :00 P.M. Overton, Nevada OVERTON POWER DISTRICT NO. 5 BOARD MEETING November 28, 2018 4:00 P.M. Overton, Nevada PRESENT: Mr. Mike Fetherston, Chairman Mr. Doug Waite, Vice Chairman Mr. Mike Young, Secretary / Treasurer Mr. Robert

More information

2018 Corporate Operating Plan

2018 Corporate Operating Plan 2018 Corporate Operating Plan 2018 CORPORATE OPERATING PLAN TABLE OF CONTENTS Page Management Letter... 1 Corporate Strategic Planning... 2 Executive Summary... 7 Assumptions... 9 2018 Corporate Operating

More information

Exhibit Table 1: PG&E Corporation Business Priorities

Exhibit Table 1: PG&E Corporation Business Priorities Exhibit 99.2 Table 1: PG&E Corporation Business Priorities 2006-2010 1. Advance business transformation 2. Provide attractive shareholder returns 3. Increase investment in utility infrastructure 4. Implement

More information

BOLINGER, SEGARS, GILBERT & MOSS, L.L.P.

BOLINGER, SEGARS, GILBERT & MOSS, L.L.P. BOLINGER, SEGARS, GILBERT & MOSS, L.L.P. certified public accountants PHONE: (806) 747-3806 FAX: (806) 747-3815 8215 Nashville Avenue LUBBOCK, TEXAS 79423-1954 March 6, 2014 Board of Directors Bandera

More information

EXECUTIVE SUMMARY OF APPLICATION

EXECUTIVE SUMMARY OF APPLICATION Updated: 0-0-0 EB-0-00 Page of EXECUTIVE SUMMARY OF APPLICATION. SCOPE OF APPLICATION Hydro One Networks Inc. ( Hydro One ) is applying for an Order approving the revenue requirement, cost allocation and

More information

ARIZONA POWER AUTHORITY (A BODY, CORPORATE AND POLITIC, OF THE STATE OF ARIZONA) PHOENIX, ARIZONA FINANCIAL STATEMENTS SEPTEMBER 30, 2014 AND 2013

ARIZONA POWER AUTHORITY (A BODY, CORPORATE AND POLITIC, OF THE STATE OF ARIZONA) PHOENIX, ARIZONA FINANCIAL STATEMENTS SEPTEMBER 30, 2014 AND 2013 (A BODY, CORPORATE AND POLITIC, OF THE STATE OF ARIZONA) PHOENIX, ARIZONA FINANCIAL STATEMENTS TABLE OF CONTENTS INDEPENDENT AUDITORS' REPORT 1 MANAGEMENT S DISCUSSION AND ANALYSIS 3 FINANCIAL STATEMENTS

More information

Message from the CEO and Board President

Message from the CEO and Board President 2014 Annual Report Message from the CEO and Board President 1 Lake Region Electric Cooperative s mission adopted by the board of directors charges the cooperative to promote and sustain the selfreliance

More information

MISSISSIPPI 30 JONES DIXIE ELECTRIC POWER ASSOCIATION LAUREL, MISSISSIPPI FINANCIAL STATEMENTS AS OF DECEMBER 31, 2017 AND 2016 AND AUDITORS' REPORT

MISSISSIPPI 30 JONES DIXIE ELECTRIC POWER ASSOCIATION LAUREL, MISSISSIPPI FINANCIAL STATEMENTS AS OF DECEMBER 31, 2017 AND 2016 AND AUDITORS' REPORT MISSISSIPPI 30 JONES DIXIE ELECTRIC POWER ASSOCIATION LAUREL, MISSISSIPPI FINANCIAL STATEMENTS AS OF DECEMBER 31, 2017 AND 2016 AND AUDITORS' REPORT MISSISSIPPI 30 JONES DIXIE ELECTRIC POWER ASSOCIATION

More information

BANDERA ELECTRIC COOPERATIVE, INC. BANDERA, TEXAS FINANCIAL STATEMENTS WITH ACCOMPANYING INFORMATION FOR THE YEARS ENDED DECEMBER 31, 2012 AND 2011

BANDERA ELECTRIC COOPERATIVE, INC. BANDERA, TEXAS FINANCIAL STATEMENTS WITH ACCOMPANYING INFORMATION FOR THE YEARS ENDED DECEMBER 31, 2012 AND 2011 BANDERA, TEXAS FINANCIAL STATEMENTS WITH ACCOMPANYING INFORMATION FOR THE YEARS ENDED DECEMBER 31, 2012 AND 2011 AND REPORT OF BOLINGER, SEGARS, GILBERT & MOSS, L.L.P. LUBBOCK, TEXAS BANDERA, TEXAS FINANCIAL

More information

BANDERA ELECTRIC COOPERATIVE, INC. BANDERA, TEXAS FINANCIAL STATEMENTS WITH ACCOMPANYING INFORMATION FOR THE YEARS ENDED DECEMBER 31, 2014 AND 2013

BANDERA ELECTRIC COOPERATIVE, INC. BANDERA, TEXAS FINANCIAL STATEMENTS WITH ACCOMPANYING INFORMATION FOR THE YEARS ENDED DECEMBER 31, 2014 AND 2013 BANDERA, TEXAS FINANCIAL STATEMENTS WITH ACCOMPANYING INFORMATION FOR THE YEARS ENDED DECEMBER 31, 2014 AND 2013 AND REPORT OF BOLINGER, SEGARS, GILBERT & MOSS, L.L.P. LUBBOCK, TEXAS BANDERA, TEXAS FINANCIAL

More information

NHEC Board of Directors Agenda

NHEC Board of Directors Agenda NOTE: THE AUDIT COMMITTEE WILL BE MEETING AT 8 A.M. NHEC Board of Directors Agenda NHEC Pemi Board Room, 287 Highland Street Tuesday, August 26, 2008, 9:05 a.m. Time Agenda Item Result (Product) Action

More information

MONTANA 19 STILLWATER BEARTOOTH ELECTRIC COOPERATIVE, INC. RED LODGE, MONTANA. June 30, 2017 and 2016 INDEPENDENT AUDITORS' REPORT

MONTANA 19 STILLWATER BEARTOOTH ELECTRIC COOPERATIVE, INC. RED LODGE, MONTANA. June 30, 2017 and 2016 INDEPENDENT AUDITORS' REPORT MONTANA 19 STILLWATER FINANCIAL STATEMENTS AS OF AND INDEPENDENT AUDITORS' REPORT MONTANA 19 STILLWATER CONTENTS DIRECTORS, OFFICERS, AND MANAGER 1 Page INDEPENDENT AUDITORS' REPORT 2 3 INDEPENDENT AUDITORS

More information

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA AUDIT AND FINANCE COMMITTEE MEETING AGENDA

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA AUDIT AND FINANCE COMMITTEE MEETING AGENDA CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA AUDIT AND FINANCE COMMITTEE MEETING AGENDA Rachel Morse, Chair Harold Hollis, Vice Chair Susan Reeves Jim Henderson Bettina Chastain November 6, 2018

More information

CANBY UTILITY REGULAR BOARD MEETING FEBRUARY 25, :00 P.M.

CANBY UTILITY REGULAR BOARD MEETING FEBRUARY 25, :00 P.M. CANBY UTILITY REGULAR BOARD MEETING FEBRUARY 25, 2014 7:00 P.M. I. CALL TO ORDER AGENDA II. III. IV. AGENDA Additions, Deletions or Corrections to the Meeting Agenda CONSENT AGENDA Approval of February

More information

1. Advance business transformation. 2. Provide attractive shareholder returns. 3. Increase investment in utility infrastructure

1. Advance business transformation. 2. Provide attractive shareholder returns. 3. Increase investment in utility infrastructure Table 1: PG&E Corporation Business Priorities 2006-2010 1. Advance business transformation 2. Provide attractive shareholder returns 3. Increase investment in utility infrastructure 4. Implement an effective

More information

CHUGACH ELECTRIC ASSOCIATION 1 STATEMENT OF OPERATIONS. Allowance for Funds Used During Construction. Total Cost of Electric Service (MTD Actual)

CHUGACH ELECTRIC ASSOCIATION 1 STATEMENT OF OPERATIONS. Allowance for Funds Used During Construction. Total Cost of Electric Service (MTD Actual) FINANCIAL REPORT MARCH 2014 STATEMENT OF OPERATIONS CATEGORY 2014 MTD ACTUAL 2014 MTD BUDGET Operating Revenue and Patronage Capital Fuel and Purchased Power Expense Power Production Expense Transmission

More information

Exelon Announces Fourth Quarter and Full Year 2006 Results and Continued Superior Nuclear Operating Performance

Exelon Announces Fourth Quarter and Full Year 2006 Results and Continued Superior Nuclear Operating Performance Contact: Joyce Carson FOR IMMEDIATE RELEASE Exelon Investor Relations 312-394-3441 Kathleen Cantillon Exelon Corporate Communications 312-394-2794 Exelon Announces Fourth Quarter and Full Year 2006 Results

More information

NEW ZESCO KEY PERFORMANCE INDICATORS FRAMEWORK FOR THE PERIOD JANUARY 2017 DECEMBER 2019

NEW ZESCO KEY PERFORMANCE INDICATORS FRAMEWORK FOR THE PERIOD JANUARY 2017 DECEMBER 2019 NEW ZESCO KEY PERFORMANCE INDICATORS FRAMEWORK FOR THE PERIOD JANUARY 2017 DECEMBER 2019 MARCH 2017 0 P a g e SUMMARY ZESCO S KEY PERFORMANCE INDICATORS AND WEIGHTING - 2019 JANUARY 2017-DECEMBER Thematic

More information

TVA BOARD MEETING AUGUST 22, 2013

TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING 2 CONSENT AGENDA Health Savings Account Contract Pharmacy Benefits Managers Contract Assistant Corporate Secretary Designations 3 CHAIRMAN S REPORT AUGUST

More information

AES CORPORATION. IPALCO Business Review Ann Murtlow President and CEO, IPALCO and IPL. City or location Month XX, 20XX

AES CORPORATION. IPALCO Business Review Ann Murtlow President and CEO, IPALCO and IPL. City or location Month XX, 20XX AES CORPORATION AES CORPORATION IPALCO Business Review Ann Murtlow President and CEO, IPALCO and IPL City or location Month XX, 20XX May 9, 2006 IPALCO Strategic Overview Contains Forward Looking Statements

More information

Public Utility District #1 of Ferry County Budget. December 19, 2016

Public Utility District #1 of Ferry County Budget. December 19, 2016 Public Utility District #1 of Ferry County 2017 Budget December 19, 2016 The Approved Budget for 2017 is $7,688,400 which reflects an overall decrease of 3.86% from the 2016 Budget; this is a reduction

More information

REPORT OF INDEPENDENT AUDITORS AND FINANCIAL STATEMENTS THE INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION

REPORT OF INDEPENDENT AUDITORS AND FINANCIAL STATEMENTS THE INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION REPORT OF INDEPENDENT AUDITORS AND FINANCIAL STATEMENTS THE INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION December 31, 2017 and 2016 Table of Contents Board of Directors and CEO 1 Report of Independent Auditors

More information

Connected. to the members we serve Annual Report

Connected. to the members we serve Annual Report Connected to the members we serve 2015 Annual Report Our Mission To be a dynamic, progressive organization guided by cooperative principles and to provide energy and other value-added services to members

More information

JEFFERSON PUD 2019 DRAFT BUDGET

JEFFERSON PUD 2019 DRAFT BUDGET JEFFERSON PUD 2019 DRAFT BUDGET August 20, 2018 Prepared by Larry Dunbar, General Manager Tammy Lehman, Interim CFO Mike Bailey, Financial Services Manager w/ Will O Donnell, Communications Manager HANDOUTS

More information

LOOKING AHEAD... B 2012 Annual Report

LOOKING AHEAD... B 2012 Annual Report Dear Members, This year marks an important milestone at Randolph Electric Membership Corporation. As we celebrate our 75th Anniversary, it s a good time to reflect with pride in our past and progress in

More information

ENMAX Corporation 2017 Q2 INTERIM REPORT CAUTION TO READER

ENMAX Corporation 2017 Q2 INTERIM REPORT CAUTION TO READER ENMAX Corporation 2017 Q2 INTERIM REPORT ENMAX Corporation CAUTION TO READER This document contains statements about future events and financial and operating results of ENMAX Corporation and its subsidiaries

More information

FINANCIAL and STATISTICAL REPORT for FEBRUARY 2013

FINANCIAL and STATISTICAL REPORT for FEBRUARY 2013 FINANCIAL and STATISTICAL REPORT for FEBRUARY 2013 PUBLIC UTILITY DISTRICT NO. 1 OF OKANOGAN COUNTY TELEPHONE: (509)422-3310 POST OFFICE BOX 912 FAX: (509)422-4020 OKANOGAN, WASHINGTON 98840 COMPARATIVE

More information

LINETRUST SOUTH CANTERBURY

LINETRUST SOUTH CANTERBURY LINETRUST SOUTH CANTERBURY INDEX TO THE FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 AUGUST 2003 1 Directory 2 3 Chairman's Report 4 Highlight of Trustees Income Statement 5 Statement of Financial Performance

More information

FINANCIAL and STATISTICAL REPORT for MARCH 2013

FINANCIAL and STATISTICAL REPORT for MARCH 2013 FINANCIAL and STATISTICAL REPORT for MARCH 213 PUBLIC UTILITY DISTRICT NO. 1 OF OKANOGAN COUNTY TELEPHONE: (59)422-331 POST OFFICE BOX 912 FAX: (59)422-42 OKANOGAN, WASHINGTON 9884 COMPARATIVE STATEMENT

More information

CFC s Financial Webinar Series Capital Planning: What do I do now? How to Submit Your Question. Financial Webinar Series. Financial Webinar Series

CFC s Financial Webinar Series Capital Planning: What do I do now? How to Submit Your Question. Financial Webinar Series. Financial Webinar Series CFC s Capital Planning: What do I do now? How to Submit Your Question Step 1: Type in your question here. Step 2: Click on the Send button. CFC s Capital Planning: What do I do now? Today s speakers Steve

More information

2019 Corporate Operating Plan

2019 Corporate Operating Plan 2019 Corporate Operating Plan 2019 CORPORATE OPERATING PLAN 1 2 2019 CORPORATE OPERATING PLAN TABLE OF CONTENTS Page Management Letter... 5 Corporate Strategic Planning... 9 Assumptions... 15 2019 Corporate

More information

Section 25. Conformance with Revised Commission Rules and Regulations. (216)

Section 25. Conformance with Revised Commission Rules and Regulations. (216) Section 25. Conformance with Revised Commission Rules and Regulations. (216) If a change to the Commission s Rules and Regulations renders a utility s tariff non-conforming, the utility shall file a conforming

More information

TXU Reports Strong Third Quarter Results

TXU Reports Strong Third Quarter Results News Release 1601 Bryan Street Dallas, Texas 75201-3411 TXU Reports Strong Third Quarter Results DALLAS October 22, 2004 TXU Corp. (NYSE: TXU) today reported consolidated results for the third quarter

More information

Duquesne Light Company Distribution Rate Case Docket No. R Filing Index

Duquesne Light Company Distribution Rate Case Docket No. R Filing Index Duquesne Light Company Distribution Rate Case Docket No. R-2013-2372129 Filing Index Exhibit 1 Summary of Filing Part I General Information Part II Primary Statements of Rate Base & Operating Income Part

More information

CANBY UTILITY REGULAR BOARD MEETING NOVEMBER 13, :00 P.M.

CANBY UTILITY REGULAR BOARD MEETING NOVEMBER 13, :00 P.M. CANBY UTILITY REGULAR BOARD MEETING NOVEMBER 13, 2018 7:00 P.M. I. CALL TO ORDER AGENDA I. AGENDA Additions, Deletions or Corrections to the Meeting Agenda II. III. IV. CONSENT AGENDA Approval of the Agenda

More information

Ron made a motion to approve the consent agenda as presented; Mike seconded the motion. It passed unanimously.

Ron made a motion to approve the consent agenda as presented; Mike seconded the motion. It passed unanimously. Present: Jack Janda, President (via Skype) Ron Gold, Vice President Mike Sheetz, Board Secretary Darin Hall, Director of Operations Kristin Masteller, General Manager Katie Arnold, Treasurer Julie Gray,

More information

40 th Annual EEI Finance Conference

40 th Annual EEI Finance Conference 40 th Annual EEI Finance Conference Hollywood, FL November 6-8, 2005 Forward-Looking Statements Disclosure The following presentation contains some forward-looking statements with respect to Westar Energy

More information

Scorecard - Niagara-on-the-Lake Hydro Inc. 9/24/2017

Scorecard - Niagara-on-the-Lake Hydro Inc. 9/24/2017 Scorecard - Niagara-on-the-Lake Hydro Inc. 9/24/217 Performance Outcomes Performance ategories Measures 212 21 214 215 216 Trend Industry Distributor Target ustomer Focus Services are provided in a manner

More information

Financial Statements December 31, 2012 and 2011 Rio Grande Electric Cooperative, Inc.

Financial Statements December 31, 2012 and 2011 Rio Grande Electric Cooperative, Inc. Financial Statements December 31, 2012 and 2011 Rio Grande Electric Cooperative, Inc. www.eidebailly.com Table of Contents December 31, 2012 and 2011 Independent Auditor s Report... 1 Financial Statements...

More information

Union Rural Electric Cooperative, Inc. Audited Financial Statements. December 31, 2016 and 2015

Union Rural Electric Cooperative, Inc. Audited Financial Statements. December 31, 2016 and 2015 Union Rural Electric Cooperative, Inc. Audited Financial Statements December 31, 2016 and 2015 ******* INDEX PAGE Independent Auditor s Report... 1 Balance Sheets... 2 Statements of Revenue... 3 Statements

More information

Report of Independent Auditors and Financial Statements for. Intermountain Rural Electric Association

Report of Independent Auditors and Financial Statements for. Intermountain Rural Electric Association Report of Independent Auditors and Financial Statements for Intermountain Rural Electric Association March 31, 2016 and 2015 CONTENTS BOARD OF DIRECTORS AND CEO 1 REPORT OF INDEPENDENT AUDITORS 2 3 PAGE

More information

moreno valley utility 2015/16 ANNUAL REPORT

moreno valley utility 2015/16 ANNUAL REPORT moreno valley utility 2015/16 ANNUAL REPORT the City of Moreno Valley moreno valley utility MISSION STATEMENT To provide safe, reliable, and economical public electric service with a focus on customer

More information

OVERTON POWER DISTRICT NO. 5 BOARD MEETING December 19, :00 P.M. Mesquite, Nevada

OVERTON POWER DISTRICT NO. 5 BOARD MEETING December 19, :00 P.M. Mesquite, Nevada OVERTON POWER DISTRICT NO. 5 BOARD MEETING December 19, 2018 4:00 P.M. Mesquite, Nevada PRESENT: Mr. Mike Fetherston, Chairman Mr. Doug Waite, Vice Chairman Mr. Mike Young, Secretary / Treasurer Mr. Robert

More information

GARKANE ENERGY COOPERATIVE, INC. ELECTRIC SERVICE SCHEDULE SC STATE OF UTAH IMPACT FEES & SERVICE CHARGES

GARKANE ENERGY COOPERATIVE, INC. ELECTRIC SERVICE SCHEDULE SC STATE OF UTAH IMPACT FEES & SERVICE CHARGES SCHEDULE SC IMPACT FEES & SERVICE CHARGES This schedule sets the amounts for impact fees, various services, and other miscellaneous charges authorized in the Rules and Regulations of either the Utah Public

More information

Policy on Use of Recreation Facilities by Officially Recognized University Student Organizations

Policy on Use of Recreation Facilities by Officially Recognized University Student Organizations Policy on Use of Recreation Facilities by Officially Recognized University Student Organizations Official Recognized University Student Organizations are defined as: 1) a group of currently enrolled students

More information

Blue Ridge EMC and Subsidiaries Consolidated Financial Statements December 31, 2016 and 2015

Blue Ridge EMC and Subsidiaries Consolidated Financial Statements December 31, 2016 and 2015 Consolidated Financial Statements Contents Financial Statements Independent Auditor s Report... Page 1-2 Consolidated Balance Sheets... 3-4 Consolidated Statements of Operations and Comprehensive Income...

More information

El Paso Electric Announces Fourth Quarter and Annual 2017 Financial Results

El Paso Electric Announces Fourth Quarter and Annual 2017 Financial Results NEWS RELEASE El Paso Electric Announces Fourth Quarter and Annual 2017 Financial Results 2/27/2018 EL PASO, Texas--(BUSINESS WIRE)-- El Paso Electric Company (NYSE:EE): Overview For the fourth quarter

More information

Biennial Budget. Fiscal Year 2017 through Prepared by Division of Management and Budget, Lyle G. Beefelt, Director. Exceptional Water Service

Biennial Budget. Fiscal Year 2017 through Prepared by Division of Management and Budget, Lyle G. Beefelt, Director. Exceptional Water Service Biennial Budget Fiscal Year 2017 through 2018 Prepared by Division of Management and Budget, Lyle G. Beefelt, Director Exceptional Water Service Prince William County Service Authority Biennial Budget

More information

Actual neighborhood of Sunrun customer homes

Actual neighborhood of Sunrun customer homes This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements

More information

Service Quality and Reliability Performance Monitoring and Reporting for Owners of Electric Distribution Systems and for Gas Distributors

Service Quality and Reliability Performance Monitoring and Reporting for Owners of Electric Distribution Systems and for Gas Distributors Rule 002 Service Quality and Reliability Performance Monitoring and Reporting for Owners of Electric Distribution Systems and for Gas Distributors This rule as amended was approved by the Alberta Utilities

More information

Volume 1. Summary Table of Contents. Discussion of Financial Forecasts... BC Hydro Deferral Accounts...

Volume 1. Summary Table of Contents. Discussion of Financial Forecasts... BC Hydro Deferral Accounts... Volume 1. Summary Table of Contents BC hydro CHAPTER 1. ApPLICATION OVERVIEW Introduction..... Context of Application........... Summary of Revenue Requirement... Overview of BC Hydro Organizational Structure...

More information

The Power of Membership

The Power of Membership Executive Report The Power of Membership When you think of an electric utility, more often than not you think of poles, wires, transformers and light bulbs. But as a member of an electric cooperative,

More information

CITY OF GROTON UTILITIES COMMISSION Minutes of Regular Meeting January 17, 2018

CITY OF GROTON UTILITIES COMMISSION Minutes of Regular Meeting January 17, 2018 CITY OF GROTON UTILITIES COMMISSION Minutes of Regular Meeting 1. CALL TO ORDER Chairperson Hedrick called the meeting to order at 10:01 a.m. ROLL CALL Present: Chairperson Mayor Keith Hedrick Commissioners:

More information

Table 1: PG&E Corporation Business Priorities Advance business transformation. 2. Provide attractive shareholder returns

Table 1: PG&E Corporation Business Priorities Advance business transformation. 2. Provide attractive shareholder returns Table 1: PG&E Corporation Business Priorities 2007-2011 1. Advance business transformation 2. Provide attractive shareholder returns 3. Increase investment in utility infrastructure 4. Implement an effective

More information

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS Idaho Power Company First Revised Sheet No. H-1 I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. H-1 This rule applies to requests for electric service under Schedules 1, 3, 4, 5, 7, 9, 19, 24, 45, and

More information

STATEMENT OF CORPORATE INTENT April 2018 Electra Group

STATEMENT OF CORPORATE INTENT April 2018 Electra Group STATEMENT OF CORPORATE INTENT April 2018 Electra Group Electra Group Statement of Corporate Intent Page 1 of 11 ELECTRA GROUP STATEMENT OF CORPORATE INTENT APRIL 2018 1. Business mission The mission of

More information

Lake Region Electric Cooperative, Inc. Annual Report

Lake Region Electric Cooperative, Inc. Annual Report 2015 Lake Region Electric Cooperative, Inc. Annual Report Message from the CEO and President 1 Lake Region Electric Cooperative s mission, adopted by the board of directors, charges the cooperative to

More information

Task Force on Consolidation - JEA

Task Force on Consolidation - JEA Task Force on Consolidation - JEA I. Central Service Type Activities Recently, the Task Force has heard suggestions about consolidating central service type activities (legal, IT, procurement, fleet management,

More information

Aurora Energy Limited

Aurora Energy Limited Aurora Energy Limited Statement of Intent for the year ending 30 June 2016 CONTENTS Page 1 INTRODUCTION... 1 2 STRATEGIC DIRECTION... 1 2.1 Vision... 1 2.2 Mission... 1 2.3 Corporate Goals... 1 2.4 Specific

More information

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA AUDIT AND FINANCE COMMITTEE MEETING AGENDA

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA AUDIT AND FINANCE COMMITTEE MEETING AGENDA CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA AUDIT AND FINANCE COMMITTEE MEETING AGENDA Sisi Cooper, Chair Susan Reeves, Vice Chair Jim Henderson Bettina Chastain May 7, 2018 4:00 p.m. Chugach

More information

Long Island Power Authority Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets

Long Island Power Authority Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets George E. Pataki Governor Richard M. Kessel Chairman LONG ISLAND POWER AUTHORITY APPROVED 2002 OPERATING BUDGET APPROVED 2002 AND 2003

More information

Central Virginia Electric Cooperative Financial Statements December 31, 2013 and 2012

Central Virginia Electric Cooperative Financial Statements December 31, 2013 and 2012 Financial Statements Contents Financial Statements Independent Auditor s Report... Page 1-2 Balance Sheets... 3-4 Statements of Operations and Comprehensive Income... 5 Statements of Equities... 6 Statements

More information