JEFFERSON PUD 2019 DRAFT BUDGET
|
|
- Jason Richardson
- 5 years ago
- Views:
Transcription
1 JEFFERSON PUD 2019 DRAFT BUDGET August 20, 2018 Prepared by Larry Dunbar, General Manager Tammy Lehman, Interim CFO Mike Bailey, Financial Services Manager w/ Will O Donnell, Communications Manager
2 HANDOUTS FOR PRESENTATION Draft 2019 budget resolution Draft financial policy w/ changes Available on request: Draft budget detail 2
3 June-July Preliminary Budget Review and Development BUDGET TIMELINE August Aug 20 th Budget Workshop w/boc September Sept 1st File Budget w/ Jefferson County Auditor October Oct. 1 st Budget Hearing w/boc October Board Review and Discussion. Staff revisions. November Nov 30 Deadline to File Approved Budget w/auditor 3
4 Expanded Planning and Training GUIDING PRINCIPLES Heightened Focus on Service, Reliability, & Safety Revenue Positive Budget Maintain Key Financial Ratios No Planned Rate or Staffing Increases 4
5 2019 SPECIAL PROJECTS $4M $750K $500K Consolidated Facility Construction Project Remodel and expansion of Four Corners Operations Center to bring all staff onto one campus, provide onsite board meeting space, and improved working conditions. Funded with unrestricted cash reserves. Expanded Tree Trimming Program 50% increase in spending on our tree trimming program. Downed trees or tree limbs are the PUD s single most frequent source of outages and service interruptions. Funded out of Electrical Expenses. Community Solar Project at Dana Roberts Substation 100KW ground mount solar panel installation in Port Townsend in a vacant PUD owned lot adjoining the Dana Roberts Substation. Will be largest solar installation in Jefferson County once constructed. Funded by sales of shares to participants. 5
6 CONSOLIDATED FACILTY PLAN 6
7 COMMUNITY SOLAR PROJECT 7
8 ENHANCED RELIABILITY CAUSE OF OUTAGES BY NUMBER OF INCIDENCES Customers 3% Planned Maintenance 12% Overload 6% Vehicle 1% Squirrels 13% Equip Fail 9% Trees 40% Unknown 9% Other 3% No Outage 3% Wind, Weather 1% 8
9 2019 SPECIAL PROJECTS continued Comprehensive Strategic Planning In 2019 Jefferson PUD will embark on a number of studies to review current departments, Safety training projects, program included and processes. Includes in Plans expense for: Board budget Strategic Planning, Staff Succession, Telecommunications, Electric System, IT and GIS. Funded from reserves, grants, and operating expenses. Expanded Safety and Training Renewed commitment to safety and training in Increased safety trainings, customer service trainings, and staff development. Increased capital expenditures on worker safety equipment. Funded from expenses and cash reserves. Downtown Broadband Pilot Project Funding to install fiber optic cable in the conduit and tunnel areas installed and identified during the Water Street Construction Project in Funded from cash reserves. $305K $135K $50K 9
10 BROADBAND PILOT, PLANNING, SAFETY & TRAINING 10
11 2019 OPERATING REVENUES Electric 91% Water 7% General 2% Electric Utility Revenues $35,546,621 Water Utility Revenues $2,940,463 General Fund Revenues $704,036 Total Operating Revenues $39,191, total: $39.1M 11
12 2019 REVENUE ASSUMPTIONS 2019 budget status quo including 2018 rate increases Use tax revenues to support low-income subsidy program Estimated $250K revenues from new late fees Shine Plat Consolidation and Bywater Bay Water System Improvements LUD bond Use property and forest surplus funds to supplement consolidated facility improvements if necessary Transition toward growth paying for growth regarding electric line extensions Community Solar Project Costs entirely funded by program participants 12
13 Purchased Power 42% Distribution-Operation 4% Transmission 4% Distribution- Maintenance 7% Customer Accounts & Service 4% Administrative & General 10% Depreciation & Amortization 15% 2019 OPERATING EXPENSES BY CATEGORY % of Total Budget 2019 Power Purchase 46% Financing & Taxes 29% 2019 total: $38.6M Interest on Long-Term Debt 8% Tax Expense Other 6% Operations 25% 13
14 2019 OPERATING EXPENSES Expense Electric Utility Water Utility General Fund Cost of Purchased Power $15,884,692 $127,488 $0 Transmission Expense $1,631,035 0 $0 Distribution-Operation $917,887 $759,575 $0 Distribution-Maintenance $2,357,399 $333,232 $0 Customer Accounts $1,252,862 $209,084 $0 Customer Service & Informational $135,767 $29,446 $0 Administrative & General $3,047,648 $605,802 $194,017 Depreciation & Amortization $5,091,919 $745,634 $0 Tax Expense Other $2,171,131 $122,803 $0 Interest on Long-Term Debt $2,782,107 $211,714 $56,266 Total Operating Expenses $35,272,446 $3,144,778 $250,283 Net Operating Margins (Loss) $274,175 ($204,315) $453,753 Non-Operating Margins (Loss) $1,021,678 $370,806 $0 Net Margins (Loss) $1,295,853 $166,491 $453,753 14
15 2019 EXPENSE ASSUMPTIONS Assumed 5% increase in BPA wholesale power rates beginning Oct 2019 Assumes no additional BPA spill surcharges Financial audit services by private agency, approximately $40K Reduction of $17.8K in membership costs vs 2018 $50K to PT Broadband Fiber Pilot Project Expanded Low Income Support, from $200K in 2018 budget to $400K in
16 STAFFING ASSUMPTIONS No change in staffing numbers from 2018 Includes new Water Engineer (added into 2018 budget) Wage increase for represented employees per collective bargaining agreements Salary survey and COLA for non-represented employees Electrical engineer in-house advancement opportunities (2 positions) Clothing allowance of $75 for office personnel (Laborers and Non-Represented) 16
17 CAPITAL IMPROVEMENT PROJECTS General, $4,069,000 Planning, $275,000 Water, $791, total: $9.52M Electric, $4,391,000 17
18 GENERAL CAPITAL COSTS Four Corners Facilities Upgrade $4,000,000 IT Upgrades $69,000 $4.07M PLANNING CAPITAL COSTS Electric System Plan $150,000 Telecommunications Strategic Plan $75,000 IT and GIS Strategic Plan $50,000 $275K 18
19 ELECTRIC UTILITY 19
20 ELECTRIC UTILITY CAPITAL IMPROVEMENT PROJECTS New Line Construction $423,000 Substation Changes $748,000 Miscellaneous Distribution Equipment $755,000 Other Distribution Items $270,000 Transmission Line and Station Changes $60,000 Other Transmission Items $40,000 Communications $100,000 Conversions $550,000 Community Solar Project $500,000 Warehouse Yard Improvements $45,000 $3.49M Source of Funds for Electric Utility Capital Costs: Unrestricted Cash--$3,216,000 Community Solar Project Shares Sold--$500,000 20
21 ELECTRIC FLEET AND EQUIPMENT CAPITAL COSTS Bucket Truck $250,000 Small Bucket Truck $160,000 Tools $50,000 Pickup $135,000 Personal Protection Equipment $80,000 $675K 21
22 WATER UTILITY 22
23 WATER UTILITY CAPITAL PROJECTS Snow Creek Well Treatment Plant & Well House $150,000 Hydrant Maintenance $30,000 Shine LUD Construction Distribution System $250,000 Shine LUD Construction Well and Well House $250,000 Bywater SCADA $20,000 $700K WATER FLEET AND EQUIPMENT CAPITAL COSTS Pickup $31,087 Tools $30,000 Personal Protection Equipment $30,000 $91K 23
24 2019 UNRESTRICTED CASH RESERVES BY SOURCE Cash-Operating Depository $309,758 Cash-Jeff Co Treasurer General $5,465,784 Cash-BOA-Permit #U05-24 $29,347 Cash-Payroll Clearing-BOA $15 Working Funds $2,150 Cash-1996 Bond LUD #6 $16,019 Cash-1996 Bond LUD #8 $57,947 Temp Invest JeffCo Treasurer Gen $5,866,876 Tax Revenue Fund $2,169,405 Tax Revenue Fund Investment $1,925,000 Add RUS Bond Fund $1,808 Add RUS Bond Fund Investment Account $1,101,352 Add 2019 Budgeted Net Margins $1,916, Ending Unrestricted Cash $18,861,557 $18.8M 24
25 2019 DESIGNATED CASH RESERVES 90 Days O&M Expenses less Depreciation $8,750,000 Consolidated Facility $4,000,000 Electric Capital Expenses $3,216,000 Water Capital Expenses $200,000 General Capital Expenses $119,000 Fleet and Equipment Capital Expenses $766,087 Fleet Replacement Fund $660,527 IT Equipment Replacement Fund $32, Total Designated Cash $17,743,864 $17.7M 2019 Unrestricted Ending Cash Balance $1.1M 25
26 TIER AND DSC 2018 Mid Budget Actual Budget TIER OTIER DSC ODSC
27 FINANCIAL POLICY CHANGES Line Extension Policy Changes Change to section 5 under Controls. Outlines plan to make growth pay for growth. Electric line extensions will recover 75% of all associated costs paid by the applicant. all costs associated with water, sewer, or fiber optic line extension, except for Port Townsend Pilot Project, to serve and internal to new parcels or developments must be fully paid by the applicant. Remove Depreciation from 90 Day Reserves Change to section 1 under Reserves. The District shall develop financial plans and rates to maintain end of year cash balances sufficient to provide designated funding for a minimum of 90 days of expenses, not including depreciation based on the planned year's budget. Vehicle and IT Replacement Funds When actual end of year available cash balances exceed 125% of the targeted minimum cash balances for both the year end and subsequent operating year, the Board may direct staff to use the excess cash for debt retirement, a rate stabilization fund, rate reduction, customer rebates, capital improvements, equipment replacement or other legal purposes. 27
28 Safe, Reliable, and Affordable Public Utility Services Improved Working Conditions Increased Customer Focus BUDGET AS FIRST DRAFT OF 2019 STRATEGIC PLAN Economic and Environmental Sustainability Enhanced Quality of Life for our Customers 28
29 Aug 20 Aug 20 th Budget Workshop w/boc NEXT STEPS September Sept 1st File Budget w/ Jefferson County Auditor October Oct. 1 st Budget Hearing w/boc October Oct 16: Adopt budget or further Board Review and staff revisions. November Adopt budget or further Board Review and staff revisions. November Nov 30 Deadline to File Approved Budget w/auditor 29
Jefferson County PUD No. 1 Narrative to Accompany Monthly Financial Statements For the Period Ending September 30, 2017
Jefferson County PUD No. 1 Narrative to Accompany Monthly Financial Statements For the Period Ending September 3, 217 Combined Income Statement Page 1 This report provides an overview of the revenues and
More informationPublic Utility District #1 of Ferry County Budget. December 19, 2016
Public Utility District #1 of Ferry County 2017 Budget December 19, 2016 The Approved Budget for 2017 is $7,688,400 which reflects an overall decrease of 3.86% from the 2016 Budget; this is a reduction
More informationPublic Utility District #1 of Ferry County Budget. December 17, 2018
Public Utility District #1 of Ferry County 2019 Budget December 17, 2018 The Approved Budget for 2019 reflects an overall reduction of approximately 3.2 percent from the 2018 Budget. The District is predicting
More informationKirkwood Meadows Public Utility District Finance Committee REGULAR MEETING NOTICE
Kirkwood Meadows Public Utility District Finance Committee REGULAR MEETING NOTICE NOTICE IS HEREBY GIVEN that the Finance Committee of the Kirkwood Meadows Public Utility District has called a Special
More informationORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Q3 Financial Report Page 1 of 20
ORCAS POWER AND LIGHT COOPERATIVE 2018 Q3 FINANCIALS Page 1 of 20 MEMORANDUM November 09, 2018 To: Board of Directors From: Foster Hildreth, General Manager Re: OPALCO 2018 Third Quarter Financial Report
More informationStatement of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: DATE: August 26, 2016 SUBJECT: OBJECTIVE: Commissioners Simpson, Helgeson, Manning, Mital and Brown Sue Fahey, CFO; Susan Eicher, Accounting
More informationBoard Finance & Budget Planning Workshop. April 18, 2016
Board Finance & Budget Planning Workshop April 18, 2016 1 Management Introduction (Glenn Steiger) 2 Overview Management Introduction Strategic Plan Cost of Doing Business FY2017 Financial Highlights Division
More informationSchedule of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: Commissioners Simpson, Helgeson, Manning, Mital and Brown FROM: Sue Fahey, Chief Financial Officer; Susan Eicher, Accounting & Treasury Supervisor
More informationTeam PUD 2019 BUDGET BOARD OF COMMISSIONERS: SIDNEY SID LOGAN TANYA TONI OLSON REBECCA WOLFE
Team PUD 2019 BUDGET BOARD OF COMMISSIONERS: SIDNEY SID LOGAN TANYA TONI OLSON REBECCA WOLFE Snohomish County PUD 2019 BUDGET SNOHOMISH COUNTY PUD 2019 BUDGET TABLE OF CONTENTS CEO/General Manager s Message...1
More informationAUDITED FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION MUNICIPAL UTILITIES BOARD OF THE CITY OF ALBERTVILLE ELECTRIC SYSTEM ALBERTVILLE, ALABAMA
AUDITED FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION MUNICIPAL UTILITIES BOARD OF THE CITY OF ALBERTVILLE ELECTRIC SYSTEM ALBERTVILLE, ALABAMA June 30, 2017 and 2016 TABLE OF CONTENTS PAGE INDEPENDENT
More information2018 Budget. Board of Commissioners: Sidney Sid Logan Tanya Toni Olson Kathleen Kathy Vaughn
2018 Budget Board of Commissioners: Sidney Sid Logan Tanya Toni Olson Kathleen Kathy Vaughn Snohomish County PUD 2018 BUDGET SNOHOMISH COUNTY PUD 2018 BUDGET TABLE OF CONTENTS CEO/General Manager s Message...
More informationFiscal Year Budget
Fiscal Year 2019 Budget Fiscal Year 2019 Project 3 Annual Budget Project 3 Fiscal Year 2019 Table of Contents Table Page Summary 3 Summary of Costs Table 1 4 Summary of Full Time Equivalent Table 2 5 Positions
More informationM E M O R A N D U M. Issue
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: Commissioners Brown, Carlson, Mital, Simpson and Helgeson FROM: Sue Fahey, Chief Financial Officer; Deborah Hart, Interim Finance Manager; Adam Rue,
More informationBoard Finance & Budget Planning Workshop. April 16, 2012
Board Finance & Budget Planning Workshop 1 Agenda Management Introduction Financial Highlights Administration Highlights Energy Resource Planning Highlights Engineering & Operations Highlights Customer
More informationJefferson County PUD. Rate Hearing November 10, 2016
1 Jefferson County PUD Rate Hearing November 10, 2016 Proposed PUD Electrical Rate Schedule for 2017 Updated based on PUD BOC Regular Meeting of 18 October 2016 EES Consulting EES Agenda 2 Presentation
More informationPalm Beach, Fla. January 12-13, Evercore ISI Utility CEO Conference
Palm Beach, Fla. January 12-13, 2017 Evercore ISI Utility CEO Conference Forward-Looking Statements Statements contained in this presentation that include company expectations or predictions should be
More informationANNUAL REPORT WHY MEMBERS MATTER
2017 ANNUAL REPORT WHY MEMBERS MATTER OUR MEMBERS matter Dear Member, Providing good value to the people we serve is the foundation of your cooperative that continues today for our electric members, propane
More informationFiscal Year 2013 Budget and Long Range Plan Columbia Generating Station. Brad Sawatzke VP, Nuclear Generation/CNO March 20, 2012
Fiscal Year 2013 Budget and Long Range Plan Columbia Generating Station Brad Sawatzke VP, Nuclear Generation/CNO March 20, 2012 Introduction Our goal is to provide safe, reliable, cost effective power
More informationEugene Water & Electric Board Adopted Budget. December 5, 2017
Eugene Water & Electric Board 208 Adopted Budget December 5, 207 Eugene Water & Electric Board 500 East 4 th Avenue/Post Office Box 048 Eugene, Oregon 97440-248 54-685-7000 www.eweb.org Board of Commissioners
More informationLarge Commercial Rate Simplification
Large Commercial Rate Simplification Presented to: Key Account Luncheon Red Lion Hotel Presented by: Mark Haddad Assistant Director/CFO October 19, 2017 Most Important Information First There is no rate
More informationBUDGET AND CAPITAL WORK PLAN
2018 BUDGET AND CAPITAL WORK PLAN The following pages include the supporting documentation for the 2018 Budget, 20192022 Forecast and 10year capital work plan. It includes a review of 2017, executive summary
More informationMonthly Financial Report
AGENDA ITEM NO: 4.C.1 Monthly Financial Report with data through October 2017 (Unaudited) The data contained in this report has not been independently audited. Alameda Municipal Power Financial Report
More informationNew York City March 3, Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference
New York City March 3, 2016 Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference Forward-Looking Statements Statements contained in this presentation that include company expectations
More informationPUD No. 1 of Pend Oreille County
PUD No. 1 of Pend Oreille County Public Utility District #1 of Pend Oreille County Approved December 2, 2014 Public Utility District No. 1 of Pend Oreille County, Washington (the PUD, or the District)
More informationNovember 2016 Operating Report
216 Operating Report EXECUTIVE SUMMARY Municipal demand came in just above budget with energy coming in slightly below budget. Rawhide Unit 1 ran extremely well all month. Craig Unit 1 experienced three
More informationMonthly Financial Report
AGENDA ITEM NO: 4.C.1 Monthly Financial Report with data through February 2019 (Unaudited) The data contained in this report has not been independently audited. Alameda Municipal Power Financial Report
More informationFOURTH QUARTER AND FULL-YEAR 2018 RESULTS. February 22, 2019
FOURTH QUARTER AND FULL-YEAR 208 RESULTS February 22, 209 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations,
More informationIntroduction to Priest Rapids Project Power Sales Contracts
Introduction to Priest Rapids Project Power Sales Contracts Background PRP was initially intended to be a Federal High Dam for Flood Control Pres. Eisenhower s Public/Private Partnership allowed non Fed
More informationTransmission Formula Rate 2017 Annual Update. June 23, 2017
Transmission Formula Rate 2017 Annual Update June 23, 2017 1 Topics Introductions Annual Update Overview 2017 Projection and 2016 True-Up Schedule 1 Additional Information Questions and Discussion 2 OASIS
More informationPUBLIC UTILITY DISTRICT # 1 of Jefferson County 230 Chimacum Road Port Hadlock, WA July 16, 2008 SPECIAL MEETING MINUTES
PUBLIC UTILITY DISTRICT # 1 of Jefferson County 230 Chimacum Road Port Hadlock, WA July 16, 2008 SPECIAL MEETING MINUTES CALL TO ORDER The Special Meeting of the Public Utility District No.1 of Jefferson
More informationPortland General Electric
Portland General Electric Earnings Conference Call First Quarter 2017 Cautionary Statement Information Current as of April 27, 2017 Except as expressly noted, the information in this presentation is current
More informationREPORT OF INDEPENDENT AUDITORS AND COMBINED FINANCIAL STATEMENTS WITH SUPPLEMENTARY INFORMATION PUBLIC UTILITY DISTRICT NO. 1 OF KLICKITAT COUNTY
REPORT OF INDEPENDENT AUDITORS AND COMBINED FINANCIAL STATEMENTS WITH SUPPLEMENTARY INFORMATION PUBLIC UTILITY DISTRICT NO. 1 OF KLICKITAT COUNTY December 31, 2017 and 2016 Table of Contents Report of
More informationPUBLIC UTILITY DISTRICT NO. 1 OF SKAGIT COUNTY COMMISSIONERS MEETING. DRAFT AGENDA July 10, :30 PM
PLEDGE OF ALLEGIANCE PUBLIC UTILITY DISTRICT NO. 1 OF SKAGIT COUNTY COMMISSIONERS MEETING DRAFT AGENDA July 10, 2018 4:30 PM CONSENT AGENDA 1. Approval of Agenda 07/10/18 2. Approval of Minutes 06/26/18
More informationBoard of Commissioners Meeting 5:00 PM 6 September Chimacum Road - Port Hadlock, WA PUD REGULAR BOARD MEETING
Board of Commissioners Meeting 5:00 PM 6 September 2016 230 Chimacum Road - Port Hadlock, WA PUD REGULAR BOARD MEETING 1. CALL TO ORDER 2. AGENDA 3. APPROVAL OF MINUTES 3.1 Minutes Regular Meeting of 16
More informationWater & Sewer Budget Highlights
2018-2022 Water & Sewer Budget Highlights PRESENTED BY CITY STAFF February 05, 2018 Council Meeting 2018 Water and Sewer Budgets: Background May 2017 Council approves utility rates for water and sewer
More informationFiscal Year 2018 Budget Highlights Ipswich Electric Light Department 13 June 2017
Fiscal Year 2018 Budget Highlights Ipswich Electric Light Department 13 June 2017 Relevant statistics o Projected sales: 117,000 MWh o Projected revenue from sales: $17.29M o Projected PILOT: $345,000
More informationAdopted. Budget
2016-2017 Adopted Budget 2016-2017 Adopted Budget Alderwood Water & Wastewater District 3626 156 th Street SW Lynnwood, WA 98087-5021 (425) 743-4605 www.awwd.com For the 2016 and 2017 Fiscal Years (January
More information2013 Annual Report. To The Membership. Eastern Maine Electric Cooperative, Inc. (207) P O Box 425 Calais ME (800)
2013 Annual Report To The Membership www.emec.com Eastern Maine Electric Cooperative, Inc. (207) 454-7555 P O Box 425 Calais ME 04619 (800) 696-7444 Serving Eastern and Northern Maine For 74 Years EASTERN
More informationVillage of Ridgewood
Village of Ridgewood 2016 Budget Introduction Presentation Roberta Sonenfeld Village Manager Bob Rooney Chief Financial Officer Steve Sanzari Treasurer April 13, 2016 1 General Topics 2015 Accomplishments/Highlights
More informationELECTRIC PLANT BOARD OF THE CITY OF PADUCAH, KENTUCKY D/B/A PADUCAH POWER SYSTEM FINANCIAL STATEMENTS YEARS ENDED JUNE 30,2012 AND 2011
ELECTRIC PLANT BOARD OF THE CITY OF PADUCAH, KENTUCKY D/B/A PADUCAH POWER SYSTEM FINANCIAL STATEMENTS YEARS ENDED JUNE 30,2012 AND 2011 TABLE OF CONTENTS Independent Auditor's Report Page 1-2 Required
More informationTuesday, August 14 th 2018
Tuesday, August 14 th 2018 Helena P. Alves, CGFO, CIA, MBA Finance Director Lina Williams Central Services Manager, Budget Coordinator January - March First Quarter Review Annual Financial Audit Presentation
More informationYour Trusted Energy Partner
Your Trusted Energy Partner 2016 ANNUAL REPORT Year In Review We invested $6.45 million in our electrical system in 2016 and completed several important capital construction projects in our work plan.
More informationSewer Master Plan BCC Workshop November 15, 2016
Updated 11/10/16 BOARD OF COUNTY COMMISSIONERS (BCC) CHARLOTTE COUNTY UTILITIES DEPARTMENT Sewer Master Plan BCC Workshop November 15, 2016 C h a r l otte Count y Utilities D e pt. 1 SEWER SYSTEM EXPANSION
More informationLEBANON UTILITIES 2017 BUDGET - FINAL TABLE OF CONTENTS
LEBANON UTILITIES 2017 BUDGET - FINAL TABLE OF CONTENTS ELECTRIC: Cover Sheet Revenues Revenues/Expenses Revenues/Expenses - Notes Proposed Capital Additions - 2017 Proposed Capital Additions - 2017 through
More informationBoard of Directors Meeting. December 7, 2017
Board of Directors Meeting December 7, 2017 2018 Annual Budget December 7, 2017 Agenda Recap new sections in budget document Budget changes since October Financial impact Final results Highlights 2017
More informationStatement of Revenues, Expenses, and Changes in Net Position (Income Statement) Page 4
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: DATE: August 26, 2016 SUBJECT: OBJECTIVE: Commissioners Simpson, Helgeson, Manning, Mital and Brown Sue Fahey, CFO; Susan Eicher, Accounting
More informationPUBLIC HEARING ON FISCAL YEAR BUDGET
PUBLIC HEARING ON FISCAL YEAR 2016-17 BUDGET Presenter: Greg Nyhoff, City Manager June 21, 2016 KEY MILESTONES TO DATE MILESTONES DATE Council and Executive team held a priority setting workshop October
More information20 ANNU 17 AL REPORT
2017 ANNUAL REPORT 2017 Year-End Review Letter To Our Members Being a member-owned electric cooperative, we strive for noticeably superior member services. This is not only one of our strategic goals,
More informationCorporate Presentation. March 5, 2016 NYSE: MTZ
Corporate Presentation March 5, 2016 NYSE: MTZ Safe Harbor Statement This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act. When used
More informationPortland General Electric
Portland General Electric Earnings Conference Call Fourth Quarter and Full Year 2016 Cautionary Statement Information Current as of February 17, 2017 Except as expressly noted, the information in this
More informationHomer Electric Association, Inc. and Subsidiary (Alaska 5 and Alaska 33 Kenai)
Homer Electric Association, Inc. and Subsidiary (Alaska 5 and Alaska 33 Kenai) Consolidated Financial Statements and Supplementary Information Years Ended December 31, 2014 and 2013 This report was issued
More informationFIRST QUARTER 2014 RESULTS. May 2, 2014
FIRST QUARTER 2014 RESULTS May 2, 2014 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations, including statements
More informationDATE: November 18, 2015 SUBJECT: 2016 Proposed Budgets, Revenue Requirements, and Prices OBJECTIVE: Approval of 2016 Budget and Price Proposals
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: Commissioners Mital, Simpson, Helgeson, Manning and Brown Sue Fahey, Finance Manager; Harvey Hall, Deborah Hart and Edward Yan, Senior Financial
More informationBudget. Timeline and Key Assumptions. October 16, Working Draft 9/14/17. September 20, 2016
Working Draft 9/14/17 2018-2022 2018 Budget Timeline and Key Assumptions 2017-2021 Business Planning October 2, 2017 October 16, 2017 September 20, 2016 What we will cover today Purpose Timeline Guidelines
More informationPublic Utility District No. 1 of Kittitas County
Financial Statements Audit Report Public Utility District No. 1 of Kittitas County For the period January 1, 2014 through December 31, 2015 Published December 19, 2016 Report No. 1018228 Washington State
More informationEarnings Conference Call
Exhibit 99.2 Earnings Conference Call Second Quarter 2015 Cautionary Statement Information Current as of July28, 2015 Except as expressly noted, the information in this presentation is current as of July28,
More informationTVA and HU Rate Actions. September 2018
TVA and HU Rate Actions September 2018 TVA Rate Actions 2 3 TVA Rate Change Key Components TVA implements a fixed grid access charge for local power companies on their monthly power bill based on rolling
More informationOPG REPORTS 2015 THIRD QUARTER FINANCIAL RESULTS
OPG REPORTS 2015 THIRD QUARTER FINANCIAL RESULTS Nov. 13, 2015 Quarterly earnings were $80 million as OPG successfully executes the vacuum building outage at Darlington [Toronto]: Ontario Power Generation
More informationChelan County PUD Budget Presentation. November 2, 2015
Chelan County PUD 2016 Presentation November 2, 2015 What we will cover today Timeline Strategic Goals & Initiatives Initial Results & Highlights Human Resource Overview Next Steps No Board Action Required
More informationREPORT OF INDEPENDENT AUDITORS AND FINANCIAL STATEMENTS WITH SUPPLEMENTARY INFORMATION FOR TILLAMOOK PEOPLE S UTILITY DISTRICT
REPORT OF INDEPENDENT AUDITORS AND FINANCIAL STATEMENTS WITH SUPPLEMENTARY INFORMATION FOR TILLAMOOK PEOPLE S UTILITY DISTRICT December 31, 2017 and 2016 Table of Contents Board of Directors, Administrative
More informationI 732. Carbon Pollution Tax. Presentation delivered to PUD Commissioners and at the May 2, 2016, regular public Commission meeting.
I 732 Carbon Pollution Tax Presentation delivered to PUD Commissioners and at the May 2, 2016, regular public Commission meeting. I 732 Background Why the PUD is providing customers with information related
More informationBUDGET WORKSHOP May 21, 2018
BUDGET WORKSHOP May 21, 2018 BUDGET ROLES SUMMARY Accounting prepares: Revenue estimates current and next year Expenditure estimate current year Forms for Directors to make budget requests Draft and final
More informationHomer Electric Association, Inc. and Subsidiary (Alaska 5 and Alaska 33 Kenai)
Homer Electric Association, Inc. and Subsidiary (Alaska 5 and Alaska 33 Kenai) Consolidated Financial Statements and Supplementary Information Years Ended December 31, 2015 and 2014 This report was issued
More informationCity of Linden BUDGET Fund Fund Budget Budget Impact General DRAFT. Cemetery Perpetual. Debt Retriement
City of Linden 20 Revenue Expenditures 18-19 19-20 Fund Fund Budget Budget Impact General Cemetery $ 57,800 $ 42,681 $ 15,119 Building $ 17,000 $ 44,050 $ (27,050) Administration $ 2,031,353 $ 1,366,015
More informationNATURAL GAS RATE INCREASE
NATURAL GAS RATE INCREASE 1 2 WHAT WE DO? Natural Gas Utility Natural Gas Operations 3 4 Operation and Maintenance (O&M) Leak Survey Cathodic Protection Measurement/Regulators Meter Station Maintenance
More informationTABLE OF CONTENTS. Board of Commissioners and Officers...1. Report of Independent Auditors Management s Discussion and Analysis...
December 31, 2014 and 2013 TABLE OF CONTENTS Board of Commissioners and Officers...1 Report of Independent Auditors... 2-4 Management s Discussion and Analysis... 5-16 Financial Statements Statements of
More informationRon made a motion to approve the consent agenda as presented; Mike seconded the motion. It passed unanimously.
Present: Jack Janda, President (via Skype) Ron Gold, Vice President Mike Sheetz, Board Secretary Darin Hall, Director of Operations Kristin Masteller, General Manager Katie Arnold, Treasurer Julie Gray,
More informationORCAS POWER AND LIGHT COOPERATIVE 2019 BUDGET REPORT
ORCAS POWER AND LIGHT COOPERATIVE 2019 BUDGET REPORT 1 MEMORANDUM Date: November 9, 2018 (Revised December 14, 2018) To: Board of Directors From: Foster Hildreth, General Manager Re: 2019 Budget Presentation
More informationBOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS
BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS Electric Utility Revenues, Revenue Requirements, Cost of Service, And Rates Draft Final Report (As Updated) February 2010 February 1, 2010 Kansas City Board
More informationFOURTH QUARTER AND FULL-YEAR 2017 RESULTS. February 23, 2018
FOURTH QUARTER AND FULL-YEAR 2017 RESULTS February 23, 2018 FORWARD LOOKING STATEMENTS AND NON-GAAP FINANCIAL MEASURES This presentation contains forward-looking statements based on current expectations,
More informationSPRINGFIELD UTILITY BOARD 223 A STREET, SUITE F SPRINGFIELD, OR MINUTES February 14, 2018
SPRINGFIELD UTILITY BOARD 223 A STREET, SUITE F SPRINGFIELD, OR 97477 MINUTES The regular session of the Springfield Utility Board was called to order by Chair Willis at 6:15 p.m. ATTENDANCE: Board: David
More informationAnnual Operating and Capital Budget
Annual Operating and Capital Budget Budget Year 2019 Executive Summary Gainesville Regional Utilities (GRU) proposed fiscal year 2019 capital and operating budget presents a framework for providing safe,
More informationWestlake Chemical Corporation. Fourth Quarter 2018 Earnings Presentation
Westlake Chemical Corporation Fourth Quarter 2018 Earnings Presentation Westlake Chemical Corporation 2018 Business Highlights 2018 annual net income of $1.0 billion, or $7.62 per diluted share Record
More informationReport of Independent Auditors and Financial Statements with Supplementary Information for. Tillamook People s Utility District
Report of Independent Auditors and Financial Statements with Supplementary Information for Tillamook People s Utility District December 31, 2015 and 2014 CONTENTS BOARD OF DIRECTORS, ADMINISTRATIVE STAFF,
More informationKitsap County 2018 Budget Hearings. September 13 22, 2017
Kitsap County 2018 Budget Hearings { September 13 22, 2017 2018 Budget Process Overview January April, 2017 Preparation of 6-year Revenue Forecast Preparation of Indirect Cost Allocation Preparation of
More informationPhase 1: Water Budget Based Rate Structure Feasibility Analysis
Attachment #1 SCOPE OF WORK NOTE: All references to meeting(s) will mean face-to-face meetings and not conference calls. Phase 1: Water Budget Based Rate Structure Feasibility Analysis Task 1: Kick-off
More informationNew York City March 2, Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference
New York City March 2, 2017 Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference Forward-Looking Statements Statements contained in this presentation that include company expectations
More informationDebt Management DEBT MANAGEMENT
Debt Management DEBT MANAGEMENT Introduction The County has issued debt over the last two decades primarily for the rebuilding of its facility infrastructure. Issuance of debt is managed in compliance
More informationOklahoma Turnpike Authority Report to Bondholders Second Quarter Tim J. Gatz Executive Director. Prepared by the Controller Division
Governor Mary Fallin, Member Ex-Officio Dana Weber, Chairwoman David A. Burrage Vice-Chairman G. Carl Gibson, Secretary & Treasurer Kenneth Adams, Member Guy Berry, Member Gene Love, Member Mike Patterson,
More informationReport of Independent Auditors and Combined Financial Statements for. Public Utility District No. 1 of Klickitat County
Report of Independent Auditors and Combined Financial Statements for Public Utility District No. 1 of Klickitat County December 31, 2011 and 2010 CONTENTS REPORT OF INDEPENDENT AUDITORS 1 DIRECTORY OF
More informationTalavera Community Development District
Talavera Community Development District for Presented by: Rizzetta & Company, Inc. Wesley Chapel Office 5844 Old Pasco Rd.; Suite 100 Wesley Chapel, FL 33544 813.994.1001 rizzetta.com General Fund REVENUES
More informationBudget Proposal 2017/18
Glenfield Parish Council Park House, Stamford Street, Glenfield, Leicester, LE3 8DL Telephone: 0116 231 2498 email: clerk@glenfieldparishcouncil.org.uk Glenfield Parish Council Budget Proposal 2017/18
More informationOperating Budget. Third Quarter Financial Report (July 2005 March 2006)
Third Quarter Financial Report (July 2005 March 2006) INDEX A. Executive Summary...page 2 B. Revenue and Expense Analysis...page 3 C. Budget Variance Reports...page 14 D. Ridership and Performance Measures...page
More informationPUBLIC UTILITY DISTRICT NO. 1 OF SKAGIT COUNTY COMMISSIONERS MEETING. DRAFT AGENDA January 8, :30 PM
PLEDGE OF ALLEGIANCE PUBLIC UTILITY DISTRICT NO. 1 OF SKAGIT COUNTY COMMISSIONERS MEETING ELECTION OF COMMISSION OFFICERS DRAFT AGENDA January 8, 2019 4:30 PM DESIGNATION OF COMMISSION REPRESENTATIVES
More informationProvincial Ice Storm Assistance Program Frequently Asked Questions
Provincial Ice Storm Assistance Program Frequently Asked Questions 1. What s the Ice Storm Assistance Program? The Ice Storm Assistance Program is a one-time special program designed to help municipalities
More informationCHUGACH ELECTRIC ASSOCIATION 1 STATEMENT OF OPERATIONS. Allowance for Funds Used During Construction. Total Cost of Electric Service (MTD Actual)
FINANCIAL REPORT MARCH 2014 STATEMENT OF OPERATIONS CATEGORY 2014 MTD ACTUAL 2014 MTD BUDGET Operating Revenue and Patronage Capital Fuel and Purchased Power Expense Power Production Expense Transmission
More information2019 BUDGET PROCESS SECTION 1: SECTION 2: INTRODUCTION TO BUDGET DOCUMENT A. NEW CHART OF ACCOUNTS
November 2018 Page 1 In accordance with District Resolution No. 1361, we are pleased to present the 2019 Proposed Budget for Public Utility District No. 1 of Skagit County. This report first reviews the
More informationOklahoma Turnpike Authority Report to Bondholders First Quarter Tim J. Gatz Executive Director. Prepared by the Controller Division
Governor Mary Fallin, Member Ex-Officio David A. Burrage, Vice-Chairman G. Carl Gibson, Secretary & Treasurer Kenneth Adams, Member Gene Love, Member Dana Weber, Member Gary Ridley, Secretary of Transportation
More informationLehigh County Authority Capital Plan. Preliminary Plan Board Presentation August 22, 2016
Lehigh County Authority 2017-2021 Capital Plan Preliminary Plan Board Presentation August 22, 2016 1 Process Review / Approvals Capital Plan Annual Budget Funding / New Borrowing Project Authorizations
More informationCook County Preliminary Budget Forecast. June, 2016
Cook County Preliminary Budget Forecast June, 2016 Table of Contents FY2016 Year End Outlook FY2017 Preliminary Forecast Special Purpose Funds Timeline and Next Steps 2 FY2016 Year End Outlook 3 Preliminary
More information2720 Sumner Avenue P.O. Box 480 Aberdeen, WA Fax
Grays Harbor Public Utility District No. 1 The District has a long history of serving the Grays Harbor area. Established in 1938 by a vote of the people, the PUD exists to ensure that our power resources
More informationTILLAMOOK PEOPLE'S UTILITY DISTRICT
TILLAMOOK PEOPLE'S UTILITY DISTRICT ANNUAL FINANCIAL REPORT Years Ended December 31, 2011, and 2010 KENNETH KUHNS & CO. Certified Public Accountants 570 Liberty Street S.E., Suite 210 Salem, Oregon 97301-3594
More informationLINCOLN ELECTRIC SYSTEM Revenue & Expense Statement (Condensed) DECEMBER 2018 PRELIMINARY
YEAR TO DATE LINCOLN ELECTRIC SYSTEM Revenue & Expense Statement (Condensed) DECEMBER 2018 (Dollar amounts in 000) 2018 2018 Percentage Actual Budget Difference Difference 10) Total Revenue $333,101 $320,678
More informationWashington State Health Insurance Pool Treasurer s Report September 2018 Financial Review
Washington State Health Insurance Pool Treasurer s Report September 2018 Financial Review 1. 2018 Interim III Assessment Required An assessment of $8.5 M was required to adequately fund the pool until
More informationM E M O R A N D U M. Background
M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: Commissioners Brown, Carlson, Mital, Simpson and Helgeson Sue Fahey, Chief Financial Officer; Deborah Hart, Interim Finance Manager; Adam Rue,
More informationCity of Pleasanton Finances - Overview. July 12, 2017 Chamber of Commerce
City of Pleasanton Finances - Overview July 12, 2017 Chamber of Commerce 2 Public versus Private Sector Public (not-for-profit) versus a private (for profit) entity Private company/corporation has one
More informationAGENDA LAWSS Board Meeting
AGENDA LAWSS Board Meeting Thursday, February 23 rd, 2017 10 a.m. Lambton Area Water Supply System 1215 Fort Street, Sarnia, Ontario N7V 1M1 1. Declaration Of Pecuniary Or Conflict Of Interest 2. Presentation
More informationAndrew Nazareth General Manager, Finance & Corporate Services Robert Gonzalez, P.Eng. General Manager, Engineering & Public Works
City of Richmond Report to Committee To: From: Re: General Purposes Committee Andrew Nazareth General Manager, Finance & Corporate Services Robert Gonzalez, P.Eng. General Manager, Engineering & Public
More informationMDC Integrated Plan / Financial Update Presentation to the Windsor Town Council November 20, 2017
MDC Integrated Plan / Financial Update Presentation to the Windsor Town Council November 20, 2017 Clean Water Project (CWP) requires CSO Long-Term Control Plan (LTCP) 2005 LTCP approved by CT DEEP in 2007
More informationPreliminary 2019 Corporate Operating Plan. Javier Fernandez Vice President & CFO
Preliminary 2019 Corporate Operating Plan Javier Fernandez Vice President & CFO Assumptions Alignment with Board Strategic Directives Revenue Adjustments No General rate increase No change in the fuel
More information