1 Performance Review Body PRB assessment of the revised performance targets for RP1 Prepared by the Performance Review Body (PRB) of the Single European Sky 27/04/2012

2 COPYRIGHT NOTICE AND DISCLAIMER This document is published by the Performance Review Commission (PRC) in its role as Performance Review Body (PRB) to assist the European Commission in the implementation of the Performance Scheme. It may be copied in whole or in part providing that the copyright notice and disclaimer are included. The information contained in this document may not be modified without prior written permission from the Performance Review Commission. The views expressed herein do not necessarily reflect the official views or policy of EUROCONTROL or of the European Commission, which make no warranty, either implied or express, for the information contained in this document, neither do they assume any legal liability or responsibility for the accuracy, completeness or usefulness of this information. Printed by EUROCONTROL, 96, rue de la Fusée, B-1130 Brussels, Belgium. The PRC s website address is The PRU s address is pru@eurocontrol.int.

3 TABLE OF CONTENTS 1 INTRODUCTION CAPACITY COST-EFFICIENCY OTHER INFORMATION SAFETY INTERRELATIONS BETWEEN PERFORMANCE TARGETS COMPLIANCE CHECKS MONITORING PERFORMANCE PLAN STAKEHOLDER CONSULTATION PROCESS AGGREGATED PERFORMANCE TARGETS AT FAB LEVEL ASSESSMENT OF THE REVISED PERFORMANCE PLAN CONCLUSIONS CONCLUSIONS ON CAPACITY CONCLUSIONS ON COST-EFFICIENCY...9 ANNEX 1: REVISED PERFORMANCE PLAN CHECKLIST...10 ANNEX 2: LIST OF INVESTMENTS FROM PERFORMANCE PLAN...12 ANNEX 3: LIST OF UNCONTROLLABLE COSTS...14

4 1 Introduction s Performance Plan was received on 28th June in English. It was signed by the Deputy Director General for Civil Aviation at the Department of Transport, and the Director and Assistant Director of the Safety Regulation Division of the IAA, the NSA for. PRB assessed s performance plan and transmitted its report to the European Commission on 20 th September The Commission presented a draft Commission Recommendation to the ad-hoc Single Sky Committee of 24 October 2011 asking States/FABs to revise, as appropriate, the targets contained in their performance plans. Based on the positive opinion of the Single Sky Committee, the Recommendation was adopted by the Commission on 23 November 2 and published in the Official Journal of the European Union on 29 November It requested to: Adopt revised cost efficiency targets at national level to be consistent with, and adequately contribute to, the European Union-wide performance targets adopted with Commission Decision (2011/121/EU) of 21 February 2011 for the years 2012 to Take every opportunity for further improving cost-efficiency targets in national or functional airspace block performance plans during the reference period, in particular with regard to the evolution of the general context, the reduction of the cost of capital and support costs (costs other than those for air traffic controllers in operation), the increase in productivity and the rationalisation of investments in the context of the establishment of functional airspace blocks; Review the assumptions underlying the risk premium and consequently the return on equity, and provide justifications for the significant increases in the cost of capital; Provide the assumptions and rationale for establishing costs which may be deemed out of control in accordance with Article 11a(8) of Commission Regulation (EC) No 1794/2006, with a view to facilitating the necessary adjustments at the end of the reference period. Communicate for information to the Commission aggregated performance targets highlighting the consistency at functional airspace block level with the European Unionwide performance targets as specified in article 5.3 of Commission Regulation (EC) No 691/2010. delivered the Addendum to s National Performance Plan on The documents transmission was signed by James Lavelle, Aviation Services & Security Division, Department of Transport Tourism and included: Signed letter of transmission Addendum to s NPP in pdf format (signed) Addendum to s NPP in Word format (unsigned) Revised targets spread-sheet En-route Forecasts at December The present report provides evidences on the PRB assessment of the revised NPP delivered by in responses to the recommendations adopted by the EC and complements the 1 2 PRB s final report on the assessment of National/FAB Performance Plans with Performance Targets for the period : Commission Recommendation (2011/C 348/01) of 23/11/2011 on the revision of targets contained in performance plans under Commission Regulation (EU) N 691/2010. Page 1

5 initial assessment report. The PRB especially examined whether all EC recommendations were considered by and if the amendments made to the initial NPP bring about genuine performance improvements. PRB key conclusions are also included, where necessary. The EC recommendations are highlighted in yellow boxes within the report. Additional relevant PRB conclusions from the first assessment report of 20 September 2011 are highlighted in blue boxes. The tables in the following sections include: the applicable recommendations or requests for clarification on the relevant KPA/KPI made by the EC and the related requests for clarifications made by the PRB on the initial Performance Plan; the amendments submitted via the Addendum on revised targets for RP1; The analysis of the PRB on the revised targets or clarifications. 2 Capacity Although s capacity targets were considered to be providing an adequate contribution to the EU wide capacity target, the PRB assessment suggested that would be able to adopt more stringent targets for 2012 and 2013 than were proposed. IMPROVEMENT: has revisited the intermediate targets for 2012 and 2013 and has adopted more stringent targets of 0.07 minutes for 2012 and 0.12 minutes for 2013 instead of 0.14 minutes for each year. 3 Cost-efficiency ECO EC 2c/3c Adopt revised cost-efficiency targets at national level to be consistent with, and adequately contribute to, the European Union-wide performance targets adopted with Commission Decision (2011/121/EU) of 21 February 2011 for the years 2012 to Take every opportunity for further improving cost-efficiency targets in national or functional airspace block performance plans during the reference period, in particular with regard to the evolution of the general context, the reduction of the cost of capital and support costs (costs other than those for air traffic controllers in operation), the increase in productivity and the rationalisation of investments in the context of the establishment of functional airspace blocks 4 ; ECO EC 2c/3c The revised cost-efficiency targets show an improvement compared to the information submitted in the initial Performance Plan. IMPROVEMENT The en-route DURs are lower by some -0.5% on average for RP1 compared to the initial Performance Plan (by respectively -1.0% in 2012, -0.3% in 2013 and 2014). As 3 4 Commission Recommendation (2011/C 348/01) of 23/11/2011, item 2 (c). Commission Recommendation (2011/C 348/01) of 23/11/2011, item 3 (c). Page 2

6 a result, the annual average trend over is now -0.2% p.a., compared to -0.1% in the initial Plan; In its Addendum to the national Performance Plan has revised downwards the traffic growth assumptions (by -1.5% over RP1) on the grounds that the current economic downturn appears to be substantially more serious than at the time of the preparation of the Performance Plan. has also revised the inflation assumptions slightly downwards by a cumulative -0.8 percentage point by These two revisions lead, all else equal, to a deterioration of the en-route DUR trend over The downwards revision of the DURs was therefore made possible through a significant downwards revision of the total en-route determined costs (-2.0% over RP1, or M). Significant reductions from the initial June 2011 Plan took place in the areas of staff costs and cost of capital. The PRB notes that these reductions arise as a result of genuine cost-efficiency improvement from the Irish ATSP (IAA). Although the traffic for RP1 has been revised downwards (-1.5%), the PRB calculates that the combination of both the cost and traffic effects contribute to reducing the EUwide gap by 1.9 M over RP1. Details are provided in the table below. Performance Plan: Currency: EUR Initial Performance Plan (June 2011) 2009A 2010A AAGR AAGR Total determined costs in nominal terms (in national currency) % 1.5% Inflation % -1.6% 1.0% 1.5% 1.7% 1.9% Inflation index (100 in 2009) % 1.7% Determined costs in real terms (in national currency at 2009 prices) % -0.2% Total en-route Service Units % 4.1% Real en-route DUR in national currency (at 2009 prices) % -4.2% Revised Performance Targets (December 2011) 2009A 2010A AAGR AAGR Total determined costs in nominal terms (in national currency) % 0.3% Inflation % -1.6% 1.3% 1.0% 1.4% 1.6% Inflation index (100 in 2009) % 1.3% Determined costs in real terms (in national currency at 2009 prices) % -1.0% Total en-route Service Units % 1.8% Real en-route DUR in national currency (at 2009 prices) % -2.8% Difference between revised and initial en-route DUR (in %) -1.0% -0.3% -0.3% Improvement (-) or deterioration (+) towards reducing the gap identified at EU-level from the June 2011 Performance Plans 's contribution (in national currency in real terms at 2009 prices) Exchange rate 's contribution (in 2009EUR) Total RP The 2012 annual price cap implies a reduction of about 25 % on the 2011 price cap. Thereafter, it is expected to fall a further 6 % per annum. Details of the decision are available at: Page 3

7 Index (2009=100) Revised cost-efficiency target for RP % -0.3% -0.3% DUR (EUR2009) En-route DUR (NPP June 2011) Determined en-route costs (NPP June 2011) En-route TSU (NPP June 2011) En-route DUR (Revised Target) Determined en-route costs (Revised Target) En-route TSU (Revised Target) Additional analysis relevant to recommendations ECO EC 2c/3c: Traffic assumption: was assessed as not passing the traffic forecast check in the assessment of its Performance Plan of June The reasons were that the forecast used for was based on a 2011 baseline which was totally different from the situation observed at the time (and -4.4 percentage points below the STATFOR 2011 May base) and, although the figure used in the Performance Plan for 2014 was close to the STATFOR 2011 May base, the forecasts for 2012 and 2013 had been plotted from this artificially low 2011 baseline and were therefore significantly lower than the STATFOR figures. In its Addendum to the national Performance Plan has now further revised downwards its traffic forecast for every year of RP1 (respectively by -0.5% in 2012, -1.5% in 2013 and -2.4% in 2014) on the grounds that the current economic downturn appears to be substantially more serious than at the time of preparing the Performance Plan. The PRB notes that the strong traffic growth observed between January-August 2011 in the Irish airspace (+7.7%) indeed quite sharply contrasts with the decline in traffic over the September-December 2011 period (by -2.1% on average over the same 4 months of 2010). This downwards revision of traffic leads, all else equal, to a deterioration of the DUR trend over DETERIORATION Inflation/Economic assumption: was assessed as not passing the inflation assumption check in the assessment of its Performance Plan of June 2011, as the submitted inflation forecast was significantly higher than the IMF April 2011 average inflation forecast (by a cumulative difference in the price base of +2.2 percentage points by 2014). In its Addendum to the national Performance Plan has revised the inflation assumptions slightly downwards by a cumulative -0.8 percentage point by The PRB notes that the revised assumptions are based on the September 2011 forecast of the ESRI (Economic and Social Institute of ) for 2011 and 2012 and on the IMF September 2011 forecast for 2013 and The PRB notes that this downwards revision of the inflation assumptions, albeit being closer to the IMF figures than those used in the June 2011 Plan, leads all else equal to a deterioration of the DUR trend over Page 4

8 DETERIORATION En-route DUR trend ( ): The DUR trend was assessed as not sufficient in the initial Plan, as the trend was significantly lower than the EU-wide target trend (-0.1% p.a. compared to the EU-wide target of -3.2%) and the trend was biased by the provision of outdated data for 2011 which artificially increased the 2011 baseline. has revised downwards its en-route determined costs by -2.0% over RP1 compared to the initial Performance Plan (or M at 2009 prices). This is the result of a number of revisions, as follows: - a reduction in staff costs arising from a pay freeze and a lower average level of seniority of staff following an unforeseen increase in retirements; - an increase in other operating costs reflecting more up-to-date information relating to maintenance costs for ATM systems and increased requirements for training for the replacement of retired staff; - a reduction of depreciation costs which, although not clearly described in the Addendum, seems to be induced by the rescheduling of some capex; - a reduction of the cost of capital, mainly due to a revision of the return on equity (see below), as well as to a change in the NBV of fixed assets following the probable rescheduling of some capex (see depreciation above). Differences vs June 2011 Plan (2009 prices) RP1 % RP1 Staff % Other operating costs % Depreciation % Cost of capital % Total % The overall net reduction of 7.1 M in determined costs over RP1 is a genuine cost-efficiency improvement from the Irish ATSP (IAA). The PRB also notes that intends to modify the values for terminal costs as presented in the June 2011 Performance Plan (page 23 of its Addendum), although it is not made clear in which respect these will change and whether this implies a re-allocation of costs between the en-route and terminal activities. The PRB understands that the revision of terminal costs is linked to the October 2011 decision by the Commission for Aviation Regulation to significantly reduce terminal air traffic control charges 5 between January 2012 and December Overall, the downwards revision of determined costs (-2.0% over RP1) exceeds the downwards revision of traffic (-1.5% over RP1), therefore leading to an improvement of the DUR (by -0.5%). The average trend over has now marginally improved from -0.1% p.a. in the initial Performance Plan to -0.2% p.a. IMPROVEMENT En-route DUR level: s DUR level for RP1 presented in the initial Performance Plan was assessed as passing the check. The revised targets are now lower than those presented in the initial Performance Plan. IMPROVEMENT Page 5

9 Return on equity (RoE): see ECO EC 3d below IMPROVEMENT ECO EC 3d should review the assumptions underlying the risk premium and consequently the return on equity, and should provide justifications for the significant increases in the cost of capital 6 ; ECO EC 3d was assessed as not passing the RoE check in the initial June 2011 Performance Plan, as the RoE applicable to the ANSP over RP1 (i.e. 9.01%) was based on a risk premium of 5%, which is significantly higher than the EU-wide average for ATSPs. The revised cost-efficiency targets reflect a reduction of the RoE of -1.3 percentage point at 7.71%. The changes in the underlying assumptions are a downwards revision of the risk free rate from 4.01% to 2.71%, while the risk premium remains at 5%. This decrease in RoE contributes to lower costs of capital (some M over RP1). IMPROVEMENT ECO EC 4a Specify in the national performance plan the contribution of investments over the reference period to, and impact on, the performance targets by providing references to business cases and/or cost-benefit analyses and describing their relevance in relation to the European ATM Master Plan, in particular as far as the deployment of the first implementation package (IP1) is concerned. This information should be consistent with the information contained in business plans of air navigation service providers as specified in paragraph (b) of Section 2.2 of Annex I to Commission Regulation (EC) No 2096/ ECO EC 4a The PRB notes that some additional information relating to IP1 related investment projects is provided in the Addendum on revised targets. The PRB did neither assess the consistency and adequacy of the data provided, nor validates ANSPs individual investments, which is a State/NSA responsibility. The list of investments of the ANSP as included in the Plan is provided at Annex 2 SOME ADDITIONAL INFORMATION PROVIDED ECO EC 4b Provide the assumptions and rationale for establishing costs which may be deemed out of control in accordance with Article 11a(8) of Commission Regulation (EC) No 1794/2006, with a view to facilitating the necessary adjustments at the end of the reference period. 8 ECO EC 4b In its Addendum to the national Performance Plan for RP1 did not provide additional assumptions and rationale for establishing uncontrollable costs. The information from the Plan relating to uncontrollable costs is reproduced at Annex Commission Recommendation (2011/C 348/01) of 23/11/2011, item 3 (d). Commission Recommendation (2011/C 348/01) of 23/11/2011, item 4 (a) Commission Recommendation (2011/C 348/01) of 23/11/2011, item 4 (b) Page 6

10 NO CHANGE NO ADDITIONAL INFORMATION PROVIDED s Performance Plan does not specifically indicate that EUROCONTROL costs are considered as uncontrollable. For information, the table below shows the EUROCONTROL costs taken into account by in the revised targets for cost-efficiency. These correspond to the forecast provided by EUROCONTROL in May 2011 and differ from the figures presented by EUROCONTROL at PC/36 in December EUROCONTROL costs assumptions for RP EUROCONTROL costs in nominal terms in EUR Source: Addendum on revised targets for RP1 4 Other information 4.1 Safety The table below includes the applicable recommendations on Safety made by the PRB on the Performance Plan as published in the PRB assessment report of Performance Plans for RP1 9. The CAA/NSA intention with regard to safety targets / ALoS should be clarified. The PRB appreciates to get insight whether any safety targets at national level do already exist It should be clarified that the performance monitoring and annual reporting during RP1 should include the performance of the State and its NSA with regard to Effectiveness of Safety Management and Just Culture. Clarifications provided: The statements highlighted as contradictory in the assessment report (1.4.3 to 1.4.5) reflect the fact that the NSA has been actively evolving its approach to the development and measurement of safety performance indicators. The quoted documents are not fully aligned, as they reflected current plans at the time of writing the NPP. Within SRD the Aeronautical Services Division (ASD) has responsibility for establishing an ALoS to be achieved in the provision of air traffic services. This ALoS has been established at National level and is documented in Division Policy. The policy identifies a number of safety indicators together with associated safety targets and the rationale employed in their selection. The ALoS as has been promulgated to service providers by means of a Notice to Air Navigation Service Providers (S Notice S.17, Issue 2, 19 th March 2010) 'Acceptable Level of Safety in the Provision of Air Traffic Services in ' (available on the IAA website). The NSA will ensure that performance monitoring and annual reporting during RP1 will include the performance of the State and its NSA with regard to the effectiveness of safety management and just culture KPIs. Assessment of the clarifications provided: The PRB thanks for the further explanations which are fully satisfactory. has established national safety targets in the context of the State Safety Programme (SSP). The safety indicators monitored in the National Performance Plan are a sub-set of safety indicators used in the SSP. As a result the NPP and the SSP are fully aligned. 9 PRB assessment report of Performance Plans for RP1 Page 7

11 Conclusions on SAFETY provided exhaustive explanations with regard to the key safety points published in September Interrelations between performance targets Based on the information provided in the Irish Performance Plan and in the Addendum, there are no significant issues regarding interrelations between the established performance targets. 4.3 Compliance checks The s Performance Plan initially delivered in June 2011 was found to contain the majority of the information required by the legislation. However, some information was not provided or was incomplete. provided updated information in the Addendum. Full details are provided in Annex 1: Revised Performance Plan checklist to this report. 4.4 Monitoring Performance Plan In its assessment of the June 2011 s Performance Plan, the PRB noted that s Performance Plan does not state what metrics will be monitored as part of this formal monitoring process, or what actions may be taken if performance is not consistent with the targets. Additional information was provided in the Addendum, but there is still no explicit reference to the metric used. Contingency principles are also addressed in section 4 but with no clear procedure described. 4.5 Stakeholder consultation process In its assessment of the June 2011 s Performance Plan, the PRB noted that, although s Performance Plan was subject to public consultation held jointly on a FAB basis by the UK and, the comments received do not appear to have resulted in concrete changes. Additional information on the consultation meeting held on 19 th April in London have been provided in the Addendum (page 12), addressing those changes in capacity and cost effective matters requested by the users and incorporated in the plan. 4.6 Aggregated performance targets at FAB level FAB EC 4c Communicate for information to the Commission aggregated performance targets highlighting the consistency at functional airspace block level with the European Union-wide performance targets as specified in article 5.3 of Commission Regulation (EC) No 691/ PRB notes that the UK and have agreed that the UK NSA will assume responsibility for the aggregation of the performance targets at FAB level. The UK- FAB submitted a document containing an aggregation of the targets contained in the UK and s national performance plans on 30 June Following the Commission Recommendation in relation to Regulation 691/2010 on the 23 November 2011, the UK and amended some of the targets contained in their national plans. An Addendum to the aggregated targets document to reflect the latest targets has been 10 Commission Recommendation (2011/C 348/01) of 23/11/2011, item 4 (c). Page 8

12 transmitted to the EC via mail on by Matt CLAYDON, European ATM Policy Coordinator, Directorate of Airspace Policy, UK Civil Aviation Authority. 5 Conclusions 5.1 Conclusions on capacity has improved its performance plan in regards to capacity and, if the targets are met, will provide an adequate contribution to the EU wide capacity target. 5.2 Conclusions on cost-efficiency A. The revised cost-efficiency targets show an improvement compared to the information submitted in the initial Performance Plan. The en-route DURs are lower by some - 0.5% on average for RP1 compared to the initial Performance Plan (by respectively - 1.0% in 2012, -0.3% in 2013 and 2014). As a result, the annual average trend over is now -0.2% p.a., compared to -0.1% in the initial Plan. B. In its Addendum to the national Performance Plan has revised downwards, the traffic growth assumptions (by -1.5% over RP1) on the grounds that the current economic downturn appears to be substantially more serious than at the time of the preparation of the Performance Plan. has also revised the inflation assumptions slightly downwards. These two effects lead, all else equal, to a deterioration of the DUR trend over C. The downwards revision of the DURs was therefore made possible through a significant downwards revision of the total en-route determined costs (-2.0% over RP1, or M). Significant reductions from the initial June 2011 Plan took place in the areas of staff costs and cost of capital. The PRB notes that these reductions arise as a result of genuine cost-efficiency improvement from the Irish ATSP (IAA). D. Although the traffic for RP1 has been revised downwards (-1.5%), the PRB calculates that the combination of both the cost and traffic effects contribute to reducing the EUwide gap by 1.9 M over RP1. Page 9

13 Annex 1: Revised Performance Plan checklist The table below includes those elements which received a No or Incomplete check in the PRB report on the Performance Plan initially submitted in June The fifth column (Amendment) refers to the new information received in the Addendum / Revised Performance Plan. Ref Requirement Check in the initial Performance Plan (Yes / No / Incomplete) Notes / reference in the initial Performance Plan Amendments 1.1 Description of situation For National Performance Plans, NSA or body responsible for providing the aggregation of performance targets for the FAB No Not included Page 12: the UK and have agreed that the UK NSA will assume responsibility for the aggregation of the performance targets at FAB level. 1.3 Stakeholder consultation List of stakeholders consulted Incomplete Section 1.3, Annex D however only lists those participating in the informal feedback, not attendees at formal consultation meeting. Provided in Appendix 2 2.1a Effectiveness of safety management Application of severity classification Just culture targets for each year No No No Section No safety targets for RP1 Details on each of these to come once European Approach has been determined. Page 11: The NSA will ensure that performance monitoring and annual reporting during RP1 will include the performance of the State and its NSA with regard to the effectiveness of safety management and just culture KPIs. 2.1d Description of investment needed to achieve targets Capex for each year Breakdown of projects Description of relevance and coherence No No No ANSP: Section but provides major capex only, no yearly breakdown, and only projects significant during 2009 Part of the projects can be found in Appendix 1. No breakdown of the investment is provided Page 10

14 Ref Requirement Check in the initial Performance Plan (Yes / No / Incomplete) Notes / reference in the initial Performance Plan Amendments 2.2 Explanation of consistency with EU-wide targets Cost efficiency No Asserts that it is consistent, on basis of trend, but does not acknowledge longer term trend Improved cost efficiency targets 5 Analysis of sensitivity to external assumptions Incomplete Section 5.1 Very brief discussion of traffic only. No quantitative analysis Brief reference to Inflation 6 Implementation of the Plan Measures to be put in place to achieve the targets Safety No Not included Additional information provided in section 4.8 Environment No Not included No change Cost-efficiency Incomplete Some discussion in section No change Contingency plans if targets are not met during reference period No Not included Brief reference at page 12 Annex D: Public consultation material Incomplete Annex D However, main comments provided only. Additional information provided at page 12. No material submitted Page 11

15 Annex 2: List of investments from Performance Plan The list of investments provided in the Irish Performance Plan (and mapping with the ATM Master Plan where appropriate) is reproduced in the table below for the purpose of transparency of information only. The PRB did neither assess the consistency and adequacy of the data provided, nor validates ANSPs individual investments, which is a State/NSA responsibility. Project Number IP1-OIs Project Pre C003 L005 Ao-0102 Ao-0201 ASMGCS ASMGCS Enhancements G006 A SMR Replacement C002 F001 AOM 0703 AOM-0202 AOM 0205 DCB 0207 COOPANS Project Number IP1-OIs Project Pre AOM-0401 AOU-0301 AOM 0504 H001 AOM-0802 AUO -804 CM-0101 CM-0202 COOPANS Build 2 H004 IS 0203 AFTN Replacement DCB-0102 DCB-0203 Additional Projects CM-0801 IS-0101 COOPANS Build 3 TS-0102 TS-0305 SDM-0101 SDM-0103 AOM 0601 TMA 2012 Page 12

16 AOM 0602 AOM-0602 Page 13

17 Annex 3: List of uncontrollable costs No additional information is available in the Addendum. Page 14

Denmark-Sweden. PRB assessment of the revised performance targets for RP1. Prepared by the Performance Review Body (PRB) of the Single European Sky

Denmark-Sweden. PRB assessment of the revised performance targets for RP1. Prepared by the Performance Review Body (PRB) of the Single European Sky Performance Review Body PRB assessment of the revised performance targets for RP1 Prepared by the Performance Review Body (PRB) of the Single European Sky 27/04/2012 COPYRIGHT NOTICE AND DISCLAIMER This

More information

PRB assessment report of Performance Plans for RP1. Czech Republic. Prepared by the Performance Review Body (PRB) of the Single European Sky

PRB assessment report of Performance Plans for RP1. Czech Republic. Prepared by the Performance Review Body (PRB) of the Single European Sky Performance Review Body EUROCONTROL PRB assessment report of Performance Plans for RP1 Prepared by the Performance Review Body (PRB) of the Single European Sky 20 September 2011 COPYRIGHT NOTICE AND DISCLAIMER

More information

PRB assessment report of Performance Plans for RP1. Slovenia. Prepared by the Performance Review Body (PRB) of the Single European Sky

PRB assessment report of Performance Plans for RP1. Slovenia. Prepared by the Performance Review Body (PRB) of the Single European Sky Performance Review Body EUROCONTROL PRB assessment report of Performance Plans for RP1 Prepared by the Performance Review Body (PRB) of the Single European Sky 20 September 2011 COPYRIGHT NOTICE AND DISCLAIMER

More information

PRB assessment report of Performance Plans for RP1. Belgium/Luxembourg. Prepared by the Performance Review Body (PRB) of the Single European Sky

PRB assessment report of Performance Plans for RP1. Belgium/Luxembourg. Prepared by the Performance Review Body (PRB) of the Single European Sky Performance Review Body EUROCONTROL PRB assessment report of Performance Plans for RP1 Prepared by the Performance Review Body (PRB) of the Single European Sky 20 September 2011 COPYRIGHT NOTICE AND DISCLAIMER

More information

PRB assessment report of Performance Plans for RP1. Hungary. Prepared by the Performance Review Body (PRB) of the Single European Sky

PRB assessment report of Performance Plans for RP1. Hungary. Prepared by the Performance Review Body (PRB) of the Single European Sky Performance Review Body EUROCONTROL PRB assessment report of Performance Plans for RP1 Prepared by the Performance Review Body (PRB) of the Single European Sky 20 September 2011 COPYRIGHT NOTICE AND DISCLAIMER

More information

PRB assessment report of Performance Plans for RP1. Denmark-Sweden. Prepared by the Performance Review Body (PRB) of the Single European Sky

PRB assessment report of Performance Plans for RP1. Denmark-Sweden. Prepared by the Performance Review Body (PRB) of the Single European Sky Performance Review Body EUROCONTROL PRB assessment report of Performance Plans for RP1 Prepared by the Performance Review Body (PRB) of the Single European Sky 20 September 2011 COPYRIGHT NOTICE AND DISCLAIMER

More information

PRB Corrigenda/Amendments Assessment of RP2 FAB Performance Plans following the ad-hoc SSC of 24 October 2014

PRB Corrigenda/Amendments Assessment of RP2 FAB Performance Plans following the ad-hoc SSC of 24 October 2014 PRB Corrigenda/Amendments Assessment of RP2 FAB Performance Plans following the ad-hoc SSC of 24 October 2014 FAB UK-IRELAND Edition date: 12/12/2014 European Union, 2014 COPYRIGHT NOTICE AND DISCLAIMER

More information

PRB Assessment Report of Performance Plans for RP2

PRB Assessment Report of Performance Plans for RP2 PRB Assessment Report of Performance Plans for RP2 UK-Ireland FAB Final edition Edition date: 06/10/2014 European Union, 2014 COPYRIGHT NOTICE AND DISCLAIMER This report has been prepared for the European

More information

SES Performance targets and achievements

SES Performance targets and achievements SES Performance targets and achievements Peter Griffiths Friday, 24 May 13 t Topics SES Performance Scheme Targets for RP1 (2012-14) Performance achieved in 2012 Looking ahead SES Performance targets and

More information

UK-Ireland FAB Performance Plan for Reference Period 2 - Corrigendum CAP 1245

UK-Ireland FAB Performance Plan for Reference Period 2 - Corrigendum CAP 1245 UK-Ireland FAB Performance Plan for Reference Period 2 - Corrigendum CAP 1245 CAP 1245 UK-Ireland FAB Performance Plan for Reference Period 2 - Corrigendum UK-Ireland FAB Performance Plan for Reference

More information

Addendum to the. Austrian ANS Performance Plan , Version 1.0 of 27 June December 2011

Addendum to the. Austrian ANS Performance Plan , Version 1.0 of 27 June December 2011 Austrian Federal Ministry of Transport, Innovation an Technology Addendum to the Austrian ANS Performance Plan 2012-2014, Version 1.0 of 27 June 2011 27 December 2011 prepared Dr. Franz Nirschl bmvit Federal

More information

PRB Assessment of RP2 FAB Revised Performance Targets

PRB Assessment of RP2 FAB Revised Performance Targets PRB Assessment of RP2 FAB Revised Performance Targets Blue Med FAB Version 3.1 Edition date: 16/10/2015 1 European Union, 2015 COPYRIGHT NOTICE AND DISCLAIMER This report has been prepared for the European

More information

PRB Assessment Report of Performance Plans for RP2

PRB Assessment Report of Performance Plans for RP2 PRB Assessment Report of Performance Plans for RP2 Baltic FAB Final edition Edition date: 06/10/2014 European Union, 2014 COPYRIGHT NOTICE AND DISCLAIMER This report has been prepared for the European

More information

PRB assessment report of Performance Plans for RP1. FAB Europe Central. Prepared by the Performance Review Body (PRB) of the Single European Sky

PRB assessment report of Performance Plans for RP1. FAB Europe Central. Prepared by the Performance Review Body (PRB) of the Single European Sky Performance Review Body EUROCONTROL PRB assessment report of Performance Plans for RP1 Prepared by the Performance Review Body (PRB) of the Single European Sky 20 September 2011 COPYRIGHT NOTICE AND DISCLAIMER

More information

Addendum to THE ITALIAN PERFORMANCE PLAN. for Air Navigation Services

Addendum to THE ITALIAN PERFORMANCE PLAN. for Air Navigation Services Addendum to THE ITALIAN PERFORMANCE PLAN for Air Navigation Services Reference Period 1 2012-2014 Document Approval The Addendum to the National Performance Plan for Reference Period 1 has been prepared

More information

Workshop on performance monitoring & reporting

Workshop on performance monitoring & reporting NCP Performance WG Workshop on performance monitoring & reporting 14 December 2011 Agenda 2 1. Welcome and Opening 2. Legislative context of performance monitoring and reporting Requirements at European-Wide

More information

PRB Assessment Report of Performance Plans for RP2

PRB Assessment Report of Performance Plans for RP2 PRB Assessment Report of Performance Plans for RP2 NEFAB Final edition Edition date: 06/10/2014 European Union, 2014 COPYRIGHT NOTICE AND DISCLAIMER This report has been prepared for the European Commission

More information

Monitoring Report 2012

Monitoring Report 2012 Monitoring Report 2012 Sweden 1 (14) The Swedish Transport Agency The Civil Aviation and Maritime Department The Infrastructure Unit Author Eva Noréus Month Year September 2013 2 (14) 1 Introduction 1.1

More information

PRB Annual Monitoring Report 2014

PRB Annual Monitoring Report 2014 PRB Annual Monitoring Report 2014 Volume 2 - National Overviews Final Version 30/09/2015 COPYRIGHT NOTICE AND DISCLAIMER European Union, 2015 This report has been prepared for the European Commission by

More information

8187/11 GL/mkl 1 DG C I

8187/11 GL/mkl 1 DG C I COUNCIL OF THE EUROPEAN UNION Brussels, 25 March 2011 8187/11 AVIATION 68 INFORMATION NOTE From: European Commission To: Council Subject: Recent developments in implementing the Single European Sky - Information

More information

National Performance Plan for Air Navigation Services Finland

National Performance Plan for Air Navigation Services Finland Performance Plan 1(28) 17.6.2011 National Performance Plan for Air Navigation Services Finland 2012-2014 2(28) Contents National Performance Plan for Air Navigation Services Finland 2012-2014... 1 1. Introduction...

More information

PRB Annual monitoring Report 2012

PRB Annual monitoring Report 2012 PRB Performance Monitoring Report 2012 Volume 2 PRB Annual monitoring Report 2012 Volume 2 National overviews Edition 2.0 Edition date: 11/10/2013 1 PRB Performance Monitoring Report 2012 Volume 2 European

More information

4. PERFORMANCE VIEW 3. PROJECT VIEW

4. PERFORMANCE VIEW 3. PROJECT VIEW 4.1 SDM in the SES performance framework...284 4.2 Performance Assessment and CBA Methodology...286 4.3 DP expected contribution to performance...287 4.4 DP Cost Benefit Analysis...292 4.5 Next Steps...303

More information

EUROCONTROL Medium-Term Forecast of Service Units: September 2010

EUROCONTROL Medium-Term Forecast of Service Units: September 2010 EUROCONTROL Medium-Term Forecast of Service Units: September 2010 Figure 1. Average annual growth of service units in 2010-2014 Summary: This report presents the first medium-term forecast of service units

More information

PSOs summary position paper on EC RP3 proposals on performance and charging regulation

PSOs summary position paper on EC RP3 proposals on performance and charging regulation Brussels, 29 th of May PSOs summary position paper on EC RP3 proposals on performance and charging regulation Following the publication of the draft Performance and Charging regulation by the European

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY CZECH REPUBLIC REVISION OF THE PERFORMANCE PLAN OF THE CZECH REPUBLIC Reference Period 2012-2014 Ref. No.: 6868-11-701 Version: 1.0 Prague on: 8. 12. 2011 Approved by (signature):

More information

FAB Performance Plan UK-Ireland FAB

FAB Performance Plan UK-Ireland FAB Page 1 of 251 FAB Performance Plan UK-Ireland FAB Second Reference Period (2015-2019) 1 2 Page 2 of 251 Page 3 of 251 Signatories Performance plan details FAB Name UK-Ireland FAB Version number 3 (State

More information

PRB Annual monitoring Report 2012

PRB Annual monitoring Report 2012 PRB Annual monitoring Report 2012 Volume 2 National overviews Edition 1.0 Edition date: 15/08/2013-1 - PRB Performance Monitoring Report 2012 Volume 2 European Union, 2013 COPYRIGHT NOTICE AND DISCLAIMER

More information

Action number: EU-TM-0136-M Action Title DP Implementation - Call CEF 2014 Deliverable 1.7 FPA information package - Guidelines for execution phase

Action number: EU-TM-0136-M Action Title DP Implementation - Call CEF 2014 Deliverable 1.7 FPA information package - Guidelines for execution phase Action number: EU-TM-0136-M Action Title DP Implementation - Call CEF 2014 Deliverable 1.7 FPA information package - Guidelines for execution phase 3 rd December 2015 V1.0 DOCUMENT IDENTIFICATION SHEET

More information

Determination and Report on the Maximum Level of Aviation Terminal Service Charges that may be imposed by the Irish Aviation Authority.

Determination and Report on the Maximum Level of Aviation Terminal Service Charges that may be imposed by the Irish Aviation Authority. Determination and Report on the Maximum Level of Aviation Terminal Service Charges that may be imposed by the Irish Aviation Authority 23 March 2007 Commission for Aviation Regulation 3 rd Floor, Alexandra

More information

UK-Ireland Functional Airspace Block. UK-Ireland FAB Report Final 30 th April

UK-Ireland Functional Airspace Block. UK-Ireland FAB Report Final 30 th April UK-Ireland Functional Airspace Block UK-Ireland FAB Report 2009 Final 30 th April FAB Report 2009 Final 30th April 2010 1 Index 1. Background of this document...2 2. Progress against the delivery of the

More information

Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017

Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017 Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017 Together with the Joint Undertaking s reply 12, rue Alcide De Gasperi

More information

Official Journal of the European Union

Official Journal of the European Union 4.3.2015 L 60/55 COMMISSION IMPLEMTING DECISION (EU) 2015/348 of 2 March 2015 concerning the consistency of certain targets included in the national or functional airspace block plans submitted pursuant

More information

HIGH LEVEL SUMMARY REPORT ON PRELIMINARY ACE 2016 DATA

HIGH LEVEL SUMMARY REPORT ON PRELIMINARY ACE 2016 DATA HIGH LEVEL SUMMARY REPORT ON PRELIMINARY ACE 216 DATA Report commissioned by the Performance Review Commission Prepared by the EUROCONTROL Performance Review Unit (PRU) IMPORTANT NOTE: This document comprises

More information

PRB Annual monitoring Report 2012

PRB Annual monitoring Report 2012 PRB Annual monitoring Report 2012 Volume 3 Report on Capital Expenditure Edition 2.0 Edition date: 11 October 2013-1 - European Union, 2013 COPYRIGHT NOTICE AND DISCLAIMER This report has been prepared

More information

Closing the Gap on Air Traffic Management Investment Needs

Closing the Gap on Air Traffic Management Investment Needs Increasing performance and investment requirements in Air Traffic Management to meet the goals and objectives of the Single European Sky programme Air Traffic Management (ATM) is going through a period

More information

Further development in air traffic management in the area of performance incentives

Further development in air traffic management in the area of performance incentives Further development in air traffic management in the area of performance incentives European Commission DG MOVE, Unit Single European Sky Final Report 02 November 2017 Our ref: 23036801 Client ref: MOVE/E2/2015/455-458-460-464

More information

PRB Annual monitoring report 2014

PRB Annual monitoring report 2014 PRB Annual Monitoring Report 2013 PRB Annual monitoring report 2014 Registry of s received during fact validation 30.09.2015 1 COMMENT RESPONSE SHEET RP1 PRB Annual Monitoring report 2014 RP1 PRB Annual

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 29.9.2017 C(2017) 6464 final COMMISSION DELEGATED REGULATION (EU) /... of 29.9.2017 supplementing Regulation (EU) 2016/1011 of the European Parliament and of the Council specifying

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION TO THE COMMISSION. Revision of the Internal Control Standards and Underlying Framework

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION TO THE COMMISSION. Revision of the Internal Control Standards and Underlying Framework COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 16 October 2007 SEC(2007)1341 EN COMMUNICATION TO THE COMMISSION Revision of the Internal Control Standards and Underlying Framework - Strengthening Control

More information

Revision of the Cyprus National Performance Plan

Revision of the Cyprus National Performance Plan Ministry of Communications and Works Department of Civil Aviation National Supervisory Authority Revision of the Cyprus National Performance Plan for Air Navigation Services Edition Number : 2.0 Edition

More information

Final Report. Draft Implementing Technical Standards

Final Report. Draft Implementing Technical Standards EBA/ITS/2017/06 05/09/2017 Final Report Draft Implementing Technical Standards on procedures and templates for the identification and transmission of information by resolution authorities to the EBA, on

More information

Technical advice on Minimum Information Content for Prospectus Exemption

Technical advice on Minimum Information Content for Prospectus Exemption Final Report Technical advice on Minimum Information Content for Prospectus Exemption 29 March 2019 I ESMA31-62-1207 ESMA CS 60747 103 rue de Grenelle 75345 Paris Cedex 07 France Tel. +33 (0) 1 58 36 43

More information

COMMISSION DELEGATED REGULATION (EU) No /.. of

COMMISSION DELEGATED REGULATION (EU) No /.. of EUROPEAN COMMISSION Brussels, 4.9.2017 C(2017) 5959 final COMMISSION DELEGATED REGULATION (EU) No /.. of 4.9.2017 supplementing Regulation (EU) No 575/2013 of the European Parliament and of the Council

More information

Official Journal of the European Union L 129. Legislation. Legislative acts. Volume April English edition. Contents REGULATIONS

Official Journal of the European Union L 129. Legislation. Legislative acts. Volume April English edition. Contents REGULATIONS Official Journal of the European Union L 129 English edition Legislation Volume 57 30 April 2014 Contents I Legislative acts REGULATIONS Regulation (EU) No 421/2014 of the European Parliament and of the

More information

EBA FINAL draft implementing technical standards

EBA FINAL draft implementing technical standards EBA/ITS/2013/05 13 December 2013 EBA FINAL draft implementing technical standards on passport notifications under Articles 35, 36 and 39 of Directive 2013/36/EU EBA FINAL draft implementing technical standards

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 6.7.2012 C(2012) 4531 final COMMISSION DECISION of 6.7.2012 with regard to the amendment of Decision C(2012) 1216 of 27 February 2012 adopting the 2012 work programme in the

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DEPARTMENT OF CIVIL AVIATION OF BOTSWANA

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DEPARTMENT OF CIVIL AVIATION OF BOTSWANA ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DEPARTMENT OF CIVIL AVIATION OF BOTSWANA (Gaborone, 7 to 9 November 2001) International Civil

More information

D6.2 Stakeholder Consultation on Business and Regulatory Scenarios

D6.2 Stakeholder Consultation on Business and Regulatory Scenarios EXPLORATORY RESEARCH D6.2 Stakeholder Consultation on Business and Regulatory Scenarios Deliverable 6.2 Vista Grant: 699390 Call: H2020-SESAR-2015-1 Topic: Sesar-05-2015 Economics and Legal Change in ATM

More information

EUROPEA U IO. Brussels, 26 April 2013 (OR. en) 2011/0386 (COD) PE-CO S 6/13 ECOFI 163 UEM 38 CODEC 463 OC 109

EUROPEA U IO. Brussels, 26 April 2013 (OR. en) 2011/0386 (COD) PE-CO S 6/13 ECOFI 163 UEM 38 CODEC 463 OC 109 EUROPEA U IO THE EUROPEA PARLIAMT THE COU CIL Brussels, 26 April 2013 (OR. en) 2011/0386 (COD) PE-CO S 6/13 ECOFI 163 UEM 38 CODEC 463 OC 109 LEGISLATIVE ACTS A D OTHER I STRUMTS Subject: REGULATION OF

More information

ETS SUPPORT FACILITY COSTS BREAKDOWN

ETS SUPPORT FACILITY COSTS BREAKDOWN ETS SUPPORT FACILITY COSTS BREAKDOWN 1. INTRODUCTION 1.1. The EUROCONTROL Agency has recently submitted information papers to EUROCONTROL s Air Navigation Services Board and to the European Commission

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 12.0 07/01/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 18.2.2016 COM(2016) 75 final 2016/0047 (NLE) Proposal for a COUNCIL DECISION amending Decision 2008/376/EC on the adoption of the Research Programme of the Research Fund for

More information

2016 Financial and Operating Performance March 16, 2017

2016 Financial and Operating Performance March 16, 2017 2016 Financial and Operating Performance March 16, 2017 2016 Highlights Solid financial and operating results driven by traffic growth Net Revenue up 1.8% YoY to 865m 2016 underlying EBITDA (net of IPO

More information

14459/15 AT/tl 1 DGE 2B

14459/15 AT/tl 1 DGE 2B Council of the European Union Brussels, 26 November 2015 (OR. en) 14459/15 ENER 403 CLIMA 139 OUTCOME OF PROCEEDINGS From: General Secretariat of the Council On: 26 November 2015 To: Delegations No. prev.

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 2.0 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was updated further

More information

Euro area quarterly financial accounts quality report

Euro area quarterly financial accounts quality report Euro area quarterly financial accounts 2015 quality report April 2016 Executive summary 2 1 Introduction 4 2 Institutional and legal framework 6 2.1 Institutional framework for compiling euro area financial

More information

ANNUAL IMPLEMENTATION REPORT

ANNUAL IMPLEMENTATION REPORT ANNUAL IMPLEMENTATION REPORT for the years 2014-2015 of the INTERREG IPA Cross-border Cooperation Programme Bulgaria Serbia CCI No 2014TC16I5CB007 1. IDENTIFICATION OF THE ANNUAL IMPLEMENTATION REPORT

More information

Official Journal of the European Union L 140/11

Official Journal of the European Union L 140/11 27.5.2013 Official Journal of the European Union L 140/11 REGULATION (EU) No 473/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 May 2013 on common provisions for monitoring and assessing draft

More information

COMMISSION DELEGATED REGULATION (EU) No /.. of

COMMISSION DELEGATED REGULATION (EU) No /.. of EUROPEAN COMMISSION Brussels, 13.3.2014 C(2014) 1557 final COMMISSION DELEGATED REGULATION (EU) No /.. of 13.3.2014 supplementing Regulation (EU) No 575/2013 of the European Parliament and of the Council

More information

EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities

EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Final version of 07/12/2011 EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities COCOF_11-0041-01-EN GUIDANCE ON TREATMENT OF ERRORS DISCLOSED IN THE ANNUAL CONTROL

More information

POLISH PERFORMANCE PLAN addendum on revised targets for RP1

POLISH PERFORMANCE PLAN addendum on revised targets for RP1 POLISH PERFORMANCE PLAN addendum on revised targets for RP1 2 1. Revised capacity target 1.1 Key figures for the revised capacity target 2009A 2010A 2011 2012 2013 2014 Reference value calculated and proposed

More information

the procedural aspects of its future Work Package (as contained in Annex I); the final version of the future WorkPackage (as contained in Annex II);

the procedural aspects of its future Work Package (as contained in Annex I); the final version of the future WorkPackage (as contained in Annex II); COUNCIL OF THE EUROPEAN UNION Brussels, 26 November 2008 16410/08 FISC 174 "A" ITEM NOTE from: General Secretariat to: Council Subject:: Code of Conduct (Business Taxation) = Draft Council Conclusions

More information

9228/18 SBC/sr 1 DGG 1A

9228/18 SBC/sr 1 DGG 1A Council of the European Union Brussels, 24 May 2018 (OR. en) Interinstitutional File: 2018/0058 (COD) 9228/18 'I' ITEM NOTE From: General Secretariat of the Council ECOFIN 477 CODEC 826 RELEX 443 COEST

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 12.7.2012 Official Journal of the European Union L 181/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 600/2012 of 21 June 2012 on the verification of greenhouse gas emission reports

More information

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW-I Washington, D.C DEPARTMENT OF THE ARMY EC 5-2-01 U.S. Army Corps of Engineers CECW-I Washington, D.C. 20314-1000 Circular No. 5-2-01 31 March 2016 EXPIRES 30 MARCH 2018 Management EXECUTION OF CHANGE CONTROL BOARDS 1.

More information

Enlarged Committee for Route Charges

Enlarged Committee for Route Charges Enlarged Committee for Route Charges CER-106-2016-3565 ITEM 2 28.6.16 INFORMATION PAPER INITIAL ESTIMATES OF THE ROUTE CHARGES COST-BASES AND UNIT RATES CRCO Overview Estimated figures June 2016 - Submitted

More information

EU framework programme processes

EU framework programme processes Briefing January 2018 Adoption, implementation, evaluation SUMMARY Over the past 35 years, the European Union ( EU) institutions have adopted eight framework programmes for research. The lifecycles of

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of COMMIION OF THE EUROPEAN COMMUNITIE COMMIION DECIION of 26.2.2009 Brussels, 26.2.2009 C(2009) 1176 final establishing the projects of common interest eligible in the area of the trans-european transport

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 8.3.2017 C(2017) 1473 final COMMISSION DELEGATED REGULATION (EU) /... of 8.3.2017 supplementing Regulation (EU) No 1286/2014 of the European Parliament and of the Council

More information

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal Explanatory Document to all TSOs proposal for intraday cross-zonal gate opening and gate closure times in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 17.6.2013 COM(2013) 420 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of Regulation (EC) No 1445/2007 of the European Parliament

More information

STRATEGIC ACTION PLAN GUIDELINES & MODEL

STRATEGIC ACTION PLAN GUIDELINES & MODEL Innovation and Networks Executive Agency STRATEGIC ACTION PLAN GUIDELINES & MODEL Background Article II.2.4 of the standard text of the Commission Decisions granting Community financial aid for projects

More information

ACER Consultation Template. Tariff NC Article 26(5)

ACER Consultation Template. Tariff NC Article 26(5) ACER Consultation Template Tariff NC 26(5) The following document constitutes support material for the online template created by the Agency for the Coordination of Energy Regulators ( the Agency) for

More information

Appendix B - Managing Public Money. Managing public money

Appendix B - Managing Public Money. Managing public money Appendix B - Managing Public Money Managing public money July 2013 with annexes revised as at August 2015 1 Responsibilities The relationship between the government, acting on behalf of the Crown, and

More information

Introduction Part III: Report on budgetary and financial management

Introduction Part III: Report on budgetary and financial management 1 July 2015 The Final Annual Accounts 2014 are drafted in accordance with Title IX of the SESAR Joint Undertaking Financial Rules 1, which are established in accordance with Council Regulation (EC) No

More information

Executive Board Hundred and ninety-fifth session

Executive Board Hundred and ninety-fifth session Executive Board Hundred and ninety-fifth session 195 EX/23.INF.3 PARIS, 3 September 2014 English & French only Item 23 of the provisional agenda NEW AUDITS BY THE EXTERNAL AUDITOR DETAILED COMMENTS BY

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 4.12.2017 C(2017) 7967 final COMMISSION DELEGATED REGULATION (EU) /... of 4.12.2017 supplementing Regulation (EU) 2015/760 of the European Parliament and of the Council with

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. on the quality of fiscal data reported by Member States in 2017

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. on the quality of fiscal data reported by Member States in 2017 EUROPEAN COMMISSION Brussels, 8.3.2018 COM(2018) 112 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the quality of fiscal data reported by Member States in 2017 EN EN REPORT

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL 14 October 2011 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Sixty-fifth

More information

Official Journal of the European Union L 306/33

Official Journal of the European Union L 306/33 23.11.2011 Official Journal of the European Union L 306/33 COUNCIL REGULATION (EU) No 1177/2011 of 8 November 2011 amending Regulation (EC) No 1467/97 on speeding up and clarifying the implementation of

More information

User Forum Continuous Descent Operations. Implementation in Europe. Brent Day & Veronica McMahon

User Forum Continuous Descent Operations. Implementation in Europe. Brent Day & Veronica McMahon User Forum 2013 Continuous Descent Operations Implementation in Europe Brent Day & Veronica McMahon CDO Implementation Team 24 Jan 2013 SCOPE Description and Concept of CDO Why CDO the benefits European

More information

Ref. Ares(2017) /06/2017. Annual accounts of the SESAR Joint Undertaking

Ref. Ares(2017) /06/2017. Annual accounts of the SESAR Joint Undertaking Ref. Ares(2017)3166182-23/06/2017 Annual accounts of the SESAR Joint Undertaking Financial year 2016 CONTENTS CERTIFICATION OF THE ACCOUNTS... 3 BACKGROUND INFORMATION ON THE SJU... 4 FINANCIAL STATEMENTS

More information

EIOPA- CP-14/ November 2014

EIOPA- CP-14/ November 2014 EIOPA- CP-14/055 27 November 2014 Consultation Paper on the proposal for draft Implementing Technical Standards on the procedures, formats and templates of the solvency and financial condition report EIOPA

More information

DG Regional Policy DG Employment, Social Affairs and Equal Opportunities

DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Final version of 17/03/2010 COCOF 10/0002/02/EN EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Guidance note to Certifying Authorities on reporting on withdrawn

More information

Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures

Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures EBA/GL/2017/16 23/04/2018 Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures 1 Compliance and reporting obligations Status of these guidelines 1. This document contains

More information

Proposal for a COUNCIL DIRECTIVE

Proposal for a COUNCIL DIRECTIVE EUROPEAN COMMISSION Brussels, 18.1.2018 COM(2018) 21 final 2018/0006 (CNS) Proposal for a COUNCIL DIRECTIVE amending Directive 2006/112/EC on the common system of value added tax as regards the special

More information

EUROCONTROL Short- and Medium-Term Forecast of Service Units: May 2012 Update

EUROCONTROL Short- and Medium-Term Forecast of Service Units: May 2012 Update Summary: This document presents the forecast of total service units in Europe 1 for 2012-2017 prepared by the Statistics and Forecast Service of EUROCONTROL (STATFOR) for the attention of the EUROCONTROL

More information

Guidelines. on PD estimation, LGD estimation and the treatment of defaulted exposures EBA/GL/2017/16 20/11/2017

Guidelines. on PD estimation, LGD estimation and the treatment of defaulted exposures EBA/GL/2017/16 20/11/2017 EBA/GL/2017/16 20/11/2017 Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures 1 Contents 1. Executive summary 3 2. Background and rationale 5 3. Guidelines on PD estimation,

More information

EUROCONTROL Short- and Medium-Term Forecast of Service Units: May 2011 Update

EUROCONTROL Short- and Medium-Term Forecast of Service Units: May 2011 Update Summary: This document presents the forecast of total service units in Europe 1 for 2011-2016 prepared by the Statistics and Service of EUROCONTROL (STATFOR). This forecast aims principally to support

More information

Final Report. Implementing Technical Standards

Final Report. Implementing Technical Standards EBA/ITS/2016/05 22 September 2016 Final Report Implementing Technical Standards on common procedures, forms and templates for the consultation process between the relevant competent authorities for proposed

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 16/9/16 (Information paper) English and Spanish only 1 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 33: Aviation safety and air navigation

More information

The mandatory introduction of civil and military Safety Management Systems: And for the same reasons, in the ADF

The mandatory introduction of civil and military Safety Management Systems: And for the same reasons, in the ADF The mandatory introduction of civil and military Safety Management Systems: The safety outcomes of the international adoption of a systemic approach to air safety investigation since 1994 have been the

More information

Questions and Answers Notification of UCITS and exchange of information between competent authorities

Questions and Answers Notification of UCITS and exchange of information between competent authorities Questions and Answers Notification of UCITS and exchange of information between competent authorities 2012 ESMA/428 Date: 9 July 2012 ESMA/2012/ 428 Contents Question 1: Notification of new investment

More information

EUROCONTROL EUROCONTROL AGENCY ANNUAL ACCOUNTS

EUROCONTROL EUROCONTROL AGENCY ANNUAL ACCOUNTS EUROCONTROL EUROCONTROL AGENCY ANNUAL ACCOUNTS As at 31 December 2013 EUROCONTROL AGENCY Annual Accounts As at 31 December 2013 TABLE OF CONTENTS 1. Foreword and corporate governance 6 2. Financial Accounts

More information

Final Report Amendments to Commission Delegated Regulation (EU) 2017/587 (RTS 1)

Final Report Amendments to Commission Delegated Regulation (EU) 2017/587 (RTS 1) Final Report Amendments to Commission Delegated Regulation (EU) 2017/587 (RTS 1) 26 March 2018 ESMA70-156-354 Table of Contents 1 Executive Summary... 3 2 Prices reflecting prevailing market conditions...

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 12.3.2018 COM(2018) 110 final 2018/0045 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on facilitating cross-border distribution of collective

More information

JC FINAL draft Regulatory Technical Standards

JC FINAL draft Regulatory Technical Standards 26.07.2013 JC-RTS-2013 01 JC FINAL draft Regulatory Technical Standards on the consistent application of the calculation methods under Article 6(2) of the Financial Conglomerates Directive under Regulation

More information

Final Report. Draft Implementing Standards. amending Implementing Regulation (EU) No 680/2014 with regard to prudent valuation EBA/ITS/2018/01

Final Report. Draft Implementing Standards. amending Implementing Regulation (EU) No 680/2014 with regard to prudent valuation EBA/ITS/2018/01 EBA/ITS/2018/01 17/04/2018 Final Report Draft Implementing Standards amending Implementing Regulation (EU) No 680/2014 with regard to prudent valuation Contents Executive Summary 3 Background and rationale

More information

CONTACT(S) Marie Claire Tabone +44 (0) Matt Chapman +44 (0)

CONTACT(S) Marie Claire Tabone +44 (0) Matt Chapman +44 (0) IASB Agenda ref 15A STAFF PAPER IASB meeting November 2018 Project Paper topic Management Commentary The objective of management commentary CONTACT(S) Marie Claire Tabone mctabone@ifrs.org +44 (0) 20 7246

More information