1 BEFORE THE DEPARTMENT OF PUBLIC SERVICE REGULATION MONTANA PUBLIC SERVICE COMMISSION DOCKET NO. D01.. Electricity Supply Tracker Colstrip Unit Generation Asset Variable Cost Adjustments Dave Gates Generating Station Variable Cost/Credit Adjustments Spion Kop Wind Generation Variable Cost Adjustments Hydro Generation Assets Variable Cost Adjustments July 1, 01 to June 0, 01

2

3

4

5

6

7 AL BROGAN NorthWestern Energy 0 N. Montana, Suite 0 Helena, Montana 01 Tel. (0) 0 al.brogan@northwestern.com ANN HILL NorthWestern Energy 0 N. Montana Ave., Suite 0 Helena, Montana 01 Tel. (0) 0 ann.hill@northwestern.com Attorneys for NorthWestern Energy DEPARTMENT OF PUBLIC SERVICE REGULATION BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF MONTANA IN THE MATTER OF NorthWestern Energy s ) Monthly Electric Supply Cost Rate Adjustment/ ) Application for (1) Approval of Deferred Cost ) REGULATORY DIVISION Account Balances for Electricity Supply, CU ) Variable Costs, DGGS Variable Costs/Credits, ) Spion Variable Costs, and Hydro Variable Costs; ) DOCKET NO. D01.. and () Projected Electricity Supply Cost Rates, ) CU Variable Rates, DGGS Variable Rates, ) Spion Variable Rates, and Hydro Variable Rates ) NorthWestern Energy s Application for Interim and Final Electricity Supply Rate Adjustment In compliance with its Electric Tariff, Sheets No.. through., inclusive, NorthWestern Corporation d/b/a NorthWestern Energy ( NorthWestern or Applicant ) by and through its undersigned counsel respectfully submits this Application for approval of (1) Deferred Cost Account Balances for Electricity Supply, Colstrip Unit No. ( CU ) Variable Costs, Dave Gates Generating Station ( DGGS ) Variable Costs/Credits, Spion Kop Wind Generation Project ( Spion ) Variable Costs, and Hydro Generation Assets ( Hydro ) Variable Costs for the trueup period of July 1, 01 through June 0, 01

8 ( Lookback Period ); and () projected Electricity Supply Cost Rates, CU Variable Rates, DGGS Variable Rates, Spion Variable Rates, and Hydro Variable Rates for the projected period of July 1, 01 through June 0, 01 ( Goingforward Period ) to the Montana Public Service Commission ( Commission ). In support thereof, NorthWestern states as follows: I. Applicant s full name and address are: NorthWestern Energy East Park Butte, MT 01 II. Applicant is a Delaware corporation doing business as NorthWestern Energy in the states of Montana, South Dakota, and Nebraska as a public utility. III. The Lookback Period affects the Supply Deferred Charge shown in the Electric Tariff, Schedule No. ESS1, on Revised Sheet Nos. 0.1 and 0.. These are the only tariff sheets impacted by the proposals for the Lookback Period. Recovery of electricity supply costs for the Lookback Period is governed by, MCA (01) ( Mandatory Mechanism ), which mandates full recovery of prudently incurred electricity supply costs. NorthWestern has calculated the proposed Supply Deferred Charge included in this Application in accordance with the Deferred Accounting method approved by the Commission in Order No. c in Docket No. D on June, 00, Order No. f in Docket No. D00.., Order No. a in Docket No. D00.., Order No. 1l in Docket No. D0..1, and Order No. k in Docket No. D The balance in Account No., Electric Supply Deferred Costs, for the 1month period ending June 0, 01 is an undercollection of,0,0. This balance consists of

9 ,, for the undercollection of electricity supply costs from July 1, 01 to June 0, 01, plus an overcollection of (,0,) for CU Variable Costs, an overcollection of (,0) for DGGS Variable Costs, an undercollection of,01 for Spion Variable Costs, and an overcollection of (1,1) for Hydro Variable Costs, including the April 1, 01 balance of the Hydro rebate. NorthWestern proposes to amortize this undercollection balance of,0,0 in rates over the 1month period ending June 01. The Supply Deferred Charge Rates proposed in this Application, which will be shown on Revised Tariff Sheet Nos. 0.1 and 0., are shown on Appendix B. NorthWestern will submit new Revised Tariff Sheet Nos. 0.1 and 0. containing the Supply Deferred Charge rates upon the Commission s approval of the proposed rates shown above. The proposed Supply Deferred Charge rates will replace the current Supply Deferred Charge rates in Schedule ESS1 Electric Supply Service, Sheet Nos. 0.1 and 0.. IV. While the Goingforward Period will not be subject to the Mandatory Mechanism because the provisions of House Bill 1 are effective on July 1, 01, NorthWestern must file this proposal in accordance with its Electric Tariff, Sheet Nos..,., and.. Sheet Nos.. and. were originally approved by the Commission on July 1, 00 and revised on January 1, 01 to remove references to Default. ; Sheet. was originally approved on July 1, 00. These sheets set forth provisions and procedures for Electric Cost and Deferred Accounting. In part, the Tariff provides: On an annual basis, the Utility shall submit to the Commission, a filing reflecting the accounting transactions reflected in the above accounts [Account Electric Supply Deferred Costs and Account Electric Supply Cost Adjustment] for the 1month Accounting Period, and the necessary calculations and rates in support of the upcoming period s Current and Deferred Rates.

10 Electric Tariff, Original Sheet No... A utility must file, as part of its tariffs, all rules that in any manner affect the rates charged. 01(1), MCA. Approved tariffs have the force of law and are lawful until changed as provided in Title, Chapter. 0(), MCA. Although tariff rules are not technically the rates, tolls, and charges named in the printed schedules, because the statute requires the filing of rules as part of the tariff, the lawfulness provision and the procedural requirements for changing tariffs also apply to the rules. To comply with the Commissionapproved Electric Tariff provisions, NorthWestern requests continuation of its current cost recovery mechanism on an interim basis until the Commission approves a new mechanism in a contested case proceeding. In addition to the statutorily defined electricity supply costs, the Commission has authorized recovery of variable costs of generating resources and fixed costs of utilityowned resources through a single volumetric rate. Only the electricity supply costs and the variable costs of generating resources are updated and adjusted in each year s proceeding. The Commission approved the rates to recover the fixed cost revenue requirement for the generating assets in prior proceedings.

11 For the Goingforward Period, NorthWestern has estimated electricity supply costs and variable costs for the 1month period, July 1, 01 to June 0, 01. The following table shows the basis for NorthWestern s total supply rates for the Goingforward Period. Electricity Supply Costs Market Purchases/Sales Net Asset Variable Asset Fixed Off System CU CU,0,1, 1,0, Transactions,,0 NonQF Fixed DGGS DGGS 1,,,,0 Price,,1 QF Purchases,, Spion (,,1) Spion,, Index Priced Transactions 1,,1 Hydro,1 Hydro 1,,0 Ancillary & Other 1,1, Transmission 1,, Administrative 1,0, Carrying Costs 0, YNP Revenue (1,1,) Rounding Total,,,0,,0,0 Grand Total 01,, The Grand Total is a decrease of (,1,1) from current rates. NorthWestern proposes an overall electricity supply rate per kwh as shown in Appendix A to recover the component costs shown in the table above. The Electric Tariff also provides, Monthly Electric Costs shall reflect the current Utility average annual cost of electricity and Electricity Supply Rates shall be based on most recent 1month annual forecast of electricity supply costs divided by the most recent 1month forecasted load on a normalized basis. 1 st Revised Sheet No... Therefore, to comply with the Electric Tariff, NorthWestern proposes to continue using the monthly tracking methodology in which a forecast of 1 months is used in this annual filing for the period July 1 through June 0 of the tracking year with each subsequent monthly calculation

12 based on a rolling 1month forecast. V. The proposed new rates contained in Appendices A and B reflect: 1. The treatment of the Electricity Supply Deferred Cost Account Balance, the CU Variable Cost Account Balance, the DGGS Variable Cost/Credit Account Balance, the Spion Variable Cost Account Balance, and the Hydro Variable Cost Account Balance described in Section No. III; and. The projected overall monthly market supply and costs including electricity supply costs, CU costs, DGGS costs, Spion costs, and Hydro costs, as described in Section No. IV. Attached hereto and incorporated by reference are the following documents: VI. Appendix A Current and proposed Supply Rates for the Goingforward Period; Appendix B Current and proposed Supply Deferred Rates for the Lookback Period; Appendix C Typical bill computations; Notice of Interim Rate Adjustment Request and the Certificate of Issuance of said notice to the media; and Prefiled Direct Testimony and Exhibits of Kevin J. Markovich (five components), Michael S. McGowan, Joseph M. Stimatz, John B. Bushnell, Joseph S. Janhunen (five components), and Danie L. Williams. WHEREFORE, Applicant respectfully requests that the Commission: 1. Grant interim approval of the proposed rates included as Appendix A for the Goingforward Period to be effective on a monthly basis for service on and after July 1, 01;. Grant interim and final approval of the proposed rates included as Appendix B for the Supply Deferred Charge to be effective on a monthly basis for service on and after July 1, 01; and. Grant such other and additional relief, as the Commission shall deem just and proper.

13

14 A B C D E F G H I J K L M N O P Q R S Appendix A 0/01/1 Rate Change Docket No. D01.. Page 1 of 1 Current Current Current Proposed Proposed Proposed Proposed Total Rate Without Tax Tax Portion Total Supply Rate Rate Without Tax Tax Portion Total Supply Rate Total Rate Percentage Net Electric Supply Rate (/kwh) 0/1/01 [1] 0/1/01 [1] 0/1/01 [1] 0/1/01 [] 0/1/01 [] 0/1/01 [] Change (MG) Change Residential (0.0000) 1.% Employee (0.000) 1.% GS1 Secondary NonDemand (0.0000) 1.% GS1 Secondary Demand (0.0001) 1.% GS1 Primary NonDemand (0.000) 1.% GS1 Primary Demand (0.000) 1.% GS Substation (0.000) 1.% GS Transmission (0.000) 1.% Irrigation (0.0000) 1.% Lighting (0.0000) 1.% [1] Source: Appendix F June 01 Monthly Tracker Filing. [] Source: Exhibit (JSJ)11, page, col V. [] Source: Exhibit (JSJ)11, page, col V. Note: The tax portion of rate has not changed since Jan 1, 01. [] Source: Exhibit (JSJ)11, page, col V. NorthWestern Energy Electric Utility Electricity Supply Costs, CU Fixed Cost of Service and Variable Costs, DGGS Fixed Cost of Service and Variable Costs/Credits, Spion Kop Fixed Cost of Service and Variable Costs, Hydro Fixed Cost of Service and Variable Costs Rate Change Detail Effective /1/01

15 A B C D E F G H I J Appendix B 0/01/1 Rate Change Docket No. D01.. Page 1 of 1 NorthWestern Energy Electric Utility Deferred Electricity Supply Rate Change Detail Effective /1/01 Current Proposed Rate Percentage Net Deferred Electric Supply Rate (/kwh) /1/01 [1] /1/01 [] Change Change Residential % Employee % GS1 Secondary NonDemand % GS1 Secondary Demand % GS1 Primary NonDemand % GS1 Primary Demand % GS Substation % GS Transmission % Irrigation % Lighting % [1] Source: Appendix G Feb 01 Monthly Tracker Filing. [] Source: Exhibit (JSJ)11, page 1, col N.

16 Docket No. D01.. Appendix C Page 1 of A B C D E F G H I J K 1 Typical Bill Calculation *CTCQF and Overall Electric Electric Residential Service Supply Current Rates 1 Proposed Rates kwh per month 0 Date Date 1 Effective Total Bill Effective Total Bill 1 /1/01 Amount /1/01 Amount 1 Res. Dist.Service Charge Plus: Res. SupplyEnergy Res. Deferred Supply Costs Res. Supply Taxes Res. CTCQF Res. TransmissionEnergy Res. DistributionEnergy Res. Delivery Taxes Res. USBC Res. BPACredit (0.001) (.) (0.001) (.) Total Kwh Charge Total Bill Monthly Increase (Decrease) (0.0) 1 Annual Increase (Decrease) (0.) Percent Change 0.0% 1 Column represents the proposed rate changes for CTCQF, Overall Electric Supply and Net Supply Deferred Costs effective on July 1, 01. J:\FINAL Appendix C_Typical Bill 01 1

17 Docket No. D01.. Appendix C Page of A B C D E F G H I J K 1 Typical Bill Calculation General Service Secondary NonDemand CTCQF and Overall Current Rates Electric Supply 1 Proposed Rates 1 kwh per month 00 Date Date 1 Effective Total Bill Effective Total Bill 1 /1/01 Amount /1/01 Amount 1 GS1 Dist.Service Charge Plus: 1 GS1 SupplyEnergy GS1 Deferred Supply Costs GS1 Supply Taxes GS1 CTCQF GS1 TransmissionEnergy GS1 DistributionEnergy GS1 Delivery Taxes GS1 USBC Total Kwh Charge Total Bill Monthly Increase (Decrease) 1 Annual Increase (Decrease) Percent Change 0.00% 1 Column represents the proposed rate changes for CTCQF, Overall Electric Supply and Net Supply Deferred Costs effective on July 1, 01. J:\FINAL Appendix C_Typical Bill 01

18 Docket No. D01.. Appendix C Page of A B C D E F G H I J K 1 Typical Bill Calculation General Service Secondary Demand CTCQF and Overall Electric Supply Kw 1 Current Rates 1 Proposed Rates 1 kwh per month 00 Date Date 1 Effective Total Bill Effective Total Bill 1 /1/01 Amount /1/01 Amount 1 GS1 Dist.Service Charge Plus: GS1 SupplyEnergy GS1 Deferred Supply Costs GS1 Supply Taxes GS1 CTCQF GS1 TransmissionDemand GS1 DistributionDemand GS1 Demand Delivery Taxes GS1 DistributionEnergy GS1 Energy Delivery Taxes GS1 USBC Subtotal Total Bill Monthly Increase (Decrease) (0.) Annual Increase (Decrease) (1.) Percent Change 0.0% 1 Column represents the proposed rate changes for CTCQF, Overall Electric Supply and Net Supply Deferred Costs effective on July 1, 01. J:\FINAL Appendix C_Typical Bill 01

19 Docket No. D01.. Appendix C Page of A B C D E F G H I J K 1 Typical Bill Calculation General Service Primary NonDemand CTCQF and Overall Electric Supply Current Rates 1 Proposed Rates 1 kwh per month 000 Date Date 1 Effective Total Bill Effective Total Bill 1 /1/01 Amount /1/01 Amount 1 GS1 Dist.Service Charge Plus: GS1 SupplyEnergy GS1 Deferred Supply Costs GS1 Supply Taxes GS1 CTCQF GS1 TransmissionEnergy GS1 DistributionEnergy GS1 Delivery Taxes GS1 USBC Total Kwh Charge Total Bill Monthly Increase (Decrease) (0.0) 1 Annual Increase (Decrease) (0.) Percent Change 0.0% 1 Column represents the proposed rate changes for CTCQF, Overall Electric Supply and Net Supply Deferred Costs effective on July 1, 01. J:\FINAL Appendix C_Typical Bill 01

20 Docket No. D01.. Appendix C Page of A B C D E F G H I J K 1 Typical Bill Calculation General Service Primary Demand CTCQF and Overall Electric Supply Kw 00 Current Rates 1 Proposed Rates 1 kwh per month Date Date 1 Effective Total Bill Effective Total Bill 1 /1/01 Amount /1/01 Amount 1 GS1 Dist.Service Charge Plus: 1 GS1 SupplyEnergy 0.0, ,0.0 1 GS1 Deferred Supply Costs GS1 Supply Taxes GS1 CTCQF GS1 TransmissionDemand.0 1,.0.0 1,.0 GS1 DistributionDemand. 1,.. 1,. GS1 Demand Delivery Taxes GS1 DistributionEnergy , ,1.00 GS1 Energy Delivery Taxes GS1 USBC Subtotal 1,0.1 1, Total Bill 0.0 1, ,. Monthly Increase (Decrease) (1.0) Annual Increase (Decrease) (1.0) Percent Change 0.01% 1 Column represents the proposed rate changes for CTCQF, Overall Electric Supply and Net Supply Deferred Costs effective on July 1, 01. J:\FINAL Appendix C_Typical Bill 01

21 Docket No. D01.. Appendix C Page of A B C D E F G H I J K 1 Typical Bill Calculation Irrigation & Sprinkling Service NonDemand CTCQF and Overall Electric Current Rates Supply 1 Proposed Rates 1 kwh per month 1 Date Date 1 Effective Total Bill Effective Total Bill 1 /1/01 Amount /1/01 Amount 1 Irr. Dist.Service Charge (a) Plus: Irr. SupplyEnergy Irr. Deferred Supply Costs Irr. Supply Taxes Irr. CTCQF Irr. TransmissionEnergy Irr. DistributionEnergy Irr. Delivery Taxes Irr. USBC Irr. BPA Credit (0.001) (.) (0.001) (.) Total Kwh Charge Total Bill Monthly Increase (Decrease) (0.01) Season Incr (Decr) ( Months) (0.0) Percent Increase 0.01% (a) The seasonal charge is divided by months to compute a monthly average. 1 Column represents the proposed rate changes for CTCQF, Overall Electric Supply and Net Supply Deferred Costs effective on July 1, 01. J:\FINAL Appendix C_Typical Bill 01

22 Docket No. D01.. Appendix C Page of A B C D E F G H I J K 1 Typical Bill Calculation Irrigation & Sprinkling Service Demand CTCQF and Overall Electric Kw 1 Current Rates Supply 1 Proposed Rates 1 kwh per month Date Date 1 Effective Total Bill Effective Total Bill 1 /1/01 Amount /1/01 Amount 1 Irr. Dist.Service Charge (a) Plus: Irr. SupplyEnergy Irr. Deferred Supply Costs Irr. Supply Taxes Irr. CTCQF Irr. TransmissionDemand Irr. DistributionDemand Irr. Demand Delivery Taxes Irr. DistributionEnergy Irr. Energy Delivery Taxes Irr. USBC Irr. BPA Credit (0.001) (.) (0.001) (.) Subtotal 1,00. 1, Total Bill 0.0 1, ,1.1 Monthly Increase (0.0) Season Increase ( Months) (0.) Percent Increase 0.00% (1) The seasonal charge is divided by months to compute a monthly average. 0 1 Column represents the proposed rate changes for CTCQF, Overall Electric Supply and Net Supply Deferred Costs effective on July 1, 01. J:\FINAL Appendix C_Typical Bill 01

23

24 DEPARTMENT OF PUBLIC SERVICE REGULATION BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF MONTANA IN THE MATTER OF NorthWestern Energy s ) Monthly Electric Supply Cost Rate Adjustment / ) Application for (1) Approval of Deferred Cost ) REGULATORY DIVISION Account Balances for Electricity Supply, CU ) Variable Costs, DGGS Variable Costs/Credits, ) Spion Variable Costs, and Hydro Variable Costs; ) DOCKET NO. D01.. and () Projected Electricity Supply Cost Rates, ) CU Variable Rates, DGGS Variable Rates, ) Spion Variable Rates, and Hydro Variable Rates ) Notice of Interim Rate Adjustment Request NorthWestern Corporation d/b/a NorthWestern Energy ( NorthWestern ) issues notice pursuant to ARM..0 that it has filed with the Montana Public Service Commission ( MPSC ), via its Application, a request for an interim rate increase in electric supply rates in this Docket to reflect forecast overall Electric Supply Costs and the net Electric Supply Deferred Cost Account Balance. This Interim request includes the use of monthly electricity supply cost adjustments, annual Colstrip Unit No. ( CU ) Variable Cost trueups, annual Dave Gates Generating Station ( DGGS ) Variable Cost/Credit trueups, annual Spion Kop Wind Generation Project ( Spion ) Variable Cost trueups, and annual Hydro Generation Assets ( Hydro ) Variable Cost trueups. Applicant requests that the proposed rates become effective for service on an interim basis on and after July 1, 01 pending a final decision on its Application. The rate changes are required to: 1) reflect a decrease in the projected electricity supply costs, a decrease in the projected CU variable costs, a decrease in the projected DGGS variable costs/credits, a decrease in the projected Spion variable costs, and an increase in the projected Hydro variable costs and ) amortize the amounts in the 1

25 Deferred Cost Account Balances for Electricity Supply, CU Variable Costs, DGGS Variable Costs/Credits, Spion Variable Costs, and Hydro Variable Costs for the 1 month period ending June 0, 01. The net adjustments proposed in this filing result in the following: Overall electric supply per kilowatt hour ( kwh ) rate decrease, with the property tax rate component, as shown in the table below: Overall Electric Supply Rate (/kwh) Current Proposed Rate Change % Change Residential (0.0000) (1.)% Employee (0.000) (1.)% GS1 Secondary NonDemand (0.0000) (1.)% GS1 Secondary Demand (0.0001) (1.)% GS1 Primary NonDemand (0.000) (1.)% GS1 Primary Demand (0.000) (1.)% GS Substation (0.000) (1.)% GS Transmission (0.000) (1.)% Irrigation (0.0000) (1.)% Lighting (0.0000) (1.)% The electric supply deferred costs balance for the 1month period ending June 0, 01 is an undercollection of,0,0. This balance consists of 1,, for the undercollection of electricity supply costs plus the CU variable costs overcollection of (,0,), the DGGS variable costs/credits overcollection of (,0), the Spion variable costs undercollection of,01, and the Hydro variable costs overcollection of (1,1), including the April 1, 01 balance of the Hydro rebate. NorthWestern proposes to amortize the undercollection balance in rates over the 1month period ending June 01. The resulting net electric deferred cost rates are shown below:

26 Net Electric Supply Deferred Charge Rate (/kwh) Current Proposed Rate Change % Change Residential % Employee % GS1 Secondary NonDemand % GS1 Secondary Demand % GS1 Primary NonDemand % GS1 Primary Demand % GS Substation % GS Transmission % Irrigation % Lighting % The interim request and supporting documents can be examined at NorthWestern s Montana General Office, East Park Street, Butte, Montana; at the office of the Montana Consumer Counsel ( MCC ), 1 North Last Chance Gulch, Suite 1B, Helena, Montana; or at the office of the MPSC, 1 Prospect Avenue, Helena, Montana. The MCC is available to assist in the representation of consumer interests in this matter, and its phone number is 01. Any response that any person wishes to have the MPSC take into consideration in its decision with respect to this matter should be delivered to the MPSC at the above address as soon as possible or mailed to the MPSC at P.O. Box 001, Helena, MT 001. Any portion of the interim adjustment approved by the MPSC pending hearing and final decision would, pursuant to 0, MCA (01), be subject to rebate or surcharge if the final decision in this docket is to approve a final revenue level which is different than the interim level. DATED: May 1, 01

27

28 Department of Public Service Regulation Montana Public Service Commission Docket No. D01.. Annual Electricity Supply Tracker NorthWestern Energy PREFILED DIRECT TESTIMONY OF KEVIN J. MARKOVICH ON BEHALF OF NORTHWESTERN ENERGY ANNUAL ELECTRICITY SUPPLY TRACKER TABLE OF CONTENTS Description Starting Page No. Witness Information Purpose of Testimony NorthWestern s Electricity Supply Activities 01/01 Tracker Period Activities Tracker Presentation in this Docket Update to the 01/01 Electricity Supply Tracker Period Components of the 01/01 Electricity Supply Tracker Period 1 01/01 Forecast Electricity Supply Tracker Period 0 Introduction of Other Testimony and Witnesses Tables Summary of 01/01 Tracker Period 0 Summary of Forecasted 01/01 Tracker Period Exhibits Tracker for the 01/01 Period Exhibit (KJM1)11 Tracker for the 01/01 Period Exhibit (KJM)11 Copyrighted Tradition MidC Forward Pricing Exhibit (KJM)11 KJM1

29 Witness Information Q. Please state your name and business address. A. My name is Kevin J. Markovich and my business address is East Park Street, Butte, Montana 01. Q. By whom are you employed and in what capacity? A. I am employed by NorthWestern Energy ( NorthWestern ) as Director of Energy Supply Market Operations Q. Please summarize your educational and employment experiences. A. I attended Montana State University, graduating in 1 with a Bachelor of Science degree in Business, Accounting option. Upon graduation, I went to work for Marathon Oil Company in Casper and Cody, Wyoming as a production accountant. In 1, I enrolled at the University of Wyoming in Laramie where I earned a Master of Business Administration degree in December 1. In 1, I went to work in the Treasury Department of Entech, Inc., a wholly owned subsidiary of The Montana Power Company ( MPC ). In 1, I transferred to the Montana Power Trading & Marketing Company ( MPT&M ) where I worked in various capacities including realtime electric scheduler, gas marketer, and executive director of retail marketing. In 000, prior to the sale of MPT&M to Pan Canadian, I transferred to MPC, now NorthWestern Energy, where I worked on numerous energy supply activities. In January 00, I became the KJM

30 Director of Risk Management, and in September 00, I assumed my current position Q. What are your responsibilities as Director of Energy Supply Market Operations? A. I am responsible for NorthWestern s energy supply market operations including daily, weekly, monthly, and term trading and scheduling activities. This involves developing and maintaining relationships with suppliers, brokers, and other market participants; executing and managing term contracts; negotiating and approving supply arrangements that are consistent with regulatory guidelines and internal policies; and developing and implementing overall supply strategies to ensure there is adequate supply to meet demand at all times. I also provide information and testimony on utilityrelated matters before the Montana Public Service Commission ( Commission ) Q. Do you hold any professional certifications? A. Yes. I am a Certified Public Accountant and a Certified Cash Manager Purpose of Testimony Q. Please describe your Annual Electricity Supply Tracker testimony. A. In this testimony, I present the following information: I provide a framework for NorthWestern s electricity supply service; KJM

31 I provide a brief overview of significant 01/01 tracker period activities; I provide an outline of the various tracker components included in this filing; I identify and explain certain line items in the tracker; I provide updates to the costs included in the 1monthended June 01 tracker period with months of actual numbers and months of estimated numbers consistent with NorthWestern s electric tariff; I discuss the 01/01 tracker period using the Commissionapproved methodology that is included in NorthWestern s electric tariff; I provide the 1monthended June 01 tracker period forecast and explain how the volumes and costs were derived; and I identify additional testimony I am providing and introduce the other NorthWestern witnesses who are providing testimony in this filing and briefly describe the topic(s) covered by each NorthWestern s Electricity Supply Activities Q. Please describe the general framework that guides NorthWestern s electricity supply planning and acquisition activities. A. Montana statutes and Commission regulations provide the framework for NorthWestern s energy supply planning and operating activities. See 1 through 1, MCA, and ARM..01 through..01. KJM

32 These laws and regulations guide NorthWestern s planning and operating activities ARM..(1) requires NorthWestern to file a comprehensive longterm portfolio management and electricity supply resource procurement plan ( Plan ) in December of oddnumbered years. Since 00, NorthWestern has produced and filed seven biennial Plans. The Plans, and the accompanying Commission and stakeholder comments, provide guidance to the resource planning and acquisition processes that NorthWestern follows in order to costeffectively and reliably serve its customers electricity supply needs. NorthWestern s 01 Electricity Supply Resource Procurement Plan ( 01 Plan ), filed in March 01, in Docket No. N01..1, was the document that helped direct energy supply activities during the 01/01 tracker period The 01 Plan is a comprehensive analysis of NorthWestern s electricity loadserving obligations for its retail customers in Montana. Chapter 1 of the 01 Plan identifies and discusses key initiatives and baseline activities that NorthWestern will address as part of its threeyear action plan going forward. As these activities progress, NorthWestern will communicate the results to the Commission and stakeholders. The Prefiled Direct Testimony of John B. Bushnell ( Bushnell Direct KJM

33 Testimony ) discusses NorthWestern s progress addressing action items in NorthWestern s 01 Plan pertaining to the 0101 tracker period /01 Tracker Period Activities Q. Please provide an overview of the 01/01 tracker period. A. During the 01/01 tracker period no new major changes or events affected energy supply service, but the continuation of certain initiatives that began in prior tracking periods, namely Asset Optimization and Reliability Based Control ( RBC ), remained primary focus areas. RBC is a mandatory North American Electric Reliability Corporation performance standard. NorthWestern s Asset Optimization initiative is aimed at creating efficiencies in NorthWestern s dispatch and operation of its generation resources in order to facilitate RBC compliance. The Prefiled Direct Testimonies of Joseph M. Stimatz and Michael S. McGowan ( Stimatz and McGowan Direct Testimonies ) provide more details on Asset Optimization and RBC Q. What is the status of the hedging strategy that was in place prior to the 01 acquisition of the hydroelectric generating facilities? A. In Docket No. D01.., NorthWestern and the Montana Consumer Counsel ( MCC ) entered into a stipulation agreement, which the Commission approved, which, among other things, precluded NorthWestern from entering into future MidC electric hedging purchases KJM

34 after the acquisition of the hydroelectric facilities ( Hydros ). The hedging strategy that NorthWestern had traditionally described in an appendix to the biennial Plans no longer exists. The 01 Plan detailed necessary forecasted capacity and resource additions, but traditional hedge transactions are currently not needed for the supply portfolio and are not discussed in the 01 Plan. Q. Have any new MidC hedge purchases been made since the Hydros A. No. acquisition? Q. Did NorthWestern make any new term purchases of onsystem energy during the current tracker period that will provide energy in future tracker periods? A. Yes. In May 01 we conducted a Request for Proposals and procured 0 megawatts ( MW ) of onpeak energy to be delivered to NorthWestern s transmission system during the period July 01 through March 01. The contract for this energy replaces contracts for MW of onsystem supply that expire on June 0, Q. Did this transaction violate the terms of the stipulation mentioned above prohibiting additional Mid Chedge purchase transactions after the Hydros acquisition? KJM

35 A. No. This energy is to be delivered on the NorthWestern transmission system and it is based on future index prices, both of which conditions are allowed under the stipulation agreement with MCC Tracker Presentation in this Docket Q. Please summarize the tracker presentation filed in this docket. A. By statutory definition, Electricity supply costs means the actual costs incurred in providing electricity supply service through power purchase agreements, demandside management, and energy efficiency programs (), MCA. While this proceeding includes other costs for which the Commission has approved tracking, the electric tracker only addresses electricity supply costs. I provide testimony and exhibits in this docket separated into five components: (1) Electricity Supply Tracker, () Colstrip Unit ( CU ) Trueup, () Dave Gates Generating Station ( DGGS ) Trueup, () Spion Kop Wind Generation Asset ( Spion ) Trueup, and () Hydro Asset Trueup. All testimony is filed jointly to facilitate a retail customer total supply rate calculation Update to the 01/01 Electricity Supply Tracker Period Q. Please summarize the estimated 1month electricity supply tracker period ending June 01, as it was filed in Docket No. D01... A. The tracker period ending June 01 in Docket No. D01.. included 1 estimated months, July 01 through June 01. Interim Order No. KJM

36 authorized rates reflecting the 01/01 tracker period estimates effective on July 1, 01. NorthWestern filed monthly rate adjustments for each month, from August 01 through June 01 in Docket No. D01... Q. How has NorthWestern incorporated the CU generation that is reflected in the 01/01 tracker? A. NorthWestern has included the full ratebased volume of unit contingent energy associated with MW of capacity in the tracker. The variable costs associated with CU are included in the CU Trueup Q. How has NorthWestern incorporated the DGGS regulation service in the 01/01 tracker? A. The variable costs associated with the provision of regulation service by DGGS are included in the DGGS Trueup. NorthWestern has included MW of baseload energy from DGGS in the tracker to serve retail load Q. How has NorthWestern incorporated the Spion generation that is reflected in the 01/01 tracker? A. NorthWestern has included the variable energy volumes generated by Spion s 0 MW of capacity in the tracker. The variable costs associated with Spion are included in the Spion Trueup. KJM

37 Q. How has NorthWestern incorporated the Hydro generation that is reflected in the 01/01 tracker? A. NorthWestern has included the unit contingent energy associated with MW of capacity in the tracker. As identified in the 01 Plan the capacity at Ryan Dam was increased by MW due to two generator rewinds and three turbine replacements Q. How has the regulation cost associated with United Materials of Great Falls ( UMGF ) been adjusted in this filing? A. Consistent with consolidated Docket Nos. D00.. and D00.., Final Order No. c, in this tracker filing, NorthWestern reduced regulation costs associated with wind energy contracts that do not serve retail load. Accordingly, NorthWestern removed all associated wind regulation charges for the UMGF project from the 00/00 tracker period forward for the periods that NorthWestern was not purchasing the output from this facility. The removed regulation charges are not part of the Transmission Business Unit rate NorthWestern charges its retail customers, but are instead paid by NorthWestern s equity shareholders Q. How has the 1monthended June 01 electricity supply tracker period been updated from the forecasts originally filed in Docket No. D01..? KJM

38 A. The 01 electricity supply tracker filing, Docket No. D01.., was submitted under cover letter dated June, 01. The Prefiled Direct Testimony of Frank V. Bennett in the 01 filing included information for two tracker periods. Actual and estimated information was submitted for the first tracker period, July 01 through June 01. Forecast information was submitted for the second tracker period, July 01 through June 01. The July 01 through June 01 tracker period will be updated with 1 months of actual information in response to the first data requests in this docket The forecast information for the July 01 through June 01 period has been updated in this filing with actual information 1 for July 01 through March 01, and estimates for April, May, and June of 01, and is included as Exhibit (KJM1)11. The actual numbers identify the load, specific monthly resource quantities bought and sold, and related costs for each month in NorthWestern s electricity supply portfolio. The exhibit was previously updated in the December 01 monthly Electric Supply Cost Rate Adjustment to remove Lost Revenues as required by Final Order No. a, in Docket No. D01.. including a Lost Revenue trueup, and also in January 01 to reflect the property tax changes submitted in the 01 Annual Property Tax Tracker filing. 1 Actual information is provided with the exception of transmission (e.g., load following and imbalance costs) in which there is a lag of actual costs by a number of months. KJM

39 1 1 1 Pages and of Exhibit (KJM1)11 show that during the 1month tracker period ending June 01, NorthWestern expects Total Delivered Supply to be,, megawatt hours ( MWh ) of electricity. A total of,0, MWh of this electricity comes from NorthWestern s ratebased assets. The remaining,,0 MWh of electricity is projected to be purchased at a cost of 1,, to NorthWestern s electricity supply customers. The July 01 beginning Deferred Account balance was a,0, undercollection for the marketbased supply portion of this exhibit. Incorporating this undercollection with months of actual and months of estimated information, the 1monthended June 01 Deferred Account balance is forecasted to be a 1,, undercollection (refer to Exhibit (KJM1)11, page ). For further discussion of the Deferred Account, please refer to the Janhunen Direct Testimony Electricity Supply Tracker Components of the 01/01 Electricity Supply Tracker Period Q. Describe the Electricity Supply cost components of the 1monthended June 01 tracker period as shown in Exhibit (KJM1)11. A. NorthWestern s tracker exhibits in this filing reflect the expanded data analysis requested by the Commission staff and initially incorporated for the 0/01 tracker period with Frank Bennett s testimony in Docket No. D01... There are three basic cost components that make up the Electric Supply portfolio for the 1month tracker period of July 01 KJM1

40 through June 01: Electric Supply Expenses, Transmission Costs, and Administrative Expenses I. Electric Supply Expenses A. Off System Transactions These fixed and indexed price transactions have a delivery point outside of NorthWestern s service territory. These transactions are at the MidColumbia trading hub and are used for hedging purposes; they were consummated prior to the Hydros acquisition and remain only until their expiration. B. On System Transactions These fixed and indexed price transactions have a delivery point on or within NorthWestern s service territory and include the following: 1. Fixed Price Transactions a. RateBased Assets This includes any energy contributed to the Supply Portfolio by NorthWestern s owned generation assets, described below. This energy reduces market purchases that would otherwise be made to balance loads with resources. i) CU is a generation asset approved for inclusion in rates in Docket No. D00.., Order No. f at the volume of unit contingent energy associated with KJM1

41 ii) iii) iv) MW of capacity. This asset was originally included as a ratebased facility in January 00. DGGS is a generation asset approved for inclusion in rates by Order No. e in Docket No. D00... NorthWestern includes MW of baseload energy as a result of minimum turndown from generating unit operations. This asset was included as a ratebased facility starting January 1, 0. Spion is a generation asset approved for inclusion in rates by Order No. 1l in Docket No. D0..1. NorthWestern includes the variable energy volumes generated by Spion s 0 MW of capacity. This asset was included as a ratebased facility starting December 1, 01. Hydro includes generation assets approved for inclusion in rates by Order No. k in Docket No. D01.1., at the volume of unit contingent energy associated with MW of capacity. These assets were originally included as ratebased facilities on November 1, b. Base Fixed Price Purchases i.) The variable energy generated from the Judith Gap Energy, LLC ( Judith Gap ) wind turbine facility with KJM1

42 ii.) iii.) iv.) 1 MW of capacity. Judith Gap achieved commercial operation on February 1, 00. This contract expires on December 1, 0. The energy generated by two hydroelectric power purchase agreements totaling approximately 0 MW of capacity. The energy associated with approximately 0 MW of capacity from Qualifying Facility ( QF ) contracts entered into prior to 1. Under Tier II settlements, only a portion of the costs of these contracts is recovered from retail customers through the tracker. The months actual and months estimate shows that these Tier II QFs might not meet the 0, MWh target included in the Stipulation attached to Final Order Nos. w and c under combined Docket Nos. D..0 and D The volumes will be monitored through the estimated months for adjustments as required. The variable energy generated under various QF supply agreements that are segregated into two primary groups. The first group includes agreements for approximately MW of capacity that convey Renewable Energy Credits ( RECs ) to NorthWestern, KJM1

43 1 v.) which then uses them to meet its renewable energy requirements. The second group includes approximately 1 MW of generation under which the associated RECs remain with the QF (UMGF, plus other small QFs). Short and mediumterm market power purchases and sales transacted with various suppliers to balance variable customer demand with electricity supply. The energy requirements vary in part due to customer use and seasonal weather impacts that affect demand Index Price Transactions a. Base, shortterm, and mediumterm market power purchases and sales transacted with various suppliers to balance variable customer demand with electricity supply. The energy requirements vary in part due to customer use and seasonal weather impacts that affect demand. b. Imbalance charges in three categories, including current month estimates of purchases and sales, prior month trueups of the earlier estimated values, and accounting and Balancing Authority Area ( BAA ) expenses that adjust accounts not tied directly with a specific meter or customer. KJM1

44 C. Ancillary and Other The following are portfolio supplyrelated costs that are not actual energybased power purchase agreements but are required to address the needs of the retail supply portfolio: 1. Approximately 0 MW of dispatchable capacity from Basin Creek Equity Partners, LLC ( Basin Creek ). The Basin Creek plant achieved commercial operation on July 1, 00. This contract will expire on July 1, 0, unless extended for up to two fiveyear terms in accordance with the contract terms Operating Reserves which are the contingency reserves required to be in place under NERC Standard BAL00WECC and NorthWestern s Open Access Transmission Tariff. This line item includes the actual costs of operating reserves that are not supplied by the portfolio of resources Expenses related to wind other costs incurred by NorthWestern to fully incorporate wind supply contracts into NorthWestern s energy supply portfolio. These other wind costs include Judith Gap costs, wind forecasting, TIER services, Fergus Electric service at the met tower site leases, Western KJM1

45 Renewable Energy Generation Information System fees, and other direct wind costs.. DemandSide Management ( DSM ) program implementation costs directly involved with DSM programs and projects, which are included as expenses. Refer to the Prefiled Direct Testimony of Danie L. Williams ( Williams Direct Testimony ) for further explanation regarding DSM program costs II. Transmission Costs These are costs of network transmission service and those associated with moving electricity offsystem via pointtopoint transmission service for resource balancing as well as other ancillary services required for system integrity and reliability. Regulation and Frequency Response Service is an ancillary service which provides instantaneous voltage and energy regulation to balance load and resources. Because this service has been provided by DGGS since January 1, 0, these costs are included in the DGGS portion of this filing. Additionally DGGS also provides support for RBC operations as detailed in the Stimatz Direct Testimony. Costs of the transmission facilities utilized to transmit and distribute energy to electric supply customers are included in delivery rates and, KJM1

46 as such, no additional revenue is collected for these costs in this tracker filing. As explained previously, Final Order No. c reduced regulation costs associated with wind energy contracts that do not serve retail load III. Administrative Expenses Incremental administrative and general ( A&G ) costs which are in addition to those recovered in the last general rate case filing (Docket No. D00..1), total 1,0,1 or 0.% of total electric supply expenses and are also included in electricity supply costs. As explained in the Bushnell Direct Testimony, NorthWestern believes these costs should be included in the electricity cost recovery mechanism. These costs include MPSC and Montana Consumer Counsel taxes, modeling costs, trading and marketing costs, and other administrative costs including such items as scheduling, software, broker services, and other incremental expenses directly related to the electricity supply function (such as outside consultants used in conjunction with procurement activities). Q. Please summarize the results of the 1monthended June 01 tracker period. KJM1

47 A. The results of the 01/01 tracker period are summarized in the following table: Electricity Supply Cost Tracker 01/01 Beginning Deferred Account Balance () UnderCollection,0, Energy Supply/Service MWh Cost () /MWh Off System Transactions Fixed Price,,,. Index Price (,) (1,1,1) 1. On System Transactions Rate Based Assets,0, Base Fixed Price 1,01,0,,0. Index Price 0,0 1,1,. Imbalance,01 (1,,00) Ancillary and Other, 1,, Transmission Costs, Administrative Expenses 1,0,1 Carrying Cost (,1) Total Expenses: 1,, Electricity Sales MWh Revenue () Electric Cost Revenue 1,,1 Prior Deferred Expense,1,1 Total Revenue: 1,,0 Ending Deferred Account Balance () UnderCollection 1,, 01/01 Forecast Electricity Supply Tracker Period Q. How is NorthWestern treating the 01/01 forecast period? A. As explained in NorthWestern s Application in this docket, although HB 1 will become effective on July 1, 01, provisions in NorthWestern s current Electric Tariff mandate how the forecast period is to be filed. NorthWestern has filed the information and requested interim rates for the KJM0

48 01/01 forecast period in compliance with the Electric Tariff provisions. NorthWestern recognizes that the Commission may require an adjustment when it finalizes the rates for the 01/01 period. Q. What tracking periods that began prior to July 1, 01 are still open and have yet to be finalized? A. In addition to the tracking period addressed in this docket, July 1, 01 through June 0, 01, the prior tracking period, July 1, 01 through June 0, 01 (Docket No. D01..), is still open and has yet to be finalized Q. Please summarize the 1month electricity supply tracker period ending June 01 as filed in this docket. A. The June 01 Deferred Account marketbased supply undercollection ending balance of 1,, as described above is the July 01 beginning balance. July 01 through June 01 information is based on forecast numbers and includes the following sources of existing electric supply: multiple offsystem and onsystem fixed and index priced transactions that are comprised of a combination of certain ratebased assets, QFs, various base purchase contracts, as well as term and competitive solicitation contracts. Please see Exhibit (KJM)11 pages and for supply volume and cost details of the 1month forecast tracker period. KJM1

49 Basin Creek plant output in this forecast has been modeled using recent operational experience and expectations of future dispatch based on forward market prices. The actual daily operation of the plant will take into consideration market conditions and the total Electric Supply Portfolio environment. As explained previously, Final Order No. c reduced regulation costs associated with wind energy contracts that do not serve retail load. NorthWestern removed a portion of regulation costs attributable to the UMGF wind project. This adjustment is reflected in the transmission cost section on page 1 of Exhibit (KJM) Q. Explain the costs included in Exhibit (KJM)11. A. These exhibits include trackerrelated A&G costs for taxes, pricing information, broker services, and miscellaneous administrative costs. The following provides a short description of each cost category included in A&G and the basis for the costs: ) Taxes include payments of MPSC and MCC taxes; estimates are based upon currently established tax rates. 1 ) Pricing information costs, which include Intercontinental Exchange ( ICE ), Telvent DTN LLC, and TFS Energy LLC. ICE includes several combined electricity and natural gas reports, and those costs are KJM

50 allocated 0% to electric supply and 0% to natural gas supply. The electric portion of these costs are included in the trading and marketing category of the tracker model. ) Costs for broker services from Tullett Prebon Americas Corporation ( Tullett ). These costs are included in the trading and marketing category of the tracker model. ) Modeling costs have been removed from the tracker model in response to Docket No. D01.., Final Order No. 1d. ) Open Access Technology Int l, Inc. ( OATI ) software costs are estimates based upon historic invoice amounts. OATI costs are allocated between electricity supply (%), and the following shares that are not included as costs within the electric supply tracker: natural gas supply (%), Colstrip Unit No. (%), and NorthWestern s South Dakota operations (1%), consistent with the use of the software as reflected in NorthWestern s prior tracker filings. These costs are included in the general administration category of the tracker model. ) Sapere Consulting, Inc. ( Sapere ) costs are estimates based upon budgeted amounts. Sapere invoices relating to administration of Community Renewable Energy Project Requests for Proposals are included in the general administration category of the tracker model. KJM

NorthWestern BEFORE THE DEPARTMENT OF PUBLIC SERVICE REGULATION MONTANA PUBLIC SERVICE COMMISSION DOCKET NO Electricity Supply Tracker

NorthWestern BEFORE THE DEPARTMENT OF PUBLIC SERVICE REGULATION MONTANA PUBLIC SERVICE COMMISSION DOCKET NO Electricity Supply Tracker NorthWestern Energy BEFORE THE DEPARTMENT OF PUBLIC SERVICE REGULATION MONTANA PUBLIC SERVICE COMMISSION DOCKET NO. 02014.5.46 Electricity Supply Tracker Colstrip Unit 4 Generation Asset Variable Cost/Adjustment

More information

DOCKET NO. D

DOCKET NO. D BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF MONTANA DOCKET NO. D2018.2.12 Application for Authority to Increase Retail Electric Utility Service Rates and for Approval of Electric Service Schedules

More information

NORTHWESTERN REPORTS FIRST QUARTER 2016 FINANCIAL RESULTS

NORTHWESTERN REPORTS FIRST QUARTER 2016 FINANCIAL RESULTS NorthWestern Corporation d/b/a NorthWestern Energy 3010 W. 69 th Street Sioux Falls, SD 57108 www.northwesternenergy.com NYSE: NWE - FOR IMMEDIATE RELEASE NORTHWESTERN REPORTS FIRST QUARTER 2016 FINANCIAL

More information

2017 Earnings Webcast February 13, 2018

2017 Earnings Webcast February 13, 2018 2017 Earnings Webcast February 13, 2018 Presenting Today Bob Rowe, President & CEO Brian Bird, Vice President & CFO Forward Looking Statements During the course of this presentation, there will be forward-looking

More information

GILLARD, BAUER, MAZRUM, FLORIP, SMIGELSKI & GULDEN ATTORNEYS AT LAW 109 E. CHISHOLM STREET ALPENA, MICHIGAN May 12, 2015

GILLARD, BAUER, MAZRUM, FLORIP, SMIGELSKI & GULDEN ATTORNEYS AT LAW 109 E. CHISHOLM STREET ALPENA, MICHIGAN May 12, 2015 ROGER C. BAUER JAMES L. MAZRUM JAMES D. FLORIP WILLIAM S. SMIGELSKI TIMOTHY M. GULDEN JOEL E. BAUER DANIEL J. FLORIP GILLARD, BAUER, MAZRUM, FLORIP, SMIGELSKI, & GULDEN ATTORNEYS AT LAW 109 E. CHISHOLM

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * ) ) ) ) ) DIRECT TESTIMONY OF JEFFREY C.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * * ) ) ) ) ) DIRECT TESTIMONY OF JEFFREY C. Page of BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF ITS 0 0 RENEWABLE ENERGY COMPLIANCE PLAN *

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA APPLICATION OF LIBERTY UTILITIES (CALPECO ELECTRIC) LLC (U 933 E)

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA APPLICATION OF LIBERTY UTILITIES (CALPECO ELECTRIC) LLC (U 933 E) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Liberty Utilities (CalPeco Electric) LLC (U 933 E) for Authority to Update Rates Pursuant to Its Energy Cost Adjustment

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER. Direct Testimony of Michael G. Wilding

BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER. Direct Testimony of Michael G. Wilding Rocky Mountain Power Docket No. 18-035-01 Witness: Michael G. Wilding BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Direct Testimony of Michael G. Wilding March 2018 1

More information

Black Eagle Dam First Quarter Earnings Webcast April 25, 2018

Black Eagle Dam First Quarter Earnings Webcast April 25, 2018 Black Eagle Dam 2018 First Quarter Earnings Webcast April 25, 2018 Presenting Today Bob Rowe, President & CEO Brian Bird, Vice President & CFO Forward Looking Statements During the course of this presentation,

More information

BEFORE THE WYOMING PUBLIC SERVICE COMMISSION ROCKY MOUNTAIN POWER. Direct Testimony of Cindy A. Crane

BEFORE THE WYOMING PUBLIC SERVICE COMMISSION ROCKY MOUNTAIN POWER. Direct Testimony of Cindy A. Crane Docket No. 0000- -ER- Witness: Cindy A. Crane BEFORE THE WYOMING PUBLIC SERVICE COMMISSION ROCKY MOUNTAIN POWER Direct Testimony of Cindy A. Crane March 0 0 0 Introduction Q. Please state your name, business

More information

atlantic cit11 elect, c

atlantic cit11 elect, c Philip J. Passanante Assistant General Counsel 92DC42 PO Box 6066 Newark, DE 19714-6066 302.429.3105 - Telephone 302.429.3801 - Facsimile philip.passanante@pepcoholdings.com atlantic cit11 elect, c An

More information

Alberta Electric System Operator 2017 ISO Tariff Update

Alberta Electric System Operator 2017 ISO Tariff Update Alberta Electric System Operator 2017 ISO Tariff Update Date: October 20, 2016 Prepared by: Alberta Electric System Operator Prepared for: Alberta Utilities Commission Classification: Public Table of Contents

More information

NorthWestern Reports Third Quarter 2018 Financial Results

NorthWestern Reports Third Quarter 2018 Financial Results NorthWestern Corporation d/b/a NorthWestern Energy 3010 W. 69 th Street Sioux Falls, SD 57108 www.northwesternenergy.com FOR IMMEDIATE RELEASE NorthWestern Reports Third Quarter 2018 Financial Results

More information

GILLARD, BAUER, MAZRUM, FLORIP, SMIGELSKI & GULDEN ATTORNEYS AT LAW 109 E. CHISHOLM STREET ALPENA, MICHIGAN March 29, 2018

GILLARD, BAUER, MAZRUM, FLORIP, SMIGELSKI & GULDEN ATTORNEYS AT LAW 109 E. CHISHOLM STREET ALPENA, MICHIGAN March 29, 2018 ROGER C. BAUER JAMES L. MAZRUM JAMES D. FLORIP WILLIAM S. SMIGELSKI TIMOTHY M. GULDEN JOEL E. BAUER DANIEL J. FLORIP GILLARD, BAUER, MAZRUM, FLORIP, SMIGELSKI, & GULDEN ATTORNEYS AT LAW 109 E. CHISHOLM

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S INTERIM REPORT ON ITS PARTICIPATION IN THE SOUTHWEST POWER POOL REGIONAL TRANSMISSION ORGANIZATION,

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION REQUESTING: (1) ACKNOWLEDGEMENT OF ITS FILING OF THE 2016 ANNUAL RENEWABLE ENERGY PORTFOLIO

More information

OF JOE SCHWARTZENBERGER

OF JOE SCHWARTZENBERGER 6 8 9 Department of Public Service Regulation Montana Public Service Commission Docket No. D0.9.9 Natural Gas General Filing NorthWestern Energy PREFILED DIRECT TESTIMONY OF JOE SCHWARTZENBERGER 0 ON BEHALF

More information

Rocky Mountain Power Exhibit RMP (GND-5) Docket No ER-15 Witness: Gregory N. Duvall BEFORE THE WYOMING PUBLIC SERVICE COMMISSION

Rocky Mountain Power Exhibit RMP (GND-5) Docket No ER-15 Witness: Gregory N. Duvall BEFORE THE WYOMING PUBLIC SERVICE COMMISSION Exhibit RMP (GND-5) BEFORE THE WYOMING PUBLIC SERVICE COMMISSION ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Gregory N. Duvall Proposed - March 2015 Exhibit RMP (GND-5) Page 1 of 10 Available

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH

BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH C. Scott Brown (4802) Colleen Larkin Bell (5253) Questar Gas Company 180 East First South P.O. Box 45360 Salt Lake City, Utah 84145 (801) 324-5172 (801) 324-5935 (fax) scott.brown@questar.com colleen.bell@questar.com

More information

DEPARTMENT OF PUBLIC SERVICE REGULATION BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF MONTANA

DEPARTMENT OF PUBLIC SERVICE REGULATION BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF MONTANA DEPARTMENT OF PUBLIC SERVICE REGULATION BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF MONTANA IN THE MATTER OF NorthWestern Energy s Application for Interim and Final Approval of Revised Tariff

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH

BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH R. Jeff Richards (7294) Yvonne R. Hogle (7550) 1407 West North Temple, Suite 320 Salt Lake City, Utah 84116 Telephone: (801) 220-4050 Facsimile: (801) 220-3299 Email: robert.richards@pacificorp.com yvonne.hogle@pacificorp.com

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION FOR APPROVAL OF ITS 2009 ENERGY EFFICIENCY AND LOAD MANAGEMENT PLAN AND ASSOCIATED

More information

RR9 - Page 356 of 510

RR9 - Page 356 of 510 DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of JEFFREY C. KLEIN on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION REQUESTING: (1) ACKNOWLEDGEMENT OF ITS FILING OF THE 2017 ANNUAL RENEWABLE ENERGY PORTFOLIO

More information

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517)

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517) Founded in 1852 by Sidney Davy Miller SHERRI A. WELLMAN TEL (517) 483-4954 FAX (517) 374-6304 E-MAIL wellmans@millercanfield.com Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900

More information

2017 First Quarter Earnings Webcast April 27, 2017

2017 First Quarter Earnings Webcast April 27, 2017 Beethoven Wind Farm near Tripp, South Dakota 2017 First Quarter Earnings Webcast April 27, 2017 Presenting Today Bob Rowe, President & CEO Brian Bird, Vice President & CFO 2 Forward Looking Statements

More information

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance February 16, 2018 Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance Full-year 2017 financial results on target excluding the effects of the Tax Cuts and Jobs

More information

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS Electric Utility Revenues, Revenue Requirements, Cost of Service, And Rates Draft Final Report (As Updated) February 2010 February 1, 2010 Kansas City Board

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION REQUESTING: ( ACKNOWLEDGEMENT OF ITS FILING OF THE 0 ANNUAL RENEWABLE ENERGY PORTFOLIO

More information

RR16 - Page 1 of

RR16 - Page 1 of DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of ARTHUR P. FREITAS on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

DOCKET NO. 13A-0773EG DIRECT TESTIMONY AND EXHIBITS OF LEE E. GABLER

DOCKET NO. 13A-0773EG DIRECT TESTIMONY AND EXHIBITS OF LEE E. GABLER IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF ITS ELECTRIC AND NATURAL GAS DEMAND-SIDE MANAGEMENT (DSM PLAN FOR THE CALENDAR YEAR 0 AND TO CHANGE ITS ELECTRIC AND

More information

NorthWestern Reports 2017 Financial Results

NorthWestern Reports 2017 Financial Results NorthWestern Corporation d/b/a NorthWestern Energy 3010 W. 69 th Street Sioux Falls, SD 57108 www.northwesternenergy.com FOR IMMEDIATE RELEASE NorthWestern Reports 2017 Financial Results Company reports

More information

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517)

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517) Founded in 1852 by Sidney Davy Miller SHERRI A. WELLMAN TEL (517) 483-4954 FAX (517) 374-6304 E-MAIL wellmans@millercanfield.com Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900

More information

PUC DOCKET NO. I. Business Address and Authorized Representatives The business address of the Company is:

PUC DOCKET NO. I. Business Address and Authorized Representatives The business address of the Company is: PUC DOCKET NO. NON-STANDARD TRUE-UP FILING OF ENTERGY TEXAS, INC. PURSUANT TO THE FINANCING ORDER IN DOCKET NO. 37247 CONCERNING SCHEDULE SRC PUBLIC UTILITY COMMISSION OF TEXAS PETITION Entergy Texas,

More information

OREGON STANDARD AVOIDED COST RATES AVOIDED COST PURCHASES FROM ELIGIBLE QUALIFYING FACILITIES Page 1

OREGON STANDARD AVOIDED COST RATES AVOIDED COST PURCHASES FROM ELIGIBLE QUALIFYING FACILITIES Page 1 S ELIGIBLE QUALIFYING FACILITIES Page 1 Available To owners of Qualifying Facilities making sales of electricity to the Company in the State of Oregon. Applicable For power purchased from Base Load and

More information

2017 Renewable Energy Plan Public Service Company of Colorado February Volume 1. Hearing Exhibit 101 Attachment RLK-1 Page 1 of 81

2017 Renewable Energy Plan Public Service Company of Colorado February Volume 1. Hearing Exhibit 101 Attachment RLK-1 Page 1 of 81 Hearing Exhibit 101 Page 1 of 81 2017 Renewable Energy Plan Public Service Company of Colorado February 2016 Volume 1 xcelenergy.com 2016 Xcel Energy Inc. Xcel Energy is a registered trademark of Xcel

More information

Alberta Electric System Operator Amended 2018 ISO Tariff Application

Alberta Electric System Operator Amended 2018 ISO Tariff Application Alberta Electric System Operator Amended 2018 ISO Tariff Application Date: August 17, 2018 Table of Contents 1 Application... 6 1.1 Background... 6 1.2 Organization of application... 7 1.3 Relief requested...

More information

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517)

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517) Founded in 185 by Sidney Davy Miller SHERRI A. WELLMAN TEL (517) 8-95 FAX (517) 7-60 E-MAIL wellmans@millercanfield.com Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing,

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO Proceeding No. A- E IN THE MATTER OF THE APPLICATION OF BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, LP FOR APPROVAL OF ITS ELECTRIC DEMAND

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION PECO ENERGY COMPANY STATEMENT NO. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION DOCKET NO. R-01-0001 DIRECT TESTIMONY

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION PECO ENERGY COMPANY STATEMENT NO. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION DOCKET NO. R-01-1 DIRECT TESTIMONY WITNESS:

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S ENERGY EFFICIENCY COMPLIANCE APPLICATION THAT REQUESTS AUTHORIZATION TO: () PER APPROVED VARIANCE,

More information

2 BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION. 8 Proceedings held in the above-entitled. 9 matter before Suzanne D. Sonneborn, Administrative

2 BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION. 8 Proceedings held in the above-entitled. 9 matter before Suzanne D. Sonneborn, Administrative STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION In the matter, on the Commission's Own Motion, establishing the method and Case No. U- avoided cost calculation for Upper Peninsula Power

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1953 I. INTRODUCTION

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1953 I. INTRODUCTION BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1953 In the Matter of PORTLAND GENERAL ELECTRIC COMPANY, STAFF'S OPENING BRIEF Investigation into Proposed Green Tariff. I. INTRODUCTION Pursuant to Administrative

More information

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. EnergyNorth Natural Gas, Inc. d/b/a National Grid NH. Summer 2009 Cost of Gas DG 09-

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. EnergyNorth Natural Gas, Inc. d/b/a National Grid NH. Summer 2009 Cost of Gas DG 09- STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION EnergyNorth Natural Gas, Inc. d/b/a National Grid NH Summer 2009 Cost of Gas DG 09- Prefiled Testimony of Ann E. Leary March 16, 2009 TABLE

More information

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION In the matter on the Commission s own ) motion, to consider changes in the rates ) of all the Michigan rate-regulated ) electric, steam,

More information

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501 Original Sheet No. 70 Page 1 of 7 1. Applicability: This rate schedule constitutes a Purchased Gas Cost Adjustment (PGA) provision and specifies the procedure to be utilized to adjust the rates for gas

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY COMPANY

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY COMPANY BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF PECO ENERGY : COMPANY FOR APPROVAL OF ITS : DEFAULT SERVICE PROGRAM FOR : DOCKET NO. P-2016- THE PERIOD FROM JUNE 1, 2017 : THROUGH MAY 31,

More information

Available In all territory served by the Company in the State of Wyoming.

Available In all territory served by the Company in the State of Wyoming. Available In all territory served by the Company in the State of Wyoming. First Revision of Sheet No. 95-1 Canceling Original Sheet No. 95-1 Applicable This Schedule shall be applicable to all retail tariff

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E*

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E* Southern California Edison Revised Cal. PUC Sheet No. 28371-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 26736-E* Schedule PE Sheet 1 APPLICABILITY Applicable to all SCE Bundled Service

More information

DRAFT REQUEST FOR PROPOSALS BY THE ARIZONA POWER AUTHORITY FOR SCHEDULING SERVICES AND/OR USE OF HOOVER DAM DYNAMIC SIGNAL.

DRAFT REQUEST FOR PROPOSALS BY THE ARIZONA POWER AUTHORITY FOR SCHEDULING SERVICES AND/OR USE OF HOOVER DAM DYNAMIC SIGNAL. DRAFT REQUEST FOR PROPOSALS BY THE ARIZONA POWER AUTHORITY FOR SCHEDULING SERVICES AND/OR USE OF HOOVER DAM DYNAMIC SIGNAL March 31, 2017 Summary The Arizona Power Authority ( Authority ) recently signed

More information

Supplement No. 611 to P.S.C. Md. E-6: Rider 2 Electric Efficiency Charge, Rider 15 Demand Response Service Charge and Rider 26 Peak Time Rebate Charge

Supplement No. 611 to P.S.C. Md. E-6: Rider 2 Electric Efficiency Charge, Rider 15 Demand Response Service Charge and Rider 26 Peak Time Rebate Charge John C. Frain Director Regulatory Strategy & Revenue Policy P.O. Box 1475 Baltimore, Maryland 21203-1475 Telephone 410.470.1169 Fax 410.470.8022 www.bge.com john.frain@bge.com November 20, 2017 David J.

More information

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2016

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2016 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PROVISION OF BASIC GENERATION SERVICE FOR THE PERIOD BEGINNING JUNE 1, 2016 Docket No. ER15040482 ROCKLAND ELECTRIC COMPANY PROPOSAL FOR

More information

IDT ENERGY, INC. 520 Broad Street, Newark, NJ

IDT ENERGY, INC. 520 Broad Street, Newark, NJ IDT ENERGY, INC. 520 Broad Street, Newark, NJ 07102 1-877-887-6866 MARYLAND FIXED RATE NATURAL GAS CONTRACT SUMMARY Natural Gas Supplier Information Price Structure Supply Price Statement Regarding Savings

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION PECO ENERGY COMPANY STATEMENT NO. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION DOCKET NO. R-0-000 DIRECT TESTIMONY WITNESS:

More information

Amended Solicitation Plan for the Purchase and Sale of Connecticut. Class I Renewable Energy Credits. from Low and Zero Emission Projects

Amended Solicitation Plan for the Purchase and Sale of Connecticut. Class I Renewable Energy Credits. from Low and Zero Emission Projects Amended Solicitation Plan for the Purchase and Sale of Connecticut Class I Renewable Energy Credits from Low and Zero Emission Projects submitted by THE CONNECTICUT LIGHT AND POWER COMPANY DBA EVERSOURCE

More information

Alberta Electric System Operator 2018 ISO Tariff Application

Alberta Electric System Operator 2018 ISO Tariff Application Alberta Electric System Operator 2018 ISO Tariff Application Date: September 14, 2017 Table of Contents 1 Application... 6 1.1 Background... 6 1.2 Organization of application... 6 1.3 Relief requested...

More information

Model FSA Appendix 11 FULL REQUIREMENTS SERVICE AGREEMENT BETWEEN [BUYER NAME] AND [SELLER NAME] DATED [DATE]

Model FSA Appendix 11 FULL REQUIREMENTS SERVICE AGREEMENT BETWEEN [BUYER NAME] AND [SELLER NAME] DATED [DATE] Appendix 11 20172018 FULL REQUIREMENTS SERVICE AGREEMENT BETWEEN [BUYER NAME] AND [SELLER NAME] DATED [DATE] i FULL REQUIREMENTS SERVICE AGREEMENT Articles and Provisions Table of Contents ARTICLE 1 DEFINITIONS...1

More information

2003 Management s Discussion and Analysis

2003 Management s Discussion and Analysis OGE Energy Corp. 2003 Management s Discussion and Analysis Appendix A to the Proxy statement Management s Discussion and Analysis of Financial Condition and Results of Operations. Introduction OGE Energy

More information

Twelfth Revised Sheet No FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No INDEX OF CONTRACTS AND AGREEMENTS

Twelfth Revised Sheet No FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No INDEX OF CONTRACTS AND AGREEMENTS Twelfth Revised Sheet No. 10.001 FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No. 10.001 INDEX OF CONTRACTS AND AGREEMENTS Sheet No. Contract Provisions - Various 10.010 Distribution Substation

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2016/17 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

December 23, By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

December 23, By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 December 23, 2014 By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Nevada Power Company and Sierra Pacific Power Company,

More information

2 BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

2 BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION In the matter, on the Commission's Own Motion to consider changes in the rates of all of the Michigan rate-regulated Case U- electric, steam,

More information

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2018

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2018 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PROVISION OF BASIC GENERATION SERVICE FOR THE PERIOD BEGINNING JUNE 1, 2018 Docket No. ER17040335 ROCKLAND ELECTRIC COMPANY PROPOSAL FOR

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY DOCKET NO.

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION. PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY DOCKET NO. PECO ENERGY COMPANY STATEMENT NO. -R BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY DOCKET NO. R-01-0001 REBUTTAL TESTIMONY WITNESS: ALAN

More information

S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * *

S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * In the matter of the application of ) CONSUMERS ENERGY COMPANY ) for authority to increase its rates for the ) Case No.

More information

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517)

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517) Founded in 1852 by Sidney Davy Miller SHERRI A. WELLMAN TEL (517) 48-4954 FAX (517) 74-04 E-MAIL wellmans@millercanfield.com Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing,

More information

BEFORE THE WASHINGTON UTILITIES AND TRANSPORTATION COMMISSION I. INTRODUCTION

BEFORE THE WASHINGTON UTILITIES AND TRANSPORTATION COMMISSION I. INTRODUCTION BEFORE THE WASHINGTON UTILITIES AND TRANSPORTATION COMMISSION WASHINGTON UTILITIES AND TRANSPORTATION COMMISSION, Complainant, v. PUGET SOUND ENERGY, DOCKETS UE-170033 & UG-170034 MULTIPARTY SETTLEMENT

More information

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DE DIRECT TESTIMONY

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DE DIRECT TESTIMONY EXHIBIT Liberty Utilities STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities Distribution Service Rate Case DIRECT TESTIMONY

More information

Unaudited Condensed Interim Financial Statements For the three and nine months ended September 30, 2018

Unaudited Condensed Interim Financial Statements For the three and nine months ended September 30, 2018 FORTISALBERTA INC. Unaudited Condensed Interim Financial Statements For the three and nine months ended 2018 FORTISALBERTA INC. CONDENSED INTERIM BALANCE SHEETS (UNAUDITED) As at (all amounts in thousands

More information

PUC DOCKET NO. BEFORE THE PUBLIC UTILITY COMMISSION OF TEXAS APPLICATION OF TEXAS-NEW MEXICO POWER COMPANY FOR AUTHORITY TO CHANGE RATES

PUC DOCKET NO. BEFORE THE PUBLIC UTILITY COMMISSION OF TEXAS APPLICATION OF TEXAS-NEW MEXICO POWER COMPANY FOR AUTHORITY TO CHANGE RATES PUC DOCKET NO. BEFORE THE PUBLIC UTILITY COMMISSION OF TEXAS APPLICATION OF TEXAS-NEW MEXICO POWER COMPANY FOR AUTHORITY TO CHANGE RATES PREPARED DIRECT TESTIMONY AND EXHIBITS OF EMMANUEL J. LOPEZ ON BEHALF

More information

Prototype Wind PPA Term Sheet

Prototype Wind PPA Term Sheet Prototype Wind PPA Term Sheet Background: This Prototype Wind PPA Term Sheet ( Term Sheet ) sets forth the current requirements that PSE wants the Respondent to address or incorporate into any proposal

More information

Carbon Offset Natural Gas and/or Electricity and RECs Terms and Conditions

Carbon Offset Natural Gas and/or Electricity and RECs Terms and Conditions Maryland Spring Power & Gas Variable Terms and Conditions Spring Energy RRH, LLC d/b/a Spring Power & Gas, 111 East 14 th Street #105, New York, NY 10003 Tel No. 1.888.710.4782 springpowerandgas.us MD

More information

Assembly Bill No. 428 Committee on Commerce and Labor

Assembly Bill No. 428 Committee on Commerce and Labor Assembly Bill No. 428 Committee on Commerce and Labor CHAPTER... AN ACT relating to energy; revising provisions relating to the Solar Energy Systems Incentive Program, the Wind Energy Systems Demonstration

More information

No. 47. An act relating to the Vermont Energy Act of (H.56) It is hereby enacted by the General Assembly of the State of Vermont:

No. 47. An act relating to the Vermont Energy Act of (H.56) It is hereby enacted by the General Assembly of the State of Vermont: No. 47. An act relating to the Vermont Energy Act of 2011. (H.56) It is hereby enacted by the General Assembly of the State of Vermont: * * * Net Metering * * * Sec. 1. 30 V.S.A. 219a is amended to read:

More information

Appendix H: Green-e Logo Use Guidelines (available at

Appendix H: Green-e Logo Use Guidelines (available at Federal Option for Green-e Energy Certification and Logo Use Agreement This Federal Option for Green-e Energy Certification and Logo Use Agreement ( Agreement ) is made and entered into by and between

More information

OPG REPORTS 2017 THIRD QUARTER FINANCIAL RESULTS. Darlington Refurbishment Project Remains on Time and on Budget at One-Year Mark

OPG REPORTS 2017 THIRD QUARTER FINANCIAL RESULTS. Darlington Refurbishment Project Remains on Time and on Budget at One-Year Mark OPG REPORTS 2017 THIRD QUARTER FINANCIAL RESULTS Nov. 9, 2017 Darlington Refurbishment Project Remains on Time and on Budget at One-Year Mark Toronto: Ontario Power Generation Inc. (OPG or Company) today

More information

Docket No. ER April 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity

Docket No. ER April 2018 Informational Report Energy Imbalance Market Transition Period Report Powerex Canadian EIM Entity California Independent System Operator Corporation June 13, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent

More information

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517)

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517) Founded in 1852 by Sidney Davy Miller SHERRI A. WELLMAN TEL (517 483-4954 FAX (517 374-6304 E-MAIL wellmans@millercanfield.com Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900

More information

JOSEPH A. HOLTMAN - ELECTRIC. 1 Q. Please state your name, title, employer and business. 4 Electricity Supply for Consolidated Edison Company of

JOSEPH A. HOLTMAN - ELECTRIC. 1 Q. Please state your name, title, employer and business. 4 Electricity Supply for Consolidated Edison Company of 1 Q. Please state your name, title, employer and business 2 address. 3 A. My name is Joseph A. Holtman. I am Director - 4 Electricity Supply for Consolidated Edison Company of 5 New York, Inc. ("Con Edison"

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) NOTICE TO SPS CUSTOMERS

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) NOTICE TO SPS CUSTOMERS BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S ENERGY EFFICIENCY COMPLIANCE APPLICATION THAT REQUESTS AUTHORIZATION TO: (1 PER APPROVED VARIANCE,

More information

Colorado PUC E-Filings System

Colorado PUC E-Filings System BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO PROCEEDING No. 16 - E IN THE MATTER OF THE APPLICATION OF BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, LP FOR (1) APPROVAL OF ITS 2016

More information

BIENNIAL REPORT OF THE NORTH CAROLINA UTILITIES COMMISSION

BIENNIAL REPORT OF THE NORTH CAROLINA UTILITIES COMMISSION BIENNIAL REPORT OF THE NORTH CAROLINA UTILITIES COMMISSION TO THE GOVERNOR OF NORTH CAROLINA, THE ENVIRONMENTAL REVIEW COMMISSION, AND THE JOINT LEGISLATIVE COMMISSION ON GOVERNMENTAL OPERATIONS REGARDING

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF DELAWARE

BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF DELAWARE BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF DELAWARE IN THE MATTER OF THE APPLICATION OF ) DELMARVA POWER & LIGHT COMPANY FOR ) PSC DOCKET NO. 06-284 A CHANGE IN NATURAL GAS BASE RATES ) (FILED

More information

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001 Pacific Gas and Electric Company Statement of Estimated Cash Flows April 20, 2001 This document provides the latest forecast of cash flows for Pacific Gas and Electric Company (the Company ). The purpose

More information

Long Island Power Authority Fifth Revised Leaf No. 280 PSEG LONG ISLAND LONG ISLAND CHOICE PROGRAM TARIFF LEAVES

Long Island Power Authority Fifth Revised Leaf No. 280 PSEG LONG ISLAND LONG ISLAND CHOICE PROGRAM TARIFF LEAVES Long Island Power Authority Fifth Revised Leaf No. 280 PSEG LONG ISLAND LONG ISLAND CHOICE PROGRAM TARIFF LEAVES Long Island Power Authority Fifth Revised Leaf No. 280 IX. LONG ISLAND CHOICE PROGRAM TABLE

More information

Attachment G. Glossary for Duke Energy Ohio, Inc. s Competitive Bidding Process Auctions

Attachment G. Glossary for Duke Energy Ohio, Inc. s Competitive Bidding Process Auctions Attachment G Glossary for Duke Energy Ohio, Inc. s Competitive Bidding Process Auctions GLOSSARY In the event of a conflict between this Glossary and the Master SSO Supply Agreement with respect to the

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF UGI UTILITIES, INC. ELECTRIC DIVISION FOR APPROVAL OF ITS ENERGY EFFICIENCY AND CONSERVATION PLAN DOCKET NO. M-0- TESTIMONY OF BRIAN J. FITZPATRICK

More information

June 8, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Restatement of the Transition Cost Balancing Account

June 8, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Restatement of the Transition Cost Balancing Account Akbar Jazayeri Director of Revenue and Tariffs June 8, 2001 ADVICE 1535-E-A (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Restatement of the Transition Cost

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON DR filed by PacifiCorp d/b/a Pacific Power (PacifiCorp) and by Noble Americas Energy Solutions

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON DR filed by PacifiCorp d/b/a Pacific Power (PacifiCorp) and by Noble Americas Energy Solutions 1 2 3 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON DR 49 4 In the Matter of 5 GEORGIA-PACIFIC CONSUMER PRODUCTS (CAMAS) LLC and 6 CLATSKANIE PEOPLE'S UTILITY DISTRICT, 7 Petition for Declaratory Ruling.

More information

Parties to Case No. U per Attachment 1 to Proof of Service

Parties to Case No. U per Attachment 1 to Proof of Service A CMS Energy Company August 10, 2018 Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Post Office Box 30221 Lansing, MI 48909 General Offices: LEGAL DEPARTMENT

More information

STATE OF INDIANA INDIANA UTILITY REGULATORY COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) VERIFIED PETITION AND REQUEST FOR ADMINISTRATIVE NOTICE

STATE OF INDIANA INDIANA UTILITY REGULATORY COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) VERIFIED PETITION AND REQUEST FOR ADMINISTRATIVE NOTICE STATE OF INDIANA INDIANA UTILITY REGULATORY COMMISSION IN THE MATTER OF THE VERIFIED PETITION OF INDIANAPOLIS POWER & LIGHT FOR APPROVAL OF DEMAND SIDE MANAGEMENT (DSM PLAN, INCLUDING ENERGY EFFICIENCY

More information

I. INTRODUCTION. A. My name is Barry F. Blackwell and my business address is 1000 East Main Street, Q. BY WHOM ARE YOU EMPLOYED AND IN WHAT CAPACITY?

I. INTRODUCTION. A. My name is Barry F. Blackwell and my business address is 1000 East Main Street, Q. BY WHOM ARE YOU EMPLOYED AND IN WHAT CAPACITY? PETITIONER S EXHIBIT D PREFILED TESTIMONY OF, DIRECTOR OF RATES DUKE ENERGY BUSINESS SERVICES, LLC ON BEHALF OF DUKE ENERGY INDIANA, INC. CAUSE NO. 01 BEFORE THE INDIANA UTILITY REGULATORY COMMISSION I.

More information

Exelon Reports Second Quarter 2018 Results

Exelon Reports Second Quarter 2018 Results Investors Newsroom Suppliers Contact Us COMPANY THE CAREERS LOCATIONS SUSTAINABILITY COMMUNITY GRID NEWSROOM Exelon Reports Second Quarter 2018 Results AUGUST 2, 2018 Earnings Release Highlights GAAP Net

More information

Public Service Commission. November 2,2015. Re: CASE NO E-P MONONGAHELA POWER COMPANY and THE POTOMAC EDISON COMPANY

Public Service Commission. November 2,2015. Re: CASE NO E-P MONONGAHELA POWER COMPANY and THE POTOMAC EDISON COMPANY 01 Brooks Street, P.0 Box 1 Charleston, West Virginla 33 Public Service Commission of West Virginia Phone (30) 300300 Fax (30) 3003 November,01 Ingrid Ferrell, Executive Secretary Public Service Commission

More information

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517)

Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing, Michigan TEL (517) FAX (517) Founded in 1852 by Sidney Davy Miller SHERRI A. WELLMAN TEL (517) 83-95 FAX (517) 37-30 E-MAIL wellmans@millercanfield.com Miller, Canfield, Paddock and Stone, P.L.C. One Michigan Avenue, Suite 900 Lansing,

More information

RENEWABLE MARKET ADJUSTING TARIFF POWER PURCHASE AGREEMENT

RENEWABLE MARKET ADJUSTING TARIFF POWER PURCHASE AGREEMENT [This contract has been approved by the California Public Utilities Commission in Decision 13-05-034. Modification of the terms and conditions of this contract will result in the need to obtain additional

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION PECO ENERGY COMPANY ELECTRIC DIVISION

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION PECO ENERGY COMPANY ELECTRIC DIVISION PECO ENERGY COMPANY STATEMENT NO. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PENNSYLVANIA PUBLIC UTILITY COMMISSION v. PECO ENERGY COMPANY ELECTRIC DIVISION DOCKET NO. R-01-0001 DIRECT TESTIMONY

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND. * COMAR * Administrative Docket RM17 Competitive Electric Supply * * * * * * * * *

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND. * COMAR * Administrative Docket RM17 Competitive Electric Supply * * * * * * * * * BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND * COMAR 20.53 * Administrative Docket RM17 Competitive Electric Supply * * * * * * * * * Comments of the Office of People s Counsel Regarding Proposed Regulations,

More information

Stochastic Loss of Load Study for the 2011 Integrated Resource Plan

Stochastic Loss of Load Study for the 2011 Integrated Resource Plan November 18, 2010 Stochastic Loss of Load Study for the 2011 Integrated Resource Plan INTRODUCTION PacifiCorp evaluates the desired level of capacity planning reserves for each integrated resource plan.