1 Earnings Release August 9, El Muña overpass, Bogotá Girardot

2 2018 2Q Investments Relevant Corporate Events: Minute on the initiation of construction of vía 40 express On June 20, 2018, VÍA 40 EXPRESS initiated works between the El Muña Viaduct in Sibaté and the La Despensa Bridge in Soacha. The works in this tranche include a two-level intersection at the intersection to Sibaté, approximately 1km of the third lane of the road in both directions, a pedestrian path; a bike path, pedestrian bridges, sidewalks, and the rehabilitation of the existing road in this Functional Unit (FU). El Muña overpass, Bogotá Girardot Tolemaida Bridge will be replaced by one with better specifications. The construction phase of this project will last approximately five (5) years, starting with FU 8 and will be developed through nine (9) FUs: Functional Units 2 to 7: These will incorporate the construction of third lanes; short tunnels: rehabilitation, operation and maintenance of the current Sumapaz Tunnel; nine (9) bridges and intersections throughout the road. Functional Unit 0: Operation and maintenance works of the existing corridor. Functional Unit 1: This includes rehabilitation, operation and maintenance works between the tranches from San Rafael to El Paso and from Giradot to the Sumapaz Tunnel, including the current Melgar alternate road. In this tranche, a single-level intersection will be built at Los Manuales, nearly four (4) kilometers of bike paths and three (3) vehicular bridges will be built, and the Functional Unit 8: This will include the construction of a vehicular bridge and the operation and maintenance of the road of the tranche between El Muña and Soacha, ending with the La Despensa pedestrian bridge in Soacha. Bogotá D.C Soacha FUNCTIONAL UNIT 8 Soacha El Muña overpass Sibaté El Muña - Soacha 9,86 Bogotá D.C Pedestrian bridge La Despensa (Soacha) km Silvania Extension to third lane Girardot Alto de Canecas Suárez 1 start Concession Nilo Ricaurte Variant Melgar Weighing machine El Salero Piscilago Melgar 2 Military Club Icononzo 8 end Concession Granada 6 Toll Chusacá Sibaté 5 Weighing machine Fusagasugá Variant Fusagasugá Fusagasugá 4 3 Toll Chinauta Our experience in construction of: ROADS AND BRIDGES 755 km Tunnel de Sumapaz Air Force Base Viaduct del Muña 7 Pandi TUNNELS: 162,13 km

3 Infrastructure Relevant Corporate Events: National Engineering Award, Agua dulce Boscoal Port National Engineering Award Winner 2018 Boscoal, Grains and Carbon Terminal Phase I. Buenaventura, Valle del Cauca. Description of the Project: We are proud to share the recognition made by the Board of Directors of the Colombian Society of Engineers, giving the Aguadulce consortium the National Award of Engineering 2018 for the Project "Boscoal Dry Bulk Terminal in the Aguadulce port in which Conconcreto has a participation of 35% and was finished in Design and construction of a 250 m long pier made up of two sections, the first one of 210 m x 32 m and the second one of 40 m x 40 m, for a total area of 8,320 m 2 with an access walkway of 178 m. The works included the construction of 6 hectares of patios for the bulk and coal terminal, earthworks and containment works, shallow foundations for 2 silos, road pavements and soil improvement.

4 Innovation Relevant Corporate Events: Productivity Measurement System We introduce a system that allows detecting the presence of workers in the different productive areas of construction projects. All of this through instrumentation technology and collection of information with imbedded systems (IoT) for productivity analysis in s. How does it work? Equipment Workers Receiver PC Network IoT Hub Database The system delivers information organized by: Name Labor Programmed work zone Real zone of permanence Hours of stay in work area Productivity Measurement System We have made measurements with managers, workers, Laborers. Number of visits on average per day (visits/day) Experience in Innovation: Innovations implemented at Patents 47 the service of the company 2 4 Granted Patents in process

5 Concessions Relevant Events: Concessions under construction and structuring: Road Vía 40 Express (Bogotá Girardot): Start of operations on December 1st, The construction of the project began in June 20, the works started by the first functional unit (UF8) Soacha-El Muña. The estimated time to complete the construction is 60 months. The financial closure and disbursement is in negotiation with potential lenders. Vía Pacífico (Buga - Buenaventura): start of operations on August 17, Under study the possibility of an early termination of the contract between the ANI and the Concessionaire under mutual agreement. Doble Calzada de Oriente (Palmas - Tablazo): Private initiative presented to the Antioquia Governor s Office. In June, the Antioquia Governor s office filed upon the Finance Ministry the project for its approval. Once the corresponding approvals are provided, the Government will initiate the bidding process. Energy Generation: PCH Patico: Currently in process of revision and signing of the contracts that are part of the Credit operation obtained. Port: Advances in complying with the precedent conditions of the Credit for the first disbursement. Darien International Port: Progress continues with conceptual engineering. With the results of the conceptual engineering, visits will be made to potential clients of the port. Concessions in Operation: Road Toll Cocorná Puerto Triunfo Guarne Palmas DEVIMED: Average Daily Traffic Total Operational Income EBITDA* Medellín Caño Alegre y malla vial de Oriente Starting date: June, CCFC: 1Q Accumulated Financial Results (COP millions) *Figures under IFRS *Figures under IFRS Finishing date: December, Average Daily Traffic 1Q Toll T2018 Corzo Río Bogotá Total Accumulated Financial Results (COP millions) Operational Income EBITDA* Starting Date: Bogotá Faca Los Alpes Finishing date: % Conconcreto Participation: 25% 1T2018 2Q Q % Conconcreto Participation: June, 1995 Marzo, % 2T T

6 Real-Estate Portfolio Relevant Events: Relevant events Industry 26% 1. It was performed an Equity contribution from Protección for COP MM in April. 2. A restitution of contributions was performed in June for COP MM. Said restitution didn t changed the investors participation in the Private Equity Fund. NOI 2Q2018 Offices 17% Hotels 5% Self-Storage 4% Internationals 2% 3. Grupo Argos contributed the Fund with COP MM in June, corresponding to the improvements of the Santillana Lot. Therefore, the participations at the closing of the quarter are: Conconcreto: 42,14% Grupo Argos: 33,48% Protección: 24,38% 4. A Lot was acquired for the development of the Multifamily Project in Coral Gables, Miami, Florida. Industry 47% GLA 2Q2018 Offices 16% Hotels 2% Self-Storage 3% $ mill Commerce 46% m 2 in operation Commerce 32% Participation in the Pactia PEF* (%) 24% 18% 34% 36% 42% 46% *Private Equity Fund jun-18 dic-17 Conconcreto Grupo Argos Protección

7 Real-Estate Portfolio: Relevant Events: Pactia PEF Capital Structure Equity Adjusted to Participation 2Q Var.% Assets % Liabilities % Equity % jun-18 Dec 2017 *Date of initiation of the fund Junuary20/2017* Pactia PEF Financial Results PA PACTIA 2Q2018 2Q2017 Var. % Gross Income % Operating Expenses (Opex) % Net Operating Income % Consolidated EBITDA % Occupation as of Jun-18 88% 93% 82% 64% 67% 89% Net Profit % Commerce Industry Offices Hotels Self- TOTAL* Storage * The total occupation weighted average does not include the hotels segment

8 Relevant Corporate Events: Backlog June 2018 The Company s backlog as of June 2018 is COP 2,3 billion, which amounts to 2.2 years of operation. 70% corresponds to infrastructure projects and 30% to building projects which includes housing projects. COP Thousands of millions jul-dec jun $3.313 $2.395 $2.333 $2.551 $2.000 $1.900 $1.900 $758 $542 $428 $308 $297 Closing Year Backlog Backlog Distribution 70 Infrastructure 30 Building (Includes ) NOTE: Includes Vía Pacífico Services: Relevant Events: Infrastructure: The execution of the first semester concentrated in projects such as: Ituango Hydroelectric Plant, La Línea Pilot Tunnel, Barranquilla port connectivity road, Ruote 40, carriage of materials in Cerromatoso, LATAM technical management, among others. Infrastructure COP $ Millions $ $ - + $ $ $ During the first semester, a change in scope of some contracts amounted COP $ mil Contracted Change in Scope Executed 2Q2018

9 services: Relevant Events: Building: During the first semester the execution concentrated in projects for Pactia such as: Corferias Hotel (Bogotá), El Ensueño Shopping Center (Bogotá), Cedi Colgate Palmira (Valle del Cauca) and others. The execution also concentrated in projects for third parties like the Medellín Chamber of Commerce, Admin. EPSA (Valle del Cauca), Avianca Tower Clle 26 (Bogotá), Nova second stage (Jumbo, Valle del Cauca), among others. Regarding the works contracted, stand out: Chimeneas Shopping Center for COP $ mil, Buró 25 Stage 3 for COP $ mil, Colgate Distribution Center in Palmira for COP $ mil, Buró Milla de Oro for COP $ mil, Corferias offices for COP $ mil, among others for COP $8.384 mil. $ Building (Includes ) COP $ Millions +$ $ $ $ : During the first semester the execution concentrated in projects such as: Zanetti and Mantia (Itagui, Antioquia), Caminos de la Primavera (Huila), Puerto Azul (Cundinamarca), Sunset Boulevard (Barranquilla), ILO, Marea II, Maui and Manhattan (Panama), among others Contracted Change in Scope Executed 2Q2018 During the first semester stands out the change in scope of some Building and contracts for COP $ mill. Engineering and Design: New designs which began to be executed: Greenwood, Mañanitas, Tocumen Haus, Royal Park (Panama), Argo Nunciatura (Costa Rica), Logika Via 40, Core Trade (Barranquilla), Cerro Claro Monserrate (Bello), Entrance Logika (Siberia), Redesign Gran Plaza del Sol Shopping Center (Soledad), Redesign Gran Plaza Ipiales Shopping Center (Ipiales), Redesign Gran Plaza San Antonio Shopping Center - (Pitalito), Redesign Gran Plaza Soacha Shopping Center (Soacha), Redesign Gran Plaza Florencia Shopping Center (Florencia), Monte Río Apartments (La Estrella), Countree Building (Medellín), Chimeneas Shopping Center (Itagüí), Buró 25 Tower 3 and Parking lots (Bogotá), Complimentary buildings Ruta 40, Design Box and Walls Ruta 40 - Bogotá (Girardot Road). $ Engineering and Design COP $ Millions +$ $ $ Contracted Executed 2Q2018

10 Relevant Events: Launched units for selling and estimated time to market ,86 At the closing of June 2018 there are: 12 1 Projects under Project on construction. pre-sales. 15,57 6 Terminated projects , Units for sale which are expected to be sold in average on a 17,4 month term counted as of to-date. LIH* Medium High Num. Units Time (months) * Low Income Concentrated in Bogotá, Medellín and Barranquilla During the 2nd quarter of 2018, 178 units were commercialized Q2016 2Q2016 3Q2016 4Q2016 1Q2017 2Q2017 3Q2017 4Q017 1Q2018 2Q2018 Real Average 63% Pre-Sales 5% Cundinamarca 26% Antioquia 22% Huila 5% Terminated 32% Región Caribe 47% From 19 projects that compose the housing portfolio, 11 are under construction (63%), 8 are finished projects (Including Mantia, Itagüí) (32%) and 1 is on pre-sales (5%). From the 19 on-going housing projects, 9 are located in the Caribe region (47%), 5 in Cundinamarca (26%), 4 in Antioquia (21%) and 1 in Huila (5%).

11 Relevant Figures: Consolidated Income from Ordinary Activities Jun-2018 COP mill -20% Jun-2017 COP mill Investment Corporate Investment Corporate Eliminations (5.966) Eliminations (16.972) Revenues COP mill -29% Revenues COP mill Equipment Building Engineering and Design Infrastructure Equipment Building Engineering and Design Infrastructure Fund 905 Investment Revenues COP mill Subsidiaries % Fund 901 Investment Revenues COP mill Subsidiaries 114 Industrial CC Industrial CC Concessions Other Real Estate Assets Concessions Other Real Estate Assets

12 Relevant Figures: Jun-2018 COP mill Consolidated EBITDA 11% Jun-2017 COP mill Investment Investment Corporate (12.948) Corporate (11.524) EBITDA COP mill Equipment Building Fund 562 Infrastructure Engineering and Design (269) Investment EBITDA COP mill Industrial CC % -2% EBITDA COP mill Equipment Building (4.902) Fund 531 Engineering and Design 940 Investment EBITDA COP mill Infrastructure Industrial CC Concessions PACTIA Subsidiaries (7.781) Concessions PACTIA Subsidiaries (157)

13 Financial Results June 2018: Consolidated statement of results: The GROSS PROFIT of Semester I 2017 was impacted due to the change in the result of the Centro Comercial la Felicidad project. OTHER NON-RECURRING INCOME was registered associated to the liquidation of foreign exchange hedges and the profit from the sale of the Asdesillas lot. The decrease in OPERATING EXPENSES was 27%. Reduction in OTHER PROFITS affected by Pactia. The reduction in the Backlog in some of the companies has generated a reduction in their profits, which explains the variation in the EQUITY METHODS. Last year s foreign exchange hedge policy and the volatility of the exchange rate generated income for DIFFERENCE IN THE EXCHANGE RATE, which contrasts with the revaluation of Semester I The greater FINANCIAL REVENUES are related to the accrual of the interests of the subordinated debt, interest for loans for infrastructure projects and higher yields of the surplus cash of Consorcio Helios. The 10% reduction in FINANCIAL EXPENSES, due to a 110 bp decrease in the rate. The short-term renewal rate, while the re-profiling of the financial debt is concluded. Status in the Consolidated Financial Situation: Within the variations, noteworthy are the increase in CURRENT LIABILITY, which is explained by greater liabilities for current taxes, advances received and reclassifications. From the $ mill of FINANCIAL LIABILI- TIES, the debt associated to Consortia, Subsidiaries and Trusts amounting COP $ mill, is covered by each of them. The remaining COP $ mill is covered directly by the operation of the Company. For more information, Click here to consult the notes to the consolidated Financial Statements CONSOLIDATED STATEMENT OF RESULTS jun-18 jun-17 Var $ Var % COP Million Income from ordinary activities ( ) -20,2% Cost of sales ( ) ( ) ( ) - Gross Profit ,7% Gross Margin 14,5% 9,3% Other income (2.212) -11,7% Administration and sales expenses (15.255) (21.081) (5.825) -27,6% Employee benefit expenses (22.310) (30.104) (7.794) -25,9% Other expenses (2.969) (5.576) (2.606) -46,7% Other earnings (losses) (7.145) -21,4% Equity Method (2.396) -19,4% Operating Profit ,9% Operating Margin 17,1% 10,7% Exchange difference (3.623) (6.494) -226,2% Financial income (2.792) 32,2% Financial expenses (35.306) (39.250) ,0% Before Tax Profit ,4% Before Tax Margin 11,2% 5,9% Current tax expenses (7.648) (9.048) (1.400) -15,5% Adjustment for deferred taxes (9.715) (2.004) ,9% Minority interest (581) ,6% Net Profit ,1% Net Margin 7,3% 4,0% EBITDA ,5% EBITDA Margin 22,6% 16,4% CONSOLIDATED BALANCE SHEET COP Million jun-18 dec-17 Var $ Var % Current Assets (26.010) -1,9% Non-current Assets ,8% Total Assets (12.407) -0,4% Current Liabilities ,1% Non-current Liabilities (95.448) -10,4% Total Liabilities (39.588) -2,3% Total Equity ,0% FINANCIAL LIABILITIES (COP Million) jun-18 dec-17 Var $ Var % (18.573) -9% Investment % (10.470) -9% Corporate % TOTAL (15.388) -1,6%

14 Financial Liabilities Consolidated: Jun 18 COP mill -1,6% Dec 17 COP mill Corporate $ Investment $ $ $ Corporate 30% -9% Investment 0% -9% Corporate $ Investment $ $ $ STATEMENT OF RESULTS SEPARATED (Million COP) Financial Results June 2018 Separated: jun-18 jun-17 Var $ Var % Income from ordinary activities ( ) -23,6% Cost of sales ( ) ( ) ( ) -30,2% Gross Profit ,9% Gross Margin 16,1% 8,0% Other income (1.661) -10,1% Administration and sales expenses (11.618) (13.623) (2.004) -14,7% Employee benefit expenses (17.689) (24.688) (6.999) -28,3% Other expenses (2.119) (4.237) (2.118) -50,0% Other earnings (losses) (3.632) -22,4% Equity method from associated companies (7.145) -21,4% Operating Profit ,1% Operating Margin 21,9% 12,8% Exchange difference (3.597) (6.497) -224,0% Financial income (1.076) 13,1% Financial expenses (32.787) (37.879) ,4% Before Tax Profit ,2% Before Tax Margin 14,8% 7,4% Expense (Income) for taxes, continuing operations (14.365) (11.592) ,9% Net Profit ,9% Net Margin 10,9% 5,0% EBITDA ,0% EBITDA Margin 27,6% 18,2% SEPARATED BALANCE SHEET jun-18 dec-17 Var $ Var % (Million COP) Current Assets (13.804) -1,3% Non-current Assets ,2% Total Assets ,3% Current Liabilities ,8% Non-current Liabilities (76.725) -10,1% Total Liabilities (28.767) -2,0% Total Equity ,6% For more information, Click here to consult the notes to the separated Financial Statements

E A R N I N G S R E L E A S E

E A R N I N G S R E L E A S E EARNINGS RELEASE May 9, 2018 1Q Innovation Relevant Corporate Events: We Are Focused on Innovation: Orchestration of the Crane Towers C rane Towers are one of the most expensive assets in construction

More information

R E L E AS E. November 14, Cámara de Comercio de Medellín para Antioquia Centro Empresarial El Poblado Medellín, Antioquia.

R E L E AS E. November 14, Cámara de Comercio de Medellín para Antioquia Centro Empresarial El Poblado Medellín, Antioquia. Earnings R E L E AS E 3Q November 14, Cámara de Comercio de Medellín para Antioquia Centro Empresarial El Poblado Medellín, Antioquia. 2018 3Q Infrastructure Relevant Corporate Events: In a safe, controlled

More information

Earnings Release 4Q2017

Earnings Release 4Q2017 Earnings Release 4Q2017 February 28, 2018 4Q 2017 Innovation Relevant corporate events: Casa DC We have named CASA DC an initiative that has a 24W circuit installation of direct current DC powered by photovoltaic

More information

R E L E AS E. November 14, Cámara de Comercio de Medellín para Antioquia Centro Empresarial El Poblado

R E L E AS E. November 14, Cámara de Comercio de Medellín para Antioquia Centro Empresarial El Poblado Earnings R E L E AS E 3Q November 14, Cámara de Comercio de Medellín para Antioquia Centro Empresarial El Poblado Corporaterelevant events 3Q2018 Centro comercial Gran Plaza El Ensueño Bogotá, Cundinamarca

More information

E A R N I N G S 1Q2017 R E L E A S E. May 10, 2017

E A R N I N G S 1Q2017 R E L E A S E. May 10, 2017 E A R N I N G S R E L E A S E 1Q2017 May 10, 2017 Relevant corporate events 1Q 2017 Investment $20.971 Eliminations $(8.641) Consolidated Income from Ordinary Activities March2017 COP 318.395 mill $252.040

More information

E A R N I N G S 2Q2016 R E L E A S E. August 30, 2016

E A R N I N G S 2Q2016 R E L E A S E. August 30, 2016 E A R N I N G S R E L E A S E 2Q2016 August 30, 2016 Relevant corporate events New market maker with Credicorp: a value adding tool for investors With the objective of promoting and maximizing the share

More information

EARNINGS 1Q2016 RELEASE. May 23, 2016

EARNINGS 1Q2016 RELEASE. May 23, 2016 EARNINGS RELEASE 1Q2016 May 23, 2016 MULTIPLAZA LA FELICIDAD BOGOTÁ - CUNDINAMARCA RELEVANT CORPORATE EVENTS 1Q2016 RELEVANT CORPORATE EVENTS BUGA BUENAVENTURA ROAD CALI Calima Buenaventura Loboguerrero

More information

RESULTS R E P O R T. June 12, 2015

RESULTS R E P O R T. June 12, 2015 RESULTS R E P O R T 2015 June 12, 2015 IFRS Implications Opening Balance 2013 (COLGAAP vs. IFRS) Consolidated FS Principales variaciones netas: Inclusion of assets and liabilities from consortiums for

More information

FINANCIAL STATEMENTS. 3rd Quarter

FINANCIAL STATEMENTS. 3rd Quarter FINANCIAL STATEMENTS 3rd Quarter 2014 Executive Summary Relevant News of COP $204.607 million in, making for 26.8% growth over as a result of the increased execution of Building projects, the entry into

More information

TRANSCRIPTION OF THE EVENT REPORT: 3 RD QUARTER OF 2017

TRANSCRIPTION OF THE EVENT REPORT: 3 RD QUARTER OF 2017 TRANSCRIPTION OF THE EVENT REPORT: 3 RD QUARTER OF 2017 Good morning. Welcome to the Constructora Conconcreto conference call for the 3 rd Quarter of 2017. At this time, all the participants are in the

More information

FINANCIAL STATEMENTS. 4th Quarter

FINANCIAL STATEMENTS. 4th Quarter FINANCIAL STATEMENTS 4th Quarter 2014 Executive Summary Relevant News of COP $265.986 million in, with a growth of 39.2% over as a result of the increased execution of Infrastructure projects and assets

More information

THIRD QUARTER 2014 CONFERENCE-CALL OPENING

THIRD QUARTER 2014 CONFERENCE-CALL OPENING CONFERENCE-CALL OPENING THIRD QUARTER 2014 Good morning, we welcome you to the conference regarding Conconcreto results for the third quarter of 2014. Before we start, we would like to give you some advice

More information

QUARTERLY REPORT: FOURTH QUARTER, 2016

QUARTERLY REPORT: FOURTH QUARTER, 2016 TRANSCRIPTION OF THE EVENT QUARTERLY REPORT: FOURTH QUARTER, 2016 Good morning. We welcome you to the conference on the Constructora Conconcreto Fourth Quarter 2016 results. Before beginning, we would

More information

Good morning, we welcome you all to the conference on the presentation of the results of Constructora Conconcreto for the second quarter of 2014.

Good morning, we welcome you all to the conference on the presentation of the results of Constructora Conconcreto for the second quarter of 2014. INTRODUCTION Good morning, we welcome you all to the conference on the presentation of the results of Constructora Conconcreto for the second quarter of 2014. Before we start, I would like to advise you

More information

Financial Statements Report Third Quarter 2016

Financial Statements Report Third Quarter 2016 Outline 1. Major events 2. Industry 3. Financial results 4. Construction (part 1) Backlog 5. Investment portfolio (part 2) 6. Pipeline 7. Ownership structure and free float evolution 8. Stock performance

More information

Earnings. Presentation Q1 2016

Earnings. Presentation Q1 2016 Earnings Presentation Q1 2016 DISCLAIMER This document contains forward-looking statements relating to GRUPO ARGOS and its subsidiaries based upon management projections. These projections reflect GRUPO

More information

PERFORMANCE INFORME REPORT GESTIÓN

PERFORMANCE INFORME REPORT GESTIÓN PERFORMANCE INFORME INFORME REPORT DEDE GESTIÓN GESTIÓN ESTE ESTE ES ES EL EL RESULTADO RESULTADO THIS THE RESULT OF DE DE MÁS MÁS DE IS DE 14.000 14.000 PERSONAS PERSONAS MORE THAN EN 14,000 TRABAJANDO

More information

GRUPO ARGOS. September 30, 2014 Report BVC: GRUPOARGOS, PFGRUPOARG

GRUPO ARGOS. September 30, 2014 Report BVC: GRUPOARGOS, PFGRUPOARG GRUPO ARGOS September 30, 2014 Report BVC: GRUPOARGOS, PFGRUPOARG EXECUTIVE SUMMARY For the third quarter of 2014, revenues for consolidated Grupo Argos were nearly COP 6.6 trillion (USD 3.4 billion),

More information

Grupo Argos continues consolidating the businesses in which it operates, reporting some of its best figures in the cement and port businesses.

Grupo Argos continues consolidating the businesses in which it operates, reporting some of its best figures in the cement and port businesses. GRUPO ARGOS March 31, 2015 Report BVC: GRUPOARGOS, PFGRUPOARG EXECUTIVE SUMMARY At the close of Q1 2015, Grupo Argos reports year-to-date revenue of COP 2.6 trillion (USD 1,057 million), up 16% in Colombian

More information

2016 Management Report. Letter from the President

2016 Management Report. Letter from the President 2016 Management Report Letter from the President 1 Cover photo: Hidroituango, Antioquia. Work developed in consortia. Photo: Jorge Hernán Jiménez Jaramillo, former General Secretary Management Report 2016

More information

The Consolidated EBITDA of Grupo Argos totaled COP 1,85 trillion (USD 594 million), a 29% increase in Colombian pesos. The EBITDA margin was 25%.

The Consolidated EBITDA of Grupo Argos totaled COP 1,85 trillion (USD 594 million), a 29% increase in Colombian pesos. The EBITDA margin was 25%. GRUPO ARGOS June 30, 2016 Report BVC: GRUPOARGOS, PFGRUPOARG EXECUTIVE SUMMARY At the close of the first semester, the consolidated revenue of Grupo Argos was nearly COP 7.5 trillion (USD 2,386 million),

More information

Cementos Argos. Results 1Q17. Martinsburg plant, USA 1

Cementos Argos. Results 1Q17. Martinsburg plant, USA 1 Cementos Argos Results 1Q17 Martinsburg plant, USA 1 DISCLAIMER This document contains forward-looking statements and information related to Cementos Argos S.A. and its subsidiaries (together referred

More information

MANAGEMENT REPORT BY THE BOARD OF DIRECTORS AND THE CEO

MANAGEMENT REPORT BY THE BOARD OF DIRECTORS AND THE CEO MANAGEMENT REPORT BY THE BOARD OF DIRECTORS AND THE CEO - 2015 RESULTS OF THE PERIOD Period results will read differently due to the inclusion of the International Financial Reporting Standards (IFRS).

More information

GRUPO ARGOS. September 30, Q Report BVC: INVARGOS, PFINVRAGOS

GRUPO ARGOS. September 30, Q Report BVC: INVARGOS, PFINVRAGOS GRUPO ARGOS September 30, 2012 3Q Report BVC: INVARGOS, PFINVRAGOS EXECUTIVE SUMMARY For the first nine months of 2012, revenues for consolidated Grupo Argos up to COP$ 5.0 billion pesos (US$ 2.8 billion),

More information

GRUPO ARGOS. June 30, Q Report BVC: GRUPOARGOS, PFGRUPOARG

GRUPO ARGOS. June 30, Q Report BVC: GRUPOARGOS, PFGRUPOARG GRUPO ARGOS June 30, 2013 2Q Report BVC: GRUPOARGOS, PFGRUPOARG EXECUTIVE SUMMARY For the first semester of 2013, revenues for consolidated Grupo Argos up to COP$ 3.7 trillion (US$ 2 billions), an increase

More information

GRUPO ARGOS. March 31, Q Report BVC: INVARGOS, PFINVRAGOS

GRUPO ARGOS. March 31, Q Report BVC: INVARGOS, PFINVRAGOS GRUPO ARGOS March 31, 2013 1Q Report BVC: INVARGOS, PFINVRAGOS EXECUTIVE SUMMARY For the first quarter of 2013, revenues for consolidated Grupo Argos up to COP$ 1.7 trillion (US$ 995 millions), an increase

More information

Quarterly Earnings Presentation. Fourth Quarter 2018

Quarterly Earnings Presentation. Fourth Quarter 2018 Quarterly Earnings Presentation Fourth Quarter 2018 IMPORTANT NOTE This presentation contains certain forward-looking information and statements related to GRUPO ARGOS and its subsidiaries that are based

More information

Results Report 4Q2017

Results Report 4Q2017 Results Report 4Q2017 Grupo Argos works with Colombia's National Parks to achieve the protection of eight ecosystems in Colombia, such as the one in Cinaruco, in Arauca. Photo: Rodrigo Durán 1 GRUPO ARGOS

More information

Holding Company with SUSTAINABLE

Holding Company with SUSTAINABLE Holding Company with SUSTAINABLE INVESTMENTS IN INFRASTRUCTURE January 2017 Principles of our Strategy Investment focus Searching Allowing Basic sectors of the economy With natural entry barriers Capital

More information

Carrera 14 N. 93A 30 Bogotá, Colombia Tel. (57-1) Una empresa de Grupo Argos

Carrera 14 N. 93A 30 Bogotá, Colombia Tel. (57-1) Una empresa de Grupo Argos Results Presentation 2Q2017 General Introduction We are pleased to announce the results of Odinsa for the first half of 2017. It is worth highlighting three aspects that we will develop throughout this

More information

GRUPO ARGOS. December 31, Q Report BVC: INVARGOS, PFINVRAGOS

GRUPO ARGOS. December 31, Q Report BVC: INVARGOS, PFINVRAGOS GRUPO ARGOS December 31, 2012 4Q Report BVC: INVARGOS, PFINVRAGOS EXECUTIVE SUMMARY During 2012, revenues for consolidated Grupo Argos up to COP$ 6.7 billion pesos (US$ 3.7 billion), an increase of 15%

More information

Fourth Quarter and full year 2017 Financial Report

Fourth Quarter and full year 2017 Financial Report Medellin, April 3, 2018 EPM Group announces consolidated financial results as of December 31, 2017 Empresas Públicas de Medellin E.S.P. and subsidiaries (hereinafter, "EPM Group") is the holding company

More information

BUY / TP: COP 22,620 Common Share - COP 22,480 Preferred Share May 25, 2015

BUY / TP: COP 22,620 Common Share - COP 22,480 Preferred Share May 25, 2015 28-12-12 28-01-13 28-02-13 31-03-13 30-04-13 31-05-13 30-06-13 31-07-13 31-08-13 30-09-13 31-10-13 30-11-13 31-12-13 31-01-14 28-02-14 31-03-14 30-04-14 31-05-14 30-06-14 31-07-14 31-08-14 30-09-14 31-10-14

More information

3Q2015 Results Presentation

3Q2015 Results Presentation 3Q2015 Results Presentation 1 DISCLAIMER This document contains forward-looking statements relating to GRUPO ARGOS and its subsidiaries based upon management projections. These projections reflect GRUPO

More information

Included in The Sustainabilty Yearbook Q2018 Report

Included in The Sustainabilty Yearbook Q2018 Report Included in The Sustainabilty Yearbook 2018 2Q2018 Report Agenda Relevant events Energy market Update on the contingency presented at the Ituango Hydroelectric Project Financial results as of June 2018

More information

Quarterly Earnings Presentation. Third Quarter 2018

Quarterly Earnings Presentation. Third Quarter 2018 Quarterly Earnings Presentation Third Quarter 2018 IMPORTANT NOTE This presentation contains certain forward-looking information and statements related to GRUPO ARGOS and its subsidiaries that are based

More information

Annual Emerging Markets Corporate Conference 2015 Bank of America Merrill Lynch Miami, FL. May 27 29

Annual Emerging Markets Corporate Conference 2015 Bank of America Merrill Lynch Miami, FL. May 27 29 Annual Emerging Markets Corporate Conference 2015 Bank of America Merrill Lynch Miami, FL. May 27 29 Disclaimer The material that follows is a presentation of general background information about Empresas

More information

RESULTS 4Q15. F e b r u a r y 4,

RESULTS 4Q15. F e b r u a r y 4, RESULTS 4Q15 F e b r u a r y 4, 2 0 1 6 Forward looking information This presentation contains forward-looking statements. In some cases, these statements can be identified by the use of forward-looking

More information

Fourth Quarter 2016 Financial Report

Fourth Quarter 2016 Financial Report Medellin, April 5,2016 Empresas Públicas de Medellin E.S.P. (hereinafter, "EPM Group") is the holding company of a multi-latin enterprise group formed by 45 companies and one structured entity, that have

More information

Resultados Results. First Quarter May Sacyr Vallehermoso

Resultados Results. First Quarter May Sacyr Vallehermoso Resultados 2012 Results First Quarter 2014 14 May 2014 Sacyr Vallehermoso 1 HIGHLIGHTS 1. Operating performance 2. Corporate business 3. Share price trend 4. Reduction of financial debt Sacyr Vallehermoso

More information

Agenda. Relevant events. Energy market. Work progress in main project: Ituango. Financial results as of Sept. 2017

Agenda. Relevant events. Energy market. Work progress in main project: Ituango. Financial results as of Sept. 2017 3Q2017 Report Agenda Relevant events Energy market Work progress in main project: Ituango Financial results as of Sept. 2017 Note: please, see disclaimer at the end of the presentation. 2 Relevant events

More information

THIRD QUARTER 2013 RESULTS. Medellín, Colombia November 6, 2013

THIRD QUARTER 2013 RESULTS. Medellín, Colombia November 6, 2013 THIRD QUARTER 2013 RESULTS Medellín, Colombia November 6, 2013 Luis Fernando Alarcón, CEO Judith Cure, CFO(E) All rights reserved Interconexión Eléctrica S.A. E.S.P. AGENDA Operating Highlights Strategic

More information

2012 results. Results. Second Half February Sacyr Vallehermoso 1

2012 results. Results. Second Half February Sacyr Vallehermoso 1 Results Second Half 2013 28 February 2014 Sacyr Vallehermoso 1 HIGHLIGHTS 1. Operating performance 2. Corporate business 3. Share price trend 4. Reduction of financial debt Sacyr Vallehermoso 2 Operating

More information

Colaboradores Popayán, Cauca

Colaboradores Popayán, Cauca Colaboradores Popayán, Cauca Chapter 8 Relevant information Let s comply 8. Relevant information Disclosure and Control of Financial Information Pursuant to Article 47 of Law 964 / 2005, during the second

More information

Corporate presentation

Corporate presentation Corporate presentation Disclaimer This document contains forward-looking statements relating to GRUPO ARGOS and its subsidiaries based upon management projections. These projections reflect GRUPO ARGOS

More information

Investors Presentation. march 2018

Investors Presentation. march 2018 Investors Presentation march 2018 IMPORTANT NOTE This presentation contains certain forward-looking information and statements related to GRUPO ARGOS and its subsidiaries that are based on knowledge of

More information

Financial Information. First Quarter 2012

Financial Information. First Quarter 2012 Financial Information First Quarter 2012 Disclaimer This document was prepared by EPM for the purpose of providing interested parties with the company's financial information. This document may include

More information

June 10th 2015 Results Presentation 1Q2015

June 10th 2015 Results Presentation 1Q2015 Grupo Odinsa reports a strong operational performance over 1Q2015, as evidenced by the strength of its various business lines, allowing it to report revenue in line with 2014 results (under IFRS): Results

More information

Acquisition of a stake in Odinsa. April 2015

Acquisition of a stake in Odinsa. April 2015 Acquisition of a stake in Odinsa April 2015 Transaction First stage Acquisition of a 24,8% stake Price per share $9.495 pesos Transaction value $461 billion pesos Acquired shares Average Price Amount (COP$

More information

Topics Project Ruta del Sol 2

Topics Project Ruta del Sol 2 Topics Project Ruta del Sol 2 February 17, 2017 Date 0 Note The information provided includes forward-looking statements based on facts and circumstances as known today. The final results may vary from

More information

Chapter 3 Our Financial Results. José Solano. Angela Espinosa. 28 Management Report First Half Civil Engineer, Hidralpor

Chapter 3 Our Financial Results. José Solano. Angela Espinosa. 28 Management Report First Half Civil Engineer, Hidralpor 28 Management Report First Half 2013 José Solano Civil Engineer, Hidralpor Angela Espinosa Corporate Manager, Banco de Bogotá Hidroeléctrica del Alto Porce Chapter 3 Our Financial Results 29 We grow as

More information

CORPORATE PRESENTATION

CORPORATE PRESENTATION CORPORATE PRESENTATION 0 Main Figures Figures in Colombian Pesos Consolidated 2017 Separate 2017 Investment Grade Rating Assets: $21.156.016 MM Total Equity: $5.279.463 MM Net Income: $210.807 MM ROE:

More information

Included in The Sustainabilty Yearbook Q2018 Report

Included in The Sustainabilty Yearbook Q2018 Report Included in The Sustainabilty Yearbook 2018 1Q2018 Report Agenda Relevant events Energy market Work progress in main project: Ituango Financial results as of March 2018 Note: please, see disclaimer at

More information

Rating Report PROGRAM TO ISSUE AND PLACE ORDINARY BONDS AND/OR COMMERCIAL PAPERS OF GRUPO ARGOS S.A. Colombia

Rating Report PROGRAM TO ISSUE AND PLACE ORDINARY BONDS AND/OR COMMERCIAL PAPERS OF GRUPO ARGOS S.A. Colombia Colombia Rating Report................................. PROGRAM TO ISSUE AND PLACE ORDINARY BONDS AND/OR COMMERCIAL PAPERS OF GRUPO ARGOS S.A. Technical Committee: May 13, 2016 Minute number: 947 Contacts:

More information

Third quarter results. 15 November 2010

Third quarter results. 15 November 2010 Third quarter results 15 November 2010 1 Period operatives keys Analysis of 3Q10 results Business areas Appendices 2 Period operative keys SyV third quarter results reflect the advancement made in: INTERANTIONAL

More information

Investor Presentation. London - March, 2016

Investor Presentation. London - March, 2016 Investor Presentation London - March, 2016 Disclaimer Grupo Aval Acciones y Valores S.A. ( Grupo Aval ) is an issuer of securities in Colombia and the United States, registered with Colombia s National

More information

Consolidated Results June 2012

Consolidated Results June 2012 Consolidated Results June 2012 1 Financial Statements June 2012 This document contains a discussion of consolidated and individual results of the major companies of the Andino Group. These results have

More information

Investor Presentation Colombia Inside Out New York. September, 2014

Investor Presentation Colombia Inside Out New York. September, 2014 Investor Presentation Colombia Inside Out New York. September, 2014 1 Disclaimer Certain statements contained in this report constitute "forward-looking statements" within the meaning of the Private Securities

More information

28 Management Report Second Half Chapter 3 Our Financial Results

28 Management Report Second Half Chapter 3 Our Financial Results 28 Management Report Second Half 2013 Chapter 3 Our Financial Results 29 We grow in a dynamic and sustainable way, providing value to all our stakeholders Our financial and administrative management strategies

More information

Celsia Energy in action

Celsia Energy in action Celsia Energy in action 2014 The story of a transformation 2 The transformation process at a glance 1919 2001 Coltabaco 2001 2002 2006 Coltabaco 2007 2012 Tobacco Business Tobacco Business Electric Utility

More information

As of September 30, 2018 (unaudited) and December 31, 2017 and for the nine-month periods ended September 30, 2018 and 2017

As of September 30, 2018 (unaudited) and December 31, 2017 and for the nine-month periods ended September 30, 2018 and 2017 Interim Consolidated Financial Statements PARQUE ARAUCO S.A. AND SUBSIDIARIES As of September 30, 2018 (unaudited) and December 31, 2017 and for the nine-month periods ended September 30, 2018 and 2017

More information

Financial Planning and Strategy Management Team

Financial Planning and Strategy Management Team Financial Planning and Strategy Management Team Chapter 3 Our Financial Results We prioritize our strategic efforts to generate economic and social value for our clients, partners, shareholders and investors.

More information

THIRD QUARTER 2015 RESULTS Medellin, Colombia November 4, 2015

THIRD QUARTER 2015 RESULTS Medellin, Colombia November 4, 2015 THIRD QUARTER 2015 RESULTS Medellin, Colombia November 4, 2015 DISCLAIMER ISA THIRD QUARTER 2015 FINANCIAL RESULTS Certain statements contained in this report constitute "forward-looking statements" within

More information

Agenda. Relevant facts. El Niño phenomenon. Energy market. Main projects. Financial results. Subsequent events

Agenda. Relevant facts. El Niño phenomenon. Energy market. Main projects. Financial results. Subsequent events 1Q2016 Report Disclaimer o Below is a general information presentation about Empresas Públicas de Medellín ESP and its, as on the date of presentation. The materials herein contained have been summarized

More information

First Quarter 2018 Financial Report

First Quarter 2018 Financial Report Medellin, May 8, 2018 EPM Group announces consolidated financial results as of March 31, 2018 Empresas Públicas de Medellin E.S.P. and subsidiaries (hereinafter, "EPM Group") is the holding company of

More information

ASUR 1Q18 Passenger Traffic Increased 9.3% YoY in Mexico and Declined 19.2% in San Juan, Puerto Rico and 5.2% in Colombia

ASUR 1Q18 Passenger Traffic Increased 9.3% YoY in Mexico and Declined 19.2% in San Juan, Puerto Rico and 5.2% in Colombia ASUR 1Q18 Passenger Traffic Increased 9.3% YoY in Mexico and Declined 19.2% in San Juan, Puerto Rico and 5.2% in Colombia Mexico City, April 23, 2018 - Grupo Aeroportuario del Sureste, S.A.B. de C.V. (NYSE:

More information

1Q Results Presentation

1Q Results Presentation 1Q 2018 Results Presentation D I S C L A I M E R The forward-looking statements contained herein are based on Management s current forecasts and outlook For better illustration and decision-making, figures

More information

Investors Presentation. September 2018

Investors Presentation. September 2018 Investors Presentation September 2018 IMPORTANT NOTE This presentation contains certain forward-looking information and statements related to GRUPO ARGOS and its subsidiaries that are based on knowledge

More information

QUARTERLY MANAGEMENT RESULTS. M a r c h

QUARTERLY MANAGEMENT RESULTS. M a r c h QUARTERLY MANAGEMENT RESULTS M a r c h 2 0 1 7 CORPORATE ASPECTS General Results Relevant data by GEN (Figures as of March 2017) GEN Transmission GEN Distribution 3 * Gas pipeline: 3,089 kilometers 4%

More information

1. Summary of Consolidated Results 4th Quarter Summary of Consolidated Results accumulated as for December

1. Summary of Consolidated Results 4th Quarter Summary of Consolidated Results accumulated as for December 24 Index 1. Summary of Consolidated Results 4th Quarter 2015.. 2. Summary of Consolidated Results accumulated as for December 2015... 3. Highlights in the Period.... 4. Consolidated Income Statement......

More information

CONSORCIO ARA, S. A. B. DE C. V. (ARA*) RESULTS FOR THE THIRD QUARTER OF 2018 (3Q18)

CONSORCIO ARA, S. A. B. DE C. V. (ARA*) RESULTS FOR THE THIRD QUARTER OF 2018 (3Q18) CONSORCIO ARA, S. A. B. DE C. V. (ARA*) RESULTS FOR THE THIRD QUARTER OF 2018 (3Q18) (All figures in millions of pesos) Mexico City, October 24, 2018 Consorcio ARA, S.A.B. de C.V. ( ARA BMV: ARA*) reports

More information

Agenda. Introduction. Relevant facts. Energy market. Main projects. Financial results. UNE operational results. Subsequent events

Agenda. Introduction. Relevant facts. Energy market. Main projects. Financial results. UNE operational results. Subsequent events 4Q2015 Report Disclaimer o Below is a general information presentation about Empresas Públicas de Medellín ESP and its Subsidiaries, as on the date of presentation. The materials herein contained have

More information

First half Results 29 July 2011

First half Results 29 July 2011 First half Results 29 July 2011 First Half Results Period highlights 1H11 results Business areas Appendices Sacyr Vallehermoso 2 First Half of 2011 Reduction of financial exposure concluded CAPITALIZATION:

More information

GRUPO ENERGÍA DE BOGOTA 1Q 2015 Key Results and Developments

GRUPO ENERGÍA DE BOGOTA 1Q 2015 Key Results and Developments GRUPO ENERGÍA DE BOGOTA 1Q 2015 Key Results and Developments May 29th, 2015 Agenda I. EEB Overview and Key Updates 1Q 2015 II. Expansion Projects Review III. Financial Review 1Q 2015 IV. Convergence to

More information

The role of FDN as a specialized and innovative development bank CLEMENTE DEL VALLE PRESIDENTE

The role of FDN as a specialized and innovative development bank CLEMENTE DEL VALLE PRESIDENTE The role of FDN as a specialized and innovative development bank CLEMENTE DEL VALLE PRESIDENTE Acces to infrastructure is a critical challenge for Colombia RANK/140 Quality of overall infrastructure Quality

More information

FIRST QUARTER 2011 RESULTS

FIRST QUARTER 2011 RESULTS FIRST QUARTER 2011 RESULTS ISA ANNOUNCES FIRST QUARTER RESULTS 2011 Medellín, Colombia, May 2, 2011 Interconexión Eléctrica S.A. E.S.P ISA (BVC: ISA; OTC: IESFY) ( ISA or the Company ), a Colombian organization

More information

2Q-2016 Consolidated Results Conference Call

2Q-2016 Consolidated Results Conference Call 2Q-2016 Consolidated Results Conference Call FULL IFRS September 27, 2016 The IR Recognition granted by the Colombian Securities Exchange (Bolsa de Valores de Colombia S.A) is not a certification of the

More information

Investor Presentation

Investor Presentation Investor Presentation J.P.Morgan Southern Cone & Andean Opportunities Conference Bogotá. April 22-23, 2015 Disclaimer Certain statements contained in this report constitute "forward-looking statements"

More information

SECOND QUARTER 2015 RESULTS Medellin, Colombia August 5, 2015

SECOND QUARTER 2015 RESULTS Medellin, Colombia August 5, 2015 SECOND QUARTER 2015 RESULTS Medellin, Colombia August 5, 2015 The IR Recognition granted by the Colombian Securities Exchange (Bolsa de Valores de Colombia S.A) is not a certification of the registered

More information

What happened in 2009?

What happened in 2009? 1 What happened in 2009? Last year was very dynamic in Cementos Argos We divested some Coal Assets to VALE for US$373 million We successfully issued US$500 million in commercial paper and bonds, materially

More information

CONSORCIO ARA, S. A. B. DE C. V. (ARA*) RESULTS FOR THE THIRD QUARTER OF 2015 (3Q15)

CONSORCIO ARA, S. A. B. DE C. V. (ARA*) RESULTS FOR THE THIRD QUARTER OF 2015 (3Q15) CONSORCIO ARA, S. A. B. DE C. V. (ARA*) RESULTS FOR THE THIRD QUARTER OF 2015 (3Q15) (All figures in millions of pesos) Mexico City, October 26, 2015 Consorcio ARA, S.A.B. de C.V. ( ARA BMV: ARA*) reports

More information

Capital Improvement Program

Capital Improvement Program Capital Improvement Program May 14, 2015 KEN KNATZ, P.E. PRINCIPAL CIVIL ENGINEER FY 2015 Current CIP Status Maintenance Projects, $13.9M CIP Projects, $30.5M Total FY 2015 CIP: $44.4 M 2 Courtney s Sand

More information

Investors Presentation. june 2018

Investors Presentation. june 2018 Investors Presentation june 2018 IMPORTANT NOTE This presentation contains certain forward-looking information and statements related to GRUPO ARGOS and its subsidiaries that are based on knowledge of

More information

1Q 2013 Earnings Release

1Q 2013 Earnings Release 1Q 2013 Earnings Release EBITDA of Ripley Chile and Peru increases 26.9% Ripley and 67.5% respectively, compared to 1Q2012 EBITDA Ripley Corp increased 6.7%, absorbing pre-operating expenses of Colombia,

More information

CORPORATE PRESENTATION

CORPORATE PRESENTATION CORPORATE PRESENTATION DISCLAIMER This document contains forward-looking statements relating to GRUPO ARGOS and its subsidiaries based upon management projections. These projections reflect GRUPO ARGOS

More information

Celsia S.A. E. S. P. Balance Sheet

Celsia S.A. E. S. P. Balance Sheet Celsia S.A. E. S. P. Balance Sheet As at Wednesday, December 31, and 2013 Notes 2013 Assets Current assets Cash 5 10,073 68,985 Temporary investments 6 17,240 311,236 Accounts receivable, net 7 113,162

More information

61.2 GRUPO SURA QUARTER REPORT. Company figures Figures for our strategic investments Commercial value of our portfolio Behavior of the shares

61.2 GRUPO SURA QUARTER REPORT. Company figures Figures for our strategic investments Commercial value of our portfolio Behavior of the shares 2013 FIRST REPORT GRUPO SURA QUARTER began 2013 in growth mode, with an increase in profits 61.2 of % compared to the same period in 2012. Grupo de Inversiones Suramericana / FIRST QUARTER 2013 With a

More information

1. CONSOLIDATION SCOPE

1. CONSOLIDATION SCOPE Medellin, November 9, 2015. Empresas Públicas de Medellín E.S.P. (hereinafter, "EPM" or the "company") is the parent company of an economic group consisting of 52 companies with presence in Colombia, Chile,

More information

FINANCIAL STATEMENTS EPM GROUP Quarter

FINANCIAL STATEMENTS EPM GROUP Quarter FINANCIAL STATEMENTS EPM GROUP Quarter 3-2011 1 Disclaimer 2 EPM prepared this document to provide stakeholders with information on the company s financial status. This document may include discussions

More information

Grupo ACS net profit in 2011 totals EUR 962 million

Grupo ACS net profit in 2011 totals EUR 962 million Grupo ACS net profit in 2011 totals EUR 962 million Turnover grew up to EUR 28,472 million, a 98.7% increase. International turnover now accounts for 72.5% of the total. The Grupo ACS ordinary net profit

More information

SACYR REPORTS EBITDA OF 318 MILLION (+33%) AND ITS TURNOVER INCREASES BY 8.5%

SACYR REPORTS EBITDA OF 318 MILLION (+33%) AND ITS TURNOVER INCREASES BY 8.5% PRESS RELEASE The group achieves net profits of 370 million SACYR REPORTS EBITDA OF 318 MILLION (+33%) AND ITS TURNOVER INCREASES BY 8.5% International construction revenue represents 75% of the total,

More information

Outline. 1. Who We Are. 2. Our Figures. 3. Backlog and Investment Portfolio. 4. Key Value Drivers. 5. Stock Information

Outline. 1. Who We Are. 2. Our Figures. 3. Backlog and Investment Portfolio. 4. Key Value Drivers. 5. Stock Information Disclaimer This document contains forward-looking statements on the intentions, expectations or forecasts of Construcciones El Cóndor S.A at the time the document was drawn up and in reference to various

More information

Almacenes Exito. Casino s Analyst Day December 10-11, 2009

Almacenes Exito. Casino s Analyst Day December 10-11, 2009 Almacenes Exito Casino s Analyst Day December 10-11, 2009 1 Agenda Almacenes Exito in a snapshot Colombia: Macroeconomic Overview and Retail Market Our Strategy Financial Highlights Opportunities going

More information

Fe de Erratas. Due to changes in some of the information of third quarter 2012 ( 3Q12), please see Fe de erratas on slide 21

Fe de Erratas. Due to changes in some of the information of third quarter 2012 ( 3Q12), please see Fe de erratas on slide 21 Fe de Erratas Due to changes in some of the information of third quarter 2012 ( 3Q12), please see Fe de erratas on slide 21 X 3Q12 Earnings Presentation 1 The information presented here is exclusively

More information

Q Results Presentation

Q Results Presentation Q2 2018 Results Presentation D I S C L A I M E R The forward-looking statements contained herein are based on Management s current forecasts and outlook For better illustration and decision-making, figures

More information

Below we present the main impacts on the financial statements as of December 31, 2014 resulting from the change of standards.

Below we present the main impacts on the financial statements as of December 31, 2014 resulting from the change of standards. Empresas Públicas de Medellín E.S.P. (hereinafter, "EPM" or the "company") is the parent company of an economic group consisting of 48 companies with presence in Colombia, Chile, El Salvador, Guatemala,

More information

Corporate Presentation 3Q 2016

Corporate Presentation 3Q 2016 Corporate Presentation 3Q 2016 1 DISCLAIMER the forward-looking statements contained herein are based on Management s current forecasts and outlook. For better illustration and decision-making, figures

More information

4Q11 Results 4Q11. Executive Summary: Full Year Revenues Increased by 18%, Reaching Ch$ 86,345. million in 2011; 4Q 2011 Revenues up 16.

4Q11 Results 4Q11. Executive Summary: Full Year Revenues Increased by 18%, Reaching Ch$ 86,345. million in 2011; 4Q 2011 Revenues up 16. 4Q11 4Q11 Results Parque Arauco S.A. Executive Summary: Full Year Revenues Increased by 18%, Reaching Ch$ 86,345 million in 2011; 4Q 2011 Revenues up 16.3% Full Year EBITDA Increased 17.6% from 2010 to

More information

THIRD QUARTER 2013 NOVEMBER 2013

THIRD QUARTER 2013 NOVEMBER 2013 FINANCIAL REPORT THIRD QUARTER 2013 NOVEMBER 2013 Index 1. Summary of Consolidated Results 3rd Quarter 2013.... 2. Summary of Consolidated Results accumulated as for September 2013... 3. Highlights in

More information

Cementos Argos S.A Corporate presentation

Cementos Argos S.A Corporate presentation Cementos Argos S.A Corporate presentation 2016 DISCLAIMER This document contains forward-looking statements and information related to Cementos Argos S.A. and its subsidiaries (together referred to as

More information