Setting Competitive Electric Rates. Ronald D. Elks General Manager/CEO Presented to: Joint Municipal Power Agency Relief Committee January 10, 2012

Size: px
Start display at page:

Download "Setting Competitive Electric Rates. Ronald D. Elks General Manager/CEO Presented to: Joint Municipal Power Agency Relief Committee January 10, 2012"

Transcription

1 Setting Competitive Electric Rates Ronald D. Elks General Manager/CEO Presented to: Joint Municipal Power Agency Relief Committee January 10, 2012

2 2 Overview About GUC Our Customers Rate Setting Methodology/Strategy Competitiveness Catalyst for Economic Growth Summary

3 3 Mission Statement Greenville Utilities is dedicated to enhancing the quality of life for those we serve by providing safe, reliable utility services at the lowest reasonable cost, with exceptional customer service.

4 4 Local Control GUC is governed by an eight-member Board of Commissioners made up of local citizens representing the interests of all customers

5 5 Our Board Is the regulatory body for GUC Makes decisions that support local needs and values Is responsible for approving rates and development plans, setting operating and extension policies, and recommending GUC s annual budget for approval by City Council

6 6 Customer Connections 64,000 Electric 22,000 Gas Edgecombe/Martin EMC Edgecombe/Martin EMC 34,250 Water 28,000 Sewer Pitt/Greene EMC GUC Electric Winterville Progress Energy Combined total: ~148,250 Ayden Progress Energy

7 7 Energy Sales by Customer Type kwh Billed 21% 7% 29% 43% Residential Small Commercial Commercial Industrial

8 8 Four Enterprise Funds: Separate and Self-Sustaining Electric/water/sewer/natural gas enterprise funds are operated as separate and selfsustaining business units. Each enterprise fund stands alone and each is supported by cost-of-service rates and fees.

9 9 Cost-of-Service Principles The rates for all GUC services are developed on a cost-of-service basis. Based on comprehensive rate studies, the actual rate structure is set to recover the costs to serve all customers. GUC s policy is to maintain rates at or below the median or midpoint when compared to other regional electric providers.

10 Electric: Winter Bill Typical Residential Customer using 1,000 kwh with LM Credits EMCs Municipals Median GUC IOUs $0.00 $20.00 $40.00 $60.00 $80.00 $ $ $ Updated January 2012 Total Bill

11 11 Competitive Rates GUC has been successful in consistently maintaining residential and industrial rates at or below the median of other neighboring and regional providers.

12 12 Electric: Where Does Our Dollar Go? 83 Purchased Power Costs (including NCEMPA debt) 17 Operations/Maintenance, System Infrastructure, Turnover, Salaries

13 13 Formal Transfer Agreement with City Computation of City Transfer is specified in Chapter 861 of Senate Bill 1069, An Act to Amend and Restate the Charter of the Greenville Utilities Commission of the City of Greenville. General fund transfers are computed based on 6% of the Electric and Gas Funds fixed assets, net of related debt plus 50% of the annual retail cost of service for the City's public lighting. Transfers are made to the City only after payment of all debt service.

14 Rate Strategy: Lowest Reasonable Cost 14 Focus on ensuring that our customers pay the lowest reasonable rates, consistent with safe and reliable service. GUC has offset past wholesale electric increases through system growth and costsaving measures such as load management, industrial generation, and other efficiencies.

15 15 Absorbing Increases Since 2002, GUC has absorbed: Nearly $10.5 million in wholesale electric cost increases Nearly $4.7 million in increased costs for poles, transformers, wire, vehicles, fuel, insurance, labor, etc. Last electric base rate adjustment in 1991 All increases since that time have been directly attributable to the cost of acquiring power for customers

16 Record of Reliability GUC continually reinvests in its systems, ensuring consistent, reliable service for all customers. For FY2011, overall electric system reliability was % GUC compares favorably with national averages for outage duration and frequency. We rank in the top 10 percent based on industry benchmarking results.

17 17 Catalyst for Economic Growth Commercial, Industrial & Institutional Customers Mutual Benefits Profitability & Sustainability Key Relationships Provide Support & Assistance

18 18 Industrial Requirements Reliability (infrastructure in place) Power quality 5% growth since 1990 Flexibility to meet specific needs

19 Total Customers Growth in Electric Customers 70,000 65,000 60,000 55,000 50,000 45,000 40,000 35,000 30,

20 MWh Growth in Electric Sales (MWh) 1,750 1,700 1,650 1,600 1,550 1,500 1,450 1,400 1,350 1,300 1,

21 21 Managing the Debt Since the early 1980s, GUC s portion of the NCEMPA debt has been incorporated into our electric rates. For over 30 years, through load management, industrial generation, growth and other costcontainment measures, GUC has successfully managed and paid its portion of the debt while maintaining competitive rates, high levels of service and supporting the economic growth of Greenville-Pitt County.

22 22 Summary Competitive rates Safe, reliable service Sound financial management A catalyst for economic growth/ industrial recruitment

23 Setting Competitive Electric Rates Ronald D. Elks General Manager/CEO Presented to: Joint Municipal Power Agency Relief Committee January 10, 2012

A Letter to Our Customers

A Letter to Our Customers ANNUAL REPORT 2003 A Letter to Our Customers From the General Manager MG&E experienced a year of progress in spite of the contentious world climate in 2003. This climate contributed to volatile energy

More information

Transportation Trust Fund Overview

Transportation Trust Fund Overview Transportation Trust Fund Overview Created pursuant to New Jersey Transportation Trust Fund Authority Act of 1984 Established to finance the cost of planning, acquisition, engineering, construction, reconstruction,

More information

Request for Proposals. For GREENVILLE UTILITIES COMMISSION

Request for Proposals. For GREENVILLE UTILITIES COMMISSION Request for Proposals Design and Specifications for Greenville 230 South (POD) to Bells Fork Substation 115 kv Transmission Line For GREENVILLE UTILITIES COMMISSION Of the City of Greenville, North Carolina

More information

October Snohomish County Public Utility District

October Snohomish County Public Utility District October 2017 Snohomish County Public Utility District 2 Disclaimer The information within this presentation is limited in scope. The presentation does not constitute an offer to sell or a solicitation

More information

Presentation to Joint Municipal Power Agency Relief Committee. January 10, 2012

Presentation to Joint Municipal Power Agency Relief Committee. January 10, 2012 Presentation to Joint Municipal Power Agency Relief Committee January 10, 2012 Electric Rates in Eastern NC How Did We Get Here? History Provides Perspective on Debt The Lasting Effect of the 1970s Energy

More information

FPUA REVENUE SUFFICIENCY ANALYSIS Rate Study Update

FPUA REVENUE SUFFICIENCY ANALYSIS Rate Study Update FPUA REVENUE SUFFICIENCY ANALYSIS Rate Study Update Purpose: Summary of Observations: Special Considerations: Update Financial Forecast through Fiscal Year 2020 Estimate Sufficiency of the Utility Systems

More information

Regardless of the ownership model, however, the costs of providing service, with only a few exceptions, are covered by the customer.

Regardless of the ownership model, however, the costs of providing service, with only a few exceptions, are covered by the customer. Executive Summary There are numerous considerations when evaluating a possible transaction, such as a sale of JEA. Value the price a willing buyer would pay should the City be willing to sell is but one

More information

Grady Electric Membership Corporation

Grady Electric Membership Corporation Grady Electric Membership Corporation P.O. Box 270 / Cairo, Georgia 39828 / Phone (229) 377-4182 Dear Members: As we approach Grady EMC s annual meeting, I d like to take a moment to update you on what

More information

M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD

M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: Commissioners Helgeson, Brown, Mital, Simpson and Carlson FROM: Sue Fahey, Chief Financial Officer; Deborah Hart, Fiscal Services Supervisor; Jerry

More information

CHAPTER 67. SERVICE OUTAGES 67.1. General provisions. ANNEX A (a) Electric, gas, water and telephone utilities holding certificates of public convenience under 66 Pa.C.S. 1101 and 1102 (relating to organization

More information

July 8, Ms. Carolyn Dougherty Grand River Dam Authority 226 W. Dwain Willis Avenue Vinita, OK Dear Carolyn;

July 8, Ms. Carolyn Dougherty Grand River Dam Authority 226 W. Dwain Willis Avenue Vinita, OK Dear Carolyn; Baker Tilly Virchow Krause, LLP Ten Terrace Ct, PO Box 7398 Madison, WI 53707-7398 tel 608 249 6622 fax 608 249 8532 bakertilly.com July 8, 2011 Ms. Carolyn Dougherty Grand River Dam Authority 226 W. Dwain

More information

ELECTRIC RATE SCHEDULE NO. 3-CP-C LARGE GENERAL SERVICE-CP-C

ELECTRIC RATE SCHEDULE NO. 3-CP-C LARGE GENERAL SERVICE-CP-C GREENVILLE UTILITIES COMMISSION I. AVAILABILITY ELECTRIC RATE SCHEDULE NO. 3-CP-C LARGE GENERAL SERVICE-CP-C This schedule is available for electric service used by a nonresidential customer where the

More information

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS Electric Utility Revenues, Revenue Requirements, Cost of Service, And Rates Draft Final Report (As Updated) February 2010 February 1, 2010 Kansas City Board

More information

Preliminary 2019 Corporate Operating Plan. Javier Fernandez Vice President & CFO

Preliminary 2019 Corporate Operating Plan. Javier Fernandez Vice President & CFO Preliminary 2019 Corporate Operating Plan Javier Fernandez Vice President & CFO Assumptions Alignment with Board Strategic Directives Revenue Adjustments No General rate increase No change in the fuel

More information

OFFICIAL MINUTES JOINT MEETING OF THE GREENVILLE CITY COUNCIL AND THE GREENVILLE UTILITIES COMMISSION BOARD OF COMMISSIONERS MONDAY, APRIL 24, 2017

OFFICIAL MINUTES JOINT MEETING OF THE GREENVILLE CITY COUNCIL AND THE GREENVILLE UTILITIES COMMISSION BOARD OF COMMISSIONERS MONDAY, APRIL 24, 2017 OFFICIAL MINUTES JOINT MEETING OF THE GREENVILLE CITY COUNCIL AND THE GREENVILLE UTILITIES COMMISSION BOARD OF COMMISSIONERS MONDAY, APRIL 24, 2017 Having been properly advertised, a joint session of the

More information

IREDELL COUNTY FY2016 BUDGET MESSAGE

IREDELL COUNTY FY2016 BUDGET MESSAGE In this year of revaluation I found the results to be a good indicator of where we are overall as a County. Mooresville and South Iredell have generally seen a resurgence in development and are experiencing

More information

GREENVILLE UTILITIES COMMISSION ELECTRIC RATE SCHEDULE EG-4 LARGE GENERAL SERVICE CP (E-INDLGS)

GREENVILLE UTILITIES COMMISSION ELECTRIC RATE SCHEDULE EG-4 LARGE GENERAL SERVICE CP (E-INDLGS) GREENVILLE UTILITIES COMMISSION I. AVAILABILITY ELECTRIC RATE SCHEDULE EG-4 LARGE GENERAL SERVICE CP (E-INDLGS) This schedule is available for electric service used by a nonresidential customer where the

More information

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA. March 20, Sherri McKay-Highers, Manager, Budget and Financial Reporting

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA. March 20, Sherri McKay-Highers, Manager, Budget and Financial Reporting ANCHORAGE, ALASKA To: From: Subject: Ron Vecera, Interim Chief Financial Officer Sherri McKay-Highers, Manager, Budget and Financial Reporting kwh Sales Retail kwh Sales 116,746,326 117,739,000 Wholesale

More information

Building Department Business Plan Fiscal Year

Building Department Business Plan Fiscal Year Marion County Board of County Commissioners Building Department Business Plan Fiscal Year 2012-2013 Marion County Building Department 2710 E. Silver Springs Blvd. Ocala, Florida 34470 Ph: (352) 438-2400

More information

FINANCIAL PLAN and 2015 ANNUAL BUDGET Public Hearing. VILLAGE OF WESTON Monday, Nov 24th, 6:00 p.m. Daniel Guild, Weston Administrator

FINANCIAL PLAN and 2015 ANNUAL BUDGET Public Hearing. VILLAGE OF WESTON Monday, Nov 24th, 6:00 p.m. Daniel Guild, Weston Administrator FINANCIAL PLAN and 2015 ANNUAL BUDGET Public Hearing VILLAGE OF WESTON Monday, Nov 24th, 2014 @ 6:00 p.m. Daniel Guild, Weston Administrator Vision & Mission. Vision Statement: The Village of Weston strives

More information

Ontario Energy Board

Ontario Energy Board Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Filing Requirements For Electricity Transmission Applications Chapter 2 Revenue Requirement Applications February 11, 2016

More information

FISCAL YEAR 2016 FINANCIAL RESULTS AND SYSTEM HIGHLIGHTS. August 29, 2016

FISCAL YEAR 2016 FINANCIAL RESULTS AND SYSTEM HIGHLIGHTS. August 29, 2016 FISCAL YEAR 2016 FINANCIAL RESULTS AND SYSTEM HIGHLIGHTS August 29, 2016 1 UPMC S FINANCIAL PICTURE Strong balance sheet allows UPMC to continue meeting the region s health care needs Provide top-ranked

More information

Cost of Service Study and Recommended Rate Design

Cost of Service Study and Recommended Rate Design PEDERNALES ELECTRIC COOPERATIVE, INC. Cost of Service Study and Recommended Rate Design May 11, 2009 Presented by C. H. GUERNSEY & COMPANY Engineers Architects Consultants Cost of Service and Rate Design

More information

An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011

An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011 An Integrated Water and Sewer Utility Planning and Rate Study for October 4 & 5, 2011 HID E 1 Integrated Study Scope of Study HID E 2 Scope of the Study Part 1: Capital Assets Inventory water & sewer system

More information

Officials of Municipalities with Electric Systems and Their Independent Auditors

Officials of Municipalities with Electric Systems and Their Independent Auditors NORTH CAROLINA DEPARTMENT OF STATE TREASURER STATE AND LOCAL GOVERNMENT FINANCE DIVISION AND THE LOCAL GOVERNMENT COMMISSION JANET COWELL TREASURER T. VANCE HOLLOMAN DEPUTY TREASURER Memorandum #2010-31

More information

Financial and Operating Performance Factors

Financial and Operating Performance Factors Management s Discussion and Analysis Management s discussion and analysis reviews the financial and operational results for the fiscal year ended March 31, 2016, relative to the previous year. This section

More information

TAX CREDITS FOR GROWING BUSINESSES ACT 2011 REPORT

TAX CREDITS FOR GROWING BUSINESSES ACT 2011 REPORT TAX CREDITS FOR GROWING BUSINESSES ACT 2011 REPORT June 1, 2011 * State of North Carolina Department of Commerce Secretary J. Keith Crisco * Distribution of Article 3J Tax Credits by Industry section was

More information

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA. April 29, Sherri McKay-Highers, Manager, Budget and Financial Reporting

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA. April 29, Sherri McKay-Highers, Manager, Budget and Financial Reporting ANCHORAGE, ALASKA To: From: Subject: Ron Vecera, Interim Chief Financial Officer Sherri McKay-Highers, Manager, Budget and Financial Reporting March 2013 Year to Date Financial Results kwh Sales Retail

More information

How the High Cost of Power from Prairie State is Affecting Bowling Green Municipal Utilities Customers Updated as of October 6, 2014 Introduction

How the High Cost of Power from Prairie State is Affecting Bowling Green Municipal Utilities Customers Updated as of October 6, 2014 Introduction How the High Cost of Power from Prairie State is Affecting Bowling Green Municipal Utilities Customers Updated as of October 6, 2014 Introduction This is an updated version of the report that the Institute

More information

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE GRANITE STATE ELECTRIC COMPANY d/b/a NATIONAL GRID

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE GRANITE STATE ELECTRIC COMPANY d/b/a NATIONAL GRID STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE 08-072 GRANITE STATE ELECTRIC COMPANY d/b/a NATIONAL GRID Fiscal Year 2008 Reliability Enhancement and Vegetation Management Plan Results and Reconciliation

More information

ASSEMBLY, No. 10 STATE OF NEW JERSEY 217th LEGISLATURE

ASSEMBLY, No. 10 STATE OF NEW JERSEY 217th LEGISLATURE LEGISLATIVE FISCAL ESTIMATE [Third Reprint] ASSEMBLY, No. 10 STATE OF NEW JERSEY 217th LEGISLATURE DATED: AUGUST 4, 2016 SUMMARY Synopsis: Type of Impact: Revises New Jersey Transportation Trust Fund Authority

More information

INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017

INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017 Second Quarter 2017 INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017 Dated July 28, 2017 The following interim Management Discussion and Analysis ( MD&A

More information

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001 Pacific Gas and Electric Company Statement of Estimated Cash Flows April 20, 2001 This document provides the latest forecast of cash flows for Pacific Gas and Electric Company (the Company ). The purpose

More information

POLICY BRIEF. Unemployment Insurance Modernization: Good for Nebraska

POLICY BRIEF. Unemployment Insurance Modernization: Good for Nebraska POLICY BRIEF Unemployment Insurance Modernization: Good for Nebraska LOW INCOME SELF SUFFICIENCY Child Welfare System Accountability Program Nebraska Appleseed Center for Law in the Public Interest December

More information

Budget to Actual Comparison. For the Period Ended December 31, 2018

Budget to Actual Comparison. For the Period Ended December 31, 2018 Contents Overview and Basis of Accounting 5 Management s Discussion and Analysis 7 Financial Statements Combined System 11 Electric System 13 Water System 14 Wastewater System 15 Gas System 16 Telecommunications

More information

Exhibit Table 1: PG&E Corporation Business Priorities

Exhibit Table 1: PG&E Corporation Business Priorities Exhibit 99.2 Table 1: PG&E Corporation Business Priorities 2006-2010 1. Advance business transformation 2. Provide attractive shareholder returns 3. Increase investment in utility infrastructure 4. Implement

More information

AEP REPORTS STRONG 2013 FOURTH-QUARTER AND YEAR-END EARNINGS; COMPLETES OHIO CORPORATE SEPARATION

AEP REPORTS STRONG 2013 FOURTH-QUARTER AND YEAR-END EARNINGS; COMPLETES OHIO CORPORATE SEPARATION MEDIA CONTACT: ANALYSTS CONTACT: Melissa McHenry Bette Jo Rozsa Director, External Communications Managing Director, Investor Relations 614/716-1120 614/716-2840 FOR IMMEDIATE RELEASE AEP REPORTS STRONG

More information

Environmental Improvement Fund

Environmental Improvement Fund Informational Paper 64 Environmental Improvement Fund Wisconsin Legislative Fiscal Bureau January, 2009 Environmental Improvement Fund Prepared by Kendra Bonderud Wisconsin Legislative Fiscal Bureau One

More information

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA. August 1, 2013

CHUGACH ELECTRIC ASSOCIATION, INC. ANCHORAGE, ALASKA. August 1, 2013 ANCHORAGE, ALASKA To: From: Subject: Sherri McKay-Highers, Chief Financial Officer Renee Curran, Senior Financial Analyst June 2013 Year-to-Date Financial Results kwh Sales Retail kwh Sales 579,595,050

More information

East Central Energy. Rate schedule C&I. C&I Interruptible Service Effective: March 2018 revenue month Energy bills due in April

East Central Energy. Rate schedule C&I. C&I Interruptible Service Effective: March 2018 revenue month Energy bills due in April East Central Energy Rate schedule C&I C&I Interruptible Service Effective: March 2018 revenue month Energy bills due in April Availability This service is available to all non-residential members who agree

More information

A Message from the Chairman.

A Message from the Chairman. A Message from the Chairman A Message from the Chairman. As we move into FY 2016, our goal is to continue to improve the County's conservative management policies and strive for continued transparency

More information

BOARD MEETING. Knoxville, Tennessee. August 21, 2014

BOARD MEETING. Knoxville, Tennessee. August 21, 2014 BOARD MEETING Knoxville, Tennessee August 21, 2014 CHAIRMAN S REPORT BOARD MEETING Knoxville, Tennessee August 21, 2014 PRESIDENT S REPORT Bill Johnson President & CEO President s Report 4 Mission of Service

More information

Vision, Mission, Values and Critical Success Factors

Vision, Mission, Values and Critical Success Factors Approved Budget Vision, Mission, Values and Critical Success Factors The City of Tallahassee, through workshops, surveys and commission retreats has developed the following vision, mission, and target

More information

AUDITED FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION MUNICIPAL UTILITIES BOARD OF THE CITY OF ALBERTVILLE ELECTRIC SYSTEM ALBERTVILLE, ALABAMA

AUDITED FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION MUNICIPAL UTILITIES BOARD OF THE CITY OF ALBERTVILLE ELECTRIC SYSTEM ALBERTVILLE, ALABAMA AUDITED FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION MUNICIPAL UTILITIES BOARD OF THE CITY OF ALBERTVILLE ELECTRIC SYSTEM ALBERTVILLE, ALABAMA June 30, 2017 and 2016 TABLE OF CONTENTS PAGE INDEPENDENT

More information

Aurora Energy Limited

Aurora Energy Limited Aurora Energy Limited Statement of Intent for the year ending 30 June 2016 CONTENTS Page 1 INTRODUCTION... 1 2 STRATEGIC DIRECTION... 1 2.1 Vision... 1 2.2 Mission... 1 2.3 Corporate Goals... 1 2.4 Specific

More information

Town of Hudson, North Carolina Annual Budget Fiscal Year

Town of Hudson, North Carolina Annual Budget Fiscal Year Town of Hudson, North Carolina Annual Budget Fiscal Year 2017-2018 Board of Commissioners Janet H. Winkler Mayor Bill Warren, Mayor Pro-Tempore Larry Chapman, Commissioner Tony Colvard, Commissioner David

More information

First Quarter Fiscal Year 2018 Conference Call. February 2, 2018

First Quarter Fiscal Year 2018 Conference Call. February 2, 2018 First Quarter Fiscal Year 2018 Conference Call February 2, 2018 Agenda First Quarter Fiscal Year 2018 Review Bill Johnson, President and Chief Executive Officer Review of Financial Performance John Thomas,

More information

Wakulla County. Annual Debt Report. For. FY (unaudited) Prepared by the Wakulla County Clerk of Court, Finance Department

Wakulla County. Annual Debt Report. For. FY (unaudited) Prepared by the Wakulla County Clerk of Court, Finance Department Wakulla County Annual Debt Report For FY 2013-2014 (unaudited) Prepared by the Wakulla County Clerk of Court, Finance Department 1 Board of County Commissioners and Citizens of Wakulla County, As your

More information

The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents

The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents The Victory Electric Cooperative Association, Inc. Schedule of Tariffs Table of Contents Description Status Schedule Index All-Electric Service Active AE-17 2 Domestic Service Active D-17 3 Small Commercial

More information

COMBINED UTILITY SYSTEM OF EASLEY Easley, South Carolina

COMBINED UTILITY SYSTEM OF EASLEY Easley, South Carolina COMBINED UTILITY SYSTEM OF EASLEY Easley, South Carolina COMPREHENSIVE ANNUAL FINANCIAL REPORT FOR THE FISCAL YEARS ENDED MARCH 31, 2017 AND 2016 Prepared by the Finance Department INTRODUCTORY SECTION

More information

Xcel Energy Minnesota 2012 Rate Case Overview (Docket No:12-961) November 15, 2012

Xcel Energy Minnesota 2012 Rate Case Overview (Docket No:12-961) November 15, 2012 Xcel Energy Minnesota 2012 Rate Case Overview (Docket No:12-961) November 15, 2012 *All data is from: U.S. Department of Energy Energy Information Administration Minnesota Chamber of Commerce We represent

More information

City of Margate Strategic Plan FY 2018 FY 2022

City of Margate Strategic Plan FY 2018 FY 2022 City of Margate Strategic Plan FY 2018 FY 2022 Strategic Planning is a process in which an organization reviews its current situation and provides a roadmap to achieve its desired destination. Margate

More information

Fiscal Year 2018 Budget Highlights Ipswich Electric Light Department 13 June 2017

Fiscal Year 2018 Budget Highlights Ipswich Electric Light Department 13 June 2017 Fiscal Year 2018 Budget Highlights Ipswich Electric Light Department 13 June 2017 Relevant statistics o Projected sales: 117,000 MWh o Projected revenue from sales: $17.29M o Projected PILOT: $345,000

More information

AEP REPORTS STRONG FIRST-QUARTER 2015 EARNINGS, DRIVEN BY SOLID PERFORMANCE IN REGULATED AND COMPETITIVE BUSINESSES

AEP REPORTS STRONG FIRST-QUARTER 2015 EARNINGS, DRIVEN BY SOLID PERFORMANCE IN REGULATED AND COMPETITIVE BUSINESSES MEDIA CONTACT: ANALYSTS CONTACT: Tammy Ridout Bette Jo Rozsa Manager, Media Relations Managing Director, Investor Relations 614/716-2347 614/716-2840 FOR IMMEDIATE RELEASE AEP REPORTS STRONG FIRST-QUARTER

More information

Town of Ayden. Comprehensive Annual Financial Report

Town of Ayden. Comprehensive Annual Financial Report 2017 Town of Ayden FISCAL YEAR ENDING JUNE 30, 2017 Comprehensive Annual Financial Report FINANCIAL STATEMENTS AND SUPPLEMENTAL INFORMATION For the Year Ended June 30, 2017 And Report of Independent Auditors

More information

Forward Looking Statements. Non-GAAP Financial Statements

Forward Looking Statements. Non-GAAP Financial Statements Annual Shareholders Meeting May 16, 2017 Forward Looking Statements This document contains forward-looking statements as defined in the Private Securities Litigation Reform Act of 1995. There are several

More information

Long Island Power Authority Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets

Long Island Power Authority Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets Approved 2002 Operating Budget Approved 2002 and 2003 Capital Budgets George E. Pataki Governor Richard M. Kessel Chairman LONG ISLAND POWER AUTHORITY APPROVED 2002 OPERATING BUDGET APPROVED 2002 AND 2003

More information

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION. The following Commissioners participated in the disposition of this matter:

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION. The following Commissioners participated in the disposition of this matter: BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Petition of Gulf Power Company for approval of negotiated renewable energy power purchase agreement with Bay County, Florida. ORDER NO. PSC-2017-0449-PAA-EI

More information

moreno valley utility 2015/16 ANNUAL REPORT

moreno valley utility 2015/16 ANNUAL REPORT moreno valley utility 2015/16 ANNUAL REPORT the City of Moreno Valley moreno valley utility MISSION STATEMENT To provide safe, reliable, and economical public electric service with a focus on customer

More information

Woodinville Water District King County, Washington. Resolution No. 3595

Woodinville Water District King County, Washington. Resolution No. 3595 Woodinville Water District King County, Washington Resolution No. 3595 A resolution of the Board of Commissioners of the Woodinville Water District, King County, Washington, establishing billing and collection

More information

VILLAGE OF RANTOUL & PEER COMMUNITIES TAX AND FEE REVENUE COMPARISONS

VILLAGE OF RANTOUL & PEER COMMUNITIES TAX AND FEE REVENUE COMPARISONS VILLAGE OF RANTOUL & PEER COMMUNITIES TAX AND FEE REVENUE COMPARISONS INTRODUCTION RANTOUL VS. COMPARISON CITIES 1. Bloomington 2. Champaign 3. Danville 4. Mahomet 5. Normal 6. Paxton 7. Rantoul 8. Urbana

More information

City of Newport News Virginia. Waterworks Ratings Presentation. April 27, 2017

City of Newport News Virginia. Waterworks Ratings Presentation. April 27, 2017 City of Newport News Virginia Waterworks Ratings Presentation April 27, 2017 I. Overview Newport News Waterworks Mission Statement: To provide high quality drinking water and support public health, safety,

More information

DFPS INFORMATION REGARDING STAFF COMPENSATION

DFPS INFORMATION REGARDING STAFF COMPENSATION DFPS INFORMATION REGARDING STAFF COMPENSATION As required by Section 659.026 of Texas Government Code, certain executive and non-executive compensation information must be made available to the public

More information

A FAIR SHARE OF THE TAT ALLOCATION OF TRANSIENT ACCOMMODATIONS TAX (TAT) REVENUE

A FAIR SHARE OF THE TAT ALLOCATION OF TRANSIENT ACCOMMODATIONS TAX (TAT) REVENUE A FAIR SHARE OF THE TAT ALLOCATION OF TRANSIENT ACCOMMODATIONS TAX (TAT) REVENUE The State took the counties TAT money to cover losses when times were challenging, but failed to make significant adjustments

More information

Manitoba Hydro 2015 General Rate Application

Manitoba Hydro 2015 General Rate Application Manitoba Hydro 2015 General Rate Application OVERVIEW & REASONS FOR THE APPLICATION Darren Rainkie Vice-President, Finance & Regulatory Manitoba Hydro Why Rate Increases are Needed 2 Manitoba Hydro is

More information

Tennessee Valley Authority Strategic Plan. Fiscal Years

Tennessee Valley Authority Strategic Plan. Fiscal Years Tennessee Valley Authority Strategic Plan Fiscal Years 2014-2018 Submitted to Office of Management and Budget March 2014 Table of Contents 1. TVA s Mission Energy Environment Economic Development 2. Overview

More information

BUDGET AND CAPITAL WORK PLAN

BUDGET AND CAPITAL WORK PLAN 2018 BUDGET AND CAPITAL WORK PLAN The following pages include the supporting documentation for the 2018 Budget, 20192022 Forecast and 10year capital work plan. It includes a review of 2017, executive summary

More information

COOS-CURRY ELECTRIC COOPERATIVE, INC. RULES AND REGULATIONS. August 24, 2017

COOS-CURRY ELECTRIC COOPERATIVE, INC. RULES AND REGULATIONS. August 24, 2017 POLICY NO. 300-010 COOS-CURRY ELECTRIC COOPERATIVE, INC. RULES AND REGULATIONS August 24, 2017 These are Coos-Curry Electric Cooperative s Rules and Regulations designed to supplement and clarify the application

More information

Annual Operating and Capital Budget

Annual Operating and Capital Budget Annual Operating and Capital Budget Budget Year Executive Summary Gainesville Regional Utilities (GRU) proposed Fiscal Year capital and operating budget presents a framework for providing safe, reliable,

More information

Request for Proposal for Life and Disability Insurance Broker Services

Request for Proposal for Life and Disability Insurance Broker Services City of Greenville and Greenville Utilities Commission Greenville, North Carolina Request for Proposal for Life and Disability Insurance Broker Services Release Date: July 17, 2013 Submittal Deadline:

More information

Task Force on Consolidation - JEA

Task Force on Consolidation - JEA Task Force on Consolidation - JEA I. Central Service Type Activities Recently, the Task Force has heard suggestions about consolidating central service type activities (legal, IT, procurement, fleet management,

More information

[Third Reprint] ASSEMBLY, No STATE OF NEW JERSEY. 213th LEGISLATURE INTRODUCED DECEMBER 8, 2008

[Third Reprint] ASSEMBLY, No STATE OF NEW JERSEY. 213th LEGISLATURE INTRODUCED DECEMBER 8, 2008 [Third Reprint] ASSEMBLY, No. 0 STATE OF NEW JERSEY th LEGISLATURE INTRODUCED DECEMBER, 00 Sponsored by: Assemblyman UPENDRA J. CHIVUKULA District (Middlesex and Somerset) Assemblyman WAYNE P. DEANGELO

More information

SUMMARY OF APPLICATION

SUMMARY OF APPLICATION Page of 0 0 SUMMARY OF APPLICATION OVERVIEW AND CONTEXT This is an application for an order or orders of the Ontario Energy Board ( OEB ) approving payment amounts for OPG s prescribed hydroelectric and

More information

Kissimmee Utility Authority

Kissimmee Utility Authority Kissimmee Utility Authority 1701 W. Carroll Street Kissimmee, FL 34741 Year End Audited Financial Report for FY 16 AUDITED FINANCIAL REPORT YEAR ENDED SEPTEMBER 30, 2016 TABLE OF CONTENTS Financial Section

More information

Power Accountants Association Annual Meeting Potential Impacts from Oct 2015 Rate Change

Power Accountants Association Annual Meeting Potential Impacts from Oct 2015 Rate Change Power Accountants Association Annual Meeting Potential Impacts from Oct 2015 Rate Change Material Provided by: Chris Mitchell Chris Mitchell Management Consultants (CMMC) mail@chrismitchellmc.com 5/14/2015

More information

Eastern North Carolina Mayors Association North Carolina Eastern Municipal Power Agency ElectriCities of NC, Inc.

Eastern North Carolina Mayors Association North Carolina Eastern Municipal Power Agency ElectriCities of NC, Inc. Eastern North Carolina Mayors Association North Carolina Eastern Municipal Power Agency ElectriCities of NC, Inc. November 4, 2010 Kinston, North Carolina We hear you! Who is ElectriCities? Who is NCEMPA?

More information

Providing Pennsylvania Energy and Pennsylvania Jobs for 100 years

Providing Pennsylvania Energy and Pennsylvania Jobs for 100 years Providing Pennsylvania Energy and Pennsylvania Jobs for 100 years The following is a brief overview of Seneca Resources operations in the Appalachian Basin Seneca Resources East Division Payouts by Fiscal

More information

MUNICIPAL UTILITY FEASIBILITY STUDY

MUNICIPAL UTILITY FEASIBILITY STUDY REPORT January 2018 MUNICIPAL UTILITY FEASIBILITY STUDY Decorah Power PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net Table of Contents Executive Summary Section 1

More information

ANNUAL DEBT GUIDE. Palm Beach County, Florida C L ERK & C O MP TRO L L ER S O F F IC E F ISC AL Y EA R E N D ED S EP T EMB E R 30, 2009

ANNUAL DEBT GUIDE. Palm Beach County, Florida C L ERK & C O MP TRO L L ER S O F F IC E F ISC AL Y EA R E N D ED S EP T EMB E R 30, 2009 ANNUAL DEBT GUIDE Palm Beach County, Florida P R EP A R ED B Y TH E C L ERK & C O MP TRO L L ER S O F F IC E FOR THE F ISC AL Y EA R E N D ED S EP T EMB E R 30, 2009 PREPARED BY THE CLERK & COMPTROLLER

More information

Electric Rate Schedule GS-2 General Service - Demand

Electric Rate Schedule GS-2 General Service - Demand Page 1 of 5 Applicability This Schedule is applicable to general commercial customers having demands in excess of 20 kilowatts and less than 1,000 kilowatts, and public units for residential occupancy.

More information

TVA BOARD MEETING AUGUST 22, 2013

TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING AUGUST 22, 2013 TVA BOARD MEETING 2 CONSENT AGENDA Health Savings Account Contract Pharmacy Benefits Managers Contract Assistant Corporate Secretary Designations 3 CHAIRMAN S REPORT AUGUST

More information

Southeast Water District. Southeast Water District Revenue

Southeast Water District. Southeast Water District Revenue Southeast Water District The Southeast Water District Fund accounts for the activities of the Southeast Water District, which includes water purchases, maintenance and debt service on water lines approved

More information

40 th Annual EEI Finance Conference

40 th Annual EEI Finance Conference 40 th Annual EEI Finance Conference Hollywood, FL November 6-8, 2005 Forward-Looking Statements Disclosure The following presentation contains some forward-looking statements with respect to Westar Energy

More information

City of Laramie Adjusted Budget FY - Wastewater Fund. 189 P age

City of Laramie Adjusted Budget FY - Wastewater Fund. 189 P age Wastewater Fund 189 P age Wastewater Fund The Water and Wastewater Funds are part of the Utility Fund, which is run as an enterprise fund, or businesstype activity. The Water and Wastewater Utilities are

More information

Public Service Enterprise Group

Public Service Enterprise Group Public Service Enterprise Group PSEG Earnings Conference Call 1 st Quarter 2018 April 30, 2018 Forward-Looking Statements Certain of the matters discussed in this presentation about our and our subsidiaries

More information

NEW PRAGUE UTILITIES COMMISSION CUSTOMER SERVICE POLICY ELECTRIC, WATER & SEWER SERVICE

NEW PRAGUE UTILITIES COMMISSION CUSTOMER SERVICE POLICY ELECTRIC, WATER & SEWER SERVICE NEW PRAGUE UTILITIES COMMISSION CUSTOMER SERVICE POLICY ELECTRIC, WATER & SEWER SERVICE Revised 9/05/17 APPLICATION FOR SERVICE Each customer must fill out an Application for Utility Service. This application

More information

Merger Plus. Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005

Merger Plus. Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005 Merger Plus Robert S. Shapard Executive Vice President & CFO UBS Natural Gas & Electric Utilities Conference New York City February 17, 2005 Safe Harbor Language This presentation includes forward-looking

More information

STATE OF FLORIDA 2018 DEBT REPORT

STATE OF FLORIDA 2018 DEBT REPORT STATE OF FLORIDA 2018 DEBT REPORT Prepared by The Division of Bond Finance December 2018 TABLE OF CONTENTS Executive Summary... 1 Introduction... 5 Composition of Outstanding State Debt... 6 Developments

More information

M E M O R A N D U M. Financial savings initiatives over the last several years are summarized in Attachment 1. EUGENE WATER & ELECTRIC BOARD

M E M O R A N D U M. Financial savings initiatives over the last several years are summarized in Attachment 1. EUGENE WATER & ELECTRIC BOARD M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: Commissioners Helgeson, Brown, Mital, Simpson and Carlson FROM: Sue Fahey, Chief Financial Officer; Deborah Hart, Fiscal Services Supervisor; Jerry

More information

Public Utility District No. 1 of Lewis County. Customer Information. and. Electric Rate Schedules

Public Utility District No. 1 of Lewis County. Customer Information. and. Electric Rate Schedules Public Utility District No. 1 of Lewis County Customer Information and Electric Rate Schedules June 1, 2015 TABLE OF CONTENTS Introduction 5 About the PUD 5 Billing and Credit Policies 6 Miscellaneous

More information

Updated Financial Analysis Final Draft

Updated Financial Analysis Final Draft Solar Market Pathways: San Francisco Solar and Storage for Resilience Project December 2017 Final Draft Important Notice This report was prepared by Arup North America Ltd. ( Arup ) in its capacity as

More information

5::BASE CASE FINANCIAL MODEL

5::BASE CASE FINANCIAL MODEL 5::BASE CASE FINANCIAL MODEL Key Findings There are small cost savings due to differences in ownership structure. Ownership makes a minor difference in rates because there is an additional expense from

More information

COMPREHENSIVE ANNUAL FINANCIAL REPORT For the Fiscal Year Ended June 30, 2014 Greenville Utilities Commission is an enterprise fund of the City of

COMPREHENSIVE ANNUAL FINANCIAL REPORT For the Fiscal Year Ended June 30, 2014 Greenville Utilities Commission is an enterprise fund of the City of COMPREHENSIVE ANNUAL FINANCIAL REPORT For the Fiscal Year Ended June 30, 2014 Greenville Utilities Commission is an enterprise fund of the City of Greenville, North Carolina ON THE COVER: The cover photo,

More information

Exhibit "B" TAX INCREMENT REINVESTMENT ZONE, NUMBER ONE CITY OF BAYTOWN. July 8, 2015

Exhibit B TAX INCREMENT REINVESTMENT ZONE, NUMBER ONE CITY OF BAYTOWN. July 8, 2015 Exhibit "B" TAX INCREMENT REINVESTMENT ZONE, NUMBER ONE CITY OF BAYTOWN July 8, 2015 2015 AMENDMENT TO THE PROJECT PLAN AND REINVESTMENT ZONE FINANCING PLAN PROJECT PLAN Page I. Existing uses and conditions

More information

DATE: November 18, 2015 SUBJECT: 2016 Proposed Budgets, Revenue Requirements, and Prices OBJECTIVE: Approval of 2016 Budget and Price Proposals

DATE: November 18, 2015 SUBJECT: 2016 Proposed Budgets, Revenue Requirements, and Prices OBJECTIVE: Approval of 2016 Budget and Price Proposals M E M O R A N D U M EUGENE WATER & ELECTRIC BOARD TO: FROM: Commissioners Mital, Simpson, Helgeson, Manning and Brown Sue Fahey, Finance Manager; Harvey Hall, Deborah Hart and Edward Yan, Senior Financial

More information

Prepared for: Iowa Department of Human Rights Des Moines, Iowa WINTER WEATHER PAYMENTS:

Prepared for: Iowa Department of Human Rights Des Moines, Iowa WINTER WEATHER PAYMENTS: WINTER WEATHER PAYMENTS: The Impact of Iowa s Winter Utility Shutoff Moratorium On Utility Bill Payments by Low-Income Customers February 2002 PREPARED BY: Roger D. Colton Fisher Sheehan & Colton Public

More information

Scorecard - Niagara-on-the-Lake Hydro Inc. 9/24/2017

Scorecard - Niagara-on-the-Lake Hydro Inc. 9/24/2017 Scorecard - Niagara-on-the-Lake Hydro Inc. 9/24/217 Performance Outcomes Performance ategories Measures 212 21 214 215 216 Trend Industry Distributor Target ustomer Focus Services are provided in a manner

More information

INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three Months Ended March 31, 2017

INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three Months Ended March 31, 2017 First Quarter 2017 INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three Months Ended March 31, 2017 Dated May 2, 2017 The following interim Management Discussion and Analysis ( MD&A ) should be read

More information

Summary of Economic Indicators

Summary of Economic Indicators La Paz County Summary of Economic Indicators The economic overview includes a variety of topic areas and benchmarks of economic performance over the past six years Data is indexed based on 2005 county