JSW STEEL LIMITED. Rating assigned. Instruments Amount (Rs. crore) Ratings 1 Remarks Commercial Paper issue 1, CARE A1+ (A One Plus) Assigned

Size: px
Start display at page:

Download "JSW STEEL LIMITED. Rating assigned. Instruments Amount (Rs. crore) Ratings 1 Remarks Commercial Paper issue 1, CARE A1+ (A One Plus) Assigned"

Transcription

1 Rating assigned JSW STEEL LIMITED Instruments Amount (Rs. crore) Ratings 1 Remarks Commercial Paper issue 1, CARE A1+ (A One Plus) Assigned JSWSL has proposed to raise up to Rs.1,500 crore through a Commercial Paper (CP) issue shortly. The proceeds of the CP issue are proposed to be utilized for the working capital requirement and general corporate purpose. The CP issue would have a tenure of up to one year. Rating Rationale The rating derives strength from JSWSL s significant presence in the Indian steel sector, its experienced management with wellestablished track record in brownfield project execution and cost management expertise, well-diversified product mix with increasing share of value added and upstream products, improvement in operational performance during FY13 (refers to the period from April 1, 2012 to March 31, 2013) and Q1FY14 (refers to the period from April 1, 2013 to June 30, 2013) as well as improving availability of iron ore in Karnataka, though, at a slow pace. The rating also factors in susceptibility of profit margins to volatility in input cost due to lack of raw material integration, residual commitments towards various projects undertaken by the company, moderation in capital structure, exposure to foreign exchange risk and inherent cyclicality of the steel industry. JSWSL s ability to complete the ongoing projects within the envisaged time and cost enhancing the level of backward integration for cost effective production as well as further improvement in iron ore supply are the key rating sensitivities. Background JSWSL is part of the JSW group, which in turn is part of the O.P. Jindal group. The group has presence across various sectors, such as steel, energy, minerals, ports and infrastructure, cement, etc. With the recent merger of JSW Ispat Steel Limited (JSIL) with JSWSL, the overall steelmaking capacity of the company stands at million tonnes per annum (mtpa), which is at present the largest in terms of rated capacity in India. Integrated manufacturing units located across three states (i.e., Karnataka, Maharashtra and Tamil Nadu) have facilities to produce a wide range of flat and long steel products. Key developments Scheme of amalgamation and arrangement The composite scheme of amalgamation and arrangement amongst JSWSL, JISL, JSW Building Systems Ltd (JBSL) and JSW Steel Coated Products Ltd (JSCPL) has become effective from June 01, 2013, with the appointed date of July 01, Consequently, Kalmeshwar unit of JISL as well as Vasind and Tarapur units of JSWSL in Maharashtra were transferred to JSCPL. Further, JBSL and residual JISL (Dolvi steel complex) were amalgamated with JSWSL. Karnataka iron ore update In April 2013, the Supreme Court allowed resumption of mining operations of all mines in category A and 63 mines in category B subject to the terms and conditions as stipulated by Central Empowered Committee (CEC). CEC has approved Reclamation & Rehabilitation (R&R) plan for 29 mines in category A (permitted capacity ~8 mtpa) and 28 mines in category B (permitted capacity ~8 mtpa). 11 mines in category A and 3 mines in category B with a combined capacity of over 6 mtpa have resumed mining operations. More mines are expected to get into production in short to medium term. National Mineral Development Corporation (NMDC) is currently operating at around 9 mtpa production rate. Credit Risk Assessment JSWSL s significant presence in the Indian steel sector JSWSL, with its enhanced steelmaking capacity of mtpa, has considerable presence in the steel industry in India. Its multilocation steel manufacturing facilities produce various upstream products ranging from Mild Steel (MS) slabs/billets and Hot 1 Complete definition of the ratings assigned are available at and in other CARE publications 1

2 Rolled (HR) coils/steel plates/sheets, bar and wire rod products to the downstream products like cold rolled coils/sheets, colour coated coils/sheets and galvanized coils/sheets. The company also has a foreign collaboration agreement with JFE Steel Corp (Japan) for licensing of the high grade automotive steel technology which will be used to manufacture value added steel products. The company also has mining assets overseas in Chile, USA and Mozambique. Experienced management JSWSL is amongst fastest growing steel companies in India. Over the past years, JSWSL and various group companies have ramped up their capacities in a timely and cost-effective manner. Furthermore, the company managed to maintain competitive margins (despite lack of raw material integration) due to its efficient operations. The company has shown strong track record in brownfield project execution as well as cost management expertise. Well-diversified product mix JSWSL earns its revenues from a diversified mix of steel products. During FY13, the share of flat rolled product to the total sales volume increased to 60% from 55% in FY12 (refers to the period from April 1, 2011 to March 31, 2012), while that of long rolled products remained flat at 19%. Due to continuous emphasis on increasing value addition, contribution from semis has come down substantially over past few years and stood at 3% in FY13 (5% in FY12). Value-added products accounted for 18% of total sales volume in FY13. Improvement in operational performance During FY13, JSWSL achieved highest crude steel production of 8.52 million tonnes (15% y-o-y growth). Vijayanagar steel complex (10 mtpa capacity) was operating at around 80% capacity utilization level during FY13. This was on the back of several initiatives undertaken by the company, such as higher capability to use low grade iron ore due to commissioning of 20 mtpa beneficiation plant; augmented in-bound and out-bound logistics infrastructure to enhance flexibility in utilization of inputs and dispatch of finished goods; commissioned fourth stove of Blast Furnace III and phase 2 of Hot Strip Mill (HSM). This led to 11% y-o-y growth in JSWSL s total income while PBILDT witnessed 15% y-o-y growth in FY13. The PBILDT margin improved from 16.04% in FY12 to 16.71% in FY13. This was in spite of softening average realization as well as higher price of iron ore procured through e-auctions. The company was able to achieve this due to better cost management by optimizing blend of coal for coke making, improved fuel efficiency, reduction in the price of coal, increased waste heat utilization across plants and productivity improvements. During Q1FY14, JSWSL sustained its operating profitability in spite of giving effect of the merger of Dolvi steel complex of JISL having lower operating profitability (largely due to lower level of integration). The operating profitability of Dolvi steel complex is expected to improve from FY15 onwards with completion of the ongoing backward integration projects (viz., 1 mtpa coke oven and 4 mtpa pellet plant). Availability of iron ore improving but at a slow pace Even with the Supreme Court allowing mines in A and B categories restart operations in Karnataka, iron ore remains in short supply as it takes time for the mining output to bounce back. Several mines are yet to get R&R plan approved by CEC and are in the process of getting their mining lease renewed. Currently operating A and B category mines are producing over 6 million tonnes, while NMDC is expected to produce at the rate of around 9 mtpa. Additional 5 million tonnes of sub-grade iron ore is expected to be e-auctioned. JSWSL will have to procure the balance iron ore requirement from nearby states in order to achieve its crude steel production target of 12 million tonnes for the current financial year. Approval by the court for cancellation of Category C mines and allotting/assigning them through transparent bidding process to end users is expected to ease availability of iron ore in Karnataka. Lack of captive raw material resources Since the company relies on open market purchases for its key raw materials, i.e iron ore and coal, the company s profit margins are susceptible to volatility in the raw material prices. The volatility in input prices has adversely impacted JSWSL s PBILDT margins over the past three years which the company has been able to mitigate to some extent through its various cost reduction and productivity improvement measures. The company has one of the lowest conversion cost in the industry owing to operational efficiencies. Also, JSWSL is self-sufficient with regard to its power requirement through captive power plants, thereby reducing its power cost. Moderation in capital structure and debt coverage indicators JSWSL s total debt (including Bills Discounted and creditors backed by Acceptances) stood at Rs.28,150 crore as on March 31, 2013 (up from Rs.26,648 crore as on March 31, 2012). Overall gearing remained moderate at 1.22x as at end-fy13 (1.26x as at end-fy12). The gearing levels JSWSL have remained at this level largely on account of debt-funded investment in expansion of 2

3 steelmaking capacities and higher working capital requirements due to increased volumes. The capital structure is expected to deteriorate moderately owing to transfer to JISL s debt to JSWSL upon the amalgamation. Total Debt/GCA ratio was moderate at 6.82x in FY13 (6.14x in FY12). Interest coverage dipped to 3.45x in FY13 (4.36x in FY12) in line with increase in interest expense due to commissioning of the projects. Commitment towards ongoing projects At Vijayanagar works, major ongoing projects include 2.3 mtpa Cold Rolling Mill (CRM) complex and balancing equipment for achieving full utilization of rolling capacity at 10 mtpa capacity including de-bottlenecking/setting up new facilities. Total investment in the above projects is planned at Rs.8,679 crore, out of which the company has incurred Rs.4,321 crore (50% of total cost) till June 30, The projects are to be completed in phases during FY14 and FY15. In addition, JSWSL (through a wholly owned subsidiary) is setting up 1.0 mtpa coke oven and 4.0 mtpa pellet plant as part of backward integration plan at Dolvi steel complex. The total planned investment in the projects is Rs.1,875 crore. Till June 30, 2013, the company has incurred Rs.1,314 crore (70% of total cost). Project execution risk With the capital-intensive projects in progress, JSWSL is exposed to project execution risk as well as stabilization risk of newly commissioned capacities. However, in the past, JSWSL has successfully completed the projects and stabilized the operations of the new capacities ramped-up in a phased manner, including the 3.2 mtpa capacity expansion program (taking the steelmaking capacity to 11 mtpa). Thus, the project execution risk is mitigated to large extent. Exposure to foreign exchange risk During FY13, JSWSL s imports of raw materials amounted to Rs.12,080 crore (forming 53% of raw materials consumed), which was largely on account of imports of coal/coke. JSWSL earned Rs.7,597 crore through exports (around 20% of total revenue) during the same period, therefore, the company was a net importer. In addition, the company had foreign currency borrowings of around Rs.6,665 crore (around USD 1.23 billion) with a current portion of Rs.528 crore as on March 31, Un-hedged Acceptances stood at Rs.6,200 crore (around USD 1.14 billion) as on March 31, Hence, the company is exposed to foreign exchange fluctuation risk for the un-hedged portion of the currency exposure. JSWSL registered exceptional foreign exchange loss (net) of Rs.367 crore in FY13 (Rs.821 crore in FY12) and exchange loss of Rs.853 crore in Q1FY14. However, the company has a natural hedge to a large extent against the currency exposure as the domestic steel prices generally follow the international steel prices. Cyclicality of the steel industry Prospects of steel industry are strongly co-related to economic cycles. Demand for steel is sensitive to trends of particular industries, viz. automotive, construction, infrastructure and consumer durables, which are the key consumers of steel products. These key user industries in turn depend on various macroeconomic factors, such as consumer confidence, employment rates, interest rates and inflation rates, etc. in the economies in which they sell their products. When downturns occur in these economies or sectors, steel industry may witness decline in demand. Prospects The demand growth from the key consumer sectors (i.e., consumer durable, automobile, construction and infrastructure) is foreseen as muted in the short term as concerns over economic slowdown are expected to prevail for a while. However, a good monsoon is expected to drive consumption in the second part of FY14, which in turn, would support revival of steel demand growth. With the enhanced steel-making capacity and benefits accruing from continuing efforts towards increasing level of integration and reducing conversion costs, JWSL is expected to benefit from the pickup in demand. Going forward, JSWSL s revenue growth is expected to be largely volume driven. While the company s ability to improve its profitability will depend on uninterrupted supply of iron ore, movement in input prices and timely implementation of backward integration projects. 3

4 Financial Performance (Rs. Crore) For the period ended / as at Mar.31, (12m, A) (12m, A) (12m, A) Working Results Net Sales 23,060 32,028 35,325 Total Operating income 23,474 32,188 35,571 PBILDT 5,011 5,163 5,944 Interest 851 1,184 1,722 Depreciation 1,379 1,708 1,974 PBT 2,769 2,097 2,507 PAT (after deferred tax) 2,011 1,626 1,801 Gross Cash Accruals 3,777 4,342 4,129 Financial Position Equity Capital Networth 19,251 21,212 23,074 Total capital employed 34,116 40,557 44,309 Key Ratios Growth Growth in Total income (%) Growth in PAT (after deferred tax) (%) Profitability PBILDT/Total Op. income (%) PAT (after deferred tax)/total income (%) ROCE (%) Solvency Long Term Debt Equity ratio (times) Overall gearing ratio (times)*@ Interest coverage (times) Term debt/gross cash accruals (years) Liquidity Current ratio (times)@ Quick ratio (times)@ Turnover Average collection period (days)@ Average creditors (days)* Average inventory (days) Operating cycle (days) * Including Acceptances as on the balance sheet Including Bills Discounted, which are largely backed by Letter of Credit After giving effect of the scheme of amalgamation and arrangement, JSWSL posted a total income of Rs.9,358 crore and net loss of Rs.221 crore (including exceptional net foreign exchange loss of Rs.853 crore) during Q1FY14. (This follows our brief rational for entity published on 08 November 2013) DISCLAIMER CARE s ratings are opinions on credit quality and are not recommendations to sanction, renew, disburse or recall the concerned bank facilities or to buy, sell or hold any security. CARE has based its ratings on information obtained from sources believed by it to be accurate and reliable. CARE does not, however, guarantee the accuracy, adequacy or completeness of any information and is not responsible for any errors or omissions or for the results obtained from the use of such information. Most entities whose bank facilities/instruments are rated by CARE have paid a credit rating fee, based on the amount and type of bank facilities/instruments. 4

5 CARE is headquartered in Mumbai, with Offices all over India. The office addresses and contact numbers are given below: HEAD OFFICE: MUMBAI Mr. D.R. Dogra Managing Director Mobile : dr.dogra@careratings.com Ms. Meenal Sikchi Vice President Bank Loan & Instrument Rating Mobile: mail: meenal.sikchi@careratings.com Mr. Rajesh Mokashi Dy. Managing Director Mobile rajesh.mokashi@careratings.com Mr.Ankur Sachdeva Vice President Banking & Financial Services Mobile: ankur.sachdeva@careratings.com CREDIT ANALYSIS & RESEARCH LTD. HEAD OFFICE 4th Floor, Godrej Coliseum, Somaiya Hospital Road, Off Eastern Express Highway, Sion (East), Mumbai Tel: care@careratings.com Fax: KOLKATA Ms. Priti Agarwal Cell: Tel: / 1602 E- mail: priti.agarwal@careratings.com 3rd Flr., Prasad Chambers (Shagun Mall Bldg), 10A, Shakespeare Sarani, Kolkata CHENNAI Mr. V Pradeep Kumar Cell: Tel: / Fax: pradeep.kumar@careratings.com Unit No. O-509/C, Spencer Plaza, 5th Floor, No. 769, Anna Salai, Chennai AHMEDABAD Mr. Mehul Pandya Cell: Tel: Fax: mehul.pandya@careratings.com 32, Titanium, Prahaladnagar Corporate Road, Satellite, Ahmedabad NEW DELHI Ms. Swati Agrawal Cell: Tel: / swati.agrawal@careratings.com 3 rd Floor, B -47, Inner Circle, Near Plaza Cinema, Connaught Place, New Delhi BENGALURU Mr. Dinesh Sharma Cell: Tel: / Tele fax: dinesh.sharma@careratings.com Unit No , 11 th Floor, Prestige Meridian II No-30, M.G. Road, Bengaluru HYDERABAD Mr. Saikat Roy Tel: saikat. roy@careratings.com 401, Ashoka Scintilla , Himayat Nagar Hyderabad PUNE Mr. Rahul Patni Cell: Tel: rahul.patni@careratings.com 9th Floor, Pride Kumar Senate, Plot No. 970, Bhamburda, Senapati Bapat Road, Shivaji Nagar, Pune JAIPUR Mr. Rahul Jain Cell: Tel: /14 rahul.jain@careratings.com 304, Pashupati Akshat Heights, Plot No. D-91, Madho Singh Road, Near Collectorate Circle, Bani Park, Jaipur

DIGAMBER CAPFIN LIMITED

DIGAMBER CAPFIN LIMITED DIGAMBER CAPFIN LIMITED Rating Facilities Amount (Rs. crore) Rating 1 Remarks Long-term Bank Facilities 30 CARE BB (Double B) Assigned Rating Rationale The rating is primarily constrained by the small

More information

MCNALLY BHARAT ENGINEERING COMPANY LIMITED

MCNALLY BHARAT ENGINEERING COMPANY LIMITED MCNALLY BHARAT ENGINEERING COMPANY LIMITED Ratings Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 3,904.2 (enhanced from 3,779.8) CARE A (Single A) Revised from CARE A+ (Single

More information

PENNA CEMENT INDUSTRIES LIMITED

PENNA CEMENT INDUSTRIES LIMITED Ratings PENNA CEMENT INDUSTRIES LIMITED Facilities Amount (Rs. crore) Ratings 1 Remarks Proposed Non-Convertible Debenture 150 CARE A+ [Single A Plus] Assigned Total Facilities 150 Rating Rationale The

More information

TLT Engineering India Private Limited

TLT Engineering India Private Limited Ratings TLT Engineering India Private Limited Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 9.45 CARE BBB- (Triple B Minus) Reaffirmed Long/Short-term Bank Facilities 35.00

More information

AU FINANCIERS (INDIA) LIMITED

AU FINANCIERS (INDIA) LIMITED AU FINANCIERS (INDIA) LIMITED Ratings Instrument Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 1,100 CARE A [Single A] Non Convertible Debenture 45 CARE A [Single A] Subordinated Debt

More information

SATIN CREDITCARE NETWORK LIMITED

SATIN CREDITCARE NETWORK LIMITED SATIN CREDITCARE NETWORK LIMITED Ratings Instrument/Facility Amount (Rs. crore) Ratings 1 Remarks Fully Paid-Up Cumulative Non- Convertible Compulsorily Redeemable Preference Shares (Proposed) Long-term

More information

AMTEK INDIA LIMITED. CARE AA- (Double A Minus) Reaffirmed and credit watch removed. CARE A1+ (A One Plus) Reaffirmed and credit watch removed

AMTEK INDIA LIMITED. CARE AA- (Double A Minus) Reaffirmed and credit watch removed. CARE A1+ (A One Plus) Reaffirmed and credit watch removed AMTEK INDIA LIMITED Ratings Facilities/Instruments Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 4038.12 (enhanced from 2392.62) Short-term Bank Facilities 88 (enhanced from 38) Total

More information

INDOSTAR CAPITAL FINANCE PVT. LIMITED

INDOSTAR CAPITAL FINANCE PVT. LIMITED Rated Instruments/Facilities INDOSTAR CAPITAL FINANCE PVT. LIMITED Instrument / Facility Amt Rated (Rs crore) Rating 1 Remarks Long Term Debt^ 2,450 (enhanced from Rs.1,950)* CARE AA- (Double A Minus)

More information

TATA MOTORS LIMITED. 1 Complete definition of the ratings assigned are available at and other CARE publications

TATA MOTORS LIMITED. 1 Complete definition of the ratings assigned are available at   and other CARE publications TATA MOTORS LIMITED Ratings Instruments Amount (Rs. crore) Ratings 1 Remarks Non-Convertible Debentures 6,600 CARE AA+ [Double A plus] Revised from CARE AA [Double A] Total 6,600 Rating Rationale CARE

More information

SHREE GANESH JEWELLERY HOUSE (I) LIMITED

SHREE GANESH JEWELLERY HOUSE (I) LIMITED Ratings SHREE GANESH JEWELLERY HOUSE (I) LIMITED Facilities/Instruments Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 150 CARE BBB+ Short-term Bank Facilities 3695 CARE A3+ (A Three Plus)

More information

CESC LIMITED. Ratings

CESC LIMITED. Ratings Ratings CESC LIMITED Facilities/Instruments Amount Ratings 1 Remarks Long-term Bank Facilities 905.4 (reduced from 1,015.0) CARE AA (Double A) Reaffirmed Short-term Bank Facilities 250.0 CARE A1+ (A One

More information

RUCHI SOYA INDUSTRIES LIMITED

RUCHI SOYA INDUSTRIES LIMITED RUCHI SOYA INDUSTRIES LIMITED Ratings Facilities/Instruments Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 4,250.50 [enhanced from Rs.3,731.50] Long-term / Short-term Bank Facilities 6,478.00

More information

CARE REVISES THE RATING ASSIGNED TO BANK FACILITIES AND CP/STD OF BOMBAY RAYON FASHIONS LTD. Amount

CARE REVISES THE RATING ASSIGNED TO BANK FACILITIES AND CP/STD OF BOMBAY RAYON FASHIONS LTD. Amount July 31, 2012 Press Release CARE REVISES THE RATING ASSIGNED TO BANK FACILITIES AND CP/STD OF BOMBAY RAYON FASHIONS LTD. Facilities/Instruments Long-term Bank Facilities Amount Ratings 1 (Rs. crore) 3,167.20

More information

TMT Steels Private Limited

TMT Steels Private Limited Ratings TMT Steels Private Limited Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 5 CARE BB- (Double B Minus) Assigned Short-term Bank Facilities 5 CARE A4 (A Four) Assigned

More information

Unidrug Innovative Pharma Technologies Limited

Unidrug Innovative Pharma Technologies Limited Ratings Unidrug Innovative Pharma Technologies Limited Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 7.10 (reduced from 7.30) CARE BB (Double B) Revised from CARE BB- (Double

More information

RAYMOND LIMITED. (Rs. crore) (Rs. crore)

RAYMOND LIMITED. (Rs. crore) (Rs. crore) RAYMOND LIMITED Amount (Rs. crore) 1 Remarks Long-term Bank 1,585 CARE AA- Short-term Bank 475 (enhanced from Rs.370.95) Total 2,060 CARE A1+ [A One Plus] Non Convertible Debentures 175 CARE AA- Commercial

More information

EMCURE PHARMACEUTICALS LIMITED

EMCURE PHARMACEUTICALS LIMITED EMCURE PHARMACEUTICALS LIMITED Ratings Facilities Amount (Rs. crore) Long-term Bank Facilities 507.89 (reduced from 542.80) Short-term Bank Facilities 115.04 (reduced from 117) Long/Short-term Bank Facilities

More information

C.M.Builds Private Limited November 03, 2017

C.M.Builds Private Limited November 03, 2017 Rating Facilities Long-term Bank Facilities C.M.Builds Private Limited November 03, 2017 Amount 10 Total Facilities (Rupees Ten crore only) Details of instruments/facilities in Annexure-1 10 Rating 1 CARE

More information

November 07, 2014 CARE ASSIGNS CARE AA RATING TO NCD ISSUE OF TATA POWER COMPANY LIMITED & REAFFIRMS THE RATING OF OUSTANDING INSTRUMENTS

November 07, 2014 CARE ASSIGNS CARE AA RATING TO NCD ISSUE OF TATA POWER COMPANY LIMITED & REAFFIRMS THE RATING OF OUSTANDING INSTRUMENTS November 07, 2014 CARE ASSIGNS CARE AA RATING TO NCD ISSUE OF TATA POWER COMPANY LIMITED & REAFFIRMS THE RATING OF OUSTANDING INSTRUMENTS Ratings Facilities Amount (Rs. crore) Ratings 1 Remarks Perpetual

More information

Central Bank of India

Central Bank of India Central Bank of India May 25, 2018 Ratings Facilities/Instruments Amount Rating 1 Rating Action Lower Tier II Bond Series XIII - - Withdrawn Details of instruments/facilities in Annexure-1 Detailed Rationale,

More information

SHIVA INDUSTRIAL SECURITY AGENCY (GUJARAT) PRIVATE LIMITED JANUARY 19, 2017

SHIVA INDUSTRIAL SECURITY AGENCY (GUJARAT) PRIVATE LIMITED JANUARY 19, 2017 SHIVA INDUSTRIAL SECURITY AGENCY (GUJARAT) PRIVATE LIMITED JANUARY 19, 2017 Ratings Facilities Amount Long-term Bank Facilities 12.69 Short-term Bank Facilities 1.00 13.69 Total (Rupees Thirteen crore

More information

ICICI Prudential Capital Protection Oriented Fund III-XII. July 26, 2017

ICICI Prudential Capital Protection Oriented Fund III-XII. July 26, 2017 IIIXII July 26, 2017 Ratings Facilities/Instruments Scheme Type Ratings 1 Remarks III Plan B, E, G and H IV Plan A, C, D, F and G V Plan A and C V Plan B, DF* VI Plan AH VII Plan AH VIII Plan AJ IX Plan

More information

Aquarelle India Pvt. Ltd.

Aquarelle India Pvt. Ltd. Ratings Aquarelle India Pvt. Ltd. Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities-Term Loan 42.00 CARE A- (A Minus) Assigned Long-term Bank Facilities-Fund based 54.00 CARE A-

More information

Amtek Auto Ltd Ratings Facilities Amount (Rs. crore) Ratings 1 Remarks Proposed Non-Convertible Debentures 600 CARE AA (Double A) Assigned Total 600

Amtek Auto Ltd Ratings Facilities Amount (Rs. crore) Ratings 1 Remarks Proposed Non-Convertible Debentures 600 CARE AA (Double A) Assigned Total 600 Amtek Auto Ltd Ratings Facilities Amount (Rs. crore) Ratings 1 Remarks Proposed Non-Convertible Debentures 600 CARE AA (Double A) Assigned Total 600 Rating Rationale The rating derives strength from the

More information

KESORAM INDUSTRIES LIMITED

KESORAM INDUSTRIES LIMITED Ratings KESORAM INDUSTRIES LIMITED Instruments/Facilities Amount (Rs. crore) Ratings 1 Remarks Facilities Long-term Bank Facilities 2,918.1 (enhanced from 2,596.8) Short-term Bank Facilities 600.0 (enhanced

More information

ICICI PRUDENTIAL MUTUAL FUND (Revised) August 08, 2018

ICICI PRUDENTIAL MUTUAL FUND (Revised) August 08, 2018 : ICICI PRUDENTIAL MUTUAL FUND (Revised) August 08, 2018 Scheme Name Scheme Tenure 1 Action Series VIII Plan F * Close Ended 683 Days [Triple A mfs (Structured Obligation)] Reaffirmed Details of /Facilities

More information

Shyam Sel & Power Limited January 04, 2017

Shyam Sel & Power Limited January 04, 2017 Ratings Shyam Sel & Power Limited January 04, 2017 Facilities Long-term Bank Facilities Short-term Bank Facilities Total Facilities Details of instruments/facilities in Annexure-1 Amount 575.14 (enhanced

More information

EMT Megatherm Pvt Ltd

EMT Megatherm Pvt Ltd Ratings EMT Megatherm Pvt Ltd Facilities Amount Ratings 1 Remarks Long term Bank Facilities 17.1 (reduced from 18) CARE BB+ (Double B Plus) Reaffirmed Short term Bank Facilities 27 (reduced from 28) CARE

More information

Shirdi Sai Electricals Ltd

Shirdi Sai Electricals Ltd Ratings Shirdi Sai Electricals Ltd Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 40 (enhanced from 15) CARE BBB+ (Triple B Plus) Revised from CARE BBB (Triple B) Short-term

More information

Ganapati Builders Limited

Ganapati Builders Limited Ratings Facilities Ganapati Builders Limited Amount Long term Bank Facilities 8.00 Total December 18, 2017 8.00 (Rupees Eight crore only) Rating 1 CARE B+; Stable (Single B Plus ; Outlook: Stable) Rating

More information

Millenium Steel India Private Limited

Millenium Steel India Private Limited Millenium Steel India Private Limited Ratings Facilities Amount Long term Bank Facilities 6.88 Short term Bank Facilities 26.00 Total Facilities February 28, 2018 32.88 (Rs. Thirty Two crore and Eighty

More information

Mahavir Coal Resources Private Limited

Mahavir Coal Resources Private Limited Mahavir Coal Resources Private Limited Ratings Facilities Amount (Rs. crore) Ratings 1 Rating Action Long-term Bank Facilities 25 (enhanced from Rs.11.25 crore) CARE BB; Stable (Double B; Outlook: Stable)

More information

Binani Cement Limited

Binani Cement Limited Binani Cement Limited July 11, 2018 Ratings Amount Rating 1 Long term Bank 2,304.27 CARE D; ISSUER (Single D; ISSUER Short term Bank 436.00 ) Total facilities 2,740.27 (Rupees Two Thousand Seven Hundred

More information

JSW Steel Limited. October 08, 2018

JSW Steel Limited. October 08, 2018 Ratings Instrument Long Term Bank Facilities Term Loan Long Term Bank Facilities Fund Based Short Term Bank Facilities Non Fund Based Long/Short Term Bank Facilities Non Fund Based Amount JSW Steel Limited

More information

VIVIMED LABS LIMITED

VIVIMED LABS LIMITED Ratings VIVIMED LABS LIMITED Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 92.60 (reduced from 109.07 CARE BBB- (Triple B Minus) Revised from CARE A- and removed from Credit

More information

Raipur Power and Steel Limited August 21, 2018

Raipur Power and Steel Limited August 21, 2018 Ratings Long term Bank Short term Bank Total 354.65 (Rupees Three hundred fifty four crore and sixty five lakhs only) Details of instruments/facilities in Annexure-1 Raipur Power and Steel Limited August

More information

Sakar Healthcare Private Limited

Sakar Healthcare Private Limited Ratings Sakar Healthcare Private Limited Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 18.48 (reduced from 20.30) CARE BBB- (Triple B Minus) Reaffirmed Short-term Bank Facilities

More information

Roop Polymers Limited

Roop Polymers Limited Ratings Roop Polymers Limited Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 75.67 (enhanced from Rs.60.85 crore) CARE BBB (Triple B) Reaffirmed Short-term Bank Facilities 19.80

More information

FUTURE RETAIL LIMITED

FUTURE RETAIL LIMITED FUTURE RETAIL LIMITED Ratings Facilities Amount (Rs. crore) Ratings 1 * Remarks Long-term Bank Facilities 950 CARE A [Single A] Short-term Bank Facilities 625 CARE A1 [A One] Total Facilities 1,575 Commercial

More information

Coimbatore Capital Limited January 6, 2017

Coimbatore Capital Limited January 6, 2017 Ratings Facilities Coimbatore Capital Limited January 6, 2017 Amount Short-term Bank Facilities 37 37 Total Facilities (Rupees Thirty Seven crore only) Details of instruments/facilities in Anneuxre-1 Rating

More information

Gayatri Projects Limited

Gayatri Projects Limited Gayatri Projects Limited March 12, 2018 Ratings Amount Long-term Bank 2138.03 Long-term/Short-term Bank 4594.03 6732.06 (Rupees Six thousand Seven Total hundred Thirty Two crore and Six lakh only) Details

More information

Jindal Power Limited

Jindal Power Limited Ratings Facilities/Instruments Amount Long-term Bank Facilities 3,204.73 (reduced from 3,270.81) Jindal Power Limited January 04, 2018 3,204.73 (Rupees Three Thousand Two Total Hundred Four crore and Seventy

More information

Rating Methodology - Private Power Producers

Rating Methodology - Private Power Producers RATING METHODOLOGY - PRIVATE POWER PRODUCERS Rating Methodology - Private Power Producers [In supersession of Rating Methodology - Private Power Producers issued in December 2016] The ongoing liberalisation

More information

Madhav Alloys Private Limited

Madhav Alloys Private Limited Madhav Alloys Private Limited Ratings Facilities Amount (Rs. crore) Long-term Bank Facilities 81.84 Short-term Bank Facilities 70 Ratings1 CARE A- [Single A Minus] CARE A2+ [A Two Plus] Remarks Revised

More information

Panyam Cements and Mineral Industries Limited January 6, 2017

Panyam Cements and Mineral Industries Limited January 6, 2017 Ratings Facilities Panyam Cements and Mineral Industries Limited January 6, 2017 Amount Long-term Bank Facilities 30.00 Short-term Bank Facilities 9.32 Rating 1 CARE BB-; Stable (Double B Minus; Outlook:

More information

L&T Infrastructure Finance Company Limited

L&T Infrastructure Finance Company Limited Ratings Facilities L&T Infrastructure Finance Company Limited December 07, 2017 Amount (Rs. crore) Rating 1 Rating Action Commercial Paper (for IPO financing) - - Withdrawn Details of instruments/facilities

More information

L&T Infrastructure Finance Company Limited

L&T Infrastructure Finance Company Limited Ratings L&T Infrastructure Finance Company Limited July 23, 2018 Facilities Amount(Rs. crore) Rating 1 Rating Action Commercial Paper (IPO Financing) - - Withdrawn Details of instruments/facilities in

More information

Kripa Telecom. March 23, Rating 1. CARE A4; ISSUER NOT COOPERATING* (A four)

Kripa Telecom. March 23, Rating 1. CARE A4; ISSUER NOT COOPERATING* (A four) Ratings Facilities Amount Long term Bank Facilities 3 Short-term Bank Facilities 6 Total 9 (Rupees Nine crore only) Details of instruments/facilities in Annexure-1 Detailed Rationale & Key Rating Drivers

More information

Sunil Hitech Engineers Ltd.

Sunil Hitech Engineers Ltd. Sunil Hitech Engineers Ltd. April 20, 2018 Ratings Facilities Long-term Bank Facilities (TL) Long-term Bank Facilities (CC) Short-term Bank Facilities Long/Short Term Bank Facilities Amount (Rs. crore)

More information

ICICI Securities Primary Dealership Ltd.

ICICI Securities Primary Dealership Ltd. Ratings Instrument Amount (Rs. crore) Tier II Bonds 50 (Rupees Fifty Crore Only) Details of instruments/facilities in Annexure-1 ICICI Securities Primary Dealership Ltd. May 09, 2018 Rating 1 CARE (Triple

More information

NLC Tamil Nadu Power Limited

NLC Tamil Nadu Power Limited Ratings NLC Tamil Nadu Power Limited Facilities Amount (Rs. crore) Ratings 1 Remarks Long term Bank Facilities* 3,437.00 CARE AAA (SO)(In-Principle) [Triple A (Structured Obligation)] (In-Principle) Long

More information

L&T Finance Ltd. (erstwhile Family Credit Ltd) July 7, (Rs. crore) 16,500

L&T Finance Ltd. (erstwhile Family Credit Ltd) July 7, (Rs. crore) 16,500 Ratings Instrument L&T Finance Ltd. (erstwhile Family Credit Ltd) July 7, 2017 Amount (Rs. crore) 16,500 Commercial Paper issue (enhanced from Rs 13,500) Details of instruments/facilities in Annexure-1

More information

CARE s Fund Credit Quality Rating Criteria

CARE s Fund Credit Quality Rating Criteria FUND CREDIT QUALITY RATING CRITERIA CARE s Fund Credit Quality Rating Criteria Introduction CARE s fund credit quality ratings are opinion on the overall credit quality of specific Debt Mutual Fund schemes.

More information

Tapadia Polyesters Private Limited

Tapadia Polyesters Private Limited Tapadia Polyesters Private Limited January 06, 2017 Ratings Facilities Amount Rating 1 Long-term Bank Facilities 63.00 CARE BBB-; Stable (Triple B Minus; Outlook: Stable) Short-term Bank Facilities 4.00

More information

Sai Engicon and Construction Private Limited December 17, 2018

Sai Engicon and Construction Private Limited December 17, 2018 Ratings /Instruments Long term Bank Short-term Bank Sai Engicon and Construction Private Limited December 17, 2018 Amount 5.00 20.00 Total 25.00 (Rupees Twenty Five crore only) Details of facilities in

More information

CARE s Rating Methodology - Wholesale Trading

CARE s Rating Methodology - Wholesale Trading RATING METHODOLOGY - WHOLESALE TRADING CARE s Rating Methodology - Wholesale Trading [In supersession of CARE s Rating Methodology - Wholesale Trading issued in June 2017] Overview The increase in global

More information

Mahalaxmi Roller Flour Mills

Mahalaxmi Roller Flour Mills Rating Facilities Long-term bank facilities Total 5.84 (Rs. Five Crore and Eighty Four Lakh only) Details of instruments/facilities in Annexure-1 Mahalaxmi Roller Flour Mills July 09, 2018 Amount Rating

More information

Reliance Infrastructure Limited

Reliance Infrastructure Limited Ratings Reliance Infrastructure Limited Facilities Amount (Rs. crore) Ratings 1 Remarks 2600(Enhanced from Rs CARE A+ (on credit watch) [Single A Long Term Bank Facilities 600 crore) CARE A1+(on credit

More information

Trimex Sands Private Limited

Trimex Sands Private Limited Ratings Trimex Sands Private Limited Facility Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 29.63 (reduced from 41.57) CARE BBB+ (Triple B Plus) Reaffirmed Total Facilities 29.63 Rating

More information

Bansal Construction Works

Bansal Construction Works Bansal Construction Works January 23, 2017 Ratings Facilities Long Term Bank Facilities Long Term / Short Term Bank Facilities Amount 12.00 8.00 Ratings 1 CARE BBB; Stable (Triple B; Outlook: Stable) CARE

More information

Jaiprakash Associates Limited

Jaiprakash Associates Limited Jaiprakash Associates Limited April 26, 2017 Ratings Facilities/Instruments Amount (Rs. crore) Rating 1 Rating Action Long-term Bank Facilities 21,244.97 (reduced from 21,786.30) Short-term Bank Facilities

More information

Rating Methodology - Port Projects [In supersession of Rating Methodology Port Projects issued in June 2017]

Rating Methodology - Port Projects [In supersession of Rating Methodology Port Projects issued in June 2017] RATING METHODOLOGY - PORT PROJECTS Rating Methodology - Port Projects [In supersession of Rating Methodology Port Projects issued in June 2017] Background India has 7,517-km long coastline with 13 major

More information

C&S Electric Limited April 6, 2018

C&S Electric Limited April 6, 2018 C&S Electric Limited April 6, 2018 Ratings Facilities Long-term Bank Facilities Term Loan Long-term Bank Facilities Cash Credit Short-Term Bank Facilities Amount 87.01 (enhanced from 18.60) 235 (enhanced

More information

Press Release. Maithan Alloys Limited February 16, 2018 Ratings Facilities Amount (Rs. crore) Ratings 1 Rating Action

Press Release. Maithan Alloys Limited February 16, 2018 Ratings Facilities Amount (Rs. crore) Ratings 1 Rating Action Maithan Alloys Limited February 16, 2018 Ratings Amount (Rs. crore) Ratings 1 Rating Action CARE AA-; Stable Revised from CARE A+; Long-term Bank 130.99 (Double A Minus; Outlook: Stable (Single A Plus;

More information

L&T Finance Ltd (erstwhile Family Credit Ltd) July 23, 2018

L&T Finance Ltd (erstwhile Family Credit Ltd) July 23, 2018 Ratings Facilities L&T Finance Ltd (erstwhile Family Credit Ltd) July 23, 2018 Amount (Rs. crore) Commercial Paper Issue (IPO Financing) Rating 1 Rating Action Withdrawn Details of instruments/facilities

More information

Bandhan Financial Services Pvt. Ltd.

Bandhan Financial Services Pvt. Ltd. Ratings Bandhan Financial Services Pvt. Ltd. Facilities Amount (Rs. crore) Ratings 1 Remarks Unsecured Subordinated Tier II NCD 160.0 CARE A (Single A) Assigned Total 160.0 Rating Rationale The assigned

More information

HDFCs Assignment Of Receivables Of SEP 11. [Originator: HDFC Limited]

HDFCs Assignment Of Receivables Of SEP 11. [Originator: HDFC Limited] HDFCs Assignment Of Receivables Of SEP 11 [Originator: HDFC Limited] March 29, 2018 Ratings Instrument Assignee Payouts Amount 212.69 (Rs.Two hundred and twelve crore and sixty nine lakhs only) Details

More information

Emaar MGF Land Limited

Emaar MGF Land Limited Emaar MGF Land Limited January 23, 2017 Ratings S.No Facilities Amount 1 Long-term Bank Facilities 205 (reduced from 320) Total Facilities 205 (Rupees Two Hundred Five crore only) 2 Non-convertible Debenture

More information

HINDUSTAN CONSTRUCTION COMPANY LIMITED

HINDUSTAN CONSTRUCTION COMPANY LIMITED HINDUSTAN CONSTRUCTION COMPANY LIMITED Ratings Facilities/ Instruments Amount (Rs. crore) Rating 1 * Remarks Long-term Facilities (Term Loans) 2,084.28 (reduced from 2,358.75) Short-term Facilities 875.00

More information

Pavathal Spinning Mills Private Limited

Pavathal Spinning Mills Private Limited Ratings Pavathal Spinning Mills Private Limited December 27, 2017 Amount (Rs. crore) Ratings 1 Remarks Long-term Bank 10.42 (reduce from 11.11) CARE BB+; Stable (Double B Plus; Outlook:Stable) Reaffirmed

More information

Rating Methodology - Manufacturing Companies

Rating Methodology - Manufacturing Companies RATING METHODOLOGY - MANUFACTURING COMPANIES Rating Methodology - Manufacturing Companies [In supersession of Rating Methodology - Manufacturing Companies issued in December 2016] Credit analysis of an

More information

Bannari Amman Sugars Limited January 13, 2017

Bannari Amman Sugars Limited January 13, 2017 Ratings Long-term Bank Short-term Bank Long-term /Shortterm Bank Total Bannari Amman Sugars Limited January 13, 2017 Amount 871.50 (reduced from 1,239.50) 7.50 15.40 894.40 (Rupees Eight Hundred Ninety

More information

High Breetd Fashions January 17, 2019

High Breetd Fashions January 17, 2019 Rating Facilities Short-term Bank Facilities Total Facilities High Breetd Fashions January 17, 2019 Amount Ratings 1 9.50 CARE A4 ( A Four) 9.50 (Rupees Nine Crore and Fifty Lakh only) Remarks Reaffirmed

More information

Colourtex Industries Private Limited

Colourtex Industries Private Limited Colourtex Industries Private Limited January 18, 2017 Ratings Facilities Long-term Bank facilities Long-term/Short-term Bank facilities Amount 50.25 (reduced from 71.14) 370.00 420.25 Total Facilities

More information

Users of this rating (including investors, lenders and the public at large) are hence requested to exercise caution while using the above rating(s).

Users of this rating (including investors, lenders and the public at large) are hence requested to exercise caution while using the above rating(s). Neosym Industry Limited April 05, 2018 Ratings Rating 1 Long term Bank 135.00 CARE BBB; ; (Triple B; Outlook: ; ) Short term Bank 14.00 CARE A3; (A Three; ) Total 149.00 (Rs. One Hundred and Forty Nine

More information

Aircel Limited. November 16, Amount (Rs. crore) 17,479 (Rupees Seventeen Thousand Four Hundred and Seventy Nine Crore Only)

Aircel Limited. November 16, Amount (Rs. crore) 17,479 (Rupees Seventeen Thousand Four Hundred and Seventy Nine Crore Only) Aircel Limited November 16, 2017 Ratings Facilities Amount Long term Bank Facilities 17,479 Total Details of instruments/facilities in Annexure-1 17,479 (Rupees Seventeen Thousand Four Hundred and Seventy

More information

Shriram Housing Finance Limited

Shriram Housing Finance Limited Ratings Facilities Commercial Paper programme Details of instruments/facilities in Annexure-1 Shriram Housing Finance Limited August 07, 2018 Amount (Rs.cr) 300 (enhanced from Rs. 200 crore) (Rupees three

More information

Global Offshore Services Limited

Global Offshore Services Limited Ratings Facilities/Instruments Term Loan Fund Based Limits LT/ST Bank Facilities Non- Fund based Limits Long term Bank Facilities Term Loan UBI # FB Limits UBI LT/ST Bank Facilities NFB Limits- UBI Global

More information

India Infrastructure Finance Company Ltd October 06, 2017

India Infrastructure Finance Company Ltd October 06, 2017 India Infrastructure Finance Company Ltd October 06, 2017 Ratings Facilities Unsecured Taxable * Amount (Rs. Crore) 3,000 (Rupees Three Thousand crore only) Long-term 67.12 Infrastructure (Rupees Sixty

More information

Coimbatore Capital Limited

Coimbatore Capital Limited Coimbatore Capital Limited December 27, 2017 Ratings Facilities Amount Short-term Bank Facilities 37 Total Facilities Details of instruments/facilities in Annexure-1 37 (Rupees Thirty Seven crore only)

More information

P R R Travels July 18, 2018

P R R Travels July 18, 2018 Rating Facilities Amount (Rs. Crore) Long-term Bank Facilities 18.00 P R R Travels July 18, 2018 18.00 Total Facilities (Rupees Eighteen crore only) Details of instruments/facilities in Annexure-1 Rating

More information

Precision Camshafts Limited

Precision Camshafts Limited Ratings Precision Camshafts Limited Facilities Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 154.15 CARE BBB+ (Triple B Plus) Long-term / Short-term Bank Facilities 47.50 CARE BBB+ / CARE

More information

Khagaria Purnea Highway Project Limited

Khagaria Purnea Highway Project Limited Khagaria Purnea Highway Project Limited March 31, 2018 Ratings Facilities Long-term Bank Facilities (Senior debt) Long-term Bank Facilities (Sub-ordinate debt) Amount 462.35 (reduced from Rs.516.95 crore)

More information

Press Release. JMS Mining Services Private Limited April 05, Ratings. Facilities Amount (Rs. crore) Ratings 1 Rating Action

Press Release. JMS Mining Services Private Limited April 05, Ratings. Facilities Amount (Rs. crore) Ratings 1 Rating Action Ratings JMS Mining Services Private Limited April 05, 2018 Facilities Amount (Rs. crore) Ratings 1 Rating Action Long-term Bank Facilities 304.74 (enhanced from 260) Short-term Bank Facilities 15 Long/Short-term

More information

JMS Mining Services Pvt Ltd

JMS Mining Services Pvt Ltd s JMS Mining Services Pvt Ltd Amount (Rs. crore) Long-term Bank 260 Short-term Bank 15 Long/Short-term Total Bank Bank Details of facilities in Annexure-1 485 (enhanced from 215) 760 (Rupees Seven Hundred

More information

Dalmia Bharat Limited

Dalmia Bharat Limited Dalmia Bharat Limited March 16, 2017 Ratings Amount Rating1 Rating Action Long-term/Short-term Bank 30 CARE AA-; Stable/ (Double A Minus/A One Plus; Outlook: Stable) Long-term Bank - - Withdrawn* Total

More information

Sharekhan Financial Services Private Limited

Sharekhan Financial Services Private Limited Ratings Sharekhan Financial Services Private Limited December 18, 2017 Instruments Commercial Paper Issue (IPO Financing) Details of instruments/facilities in Annexure-1 Amount (Rs. crore) 2000 (Rupees

More information

Pix Transmissions Ltd January 04, 2019

Pix Transmissions Ltd January 04, 2019 Ratings Long term Bank Short term Bank Long-term/Short-term Bank Long-term/Short-term Bank Total 134.58 (Rs. One hundred and Thirty Four crore and Fifty Eight lakhs only) Details of instruments/facilities

More information

SINTEX INDUSTRIES LIMITED

SINTEX INDUSTRIES LIMITED Ratings SINTEX INDUSTRIES LIMITED Facilities/ Instruments Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 3,768.63 (enhanced by Rs.1,220.00 crore) CARE AA (Double A) Long/Short-term Bank

More information

Credit Analysis & Research Limited. Complete definitions of the ratings assigned are available at and other CARE publications

Credit Analysis & Research Limited. Complete definitions of the ratings assigned are available at   and other CARE publications Govind Milk and Milk Products Private Limited Ratings Facilities / Instruments Amount (Rs. crore) Ratings 1 Remarks Long-term Bank Facilities 45.72 (enhanced from 36.79) CARE BBB- [Triple B Minus] Reaffirmed

More information

Asahi Songwon Colors Limited

Asahi Songwon Colors Limited Asahi Songwon Colors Limited January 11, 2017 Ratings Amount Long-term Bank 5.25 Short-term Bank 33.00 Long-term/ Short-term Bank Total 41.00 79.25 (Rupees Seventy Nine crore and Twenty Five lakh only)

More information

K.P. CHACKO & SONS JUNE 30, 2017

K.P. CHACKO & SONS JUNE 30, 2017 Ratings K.P. CHACKO & SONS JUNE 30, 2017 Facilities Amount Rating 1 Long-term Bank Facilities 17 CARE B+; Stable (Single B Plus ; Outlook: Stable) Rating Action Assigned Total 17 (Rupees Seventeen crore

More information

ISSUER NOT COOPERATING*

ISSUER NOT COOPERATING* Senthil Timber Traders January 24, 2019 Rating Facilities Amount (Rs. crore) Ratings 1 Rating Action CARE B ; Long -term Bank Facilities 1.50 ISSUER NOT Issuer Not Cooperating; (Single B; Outlook : stable

More information

Rating Methodology - Banks

Rating Methodology - Banks RATING METHODOLOGY - BANKS Rating Methodology - Banks [In supersession of CARE s Rating Methodology - Banks issued in December 2016] CARE's ratings are an opinion on the relative ability and willingness

More information

IL&FS Infra Asset Management Limited October 10, 2018

IL&FS Infra Asset Management Limited October 10, 2018 s IL&FS Infra Asset Management Limited October 10, 2018 Scheme Name Tenure Action Debt Fund Series 1A Debt Fund Series 1B Debt Fund Series 1C Debt Fund Series 3A Debt Fund Series 3B 5 years 7 years 9 years

More information

Prime Comfort Products Pvt. Ltd. (Revise)

Prime Comfort Products Pvt. Ltd. (Revise) Prime Comfort Products Pvt. Ltd. (Revise) Ratings Long-term Bank Amount Total 50.07 (Rupees Fifty crore and seven lakh only) Details of instruments/facilities in Annexure-1 October 25, 2017 Rating 1 50.07

More information

Bhilangana Hydro Power Limited

Bhilangana Hydro Power Limited Ratings Facilities/Instruments Non- (NCD) Non--I (NCD-I) Non--II (NCD-II) Bhilangana Hydro Power Limited March 26, 2018 153.80 Total (Rupees One Hundred Fifty Three crore and Eighty lakh only) Details

More information

HDFC Bank Ltd. May 8, 2017

HDFC Bank Ltd. May 8, 2017 HDFC Bank Ltd. May 8, 2017 Rating Facilities/Instruments Amount (Rs. crore) Rating 1 Rating Action Certificate of Deposits 40,000 (enhanced from 25,000) CARE A1+ (A One Plus) Reaffirmed Additional Tier

More information

RSB Transmissions (I) Limited January 20, 2017

RSB Transmissions (I) Limited January 20, 2017 Ratings Long-term Bank Amount 286.84 (reduced from 310.19) Short-term Bank 194.29 481.13 Total (Rupees Four Hundred Eighty One crore and Thirteen lakh only) Details of facilities in Annexure-1 RSB Transmissions

More information

Mahakali Rice Mills Private Limited

Mahakali Rice Mills Private Limited Mahakali Rice Mills Private Limited March 22, 2018 Facilities Amount Long-term Bank Facility 9.25 Total Details of facilities in Annexure-1 9.25 (Rupees Nine crore and Twenty Five Lakh only) 1 CARE BB;

More information