Variable selection for heavy-duty vehicle battery failure prognostics using random survival forests

Size: px
Start display at page:

Download "Variable selection for heavy-duty vehicle battery failure prognostics using random survival forests"

Transcription

1 Variable selecion for heavy-duy vehicle baery failure prognosics using random survival foress Sergii Voronov, Daniel Jung, and Erik Frisk 3,,3 Deparmen of Elecrical Engineering, Linköping Universiy, Linköping, 8 83, SWEDEN sergii.voronov@liu.se daniel.jung@liu.se erik.frisk@liu.se ABSTRACT Prognosics and healh managemen is a useful ool for more flexible mainenance planning and increased sysem reliabiliy. The applicaion in his sudy is lead-acid baery failure prognosis for heavy-duy rucks which is imporan o avoid unplanned sops by he road. There are large amouns of daa available, logged from rucks in operaion. However, daa is no closely relaed o baery healh which makes baery prognosic challenging. When developing a daa-driven prognosics model and he number of available variables is large, variable selecion is an imporan ask, since including noninformaive variables in he model have a negaive impac on prognosis performance. Two feaures of he daase has been idenified, ) few informaive variables, and ) highly correlaed variables in he daase. The main conribuion is a novel mehod for idenifying imporan variables, aking hese wo properies ino accoun, using Random Survival Foress o esimae prognosics models. The resul of he proposed mehod is compared o exising variable selecion mehods, and applied o a real-world auomoive daase. Prognosic models wih all and reduced se of variables are generaed and differences beween he model predicions are discussed, and favorable properies of he proposed approach are highlighed.. INTRODUCTION Prognosics and healh managemen are imporan pars o preven unexpeced failures by more flexible mainenance planning. The purpose is o replace a failing componen before i fails, bu avoid changing i oo ofen. Coarsely, here are wo main approaches in prognosics, daa-driven and modelbased echniques, bu also hybrid approaches ha combine he wo are possible. Model-based prognosics uses a model of he moniored sysem and he faul o monior o predic he degradaion rae and Remaining Useful Life (RUL), see Sergii Voronov e al. This is an open-access aricle disribued under he erms of he Creaive Commons Aribuion 3. Unied Saes License, which permis unresriced use, disribuion, and reproducion in any medium, provided he original auhor and source are credied. for example (Daigle & Goebel, ). Saisical daa-driven mehods (Si, Wang, Hu, & Zhou, ) generae a predicion model based on raining daa o predic RUL. One relevan applicaion is lead-acid sarer baery prognosis for heavy-duy rucks. Heavy-duy rucks are imporan for ransporing goods, working a mines, or consrucion sies, and i is vial ha vehicles have a high degree of availabiliy. Unplanned sops by he road can resul in increased cos for he company due o he delay in delivery, bu can also lead o damaged cargo. One cause of unplanned sops is a failure in he elecrical power sysem, and in paricular he lead-acid sarer baery. The main purpose of he baery is o power he sarer moor o ge he diesel engine running, bu i is also used o, for example, power auxiliary unis such as heaing and kichen equipmen. The main conribuion in his work is a daa-driven mehod for variable selecion when esimaing a baery failure prognosics model for auomoive lead-acid baeries based on Random Survival Foress (Ishwaran, Kogalur, Blacksone, & Lauer, 8). In paricular, wo key properies of he applicaion daa se are addressed ) he number of informaive variables is assumed o be small, and ) he daa conains highly correlaed variables. Boh aspecs make building a prognosics model more difficul and are he main moivaing facors for he proposed approach. Furher, variable selecion is also imporan o beer undersand which facors ha are correlaed wih baery failure rae and also wha is causing i. This work is a coninuaion of (Voronov, Jung, & Frisk, 6), where he main focus was o analyze he auomoive applicaion case sudy. Here, he main conribuion is an exended analysis of he variable selecion problem ha resuls in an augmenaion of he decision space wih an exra dimension. Furher, characerisics of exising variable selecion mehods for Random Survival Foress are analyzed and compared o he proposed mehod, in paricular for he case where here are many correlaed variables in he daa se. In addiion, a basic variable selecion mehodology is proposed.

2 . PROBLEM FORMULATION The main objecive in his work is o use Random Survival Foress (RSF) (Ishwaran e al., 8) o idenify, from daa, which variables are relevan for building RSF models for survival analysis. The problem of idenifying imporan variables is usually referred o as variable selecion and is a relevan opic in daa-driven prognosics and machine learning in general (Guyon & Elisseeff, 3). The prognosic problem sudied here is o esimae he baery lifeime predicion funcion based on recorded vehicle daa. The lifeime predicion funcion is defined as B V (; ) = P (T > + T, V) () where T is he random variable failure ime of he baery and V he vehicle daa a ime = when daa is submied ino he model, in our case when a vehicle comes o he workshop. The funcion B V (; ) is a funcion of and gives he probabiliy ha he baery will funcion a leas ime unis afer. The daa V is recorded operaional daa for a specific vehicle... Operaional daa In his work a vehicle flee daabase is provided by an indusrial parner, where one snapsho of daa is available from each vehicle including informaion regarding how he ruck has been used and he configuraion of he specific ruck. There is also informaion if he baery has failed or no. The daabase conains los of informaion from he ruck, no always relaed o baery degradaion, ing ha i is no known wha available informaion is relevan for his specific ask. Therefore, i is relevan o idenify which variables are relevan for baery lifeime predicion. Previous works considering his vehicle daa se are presened in (Frisk & Krysander, ) and (Frisk, Krysander, & Larsson, 4). The main characerisics of he daabase can be summarized as follows: 3363 vehicles from EU markes A single snapsho per vehicle 84 variables sored for each vehicle snapsho Heerogeneous daa, i.e., i is a mixure of caegorical and numerical daa Availabiliy of hisogram variables Censoring rae more han 9 percen Significan missing daa rae A main characerisic of he daabase is ha here are no ime series available for a vehicle. I s ha here is only one snapsho V of he variables in he daabase from each vehicle. Informaion describing how he vehicle has been used is sored as hisogram daa represening how ofen specific sensor daa is measured wihin differen inervals. As an example, here is a hisogram describing how much ime he vehicle has been subjeced o differen ambien emperaures. Due o he non-specific purpose of he daabase, i is probable ha only a small number of variables from se V influence predicion of he baery failure rae. Thus, idenifying he imporan variables in order o remove irrelevan variables, should improve he performance of a baery prognosis model... Moivaion for variable selecion There are several reasons why variable selecion is imporan when working wih daa-driven models. Firs, i is possible o improve predicion performance by reducing he number of variables. The second moivaion is beer inerpreabiliy of he resuls by clearly undersanding which facors are imporan for baery failure. The hird moivaion is o reduce model generaion and predicion ime by reducing he number of variables used for generaing he RSF. An example why he qualiy of predicor may become bad if he number of noisy (non-imporan) variables is significanly large is given below. Synheic daa is creaed wih he following properies. Le h be a consan nominal hazard rae (Cox & Oakes, 984) for baery failures. The hazard rae h() = lim d P ( T < + d T ) d represens he probabiliy of a baery failure a a paricular ime. In his example, he hazard rae does no change wih ime and he nominal hazard rae corresponds o an expeced years of baery life. I is assumed ha here is one variable v wih an impac on baery hazard rae h as h, if v = h = h, if v = (3) 3 h, if v = 3 where h is he nominal hazard rae. Daa for 3 vehicles is generaed wih a censoring rae abou 8 percen. Differen numbers of noisy variables are included in he synheic daa o observe how hey change he RSF oupu. Firs, only wo noisy variables are added in addiion o v. In he second case, noisy variables are added. All noisy variables are sampled from a normal disribuion wih zero and uniy variance. Afer generaing wo RSF models, one for each se of variables, he reliabiliy funcions (Cox & Oakes, 984) R() = P (T ) (4) compued by he wo RSF models are compared wih he heoreical values of he reliabiliy as shown in Figure. One vehicle from each of he hree classes was chosen and submied o he fores o receive he predicions. I is shown in Figure (a) ha predicions from RSF for he case of ()

3 noisy variables, dashed blue curves, are following he heoreical reliabiliy funcions, red solid curves, beer han he case wih noisy variables, see Figure (b). However, he error rae, which is a common performance measure for he RSF, is similar for boh cases. This s ha he error rae is no a good measure in prognosic erms. I is worh o noice ha in he simulaion environmen, informaion abou he rue reliabiliy curves is available. However, his is no he case for he vehicle flee daabase. R() (a) noisy variables R() (b) noisy variables Figure. Predicions from RSF wih differen number of noisy variables. The example moivaes he relevance of finding he imporan variables and a he same ime removing noisy ones, especially if number of imporan is small, in a se of daa as expeced in he vehicle flee daabase. The qualiy of he esimaed reliabiliy funcion from he RSF is significanly improved when he noisy variables are removed. 3. RANDOM SURVIVAL FORESTS A brief descripion of Random Survival Foress and wo sandard mehods for evaluaing variable imporance are presened. For a more deailed descripion, he ineresed reader is referred o, for example, (Ishwaran e al., 8) and (Ishwaran, Kogalur, Chen, & Minn, ). The difference beween an ordinary decision ree classifier and a random fores is ha here is randomness of wo kinds injeced ino he process of esimaing he model. The firs source is he usage of a boosrap procedure. Each ree is grown using is own bag of cases which are sampled from he raining se. Second, for each node in a ree, spliing variables are seleced from a randomly sampled subse. RSF exends he RF approach o righ-censored survival daa, i.e., objecs in he sudy wihou experienced failure. RSF is a daa-driven mehod ha can be used for compuing maximum-likelihood esimaes of he reliabiliy funcion (4). I can be used o rewrie he lifeime predicion funcion () as B V (; ) = P (T > + T, V) = RV ( + ) R V ( ) The oupu from each ree T in he RSF is he Nelson-Aalen () esimae of he cumulaive hazard rae, see (Cox & Oakes, 984). Le T < T <... < T N be N disinc even imes when failures of objecs under sudy occur. Then, he Nelson- Aalen esimae for ree T and vehicle (daa) V is Ĥ T ( V) = T j f j,ni s j,ni (6) where f j,ni and s j,ni are number of failures and survived objecs in erminal node n i of a ree T a even ime T j respecively. Terminal node n i is deermined by dropping vehicle V down hrough he fores. The cumulaive hazard esimae Ĥ( V) for he whole fores is received by averaging over all Ĥ T ( V). Finally, he reliabiliy funcion R V () from () is obained from he fac (Cox & Oakes, 984) R V () = e Ĥ( V) (7) and hen B V (; ) can be compued from (). One measure of predicion error of RSF models proposed in (Ishwaran e al., 8) is based on pair-wise evaluaion of non-censored daa, called concordance index (Harrell, Califf, Pryor, Lee, & Rosai, 98). In shor, he measure akes ino consideraion if he RSF model correcly predics which of he wo samples ha will fail firs. However, noe ha i does no ake ino consideraion how accurae he predicion is wih respec o he acual failure ime. Therefore, he error raes of he wo models in Figure urn ou o be more or less equal even hough he model wih fewer variables is visibly more accurae. 3.. Variable selecion using VIMP One inuiive measure of variable imporance is o measure he increase in predicion error when ignoring a variable in he RSF. This is done by randomizing he sample variable value when used as a spliing variable in he fores (Ishwaran e al., 8). The idea is ha a large increase in predicion error indicaes ha a variable is imporan while a low increase (or a decrease) indicaes ha he variable is no imporan. This variable imporance mehod is called VIMP and is a candidae ool for variable selecion by selecing a subse of he variables wih he highes VIMP values. However, previous works, for example (Ishwaran e al., ), have shown ha VIMP can have problems when here are many correlaed variables. If several imporan variables are correlaed hey will share imporance and VIMP will be low even if he variables are imporan. Thus, here is a risk ha imporan variables will be los and resul in degraded predicion performance. 3.. Variable selecion using Minimal deph As an alernaive o VIMP, a candidae measure called minimal deph for variable selecion in RSF has been proposed, see (Ishwaran e al., ) or (Ishwaran, Kogalur, Gorodeski,

4 Minn, & Lauer, ). The minimal deph for variable v is defined as he average disance from he roo o he closes node where i appears in he RSF. Imporan variables should have a higher probabiliy o be seleced as spliing variables, compared o noisy variables, a low levels close o he roo when he rees are generaed. Thus, he minimal deph for imporan variables in he fores should be lower compared o noisy variables. To idenify imporan variables using minimal deph, a hreshold ha disinguishes imporan variables from noisy variables is derived in (Ishwaran e al., ) based on he disribuion for minimal deph D v of noisy variables as P (D v = d v is noisy variable) = ( = ) [ Ld ( ) ] ld, d D(T ) p p where D(T ) is he ree deph, l d is number of nodes a deph d, L d = l +l +...+l d and p is number of candidae variables chosen from when generaing he spliing rule in a node. The hreshold can be seleced as he value for he variable disribuion (8). If he minimal deph measure of a variable value is less han he hreshold, i is reaed as imporan, oherwise as noise. The minimal deph measure is evaluaed in (Ishwaran e al., ) and (Ishwaran e al., ) where i is shown o be successful for finding imporan variables in problems wih few imporan variables and large number of noisy ones, even when he daa samples are relaively small. 4. VARIABLE DEPTH DISTRIBUTION METHOD VIMP and minimal deph are he sandard mehods for variable selecion in RSF models. However, here are problems conneced wih hem. If many correlaed variables are presen in he daabase, as expeced in our case, variables share VIMP beween each oher and i could happen ha imporan variables will be los if a VIMP based variable selecion procedure is applied. The second reason why VIMP can have problems is ha i is associaed wih error rae. As illusraed in Secion, low error rae does no always correspond o good prognosic performance. Minimal deph does no depend on error rae and he variable selecion approach has shown good resuls when applied o differen daabases in medical applicaions, see (Ishwaran e al., ) and (Ishwaran e al., ). However, i will be shown laer ha i did no work well when applied o he vehicle daabase. Taking ino accoun aforemenioned reasons, a new mehod for variable selecion called Variable Deph Disribuion (VDD) is proposed. The VIMP and minimal deph measures are applied o he vehicle daabase and he resuls are shown in Figure and Figure 3, respecively. As a reference, hree variables, only conaining Gaussian noise, are included in he daa se. The compued VIMP is posiive for half of he variables, bu he VIMP curve (8) VIMP variable Figure. VIMP of variables in vehicle daabase sored in ascending order. nd order minimal deph Mean minimal deph Figure 3. Minimal deph analysis of vehicle daa. Black crosses correspond o 3 variables wih highes VIMP and red riangles o added noise variables. Red dashed line is a hreshold. Noisy variables should be locaed o he righ of he red dashed line. sars o flaen ou afer he firs 3 variables wih highes VIMP indicaing ha approximaely % of he variables are expeced o be relevan for baery lifeime predicion. The resul of he minimal deph measure is presened in Figure 3 where he x axis is a value of he firs appearance of he variable in he fores, y axis is a value of he second appearance of he variable in he fores, and he red dashed line is he hreshold compued based on (8). The figure shows ha mos variables are idenified as imporan, including he added noisy variables. Since he noisy variables are idenified as imporan, i is an indicaion ha minimal deph is no a suiable mehod for he vehicle daabase. Due o he limiaions using he VIMP, as discussed above, and he evaluaion of he minimal deph measure in Figure 3, a new measure of variable imporance is proposed. The principle of he proposed measure is similar o minimal deph, bu considers he probabiliy of a spliing variable being used a differen levels of a ree. An imporan variable should be used more ofen as a spliing variable a lower ree levels, close o he roo, and less a higher ree levels as illusraed in Figure 4. If noisy variables are seleced as spliing variables he probabiliy should no change as much beween differen ree levels, maybe increase slighly for higher levels.

5 P (v is used as spliing variable in node a level l) Probabiliy Imporan variable Noisy variable Pv(d) Kichen equipmen BaVol SarMoorTime Road slope Noise Tree level Figure 4. Illusraive example of he probabiliy ha a given spliing variable is used in a node a differen ree levels Tree level Le d =,,..., max(d(t )), where D(T ) is he ree deph, be all possible ree levels in a RSF and v ν is a spliing variable. Consider wo random evens, namely, choosing a random level d in a ree and picking a variable v as spliing in a ree. Firs even is similar o he problem of drawing a one ball from he boxes of enumeraed balls. Firs, define P (v, d) which describes he join probabiliy ha v is seleced as a spliing variable in a node a a ree level d. Then, according o Bayes rule P (v d)p (d) P (d v) = (9) P (v) where, P (v d) denoes he condiional probabiliy ha v is seleced as a spliing variable in a node given ree level d. The probabiliy P (d) is a prior probabiliy o selec a specific level in a ree, independen of spliing variable, and P (v) is he probabiliy of selecing v as a spliing variable for he whole ree. I is assumed ha here is no prior knowledge of P (d), herefore, he probabiliy is se equal for all levels, i.e., P (d) = max(d(t )), d. The condiional probabiliy P (d v) can be inerpreed as he a poserior probabiliy of selecing a ree level given ha v is used as a spliing variable. The poserior disribuion (9) is here considered a relevan measure of he imporance of he spliing variable v in he RSF. The measure avoids he problem ha, for example, VIMP has where he imporance will be shared beween he correlaed variables. This is because (9) considers he probabiliy of selecing differen ree levels condiioned ha a spliing variable is seleced and does no depend on he probabiliy of selecing v which is reduced if variables are correlaed. The condiional probabiliy (9) will be used as a variable imporance measure. However, he rue probabiliy is no known because i depends on many differen facors, for example, he parameers when generaing he RSF. I can be noiced from (9) ha P (d v) P (v d) and if P (v d) is known he value P (d v) could be found as well. Afer growing he fores, P (v d) can be esimaed by firs compuing T l d,v l d φ v (d) = # of rees in RSF Figure. Examples of he esimaed P v (d) for five differen variables including one known noisy variable. where l d,v is number of nodes a level d where v is spliing variable. Equaion () is hen used o compue he esimae P v (d) = φ v(d) k φ v(k). () which will be used when analyzing he RSF. An example of differen disribuions P v (d) are shown in Figure. Four variables from he vehicle daa and one added noise variable are analyzed how hey are used in a RSF generaed from he vehicle flee daabase. The disribuion P v (d) of he noise variable is almos evenly disribued beween levels 3 o 3, while variables relaed o baery usage, such as, if here is kichen equipmen in he ruck and informaion abou he baery volage are significanly skewed o he lef, indicaing ha hese variables are imporan for prognosics of he baery healh. The sarer moor ime variable has a higher probabiliy mass a lower ree levels compared o he noisy variable bu no as much as he kichen equipmen and baery volage variables. The real daa in Figure resembles Figure 4 and he level of imporance appears o increase wih increased probabiliy mass a lower ree levels. Insead of comparing he whole disribuion P v (d) for each variable v, wo represenaive feaures are considered, and, µ d = E Pv [d] () [ (d ) ] 3 µd γ d = E Pv () σ d () According o Figure 4 and Figure, an imporan variable should have high posiive value of and low value of. These wo feaures can be used alone o idenify which variables ha are imporan. There is one drawback wih his approach, namely, i is possible ha a noisy variable will be seleced by random a low level of a ree. I s i will have values of and as imporan variable. However,

6 for a noisy variable, his is likely o be a rare even. Therefore, inroducing informaion abou how ofen a variable is used as a hird dimension can help o filer ou noisy variables in he area where imporan one should reside. Two possible candidaes o express his informaion are: The probabiliy ha v is used as a spliing variable in each node P (v). The probabiliy ha v is used as a spliing variable in a ree. The firs candidae can be esimaed by couning he fracion of nodes a variable is used in a ree and aking he average over he whole fores. The second feaure only considers if a variable is used a all in a ree and can be esimaed by couning he number of rees in he fores where a variable is used. As i is shown below, he hird dimension, which ake ino accoun how ofen variable is seleced, can help idenify imporan variables more efficienly han if only and is used as in (Voronov e al., 6). 4.. Real daa case sudy The resul of applying he firs candidae o he vehicle daa as he hird dimension ogeher wih and () is shown in Figure 6 where each do represens one variable. For comparison in he analysis, he 3 mos imporan variables according o VIMP, are highlighed as black crosses and variables rejeced by minimal deph are highlighed as green riangles poining up. Also for he analysis he hree added noisy variables are highlighed as red riangles poining righ. Noe ha he 3 variables wih highes VIMP have similar properies in Figure 6. They have low, high, and are used in a relaively large fracion of he nodes. This can be inerpreed as variables wih high VIMP are used as spliing variables in many nodes close o he roo of each ree. The noisy variables are also used in many of he nodes, bu are locaed furher away from he roo node, hus having high and low. There is also a number of variables wih low and high bu are used in a smaller fracion of he nodes. Some of hese variables are binary, ing ha hey canno be used as spliing variables more han once in a branch. Thus, hey can be relevan for he problem bu will no be used in many nodes. Noe ha he variables ha are only used in a low fracion of nodes are variables rejeced by minimal deph in Figure 3. Comparing wih he resuls using minimal deph in Figure 3 he resuls in Figure 6 looks promising because i is possible o find hreshold o separae mos of he imporan variables given by VIMP from noisy ones. Here, i is assumed ha here are imporan variables among he 3 bes given by VIMP, bu i does no ha all are imporan. The minimal deph mehod maps mos of he variables below he hreshold, including he known noisy variables, which indicaes ha i has difficulies wih his daa se. Noe ha Figure 6 clearly Fracion of nodes used Figure 6. Skewness and of () of vehicle daa combined wih fracion of nodes. Black crosses correspond o 3 variables wih highes VIMP, green riangles are variables rejeced by minimal deph, and red riangles are added noise variables. illusraes wha properies are imporan in his case sudy according o VIMP and Minimal deph.. ANALYSIS Before coninuing he analysis of he vehicle flee daa using he new variable selecion mehod in he prognosic algorihm, he properies of he proposed measure in Secion 4 are furher analyzed. As menioned in Secion 4, here is no knowledge which variables are imporan in he vehicle daabase. There is an inuiion ha some of hem could be informaive, bu i is no clear how many hey are and wha heir influence is on he baery hazard rae. In his secion, wo case sudies are performed, namely, undersanding he properies of he VDD mehod in a simulaed environmen and how o selec imporan variables using an ad-hoc hreshold based on simulaions. Firs, a simple model is considered where only one imporan variable influences he life of he baery. Then, anoher example wih a large number of correlaed variables is considered. A hird example using he simulaed environmen shows when he VDD mehod can be more advanageous han VIMP. Finally, he VDD mehod is applied o he vehicle flee daabase where a se of imporan variables is seleced using on he proposed mehodology... Case sudy in simulaed environmen To analyze he properies of he measure discussed in Secion 4, simulaed baery failure daa is generaed which should resemble he general characerisics of he real vehicle daabase. Similar o he example from Secion, i is assumed ha he average baery lives for years which is defined by a consan hazard rae h. One imporan variable v changes he

7 -3 Number of rees used Figure 7. Simulaed daa from generaed vehicles wih censoring rae 8 percen. The imporan variable is marked wih a cross. VIMP Variables Figure 8. Compued VIMP of simulaed daa from generaed vehicles wih censoring rae 8 percen. The imporan variable is marked wih a cross. hazard rae h by a facor h defined as, if v =., if v = h =., if v = 3.9, if v = 4 3.4, if v = () Thus, he hazard rae for a randomly generaed vehicle would be h h. Afer generaing hazard raes for all vehicles, simulaed baery lifeimes are generaed sampling from an exponenial disribuion wih µ = h h. Censoring is done by sampling censored imes from a gamma disribuion, wih shape parameer k = 7 h and scale parameer θ =, and comparing achieved ime values wih failure ones. If he baery lifeime is less han he censored ime he baery experienced failure, oherwise i is censored. The seleced gamma disribuion gives a censoring rae of approximaely 8 percen which is similar o he vehicle daabase. In he firs example, daa from vehicles is generaed and one hundred noisy variables are added o simulae nonimporan variables. Half of hem are normally disribued wih zero and uni variance and he oher half are discree uniformly disribued numbers from o. The resul of applying he proposed mehod is shown in Figure 7. The known imporan feaure is highlighed as a black cross and noisy variables are shown as blue dos. Figures 8 and 9 show he resuls for he same problem, bu using VIMP and minimal deph respecively. Using VIMP, i is easy o idenify he imporan variable, herefore, VIMP and he mehod proposed in he paper gives similar resuls in his case. In Figure 9, he red dashed line is he hreshold ha separaes imporan and non-imporan variables according o (Ishwaran e al., ). Variables o he lef of he hreshold should be imporan and variables o he righ are no. Figure 9 shows ha he specific hreshold is no able o disinguish imporan variables in his case. However, i is visible ha i is nd order minimal deph Mean minimal deph Figure 9. Minimal deph of simulaed daa from generaed vehicles wih censoring rae 8 percen. The imporan variable is marked wih a cross. possible o manually selec a hreshold ha could o ha. When using VIMP, correlaed variables will share imporance. Therefore, here is a risk ha hey will be missed when choosing a se of imporan variables since heir individual imporance will be low. In he proposed mehod, and of srongly correlaed variables should be similar o each oher, because hey should be chosen in a ree a he same levels. To illusrae his, correlaed variables o he imporan one from he previous example are added o he simulaed daabase. The number of vehicles in he simulaed daabase is kep unchanged as well as number of noisy variables and censoring rae. Resuls are presened in Figures -. Noe ha he gap beween imporan and non-imporan variables using VIMP has almos vanished compared o he previous example in Figure 8. A he same ime, and of he imporan variables are similar o he single variable case in Figure and Figure 7, respecively. The main difference is ha he number of rees where each variable is chosen has decreased. The minimal deph approach fails in his case and is reaing all imporan variables as non-imporan, see Figure which is consisen wih he observaion in Figure 6. The proposed VDD mehod, as can be seen above, does no

8 Number of rees used Figure. Simulaed daa from generaed vehicles wih censoring rae 8 percen. The imporan srongly correlaed variables are marked as crosses. -4 nd order minimal deph Mean minimal deph Figure. Minimal deph of simulaed daa from generaed vehicles wih censoring rae 8 percen. The imporan srongly correlaed variables are marked as crosses. VIMP Variables Figure. Compued VIMP for simulaed daa from generaed vehicles wih censoring rae 8 percen. The imporan srongly correlaed variables are marked as crosses. suffer of problems wih correlaed variables like VIMP do. An example showing why he VDD mehod could be more advanageous in some siuaions wih respec o VIMP is presened below. The case of one imporan variable and correlaed is considered. The number of vehicles was reduced o bu keeping censoring rae unchanged. The number of noisy variables is also increased o 4, equally spliing beween discree and coninuous noise. Resuls are shown in Figure 3 - Figure. Noe ha he added hird dimension helps o separae imporan variables from noise in Figure 3. VIMP performs worse han VDD, see Figure 4, where he level of imporance for some noisy variables is higher han for imporan ones. The Minimal deph sill have problems idenifying he imporan variables as shown in Figure... Sraegy for variable selecion As i was shown above, i is possible o se up a hreshold ha separaes imporan variables from noisy, however, i is no sraighforward. Furher sudies are required o undersand how informaion conained in he hree dimensions could be used o build a consisen and auomaic algorihm for variable selecion. However, i is possible, using he resuls in he paper and experience from simulaed daa, o sugges an ad- Number of rees used Figure 3. Simulaed daa from generaed vehicles wih srongly correlaed imporan variables, 4 noisy variables, and censoring rae 8 percen. Imporan variables are highlighed wih crosses. hoc sraegy. Variables from he vehicle daabase are ploed in Figure 6 where he number of rees a variable is used in is used as he hird dimension. Imporan variables should be used in mos of he rees. Therefore, selecing a hreshold ha sors ou variables ha are no used in many rees, for example 8, should give a firs se of candidaes of imporan variables. I could be he case ha imporan variables are used less if here are many correlaed variables, however, in ha case i is expeced ha and would be similar for hose variables, Secion.. Then, here should be variables ha are grouped in he - plane which is no observed for he variables wih values of number of rees less han 8. Therefore, i is assumed ha here are no imporan variables in ha area. I was shown in Secion. ha for some difficul cases, noisy variables are used as spliing variables more ofen han imporan variables, see Figure 3. Seing up a hreshold wih aforemenioned sraegy will no work for ha case. This siuaion is no considered in his case sudy, bu a more general sraegy for selecing he hreshold is required for a final version of he variable selecion algorihm.

9 -3. VIMP Variables Figure 4. Compued VIMP of simulaed daa from generaed vehicles wih wih srongly correlaed imporan variables, 4 noisy variables, and censoring rae 8 percen. Imporan variables are highlighed wih crosses. Number of rees used Threshold - 4 Figure 6. Seing up hreshold for he vehicle daabase. x and y axis are and of () respecively, and z axis is he number of rees in fores variable was chosen. Red poins are candidaes for imporan variables, blue dos - noisy variables, gray plane - hreshold value. nd order minimal deph Mean minimal deph Figure. Minimal deph of simulaed daa from generaed vehicles wih wih srongly correlaed imporan variables, 4 noisy variables, and censoring rae 8 percen. Imporan variables are highlighed wih crosses Threshold Figure 7. Seing up hreshold for he vehicle daabase. x and y axis are and of () respecively. Red poins correspond o imporan variables, blue dos - o noisy. The second sep is o projec candidae imporan variables ino he - plane and o se up a new hreshold o remove noisy variables. This sep is illusraed in Figure 7. Imporan variables should have high posiive value of and low value of. The hreshold is manually seleced o rejec he cloud of variables which are reaed as noisy. This sep is similar o approach in (Voronov e al., 6). However, number of variables ha are considered o be imporan is less han in he previous paper due o he augmenaion of wo dimensional space wih he exra dimension. The mehodology for variable selecion could be summarized in he following seps:. Se up hreshold in he number of rees dimension o filer ou noisy variables which are seldom used.. Projec remaining variables in he - plane and se up a hreshold ha disinguishes imporan variables as he subse of variables wih high posiive value of and low value of. 6. CASE STUDY: BATTERY FAILURE PROGNOSTICS Using he manually chosen hresholds as described in Secion and demonsraed wih he s of Figures 6-7, 34 of he variables, i.e. abou percen, are seleced and reaed as imporan. The performance of he RSF using he reduced se of variables is compared o using all variables. The performances of he generaed RSF models are evaluaed using error rae. However, as discussed earlier in Secion, he error rae is no an opimal measure since he wo models in Figure achieves similar error raes while heir predicion qualiy is significanly differen. An RSF is generaed wih rees and a minimal erminal node size of for boh variable ses, he 34 seleced variables and all variables. The error rae for he case wih all variables is., and for he reduced se,.77, which are comparable in magniude. I is worh o emphasize ha node size is here used for growing he fores for predicive purposes and node size for variable selecion.

10 For he analysis, vehicles wih baery failures and wihou are seleced randomly as validaion daa. These vehicles are hen used as inpus in he RSF o compue he lifeime predicion funcions B V (; ) and he resuls are shown in Figures 8 and 9, respecively, for vehicles wih baery problems and healhy ones. B V (; ) B V (; ) (a) RSF using all variables B V (; ) B V (; ) (a) RSF using all variables (b) RSF using seleced subse of variables Figure 9. Lifeime predicion funcion B V (; ) for censored vehicles (b) RSF using seleced subse of variables Figure 8. Lifeime predicion funcion B V (; ) for vehicles wih baery failures. In Figure 8 (b), vehicles are clearly more grouped compared o Figure 8 (a) where mos vehicles have faser decaying lifeime predicion. The resul seems reasonable since lifeime of he baeries of grouped vehicles wih fas decaying lifeime predicion funcions B V (; ) in Figure 8 (b) are wihin o 3 ime unis which is quie long life for baeries. Therefore, fas decaying lifeime predicion funcions for hose vehicles should be expeced. Baery lifeime of he vehicle corresponding o he purple curve in Figure 8 is abou.4 ime unis. However, he vehicle failed early and value of lifeime funcion would no allow o predic he failure, bu i is possible ha he cause of he baery problem is no so common in he vehicles from he daabase. In general, i could be seen ha vehicles ha lived longer are well separaed from he ones ha lived shorer. Of cause, i could no be used as he evaluaion of he mehod, bu as a posiive sign. Noe ha he lifeime funcion of he vehicle which corresponds o he green curve in Figure 8 has changed significanly beween he wo figures. This vehicle operaed for abou. ime unis. I has no ye failed, bu should be likely o fail soon. Tha is why he lifeime predicion funcion decays faser han for he oher vehicles. I should be noiced ha we need a measure for assessing predicive performance of RSF, and, when i is available, more can be said abou he influence of variable selecion on prognosic capabiliies of he model. 7. CONCLUSIONS A mehod for variable selecion and variable imporance analysis using random survival foress is proposed and analyzed. Main moivaing facors for he approach are ) small number of informaive variables, and ) highly correlaed variables in he daa se. Analyzing he feaure space in Figure 6 indicaes ha i is possible o disinguish how VIMP and Minimal deph deermines which variables ha are considered imporan and his should be analyzed furher. The proposed mehod is evaluaed in he indusrially relevan problem of heavy-duy vehicle baery failure prognosics and evaluaed using real vehicle flee daa and simulaed daa. Simulaed daa shows ha imporan variables can be disinguished from noisy variables even in difficul cases. The case sudy using real daa shows ha a prognosis model wih % of he available variables achieves comparable error-rae wih using all variables. ACKNOWLEDGMENT The auhors acknowledge Scania and VINNOVA (Swedish Governmenal Agency for Innovaion Sysems) for sponsorship of his work. REFERENCES Cox, D. R., & Oakes, D. (984). Analysis of survival daa (Vol. ). CRC Press. Daigle, M., & Goebel, K. (). A model-based prognosics approach applied o pneumaic valves. Inernaional Journal of Prognosics and Healh Managemen Volume (color), 84.

11 Frisk, E., & Krysander, M. (). Treamen of accumulaive variables in daa-driven prognosics of lead-acid baeries. In Proceedings of ifac safeprocess. Paris, France. Frisk, E., Krysander, M., & Larsson, E. (4). Daa-driven lead-acide baery prognosics using random survival foress. In Proceedings of he annual conference of he prognosics and healh managemen sociey. For Worh, Texas, USA. Guyon, I., & Elisseeff, A. (3). An inroducion o variable and feaure selecion. The Journal of Machine Learning Research, 3, 7 8. Harrell, F., Califf, R., Pryor, D., Lee, K., & Rosai, R. (98). Evaluaing he yield of medical ess. Jama, 47(8), Ishwaran, H., Kogalur, U., Blacksone, E., & Lauer, M. (8). Random survival foress. The Annals of Applied Saisics, Ishwaran, H., Kogalur, U., Chen, X., & Minn, A. (). Random survival foress for high-dimensional daa. Saisical Analysis and Daa Mining: The ASA Daa Science Journal, 4(), 3. Ishwaran, H., Kogalur, U., Gorodeski, E., Minn, A., & Lauer, M. (). High-dimensional variable selecion for survival daa. Journal of he American Saisical Associaion, (489), 7. Si, X., Wang, W., Hu, C., & Zhou, D. (). Remaining useful life esimaion a review on he saisical daa driven approaches. European Journal of Operaional Research, 3(), 4. Voronov, S., Jung, D., & Frisk, E. (6). Heavy-duy ruck baery failure prognosics using random survival foress. In Proceedings of Advances in Auomoive Conrol, (Acceped for publicaion). Norrköping, Sweden.

Data Mining Anomaly Detection. Lecture Notes for Chapter 10. Introduction to Data Mining

Data Mining Anomaly Detection. Lecture Notes for Chapter 10. Introduction to Data Mining Daa Mining Anomaly Deecion Lecure Noes for Chaper 10 Inroducion o Daa Mining by Tan, Seinbach, Kumar Tan,Seinbach, Kumar Inroducion o Daa Mining 4/18/2004 1 Anomaly/Oulier Deecion Wha are anomalies/ouliers?

More information

Data Mining Anomaly Detection. Lecture Notes for Chapter 10. Introduction to Data Mining

Data Mining Anomaly Detection. Lecture Notes for Chapter 10. Introduction to Data Mining Daa Mining Anomaly Deecion Lecure Noes for Chaper 10 Inroducion o Daa Mining by Tan, Seinbach, Kumar Tan,Seinbach, Kumar Inroducion o Daa Mining 4/18/2004 1 Anomaly/Oulier Deecion Wha are anomalies/ouliers?

More information

1 Purpose of the paper

1 Purpose of the paper Moneary Economics 2 F.C. Bagliano - Sepember 2017 Noes on: F.X. Diebold and C. Li, Forecasing he erm srucure of governmen bond yields, Journal of Economerics, 2006 1 Purpose of he paper The paper presens

More information

Introduction. Enterprises and background. chapter

Introduction. Enterprises and background. chapter NACE: High-Growh Inroducion Enerprises and background 18 chaper High-Growh Enerprises 8 8.1 Definiion A variey of approaches can be considered as providing he basis for defining high-growh enerprises.

More information

Documentation: Philadelphia Fed's Real-Time Data Set for Macroeconomists First-, Second-, and Third-Release Values

Documentation: Philadelphia Fed's Real-Time Data Set for Macroeconomists First-, Second-, and Third-Release Values Documenaion: Philadelphia Fed's Real-Time Daa Se for Macroeconomiss Firs-, Second-, and Third-Release Values Las Updaed: December 16, 2013 1. Inroducion We documen our compuaional mehods for consrucing

More information

A Note on Missing Data Effects on the Hausman (1978) Simultaneity Test:

A Note on Missing Data Effects on the Hausman (1978) Simultaneity Test: A Noe on Missing Daa Effecs on he Hausman (978) Simulaneiy Tes: Some Mone Carlo Resuls. Dikaios Tserkezos and Konsaninos P. Tsagarakis Deparmen of Economics, Universiy of Cree, Universiy Campus, 7400,

More information

FORECASTING WITH A LINEX LOSS: A MONTE CARLO STUDY

FORECASTING WITH A LINEX LOSS: A MONTE CARLO STUDY Proceedings of he 9h WSEAS Inernaional Conference on Applied Mahemaics, Isanbul, Turkey, May 7-9, 006 (pp63-67) FORECASTING WITH A LINEX LOSS: A MONTE CARLO STUDY Yasemin Ulu Deparmen of Economics American

More information

UCLA Department of Economics Fall PhD. Qualifying Exam in Macroeconomic Theory

UCLA Department of Economics Fall PhD. Qualifying Exam in Macroeconomic Theory UCLA Deparmen of Economics Fall 2016 PhD. Qualifying Exam in Macroeconomic Theory Insrucions: This exam consiss of hree pars, and you are o complee each par. Answer each par in a separae bluebook. All

More information

Reconciling Gross Output TFP Growth with Value Added TFP Growth

Reconciling Gross Output TFP Growth with Value Added TFP Growth Reconciling Gross Oupu TP Growh wih Value Added TP Growh Erwin Diewer Universiy of Briish Columbia and Universiy of New Souh Wales ABSTRACT This aricle obains relaively simple exac expressions ha relae

More information

INSTITUTE OF ACTUARIES OF INDIA

INSTITUTE OF ACTUARIES OF INDIA INSTITUTE OF ACTUARIES OF INDIA EXAMINATIONS 9 h November 2010 Subjec CT6 Saisical Mehods Time allowed: Three Hours (10.00 13.00 Hrs.) Toal Marks: 100 INSTRUCTIONS TO THE CANDIDATES 1. Please read he insrucions

More information

2. Quantity and price measures in macroeconomic statistics 2.1. Long-run deflation? As typical price indexes, Figure 2-1 depicts the GDP deflator,

2. Quantity and price measures in macroeconomic statistics 2.1. Long-run deflation? As typical price indexes, Figure 2-1 depicts the GDP deflator, 1 2. Quaniy and price measures in macroeconomic saisics 2.1. Long-run deflaion? As ypical price indexes, Figure 2-1 depics he GD deflaor, he Consumer rice ndex (C), and he Corporae Goods rice ndex (CG)

More information

Estimating Earnings Trend Using Unobserved Components Framework

Estimating Earnings Trend Using Unobserved Components Framework Esimaing Earnings Trend Using Unobserved Componens Framework Arabinda Basisha and Alexander Kurov College of Business and Economics, Wes Virginia Universiy December 008 Absrac Regressions using valuaion

More information

The Mathematics Of Stock Option Valuation - Part Four Deriving The Black-Scholes Model Via Partial Differential Equations

The Mathematics Of Stock Option Valuation - Part Four Deriving The Black-Scholes Model Via Partial Differential Equations The Mahemaics Of Sock Opion Valuaion - Par Four Deriving The Black-Scholes Model Via Parial Differenial Equaions Gary Schurman, MBE, CFA Ocober 1 In Par One we explained why valuing a call opion as a sand-alone

More information

DYNAMIC ECONOMETRIC MODELS Vol. 7 Nicolaus Copernicus University Toruń Krzysztof Jajuga Wrocław University of Economics

DYNAMIC ECONOMETRIC MODELS Vol. 7 Nicolaus Copernicus University Toruń Krzysztof Jajuga Wrocław University of Economics DYNAMIC ECONOMETRIC MODELS Vol. 7 Nicolaus Copernicus Universiy Toruń 2006 Krzyszof Jajuga Wrocław Universiy of Economics Ineres Rae Modeling and Tools of Financial Economerics 1. Financial Economerics

More information

Appendix B: DETAILS ABOUT THE SIMULATION MODEL. contained in lookup tables that are all calculated on an auxiliary spreadsheet.

Appendix B: DETAILS ABOUT THE SIMULATION MODEL. contained in lookup tables that are all calculated on an auxiliary spreadsheet. Appendix B: DETAILS ABOUT THE SIMULATION MODEL The simulaion model is carried ou on one spreadshee and has five modules, four of which are conained in lookup ables ha are all calculaed on an auxiliary

More information

MA Advanced Macro, 2016 (Karl Whelan) 1

MA Advanced Macro, 2016 (Karl Whelan) 1 MA Advanced Macro, 2016 (Karl Whelan) 1 The Calvo Model of Price Rigidiy The form of price rigidiy faced by he Calvo firm is as follows. Each period, only a random fracion (1 ) of firms are able o rese

More information

4452 Mathematical Modeling Lecture 17: Modeling of Data: Linear Regression

4452 Mathematical Modeling Lecture 17: Modeling of Data: Linear Regression Mah Modeling Lecure 17: Modeling of Daa: Linear Regression Page 1 5 Mahemaical Modeling Lecure 17: Modeling of Daa: Linear Regression Inroducion In modeling of daa, we are given a se of daa poins, and

More information

UNIVERSITY OF MORATUWA

UNIVERSITY OF MORATUWA MA5100 UNIVERSITY OF MORATUWA MSC/POSTGRADUATE DIPLOMA IN FINANCIAL MATHEMATICS 009 MA 5100 INTRODUCTION TO STATISTICS THREE HOURS November 009 Answer FIVE quesions and NO MORE. Quesion 1 (a) A supplier

More information

San Francisco State University ECON 560 Summer 2018 Problem set 3 Due Monday, July 23

San Francisco State University ECON 560 Summer 2018 Problem set 3 Due Monday, July 23 San Francisco Sae Universiy Michael Bar ECON 56 Summer 28 Problem se 3 Due Monday, July 23 Name Assignmen Rules. Homework assignmens mus be yped. For insrucions on how o ype equaions and mah objecs please

More information

Synthetic CDO s and Basket Default Swaps in a Fixed Income Credit Portfolio

Synthetic CDO s and Basket Default Swaps in a Fixed Income Credit Portfolio Synheic CDO s and Baske Defaul Swaps in a Fixed Income Credi Porfolio Louis Sco June 2005 Credi Derivaive Producs CDO Noes Cash & Synheic CDO s, various ranches Invesmen Grade Corporae names, High Yield

More information

This specification describes the models that are used to forecast

This specification describes the models that are used to forecast PCE and CPI Inflaion Differenials: Convering Inflaion Forecass Model Specificaion By Craig S. Hakkio This specificaion describes he models ha are used o forecas he inflaion differenial. The 14 forecass

More information

Advanced Forecasting Techniques and Models: Time-Series Forecasts

Advanced Forecasting Techniques and Models: Time-Series Forecasts Advanced Forecasing Techniques and Models: Time-Series Forecass Shor Examples Series using Risk Simulaor For more informaion please visi: www.realopionsvaluaion.com or conac us a: admin@realopionsvaluaion.com

More information

The relation between U.S. money growth and inflation: evidence from a band pass filter. Abstract

The relation between U.S. money growth and inflation: evidence from a band pass filter. Abstract The relaion beween U.S. money growh and inflaion: evidence from a band pass filer Gary Shelley Dep. of Economics Finance; Eas Tennessee Sae Universiy Frederick Wallace Dep. of Managemen Markeing; Prairie

More information

An Incentive-Based, Multi-Period Decision Model for Hierarchical Systems

An Incentive-Based, Multi-Period Decision Model for Hierarchical Systems Wernz C. and Deshmukh A. An Incenive-Based Muli-Period Decision Model for Hierarchical Sysems Proceedings of he 3 rd Inernaional Conference on Global Inerdependence and Decision Sciences (ICGIDS) pp. 84-88

More information

Systemic Risk Illustrated

Systemic Risk Illustrated Sysemic Risk Illusraed Jean-Pierre Fouque Li-Hsien Sun March 2, 22 Absrac We sudy he behavior of diffusions coupled hrough heir drifs in a way ha each componen mean-revers o he mean of he ensemble. In

More information

VERIFICATION OF ECONOMIC EFFICIENCY OF LIGNITE DEPOSIT DEVELOPMENT USING THE SENSITIVITY ANALYSIS

VERIFICATION OF ECONOMIC EFFICIENCY OF LIGNITE DEPOSIT DEVELOPMENT USING THE SENSITIVITY ANALYSIS 1 Beaa TRZASKUŚ-ŻAK 1, Kazimierz CZOPEK 2 MG 3 1 Trzaskuś-Żak Beaa PhD. (corresponding auhor) AGH Universiy of Science and Technology Faculy of Mining and Geoengineering Al. Mickiewicza 30, 30-59 Krakow,

More information

ECONOMIC GROWTH. Student Assessment. Macroeconomics II. Class 1

ECONOMIC GROWTH. Student Assessment. Macroeconomics II. Class 1 Suden Assessmen You will be graded on he basis of In-class aciviies (quizzes worh 30 poins) which can be replaced wih he number of marks from he regular uorial IF i is >=30 (capped a 30, i.e. marks from

More information

Comparison of back-testing results for various VaR estimation methods. Aleš Kresta, ICSP 2013, Bergamo 8 th July, 2013

Comparison of back-testing results for various VaR estimation methods. Aleš Kresta, ICSP 2013, Bergamo 8 th July, 2013 Comparison of back-esing resuls for various VaR esimaion mehods, ICSP 3, Bergamo 8 h July, 3 THE MOTIVATION AND GOAL In order o esimae he risk of financial invesmens, i is crucial for all he models o esimae

More information

Problem Set 1 Answers. a. The computer is a final good produced and sold in Hence, 2006 GDP increases by $2,000.

Problem Set 1 Answers. a. The computer is a final good produced and sold in Hence, 2006 GDP increases by $2,000. Social Analysis 10 Spring 2006 Problem Se 1 Answers Quesion 1 a. The compuer is a final good produced and sold in 2006. Hence, 2006 GDP increases by $2,000. b. The bread is a final good sold in 2006. 2006

More information

OPTIMUM FISCAL AND MONETARY POLICY USING THE MONETARY OVERLAPPING GENERATION MODELS

OPTIMUM FISCAL AND MONETARY POLICY USING THE MONETARY OVERLAPPING GENERATION MODELS Kuwai Chaper of Arabian Journal of Business and Managemen Review Vol. 3, No.6; Feb. 2014 OPTIMUM FISCAL AND MONETARY POLICY USING THE MONETARY OVERLAPPING GENERATION MODELS Ayoub Faramarzi 1, Dr.Rahim

More information

Web Usage Patterns Using Association Rules and Markov Chains

Web Usage Patterns Using Association Rules and Markov Chains Web Usage Paerns Using Associaion Rules and Markov hains handrakasem Rajabha Universiy, Thailand amnas.cru@gmail.com Absrac - The objecive of his research is o illusrae he probabiliy of web page using

More information

Exam 1. Econ520. Spring 2017

Exam 1. Econ520. Spring 2017 Exam 1. Econ520. Spring 2017 Professor Luz Hendricks UNC Insrucions: Answer all quesions. Clearly number your answers. Wrie legibly. Do no wrie your answers on he quesion shees. Explain your answers do

More information

ASSESSING PREDICTION INTERVALS FOR DEMAND RATES OF SLOW-MOVING PARTS FOR A NATIONAL RETAILER

ASSESSING PREDICTION INTERVALS FOR DEMAND RATES OF SLOW-MOVING PARTS FOR A NATIONAL RETAILER ASSESSING PREDICTION INTERVALS FOR DEMAND RATES OF SLOW-MOVING PARTS FOR A NATIONAL RETAILER Ma Lindsey, Nelson Rusche College of Business, Sephen F. Ausin Sae Universiy, Nacogdoches, TX 75965, (936) 468-1858,

More information

Empirical analysis on China money multiplier

Empirical analysis on China money multiplier Aug. 2009, Volume 8, No.8 (Serial No.74) Chinese Business Review, ISSN 1537-1506, USA Empirical analysis on China money muliplier SHANG Hua-juan (Financial School, Shanghai Universiy of Finance and Economics,

More information

FINAL EXAM EC26102: MONEY, BANKING AND FINANCIAL MARKETS MAY 11, 2004

FINAL EXAM EC26102: MONEY, BANKING AND FINANCIAL MARKETS MAY 11, 2004 FINAL EXAM EC26102: MONEY, BANKING AND FINANCIAL MARKETS MAY 11, 2004 This exam has 50 quesions on 14 pages. Before you begin, please check o make sure ha your copy has all 50 quesions and all 14 pages.

More information

A Screen for Fraudulent Return Smoothing in the Hedge Fund Industry

A Screen for Fraudulent Return Smoothing in the Hedge Fund Industry A Screen for Fraudulen Reurn Smoohing in he Hedge Fund Indusry Nicolas P.B. Bollen Vanderbil Universiy Veronika Krepely Universiy of Indiana May 16 h, 2006 Hisorical performance Cum. Mean Sd Dev CSFB Tremon

More information

Capital Strength and Bank Profitability

Capital Strength and Bank Profitability Capial Srengh and Bank Profiabiliy Seok Weon Lee 1 Asian Social Science; Vol. 11, No. 10; 2015 ISSN 1911-2017 E-ISSN 1911-2025 Published by Canadian Cener of Science and Educaion 1 Division of Inernaional

More information

Subdivided Research on the Inflation-hedging Ability of Residential Property: A Case of Hong Kong

Subdivided Research on the Inflation-hedging Ability of Residential Property: A Case of Hong Kong Subdivided Research on he -hedging Abiliy of Residenial Propery: A Case of Hong Kong Guohua Huang 1, Haili Tu 2, Boyu Liu 3,* 1 Economics and Managemen School of Wuhan Universiy,Economics and Managemen

More information

Forecasting Financial Time Series

Forecasting Financial Time Series 1 Inroducion Forecasing Financial Time Series Peer Princ 1, Sára Bisová 2, Adam Borovička 3 Absrac. Densiy forecas is an esimae of he probabiliy disribuion of he possible fuure values of a random variable.

More information

IJRSS Volume 2, Issue 2 ISSN:

IJRSS Volume 2, Issue 2 ISSN: A LOGITIC BROWNIAN MOTION WITH A PRICE OF DIVIDEND YIELDING AET D. B. ODUOR ilas N. Onyango _ Absrac: In his paper, we have used he idea of Onyango (2003) he used o develop a logisic equaion used in naural

More information

On the Impact of Inflation and Exchange Rate on Conditional Stock Market Volatility: A Re-Assessment

On the Impact of Inflation and Exchange Rate on Conditional Stock Market Volatility: A Re-Assessment MPRA Munich Personal RePEc Archive On he Impac of Inflaion and Exchange Rae on Condiional Sock Marke Volailiy: A Re-Assessmen OlaOluwa S Yaya and Olanrewaju I Shiu Deparmen of Saisics, Universiy of Ibadan,

More information

The Relationship between Money Demand and Interest Rates: An Empirical Investigation in Sri Lanka

The Relationship between Money Demand and Interest Rates: An Empirical Investigation in Sri Lanka The Relaionship beween Money Demand and Ineres Raes: An Empirical Invesigaion in Sri Lanka R. C. P. Padmasiri 1 and O. G. Dayarana Banda 2 1 Economic Research Uni, Deparmen of Expor Agriculure 2 Deparmen

More information

CENTRO DE ESTUDIOS MONETARIOS Y FINANCIEROS T. J. KEHOE MACROECONOMICS I WINTER 2011 PROBLEM SET #6

CENTRO DE ESTUDIOS MONETARIOS Y FINANCIEROS T. J. KEHOE MACROECONOMICS I WINTER 2011 PROBLEM SET #6 CENTRO DE ESTUDIOS MONETARIOS Y FINANCIEROS T J KEHOE MACROECONOMICS I WINTER PROBLEM SET #6 This quesion requires you o apply he Hodrick-Presco filer o he ime series for macroeconomic variables for he

More information

Forecasting Sales: Models, Managers (Experts) and their Interactions

Forecasting Sales: Models, Managers (Experts) and their Interactions Forecasing Sales: Models, Managers (Expers) and heir Ineracions Philip Hans Franses Erasmus School of Economics franses@ese.eur.nl ISF 203, Seoul Ouline Key issues Durable producs SKU sales Opimal behavior

More information

A Study of Process Capability Analysis on Second-order Autoregressive Processes

A Study of Process Capability Analysis on Second-order Autoregressive Processes A Sudy of Process apabiliy Analysis on Second-order Auoregressive Processes Dja Shin Wang, Business Adminisraion, TransWorld Universiy, Taiwan. E-mail: shin@wu.edu.w Szu hi Ho, Indusrial Engineering and

More information

DOES EVA REALLY HELP LONG TERM STOCK PERFORMANCE?

DOES EVA REALLY HELP LONG TERM STOCK PERFORMANCE? DOES EVA REALLY HELP LONG TERM STOCK PERFORMANCE? Wesley M. Jones, Jr. The Ciadel wes.jones@ciadel.edu George Lowry, Randolph Macon College glowry@rmc.edu ABSTRACT Economic Value Added (EVA) as a philosophy

More information

Effect of Probabilistic Backorder on an Inventory System with Selling Price Demand Under Volume Flexible Strategy

Effect of Probabilistic Backorder on an Inventory System with Selling Price Demand Under Volume Flexible Strategy Inernaional Transacions in Mahemaical Sciences and compuers July-December 0, Volume 5, No., pp. 97-04 ISSN-(Prining) 0974-5068, (Online) 0975-75 AACS. (www.aacsjournals.com) All righ reserved. Effec of

More information

STATIONERY REQUIREMENTS SPECIAL REQUIREMENTS 20 Page booklet List of statistical formulae New Cambridge Elementary Statistical Tables

STATIONERY REQUIREMENTS SPECIAL REQUIREMENTS 20 Page booklet List of statistical formulae New Cambridge Elementary Statistical Tables ECONOMICS RIPOS Par I Friday 7 June 005 9 Paper Quaniaive Mehods in Economics his exam comprises four secions. Secions A and B are on Mahemaics; Secions C and D are on Saisics. You should do he appropriae

More information

Missing Data Prediction and Forecasting for Water Quantity Data

Missing Data Prediction and Forecasting for Water Quantity Data 2011 Inernaional Conference on Modeling, Simulaion and Conrol ICSIT vol.10 (2011) (2011) IACSIT ress, Singapore Missing Daa redicion and Forecasing for Waer Quaniy Daa rakhar Gupa 1 and R.Srinivasan 2

More information

ECON Lecture 5 (OB), Sept. 21, 2010

ECON Lecture 5 (OB), Sept. 21, 2010 1 ECON4925 2010 Lecure 5 (OB), Sep. 21, 2010 axaion of exhausible resources Perman e al. (2003), Ch. 15.7. INODUCION he axaion of nonrenewable resources in general and of oil in paricular has generaed

More information

HEADWAY DISTRIBUTION FOR NH-8 TRAFFIC AT VAGHASI VILLAGE LOCATION

HEADWAY DISTRIBUTION FOR NH-8 TRAFFIC AT VAGHASI VILLAGE LOCATION HEADWAY DISTRIBUTION FOR NH-8 TRAFFIC AT VAGHASI VILLAGE LOCATION Dr. L. B. Zala Associae Professor, Civil Engineering Deparmen, lbzala@yahoo.co.in Kevin B. Modi M.Tech (Civil) Transporaion Sysem Engineering

More information

Population growth and intra-specific competition in duckweed

Population growth and intra-specific competition in duckweed Populaion growh and inra-specific compeiion in duckweed We will use a species of floaing aquaic plan o invesigae principles of populaion growh and inra-specific compeiion, in oher words densiy-dependence.

More information

VOLATILITY CLUSTERING, NEW HEAVY-TAILED DISTRIBUTION AND THE STOCK MARKET RETURNS IN SOUTH KOREA

VOLATILITY CLUSTERING, NEW HEAVY-TAILED DISTRIBUTION AND THE STOCK MARKET RETURNS IN SOUTH KOREA 64 VOLATILITY CLUSTERING, NEW HEAVY-TAILED DISTRIBUTION AND THE STOCK MARKET RETURNS IN SOUTH KOREA Yoon Hong, PhD, Research Fellow Deparmen of Economics Hanyang Universiy, Souh Korea Ji-chul Lee, PhD,

More information

If You Are No Longer Able to Work

If You Are No Longer Able to Work If You Are No Longer Able o Work NY STRS A Guide for Making Disabiliy Reiremen Decisions INTRODUCTION If you re forced o sop working because of a serious illness or injury, you and your family will be

More information

Market risk VaR historical simulation model with autocorrelation effect: A note

Market risk VaR historical simulation model with autocorrelation effect: A note Inernaional Journal of Banking and Finance Volume 6 Issue 2 Aricle 9 3--29 Marke risk VaR hisorical simulaion model wih auocorrelaion effec: A noe Wananee Surapaioolkorn SASIN Chulalunkorn Universiy Follow

More information

Dual Valuation and Hedging of Bermudan Options

Dual Valuation and Hedging of Bermudan Options SIAM J. FINANCIAL MAH. Vol. 1, pp. 604 608 c 2010 Sociey for Indusrial and Applied Mahemaics Dual Valuaion and Hedging of Bermudan Opions L. C. G. Rogers Absrac. Some years ago, a differen characerizaion

More information

Organize your work as follows (see book): Chapter 3 Engineering Solutions. 3.4 and 3.5 Problem Presentation

Organize your work as follows (see book): Chapter 3 Engineering Solutions. 3.4 and 3.5 Problem Presentation Chaper Engineering Soluions.4 and.5 Problem Presenaion Organize your work as follows (see book): Problem Saemen Theory and Assumpions Soluion Verificaion Tools: Pencil and Paper See Fig.. in Book or use

More information

Pricing FX Target Redemption Forward under. Regime Switching Model

Pricing FX Target Redemption Forward under. Regime Switching Model In. J. Conemp. Mah. Sciences, Vol. 8, 2013, no. 20, 987-991 HIKARI Ld, www.m-hikari.com hp://dx.doi.org/10.12988/ijcms.2013.311123 Pricing FX Targe Redempion Forward under Regime Swiching Model Ho-Seok

More information

Bond Prices and Interest Rates

Bond Prices and Interest Rates Winer erm 1999 Bond rice Handou age 1 of 4 Bond rices and Ineres Raes A bond is an IOU. ha is, a bond is a promise o pay, in he fuure, fixed amouns ha are saed on he bond. he ineres rae ha a bond acually

More information

(1 + Nominal Yield) = (1 + Real Yield) (1 + Expected Inflation Rate) (1 + Inflation Risk Premium)

(1 + Nominal Yield) = (1 + Real Yield) (1 + Expected Inflation Rate) (1 + Inflation Risk Premium) 5. Inflaion-linked bonds Inflaion is an economic erm ha describes he general rise in prices of goods and services. As prices rise, a uni of money can buy less goods and services. Hence, inflaion is an

More information

Volatility and Hedging Errors

Volatility and Hedging Errors Volailiy and Hedging Errors Jim Gaheral Sepember, 5 1999 Background Derivaive porfolio bookrunners ofen complain ha hedging a marke-implied volailiies is sub-opimal relaive o hedging a heir bes guess of

More information

The Impact of Interest Rate Liberalization Announcement in China on the Market Value of Hong Kong Listed Chinese Commercial Banks

The Impact of Interest Rate Liberalization Announcement in China on the Market Value of Hong Kong Listed Chinese Commercial Banks Journal of Finance and Invesmen Analysis, vol. 2, no.3, 203, 35-39 ISSN: 224-0998 (prin version), 224-0996(online) Scienpress Ld, 203 The Impac of Ineres Rae Liberalizaion Announcemen in China on he Marke

More information

Online Appendix to: Implementing Supply Routing Optimization in a Make-To-Order Manufacturing Network

Online Appendix to: Implementing Supply Routing Optimization in a Make-To-Order Manufacturing Network Online Appendix o: Implemening Supply Rouing Opimizaion in a Make-To-Order Manufacuring Nework A.1. Forecas Accuracy Sudy. July 29, 2008 Assuming a single locaion and par for now, his sudy can be described

More information

Financial Econometrics Jeffrey R. Russell Midterm Winter 2011

Financial Econometrics Jeffrey R. Russell Midterm Winter 2011 Name Financial Economerics Jeffrey R. Russell Miderm Winer 2011 You have 2 hours o complee he exam. Use can use a calculaor. Try o fi all your work in he space provided. If you find you need more space

More information

Robustness of Memory-Type Charts to Skew Processes

Robustness of Memory-Type Charts to Skew Processes Inernaional Journal of Applied Physics and Mahemaics Robusness of Memory-Type Chars o Skew Processes Saowani Sukparungsee* Deparmen of Applied Saisics, Faculy of Applied Science, King Mongku s Universiy

More information

You should turn in (at least) FOUR bluebooks, one (or more, if needed) bluebook(s) for each question.

You should turn in (at least) FOUR bluebooks, one (or more, if needed) bluebook(s) for each question. UCLA Deparmen of Economics Spring 05 PhD. Qualifying Exam in Macroeconomic Theory Insrucions: This exam consiss of hree pars, and each par is worh 0 poins. Pars and have one quesion each, and Par 3 has

More information

Final Exam Answers Exchange Rate Economics

Final Exam Answers Exchange Rate Economics Kiel Insiu für Welwirhschaf Advanced Sudies in Inernaional Economic Policy Research Spring 2005 Menzie D. Chinn Final Exam Answers Exchange Rae Economics This exam is 1 ½ hours long. Answer all quesions.

More information

Computer Lab 6. Minitab Project Report. Time Series Plot of x. Year

Computer Lab 6. Minitab Project Report. Time Series Plot of x. Year Compuer Lab Problem. Lengh of Growing Season in England Miniab Projec Repor Time Series Plo of x x 77 8 8 889 Year 98 97 The ime series plo indicaes a consan rend up o abou 9, hen he lengh of growing season

More information

Midterm Exam. Use the end of month price data for the S&P 500 index in the table below to answer the following questions.

Midterm Exam. Use the end of month price data for the S&P 500 index in the table below to answer the following questions. Universiy of Washingon Winer 00 Deparmen of Economics Eric Zivo Economics 483 Miderm Exam This is a closed book and closed noe exam. However, you are allowed one page of handwrien noes. Answer all quesions

More information

Watch out for the impact of Scottish independence opinion polls on UK s borrowing costs

Watch out for the impact of Scottish independence opinion polls on UK s borrowing costs Wach ou for he impac of Scoish independence opinion polls on UK s borrowing coss Cosas Milas (Universiy of Liverpool; email: cosas.milas@liverpool.ac.uk) and Tim Worrall (Universiy of Edinburgh; email:

More information

The Death of the Phillips Curve?

The Death of the Phillips Curve? The Deah of he Phillips Curve? Anhony Murphy Federal Reserve Bank of Dallas Research Deparmen Working Paper 1801 hps://doi.org/10.19/wp1801 The Deah of he Phillips Curve? 1 Anhony Murphy, Federal Reserve

More information

Volume 31, Issue 1. Pitfall of simple permanent income hypothesis model

Volume 31, Issue 1. Pitfall of simple permanent income hypothesis model Volume 31, Issue 1 ifall of simple permanen income hypohesis model Kazuo Masuda Bank of Japan Absrac ermanen Income Hypohesis (hereafer, IH) is one of he cenral conceps in macroeconomics. Single equaion

More information

Session IX: Special topics

Session IX: Special topics Session IX: Special opics 2. Subnaional populaion projecions 10 March 2016 Cheryl Sawyer, Lina Bassarsky Populaion Esimaes and Projecions Secion www.unpopulaion.org Maerials adaped from Unied Naions Naional

More information

Li Gan Guan Gong Michael Hurd. April, 2006

Li Gan Guan Gong Michael Hurd. April, 2006 Ne Inergeneraional Transfers from an Increase in Social Securiy Benefis Li Gan Guan Gong Michael Hurd April, 2006 ABSTRACT When he age of deah is uncerain, individuals will leave bequess even if hey have

More information

VaR and Low Interest Rates

VaR and Low Interest Rates VaR and Low Ineres Raes Presened a he Sevenh Monreal Indusrial Problem Solving Workshop By Louis Doray (U de M) Frédéric Edoukou (U de M) Rim Labdi (HEC Monréal) Zichun Ye (UBC) 20 May 2016 P r e s e n

More information

Technological progress breakthrough inventions. Dr hab. Joanna Siwińska-Gorzelak

Technological progress breakthrough inventions. Dr hab. Joanna Siwińska-Gorzelak Technological progress breakhrough invenions Dr hab. Joanna Siwińska-Gorzelak Inroducion Afer The Economis : Solow has shown, ha accumulaion of capial alone canno yield lasing progress. Wha can? Anyhing

More information

The Economic Impact of the Proposed Gasoline Tax Cut In Connecticut

The Economic Impact of the Proposed Gasoline Tax Cut In Connecticut The Economic Impac of he Proposed Gasoline Tax Cu In Connecicu By Hemana Shresha, Research Assisan Bobur Alimov, Research Assisan Sanley McMillen, Manager, Research Projecs June 21, 2000 CONNECTICUT CENTER

More information

Stock Market Behaviour Around Profit Warning Announcements

Stock Market Behaviour Around Profit Warning Announcements Sock Marke Behaviour Around Profi Warning Announcemens Henryk Gurgul Conen 1. Moivaion 2. Review of exising evidence 3. Main conjecures 4. Daa and preliminary resuls 5. GARCH relaed mehodology 6. Empirical

More information

An Alternative Test of Purchasing Power Parity

An Alternative Test of Purchasing Power Parity An Alernaive Tes of Purchasing Power Pariy Frederic H. Wallace* Deparmen of Managemen and Mareing Prairie View A&M Universiy Prairie View, Texas 77446 and Gary L. Shelley Deparmen of Economics, Finance,

More information

ASSIGNMENT BOOKLET. M.Sc. (Mathematics with Applications in Computer Science) Mathematical Modelling (January 2014 November 2014)

ASSIGNMENT BOOKLET. M.Sc. (Mathematics with Applications in Computer Science) Mathematical Modelling (January 2014 November 2014) ASSIGNMENT BOOKLET MMT-009 M.Sc. (Mahemaics wih Applicaions in Compuer Science) Mahemaical Modelling (January 014 November 014) School of Sciences Indira Gandhi Naional Open Universiy Maidan Garhi New

More information

How Well Does the Vasicek-Basel AIRB Model Fit the Data? Evidence from a Long Time Series of Corporate Credit Ratings Data

How Well Does the Vasicek-Basel AIRB Model Fit the Data? Evidence from a Long Time Series of Corporate Credit Ratings Data How Well Does he Vasicek-Basel AIRB Model Fi he Daa? Evidence from a Long ime Series of Corporae Credi Raings Daa by Paul H. Kupiec Preliminary Sepember 2009 EXENDED ABSRAC he Basel II AIRB framework uses

More information

Macroeconomics II A dynamic approach to short run economic fluctuations. The DAD/DAS model.

Macroeconomics II A dynamic approach to short run economic fluctuations. The DAD/DAS model. Macroeconomics II A dynamic approach o shor run economic flucuaions. The DAD/DAS model. Par 2. The demand side of he model he dynamic aggregae demand (DAD) Inflaion and dynamics in he shor run So far,

More information

Market and Information Economics

Market and Information Economics Marke and Informaion Economics Preliminary Examinaion Deparmen of Agriculural Economics Texas A&M Universiy May 2015 Insrucions: This examinaion consiss of six quesions. You mus answer he firs quesion

More information

Output: The Demand for Goods and Services

Output: The Demand for Goods and Services IN CHAPTER 15 how o incorporae dynamics ino he AD-AS model we previously sudied how o use he dynamic AD-AS model o illusrae long-run economic growh how o use he dynamic AD-AS model o race ou he effecs

More information

Portfolio investments accounted for the largest outflow of SEK 77.5 billion in the financial account, which gave a net outflow of SEK billion.

Portfolio investments accounted for the largest outflow of SEK 77.5 billion in the financial account, which gave a net outflow of SEK billion. BALANCE OF PAYMENTS DATE: 27-11-27 PUBLISHER: Saisics Sweden Balance of Paymens and Financial Markes (BFM) Maria Falk +46 8 6 94 72, maria.falk@scb.se Camilla Bergeling +46 8 6 942 6, camilla.bergeling@scb.se

More information

Finance Solutions to Problem Set #6: Demand Estimation and Forecasting

Finance Solutions to Problem Set #6: Demand Estimation and Forecasting Finance 30210 Soluions o Problem Se #6: Demand Esimaion and Forecasing 1) Consider he following regression for Ice Cream sales (in housands) as a funcion of price in dollars per pin. My daa is aken from

More information

1.2 A CATALOG OF ESSENTIAL FUNCTIONS

1.2 A CATALOG OF ESSENTIAL FUNCTIONS SETION. A ATALOG OF ESSENTIAL FUNTIONS. A ATALOG OF ESSENTIAL FUNTIONS V Pla he Video V EXAMPLE A Table liss he average carbon dioide level in he amosphere, measured in pars per million a Mauna Loa Observaor

More information

Backtesting Stochastic Mortality Models: An Ex-Post Evaluation of Multi-Period-Ahead Density Forecasts

Backtesting Stochastic Mortality Models: An Ex-Post Evaluation of Multi-Period-Ahead Density Forecasts Cenre for Risk & Insurance Sudies enhancing he undersanding of risk and insurance Backesing Sochasic Moraliy Models: An Ex-Pos Evaluaion of Muli-Period-Ahead Densiy Forecass Kevin Dowd, Andrew J.G. Cairns,

More information

A Regime Switching Independent Component Analysis Method for Temporal Data

A Regime Switching Independent Component Analysis Method for Temporal Data Journal of Compuaions & Modelling, vol.2, no.1, 2012, 109-122 ISSN: 1792-7625 (prin), 1792-8850 (online) Inernaional Scienific Press, 2012 A Regime Swiching Independen Componen Analysis Mehod for Temporal

More information

Exponential Functions Last update: February 2008

Exponential Functions Last update: February 2008 Eponenial Funcions Las updae: February 2008 Secion 1: Percen Growh and Decay Any quaniy ha increases or decreases by a consan percenage is said o change eponenially. Le's look a a few eamples o undersand

More information

Forecasting with Judgment

Forecasting with Judgment Forecasing wih Judgmen Simone Manganelli DG-Research European Cenral Bank Frankfur am Main, German) Disclaimer: he views expressed in his paper are our own and do no necessaril reflec he views of he ECB

More information

Optimal Early Exercise of Vulnerable American Options

Optimal Early Exercise of Vulnerable American Options Opimal Early Exercise of Vulnerable American Opions March 15, 2008 This paper is preliminary and incomplee. Opimal Early Exercise of Vulnerable American Opions Absrac We analyze he effec of credi risk

More information

Jarrow-Lando-Turnbull model

Jarrow-Lando-Turnbull model Jarrow-Lando-urnbull model Characerisics Credi raing dynamics is represened by a Markov chain. Defaul is modelled as he firs ime a coninuous ime Markov chain wih K saes hiing he absorbing sae K defaul

More information

a. If Y is 1,000, M is 100, and the growth rate of nominal money is 1 percent, what must i and P be?

a. If Y is 1,000, M is 100, and the growth rate of nominal money is 1 percent, what must i and P be? Problem Se 4 ECN 101 Inermediae Macroeconomics SOLUTIONS Numerical Quesions 1. Assume ha he demand for real money balance (M/P) is M/P = 0.6-100i, where is naional income and i is he nominal ineres rae.

More information

The Empirical Study about Introduction of Stock Index Futures on the Volatility of Spot Market

The Empirical Study about Introduction of Stock Index Futures on the Volatility of Spot Market ibusiness, 013, 5, 113-117 hp://dx.doi.org/10.436/ib.013.53b04 Published Online Sepember 013 (hp://www.scirp.org/journal/ib) 113 The Empirical Sudy abou Inroducion of Sock Index Fuures on he Volailiy of

More information

Unemployment and Phillips curve

Unemployment and Phillips curve Unemploymen and Phillips curve 2 of The Naural Rae of Unemploymen and he Phillips Curve Figure 1 Inflaion versus Unemploymen in he Unied Saes, 1900 o 1960 During he period 1900 o 1960 in he Unied Saes,

More information

1. FIXED ASSETS - DEFINITION AND CHARACTERISTICS

1. FIXED ASSETS - DEFINITION AND CHARACTERISTICS 1. FIXED ASSETS - DEFINITION AND CHARACTERISTICS Fixed asses represen a par of he business asses of he company and is long-erm propery, which canno be easily liquidaed (convered ino cash). Their characerisics

More information

An Introduction to PAM Based Project Appraisal

An Introduction to PAM Based Project Appraisal Slide 1 An Inroducion o PAM Based Projec Appraisal Sco Pearson Sanford Universiy Sco Pearson is Professor of Agriculural Economics a he Food Research Insiue, Sanford Universiy. He has paricipaed in projecs

More information

Progress Risk Assessment for Spliced Network of Engineering Project Based on Improved PERT

Progress Risk Assessment for Spliced Network of Engineering Project Based on Improved PERT Available online a www.sciencedirec.com Sysems Engineering Procedia (0) 7 78 0 nernaional Conference on Risk and Engineering Managemen (REM) Progress Risk Assessmen for Spliced Nework of Engineering Projec

More information

LIDSTONE IN THE CONTINUOUS CASE by. Ragnar Norberg

LIDSTONE IN THE CONTINUOUS CASE by. Ragnar Norberg LIDSTONE IN THE CONTINUOUS CASE by Ragnar Norberg Absrac A generalized version of he classical Lidsone heorem, which deals wih he dependency of reserves on echnical basis and conrac erms, is proved in

More information