Real Options for Engineering Systems

Size: px
Start display at page:

Download "Real Options for Engineering Systems"

Transcription

1 Real Options for Engineering Systems Session 1: What s wrong with the Net Present Value criterion? Stefan Scholtes Judge Institute of Management, CU Slide 1 Main issues of the module! Project valuation: Making an economic case for a technology project! Design optimisation: adding design features to technology projects to make them economically more attractive! Making an economic case for a project: Convince the board that the company can do nothing better with the investment capital than investing it in the project " Compare project payoffs with alternative investment opportunities within the company and in the market place " Take existing portfolio of projects and long-term strategic considerations into account (alignment of project with existing strengths and strategic positioning of the company) Stefan Scholtes Judge Institute of Management, CU Slide 2 Page 1

2 CFO s point of view! Finance department: A project consists of an initial investment followed by a stream of future cash flows! Invest in the project if there is no better alternative investment opportunity! Two major problems: " Cash flows of the project depend on external uncertainties " Cash flows depend on our (and our competitors ) management decisions during the life time of the project! How can we compare streams of uncertain payoffs which depend on future decisions (which in turn depend on uncertain events)?! Let s first look at how projects are evaluated in practice Stefan Scholtes Judge Institute of Management, CU Slide 3 A quick look into the manager s project valuation toolbox! Break-even analysis! Accounting rates of return! Net present value! Real options Stefan Scholtes Judge Institute of Management, CU Slide 4 Page 2

3 Break-even analysis! Input: " Initial investment " Projected cash flows over a number of periods! Break-even point: " Number of periods necessary for the sum of discounted cash flows to exceed the initial investment! Making a case for the project: " Compare break-even point with company benchmark Stefan Scholtes Judge Institute of Management, CU Slide 5 Accounting rates of return! Input: " Projected book value of investment over the life time of the project " Projected profits of the project over its lifetime! Accounting rate of return: average profit / average book value! Making a case for the project: " Compare the ratio with company benchmark Stefan Scholtes Judge Institute of Management, CU Slide 6 Page 3

4 Net present value! Most popular valuation criterion! Inputs: " Initial investment " Projected cash flows over the life time of the project " Discount rate! NPV = Present value of cash flows minus initial investment! Making a case for the project: " NPV>0! Let s have a closer look at NPV Stefan Scholtes Judge Institute of Management, CU Slide 7 NPV: underlying alternative investment opportunities! The NPV criterion is equivalent to comparing the project with a single alternative investment opportunity: " deposit y into a bank account that pays r% interest per period and withdraw the cash flows when they occur! If the life time of the project is T periods with cash flows x=(x 1,,x T ) and interest is compounded continuously then y = t = 1 rt xt! y is called the present value (PV) of the cash flow stream! Net present value NPV = PV initial investment! Economic case: Invest in the project if NPV>0 T e Stefan Scholtes Judge Institute of Management, CU Slide 8 Page 4

5 First problem with NPV: Simplistic and in-flexible investment alternative! Notice that we are not comparing the project with a more flexible account which would allow us to withdraw at nonscheduled times or withdraw non-scheduled amounts if opportunities arise! Lesson 1: Using NPV assumes a single and inflexible investment alternative " In an attempt to make up for this, companies typically assume a higher discount rate than the normal fixed interest in a bank account but this only means that a realistic investment alternative is replace by a virtual one! Inflexibility of the alternative is in line with the tacit (but unrealistic) NPV assumption that the cash flows are fixed, i.e., not influenced by management decisions or uncertain exogenous events Stefan Scholtes Judge Institute of Management, CU Slide 9 Second problem with NPV: The forecast is always wrong! Let s have a look at a spreadsheet example (open NPV.xls worksheet Project Plan)! Cash flow calculated on the basis of forecasted demand " Demand in period t is uncertain and depends on endogenous (price) and exogenous (economy, fashion, competitors) variables " Unknown demands in periods 1,,t-1 may help us to predict demand in period t more accurately (statistical dependence)! Lesson 2: NPV is a function of uncertain quantities and therefore itself uncertain Stefan Scholtes Judge Institute of Management, CU Slide 10 Page 5

6 Let s formalize this! Mathematically: NPV depends on uncertain quantities X 1,,X n (random variables): NPV=NPV(X 1,,X n )! A function of a random variable is itself a random variable " A single number (even the mean) is very limited information about a random variable " Can make a better economic case from knowledge of the NPV distribution! If we can t get the distribution then we want at least some of its characteristics: " expected NPV " variance of NPV " 95% confidence interval for NPV Stefan Scholtes Judge Institute of Management, CU Slide 11 Distributions and Value at risk NPV cumulative distribution function 100.0% 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% - 1,500,000-1,000, , ,000 1,000,000 1,500,000 2,000,000 2,500,000 10% VAR is roughly 500,000 5% VAR is roughly 800,000 Stefan Scholtes Judge Institute of Management, CU Slide 12 Page 6

7 The flaw of the averages! In practice, decisions are often made on the basis of expected NPV alone! Naïve approach: Let s work with expected demands " Let s assume marketing department has given us price 1000 and expected demands! Is the NPV then the expected NPV? " Let s look at our example spreadsheet! Lesson 3: The flaw of the averages : Plugging expected values into uncertain cells in a spreadsheet does not give expected values of the formula cells! Mathematically: E( f ( X)) f ( E( X)) Stefan Scholtes Judge Institute of Management, CU Slide 13 Uncertainty: the naïve approach! If cash flow is uncertain, then replace it by its expectation and discount as before to obtain expected NPV! Which gamble would you prefer? 50% % % 50% 101-1! Expected cash flow in period 1 is 50 Stefan Scholtes Judge Institute of Management, CU Slide 14 Page 7

8 A little less naïve! Can t compare apples with bananas! Different risk levels need to be reflected in the valuation! Risk-adjusted discount rate: Discount rate = risk-free rate + risk premium! What s the appropriate risk premium? " Discount rate should be the expected return on an asset with comparable risk (same risk class )! Theory: Capital Asset Pricing Model (CAPM)! Practice: " Find projects with comparable risks and use the average return on these projects as discount rate " Specify a company-internal discount rate Stefan Scholtes Judge Institute of Management, CU Slide 15 Constant risk premium! Taking a constant risk premium assumes that the risk in passing from year n to year n+1 is the same for all n! Conical uncertainty: where-ever a sample path of scenarios leads me, the uncertainty ahead of me remains the same " Analogy to repeated gamble Stefan Scholtes Judge Institute of Management, CU Slide 16 Page 8

9 Conical uncertainty Expectation Measure of variation / risk Time Stefan Scholtes Judge Institute of Management, CU Slide 17 Conical uncertainty Sample path Expectation Time Precise repetition of Uncertainty pattern Stefan Scholtes Judge Institute of Management, CU Slide 18 Page 9

10 Example: Brownian motion! Continuous form: dx = α dt + σ dz! Discrete form: x( t) x( t 1) =α + σz where Z is a standard normal variable (mean 0, variance 1)! Brownian motion assumption: increments x(t)-x(t-1) and x(s)-x(s-1) are independent for t s! Expectation and variance of increments are linear functions of time: t x( t) x(0) = E( x( t) x(0)) = V ( x( t) x(0)) = x( s) x( s 1) E( x( s) x( s 1)) = αt V ( x( s) x( s 1)) = σ Stefan Scholtes Judge Institute of Management, CU Slide 19 s= 1 t s= 1 t s= 1 2 t Non-conical uncertainty! Examples: " Future demand for a new product (versus future demand for an established product) " Research uncertainty of an R&D project " Regulatory uncertainty in the pharmaceutical industry! Characteristics of non-conic uncertainty: " Uncertainty that is largely resolved after a few periods " Variance of unknown quantities do not tend to infinity over time (e.g. mean reversion property vs. Brownian motion)! Constant risk-premium concept does not capture non-conic uncertainties! How about adjusting risk-premium over time?! Risk of the project depends not only on time but also on the path of the resolved uncertainties " Example: high demand vs low demand scenario materializes after one year future risk (after year 1) depends on the scenario Stefan Scholtes Judge Institute of Management, CU Slide 20 Page 10

11 A closer look at discount rates! Discount rate: inverse interest rate! Interest rate: opportunity cost of capital (per and period) " Return over one period of the best investment alternative " Not clear what best means a priori in the presence of uncertainty " Assumes that we can sell the asset on the market after one period! Conceptually better: " For each cash flow period define a sensible investment strategy that results in a sellable asset at the time of the period cash flow " Use the return of this investment strategy as the discount rate for this particular period cash flow Stefan Scholtes Judge Institute of Management, CU Slide 21 Random discount rates! Value of an alternative investment strategy depends on unfolding of future uncertainties " Even the value of a fixed interest rate account changes when the base rate changes! Therefore: Opportunity cost of capital is a random process (random and time-dependent)! Practice: Replace the random process by its long-run average! Caution! NPV depends nonlinearly on the discount rate # flaw of the averages Stefan Scholtes Judge Institute of Management, CU Slide 22 Page 11

12 The flaw of the averages and discount rates! Taking as discount rate an average rate is conceptually wrong because NPV depends nonlinearly on the discount rate (flaw of the averages) " Way out: simulate, using historic period returns instead of averages! Jensen s inequality: the NPV calculation on the basis of average rate of return is lower than the expected NPV based on historic returns! See Flaw of the averages for discount rates.xls Stefan Scholtes Judge Institute of Management, CU Slide 23 Third problem with NPV: No managerial activity! NPV assumes that the cash flows of the project are fixed! Even if cash flows are random and simulation is used to evaluate expected NPV, there is no managerial flexibility in the model! Typically, management acts depending on the unfolding of uncertainties! Typical actions " Increase marketing efforts " Abandon project " Grow project! Let s look at an example (see NPV.xls, worksheet expansion option) Stefan Scholtes Judge Institute of Management, CU Slide 24 Page 12

13 Summary! Company should invest in a project if there are no better investment alternatives! NPV-criterion has severe drawbacks: " Discount approach assumes comparison of project with only one, and a rather in-flexible, alternative investment (this overvalues the project) " Risk-premium approach does not properly account for project risk (whether this is in favour of the project or not depends on the level of the risk-premium) " NPV criterion is based on FIXED cash flow projections and does not take managerial flexibility into account (this undervalues the project) Stefan Scholtes Judge Institute of Management, CU Slide 25 Back to the basics! Invest in a project if that s the best you can do with your money! Starting point: Company is engaged in a portfolio of projects! A project portfolio generates a random stream of cash flows! Want a combination of projects so that the stream of cash flows is desirable ( optimal )! Cash flows depend on " Exogenous uncertainties " Decisions of project managers in reaction to unfolding uncertainties and external decisions (e.g. regulation) " Exogenous decision and reactions to internal decisions (e.g. by competitors, government, etc.) " Decisions of portfolio managers (e.g. reballancing, abandonment of individual projects) Stefan Scholtes Judge Institute of Management, CU Slide 26 Page 13

14 Investing in a new project To make an economic case for a new project we need to argue that adding the new project to the existing project portfolio (and therefore abandoning or down-sizing other projects) increases the desirability of the stream of future cash flows Stefan Scholtes Judge Institute of Management, CU Slide 27 The courtroom! Innocence hypothesis: The project does not add value to the portfolio! Jury: The decision maker! Prosecutor: I want the project in the portfolio " Need to construct a case that the project adds value to the company s portfolio " In particular: need to argue how the portfolio re-balancing should be done (i.e. where the money should come from)! Defence lawyer: I don t want the project in the portfolio " Need to reply to the prosecutors case by constructing alternative investments and arguing that these are more beneficial to the company than investing in the project! Question: Why don t we use as innocence hypothesis that the project adds value to the portfolio? Stefan Scholtes Judge Institute of Management, CU Slide 28 Page 14

15 Using a computer! Prosecutor: Build a stochastic (scenario-based) computer model of the project, including decision points and decision rules (plans of action for all possible scenarios)! Defence lawyer: Build a stochastic model of a sensible alternative investment strategy (using projects or assets from within the company or in the market place), including possible decision points and decision rules! Jury: Decide whether there is a case for the project on the basis of the (random) difference between the cash flow streams of the project and the alternative investment strategy " Can use simulation to estimate the distribution of the difference between the cash flow streams of the two investments for given decision rules " Jury will also take strategic issues into account Stefan Scholtes Judge Institute of Management, CU Slide 29 Simulation Results Settings % Mean 5% 0 periods 1+2 periods 3+4 periods Difference between project cash flow and alternative investment cash flow Stefan Scholtes Judge Institute of Management, CU Slide 30 Page 15

16 What s the problem with this approach?! Meaning of optimal decision rule is not clear " What is optimal for cash flow in period 1 may be bad for cash flow in other periods " What is optimal in one scenario may be bad in another! Approach allows us to compare investments with regard to risk but not with regard to flexibility " Alternative investment is often more flexible e.g. investments in stock portfolio! Most importantly: Model is complex " But: there may be no simple solution to a complex problem " If we could only do something that was similar to the above but simpler! Research: Suggest rules of thumb to practitioners which are conceptually sound but have some simple intuitive interpretation " Academics adds to practitioners confidence that they are doing the right thing by following their intuition Stefan Scholtes Judge Institute of Management, CU Slide 31 Conclusion! NPV criterion has serious pitfalls! The courtroom is a sensible model for project appraisal! Complexity of cases for or against a project is a serious hurdle to acceptance in practice " But then again: there may not be a simple solution to this complex problem! More questions than answers Stefan Scholtes Judge Institute of Management, CU Slide 32 Page 16

Page 1. Real Options for Engineering Systems. Financial Options. Leverage. Session 4: Valuation of financial options

Page 1. Real Options for Engineering Systems. Financial Options. Leverage. Session 4: Valuation of financial options Real Options for Engineering Systems Session 4: Valuation of financial options Stefan Scholtes Judge Institute of Management, CU Slide 1 Financial Options Option: Right (but not obligation) to buy ( call

More information

Economic Risk and Decision Analysis for Oil and Gas Industry CE School of Engineering and Technology Asian Institute of Technology

Economic Risk and Decision Analysis for Oil and Gas Industry CE School of Engineering and Technology Asian Institute of Technology Economic Risk and Decision Analysis for Oil and Gas Industry CE81.98 School of Engineering and Technology Asian Institute of Technology January Semester Presented by Dr. Thitisak Boonpramote Department

More information

CMA Part 2. Financial Decision Making

CMA Part 2. Financial Decision Making CMA Part 2 Financial Decision Making SU 8.1 The Capital Budgeting Process Capital budgeting is the process of planning and controlling investment for long-term projects. Will affect the company for many

More information

WHAT IS CAPITAL BUDGETING?

WHAT IS CAPITAL BUDGETING? WHAT IS CAPITAL BUDGETING? Capital budgeting is a required managerial tool. One duty of a financial manager is to choose investments with satisfactory cash flows and rates of return. Therefore, a financial

More information

Characterization of the Optimum

Characterization of the Optimum ECO 317 Economics of Uncertainty Fall Term 2009 Notes for lectures 5. Portfolio Allocation with One Riskless, One Risky Asset Characterization of the Optimum Consider a risk-averse, expected-utility-maximizing

More information

Dr. Maddah ENMG 625 Financial Eng g II 10/16/06

Dr. Maddah ENMG 625 Financial Eng g II 10/16/06 Dr. Maddah ENMG 65 Financial Eng g II 10/16/06 Chapter 11 Models of Asset Dynamics () Random Walk A random process, z, is an additive process defined over times t 0, t 1,, t k, t k+1,, such that z( t )

More information

STEX s valuation analysis, version 0.0

STEX s valuation analysis, version 0.0 SMART TOKEN EXCHANGE STEX s valuation analysis, version. Paulo Finardi, Olivia Saa, Serguei Popov November, 7 ABSTRACT In this paper we evaluate an investment consisting of paying an given amount (the

More information

Real Options. Katharina Lewellen Finance Theory II April 28, 2003

Real Options. Katharina Lewellen Finance Theory II April 28, 2003 Real Options Katharina Lewellen Finance Theory II April 28, 2003 Real options Managers have many options to adapt and revise decisions in response to unexpected developments. Such flexibility is clearly

More information

Mobility for the Future:

Mobility for the Future: Mobility for the Future: Cambridge Municipal Vehicle Fleet Options FINAL APPLICATION PORTFOLIO REPORT Christopher Evans December 12, 2006 Executive Summary The Public Works Department of the City of Cambridge

More information

Chapter 7 Risk Analysis, Real Options, and Capital Budgeting

Chapter 7 Risk Analysis, Real Options, and Capital Budgeting University of Science and Technology Beijing Dongling School of Economics and management Chapter 7 Risk Analysis, Real Options, and Capital Budgeting Oct. 2012 Dr. Xiao Ming USTB 1 Key Concepts and Skills

More information

Chapter 9. Risk Analysis and Real Options

Chapter 9. Risk Analysis and Real Options Chapter 9 Risk Analysis and Real Options Grasp and execute decision trees Practically apply real options in capital budgeting Apply scenario and sensitivity analysis Comprehend and utilize the various

More information

Fixed-Income Securities Lecture 5: Tools from Option Pricing

Fixed-Income Securities Lecture 5: Tools from Option Pricing Fixed-Income Securities Lecture 5: Tools from Option Pricing Philip H. Dybvig Washington University in Saint Louis Review of binomial option pricing Interest rates and option pricing Effective duration

More information

Question from Session Two

Question from Session Two ESD.70J Engineering Economy Fall 2006 Session Three Alex Fadeev - afadeev@mit.edu Link for this PPT: http://ardent.mit.edu/real_options/rocse_excel_latest/excelsession3.pdf ESD.70J Engineering Economy

More information

Practice of Finance: Advanced Corporate Risk Management

Practice of Finance: Advanced Corporate Risk Management MIT OpenCourseWare http://ocw.mit.edu 15.997 Practice of Finance: Advanced Corporate Risk Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.

More information

A First Encounter with Capital Budgeting Rules

A First Encounter with Capital Budgeting Rules A First Encounter with Capital Budgeting Rules Chapter 4, slides 4.1 Brais Alvarez Pereira LdM, BUS 332 F: Principles of Finance, Spring 2016 April, 2016 Capital budgeting in the real world Video 1 Definition:

More information

One note for Session Two

One note for Session Two ESD.70J Engineering Economy Module Fall 2004 Session Three Link for PPT: http://web.mit.edu/tao/www/esd70/s3/p.ppt ESD.70J Engineering Economy Module - Session 3 1 One note for Session Two If you Excel

More information

Topics in Corporate Finance. Chapter 2: Valuing Real Assets. Albert Banal-Estanol

Topics in Corporate Finance. Chapter 2: Valuing Real Assets. Albert Banal-Estanol Topics in Corporate Finance Chapter 2: Valuing Real Assets Investment decisions Valuing risk-free and risky real assets: Factories, machines, but also intangibles: patents, What to value? cash flows! Methods

More information

2.1 Mathematical Basis: Risk-Neutral Pricing

2.1 Mathematical Basis: Risk-Neutral Pricing Chapter Monte-Carlo Simulation.1 Mathematical Basis: Risk-Neutral Pricing Suppose that F T is the payoff at T for a European-type derivative f. Then the price at times t before T is given by f t = e r(t

More information

Introduction. Tero Haahtela

Introduction. Tero Haahtela Lecture Notes in Management Science (2012) Vol. 4: 145 153 4 th International Conference on Applied Operational Research, Proceedings Tadbir Operational Research Group Ltd. All rights reserved. www.tadbir.ca

More information

5. Equity Valuation and the Cost of Capital

5. Equity Valuation and the Cost of Capital 5. Equity Valuation and the Cost of Capital Introduction Part Two provided a detailed explanation of the investment decision with only oblique reference to the finance decision, which determines a company

More information

CHAPTER 12 APPENDIX Valuing Some More Real Options

CHAPTER 12 APPENDIX Valuing Some More Real Options CHAPTER 12 APPENDIX Valuing Some More Real Options This appendix demonstrates how to work out the value of different types of real options. By assuming the world is risk neutral, it is ignoring the fact

More information

Volatility Smiles and Yield Frowns

Volatility Smiles and Yield Frowns Volatility Smiles and Yield Frowns Peter Carr NYU CBOE Conference on Derivatives and Volatility, Chicago, Nov. 10, 2017 Peter Carr (NYU) Volatility Smiles and Yield Frowns 11/10/2017 1 / 33 Interest Rates

More information

Motivating example: MCI

Motivating example: MCI Real Options - intro Real options concerns using option pricing like thinking in situations where one looks at investments in real assets. This is really a matter of creative thinking, playing the game

More information

19. CONFIDENCE INTERVALS FOR THE MEAN; KNOWN VARIANCE

19. CONFIDENCE INTERVALS FOR THE MEAN; KNOWN VARIANCE 19. CONFIDENCE INTERVALS FOR THE MEAN; KNOWN VARIANCE We assume here that the population variance σ 2 is known. This is an unrealistic assumption, but it allows us to give a simplified presentation which

More information

Investment Appraisal. Chapter 3 Investments: Spot and Derivative Markets

Investment Appraisal. Chapter 3 Investments: Spot and Derivative Markets Investment Appraisal Chapter 3 Investments: Spot and Derivative Markets Compounding vs. Discounting Invest sum over years, how much will it be worth? Terminal Value after n years @ r : if r 1 = r 2 = =

More information

ESD MID-TERM QUIZ Page 1 of 11 SOLUTION

ESD MID-TERM QUIZ Page 1 of 11 SOLUTION ESD.71 2007 MID-TERM QUIZ Page 1 of 11 Engineering Systems Analysis for Design Mid-Semester Quiz October 23, 2007 This is a closed book exercise. Computers and other wireless enabled devices for communication

More information

arxiv: v2 [q-fin.pr] 23 Nov 2017

arxiv: v2 [q-fin.pr] 23 Nov 2017 VALUATION OF EQUITY WARRANTS FOR UNCERTAIN FINANCIAL MARKET FOAD SHOKROLLAHI arxiv:17118356v2 [q-finpr] 23 Nov 217 Department of Mathematics and Statistics, University of Vaasa, PO Box 7, FIN-6511 Vaasa,

More information

MASM006 UNIVERSITY OF EXETER SCHOOL OF ENGINEERING, COMPUTER SCIENCE AND MATHEMATICS MATHEMATICAL SCIENCES FINANCIAL MATHEMATICS.

MASM006 UNIVERSITY OF EXETER SCHOOL OF ENGINEERING, COMPUTER SCIENCE AND MATHEMATICS MATHEMATICAL SCIENCES FINANCIAL MATHEMATICS. MASM006 UNIVERSITY OF EXETER SCHOOL OF ENGINEERING, COMPUTER SCIENCE AND MATHEMATICS MATHEMATICAL SCIENCES FINANCIAL MATHEMATICS May/June 2006 Time allowed: 2 HOURS. Examiner: Dr N.P. Byott This is a CLOSED

More information

Hedging Under Jump Diffusions with Transaction Costs. Peter Forsyth, Shannon Kennedy, Ken Vetzal University of Waterloo

Hedging Under Jump Diffusions with Transaction Costs. Peter Forsyth, Shannon Kennedy, Ken Vetzal University of Waterloo Hedging Under Jump Diffusions with Transaction Costs Peter Forsyth, Shannon Kennedy, Ken Vetzal University of Waterloo Computational Finance Workshop, Shanghai, July 4, 2008 Overview Overview Single factor

More information

Monte Carlo Simulation of Stochastic Processes

Monte Carlo Simulation of Stochastic Processes Monte Carlo Simulation of Stochastic Processes Last update: January 10th, 2004. In this section is presented the steps to perform the simulation of the main stochastic processes used in real options applications,

More information

3.1 Itô s Lemma for Continuous Stochastic Variables

3.1 Itô s Lemma for Continuous Stochastic Variables Lecture 3 Log Normal Distribution 3.1 Itô s Lemma for Continuous Stochastic Variables Mathematical Finance is about pricing (or valuing) financial contracts, and in particular those contracts which depend

More information

Chapter 8 Statistical Intervals for a Single Sample

Chapter 8 Statistical Intervals for a Single Sample Chapter 8 Statistical Intervals for a Single Sample Part 1: Confidence intervals (CI) for population mean µ Section 8-1: CI for µ when σ 2 known & drawing from normal distribution Section 8-1.2: Sample

More information

CAPITAL BUDGETING IN ARBITRAGE FREE MARKETS

CAPITAL BUDGETING IN ARBITRAGE FREE MARKETS CAPITAL BUDGETING IN ARBITRAGE FREE MARKETS By Jörg Laitenberger and Andreas Löffler Abstract In capital budgeting problems future cash flows are discounted using the expected one period returns of the

More information

Corporate Financial Management. Lecture 3: Other explanations of capital structure

Corporate Financial Management. Lecture 3: Other explanations of capital structure Corporate Financial Management Lecture 3: Other explanations of capital structure As we discussed in previous lectures, two extreme results, namely the irrelevance of capital structure and 100 percent

More information

Game Theory and Economics Prof. Dr. Debarshi Das Department of Humanities and Social Sciences Indian Institute of Technology, Guwahati.

Game Theory and Economics Prof. Dr. Debarshi Das Department of Humanities and Social Sciences Indian Institute of Technology, Guwahati. Game Theory and Economics Prof. Dr. Debarshi Das Department of Humanities and Social Sciences Indian Institute of Technology, Guwahati. Module No. # 06 Illustrations of Extensive Games and Nash Equilibrium

More information

( ) since this is the benefit of buying the asset at the strike price rather

( ) since this is the benefit of buying the asset at the strike price rather Review of some financial models for MAT 483 Parity and Other Option Relationships The basic parity relationship for European options with the same strike price and the same time to expiration is: C( KT

More information

Review of whole course

Review of whole course Page 1 Review of whole course A thumbnail outline of major elements Intended as a study guide Emphasis on key points to be mastered Massachusetts Institute of Technology Review for Final Slide 1 of 24

More information

Value at Risk Ch.12. PAK Study Manual

Value at Risk Ch.12. PAK Study Manual Value at Risk Ch.12 Related Learning Objectives 3a) Apply and construct risk metrics to quantify major types of risk exposure such as market risk, credit risk, liquidity risk, regulatory risk etc., and

More information

1 Introduction. Term Paper: The Hall and Taylor Model in Duali 1. Yumin Li 5/8/2012

1 Introduction. Term Paper: The Hall and Taylor Model in Duali 1. Yumin Li 5/8/2012 Term Paper: The Hall and Taylor Model in Duali 1 Yumin Li 5/8/2012 1 Introduction In macroeconomics and policy making arena, it is extremely important to have the ability to manipulate a set of control

More information

Corporate Finance, Module 21: Option Valuation. Practice Problems. (The attached PDF file has better formatting.) Updated: July 7, 2005

Corporate Finance, Module 21: Option Valuation. Practice Problems. (The attached PDF file has better formatting.) Updated: July 7, 2005 Corporate Finance, Module 21: Option Valuation Practice Problems (The attached PDF file has better formatting.) Updated: July 7, 2005 {This posting has more information than is needed for the corporate

More information

Investment Decision Criteria. Principles Applied in This Chapter. Learning Objectives

Investment Decision Criteria. Principles Applied in This Chapter. Learning Objectives Investment Decision Criteria Chapter 11 1 Principles Applied in This Chapter Principle 1: Money Has a Time Value. Principle 2: There is a Risk-Return Tradeoff. Principle 3: Cash Flows Are the Source of

More information

Game Theory and Economics Prof. Dr. Debarshi Das Department of Humanities and Social Sciences Indian Institute of Technology, Guwahati

Game Theory and Economics Prof. Dr. Debarshi Das Department of Humanities and Social Sciences Indian Institute of Technology, Guwahati Game Theory and Economics Prof. Dr. Debarshi Das Department of Humanities and Social Sciences Indian Institute of Technology, Guwahati Module No. # 03 Illustrations of Nash Equilibrium Lecture No. # 02

More information

Probability in Options Pricing

Probability in Options Pricing Probability in Options Pricing Mark Cohen and Luke Skon Kenyon College cohenmj@kenyon.edu December 14, 2012 Mark Cohen and Luke Skon (Kenyon college) Probability Presentation December 14, 2012 1 / 16 What

More information

Key Objectives. Module 2: The Logic of Statistical Inference. Z-scores. SGSB Workshop: Using Statistical Data to Make Decisions

Key Objectives. Module 2: The Logic of Statistical Inference. Z-scores. SGSB Workshop: Using Statistical Data to Make Decisions SGSB Workshop: Using Statistical Data to Make Decisions Module 2: The Logic of Statistical Inference Dr. Tom Ilvento January 2006 Dr. Mugdim Pašić Key Objectives Understand the logic of statistical inference

More information

Martingale Pricing Theory in Discrete-Time and Discrete-Space Models

Martingale Pricing Theory in Discrete-Time and Discrete-Space Models IEOR E4707: Foundations of Financial Engineering c 206 by Martin Haugh Martingale Pricing Theory in Discrete-Time and Discrete-Space Models These notes develop the theory of martingale pricing in a discrete-time,

More information

Reading: You should read Hull chapter 12 and perhaps the very first part of chapter 13.

Reading: You should read Hull chapter 12 and perhaps the very first part of chapter 13. FIN-40008 FINANCIAL INSTRUMENTS SPRING 2008 Asset Price Dynamics Introduction These notes give assumptions of asset price returns that are derived from the efficient markets hypothesis. Although a hypothesis,

More information

The accuracy of the escrowed dividend model on the value of European options on a stock paying discrete dividend

The accuracy of the escrowed dividend model on the value of European options on a stock paying discrete dividend A Work Project, presented as part of the requirements for the Award of a Master Degree in Finance from the NOVA - School of Business and Economics. Directed Research The accuracy of the escrowed dividend

More information

Crashcourse Interest Rate Models

Crashcourse Interest Rate Models Crashcourse Interest Rate Models Stefan Gerhold August 30, 2006 Interest Rate Models Model the evolution of the yield curve Can be used for forecasting the future yield curve or for pricing interest rate

More information

Discounting the Benefits of Climate Change Policies Using Uncertain Rates

Discounting the Benefits of Climate Change Policies Using Uncertain Rates Discounting the Benefits of Climate Change Policies Using Uncertain Rates Richard Newell and William Pizer Evaluating environmental policies, such as the mitigation of greenhouse gases, frequently requires

More information

de Neufville + Scholtes D R A F T October 14, 2009 APPENDICES Appendix B Discounted Cash Flow Analysis 10

de Neufville + Scholtes D R A F T October 14, 2009 APPENDICES Appendix B Discounted Cash Flow Analysis 10 APPENDICES TABLE OF CONTENTS Appendix A Flaw of Averages 2 Appendix B Discounted Cash Flow Analysis 10 Appendix C Economics of Phasing (to be supplied) Appendix D Monte Carlo Simulation 22 Appendix E Dynamic

More information

*Efficient markets assumed

*Efficient markets assumed LECTURE 1 Introduction To Corporate Projects, Investments, and Major Theories Corporate Finance It is about how corporations make financial decisions. It is about money and markets, but also about people.

More information

Option Pricing Modeling Overview

Option Pricing Modeling Overview Option Pricing Modeling Overview Liuren Wu Zicklin School of Business, Baruch College Options Markets Liuren Wu (Baruch) Stochastic time changes Options Markets 1 / 11 What is the purpose of building a

More information

Financial Engineering and Structured Products

Financial Engineering and Structured Products 550.448 Financial Engineering and Structured Products Week of March 31, 014 Structured Securitization Liability-Side Cash Flow Analysis & Structured ransactions Assignment Reading (this week, March 31

More information

Lecture 7. Strategy and Analysis in Using Net Present Value

Lecture 7. Strategy and Analysis in Using Net Present Value Lecture 7 Strategy and Analysis in Using Net Present Value Strategy and Analysis in Using Net Present Value Decision Trees Sensitivity Analysis, Scenario Analysis, and Break-Even Analysis Monte Carlo Simulation

More information

Gamma. The finite-difference formula for gamma is

Gamma. The finite-difference formula for gamma is Gamma The finite-difference formula for gamma is [ P (S + ɛ) 2 P (S) + P (S ɛ) e rτ E ɛ 2 ]. For a correlation option with multiple underlying assets, the finite-difference formula for the cross gammas

More information

Futures and Forward Markets

Futures and Forward Markets Futures and Forward Markets (Text reference: Chapters 19, 21.4) background hedging and speculation optimal hedge ratio forward and futures prices futures prices and expected spot prices stock index futures

More information

Option Pricing. Chapter Discrete Time

Option Pricing. Chapter Discrete Time Chapter 7 Option Pricing 7.1 Discrete Time In the next section we will discuss the Black Scholes formula. To prepare for that, we will consider the much simpler problem of pricing options when there are

More information

Advanced Macroeconomics 5. Rational Expectations and Asset Prices

Advanced Macroeconomics 5. Rational Expectations and Asset Prices Advanced Macroeconomics 5. Rational Expectations and Asset Prices Karl Whelan School of Economics, UCD Spring 2015 Karl Whelan (UCD) Asset Prices Spring 2015 1 / 43 A New Topic We are now going to switch

More information

Back to estimators...

Back to estimators... Back to estimators... So far, we have: Identified estimators for common parameters Discussed the sampling distributions of estimators Introduced ways to judge the goodness of an estimator (bias, MSE, etc.)

More information

OPTIMAL PORTFOLIO CONTROL WITH TRADING STRATEGIES OF FINITE

OPTIMAL PORTFOLIO CONTROL WITH TRADING STRATEGIES OF FINITE Proceedings of the 44th IEEE Conference on Decision and Control, and the European Control Conference 005 Seville, Spain, December 1-15, 005 WeA11.6 OPTIMAL PORTFOLIO CONTROL WITH TRADING STRATEGIES OF

More information

Optimizing Modular Expansions in an Industrial Setting Using Real Options

Optimizing Modular Expansions in an Industrial Setting Using Real Options Optimizing Modular Expansions in an Industrial Setting Using Real Options Abstract Matt Davison Yuri Lawryshyn Biyun Zhang The optimization of a modular expansion strategy, while extremely relevant in

More information

AMH4 - ADVANCED OPTION PRICING. Contents

AMH4 - ADVANCED OPTION PRICING. Contents AMH4 - ADVANCED OPTION PRICING ANDREW TULLOCH Contents 1. Theory of Option Pricing 2 2. Black-Scholes PDE Method 4 3. Martingale method 4 4. Monte Carlo methods 5 4.1. Method of antithetic variances 5

More information

ECON 459 Game Theory. Lecture Notes Auctions. Luca Anderlini Spring 2017

ECON 459 Game Theory. Lecture Notes Auctions. Luca Anderlini Spring 2017 ECON 459 Game Theory Lecture Notes Auctions Luca Anderlini Spring 2017 These notes have been used and commented on before. If you can still spot any errors or have any suggestions for improvement, please

More information

Chapter 9. Capital Budgeting Decision Models

Chapter 9. Capital Budgeting Decision Models Chapter 9 Capital Budgeting Decision Models Learning Objectives 1. Explain capital budgeting and differentiate between short-term and long-term budgeting decisions. 2. Explain the payback model and its

More information

European Edition. Peter Moles, Robert Parrino and David Kidwell. WILEY A John Wiley and Sons, Ltd, Publication

European Edition. Peter Moles, Robert Parrino and David Kidwell. WILEY A John Wiley and Sons, Ltd, Publication European Edition Peter Moles, Robert Parrino and David Kidwell WILEY A John Wiley and Sons, Ltd, Publication Preface Organisation and coverage Proven pedagogical framework Instructor and student resources

More information

1. Traditional investment theory versus the options approach

1. Traditional investment theory versus the options approach Econ 659: Real options and investment I. Introduction 1. Traditional investment theory versus the options approach - traditional approach: determine whether the expected net present value exceeds zero,

More information

Event Study. Dr. Qiwei Chen

Event Study. Dr. Qiwei Chen Event Study Dr. Qiwei Chen Event Study Analysis Definition: An event study attempts to measure the valuation effects of an economic event, such as a merger or earnings announcement, by examining the response

More information

Practical example of an Economic Scenario Generator

Practical example of an Economic Scenario Generator Practical example of an Economic Scenario Generator Martin Schenk Actuarial & Insurance Solutions SAV 7 March 2014 Agenda Introduction Deterministic vs. stochastic approach Mathematical model Application

More information

Copyright 2011 Pearson Education, Inc. Publishing as Addison-Wesley.

Copyright 2011 Pearson Education, Inc. Publishing as Addison-Wesley. Appendix: Statistics in Action Part I Financial Time Series 1. These data show the effects of stock splits. If you investigate further, you ll find that most of these splits (such as in May 1970) are 3-for-1

More information

Risk Neutral Valuation

Risk Neutral Valuation copyright 2012 Christian Fries 1 / 51 Risk Neutral Valuation Christian Fries Version 2.2 http://www.christian-fries.de/finmath April 19-20, 2012 copyright 2012 Christian Fries 2 / 51 Outline Notation Differential

More information

1 The continuous time limit

1 The continuous time limit Derivative Securities, Courant Institute, Fall 2008 http://www.math.nyu.edu/faculty/goodman/teaching/derivsec08/index.html Jonathan Goodman and Keith Lewis Supplementary notes and comments, Section 3 1

More information

Do You Really Understand Rates of Return? Using them to look backward - and forward

Do You Really Understand Rates of Return? Using them to look backward - and forward Do You Really Understand Rates of Return? Using them to look backward - and forward November 29, 2011 by Michael Edesess The basic quantitative building block for professional judgments about investment

More information

Reading map : Structure of the market Measurement problems. It may simply reflect the profitability of the industry

Reading map : Structure of the market Measurement problems. It may simply reflect the profitability of the industry Reading map : The structure-conduct-performance paradigm is discussed in Chapter 8 of the Carlton & Perloff text book. We have followed the chapter somewhat closely in this case, and covered pages 244-259

More information

AFP Financial Planning & Analysis Learning System Session 1, Monday, April 3 rd (9:45-10:45) Time Value of Money and Capital Budgeting

AFP Financial Planning & Analysis Learning System Session 1, Monday, April 3 rd (9:45-10:45) Time Value of Money and Capital Budgeting AFP Financial Planning & Analysis Learning System Session 1, Monday, April 3 rd (9:45-10:45) Time Value of Money and Capital Budgeting Chapters Covered Time Value of Money: Part I, Domain B Chapter 6 Net

More information

Valuation of Asian Option. Qi An Jingjing Guo

Valuation of Asian Option. Qi An Jingjing Guo Valuation of Asian Option Qi An Jingjing Guo CONTENT Asian option Pricing Monte Carlo simulation Conclusion ASIAN OPTION Definition of Asian option always emphasizes the gist that the payoff depends on

More information

Our Own Problems and Solutions to Accompany Topic 11

Our Own Problems and Solutions to Accompany Topic 11 Our Own Problems and Solutions to Accompany Topic. A home buyer wants to borrow $240,000, and to repay the loan with monthly payments over 30 years. A. Compute the unchanging monthly payments for a standard

More information

Topic 1 (Week 1): Capital Budgeting

Topic 1 (Week 1): Capital Budgeting 4.2. The Three Rules of Time Travel Rule 1: Comparing and combining values Topic 1 (Week 1): Capital Budgeting It is only possible to compare or combine values at the same point in time. A dollar today

More information

Finance 100: Corporate Finance

Finance 100: Corporate Finance Finance 100: Corporate Finance Professor Michael R. Roberts Quiz 3 November 16, 2005 Name: Section: Question Maximum Student Score 1 40 2 35 3 25 Total 100 Instructions: Please read each question carefully

More information

Fundamentals of. Finance EDITION. Richard A. Brealey London Business School

Fundamentals of. Finance EDITION. Richard A. Brealey London Business School Fundamentals of Finance EDITION Richard A. Brealey London Business School Stewart C. Myers Sloan School of Management, Massachusetts Institute of Technology Alan J. Marcus Carroll School of Management,

More information

Homework Assignments

Homework Assignments Homework Assignments Week 1 (p. 57) #4.1, 4., 4.3 Week (pp 58 6) #4.5, 4.6, 4.8(a), 4.13, 4.0, 4.6(b), 4.8, 4.31, 4.34 Week 3 (pp 15 19) #1.9, 1.1, 1.13, 1.15, 1.18 (pp 9 31) #.,.6,.9 Week 4 (pp 36 37)

More information

In traditional investment analysis, a project or new investment should be accepted

In traditional investment analysis, a project or new investment should be accepted ch28_p781_804.qxd 12/8/11 2:04 PM Page 781 CHAPTER 28 The Option to Delay and Valuation Implications In traditional investment analysis, a project or new investment should be accepted only if the returns

More information

2 Control variates. λe λti λe e λt i where R(t) = t Y 1 Y N(t) is the time from the last event to t. L t = e λr(t) e e λt(t) Exercises

2 Control variates. λe λti λe e λt i where R(t) = t Y 1 Y N(t) is the time from the last event to t. L t = e λr(t) e e λt(t) Exercises 96 ChapterVI. Variance Reduction Methods stochastic volatility ISExSoren5.9 Example.5 (compound poisson processes) Let X(t) = Y + + Y N(t) where {N(t)},Y, Y,... are independent, {N(t)} is Poisson(λ) with

More information

Math 416/516: Stochastic Simulation

Math 416/516: Stochastic Simulation Math 416/516: Stochastic Simulation Haijun Li lih@math.wsu.edu Department of Mathematics Washington State University Week 13 Haijun Li Math 416/516: Stochastic Simulation Week 13 1 / 28 Outline 1 Simulation

More information

Optimal liquidation with market parameter shift: a forward approach

Optimal liquidation with market parameter shift: a forward approach Optimal liquidation with market parameter shift: a forward approach (with S. Nadtochiy and T. Zariphopoulou) Haoran Wang Ph.D. candidate University of Texas at Austin ICERM June, 2017 Problem Setup and

More information

Investment Decision Criteria. Principles Applied in This Chapter. Disney s Capital Budgeting Decision

Investment Decision Criteria. Principles Applied in This Chapter. Disney s Capital Budgeting Decision Investment Decision Criteria Chapter 11 1 Principles Applied in This Chapter Principle 1: Money Has a Time Value. Principle 2: There is a Risk-Return Tradeoff. Principle 3: Cash Flows Are the Source of

More information

March 30, Preliminary Monte Carlo Investigations. Vivek Bhattacharya. Outline. Mathematical Overview. Monte Carlo. Cross Correlations

March 30, Preliminary Monte Carlo Investigations. Vivek Bhattacharya. Outline. Mathematical Overview. Monte Carlo. Cross Correlations March 30, 2011 Motivation (why spend so much time on simulations) What does corr(rj 1, RJ 2 ) really represent? Results and Graphs Future Directions General Questions ( corr RJ (1), RJ (2)) = corr ( µ

More information

Slides for DN2281, KTH 1

Slides for DN2281, KTH 1 Slides for DN2281, KTH 1 January 28, 2014 1 Based on the lecture notes Stochastic and Partial Differential Equations with Adapted Numerics, by J. Carlsson, K.-S. Moon, A. Szepessy, R. Tempone, G. Zouraris.

More information

Whittle Consulting Pty Ltd Strategic Mine Planning Specialists

Whittle Consulting Pty Ltd Strategic Mine Planning Specialists Whittle Consulting Pty Ltd Strategic Mine Planning Specialists www.whittleconsulting.com.au Cut-off Grade Optimisation Gerald Whittle and Jeff Whittle - Feb 07. Intro Whilst processing all material above

More information

From Discrete Time to Continuous Time Modeling

From Discrete Time to Continuous Time Modeling From Discrete Time to Continuous Time Modeling Prof. S. Jaimungal, Department of Statistics, University of Toronto 2004 Arrow-Debreu Securities 2004 Prof. S. Jaimungal 2 Consider a simple one-period economy

More information

Lecture 3: Factor models in modern portfolio choice

Lecture 3: Factor models in modern portfolio choice Lecture 3: Factor models in modern portfolio choice Prof. Massimo Guidolin Portfolio Management Spring 2016 Overview The inputs of portfolio problems Using the single index model Multi-index models Portfolio

More information

Capital Budgeting CFA Exam Level-I Corporate Finance Module Dr. Bulent Aybar

Capital Budgeting CFA Exam Level-I Corporate Finance Module Dr. Bulent Aybar Capital Budgeting CFA Exam Level-I Corporate Finance Module Dr. Bulent Aybar Professor of International Finance Capital Budgeting Agenda Define the capital budgeting process, explain the administrative

More information

Valuing Lead Time. Valuing Lead Time. Prof. Suzanne de Treville. 13th Annual QRM Conference 1/24

Valuing Lead Time. Valuing Lead Time. Prof. Suzanne de Treville. 13th Annual QRM Conference 1/24 Valuing Lead Time Prof. Suzanne de Treville 13th Annual QRM Conference 1/24 How compelling is a 30% offshore cost differential? Comparing production to order to production to forecast with a long lead

More information

The relevance and the limits of the Arrow-Lind Theorem. Luc Baumstark University of Lyon. Christian Gollier Toulouse School of Economics.

The relevance and the limits of the Arrow-Lind Theorem. Luc Baumstark University of Lyon. Christian Gollier Toulouse School of Economics. The relevance and the limits of the Arrow-Lind Theorem Luc Baumstark University of Lyon Christian Gollier Toulouse School of Economics July 2013 1. Introduction When an investment project yields socio-economic

More information

The investment game in incomplete markets

The investment game in incomplete markets The investment game in incomplete markets M. R. Grasselli Mathematics and Statistics McMaster University Pisa, May 23, 2008 Strategic decision making We are interested in assigning monetary values to strategic

More information

CHAPTER 2 LITERATURE REVIEW

CHAPTER 2 LITERATURE REVIEW CHAPTER 2 LITERATURE REVIEW Capital budgeting is the process of analyzing investment opportunities and deciding which ones to accept. (Pearson Education, 2007, 178). 2.1. INTRODUCTION OF CAPITAL BUDGETING

More information

Week 2 Quantitative Analysis of Financial Markets Hypothesis Testing and Confidence Intervals

Week 2 Quantitative Analysis of Financial Markets Hypothesis Testing and Confidence Intervals Week 2 Quantitative Analysis of Financial Markets Hypothesis Testing and Confidence Intervals Christopher Ting http://www.mysmu.edu/faculty/christophert/ Christopher Ting : christopherting@smu.edu.sg :

More information

SPDE and portfolio choice (joint work with M. Musiela) Princeton University. Thaleia Zariphopoulou The University of Texas at Austin

SPDE and portfolio choice (joint work with M. Musiela) Princeton University. Thaleia Zariphopoulou The University of Texas at Austin SPDE and portfolio choice (joint work with M. Musiela) Princeton University November 2007 Thaleia Zariphopoulou The University of Texas at Austin 1 Performance measurement of investment strategies 2 Market

More information

MATH3075/3975 FINANCIAL MATHEMATICS TUTORIAL PROBLEMS

MATH3075/3975 FINANCIAL MATHEMATICS TUTORIAL PROBLEMS MATH307/37 FINANCIAL MATHEMATICS TUTORIAL PROBLEMS School of Mathematics and Statistics Semester, 04 Tutorial problems should be used to test your mathematical skills and understanding of the lecture material.

More information

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA Learning Objectives LO1 How to compute the net present value and why it is the best decision criterion. LO2 The payback rule and some of its shortcomings.

More information

Applied Macro Finance

Applied Macro Finance Master in Money and Finance Goethe University Frankfurt Week 2: Factor models and the cross-section of stock returns Fall 2012/2013 Please note the disclaimer on the last page Announcements Next week (30

More information