1 Mountaineer Mining Company Rum Creek Surface Mine MinE 484: Senior Mine Design Lucas O Neal O and Samantha Stahle April 28, 2006 modified for web display
2 Executive Summary Project Consists of: 4570 acres 8 Bituminous Coal seams 163 Employees at Full Production 17 Years of Mining Total Operating Cost Full Production. $136 million in capital to achieve full production. IRR 47.1% Net Present Value 7% - $348 million
3 Introduction Surface Coal Mine 8 Bituminous Coal Seams, Appalachian Coal Basin Southern WV near Argyle, Yolyn, and Braeholm, WV. Annual Production: Raw Coal Production ~ 4.6 mm tons Clean Coal Product ~ 1.7 mm tons Raw Direct Ship Product ~ 1.8 mm tons Sold to Coal Fired Steam Power Plants Project Life is 19 years with 17 years of surface mining on the property.
4 Location Located Southeast of Logan, WV 4,570 acre Property Located within 100 miles of: Huntington, Beckley, Princeton and Bluefield Rum Creek Surface Mine
5 SURFACE ELEV: Geology LEGEND UFB Roof 8 Coal Seams Upper Five Block, Lower Five Block, Upper Stockton Rider, Stockton, Lower Stockton Rider, Coalburg Rider, Coalburg, Lower Coalburg Some seams are not present or converge with others in some areas. Geologic Formation Allegheny & Kanawha Formation Flat to gently folded strata Northwestern Dip of LFB Roof USR Roof STCK Roof LSR/CR Roof CBRGRoof CBRGFloor LFB USR STCK LSR CR 1780 Typical Geologic Column CBRG DEPTH:
6 935 X X BM Reserves A Classified by USGS system of Measured, Indicated, and Inferred Reserves. R Measured STCK 4,155, tons (91%) CBRG 11,578,364 tons (91%) 8611 LCBRG 7,414,153 tons (78%) 9036 Not Present in all drillholes, assumed to converge with CBRG seam. Indicated STCK 410,943 tons (9%) CBRG 1,145,113 tons (9%) Measured Indicated ~ 91% LCBRG 2,091,172 tons (22%) 9% 9304 Inferred 0 tons Indicated 868 Measured ~ 9% Drillhole data for the property is adequate, but additional 835A drilling ling must take place to further evaluate the reserves Information was completed before additional drillholes were completed. Reserve Classification Map: Stockton Coal Seam 1100 X X
7 Reserves 75.2 Million tons of in place reserves. Quality Data: Average Average Average Average Coal Seam Name: Thickness ASH % Sulfur % BTU Stockton ,300 Coalburg ,800 Lower Coalburg ,100 * Quality Data is at a 6% As Received Moisture.
8 Seam Thickness Seam Thickness 1152 X 1100 X A A Isopach Map: Stockton Seam Thickness
9 Bench Layout Initial Bench Development: Intermediate Benches 65 Highwall Angle 50 Intermediate Benches For Slope Control Max Height of 75 Vertical Highwalls will be utilized once initial bench development is completed. Main Production Bench
10 Mine Production Operations 2 Shifts/Day, 6 day/wk, 312 day/yr Initial Production First five (5) years ~ 2.5 mm tons Difficulty Factor of 2 since we will only be utilizing two (2) shovels s and will have half the production until the plant and facilities are built and put into operation. Full Production Starts in year six (6) once we are done with facilities and have the second production pit up and running with second pair of shovels and necessary equipment.
11 Mine Timing Mining will commence in 2008, and continue through until Difficulty Factor of 2 utilized for first 5 years due to half production status and construction of mine facilities. Additional Area Not Yet Mined Mining Commences in Pit #1
12 Permitting Agencies Involved Office of Surface Mining State and Federal Fish & Wildlife Management Agency State Historic Preservation Agency Environmental Protection Agency Corps of Engineers MSHA Etc. Costs Associated with Permitting Minimum ~ $185,000 Maximum ~ $270,000
13 Sequence During Site Preparation Reclamation Water diversions & ponds Timbering, Stabilize Facility Area During Overburden Removal Divert Water Remove and Store Top Soil Coal Removal After Coal Removal Seal highwall and low wall Backfill & bury toxic materials Prior to first Planting Season Fine grade and spread top soil Mulch and tack During Planting Season Seed & revegetate Intervals Thereafter Monitor and control slope stability, water quality and vegatation growth
14 Surface Facilities (2) R.O.M. feeders (2) Grizzly screens (2) Double roll crushers (1) Raw coal stacking tube (1) Direct ship coal stacking tube, (1) Clean coal stacking tub (1) Refuse overland belt (2) Clean coal silos Train load out facility Overland belt to the trainload out facility 100 car train * 100 tons per car = 10,000 tons per train 500 TPH Rated Capacity preparation plant Office Warehouse Fuel Station Bathhouse Etc.
15 Preparation Plant Plant will begin operation on January 1, 2011 Operating 6 days a week and 24 hours a day The plant will clean the Coalburg, Lower Coalburg and 10% of all Pit Cleanings: Total Coalburg seam: 22 million raw tons Total Lower Coalburg seam: 15 million raw tons 10% Pit Cleanings: 75 million tons of total raw coal within the mining boundary* 10% = 7.5 million tons Total tons raw coal = = 44.5 million tons 14 years left when plant is built / 17 years, shows that approximately 20% of the coal will be mined prior to putting in the Prep-Plant: 44.5 * 20% = 35.6 million total tons remaining as of Jan million / 14 years = 2.5 million tons per year 2.5 million tons per year / 312 days per year = 8,200 tons per day 8,000 tons per day / 24 hours a day = 340 tons per hour 340 tons per hour + 25% rock = 425 tons per hour 425 tons per hour / 85% plant efficiency = 500 tons per hour rated capacity for design 60% clean coal yield
16 Valley Fills 8 Possible Valley Fill Locations: Capacity: million yd million yd million yd million yd3 Total = 99.2 million yd million yd million yd million yd million yd3 Using Using Average Area Calculations.
17 Cost per Raw Ton Basis Cost per Raw Ton Calculations Full Production 4,600,000 Tons Half Production Cost per Raw Ton Calculations Without Dollars Prep Plant (000) $/ton With Prep Plant 2,500,000 Tons 2,500,000 Tons Dollars (000) $/ton Dollars (000) Based $/ton 6 day work week Labor Cost $ 9,750,992 $ 2.12 Labor Cost $ 6,785,912 $ 2.71 $ 7,498,072 $ 3.00 Based on 6 day work week Based on 57% covering FICA, futa, insurance, pension, medical, worker's $ $ 1.21 Based on 57% covering FICA, futa, insurance, pension, medical, worker's Employee Benefit Cost $ 3,867,970 $ 1.55 $ 4,273,901compensation, $ 1.71 black lung, ect. compensation, black lung, ect. Supply Costs $ $ 15,625,000 $ 6.25 $ $ 15,625, Based $ on Supply 6.25 Based Cost on from Supply Peabody Cost from Peabody Energy Energy Employee Benefit Cost 5,558,065 Supply Costs 26,450,000 Power $ 2,850,000 $ 1.14 $ 2,850,000 $ 1.14 Power Costs based on 2.9 cents per kilo-watt hour Power Costs based on 2.9 cents per kilo-watt hour Power $ 5,700,000 $ 1.24 Property & Other Taxes $ 2,932,039 $ 0.85 $ 2,932,039 $ 0.85 Estimated Property and Other taxes from Capital Expenditure Property and Liability $ $ 0.96 Estimated Property and Other taxes from Capital Expenditure $ 750,000 $ 0.30 $ 750,000 $ 0.30 Estimated high for new company Insurance Reclamation Fee $ $ 375,000 $ 1,380, $ $ 0.30 Estimated high for new company 375,000 $ 0.15 Set by federal law at $0.15 Property & Other Taxes 4,798,000 Property and Liability Insurance Mine Closing Cost $ 250,000 $ 0.10 Reclamation occurs during the mining process, based on 7 million dollar final $ $ $ ,000Set $ by federal 0.10law closing at $0.15 costs. Reclamation Fee 690,000 State Severance Tax $ 4,375,000 $ 1.75 $ 4,375,000Reclamation $ 1.75 occurs High for during new mines the in mining West Virginia process, based on 9 million dollar $ $ 0.10 closing costs Total Operating Cost $ 37,810,920 $ $ 38,929,012 $ Mine Closing Cost 460,000 State Severance Tax $ 7,755,600 $ 1.69 High for new mines Overhead Costs $ 1,890,546 $ 0.76 $ 1,946,451 $ 0.78 Based in on West 5% of Total Virginia Operating Cost Total Operating Cost $ 62,542,657 $ Direct Cost $ 39,701,466 $ $ 40,875,462 $ Estimate Basis Description Estimate Basis Description Overhead Costs $ 3,127,133 $ 0.68 Direct Cost $ 65,669,790 $ Based on 5% of Total Operating Cost Based on 2mm tons of Clean Coal Product Annually
18 Net Cash Flow - Mountaineer Mining Company 80,000 Additional Equipment Purchased 60,000 40,000 Dollars (000) 20,000 - (20,000) Second Production Line is Purchased (40,000) (60,000) Period (Year)
19 Economic Analysis Coal Prices Raw Direct $35/ton Clean $55/ton Capital Expenditures Total = $164.8 million Equipment = $136 million Mineral and Property Value MV calculated using Royalty 5% of GSP PV calculated using $1000 / acre (4570 acres of Property) Analysis Mine will not turn a profit until Period 3 7% ~ $348 million IRR ~ 47.1%
20 Conclusion Rum Creek Surface Mine economic analysis shows the project can turn a reasonable profit. Further evaluation is necessary to properly assess all aspects of a full feasibility study.
PATRIOT COAL CORPORATION
(Mark One) UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 10-K/A (Amendment No. 1) ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For
More informationMassey Energy Company
Massey Energy Company Bear Stearns Commodities & Capital Goods Conference November 29, 2007 Massey Energy Company Baxter F. Phillips, Jr. Executive Vice President Safe Harbor Statement FORWARD-LOOKING
More informationDon Blankenship, Chairman and CEO
Chairman, CEO and President Don Blankenship, Chairman and CEO Lehman Brothers 2007 CEO Energy Conference New York September 6, 2007 Safe Harbor Statement FORWARD-LOOKING STATEMENTS: certain statements
More informationCity of Glendale, Arizona Pavement Management Program
City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND
More informationState of West Virginia Earl Ray Tomblin, Governor
State of West Virginia Earl Ray Tomblin, Governor WV Office of Miners Health, Safety & Training Eug ene White, Director #7 Players Club Drive Suite 2 Charleston, WV 25311-1626 Telephone 304-558-1425 Fax
More informationJinshan Gold Mines Inc. April 24, 2006
Jinshan Gold Mines Inc. April 24, 2006 FINAL FEASIBILITY STUDY EXTENDS MINE LIFE AND DEMONSTRATES ROBUST ECONOMICS FOR JINSHAN S CSH (217) GOLD PROJECT, CHINA INFILL DRILLING INCREASES MEASURED AND INDICATED
More informationSCRUTINY COMMENTS ON REVIEW AND UPDATION OF MINING PLAN(RMP), OF THIMMAPPANAGUDI IRON ORE MINE (ML.NO.2549) IN MURARIPURA VILLAGE, IN
1 ANNEXURE SCRUTINY COMMENTS ON REVIEW AND UPDATION OF MINING PLAN(RMP), OF THIMMAPPANAGUDI IRON ORE MINE (ML.NO.2549) IN MURARIPURA VILLAGE, IN SANDUR TALUK OF BELLARY-DISTT OVER AN AREA OF 46.20 HA AS
More informationKişladağ Expansion Project
Kişladağ Expansion Project Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private
More informationNovember 2010 Investor Presentation. The leading diversified fuel producer in the Eastern U.S.
November 2010 Investor Presentation The leading diversified fuel producer in the Eastern U.S. Cautionary Language This presentation contains statements, estimates and projections which are forward-looking
More informationCorsa Coal Corp. Management s Discussion and Analysis March 31, 2015
2015 The purpose of the Corsa Coal Corp. ( Corsa ) ( MD&A ) for the three months ended 2015 is to provide a narrative explanation of Corsa s operating and financial results for the period, Corsa s financial
More informationTSX: LYD ANNUAL GENERAL MEETING
TSX: LYD ANNUAL GENERAL MEETING JUNE 28, 2018 AMULSAR GOLD PROJECT Cautionary Statement Certain information contained in this presentation, including any information relating to Amulsar's expected future
More informationInitiation coverage ARCH COAL, Inc (NYCE: ACI) November 6, 2009
Initiation coverage ARCH COAL, Inc (NYCE: ACI) November 6, 2009 Edward Kohler, Ed.Kohler@yale.edu Igor Lukashov, Igor.Lukashov@yale.edu Company Statistics Current market cap: $3.45B 2008 Sales: $2.98B
More informationCRS Report for Congress
CRS Report for Congress Received through the CRS Web Order Code RS21935 September 15, 2004 Summary The Black Lung Excise Tax on Coal Salvatore Lazzari Specialist in Public Finance Resources, Science, and
More informationNEWS RELEASE NR: October 11, 2017
NEWS RELEASE NR: 17-11 October 11, 2017 Eros Announces Results of Preliminary Economic Assessment for the Bell Mountain Gold Project Vancouver, BC (October 11, 2017) Eros Resources Corp. (TSX.V: ERC) (
More informationHECLA REPORTS SECOND QUARTER RESULTS; INCREASES SILVER PRODUCTION 60% For the Period Ended June 30, 2008 For Release: August 4, 2008
NEWS RELEASE 2008-18 HECLA REPORTS SECOND QUARTER RESULTS; INCREASES SILVER PRODUCTION 60% For the Period Ended June 30, 2008 For Release: August 4, 2008 COEUR D ALENE, IDAHO -- Hecla Mining Company (HL:NYSE)
More informationTSX.V: TEN US: TCEGF
TSX.V: TEN US: TCEGF Certain information contained or incorporated by reference in this presentation and related material, including any information as to our strategy, plans or future financial or operating
More informationDECEMBER 2013 QUARTERLY REPORT
30 January 2014 ASX ANNOUNCEMENT DECEMBER 2013 QUARTERLY REPORT The Board of Paringa Resources Ltd ( Paringa or the Company ) (ASX:PNL) is pleased to present its quarterly report for the period ending
More informationPacific American Coal Corporate Presentation April 2018
Pacific American Coal Corporate Presentation April 2018 DISCLAIMER This presentation has been prepared by Pacific American Coal Limited. ( PAK or the "Company"). This presentation may not be reproduced,
More informationALASKA 1. LUCKY SHOT MILE DISTRICT
STOCK - FULL METAL MINERALS SYMBOL - FMM - TSX-V TICKER - FMM.V 52 WEEK RANGE - HIGH - 3.35 - LOW - 1.17 SHARES OUTSTANDING - BASIC - 33,953,011 - DILUTED - 39,706,761 MARKET CAPITALIZATION 105 Million
More informationJefferies 2017 Industrials Conference
August 8, 2017 Jefferies 2017 Industrials Conference Deck S. Slone Senior Vice President 2 Forward-looking information This presentation contains forward-looking statements that is, statements related
More informationTSX: LYD SPROTT NATURAL RESOURCE SYMPOSIUM
TSX: LYD SPROTT NATURAL RESOURCE SYMPOSIUM JULY 17-20 2018 AMULSAR GOLD PROJECT Cautionary Statement Certain information contained in this presentation, including any information relating to Amulsar's
More informationRAMACO RESOURCES, INC. ANNOUNCES THIRD QUARTER 2017 RESULTS
November 8, 2017 For more information, contact: Michael P. Windisch, Chief Accounting Officer, Ramaco Resources, Inc. 859-244-7455 mpw@ramacocoal.com RAMACO RESOURCES, INC. ANNOUNCES THIRD QUARTER 2017
More informationThe leading diversified fuel producer in Appalachia
October 2010 Investor Presentation The leading diversified fuel producer in Appalachia CONSOL begins pad drilling with its new Patterson Apex Walking Rig Cautionary Language This presentation contains
More informationBUILDING A LARGER, STRONGER COAL COMPANY
BUILDING A LARGER, STRONGER COAL COMPANY June 11, 2009 2 Agenda David Jan Director, Investor Relations Bob Chase Board of Director, Western Canadian Coal John Hogg Board of Director, President & CEO, Western
More informationPolish Coal : low cap.ex; low op.ex
1 April 2015 Polish Coal : low cap.ex; low op.ex BMB has 3 projects; PFS values first project at $415m. Recommendation Price BUY; High Risk 1.7c Risked Asset Valuation Base case : $1,126m Spot prices :
More informationA LEADING PRODUCER OF NATURAL SODA ASH
A LEADING PRODUCER OF NATURAL SODA ASH OCI RESOURCES LP INVESTOR PRESENTATION AUGUST 2014 OCI Resources LP 1 ORGANIZATIONAL OVERVIEW Organizational Structure OCI Enterprises Inc. 100% OCI Chemical Corporation
More informationBURNSTONE PROJECT Feasibility study and LoM plan
BURNSTONE PROJECT Feasibility study and LoM plan Richard Stewart Executive Vice President: Business Development 28 July 2016 Disclaimer The information in this presentation may include forward-looking
More informationRhino Resource Partners LP More Than Coal
Rhino Resource Partners LP More Than Coal Dave Zatezalo, CEO Scott Morris, VP Investor Relations BB&T Capital Markets Commercial and Industrial Conference March 29, 2012 Forward-Looking Statements This
More informationNovember 2010 Credit Presentation. The leading diversified fuel producer in the Eastern U.S.
November 2010 Credit Presentation The leading diversified fuel producer in the Eastern U.S. Cautionary Language This presentation contains statements, estimates and projections which are forward-looking
More informationFor personal use only
MEDIA RELEASE/ASX ANNOUNCEMENT 18 June 2012 VIEW TO ACQUIRE INTEREST IN THREE HIGH QUALITY COKING AND THERMAL COAL ASSETS LOCATED IN KYRGYZSTAN HIGHLIGHTS View to acquire an 80% ownership in three prospective
More informationMarlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update
250 1199 WEST HASTINGS ST. VANCOUVER, B.C. V6E 3T5 CANADA T. 604 646 1580 F. 604 642 2411 WWW.MARLINGOLD.COM TSX.V: MLN Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate
More informationVelocity Hole RDD-009 Intersects New Zone at Rozino Gold Project, Southeast Bulgaria
NR-17-11 October 19, 2017 Velocity Hole RDD-009 Intersects New Zone at Rozino Gold Project, Southeast Bulgaria Highlights include 27.0 metres @ 2.64 g/t gold Vancouver, British Columbia Velocity Minerals
More informationPapuan Precious Metals Corp.
For the Six Months Ended December 31, Overview The following management s discussion and analysis ( MD&A ) of the financial position and results of operations of Papuan Precious Metals Corp. ( the Company
More informationNEWS RELEASE. Fort Knox Gilmore project feasibility study highlights 1
25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 NEWS RELEASE Kinross to proceed with initial Fort Knox Gilmore expansion Project expected to extend mine life to 2030 and generate 17% IRR at a low
More informationCaretta Minerals, LLC
Caretta Minerals, LLC FINANCIAL STATEMENTS Years Ended March 31, 2017 and 2016 With Reports of Independent Auditors Braj Aggarwal, CPA, P.C. Certified Public Accountants 115 North Broadway Hicksville,
More informationVelocity Files NI Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria
NR-18-10 April 5, 2018 Velocity Files NI 43-101 Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria Inferred Resource at 0.5g/t gold cut-off
More informationMIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA
MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA August 12, 2014 Denver, Colorado Midway Gold Corp. ("Midway" or the "Company") (MDW:TSX, MDW:NYSE-
More informationINVESTOR PRESENTATION February 2016
INVESTOR PRESENTATION February 2016 1 Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking statements within the meaning of the safe harbor provisions of Section
More information5. Total number of Virginia coal mining jobs for the calendar year ending within the taxable year. 5.
Form 306 2011 Virginia Coal Related Refundable Tax Credits Coalfield Employment Enhancement Tax Credit and Virginia Coal Employment and Production Incentive Tax Credit For calendar year 2011. FISCAL YEAR
More informationFORM 10-K. Foresight Energy LP (Exact Name of Registrant as Specified in its Charter)
Section 1: 10-K (10-K) UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, DC 20549 FORM 10-K (Mark One) x ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
More informationProphecy to Acquire Advanced Gibellini Vanadium Project in Nevada
Prophecy to Acquire Advanced Gibellini Vanadium Project in Nevada Vancouver, British Columbia, May 8, 2017 Prophecy Development Corp. ( Prophecy or the Company ) (TSX:PCY, OTCPK:PRPCF, Frankfurt:1P2N)
More information2002 ANNUAL REPORT ARLP. Planning For Growth BUILDING A FOUNDATION FOR SUSTAINABLE CASH FLOW GROWTH
2002 ANNUAL REPORT ARLP Planning For Growth BUILDING A FOUNDATION FOR SUSTAINABLE CASH FLOW GROWTH ALLIANCE RESOURCE PARTNERS, L.P. is the nation s only publicly-traded master limited partnership involved
More informationLogan and Kanawha. Transaction Overview
Logan and Kanawha Transaction Overview March 2011 Forward-Looking Statements Certain statements in this Shareholder Update, and other written or oral statements made by or on behalf of us are "forward-looking
More informationDonlin Gold Permitting Update. Presentation to RDC December 3, 2015 Stan Foo, General Manager
Donlin Gold Permitting Update Presentation to RDC December 3, 2015 Stan Foo, General Manager Cautionary Statements Regarding Forward Looking Statements This presentation includes certain forward-looking
More informationAries Project Prefeasibility Study Optimization Report
Aries Project Prefeasibility Study Optimization Report Submitted to: RAM River Coal Corporation Project Number: 624-12 Date: August 8, 2017 Norwest Corporation Suite 1830, 1066 W. Hastings Street Vancouver,
More informationInvestor Presentation. February 2011
Investor Presentation February 2011 Cloud Peak Energy Inc. Financial Data Cloud Peak Energy Inc. is the sole owner of Cloud Peak Energy Resources LLC. Unless expressly stated otherwise in this presentation,
More informationPOWER METALS CORP. AND MGX MINERALS INC. FORM ACCRETIVE PARTNERSHIP OVER LITHIUM PORTFOLIO
POWER METALS CORP. AND MGX MINERALS INC. FORM ACCRETIVE PARTNERSHIP OVER LITHIUM PORTFOLIO VANCOUVER, BRITISH COLUMBIA (August 2nd, 2017) - Power Metals Corp. ("Power Metals Corp." or the "Company") (TSX
More informationStock Symbols: AEM (NYSE) For further information: Barry Landen, V.P. Corporate Affairs Agnico-Eagle Mines Limited (416)
Stock Symbols: AEM (NYSE) For further information: AGE (TSX) Barry Landen, V.P. Corporate Affairs Agnico-Eagle Mines Limited (416) 947-1212 (All amounts expressed in U.S. dollars unless otherwise noted)
More informationNR15-01 January 6, Cardero Announces New NI Resource Estimate for the Current Carbon Creek Joint Venture Property
CARDERO RESOURCE CORP. Suite 2300 1177 West Hastings Street, Vancouver, BC, Canada V6E 2K3 Tel: (604) 408-7488 Toll Free: 1-888-770-7488 Fax: (604) 408-7499 Website: www.cardero.com TSX: CDU OTCBB: CDYCF
More informationAcquisition of Magnum Coal Company. April 2008
Acquisition of Magnum Coal Company April 2008 Patriot Coal Statement on Forward-Looking Information Some of the following information contains forward-looking statements within the meaning of Section 27A
More informationGregg is a frequent lecturer for the continuing legal education seminars on mineral law, conveyancing and land use topics.
Gregg s law practice primarily consists of representing businesses involved in unconventional and conventional oil and gas, coal, coalbed methane gas, and other minerals and natural resources, and technologies
More informationHoward Weil Energy Conference
Howard Weil Energy Conference April 7, 2008 Don Blankenship Chairman, President and CEO Safe Harbor Statement FORWARD-LOOKING STATEMENTS: certain statements in this presentation are forward-looking as
More informationTELKWA METALLURGICAL COAL PROJECT PFS RESULTS PRESENTATION
TELKWA METALLURGICAL COAL PROJECT PFS RESULTS PRESENTATION P R O J E C T U P D AT E 1 0 J U LY 2 0 1 7 ALLEGIANCE COAL LIMITED (ASX:AHQ) Important Information Forward Looking Statements This Presentation
More informationMining Permit Works Plan, including Stormwater Management
Mining Permit Works Plan, including Stormwater Management Introduction The following headline summary serves to demonstrate the consideration applied in developing the mining works plan for the Kingfisher
More informationPre-Feasibility Study Demonstrates Significant Potential of the Riversdale Anthracite Project
Pre-Feasibility Study Demonstrates Significant Potential of the Riversdale Anthracite Project 1 May 2017 Acacia Coal (ASX: AJC) is pleased to announce that a Pre-Feasibility Study has found that its flagship
More informationRNS Number : 2310X Atlantic Coal PLC 27 August 2015
Atlantic Coal PLC - ATC Half Yearly Report Released 07:01 27-Aug-2015 RNS Number : 2310X Atlantic Coal PLC 27 August 2015 Atlantic Coal plc / Index: AIM / Epic: ATC / Sector: Mining Atlantic Coal plc ("Atlantic"
More informationReport on Mining and Quarries
Workers Compensation Insurance Rating Bureau of California Workers Compensation Insurance Rating Bureau of California Report on Mining and Quarries Excerpt from the WCIRB Classification and Rating Committee
More informationEXCEPTIONAL CASH FLOWS AND RETURNS FROM 51-YEAR SAWIN THERMAL COAL PROJECT: PRE-FEASIBILITY STUDY
Level 1, 350 Hay Street, Subiaco, WA 6008 ABN 84 061 219 985 P: +61 8 6365 4519 F: +61 8 9388 6040 E:enquiries@balamara.com.au 16 June 2015 EXCEPTIONAL CASH FLOWS AND RETURNS FROM 51-YEAR SAWIN THERMAL
More informationTSX.V: TEN US: TCEGF
TSX.V: TEN US: TCEGF Certain information contained or incorporated by reference in this presentation and related material, including any information as to our strategy, plans or future financial or operating
More informationEXPORT. (in millions) CONVERTIBLE
2010 annual report Strength and potential 2010 Results: building strength With global economies beginning to recover from the recession, Patriot Coal devoted 2010 to preparing for growing demand. We recapitalized
More informationObsidian Management Policy
Obsidian Management Plan For the Obsidian Management Policy Warner Mountain Ranger District Modoc National Forest Modoc County California November 2014 Purpose and Authority The purpose of this Plan is
More informationCOAL MINE RECLAMATION
United States Government Accountability Office Report to Congressional Requesters March 2018 COAL MINE RECLAMATION Federal and State Agencies Face Challenges in Managing Billions in Financial Assurances
More informationMineral resource management strategy
PLANNING FOR THE NEXT 10 YEARS expanding and managing our mineral resource base Rodney Quick Group GM Evaluation Mineral resource management strategy Manage the orebody from gold in the ground to profits
More informationTELKWA METALLURGICAL COAL PROJECT STAGE 1 PFS RESULTS
TELKWA METALLURGICAL COAL PROJECT STAGE 1 PFS RESULTS P R E S E N T A T I O N 1 2 S E P T E M B E R 2 0 1 7 ALLEGIANCE COAL LIMITED (ASX:AHQ) Important Information Forward Looking Statements This Presentation
More informationCOLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604)
COLONIAL COAL INTERNATIONAL CORP. Suite 200-595 Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604) 568-4962 NEWS RELEASE COLONIAL COAL ANNOUNCES COMBINED RESULTS OF RECENT PRELIMINARY
More informationNew PEA for Paramount Gold s San Miguel Project Confirms Robust Combination of Heap Leaching and Milling
New PEA for Paramount Gold s San Miguel Project Confirms Robust Combination of Heap Leaching and Milling Low Initial Capital of $69 Million and Low Operating Costs Generate Exceptional Economics Quick
More informationCANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) Fax: (604)
CANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) 336-8612 Fax: (604) 718-2808 www.canamex.us NEWS RELEASE Canamex Resources Announces Positive Preliminary Economic
More informationTRANSATLANTIC MINING - NI AND PRELIMINARY ECONOMIC ASSESSMENT ALDER GULCH PROJECT US GRANT MINE
TRANSATLANTIC MINING - NI 43-101 AND PRELIMINARY ECONOMIC ASSESSMENT ALDER GULCH PROJECT US GRANT MINE 12 th December 2016 TSX Venture Exchange Vancouver, British Columbia Trading Symbol: TCO Transatlantic
More informationCurrent Business Activities
ITEM 2. MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS The following Management s Discussion and Analysis of Financial Condition and Results of Operations ( MD&A
More informationRoyal Gold Announces Preliminary Economic Assessment for the Peak Gold Project
Royal Gold Announces Preliminary Economic Assessment for the Peak Gold Project DENVER, COLORADO. SEPTEMBER 24, 2018: ROYAL GOLD, INC. (NASDAQ:RGLD) (together with its subsidiaries, Royal Gold or the Company
More informationTHE NEXT BIG LITHIUM PLAY
THE NEXT BIG LITHIUM PLAY INVESTOR PRESENTATION 2018 FORWARD LOOKING STATEMENTS INVESTOR PRESENTATION 2018 This presentation may include statements which, other than statements of historical facts, may
More informationPUBLIC SERVICE COMMISSION OF WEST VIRGINIA CHARLESTON COMMISSION ORDER
PUBLIC SERVICE COMMISSION OF WEST VIRGINIA CHARLESTON At a session of the PUBLIC SERVICE COMMISSION OF WEST VIRGINIA in the City of Charleston on the 3'd day of January 2018. GENERAL ORDER NO. 236.1 In
More informationAn energy resources company. Management Presentation Extraordinary General Meeting 5 September 2008
An energy resources company Management Presentation Extraordinary General Meeting 5 September 2008 DISCLAIMER The information in this presentation is an overview and does not contain all information necessary
More informationNEWS RELEASE April 16, 2018 Saskatoon, Saskatchewan
NEWS RELEASE April 16, 2018 TSX: DIAM Saskatoon, Saskatchewan STAR - ORION SOUTH DIAMOND PROJECT: PRELIMINARY ECONOMIC ASSESSMENT POST-TAX & ROYALTY NPV OF $2.0 BILLION AND IRR OF 19 PERCENT 66 MILLION
More informationEnergizer Resources Announces Positive Preliminary Economic Assessment of the Green Giant Molo Graphite Project
Energizer Resources Announces Positive Preliminary Economic Assessment of the Green Giant Molo Graphite Project Study Indicates Operating Parameters and Attractive Financial Returns NEWS RELEASE February
More informationPapuan Precious Metals Corp.
For the three Months Ended September 30, 2013 Overview The following management s discussion and analysis ( MD&A ) of the financial position and results of operations of Papuan Precious Metals Corp. (
More informationCONSOLIDATED FINANCIAL STATEMENTS FOR THE NINE MONTHS ENDED SEPTEMBER 30, 2008, AND 2007 (UNAUDITED)
CONSOLIDATED FINANCIAL STATEMENTS FOR THE NINE MONTHS ENDED SEPTEMBER 30, 2008, AND 2007 (UNAUDITED) Suite 550 800 Pender Street Vancouver, British Columbia V6C 2V6 Ph# 604-682-2992 Fax# 604-681-5910 CONSOLIDATED
More informationVelocity Extends East Zone Discovery at Rozino Gold Project, Southeast Bulgaria
NR 18 02 February 5, 2018 Velocity Extends East Zone Discovery at Rozino Gold Project, Southeast Bulgaria Mineralization Remains Open for Further Expansion Vancouver, British Columbia Velocity Minerals
More informationNorthgate Minerals Reports Second Quarter Results
Northgate Minerals Reports Second Quarter Results Fosterville Achieves Record Quarterly Production Notice: Conference Call and Webcast of Q2 Results Today at 10:00 am ET Dial in: +647-427-7450 or 1-888-231-8191
More informationFor personal use only
Name of entity Information Form and Checklist Annexure I (Mining Entities) ABN/ARBN/ARSN Matador Mining Limited 45 612 912 393 This Annexure forms part of the Information Form and Checklist supplied by
More informationPOWERTECH URANIUM CORP. INTERIM CONSOLIDATED FINANCIAL STATEMENTS. December 31, (Stated in Canadian Dollars) (Unaudited)
POWERTECH URANIUM CORP. INTERIM CONSOLIDATED FINANCIAL STATEMENTS (Unaudited) THE ACCOMPANYING INTERIM FINANCIAL STATEMENTS FOR THE THREE AND NINE MONTHS ENDED DECEMBER 31, 2007 AND 2006 HAVE NOT BEEN
More informationNEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742
NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Probe Metals Increases Resource to 682,400 ounces Indicated at 2.35 g/t gold and 722,100 ounces Inferred at 2.41 g/t gold at the Val-d
More informationOctober 5, Case No COAL-SC-GI Tyler Morgan, LLC. Dear Ms. Smith and Mr. Hoyer:
li 21 Brooks Street, P.O. Box 812 Charleston, West Virginia 25323 Phone: (34) 34-3 Fax: (34) 34-325 October 5,21 8 Nicola D. Smith, Esq. David A. Hoyer, Esq. Counsel, Tyler Morgan, LLC Hoyer, Noyer & Smith,
More informationNEWS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER
NEWS RELEASE CZN-TSX CZICF-OTCQB FOR IMMEDIATE RELEASE November 14, 2017 CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER Positive 2017 Feasibility Study shows increased production All season road environmental
More informationVelocity Continues to Expand East Zone Discovery at Rozino Gold Project, Southeast Bulgaria
NR-18-09 March 28, 2018 Velocity Continues to Expand East Zone Discovery at Rozino Gold Project, Southeast Bulgaria Highlights include Hole RDD-046; 57.0m grading 0.82g/t gold Vancouver, British Columbia
More informationCOMPANION POLICY CP TO NATIONAL INSTRUMENT STANDARDS OF DISCLOSURE FOR MINERAL PROJECTS TABLE OF CONTENTS
COMPANION POLICY 43-101CP TO NATIONAL INSTRUMENT 43-101 STANDARDS OF DISCLOSURE FOR MINERAL PROJECTS TABLE OF CONTENTS PART PART 1 PART 2 PART 3 PART 4 TITLE APPLICATION AND TERMINOLOGY 1.1 Supplements
More informationALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)
FOR IMMEDIATE RELEASE ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) 368-9932 or 1 (866) 788-8801 (All amounts are expressed in United States dollars, unless
More informationMetallurgical Coal Producer
Metallurgical Coal Producer New Elk Coal Mine Q1 2011 Forward Looking Statement (Pt 1) The information provided in this presentation is intended exclusively for those viewing it. Reproduction or conveyance
More informationDahlman Rose & Co. Global Metals, Mining & Materials Conference. November 17, 2011
Dahlman Rose & Co. Global Metals, Mining & Materials Conference November 17, 2011 Safe Harbor Statement Some of the information included in this presentation contains forward-looking statements (as defined
More informationFor personal use only
January 31, 2017 DECEMBER 2016 QUARTERLY REPORT Paringa Resources Limited ( Paringa or Company ) (ASX:PNL) is pleased to present its quarterly report for the period ending December 31, 2016, summarized
More informationCanadian Zeolite Corp. (formerly Canadian Mining Company Inc.) Management Discussion and Analysis For the six months ended December 31, 2016
Canadian Zeolite Corp. (formerly Canadian Mining Company Inc.) Management Discussion and Analysis For the six months ended December 31, The following discussion and analysis of the operations, results,
More informationINVESTOR PRESENTATION: KANGWANE ANTHRACITE COAL PROJECT DECEMBER 2010
INVESTOR PRESENTATION: KANGWANE ANTHRACITE COAL PROJECT DECEMBER 2010 IMPORTANT INFORMATION The information in this presentation is an overview and does not contain all information necessary to make an
More informationDistribution Forward-looking statements No liability United States
This presentation ( Presentation ) has been prepared by Riversdale Resources Limited ( Riversdale ) and is provided solely for information purposes. By viewing, attending or otherwise acting on the information
More informationThe Bison Pipeline Project. Public Disclosure Document
The Bison Pipeline Project Public Disclosure Document Who is involved with the Bison project? Bison Pipeline Ltd. (Bison Pipeline), a wholly owned subsidiary of BC Gas Inc., has released a public disclosure
More informationQUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016
31 January 2017 ASX RELEASE ASX:AWV QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2016 HIGHLIGHTS Exploration and geotechnical drilling program completed at Big Springs. High grade zones intersected
More information11.75% 2019 ($200,000, AA3)
PROSPECTUS Armstrong Energy, Inc. OFFER TO EXCHANGE All Outstanding Unregistered 11.75% Senior Secured Notes Due 2019 ($200,000,000 Aggregate Principal Amount) (CUSIP No. 042380 AA3) For 11.75% Senior
More informationRICHMONT MINES INC. Investor Presentation October TSX - NYSE MKT: RIC. Copyright 2012 by Richmont Mines
RICHMONT MINES INC. Investor Presentation October 2012 w w w. r i c h m o n t - m i n e s. c o m 1 T S X N Y S E M K T : R I C SAFE HARBOR STATEMENT & CAUTIONARY NOTE TO U.S. INVESTORS CONCERNING RESOURCE
More informationJames River Coal Company Reports First Quarter 2007 Operating Results
James River Coal Company Reports First Quarter 2007 Operating Results * Cash Costs per Ton in Central Appalachia Decline by 9.8% Compared to Fourth Quarter 2006 and Decline by 1.8% Compared to Third Quarter
More informationFOCUSED ON OPERATIONAL DELIVERY
FOCUSED ON OPERATIONAL DELIVERY Investor Presentation August 2018 FORWARD LOOKING STATEMENTS This document has been prepared by Asanko Gold Inc. (the Company ) solely forinformational purposes. This presentation
More informationFourth Quarter 2010 Metallurgical Coal Producer
Fourth Quarter 2010 Metallurgical Coal Producer New Elk Coal Mine DECEMBER 2010 Forward Looking Statement (Pt 1) The information provided in this presentation is intended exclusively for those viewing
More information