1 PALADIN RESOURCES LTD John Borshoff, Managing Director/CEO Ron Chamberlain, CFO September Quarter 2007 Conference Call 19 November

2 Disclaimer This presentation includes certain statements that may be deemed forward-looking statements. All statements in this presentation, other than statements of historical facts, that address future production, reserve or resource potential, exploration drilling, exploitation activities and events or developments that Paladin Resources Ltd (the Company ) expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forwardlooking statements. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, and continued availability of capital and financing and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. The Company does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future events or otherwise. 2

3 Presentation Outline Uranium Supply Overview Paladin Status Q3 Financials Project Update Future Expectation 3

4 Building a New Mining Supply Industry 2006 to 2030 and beyond M M 30M 150M 160M 103M 40M 90M 2005 WNA forecast 4

5 Paladin Overview An S&P/ASX 100 company DUAL LISTED ON TSX PRODUCTION at Langer Heinrich Uranium Mine (Namibia) 2.6Mlb nameplate production for 2008 CONSTRUCTION started on Kayelekera Uranium Project (Malawi) US$85M already committed and on schedule M&A ACTIVITY ongoing Valhalla and Summit (Australia) Most comprehensive uranium team outside majors geological, engineering (ops & construction), environmental, marketing Globally a leading emerging uranium supply company with a uranium trading subsidiary to enhance PDN position Uranium spot price US$93.00/lb U 3 O 8 5

6 Paladin Project Locations Advanced Exploration Project Pre Development Project Development of Mine On hold Operating Mine Paladin 50% (PLUS 82% control of Summit) 6

7 Sales Revenue Sales Revenue of US$26.0M for the Sept 07 quarter 333,000lb sold at an average realised price of US$78/lb The pounds sold were sourced from Langer Heinrich production (183,000lb) and third party uranium purchased in the June 07 quarter (150,000lb) Langer Heinrich production of 274,000lb delivered to all three conversion facilities without previous transport delays 35,000lb remain of third party uranium purchased which is scheduled for delivery into sales contracts in Dec 07 quarter 7

8 Income Statement Gross profit of US$4.1M for the Sept 07 quarter with Langer Heinrich contributing US$1.8M, no impact from sale of third party uranium purchased in the June 07 quarter Exploration expenditure of US$3.8M Finance costs of US$6.8M Other expenses of US$9.3M, including US$2.9M sales contract expense on the remaining 35,000lb of third party uranium purchased Loss after tax of US$14.5m or US$0.02 per share for the Sept 07 quarter 8

9 Balance Sheet and Cash Flow Cash and cash equivalents of US$165.8M at 30 Sept 07 Inventories of US$29.3M including US$4.7M of remaining third party uranium purchased in the June 07 quarter Net assets of US$1.3bn Cash inflow from operations of US$7.9M for the Sept 07 quarter from sale of both Langer Heinrich and third party uranium purchased Cash outflow from investing of US$26.3M relating to increased investment in Deep Yellow now 14.34%, Kayelekera mine construction and exploration expenditure 9

10 Langer Heinrich - Project Update performance to date 6 months ago (April 2007) plant ramp up/official opening heat exchangers/tank liners failing and impeding ramp up progress systematic elimination of bottlenecks/design improvements metal recovery in all sections of flowsheet need major improvement alkaline leach process proving successful production (Q1/07) - 30,000lb U 3 O 8 Today (Oct 2007) & expectation for April 08 production ramp up and remediation making good progress heat exchangers stable recoveries improved significantly in scrubbing, leaching, CCD (from Oct) sections IX columns the remaining major bottleneck additional units ordered Aug 07 production (Q2/07, Q3/07) - 375,000lb U 3 O 8 6 months time (April 2008) plant operating at nameplate (2.6Mlb U 3 O 8 annual) from January 2008 cost optimization process commenced/new heat exchangers installed additional IX columns installed December 2007 Stage II expansion started - 2.6Mlb to 3.7Mlbs U 3 O 8 annually expected 6 month production (Q4/07 & Q1/08) 1,020,000lb U 3 O 8 10

11 Kayelekera - Project Update performance to date & expectation for April 08 6 months ago (April 2007) Development Agreement signed with Govt 10 year stability period BFS and EIS finalised and submitted to Govt ML granted and environmental approvals received Owner s construction team established (moved from Langer Heinrich Project) pioneer works started on site Today (October 2007) long lead capital items ordered and deliveries on schedule EPCM manager and mining contractor appointed construction underway civil and earthworks started 300 people on site social development programmes in formulation court action withdrawn 6 months time (April 2008) erection of treatment plant underway open pit mining underway GM Operations appointed and operational team being established 11

12 Mt Isa - Project Update performance to date 6 months ago (April 2007) Paladin 50% JV partner on Valhalla/Skal Deposit hostile takeover bid made for Summit Resources for balance of assets Summit Board recommends offer Areva fight for uranium marketing rights Today (October 2007) Mt Isa Uranium province controlled by Paladin & expectation for April 08 project technically reassessed to attain geological and uranium target relevancy extensive drilling underway at Valhalla and Skal deposits base line environmental studies initiated Areva actions continue (not material to Paladin) 6 months time (April 2008) intensive drilling of Valhalla and Skal for resource expansion and classification focussed metallurgical testwork underway environmental work ongoing ongoing lobbying of QLD government re uranium policy preparing for Pre-Feasibility Study 12

13 Project Pipeline assets acquired & projects developed 2012 Langer Heinrich Uranium Mining Operation Late 2008 Inventory U 3 O Mlb 13

14 Production Schedule plenty of upside on existing major projects Project Production Start Production Vol. (U 3 O 8 ) million pounds LANGER HEINRICH (Stage 1) January 2007 (full production Jan 08) 2.60 KAYELEKERA 4Q LANGER HEINRICH (Stage 2) December Mlb Potential to expand these projects to a total production of 8Mlb to 9Mlb U 3 O 8 for 2009/10 14

15 Paladin Offers Excellent Upside key work programs 07/08 Langer Heinrich design and initiate Stage II expansion (2.6Mlb to 3.7Mlb) vanadium circuit mid 08 21,000m drilling to increase resource base Kayelekera construction process ongoing 9,000m resource upgrade drilling Mt Isa Project excellent potential to increase current resource base extensive drilling (50,000m) planned to prepare for a BFS ongoing metallurgical testwork and start environmental baseline work Bigrlyi Project 52,000m focussed on excellent target good opportunity to increase current resource base Significant opportunity to increase overall resource base in 07/08 15

16 Producing Uranium Companies Paladin differentiating itself PRODUCERS - 18 countries TIER I Companies X X X X Cameco, AREVA, RIO, BHP, Kazatomprom, ROSATOM, Navoi (~83% of 2006 mine production operating in 9 Countries) TIER II Companies PALADIN, URANIUM ONE, DENISON, Heathgate, Mesteña and other producers (~17% 2006 production in 4 of above & 9 other countries) NON PRODUCERS TIER III Companies - Speculative Dozen or so companies with resources >20Mlb U 3 O 8 resources operating in 9 countries (6 new) TIER IV Companies - Highly Speculative 100 s of companies X 2008 Production Downgrade 16

17 PALADIN RESOURCES LTD Contact Details Mr John Borshoff (Managing Director/CEO) Mobile: +61 (0) Mr Ron Chamberlain (CFO) Mobile: +61 (0) Grand Central 1st Floor, 26 Railway Rd Subiaco Western Australia 6008 PO Box 201, Subiaco Western Australia 6904 Telephone: +61 (0) Facsimile: +61 (0) paladin@paladinresources.com.au Website: 17

PALADIN ENERGY LTD The New Energy In The Market John Borshoff, Managing Director Investor CB Presentation February 2008

PALADIN ENERGY LTD The New Energy In The Market John Borshoff, Managing Director Investor CB Presentation February 2008 PALADIN ENERGY LTD The New Energy In The Market John Borshoff, Managing Director Investor CB Presentation February 2008 1 Disclaimer This presentation includes certain statements that may be deemed forward-looking

More information

Paladin Energy Ltd. The New Energy In The Market. May 2010 V

Paladin Energy Ltd. The New Energy In The Market. May 2010 V Paladin Energy Ltd The New Energy In The Market Investor Update May 2010 V13.05.10 Disclaimer This presentation includes certain statements that may be deemed forward-looking statements. All statements

More information

Paladin Energy Ltd. The New Energy in the Market

Paladin Energy Ltd. The New Energy in the Market Paladin Energy Ltd The New Energy in the Market Investor Presentation October 2010 Important Information This presentation includes certain statements that may be deemed forward-looking statements, such

More information

PALADIN RESOURCES LTD THE NEW ENERGY IN THE MARKET

PALADIN RESOURCES LTD THE NEW ENERGY IN THE MARKET PALADIN RESOURCES LTD THE NEW ENERGY IN THE MARKET John Borshoff Managing Director GENERAL MEETING 8th Sept 2005 Disclaimer This presentation does not constitute an offer to sell securities and is not

More information

John Borshoff Managing Director/CEO

John Borshoff Managing Director/CEO Paladin Energy Ltd The New Energy In The Market John Borshoff Managing Director/CEO Annual General Meeting 26 November 2008 1 Disclaimer This presentation includes certain statements that may be deemed

More information

For personal use only

For personal use only PALADIN ENERGY LTD ACN 061 681 098 Ref: 399272 27 August 2015 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement Dear Sir/Madam June 2015 Full

More information

PALADIN ENERGY LTD ACN

PALADIN ENERGY LTD ACN PALADIN ENERGY LTD ACN 061 681 098 Ref: 409025 10 May 2016 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement Dear Sir/Madam March Quarter

More information

September Quarter Results Conference Call and Investor Update

September Quarter Results Conference Call and Investor Update September Quarter Results Conference Call and Investor Update 16 November 2016 Alexander Molyneux Chief Executive Officer Craig Barnes Chief Financial Officer Disclaimer and Notes for JORC and NI 43-101

More information

Langer Heinrich Mining Operation URANIUM MINING - AN INDUSTRY IN CRISIS. John Borshoff, Managing Director/CEO

Langer Heinrich Mining Operation URANIUM MINING - AN INDUSTRY IN CRISIS. John Borshoff, Managing Director/CEO Langer Heinrich Mining Operation URANIUM MINING - AN INDUSTRY IN CRISIS John Borshoff, Managing Director/CEO Australian Uranium and Rare Earths Conference 16-17 July 2013 Uranium outlook Company status

More information

Annual General Meeting 19 November 2015 Alexander Molyneux Interim Chief Executive Officer

Annual General Meeting 19 November 2015 Alexander Molyneux Interim Chief Executive Officer Annual General Meeting 19 November 2015 Alexander Molyneux Interim Chief Executive Officer Disclaimer xxxxxxxxxxxx and Notes for JORC and NI 43-101 Mineral Resources and Ore Reserves This presentation

More information

For personal use only

For personal use only Appendix 4D - Financial Report Half year ended 31 December 2018 Paladin Energy Ltd ABN or equivalent company reference ACN. 061 681 098 Results for announcement to the market 31 December 2018 31 December

More information

For personal use only

For personal use only PALADIN ENERGY LTD ACN 061 681 098 Ref: 402537_1.docx 19 November 2015 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement Dear Sir/Madam Annual

More information

Creating a Globally Diversified Uranium Producer. January 2012

Creating a Globally Diversified Uranium Producer. January 2012 Creating a Globally Diversified Uranium Producer January 2012 Cautionary Statement CORPORATE PRESENTATION JANUARY 2011 Readers are advised to refer to independent technical reports containing detailed

More information

Mining: resources, needs, process

Mining: resources, needs, process Mining: resources, needs, process Sébastien de Montessus Senior Executive Vice Presdient, Mining Business SFEN, Atoms for the future, Nov. 10, 2011 SFEN Atoms for the Future Nov. 10, 2011 1 Table of contents

More information

RCR Equity research report on global uranium companies

RCR Equity research report on global uranium companies Media Release 30 May 2008 RCR Equity research report on global uranium companies June Quarter, 2008 Key Points Uranium Market: The spot uranium price is currently US$60/lb, down 15% from US$71/lb at the

More information

For personal use only

For personal use only PALADIN ENERGY LTD ACN 061 681 098 Ref: 231720 31 August 2011 Company Announcements Office Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement Dear Sir/Madam Paladin

More information

Macusani Project Uranium & Lithium in Peru Moving Towards 2020 Production TSX-V:PLU FSE:QG1 OTC:PLUUF

Macusani Project Uranium & Lithium in Peru Moving Towards 2020 Production TSX-V:PLU FSE:QG1 OTC:PLUUF Macusani Project Uranium & Lithium in Peru Moving Towards 2020 Production TSX-V:PLU FSE:QG1 OTC:PLUUF Disclaimer The particulars contained herein were obtained from sources which we believe reliable but

More information

Q Financial Results

Q Financial Results LEAGOLD MINING IS BUILDING A NEW MID-TIER GOLD PRODUCER FOCUSED ON LATIN AMERICA Q3 2017 Financial Results November 14 2017 TSX: LMC OTCQX: LMCNF www.leagold.com Disclaimer This presentation contains "forward-looking

More information

For personal use only

For personal use only PALADIN ENERGY LTD ACN 061 681 098 Ref: 433518_1.docx 27 February 2018 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement Dear Sir/Madam 31

More information

PALADIN ENERGY LTD ACN

PALADIN ENERGY LTD ACN PALADIN ENERGY LTD ACN 061 681 098 Ref: 402368_1.DOC 12 November 2015 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement Dear Sir/Madam 30

More information

Glencore Finances Matrix into Copper Production Summary

Glencore Finances Matrix into Copper Production Summary 19 October 2006 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 Dear Sir, ANNOUNCEMENT ABN 42 082 593 235 Electronic

More information

TSX: LUN OMX: LUMI. BMO Capital Markets - Global Metals and Mining Conference

TSX: LUN OMX: LUMI. BMO Capital Markets - Global Metals and Mining Conference TSX: LUN OMX: LUMI BMO Capital Markets - Global Metals and Mining Conference February 27, 2012 Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward-looking

More information

PALADIN RESOURCES LTD

PALADIN RESOURCES LTD PALADIN RESOURCES LTD ABN 47 061 681 098 HALF YEARLY REPORT for period ending 31 December 2001 CONTENTS CORPORATE DIRECTORY 1 REVIEW OF OPERATIONS 2 DIRECTORS' REPORT 6 CONSOLIDATED STATEMENT OF FINANCIAL

More information

Uranium Equity Adjustments Hitting A Century

Uranium Equity Adjustments Hitting A Century Justin Reid, Phone (416) 943-6729, jreid@cormark.com David Wargo - Associate, Phone (416) 943-6423, dwargo@cormark.com Uranium Equity Adjustments Hitting A Century Unless otherwise denoted, all figures

More information

ANNUAL REPORT. Paladin Energy Ltd

ANNUAL REPORT. Paladin Energy Ltd ANNUAL REPORT 2016 Paladin Energy Ltd CONTENTS CORPORATE VALUES... 4 PALADIN TODAY... 4 KEY ACHIEVEMENTS... 5 INSIGHTS FROM THE CEO... 7 MANAGEMENT DISCUSSION AND ANALYSIS... 9 Review of Operations...10

More information

HIGHLIGHTS. For the period ended March 2013

HIGHLIGHTS. For the period ended March 2013 For the period ended March 2013 Aura Energy (ASX:AEE) Headquartered in Melbourne and listed on the ASX, Aura Energy (AEE) is an explorer and developer of uranium assets. The company has advanced uranium

More information

For personal use only

For personal use only "NOT FOR DISTRIBUTION TO UNITED STATES NEWS SERVICES OR FOR DISSEMINATION INTO THE UNITED STATES" BANNERMAN ANNOUNCES SHARE PLACEMENT & REFINANCING OF CONVERTIBLE NOTE Perth, Australia Bannerman Resources

More information

TIRIS URANIUM PROJECT EXPLOITATION LICENCE GRANTED KEY MILESTONE ACHIEVED FOR PROJECT MOMENTUM FOR DEVELOPMENT BUILDING

TIRIS URANIUM PROJECT EXPLOITATION LICENCE GRANTED KEY MILESTONE ACHIEVED FOR PROJECT MOMENTUM FOR DEVELOPMENT BUILDING 18 DECEMBER 2018 TIRIS URANIUM PROJECT EXPLOITATION LICENCE GRANTED KEY MILESTONE ACHIEVED FOR PROJECT MOMENTUM FOR DEVELOPMENT BUILDING Aura Energy Limited (AEE:ASX, AURA: AIM) is pleased to announce

More information

Australian Uranium Conference Fremantle July Weidong Xiang Managing Director

Australian Uranium Conference Fremantle July Weidong Xiang Managing Director Australian Uranium Conference Fremantle July 2012 Weidong Xiang Managing Director DISCLAIMER This presentation has been prepared by Energy Metals Limited ( Energy Metals or EME ). The information contained

More information

GALAXY RESOURCES LIMITED

GALAXY RESOURCES LIMITED GALAXY RESOURCES LIMITED 2017 Q2 Results Presentation July 2017 ASX: GXY [xx] Slide 1 Disclaimer This document contains forward looking statements concerning the projects owned by Galaxy. Statements concerning

More information

For personal use only

For personal use only PALADIN ENERGY LTD (Subject to Deed of Company Arrangement) ACN 061 681 098 Ref: 432406 30 January 2018 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic

More information

For personal use only

For personal use only PALADIN ENERGY LTD (Subject to Deed of Company Arrangement) ACN 061 681 098 31 January 2018 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 By Electronic Lodgement

More information

Graynic Completes Joint Venture for Central American Nickel Assets

Graynic Completes Joint Venture for Central American Nickel Assets ASX Release 10 July 2009 Graynic Completes Joint Venture for Central American Nickel Assets Key Points Joint Venture Agreement completed for Nichromet s Nickel Assets in Guatemala Provides Graynic with

More information

URANIUM PARTICIPATION CORPORATION. Associate: Michael Wichterle, MBA, CAIA

URANIUM PARTICIPATION CORPORATION. Associate: Michael Wichterle, MBA, CAIA Equity Research Price (C$) Volume (M) December 7, 2016 Company Update URANIUM PARTICIPATION CORPORATION Premium over NAV indicates investor confidence EVENT Uranium Participation Corp. ( UPC ) has announced

More information

Etango Uranium Project

Etango Uranium Project Etango Uranium Project enhancing early mover advantage Proactive s Melbourne & Sydney Investor Luncheons 5 & 6 May 2015 Why Invest in Bannerman? Strong outlook for medium term uranium price Well positioned

More information

30 September 2009 QUARTERLY REPORT ABOUT MINARA

30 September 2009 QUARTERLY REPORT ABOUT MINARA QUARTERLY REPORT 30 September 2009 ABOUT MINARA Minara Resources Limited is a leading Australian resources company based in Perth, Western Australia. Minara Resources owns and operates the Murrin Murrin

More information

RBC Global Mining and Materials Conference JUNE 14-15, The future of Oyu Tolgoi is underground Developing the third-largest copper mine

RBC Global Mining and Materials Conference JUNE 14-15, The future of Oyu Tolgoi is underground Developing the third-largest copper mine RBC Global Mining and Materials Conference JUNE 14-15, 2016 The future of Oyu Tolgoi is underground Developing the third-largest copper mine Forward-looking statements This presentation includes certain

More information

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012 THE ELEMENTS OF VALUE CREATION Revised Prefeasibility Study Results Dumont Nickel Project May 14, 2012 Disclaimer Cautionary Statements Concerning Forward Looking Statements This presentation contains

More information

Please find attached an Open Briefing interview between Perilya Limited and Corporatefile.com.au.

Please find attached an Open Briefing interview between Perilya Limited and Corporatefile.com.au. ASX re Corporate File Interview 070605.doc 7 June 2005 Company Announcements Office Australian Stock Exchange Limited 10 th Floor 20 Bond Street SYDNEY NSW 2000 Dear Sir OPEN BRIEFING INTERVIEW Please

More information

Uranium Investment Pure Commodity Play. November 2017 Investor Update

Uranium Investment Pure Commodity Play. November 2017 Investor Update Uranium Investment Pure Commodity Play November 2017 Investor Update Cautionary Statements This presentation contains certain forward-looking statements and forward-looking information based on the current

More information

PALADIN RESOURCES LTD ACN ANNUAL REPORT

PALADIN RESOURCES LTD ACN ANNUAL REPORT PALADIN PALADIN RESOURCES LTD ACN 061 681 098 2004 ANNUAL REPORT CONTENTS COMPANY SNAPSHOT 1 CHAIRMAN S LETTER 2 IN SUMMARY 3 URANIUM UPDATE 4 REVIEW OF OPERATIONS 6 CORPORATE GOVERNANCE STATEMENT 12 DIRECTORS

More information

Worldwide Targeted Customer and Investor Discussions. Gavin Lockyer CFO / Company Secretary Gary Cianfichi Head of Sales & Marketing September 2011

Worldwide Targeted Customer and Investor Discussions. Gavin Lockyer CFO / Company Secretary Gary Cianfichi Head of Sales & Marketing September 2011 Worldwide Targeted Customer and Investor Discussions Gavin Lockyer CFO / Company Secretary Gary Cianfichi Head of Sales & Marketing September 2011 Disclaimer Important Notice This presentation contains

More information

For personal use only

For personal use only GALAXY RESOURCES LIMITED 2017 Q3 Results Presentation October 2017 ASX: GXY [xx] Slide 1 Disclaimer Caution Regarding Forward Looking Information This document contains forward looking statements concerning

More information

TAMPIA GOLD PROJECT FEASIBILITY STUDY

TAMPIA GOLD PROJECT FEASIBILITY STUDY TAMPIA GOLD PROJECT FEASIBILITY STUDY DEVELOPING A NEW GOLD MINE EXPLORING A POTENTIAL NEW GOLD FIELD ASX:EXU 1 TAMPIA GOLD PROJECT Western Australian gold explorer focused on developing the shallow high

More information

Uranium Investment Pure Commodity Play. June 2017 Investor Update

Uranium Investment Pure Commodity Play. June 2017 Investor Update Uranium Investment Pure Commodity Play June 2017 Investor Update Cautionary Statements This presentation contains certain forward-looking statements and forward-looking information based on the current

More information

Investor Presentation

Investor Presentation ASX/Media Release 28 September 2011 Investor Presentation Australian gold exploration and development company, Westgold Resources Limited (ASX: WGR, Westgold ) lodges an updated investor presentation which

More information

Tuesday, 25 November Annual General Meeting

Tuesday, 25 November Annual General Meeting Tuesday, 25 November 20 20 Annual General Meeting Disclaimer and Important Notice This presentation contains forward looking statements that are subject to risk factors associated with an underground mining

More information

The New Leader in Global Copper

The New Leader in Global Copper The New Leader in Global Copper May 15, 2013 Global Diversified Cautionary Note Regarding Forward-Looking Statement Certain statements and information contained in this presentation, including all statements

More information

ASX ANNOUNCEMENT/MEDIA RELEASE

ASX ANNOUNCEMENT/MEDIA RELEASE ASX Code: MNB 27 October 2016 PERTH OFFICE Suite 1, 245 Churchill Avenue Subiaco WA 6008 T: +61 8 6270 4610 E: info@minbos.com W: www.minbos.com ABN: 93 141 175 493 ASX ANNOUNCEMENT/MEDIA RELEASE QUARTERLY

More information

Asian Investor Meetings AUGUST 15-18, The future of Oyu Tolgoi is underground Developing the third-largest copper mine

Asian Investor Meetings AUGUST 15-18, The future of Oyu Tolgoi is underground Developing the third-largest copper mine Asian Investor Meetings AUGUST 15-18, 2016 The future of Oyu Tolgoi is underground Developing the third-largest copper mine Forward-looking statements This presentation includes certain forward-looking

More information

The New Leader in Global Copper. June, 2013

The New Leader in Global Copper. June, 2013 The New Leader in Global Copper June, 2013 Cautionary Note Regarding Forward-Looking Statement Certain statements and information contained in this presentation, including all statements that are not historical

More information

Operational Outlook & Update Conference Call November 29, 2018

Operational Outlook & Update Conference Call November 29, 2018 TSX: LUN Nasdaq Stockholm: LUMI Operational Outlook & Update Conference Call November 29, 2018 1 Candelaria, Atacama Region, Chile Cautionary Statements Caution Regarding Forward-Looking Information and

More information

Etango Uranium Project

Etango Uranium Project Etango Uranium Project Enhancing Early Mover Advantage 1 December 2014 Technical Disclosures and Forward-Looking Disclaimers This presentation should be read in conjunction with the release by Bannerman

More information

December Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

December Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010 November 2010 December 2013 Underground workings at Debarwa copper-gold deposit Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea Eritrea and the Asmara Project Sudan Zara Bisha

More information

For personal use only

For personal use only STOCK EXCHANGE ANNOUNCEMENT 8 May 2015 FINANCIAL STATEMENTS AND MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE PERIOD ENDED 31 MARCH 2015 Bannerman Resources Limited (ASX: BMN, TSX: BAN, NSX: BMN) attaches

More information

Uranium Investment Pure Commodity Play. March 2017 Investor Update

Uranium Investment Pure Commodity Play. March 2017 Investor Update Uranium Investment Pure Commodity Play March 2017 Investor Update Cautionary Statements This presentation contains certain forward-looking statements and forward-looking information based on the current

More information

First Quarter 2018 Results April 26, 2018

First Quarter 2018 Results April 26, 2018 TSX: LUN Nasdaq Stockholm: LUMI First Quarter 2018 Results April 26, 2018 1 Candelaria, Atacama Region, Chile Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance

More information

Piauí Nickel-Cobalt Royalty Acquisition

Piauí Nickel-Cobalt Royalty Acquisition September 2017 Piauí Nickel-Cobalt Royalty Acquisition Important Disclaimer Certain statements in this presentation, other than statements of historical fact, are forward-looking statements based on certain

More information

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2016

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2016 29 April 2016 QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2016 COMPANY OVERVIEW Regalpoint Resources Limited (Company or ASX:RGU) currently holds projects in Queensland and Northern Territory,

More information

2018 Q1 Conference Call. April 27, 2018

2018 Q1 Conference Call. April 27, 2018 2018 Q1 Conference Call April 27, 2018 Forward-Looking Information Caution This presentation includes forward-looking information or forward-looking statements under Canadian and US securities laws, which

More information

CIBC 17th Annual Whistler

CIBC 17th Annual Whistler CIBC 17th Annual Whistler Institutional Investor Conference January 23, 2014 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain information contained or incorporated by reference in this presentation,

More information

ALEXANDER MINING PLC INTERIM REPORT FOR SIX MONTHS ENDED 30 JUNE 2017

ALEXANDER MINING PLC INTERIM REPORT FOR SIX MONTHS ENDED 30 JUNE 2017 26 September 2017 ALEXANDER MINING PLC INTERIM REPORT FOR SIX MONTHS ENDED 30 JUNE 2017 Alexander Mining plc ("Alexander" or the Company"), the AIM quoted mining and mineral processing technologies company,

More information

For personal use only

For personal use only GALAXY RESOURCES LIMITED FY2017 Results Presentation March 2018 ASX:GXY [xx] Slide 1 Disclaimer This document contains forward looking statements concerning the projects owned by Galaxy. Statements concerning

More information

Investor Update August 2014

Investor Update August 2014 Investor Update August 2014 2 Cautionary Statements This presentation contains certain forward-looking statements and forward-looking information that are based on the current internal expectations, estimates,

More information

For personal use only. Arafura Resources Investorium.tv Neil Graham GM - Operations

For personal use only. Arafura Resources Investorium.tv Neil Graham GM - Operations Arafura Resources Investorium.tv Neil Graham GM - Operations 12 th December 2011 Disclaimer Important Notice This presentation contains certain statements which may constitute forward-looking statements.

More information

Ncondezi Coal Company A Mozambican Coal Exploration and Development Company Graham Mascall CEO Ncondezi Coal Company

Ncondezi Coal Company A Mozambican Coal Exploration and Development Company Graham Mascall CEO Ncondezi Coal Company Ncondezi Coal Company A Mozambican Coal Exploration and Development Company Graham Mascall CEO Ncondezi Coal Company UK-Mozambique Investment Forum, 2 December, 2010 2010 Ncondezi Coal Company All Rights

More information

Second Quarter 2014 Results. July 24, 2014

Second Quarter 2014 Results. July 24, 2014 Second Quarter 2014 Results July 24, 2014 Forward Looking Information Both these slides and the accompanying oral presentation contain certain forward-looking statements within the meaning of the United

More information

Australian Resources. Uranium: Project deferrals likely to see the market in deficit for four years

Australian Resources. Uranium: Project deferrals likely to see the market in deficit for four years Australian Resources Uranium: Project deferrals likely to see the market in deficit for four years 211 was a challenging year for the uranium sector, following the incident at the Fukushima power plant.

More information

For personal use only

For personal use only +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

More information

ALLIANCE RESOURCES L I M I T E D

ALLIANCE RESOURCES L I M I T E D ALLIANCE RESOURCES L I M I T E D THE FOUR MILE URANIUM PROJECT Australia s next uranium mine Australian Uranium Conference Fremantle, Western Australia Patrick Mutz Managing Director 22-23 July 2009 Corporate

More information

Firesteel Resources Inc. Concludes Joint Venture Agreement

Firesteel Resources Inc. Concludes Joint Venture Agreement Vancouver, BC, December 11 th, 2017 Trading Symbol: TSX-V: FTR NEWS RELEASE Firesteel Resources Inc. Concludes Joint Venture Agreement with Nordic Mines AB and Concurrently Closes US$20.6 Million Financing

More information

31 DECEMBER 2018 HALF-YEAR FINANCIAL REPORT

31 DECEMBER 2018 HALF-YEAR FINANCIAL REPORT ASX Announcement ASX & NSX: DYL / OTCQX: DYLLF 8 March 2019 31 DECEMBER 2018 HALF-YEAR FINANCIAL REPORT Attached please find Half-Year Financial Report for the six months ended 31 December 2018. Yours

More information

April NYSE American: URG TSX: URE

April NYSE American: URG TSX: URE April 2018 This presentation contains forward-looking statements, within the meaning of applicable securities laws, regarding events or conditions that may occur in the future. Such statements include

More information

Macusani Project Lithium & Uranium in Peru Moving Towards Production TSX-V:PLU FSE:QG1 OTC:PLUUF

Macusani Project Lithium & Uranium in Peru Moving Towards Production TSX-V:PLU FSE:QG1 OTC:PLUUF Macusani Project Lithium & Uranium in Peru Moving Towards 2020-21 Production TSX-V:PLU FSE:QG1 OTC:PLUUF Disclaimer The particulars contained herein were obtained from sources which we believe reliable

More information

Investment Highlights

Investment Highlights Disclaimer This presentation includes certain forward-looking information within the meaning of the Securities Act (British Columbia). All statements regarding anticipated exploration costs, projected

More information

Corporate Presentation Anglo Pacific Group

Corporate Presentation Anglo Pacific Group Corporate Presentation Anglo Pacific Group December 2018 Early-stage Development Producing Geographic and Commodity Exposure A diverse portfolio with limited geopolitical risk Geographic Footprint Portfolio

More information

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast November 3 2016 KINROSS GOLD CORPORATION Q3 2016 Results Conference Call & Webcast 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained

More information

Abbington Investment Group, LLC Investment and Market Commentary Uranium: A Distressed Real Asset October 2014

Abbington Investment Group, LLC Investment and Market Commentary Uranium: A Distressed Real Asset October 2014 Dear Clients, Friends and Family: Abbington Investment Group, LLC Investment and Market Commentary Uranium: A Distressed Real Asset October 2014 Since we began writing our monthly note at the beginning

More information

RNC MINERALS. Q Results Conference Call TSX:RNX. November 15, 2017

RNC MINERALS. Q Results Conference Call TSX:RNX. November 15, 2017 RNC MINERALS Q3 2017 Results Conference Call November 15, 2017 TSX:RNX Disclaimer Cautionary Statements Concerning Forward-Looking Statements This presentation provides certain financial measures that

More information

Investor Day 2014: Strategic progress Mining exploiting our potential

Investor Day 2014: Strategic progress Mining exploiting our potential Investor Day 2014: Strategic progress Mining exploiting our potential Bill Scotting, EVP and CEO Mining 10 March 2014 Mary River iron ore project, Baffinland Disclaimer Forward-Looking Statements This

More information

POSITIONING FOR SUSTAINABLE GROWTH

POSITIONING FOR SUSTAINABLE GROWTH POSITIONING FOR SUSTAINABLE GROWTH Island Gold Mine Expansion Case PEA May 29, 2017 TSX NYSE : RIC RICHMONT MINES FORWARD-LOOKING STATEMENTS Safe Harbor Statement & Cautionary Note to U.S. Investors Concerning

More information

Wetar Copper Project Expansion Update - Commencement

Wetar Copper Project Expansion Update - Commencement For ASX Market Release: 7th January 2015 Wetar Copper Project Expansion Update - Commencement HIGHLIGHTS Daewoo funds of USD45M received Contract negotiations on major contracts well advanced Orders placed

More information

Toro Energy Limited. Wiluna Uranium Project Western Australia. Australia s Leading Development Stage Uranium Company. PDAC Canada March 2014

Toro Energy Limited. Wiluna Uranium Project Western Australia. Australia s Leading Development Stage Uranium Company. PDAC Canada March 2014 Toro Energy Limited Wiluna Uranium Project Western Australia Australia s Leading Development Stage Uranium Company PDAC Canada March 2014 Goals To see the Wiluna Uranium Project become Western Australia

More information

May 2014 NYSE MKT: URG TSX: URE

May 2014 NYSE MKT: URG TSX: URE May 2014 Disclaimer This presentation contains forward-looking statements, within the meaning of applicable securities laws, regarding events or conditions that may occur in the future. Such statements

More information

Third Quarter 2018 Results October 25, 2018

Third Quarter 2018 Results October 25, 2018 TSX: LUN Nasdaq Stockholm: LUMI Third Quarter 2018 Results October 25, 2018 1 Candelaria, Atacama Region, Chile Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance

More information

For personal use only Arafura Resources Annual General Meeting

For personal use only Arafura Resources Annual General Meeting Arafura Resources Annual General Meeting November 2016 Agenda 1. Chairman s Address 2. Formal Business 3. Managing Director s Report 4. Shareholder Questions 2 Chairman s Address Mr Ian Kowalick Chairman

More information

Managing Director s Review of Operations

Managing Director s Review of Operations ASX ANNOUNCEMENT Managing Director s Review of Operations 25 October 2017 Attached is a copy of the MD s review of operations as delivered at today s annual general meeting. For further information please

More information

Investor Presentation October 2011

Investor Presentation October 2011 Investor Presentation October 2011 1 Disclaimer The following information is for shareholders and not intended to guide any investment decisions in Ironbark Zinc Limited (Ironbark). This material contains

More information

MINERA IRL LIMITED Interim Accounts For the First Quarter ended 31 March 2011

MINERA IRL LIMITED Interim Accounts For the First Quarter ended 31 March 2011 MINERA IRL LIMITED Interim Accounts For the First Quarter 2011 HIGHLIGHTS Financial First quarter gold sales of 7,883 ounces, up 4.5% from 7,541 ounces in the same period in, and realised gold price of

More information

RESOURCE SECTOR OVERVIEW

RESOURCE SECTOR OVERVIEW RESOURCE SECTOR OVERVIEW Australian Investors Association 20 July, 2005 Presenter: Ron Cameron Senior Analyst Ord Minnett Research Disclaimer Research in this publication is sourced from JP Morgan Securities

More information

FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2016

FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2016 BANNERMAN RESOURCES LIMITED FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2016 www.bannermanresources.com BANNERMAN RESOURCES LIMITED ABN 34 113 017 128 Corporate Office Unit 1 2 Centro Avenue Subiaco

More information

QUARTERLY ACTIVITY STATEMENT

QUARTERLY ACTIVITY STATEMENT QUARTERLY ACTIVITY STATEMENT DECEMBER 2011 QUARTER HIGHLIGHTS Deflector Project Highlights: Deflector Deposit upgrade Significant upgrade in metallurgical test-work Deflector Drilling Program Recommencement

More information

Macusani Project Lithium & Uranium in Peru Moving Towards Production TSX-V:PLU FSE:QG1 OTC:PLUUF

Macusani Project Lithium & Uranium in Peru Moving Towards Production TSX-V:PLU FSE:QG1 OTC:PLUUF Macusani Project Lithium & Uranium in Peru Moving Towards 2020-21 Production TSX-V:PLU FSE:QG1 OTC:PLUUF Disclaimer The particulars contained herein were obtained from sources which we believe reliable

More information

GLOBAL URANIUM MARKET

GLOBAL URANIUM MARKET PC WONG DISCLAIMER The views by the author are his alone. All opinions expressed by the author are subject to change. The viewer is not to assume the performance of any company shares will equal its past

More information

Denver Gold Forum. Strengthening our precious metals position. September 11, Octavio Alvídrez, CEO Fresnillo plc

Denver Gold Forum. Strengthening our precious metals position. September 11, Octavio Alvídrez, CEO Fresnillo plc Strengthening our precious metals position Denver Gold Forum September 11, 2012 Octavio Alvídrez, CEO Fresnillo plc LSE:Fres BMV:Fres www.fresnilloplc.com Disclaimer This document includes statements that

More information

A modern mining company

A modern mining company A modern mining company 22 February 2018 The Manager, Companies Australian Securities Exchange Companies Announcement Centre 20 Bridge Street Sydney NSW 2000 Dear Sir/Madam, OZ Minerals' 2017 Full Year

More information

ACN INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2015

ACN INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2015 ACN 122 727 342 INTERIM FINANCIAL REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2015 CONTENTS Page Corporate Directory 3 Directors Report 4 Auditors Independence Declaration 10 Statement of Profit or Loss

More information

Newcastle Stock Exchange 384 Hunter Street Newcastle NSW 2300 AUSTRALIA PAGES: 7 FOR PUBLIC RELEASE. Half Yearly Report to 30 September 2005

Newcastle Stock Exchange 384 Hunter Street Newcastle NSW 2300 AUSTRALIA PAGES: 7 FOR PUBLIC RELEASE. Half Yearly Report to 30 September 2005 REGISTERED (HEAD) OFFICE 541 Parnell Road, Parnell, Auckland, New Zealand Phone: (+64 9) 303-1893 Fax: (+64 9) 303-1612 Email: office@heritagegold.co.nz Incorporated in New Zealand ABN 009 474 702 14 December

More information

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD News Release TSX: LMC March 8, 2018 LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD Vancouver, March 8, 2018 Leagold Mining Corporation

More information

Q4 and Full Year 2017 Results

Q4 and Full Year 2017 Results The leading high grade gold producer in Colombia Q4 and Full Year 2017 Results Lombardo Paredes Arenas, CEO Mike Davies, CFO 1 DISCLAIMER Forward Looking Statements This presentation contains "forward

More information