BofAML Global Metals, Mining & Steel Conference
|
|
- Suzan Stanley
- 6 years ago
- Views:
Transcription
1 Driving Long-Term Value from Solid Foundations BofAML Global Metals, Mining & Steel Conference May, 2016 Octavio Alvídrez, CEO LSE:Fres BMV:Fres
2 Disclaimer This document includes statements that are, or may be deemed to be, forward-looking statements. These forwardlooking statements can be identified by the use of forward-looking terminology, including the terms believes, estimates, plans, projects, anticipates, expects, intends, may, will, or should or, in each case, their negative or other variations or comparable terminology, or by discussions of strategy, plans, objectives, goals, future events or intentions. These forward-looking statements include all matters that are not historical facts. They appear in a number of places throughout this document and include, but are not limited to, statements regarding the Fresnillo Group s intentions, beliefs or current expectations concerning, among other things, the Fresnillo Group s results of operations, financial position, liquidity, prospects, growth, strategies and the silver and gold industries. By their nature, forward-looking statements involve risk and uncertainty because they relate to future events and circumstances. Forward-looking statements are not guarantees of future performance and the actual results of the Fresnillo Group s operations, financial position and liquidity, and the development of the markets and the industry in which the Fresnillo Group operates, may differ materially from those described in, or suggested by, the forward-looking statements contained in this document. In addition, even if the results of operations, financial position and liquidity, and the development of the markets and the industry in which the Fresnillo Group operates are consistent with the forwardlooking statements contained in this document, those results or developments may not be indicative of results or developments in subsequent periods. A number of factors could cause results and developments to differ materially from those expressed or implied by the forward-looking statements including, without limitation, general economic and business conditions, industry trends, competition, commodity prices, changes in regulation, currency fluctuations (including the US dollar and Mexican Peso exchange rates), the Fresnillo Group s ability to recover its reserves or develop new reserves, including its ability to convert its resources into reserves and its mineral potential into resources or reserves, changes in its business strategy, political and economic uncertainty. Forward-looking statements may, and often do, differ materially from actual results. Any forward-looking statements in this document speak only as of the date of this document, reflect the Fresnillo Group s current view with respect to future events and are subject to risks relating to future events and other risks, uncertainties and assumptions relating to the Fresnillo Group s operations, results of operations, growth strategy and liquidity. Investors should specifically consider the factors identified in this document which could cause actual results to differ before making an investment decision. Subject to the requirements of the Prospectus Rules, the Disclosure and Transparency Rules and the Listing Rules or applicable law, the Fresnillo Group explicitly disclaims any obligation or undertaking publicly to release the result of any revisions to any forward-looking statements in this document that may occur due to any change in the Company s expectations or to reflect events or circumstances after the date of this document. 2
3 Fresnillo at a Glance Location HERRADURA DISTRICT Key Highlights World s largest silver producer (47 moz in 2015) and Mexico s second largest gold producer (762 koz in 2015) ORISYVO Market cap of US$11.1 billion* CIÉNEGA DISTRICT Fresnillo plc mines (6 and a satellite mine)** Development projects (2) Advanced exploration projects (4) Exploration prospects SAN JULIÁN FRESNILLO DISTRICT Silver resources of 2 billion ounces and gold resources of 36 million ounces Mining concessions of 2 million hectares in Mexico Cash costs and AISC amongst the lowest in the industry Substantial, high quality project pipeline and strong commitment to disciplined and sustainable growth Focus on projects that can be developed into low-cost, worldclass mines * As at 5 May 2016 ** Operations at Soledad-Dipolos are currently suspended 3
4 Our Business Model and Strategy Our Business Model supported by four strategic pillars to create value 1. Maximise potential of existing operations Operate at 100% capacity Low-cost producer Optimise mining method and metallurgy to maintain high recovery rates 2. Deliver growth through development projects Track record of delivery on time and on budget Focus on CAPEX control Specialised Engineering and Construction team 3. Extend the growth pipeline Evaluate early-state acquisitions Maintain reserves for 10 years Ensure organic growth and assess key acquisition opportunities 4. Advance sustainable development Improve general health Reinforce safety Minimise the environmental impact Maintain sound relations with communities 4
5 2015 Highlights Silver production of 47 moz and gold production of 762 koz Revenues: US$1.4 billion Continued focus on cost control Operating profit: US$200 million EBITDA: US$548 million; EBITDA margin of 38% Capex of US$475 million and exploration expenses of US$140 million Total workforce: 8,034 (52% unionised employees and 48% contractors) Total assets: US$3.9 billion Cash and investments: US$500 million 5
6 Operations Review Fresnillo mine Key operating statistics 2015 Ore processed - mt 2.4 Gold ore grade - g/t 0.57 Silver production moz 15.6 Cost per tonne US$/t 48.2 Gold production koz 34.1 Cash cost - US$/oz 5.6 Silver ore grade - g/t 220 AISC - US$/oz 11.5 Main issues: Veins narrowing faster than expected Natural decline in grade Adverse changes in rock quality Secondary effects: Higher dilution Additional development required Difficulties in planning (inconsistencies) Measures put in place: Infill drilling with closer grid Improved infrastructure planning Adaptation to new mining conditions Turnaround progressing: 3 rd consecutive quarter of improvements in both grade and production (to 236 g/t 1Q16) Development reached 4,500 m/month in 1Q16: increase operational flexibility & continue to improve production levels Move gradually towards operating Fresnillo plant at full capacity once again 6
7 Operations Review (Cont d) Saucito Ciénega Key operating statistics 2015 Ore processed - mt 2.3 Silver production moz 22.0 Gold production koz 84.9 Silver ore grade - g/t 327 Gold ore grade - g/t 1.4 Cost per tonne US$/t 42.5 Cash cost - US$/oz 1.2 AISC - US$/oz 7.1 Key operating statistics 2015 Ore processed - mt 1.3 Gold production koz 85.7 Silver production moz 4.8 Gold ore grade - g/t 2.1 Silver ore grade - g/t 129 Cost per tonne US$/t 63.0 Cash cost - US$/oz 245 AISC - US$/oz 710 Capacity increase to 7,500TPD achieved 1Q16 (installation of vibrating screens) Continue exploration in areas of influence to extend district s mine life 7
8 Operations Review (Cont d) Herradura Noche Buena Key operating statistics 2015 Gold production koz Gold ore grade g/t 0.73 Ore processed mt 22.9 Total volume hauled mt Cost per tonne US$/t 8.7 Cash cost US$/oz 473 AISC - US$/oz 888 Key operating statistics 2015 Gold production koz Gold ore grade - g/t 0.50 Ore processed mt 17.4 Total volume hauled mt 82.4 Cost per tonne US$/t 7.9 Cash cost - US$/oz 973 AISC - US$/oz 1,015 Continue to optimise productivity now steady state reached Continue efforts to increase efficiency and control costs 8
9 Expected Delivery of Growth (1) (2) Expected Avg. Investment Annual (US$m) Production PROJECT YEAR moz Ag & 44 koz Au SAN JULIÁN A CONSTRUCTION LEACHING PLANT CONSTRUCTION FLOTATION PLANT PRODUCTION 30 3 moz Ag FRESNILLO 9,000 TPD (Optimisation project) DETAILED ENGINEERING MINE DEVELOPMENT PLANT ADEQUATION PRODUCTION moz Ag & 13 koz Au A PYRITES PLANT (Optimisation project) DETAILED ENGINEERING LEACHING PLANT CONSTRUCTION CONSTRUCTION TAILINGS FLOTATION PRODUCTION 110 Extended LoM of 390 koz Au CENTAURO EXTENSION A DEVELOPMENT 2ND LINE OF DYNAMIC LEACHING PLANT CONSTRUCTION PRODUCTION 305 (3) 10 moz Ag & 30 koz Au JUANICIPIO BASIC ENGINEERING MINE DEVELOPMENT DETAILED ENGINEERING PLANT CONSTRUCTION PRODUCTION koz Au & 1.3 m oz Ag CIENEGA 5,000 TPD (Optimisation project) DETAILED ENGINEERING MINE DEVELOPMENT PLANT CONSTRUCTION PRODUCTION koz Au CENTAURO DEEP DEVELOPMENT PRODUCTION koz Au (4) ORISYVO BASIC ENGINEERING DETAILED ENGINEERING MINE DEVELOPMENT PLANT CONSTRUCTION PRODUCTION (1) Estimated (2) Total average annual production (3) Total investment (of which 56% Fresnillo plc; 44% MAG Silver) (4) On hold A: Approved by the Board 9
10 Approved Projects San Julián Key metric estimates Avg. annual silver production Avg. annual gold production Pre-operative capex Cash cost (average LoM) All-in sustaining costs (average LoM) Phase 1 capacity (DLP to treat ore from veins) Phase 2 capacity (flotation plant to process ore from disseminated ore body) Life of mine 10.3 moz 43.9 koz $515 m $7.77 /oz $9.33 /oz 3,000TPD 6,000TPD 13 years Mining works at vein field concluded Leaching plant (phase 1): further infrastructure progress; testing ongoing at crusher and cell areas and with control system connections, instrumentation and electricity Flotation plant (phase 2): works continue Phase 1 expected to be commissioned 2Q16; phase 2 on track for 4Q16 10
11 Approved Projects San Julián: Commissioning 2Q16 Phase 1 Phase 2 11
12 Approved Projects Pyrites Plant Key metric estimates Avg. annual silver production 3.5 moz Avg. annual gold production Pre-operative capex 12.8 koz $155 m Fresnillo Plant Saucito I Saucito II Cash cost (average LoM) $2.51 /oz Old Tailings Tailings Plant Fe Plant Given improved market conditions approval to place equipment orders and commence construction Filtration Plant Hauling (Truck) Leaching Plant 12
13 Centauro Extension Project Approved 2 nd Line of Dynamic Leaching Plant Key metric estimates Plant capacity Pre-operative capex Overview Centauro Extension project, the natural evolution of the main Centauro pit, approved by the board Encompasses second line of dynamic leaching plant Will enable more efficient processing of sulphides which occur deeper in the pit Cut off grade for sulphides: 0.6g/t (vs. 1.2 g/t for oxides) Economic to process ore in DLP rather than at heap leach above these grades Approx. recovery rate for sulphides: 90% in DLP / 45% heap leach (vs. 90% in DLP / 65% heap leach for oxides) Pit design and LoM material moved unchanged Increase in gold production per year 8,000TPD US$110m 36koz Expected commissioning 2018 Ore type Oxides Mixture Sulphides Board approval granted for Centauro Extension: 2 nd line at DLP to improve processing efficiency as move deeper in pit 13
14 Centauro Extension - 2 nd Line of DLP Cut off grade for Sulphides 14
15 15 Centauro Extension - 2 nd Line of DLP Gold Production Differential Thousand Oz 50 Difference in Gold Production
16 Potential Brownfield Expansions Pyrites Plant Ciénega Optimisation Fresnillo Optimisation Centauro Extension Centauro Deep Description Tailings processing from Fresnillo & Saucito Optimisation project to increase capacity Optimisation project to increase capacity Natural evolution of the Centauro pit at Herradura Potential underground mine beneath the Centauro pit at Herradura Expected avg. annual production Estimated preoperative capex 3.5 moz silver 12.8 koz gold 15 koz gold 1.3 moz silver* 3 moz silver Extended LoM of 390 koz gold 65 koz gold $155 m $55 m* $30 m $110 m $130 m Status Given improved market conditions project to resume: approval to place equipment orders and commence construction Continue to evaluate district s capacity requirements as exploration continues Deliver optimisation once development rates and ore grades warrant Board approval granted, encompassing second line of dynamic leaching plant Additional exploration activities ongoing to accurately delineate the ore bodies Expected commissioning * Assuming a 5,000TPD expansion 16
17 Advanced Exploration Projects Juanicipio (JV with MAG Silver. Fresnillo: 56%) 8km from the Fresnillo mine; Juanicipio s mineral zones are located in silver-gold rich sulphide shoots of the veins. This project will be developed on a stand-alone basis Key metric estimates (100% basis) Avg. annual production 10moz silver 30koz gold Pre-operative capex $305m Indicated & inferred resources First production moz silver 578koz gold Orisyvo Assessing a 8,000TPD mine with a DLP processing facility; focusing on higher grade zones of the gold resource base Key metric estimates Avg. annual production 136koz gold Pre-operative capex $350m Indicated & inferred resources First production moz gold 13moz silver 10% increase in silver resources Conduct detailed engineering PEA complete; however development deferred as part of contingency plan 17
18 Strong Organic Growth Pipeline Mine Operations 2016 Budget: c.us$ m Fresnillo Saucito 27% Herradura Nochebuena Ciénega - San Ramón Soledad &Dipolos* Pipeline allows us to focus on projects that have the potential to be developed into low cost, world-class mines Development Projects San Julián Pyrites Plant 2% Advanced Exploration Orisyvo Cluster Cebollitas Juanicipio Centauro Deep 25% Prospects in drilling Early stage Exploration Fresnillo District Rodeo Guanajuato Tajitos Candameña Guachichil Pilarica (Perú) San Nicolás Guazapares Coneto Lucerito Cebadillas La Yesca Cairo Dátil Norias Sonora and Sinaloa : San Javier Nudo Carina Cerritos Dorado Olivos Chihuahua: S. Brígida Rosetillas SJPinal Lucero Tempisque Uruachic Durango: Pereñita La Huerta El Carmen 46% Zacatecas: Urite Atotonilco Corredor Concha-Nieves Argentum Villa García Perú: Huacravilca Sto. Domingo La Pampa Supaypacha Projects in blue are being prioritised * Operations at Soledad & Dipolos are currently suspended. Systematic Project Generation 18
19 Proven Track Record of Delivering on Time and on Budget Saucito I commissioning ($273m / 9 moz Ag) San Ramón satellite at Ciénega ($20m/ 25 koz Au; 2.5 moz Ag) Commissioning of DLP ($116m / 50 koz Au) Commercial production at Soledad-Dipolos began ($68m / 100 koz Au) Commercial production at Noche Buena began ($63m / 75 koz Au) (Total invested / expected average annual production) Milling capacity expansion at Ciénega ($25m / increase of 180 ktpy) Saucito II commissioning ($235m / 8 moz Ag) 19
20 Expected Silver Production Profile Million Oz 90.0 Attributable Yr Juanicipio - 56% Pyrites Plant San Julián Noche Buena Centauro extension Dynamic Leaching Plant S&D Herradura Ciénega optimisation Ciénega Saucito Fresnillo optimisation Fresnillo Target of 65 moz silver by
21 Expected Gold Production Profile Thousand Oz 1, Attributable Centauro Deep Orisyvo Pyrites Plant Juanicipio - 56% San Julián Saucito Ciénega Optiimisation Ciénega Fresnillo Optimisation Fresnillo Soledad&Dipolos Noche Buena Centauro extension Dynamic Leaching Herradura Yr Target of 750 koz gold by
22 CAPEX Spend Expectations Capital expenditure US$ Million 2016 Sustaining(operations) Fresnillo 102m Saucito 101m Herradura 96m Ciénega 50m Noche Buena 13m Others 3m Sustaining (projects approved) ProjectsApproved 35m Million Usd San Julián 127m Pyrites Plant 25m Centauro Extension 8m ProjectsforApproval Juanicipio 26m Fresnillo Optimisation 10m Others 5m Sustaining CAPEX New Projects Approved - Sustaining CAPEX New Projects for Approval - Sustaining CAPEX New Projects Approved - Preoperative CAPEX New Projects for Approval - Preoperative CAPEX 22
23 Well placed to address cyclical uncertainties Conclusions & Outlook
24 Conclusions and Outlook Precious metal prices continue to be volatile However, we are well-placed to withstand this volatility and to reap the benefits of higher prices, supported by our strong foundations Near-term priorities Turnaround at Fresnillo (low double-digit percentage increase expected in 2016 silver production vs. 2015) San Julián commissioning on time and budget (Phase 1: 2Q16, Phase 2: 4Q16) Reinstatement of Pyrites plant project (equipment orders and construction work to resume given improved market conditions) Approval of Centauro Extension project including 2 nd line at DLP (increased gold ore grade in sulphides) Renewed focus on safety (work towards achieving our zero fatalities target) Strategy unchanged; value creation driven by sustainable growth through disciplined development of new projects and ongoing investment in exploration across price cycles Focus remains on controlling expenditures, optimising performance and delivering returns across our mines and projects Remain on track to reach our 2016 production targets: moz of silver (incl. 4 moz from Silverstream) and koz of gold and our long-term strategic goal of 65 moz of silver in
25 Investment Case Strong balance sheet High quality assets Low-cost and flexible operations Disciplined approach to development Commitment to sustainable business practices 25
26 Well placed to address cyclical uncertainties Appendix
27 Income Statement (IFRS) ACCUM DECEMBER CHANGE C O N C E P T (Million USD) 2015 % 2014 % $ % ADJUSTED REVENUES 1, , HEDGING (METALS) ,732.1 TREATMENT AND REFINING CHARGES (142.8) (131.4) (11.4) 8.7 REVENUES 1, , ADJUSTED PRODUCTION COST (634.5) (43.9) (678.0) (48.0) 43.5 (6.4) PROFIT SHARING (12.8) (0.9) (12.6) (0.9) (0.2) 1.4 DEPRECIATION (331.2) (22.9) (296.2) (21.0) (35.0) 11.8 HEDGING (MXP/USD EXCHANGE RATE) (28.6) (2.0) (1.1) (0.1) (27.5) 2,457.9 CHANGE IN INVENTORIES (6.3) (0.4) (111.0) (106.0) OTHERS (9.5) (0.7) 11.5 (121.8) COST OF SALES (1,011.3) (70.0) (892.6) (63.1) (118.7) 13.3 GROSS PROFIT (88.0) (16.9) ADMINISTRATIVE EXPENSES (34.1) (2.4) (34.7) (2.5) 0.5 (1.5) CORPORATE EXPENSES (28.7) (2.0) (32.9) (2.3) 4.2 (12.7) EXPLORATION EXPENSES (140.2) (9.7) (168.8) (11.9) 28.5 (16.9) OTHER INCOME (EXPENSE) (15.9) (1.1) (25.5) (1.8) 9.7 (37.9) SELLING EXPENSES (13.7) (0.9) (13.6) (1.0) (0.1) 0.6 PROFIT FROM CONTINUING OPERATIONS (45.1) (18.4) GOLD HEDGING INCOME / (EXPENSE) N/A SILVERSTREAM AMORTIZATION EFFECTS FOR THE PERIOD (15.3) (41.4) SILVERSTREAM REVALUATION (34.0) (84.8) FINANCE INCOME / (EXPENSE) (39.4) (2.7) (47.2) (3.3) 7.8 (16.5) FOREIGN EXCHANGE GAIN / (LOSS) (36.2) (2.5) (24.4) (1.7) (11.8) 48.2 PROFIT BEFORE INCOME TAX (38.7) (15.4) INCOME TAX EXPENSE (129.0) (8.9) (118.3) (8.4) (10.7) 9.1 MINING RIGHT (14.0) (1.0) (15.7) (1.1) 1.7 (11.1) PROFIT FOR THE PERIOD (47.7) (40.7) ATTRIBUTABLE TO: EQUITY SHAREHOLDERS OF THE GROUP (37.9) (35.0) MINORITY INTEREST (1.1) (0.1) (9.8) N/A (47.7) (40.7) EBITDA (19.8) (3.5) 27
28 Cash Flow (IFRS) CHANGE C O N C E P T (Million USD) YTD 2015 YTD 2014 $ % CASH GENERATED BY OPERATIONS BEFORE CHANGES IN WORKING CAPITAL (38.0) (6.6) WORKING CAPITAL 51.3 (260.3) (119.7) INCOME TAX AND PROFIT SHARING PAID (45.8) (183.2) (75.0) NET CASH FROM OPERATING ACTIVITIES OTHER PROCEEDS SILVERSTREAM CONTRACT (19.3) (32.9) PROCEEDS FROM THE SALE OF PROPERTY, PLANT AND EQUIPMENT (8.1) (57.2) CAPITAL CONTRIBUTION OTHERS 1.6 (6.1) 7.7 N/A TOTAL OTHER PROCEEDS (19.4) (27.2) PURCHASE OF PROPERTY, PLANT AND EQUIPMENT (474.7) (425.6) (49.1) 11.5 DIVIDENDS PAID (37.5) (87.0) 49.4 (56.8) NET INTEREST RECEIVED (PAID) (30.5) (38.3) 7.8 (20.3) PURCHASE OF MINORITY SHARES 0.0 (450.5) N/A USES OF CASH (542.8) (1,001.4) (45.8) NET INCREASE / (DECREASE) IN CASH DURING THE PERIOD 52.0 (798.2) (106.5) EFFECT OF EXCHANGE RATE ON CASH AND CASH EQUIVALENTS (1.2) (4.0) 2.8 (70.0) CASH AND CASH EQUIVALENTS AT 01 JANUARY ,251.7 (802.4) (64.1) CASH AND CASH EQUIVALENTS AND SHORT TERM INVESTMENTS AT 31 DECEMBER
29 Balance Sheet (IFRS) Change Concept (Million USD) 31-DIC DIC-14 % Assets Cash and Investments Trade and Other Receivables (33.0) Inventories (1.6) Prepaid Expenses (11.6) Silverstream (1.9) Derivative Financial Instruments Property, Plant and Equipment 2, , Other Assets (Long term) (28.8) Total Assets 3, , Liabilities Profit Sharing Other Liabilities (Short term) (29.0) Retirement and Pension Plan Reserves Deferred Taxes Senior Notes N/A Other Liabilities ( Long term) Total Liabilities 1, , Share Capital and Share Premium 1, ,522.4 (24.2) Share Capital Subscribed N/A Retained earnings 1, , Other Accounts (474.4) (512.9) (7.5) Stockholder's Equity 2, , Minority Interest Total Stockholder s Equity 2, , Total Liabilities and Stockholder's Equity 3, ,
30 Cost Per Tonne (IFRS) ACCUM DEC CHANGE COST PER TONNE * % CHG. MINE UNIT Fresnillo US$/TON % Saucito US$/TON % Ciénega US$/TON % Herradura US$/TON 8.68** 9.29** -6.6% Noche Buena US$/TON 7.93** 9.98** -20.5% * Cost per tonne is calculated as total production costs less depreciation, profit sharing and the exchange rate hedging effects. ** Cost per tonne excluding unproductive costs 30
31 Cash Cost (IFRS) ACCUM DEC CHANGE CASH COST* % CHG. MINE UNIT Fresnillo PER OZ. SILVER % Saucito PER OZ. SILVER % Ciénega PER OZ. GOLD (By-prod.) % PER OZ. GOLD (Co-prod.) % PER OZ. SILVER (Co-prod.) % ** ** ** PER OZ. GOLD (Equiv.) % Herradura PER OZ. GOLD % Noche Buena PER OZ. GOLD % * Cash cost per ounce is calculated as total cash cost (cost of sales plus treatment and refining charges less depreciation) less revenues from by-products divided by the silver or gold ounces sold. ** For Ciénega we have also shown the calculation on a co-product basis, and an equivalent ounces basis. The two coproduct lines should be considered together. 31
32 All In Sustaining Cost (US$/Oz)* CASH COST * % CHG. MINE UNIT Fresnillo PER OZ. SILVER % Saucito PER OZ. SILVER % Ciénega PER OZ. GOLD % Herradura PER OZ. GOLD % Noche Buena PER OZ. GOLD 1, , % * All in sustaining cost is calculated as traditional cash cost plus on-site general, corporate and administrative costs, community costs related to current operations, capitalised stripping & underground mine development, sustaining capital expenditures and remediation expenses 32
33 Consolidated Cost Inflation 2015 (USD Based) 33
34 Contribution by Mine and by Metal to the Adjusted Revenues 2015 By mine Adjusted Revenues : US$1,583.3m By metal 11% 20% 5% 4% 28% 39% 52% 30% 11% Fresnillo Saucito Ciénega Herradura Noche Buena Lead Zinc Fresnillo Ciénega Herradura Saucito Noche Buena Consol Gold % % % % % % Silver % % % % % % Lead % % % % Zinc % % % % TOTAL % % % % % 1, % 1 Adjusted Revenue is revenue as disclosed in the income statement adjusted to exclude treatment and refining charges and gold, lead and zinc hendging. Silver Gold 34
35 Breakdown of Adjusted Production Costs Adj Prod Cost: US$634.5m 1 Contractors Operating Materials Energy & Diesel Maintenance Personnel Others Freights Charge for use of contractor s equipment 1 Contractors are hired to execute specific tasks. Fees paid include labour, operating materials, equipment, diesel and any other items required to fulfill such tasks. 35
36 Breakdown of Adjusted Production Costs Adj Prod Cost: US$634.5m Contractors Operating Materials Energy & Diesel Maintenance Personnel Others Freights Charge for use of contractor s equipment 36
37 Breakdown of Adjusted Production Costs 10.68% 5.23% 1.55% 27.72% Adj Prod Cost: US$634.5m 14.95% Contrac Mainten 1 Op Mat Person Energy & Diesel Others Freights % 22.75% 1 Contractors are hired to execute specific tasks. Fees paid include labour, operating materials, equipment, diesel and any other items required to fulfill such tasks. Fresnillo Ciénega Herradura Sol & Dip Saucito Noche Buena Other Consol Personnel % % % % % % % Maintenance and repairs % % % % % % % Operating materials % % % % % % % Diesel % % % % % % (0.27) % Electricity % % % % % % % Total Energy % % % % % % % Contractors % % % % % % (0.34) % Freight % % % % % % % Others % % % (5.01) 0.0% % % % Production Costs % % % (5.09) 0.0% % % % 37
38 Margins by mine (Metal price AISC*) (2015 vs. 2014) (USD/Oz) Cash Cost Fresnillo Saucito Cash Silver Ciénega Herradura Noche Buena Price Cost 1,900 1,629 1,357 1, , , , , , , Gold Price 1,900 1,629 1,357 1, Moz. 14.6Moz. 14.7Moz. 20.3Moz. 97.0Koz. 76.6Koz Koz Koz Koz Koz. Chg % Chg % Chg % Chg % Chg % Ounces Sold Stoppage of operations continued at Soledad-Dipolos *All in sustaining cost 38
39 Operations Fresnillo Mine 2015 Summary Lower silver production Lower grades Lower volumes Improvements in silver grade and production in H2 Lead and zinc production increased 17% and 25% respectively Expected higher ore grades as we go deeper into the mine 2015 Performance % Ore processed k t 2,410 2,625 (8.2) Looking Forward Increase average development rates to over 4,500 m/month Expect double-digit percentage increase in ore milled in 2016 Production Silver m oz (22.3) Grade Expectations Gold k oz (4.4) Ore grade Silver g/t (14.9) Gold g/t Cash cost $/ silver oz Silver (g/t) E average: 240g/t LT average: 260 g/t AISC $/ silver oz
40 Operations Turnaround at the Fresnillo Mine Main issues Secondary effects Measures put in place Expected results/ Short-term targets Veins narrowing faster than expected Natural and expected lower ore grade typical of a mature mine Delays in infrastructure installation Required increase in rate of development proportional to decrease in vein width Higher dilution than expected Infill drilling with a closer grid Improved planning to ensure necessary infrastructure in place on time Increase in stoping area from 12,000 m 2 to 20,000m 2 Expect development rates to reach over 4,500 m / month on average in 2016 Expect double digit percentage increase in ore milled in 2016 Deeper operations & increased distances (longer hauling & hoisting) Adverse change in rock quality Inconsistency in ore body led to lower certainty in geological model, which caused difficulties in mine planning Customise planning process to new mine conditions Volume processed stabilised by 2017 and expansion to 9,000 tpd by 2018 Reach 22 moz/year by 2019 Fresnillo will continue to be a key asset with 65 million tonnes in resources (747 moz of silver), equivalent to a potential 24 years of mine life 40
41 Operations Saucito Mine 2015 Summary Ramp-up of Saucito II by 2Q15 Significantly ahead of plan On budget Silver production increased Start-up of Saucito II & ramp-up Milling efficiencies, higher grade areas, improved dilution Increased Saucito I milling capacity by 20% to 3,600TPD 2015 Performance % Ore processed k t 2,339 1, Looking Forward Increase capacity of Saucito II using vibrating screens in 1H16 Total nominal capacity up to 7,500TPD Production Silver m oz Gold k oz Grade Expectations Ore grade Silver g/t (3.3) Gold g/t Cash cost $/ silver oz (53.4) Silver (g/t) E average: 295g/t LT average: 300 g/t AISC $/ silver oz
42 Operations Ciénega Mine 2015 Summary Gold production decreased on expected lower grade Silver production increased Richer veins at San Ramón satellite High grade development ore from Taspana vein Looking Forward Continue exploration in areas of influence to extend district s mine life 2015 Performance % Ore processed k t 1,329 1,341 (0.9) Production Gold k oz (20.8) Silver m oz Ore grade Gold g/t (20.0) Silver g/t Cash cost $/ gold oz (14.8) AISC $/ gold oz (9.7) Silver (g/t) Gold (g/t) (Gms/T) Grade Expectations E average: 2.0g/t LT average: 2.0g/t 2016E average: 120g/t LT average: 120 g/t 42
43 Operations Herradura Mine 2015 Summary % Ore processed m t Total volume hauled 2015 Performance m t (9.8) Second Merrill Crowe plant commissioned 4Q15 as planned Reached steady state operations (4Q15) Gold production increased Mine & DLP operational for full period Higher overall speed of recovery Installation of second Merrill Crowe plant Increase in ore grade Stabilised gold inventory levels at 160koz Looking Forward Continue to optimise productivity now steady state reached (Gms/T) Grade Expectations Production Gold k oz Ore grade Gold g/t Cash cost $/ gold oz Gold (g/t) E average: 0.65g/t LT average: 0.72 g/t AISC $/ gold oz
44 Operations Noche Buena Mine Gold production increased 2015 Summary Higher rate of recovery (full year of leaching pads 4 & 5) Partly offset by lower ore grade (ore deposited from higher banks to control haulage costs) Further efforts to improve efficiency & control costs Optimisation of tyre consumption Waste dumps relocated to reduce haulage distances % Ore processed m t Total volume hauled Production 2015 Performance m t (11.0) Gold k oz Looking Forward Continue efforts to increase efficiency and control costs Obtain International Cyanide Code certification (Gms/T) 0.7 Grade Expectations Ore grade Gold g/t (3.0) Cash cost $/ gold oz AISC $/ gold oz 1,015 1,051 (3.4) Gold (g/t) E average: 0.47g/t LT average: 0.52 g/t E 2017 E 2018 E 2019 E 2020 E 2021 E 44
Driving Long-Term Value from Solid Foundations. Denver Gold Forum. Octavio Alvídrez. 19 September 2016
Driving Long-Term Value from Solid Foundations Denver Gold Forum Octavio Alvídrez 19 September 2016 Disclaimer This document includes statements that are, or may be deemed to be, forward-looking statements.
More information25 September Dedicated to meeting our commitments
25 September 2017 Dedicated to meeting our commitments 1 Disclaimer This document includes statements that are, or may be deemed to be, forward-looking statements. These forward-looking statements can
More informationDenver Gold Forum September 24, 2013
Advancing our strategy in precious metals Denver Gold Forum September 24, 2013 Octavio Alvídrez, CEO Fresnillo plc LSE: FRES BMV:FRES www.fresnilloplc.com Disclaimer This document includes statements that
More informationBofAML Global Metals, Mining & Steel Conference May 2015
Well placed to address cyclical uncertainties BofAML Global Metals, Mining & Steel Conference 2015 13 May 2015 Octavio Alvídrez, CEO Fresnillo plc LSE: FRES BMV: FRES www.fresnilloplc.com Disclaimer This
More informationGlobal Metals, Mining & Steel Conference 2014 May 14, 2014
Looking beyond the cycle Bank of America Merrill Lynch Global Metals, Mining & Steel Conference 2014 May 14, 2014 Octavio Alvídrez, CEO Fresnillo plc www.fresnilloplc.com Disclaimer This document includes
More informationBofAML: Global Metals, Mining & Steel Conference. May 16, 2018
BofAML: Global Metals, Mining & Steel Conference May 16, 2018 Disclaimer This document includes statements that are, or may be deemed to be, forward-looking statements. These forward-looking statements
More information01 August Dedicated to meeting our commitments 1
01 August 2017 Dedicated to meeting our commitments 1 Disclaimer This document includes statements that are, or may be deemed to be, forward-looking statements. These forward-looking statements can be
More informationFirst Half 2018 Interim Results July,
First Half 2018 Interim Results July, 31 2018 Disclaimer This document includes statements that are, or may be deemed to be, forward-looking statements. These forward-looking statements can be identified
More informationDenver Gold Forum. Strengthening our precious metals position. September 11, Octavio Alvídrez, CEO Fresnillo plc
Strengthening our precious metals position Denver Gold Forum September 11, 2012 Octavio Alvídrez, CEO Fresnillo plc LSE:Fres BMV:Fres www.fresnilloplc.com Disclaimer This document includes statements that
More informationDENVER GOLD FORUM Tuesday 25 th Sept Octavio Alvídrez, CEO
DENVER GOLD FORUM Tuesday 25 th Sept 2018 Octavio Alvídrez, CEO DISCLAIMER 2 This document includes statements that are, or may be deemed to be, forward-looking statements. These forward-looking statements
More informationInterim Results August 4, 2015
Well placed to address cyclical uncertainties Interim Results Six months ended 30 June 2015 Octavio Alvídrez, CEO Mario Arreguín, CFO Roberto Díaz, COO David Giles, VP Exploration August 4, 2015 Disclaimer
More informationFresnillo plc interim results for the six months to 30 June 2015
Fresnillo plc interim results for the six months to 30 June 2015 Fresnillo plc 28 Grosvenor Street London W1K 4QR United Kingdom www.fresnilloplc.com 4 August 2015 Highlights (H1 2015/H1 2014 comparisons)
More informationDedicated to meeting our commitments. Fresnillo plc Annual Report 2016
Dedicated to meeting our commitments Fresnillo plc Annual Report 2016 Fresnillo plc is the world s leading silver miner and one of Mexico s largest gold producers. Our solid track record in creating long-term
More informationFresnillo plc interim results for the six months to 30 June 2018
Fresnillo plc 21 Upper Brook Street London W1K 7PY United Kingdom www.fresnilloplc.com 31 July 2018 Fresnillo plc interim results for the six months to 30 June 2018 Financial highlights (1H18/1H17 comparisons)
More informationProduction Report and Interim Management Statement for the six months to 30 June 2008
Overview Fresnillo Plc 28 Grosvenor Street London W1K 4QR United Kingdom www.fresnilloplc.com Production Report and Interim Management Statement for the six months to 30 June 2008 17 July 2008 Silver and
More informationFresnillo plc - Annual General Meeting Statement
Fresnillo plc 21 Upper Brook Street London W1K 7PY United Kingdom www.fresnilloplc.com 30 May 2018 Fresnillo plc - Annual General Meeting Statement Fresnillo plc (the Company ) will hold its Annual General
More informationFinancial results for the year ended 31 December 2017
Fresnillo plc Financial results for the year ended 31 December Fresnillo plc today announced its financial results for the full year ended 31 December. Octavio Alvídrez, CEO said: I am pleased to report
More informationFresnillo plc preliminary results for the year ended 31 December 2009
Fresnillo Plc 28 Grosvenor Street London W1K 4QR United Kingdom www.fresnilloplc.com Fresnillo plc preliminary results for the year ended 31 December 2009 2 March 2010 Operational Highlights: Record attributable
More informationLSE:ACA. Acacia Mining plc. Unearthing Africa s Potential
LSE:ACA Acacia Mining plc Unearthing Africa s Potential 03.09.2015 Important Notice This presentation includes forward-looking statements that express or imply expectations of future events or results
More informationHOCHSCHILD MINING BMO Metals & Mining Conference February 2014
HOCHSCHILD MINING BMO Metals & Mining Conference 2014 23-26 February 2014 DISCLAIMER Some statements contained in this presentation or in documents referred to in it are or may be forward-looking statements.
More informationPOSITIONING FOR SUSTAINABLE GROWTH
POSITIONING FOR SUSTAINABLE GROWTH Island Gold Mine Expansion Case PEA May 29, 2017 TSX NYSE : RIC RICHMONT MINES FORWARD-LOOKING STATEMENTS Safe Harbor Statement & Cautionary Note to U.S. Investors Concerning
More informationLEADERSHIP QUALITY SUSTAINABLE GROWTH Fresnillo plc 2009 ANNUAL REPORT
LEADERSHIP QUALITY SUSTAINABLE GROWTH Fresnillo plc 2009 ANNUAL REPORT Fresnillo plc is the leading primary silver producer in the world and the second largest gold producer in Mexico. We have a long track
More informationCREATING VALUE THROUGH GROWTH AND RETURNS
CREATING VALUE THROUGH GROWTH AND RETURNS IS THE WORLD S LEADING SILVER MINER AND ONE OF MEXICO S LARGEST GOLD PRODUCERS The dynamic leaching plants at Herradura one in operation and one under construction.
More informationFresnillo plc Annual Report 2011 Strengthening our precious metals position
Annual Report Strengthening our precious metals position Who We Are is the world s leading silver producer and Mexico s second largest gold producer. Headquartered in Mexico City, our shares trade on the
More informationCorporate Update. June 2013
Corporate Update June 2013 FORWARD LOOKING STATEMENTS The information in this document has been prepared as at June 5, 2013. Certain statements contained in this document constitute forwardlooking statements
More informationQ P R E S T E A P E A R E S U L T S
Q 4 2 0 1 4 P R E S T E A P E A R E S U L T S 1 1. 1 4 DISCLAIMER AND OTHER MATTERS SAFE HARBOR: Some statements contained in this presentation are forwardlooking statements within the meaning of the Private
More informationGROWTH THROUGH CASH FLOW. Q Results 3 August 2017
GROWTH THROUGH CASH FLOW 2017 Results 3 August 2017 2 DISCLOSURES Forward Looking Statements: There are risks associated with an investment in the shares of Centamin. Recipients of this presentation should
More informationMANAGEMENT S DISCUSSION AND ANALYSIS For the three and nine months ended September 30, 2018 and 2017
MANAGEMENT S DISCUSSION AND ANALYSIS The following ( MD&A ) for Alio Gold Inc. together with its wholly owned subsidiaries ( Alio or the Company ) is prepared as of November 7, 2018, and relates to the
More informationAcacia Mining plc ( ACA ) reports fourth quarter production results
2 January 206 Fourth Quarter Production Report for the three months ended 205 Based on IFRS and expressed in US Dollars (US$) Acacia Mining plc ( ACA ) reports fourth quarter production results We are
More informationLEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD
News Release TSX: LMC March 8, 2018 LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD Vancouver, March 8, 2018 Leagold Mining Corporation
More informationSpanish Mountain Gold Announces Results of New PEA for the First Zone
1120-1095 West Pender Street Vancouver, British Columbia, V6E 2M6 Tel: 604.601.3651 April 10, 2017 Spanish Mountain Gold Announces Results of New PEA for the First Zone VANCOUVER, B.C. Spanish Mountain
More informationPETROPAVLOVSK PLC FY 2017 Results Presentation 28 March 2018
PETROPAVLOVSK PLC FY 2017 Results Presentation 28 March 2018 Cautionary and Forward-looking Statements Some statements contained in this presentation or in documents referred to in it are or may be forward-looking
More informationAvocet Mining. Annual General Meeting. 2 nd May 2013
Avocet Mining Annual General Meeting 2 nd May 2013 Page 1 Quality portfolio of assets Inata Gold Mine o Producing mine with significant exploration potential o Inata cashflows strengthened following reprofiled
More informationFor personal use only
INDEPENDENCE GROUP NL PETER BRADFORD, MANAGING DIRECTOR AND CEO Australian Nickel Conference 20 October 2016 Cautionary statements & disclaimer This presentation has been prepared by Independence Group
More informationDetour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance
January 16, 2018 NEWS RELEASE Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) today announces fourth
More informationRESERVES of 700,000 ounces Gold (43-101) RESOURCES of 4.2 million ounces Gold (43-101) 25 th February 2013 Annual General Meeting
RESERVES of 700,000 ounces Gold (43-101) RESOURCES of 4.2 million ounces Gold (43-101) 25 th February 2013 Annual General Meeting www.vatukoulagoldmines.com info@vgmplc.com +44(0)207 440 0643 DISCLAIMER
More informationI N V E S T O R P R E S E N T A T I O N
I N V E S T O R P R E S E N T A T I O N 0 8. 1 4 DISCLAIMER AND OTHER MATTERS SAFE HARBOR: Some statements contained in this presentation are forward-looking statements within the meaning of the Private
More informationRBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015
RBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015 Cautionary Statement This presentation may contain forward-looking statements within the meaning of
More informationCorporate Presentation December 5, 2017
Corporate Presentation December 5, 2017 Cautionary Statements Cautionary Note Regarding Forward Looking Statements: Statements made regarding matters which are not historical facts, such as statements
More informationAfrica Projects February 2016
Africa Projects Cautionary statement Cautionary statement regarding forward looking statements: This presentation contains forward-looking statements within the meaning of Section 27A of the Securities
More information1 NYSE: GSS TSX: GSC. Focused on Cash Flow Generation
1 NYSE: GSS Focused on Cash Flow Generation Disclaimer SAFE HARBOUR: Some statements contained in this presentation are forward-looking statements or forward-looking information (collectively, forward-looking
More informationFIRST MAJESTIC SILVER CORP.
FIRST MAJESTIC SILVER CORP. Suite 1800 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail:
More informationTSX:AR CORPORATE PRESENTATION
TSX:AR CORPORATE PRESENTATION Second Quarter 2018 Conference Call August 10, 2018 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information
More informationCANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER Second Quarter 2018 Results Conference Call & Webcast July 26, 2018 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking
More informationCANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER 2019 Guidance Conference Call & Webcast January 23, 2019 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking information
More informationAcacia Mining plc Bank of America Merrill Lynch Global Metals and Mining Conference
Acacia Mining plc Bank of America Merrill Lynch Global Metals and Mining Conference Important Notice This presentation includes forward-looking statements that express or imply expectations of future events
More informationCorporate Presentation March 1, 2017
Corporate Presentation March 1, 2017 DISCLAIMER This presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking
More informationKINROSS GOLD CORPORATION Q Results Conference Call & Webcast
November 3 2016 KINROSS GOLD CORPORATION Q3 2016 Results Conference Call & Webcast 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained
More informationCANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER Fourth Quarter and Year-End 2017 Results Conference Call & Webcast March 9, 2018 1 Forward Looking Information This presentation contains certain forward-looking information
More informationMAG Silver Reports Juanicipio Updated PEA Study Prepared by AMC
#770 800 West Pender Street Vancouver, BC V6C 2V6 P: 604-630-1399 F: 604-681-0894 MAG Silver Corp. June 14, 2012 For Immediate Release NR#12-07 MAG Silver Reports Juanicipio Updated PEA Study Prepared
More informationDetour Gold Announces 2016 Operating Results and 2017 Guidance
January 30, 2017 NEWS RELEASE Detour Gold Announces 2016 Operating Results and 2017 Guidance Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) today announces fourth quarter and full year
More informationCANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER European Gold Forum Zurich April 4-6, 2017 1 Forward Looking Information This presentation contains certain forward-looking information and forward-looking statements,
More informationQ4 and Year End 2012 Conference Call. ArgonautGold.com
Q4 and Year End 2012 Conference Call Forward Looking Statement FORWARD LOOKING INFORMATION ALL MONETARY AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED This document contains certain forward-looking statements
More informationBoto Gold Project Feasibility Study Conference Call
Boto Gold Project Feasibility Study Conference Call October 23, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including
More informationCorporate Presentation. June 2015
Corporate Presentation June 2015 FORWARD LOOKING INFORMATION This investor presentation contains certain statements, which may constitute forward-looking information under Canadian securities law requirements
More informationHalf Year Financial Results December 2008
Half Year Financial Results December 2008 Ian Smith MD & CEO Greg Robinson Director Finance Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements
More informationAGNICO EAGLE MINES, LTD MEXICO. Chihuahua, Chih. Sept 13 rd, 2012.
AGNICO EAGLE MINES, LTD MEXICO Chihuahua, Chih. Sept 13 rd, 2012. Forward Looking Statements The information in this document has been prepared as at September 18, 2012. Certain statements contained in
More informationCONDOR GOLD. Mines and Money Conference. 1 st to 3 rd December 2015 CONDOR GOLD PLC
CONDOR GOLD Mines and Money Conference 1 st to 3 rd December 2015 DISCLAIMER This written presentation (the "Slides") has been prepared by Condor Gold plc (the "Company"). The Slides are the sole responsibility
More informationAGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012
AGNICO-EAGLE MINES LIMITED Corporate Update May 2012 Forward Looking Statements The information in this document has been prepared as at May 16, 2012. Certain statements contained in this document constitute
More information1. Based on the assumption of foreign exchange rate of 60 roubles per dollar
Total gold output declined by 7% q-o-q to 640 koz. The Company sold a total of 644 koz of gold, down 8% q-o-q. Revenue totaled $774 mln, down 7% q-o-q, reflecting seasonally lower sales from alluvials
More informationCorporate Update New York August 2013
Corporate Update New York August 2013 FORWARD LOOKING STATEMENTS The information in this document has been prepared as at August 23, 2013. Certain statements contained in this document constitute forwardlooking
More informationCompany Announcements Office. Date: 25 February 2019
To: From: Company Announcements Office Francesca Lee Date: 25 February 2019 Subject: BMO Conference Attached for release to the market is a presentation to be given by the Managing Director and Chief Executive
More informationMEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)
MEDIA RELEASE 26 June 2017 OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation (TSX/ASX: OGC) (the
More informationJohn A. McCluskey President and Chief Executive Officer
John A. McCluskey President and Chief Executive Officer Annual Meeting of Shareholders May 28, 204 2 Cautionary Notes Cautionary Notes No stock exchange, securities commission or other regulatory authority
More informationNOW IN COMMERCIAL PRODUCTION
NYSE American USAS TSX USA NOW IN COMMERCIAL PRODUCTION Corporate Presentation March 2018 PDAC FORWARD-LOOKING STATEMENTS Safe Harbour and Other Disclosures Certain information in this presentation may
More informationQ4 and Full Year 2017 Results
The leading high grade gold producer in Colombia Q4 and Full Year 2017 Results Lombardo Paredes Arenas, CEO Mike Davies, CFO 1 DISCLAIMER Forward Looking Statements This presentation contains "forward
More informationMarigold Life of Mine Plan
Marigold Life of Mine Plan October 7, 2014 SSRI:NDAQ SSO: TSX 1 Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains forward-looking statements within the meaning
More informationQ Financial Results
LEAGOLD MINING IS BUILDING A NEW MID-TIER GOLD PRODUCER FOCUSED ON LATIN AMERICA Q3 2017 Financial Results November 14 2017 TSX: LMC OTCQX: LMCNF www.leagold.com Disclaimer This presentation contains "forward-looking
More informationScotiabank Mining Conference. December 3, 2014
Scotiabank Mining Conference December 3, 2014 Cautionary Notes NON-GAAP MEASURE CASH COSTS PER OUNCE, NET OF BY-PRODUCT CREDITS THIS PRESENTATION PRESENTS INFORMATION ABOUT OUR CASH COSTS OF PRODUCTION
More informationSECOND QUARTER 2018 RESULTS. August 10, 2018
SECOND QUARTER 2018 RESULTS August 10, 2018 FORWARD LOOKING STATEMENTS Certain statements and information contained in this presentation constitute forward-looking statements within the meaning of applicable
More informationMANAGEMENT S DISCUSSION AND ANALYSIS FOR THE THIRD QUARTER ENDED SEPTEMBER 30, 2015
MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE THIRD QUARTER ENDED SEPTEMBER 30, 2015 As of November 9, 2015 Management s discussion and analysis ( MD&A ) is intended to help the reader understand the significant
More informationKINROSS GOLD CORPORATION
April 1 2014 KINROSS GOLD CORPORATION Results of the Tasiast feasibility study 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained
More informationEndeavour Mining. Q4 and Full Year 2015 Results CREATING A PREMIER AFRICAN GOLD PRODUCER
Endeavour Mining Q4 and Full Year 2015 Results Disclaimer & Forward Looking Statements Cash cost per ounce and all-in sustaining cash cost per ounce are non-gaap performance measures with no standard meaning
More informationCôté Gold Analyst Site Visit
Côté Gold Analyst Site Visit September 15, 2018 l TSX: IMG l NYSE: IAG l Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information
More informationHOCHSCHILD MINING Denver Gold Forum September 2014
HOCHSCHILD MINING Denver Gold Forum 14-17 September 2014 DISCLAIMER Some statements contained in this presentation or in documents referred to in it are or may be forward-looking statements. Actual results
More informationEl Compas is scheduled to achieve commercial production by the end of July 2018
NEWS RELEASE Endeavour Silver Provides 2018 Production and Cost Guidance, Targeting 20% Increase in Production to 5.8-6.4 Million oz Silver and 58-64,000 oz Gold for 10.2-11.2 Million oz Silver Equivalent
More informationManagement s Discussion and Analysis for the year ended December 31, 2015
Management s Discussion and Analysis for the year ended December 31, 2015 TABLE OF CONTENTS Introduction... 3 Core Business and Strategy... 4 2015 Highlights and Key Notes... 5 2016 Operating Outlook...
More informationNEWS RELEASE GREAT PANTHER SILVER REPORTS THIRD QUARTER 2018 PRODUCTION RESULTS AND PROVIDES CORPORATE UPDATE
October 12, 2018 For Immediate Release TSX: GPR NYSE American: GPL NEWS RELEASE GREAT PANTHER SILVER REPORTS THIRD QUARTER 2018 PRODUCTION RESULTS AND PROVIDES CORPORATE UPDATE GREAT PANTHER SILVER LIMITED
More informationTOREX GOLD RESOURCES INC. MANAGEMENT S DISCUSSION AND ANALYSIS
TOREX GOLD RESOURCES INC. MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2017 This management s discussion and analysis of the financial condition and results of operations ( MD&A
More informationCANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2018 Results Conference Call & Webcast October 25, 2018 1 Cautionary Statement on Forward Looking Information This presentation contains certain forward-looking
More informationBellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia
Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia PEA Study Highlights La Mina as One of the Lowest Cost Gold Development
More informationAvocet Mining Full Year Results. 6 th March 2014
Avocet Mining 2013 Full Year Results 6 th March 2014 Page 1 Quality assets in a highly prospective region Inata Gold Mine o o o Producing mine with significant exploration potential Cash generative asset
More informationCorporate Presentation
Corporate Presentation MAY 24, 2017 W W W. G R E A T P A N T H E R. C O M Disclaimer This presentation contains forward-looking statements within the meaning of the United States Private Securities Litigation
More informationThe Syama Transformation Story
The Syama Transformation Story Mine Gold. Create Value. Ms Lee-Anne de Bruin, Chief Financial Officer JP Morgan Australian Gold Forum September 2018 Important Notices and Disclaimers This presentation
More informationAfrican Barrick Gold. Q Results Presentation 23 rd October 2014
African Barrick Gold Q3 2014 Results Presentation 23 rd October 2014 Disclaimer Important Notice This presentation and the information contained herein is for information purposes only and does not constitute
More information1 NYSE: GSS TSX: GSC. Creating a leading African gold producer
1 NYSE: GSS Creating a leading African gold producer Disclaimer SAFE HARBOUR: Some statements contained in this presentation are forward -looking statements or forward-looking information (collectively,
More informationTECHNICAL PRESENTATION MARCH 2014
TECHNICAL PRESENTATION MARCH 2014 1 FORWARD LOOKING STATEMENTS This presentation contains certain statements that constitute forward-looking information within the meaning of applicable securities laws
More informationRNC MINERALS. Q Results Conference Call TSX:RNX. November 15, 2017
RNC MINERALS Q3 2017 Results Conference Call November 15, 2017 TSX:RNX Disclaimer Cautionary Statements Concerning Forward-Looking Statements This presentation provides certain financial measures that
More informationForward Looking Statement
Certej Project Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities
More informationExeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides
For Immediate Release: NR 17-01 Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides Vancouver, B.C., January 17, 2017: Exeter Resource Corporation (NYSE-MKT:XRA,
More informationRNC MINERALS Results Conference Call TSX:RNX. April 3, 2018
RNC MINERALS 2017 Results Conference Call April 3, 2018 TSX:RNX Disclaimer Cautionary Statements Concerning Forward-Looking Statements This presentation provides certain financial measures that do not
More informationBank of America Merrill Lynch Global Metals, Mining & Steel Conference. Iván Arriagada CEO Antofagasta Minerals 12 May 2015
Bank of America Merrill Lynch Global Metals, Mining & Steel Conference Iván Arriagada CEO Antofagasta Minerals 12 May 2015 Cautionary statement This presentation has been prepared by Antofagasta plc. By
More informationDetour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018
NEWS RELEASE Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018 April 26, 2018 Detour Gold Corporation (TSX: DGC) ( Detour Gold
More informationTSX:AR. Corporate Presentation. June 1, 2017
TSX:AR Corporate Presentation June 1, 2017 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking statements and forward-looking information under applicable Canadian securities
More informationAchieving Transformational Growth
HOCHSCHILD MINING Achieving Transformational Growth Annual Results 2015 9 March 2016 DISCLAIMER Some statements contained in this presentation or in documents referred to in it are or may be forward-looking
More informationCapstone Mining 2017 Production Results and 2018 Operating and Capital Guidance
Suite 2100 510 West Georgia Street Vancouver, BC, V6B 0M3, Canada Tel: 604-684-8894 Fax: 604-688-2180 www.capstonemining.com January 10, 2018 Capstone Mining 2017 Production Results and 2018 Operating
More informationHochschildMining plc. Merrill Lynch Canada Conference. 8 September 2011
HochschildMining plc Merrill Lynch Canada Conference 8 September 2011 Disclaimer Some statements contained in this presentation or in documents referred to in it are or may be forwardlooking statements.
More informationCAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION
September 2013 KINROSS GOLD CORPORATION BANK OF AMERICA MERRILL LYNCH CANADA MINING CONFERENCE 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical
More informationThe Turnaround Continues. Value Over Volume
The Turnaround Continues Value Over Volume Doray Minerals Limited Investor Update August 2017 Disclaimer This presentation has been prepared by Doray Minerals Limited ( Doray ) to provide an update regarding
More informationKINROSS GOLD CORPORATION Q Results Conference Call & Webcast
November 9 2017 KINROSS GOLD CORPORATION Q3 2017 Results Conference Call & Webcast 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained
More information