A MOVING TARGET: THE RHI RESET AND TARIFF GUARANTEE

Size: px
Start display at page:

Download "A MOVING TARGET: THE RHI RESET AND TARIFF GUARANTEE"

Transcription

1 A MOVING TARGET: THE RHI RESET AND TARIFF GUARANTEE

2 Introduction You may remember, back in the mists of time, that the Government announced a raft of changes to the Renewable Heat Incentive scheme (the RHI ). The changes were intended to be implemented in spring 2017, then in autumn 2017, and then in early New RHI regulations were finally laid before Parliament on 7 February 2018, only to be replaced with a superseding draft, laid before Parliament on 19 March The implementation date for the changes to the scheme has been a moving target. However, it looks as if we can now pin down a date. The new regulations published on 19 March are subject to the affirmative procedure (a procedure by which legislation must be actively approved by both Houses of Parliament). Legislation subject to affirmative procedure is typically approved by Parliament in 6 to 8 weeks. The regulations have now been debated in the House of Commons and all that remains is a similar debate in the House of Lords. So it looks like we can expect an implementation date in May. Time-line to a Tariff guarantee You do however receive the tariff applicable on the date of issue of the provisional TG notice you can therefore financially close the project knowing the tariff to which you are entitled. We therefore envisage a project development time-line similar to the example set out in the box Time-line to a Tariff Guarantee. Agree draft agreements Submit application for TG Ofgem allocates provisional TG It s important to monitor this date as applications for the tariff guarantee open at 10am on the day the new RHI regulations come into force. The regulations reset the tariffs to June 2016 levels (inflation adjusted) and make a number of changes, one of which is the introduction of the tariff guarantee (TG). Achieve financial close 3 Weeks There are a number of elements to the TG, which are essential to understand, if you are to secure its benefits. Tariff guarantees Tariff guarantees will apply to a number of technologies including biomass (>1MW), biogas (>600kW), new solid biomass CHP and biomethane. The TG is a welcome addition for the industry, as it provides certainty of both eligibility and tariff. There are a number of elements to the TG, which are essential to understand, if you are to secure its benefits. The most important element is that you will have only a three week period to reach financial close once your application for a TG has been approved. You must therefore be in the advanced stages of the development of your project, including having advanced the draft documentation to agreement, or at least very close to it. Submit evidence of financial close Ofgem allocates full TG Build and commission plant Ofgem accredits plant with TG By deadline date

3 What do you need to apply for a TG? This is not a full list but some of the information which will be required includes: Source of energy and technology. The expected commissioning date or, for biomethane projects, the date of commencement of injection. The estimated annual production of the expected capacity of the plant. For CHP, the expected power efficiency. What is required to achieve financial close? A tariff guarantee will only be allocated if the applicant provides evidence of financial close no later than 3 weeks after the date on which Ofgem issues the provisional TG notice. This is important if evidence is not provided on time the provisional TG will lapse, and you will need to submit a fresh application for a new provisional TG. The new RHI regulations define financial close as the date on which the applicant has entered into all financing agreements in relation to all the funding required for the construction of the proposed plant, or the production and injection of biomethane (our emphasis). Ofgem has issued guidance, which described what is required, as well as detailed information on budget availability (Guide to Tariff Guarantees). The Guidance states that, in order to demonstrate evidence of financial close, evidence of two main points will be required. First, that funds are available to cover the complete construction of the project and, second, that these funds are formally committed to the project. For non-biomethane plants, evidence of the proposed heat use. Evidence of grant of planning permission. For biomethane plants, evidence of a signed connection agreement. Ofgem may also request any further information which they think is relevant to the application.

4 Ofgem also require that financial close is verified by a report from an independent auditor appointed by the developer. The report must confirm that the information submitted in respect of financial close is valid, that funds are available, that they are committed to the project, and any caveats to these confirmations. It must be provided by a non-connected person, but there is no guidance as to the form of the report beyond that described above. It is not entirely clear to us that the two approaches are consistent and what they actually mean in practice. This is best illustrated by taking examples of two different funding structures. "They offered excellent advice on renewables with access to all areas of the firm when required, and adopted a very commercial and pragmatic attitude." Chambers UK, 2018 Project finance structure. In this structure you would expect to see a single purpose project vehicle, funded by debt and equity. It is reasonably clear how the wording in the RHI regulations apply financing agreements will cover any share subscription agreements and loan agreements. Signed copies of all such agreements will require to be submitted to Ofgem. It is clear from Ofgem s reference to formally committed that evidence of authority to enter into the agreements will also be needed i.e. board minutes of the applicant. It may also require a copy of a credit or investment committee approval by the provider of funds. Two main questions arise. One, how do you demonstrate you have financing for all the funding required? Developers are not required to submit a cost estimate at the application stage. Do you need to submit copies of all supply and installation contracts to demonstrate the cost of construction? Or will a reasonable cost estimate suffice? Two, can the financing agreements remain subject to conditions precedent? The RHI regulations refer only to entered into which suggests that a signed agreement is all that is required. Ofgem s use of the word available may suggest that Ofgem interprets the requirement more strictly. However, we are of the view that the word available is consistent with appropriately worded conditions precedent, and we consider the wording of the RHI regulations permits such conditions precedent. Corporate finance structure. In this structure, you may have an applicant which is a trading entity, which either has funds available in its bank accounts or has a corporate credit line. The RHI regulations refer to agreements which suggests counter-intuitively that providing evidence of the funds sitting in your bank account does not demonstrate evidence of financial close. Ofgem s guidance suggests they may accept evidence, not of agreements, but of the availability and commitment of funds to the project. This suggests evidence of funds plus a board minute authorising that the applicant to sign the supply and installation contracts may be sufficient. However, it remains hard to reconcile this with the wording of the RHI regulations. If necessary, we believe there is a reasonably straightforward structural fix. Commissioning deadline Applicants must provide an estimated commissioning (or biomethane injection) date. To receive the tariff guarantee, applicants must commission their plant within 183 days of the estimated date, and by 31 January 2020 at the latest. Note the 183 day period is not quite the same thing as saying 6 months you can t just take the corresponding day 6 months ahead as the deadline date.

5 If the estimated date is not met, ofgem has the power to revoke the TG. Applicants have a free choice as to the estimated date they provide in their application and can therefore mitigate this risk by choosing a conservative date. However, choosing a later date comes with a trade-off the plant would not be eligible to receive payments for the period before estimated date, even if commissioned in advance. Ofgem s guidance suggests they may accept evidence, not of agreements, but of the availability and commitment of funds to the project. You must also commission a plant which is the same as the plant described in your application. There is some flexibility (for example, actual capacity can be +/- 10% of the estimated capacity) and the rules clearly set out the changes which are not permitted, providing certainty on what is required to achieve the TG. Key contacts Keith Patterson CO-HEAD OF RENEWABLES Energy +44 (0) keith.patterson@brodies.com Join the conversation at brodies.com/blog/renewables Ali Rimell MANAGING ASSOCIATE Renewable Energy +44 (0) ali.rimell@brodies.com

6 brodies.com

The Renewable Heat Incentive. A reformed and refocussed scheme SVT Response

The Renewable Heat Incentive. A reformed and refocussed scheme SVT Response The Renewable Heat Incentive A reformed and refocussed scheme SVT Response Neil Liddell-Young 27 th April 2016 No. Question Response 1 Do you agree with the proposed policy approach for degression and

More information

TNUoS Tariffs in 10 minutes March 2018

TNUoS Tariffs in 10 minutes March 2018 TNUoS s in 10 minutes March 2018 An overview of TNUoS tariffs This information paper provides an overview of National Grid s Transmission Network Use of System (TNUoS) tariffs, applicable to transmission

More information

CMA Report and Summer Budget Implications for the UK energy sector July 2015

CMA Report and Summer Budget Implications for the UK energy sector July 2015 CMA Report and Summer Budget 2015 Implications for the UK energy sector July 2015 Two announcements this week are likely to have big implications for the way the UK energy market evolves over the next

More information

2014 No ENERGY. The Domestic Renewable Heat Incentive Scheme Regulations 2014

2014 No ENERGY. The Domestic Renewable Heat Incentive Scheme Regulations 2014 These draft Regulations supersede the draft Domestic Renewable Heat Incentive Scheme Regulations 2014 laid before Parliament on 11th February 2014 and are being issued free of charge to all known recipients

More information

Domestic Renewable Heat Incentive (RHI) Frequently Asked Questions

Domestic Renewable Heat Incentive (RHI) Frequently Asked Questions Domestic Renewable Heat Incentive (RHI) Frequently Asked Questions Contents Application questions...3 1. How do I apply for the Domestic RHI?... 3 2. Can I apply for the Domestic RHI if I live in Northern

More information

The Renewable Heat Incentive: a reformed and refocused scheme

The Renewable Heat Incentive: a reformed and refocused scheme The Renewable Heat Incentive: a reformed and refocused scheme Response by the Council of Mortgage Lenders to the Department of Energy and Climate Change (DECC) consultation paper Introduction 1. The CML

More information

Downing Renewables EIS. Half-Yearly Report for the six months ended 30 September 2014

Downing Renewables EIS. Half-Yearly Report for the six months ended 30 September 2014 Downing EIS Half-Yearly Report for the six months ended 30 September 2014 About the Service Introduction Downing EIS initially launched in September 2012 to provide investors with access to investments

More information

WRITTEN AGREEMENT BETWEEN THE FINANCE COMMITTEE AND THE SCOTTISH GOVERNMENT ON THE BUDGET PROCESS IN SESSION 4 OF THE SCOTTISH PARLIAMENT

WRITTEN AGREEMENT BETWEEN THE FINANCE COMMITTEE AND THE SCOTTISH GOVERNMENT ON THE BUDGET PROCESS IN SESSION 4 OF THE SCOTTISH PARLIAMENT WRITTEN AGREEMENT BETWEEN THE FINANCE COMMITTEE AND THE SCOTTISH GOVERNMENT ON THE BUDGET PROCESS IN SESSION 4 OF THE SCOTTISH PARLIAMENT Introduction 1. The Finance Committee recommended in its legacy

More information

The UK's policy proposal for a small emitter and hospital opt out from the EU ETS according to Article 27, as notified to the European Commission

The UK's policy proposal for a small emitter and hospital opt out from the EU ETS according to Article 27, as notified to the European Commission The UK's policy proposal for a small emitter and hospital opt out from the EU ETS according to Article 27, as notified to the European Commission 19 December 2011 2 The UK's policy proposal for a small

More information

Introduction to the CFD. James Rushton Head of Commercial LCCC 1 December 2016

Introduction to the CFD. James Rushton Head of Commercial LCCC 1 December 2016 Introduction to the CFD James Rushton Head of Commercial LCCC 1 December 2016 Disclaimer This presentation (including all content, whether oral or in writing) has been prepared for the exclusive use and

More information

Pension Protection Fund announces 2009/10 levy proposals

Pension Protection Fund announces 2009/10 levy proposals 2nd October 2008 Issue No: 41 Pensions Bulletin Pension Protection Fund 2008/09 invoices issued The Pension Protection Fund (PPF) has announced that schemes will be receiving their 2008/09 pension protection

More information

5% - if the local component is from. NSS introduction date From 01 January 2025 From 01 January 2020 Entities obliged to participate in the auctions

5% - if the local component is from. NSS introduction date From 01 January 2025 From 01 January 2020 Entities obliged to participate in the auctions Main differences of the draft laws alternative to the draft law On Amendments to Certain s of Ukraine on the Development of Competitive Electricity Production from Alternative Energy Sources (reg. No.

More information

Incorporation of physical securities into the bookentry

Incorporation of physical securities into the bookentry Incorporation of physical securities into the bookentry system Decision of Euroclear Finland s CEO To: Issuers Account operators Issuer agents Reference to the Rules: 2.2.46, 2.2.49, 3.1.37 and 3.2.2 Ratified:

More information

House of Commons, Committee Office 14 Tothill Street, London SW1H 9NB

House of Commons, Committee Office 14 Tothill Street, London SW1H 9NB Treasury Committee House of Commons, Committee Office 14 Tothill Street, London SW1H 9NB Tel 020 7219 5769 Fax 020 7219 2069 Email treascom@parliament.ukwebsitewww.parliament.uk/treascom John Cullinane

More information

Provisional Local Government Finance Settlement 2017/18

Provisional Local Government Finance Settlement 2017/18 Provisional Local Government Finance Settlement 2017/18 Purpose of report For information and direction. Summary This paper reports on LGA activity on the provisional 2017/18 Local Government Finance Settlement,

More information

RELATED PARTY TRANSACTIONS PROCEDURE

RELATED PARTY TRANSACTIONS PROCEDURE RELATED PARTY TRANSACTIONS PROCEDURE Approved by the Board of Directors of LU-VE S.p.A. on 3 May 2017, subordinate to and effective from the first day of trading of the Company s ordinary shares and warrants

More information

WRITTEN SUBMISSION TO THE HMRC BUSINESS INTERNATIONAL TAX TREATY TEAM ON THE ANNUAL REVIEW OF DOUBLE TAXATION TREATIES

WRITTEN SUBMISSION TO THE HMRC BUSINESS INTERNATIONAL TAX TREATY TEAM ON THE ANNUAL REVIEW OF DOUBLE TAXATION TREATIES TAXREP 18/09 DOUBLE TAXATION AGREEMENTS WRITTEN SUBMISSION TO THE HMRC BUSINESS INTERNATIONAL TAX TREATY TEAM ON THE ANNUAL REVIEW OF DOUBLE TAXATION TREATIES 2009-10 Contents Introduction Strategic Issues

More information

The Domestic Renewable Heat Incentive Scheme Regulations (Northern Ireland) 2014

The Domestic Renewable Heat Incentive Scheme Regulations (Northern Ireland) 2014 STATUTORY RULES OF NORTHERN IRELAND 2014 No. 301 ENERGY The Domestic Renewable Heat Incentive Scheme Regulations (Northern Ireland) 2014 Laid before the Assembly in draft Made - - - - 8th December 2014

More information

Changing FiT Payment Details

Changing FiT Payment Details Changing FiT Payment Details In order for us to deliver a quick and effective service that is simple for you, our FiT scheme will make payments directly into your bank account. Using the boxes below, please

More information

BRODIES BREXIT GUIDE. FINANCIAL SERVICES AND BREXIT

BRODIES BREXIT GUIDE. FINANCIAL SERVICES AND BREXIT BRODIES BREXIT GUIDE. FINANCIAL SERVICES AND BREXIT What might Brexit mean for financial services? On 29 March 2017 the UK s Article 50 Notice was delivered to the European Council in Brussels, triggering

More information

Audit Committees in Common. NHS Leeds North CCG, NHS Leeds South and East CCG and NHS Leeds West CCG. Terms of Reference

Audit Committees in Common. NHS Leeds North CCG, NHS Leeds South and East CCG and NHS Leeds West CCG. Terms of Reference Appendix 2 DRAFT Audit Committees in Common NHS Leeds North CCG, NHS Leeds South and East CCG and NHS Leeds West CCG Terms of Reference Version: 6.0 Approved by: NHS Leeds North Clinical Commissioning

More information

Timing of the Draft Scottish Budget 2017/18

Timing of the Draft Scottish Budget 2017/18 Timing of the Draft Scottish Budget 2017/18 Introduction The Draft Scottish Budget is presented to parliament in September, allowing adequate time for parliamentary scrutiny before the start of the financial

More information

ELECTRICITY MARKET REFORM Comparing Contracts for Difference to the Renewables Obligation

ELECTRICITY MARKET REFORM Comparing Contracts for Difference to the Renewables Obligation ELECTRICITY MARKET REFORM Comparing Contracts for Difference to the Renewables Obligation An analysis undertaken for Scottish Renewables Updated to take account of the Draft CfD 5 September 2013 1 Introduction

More information

Checklist for PV Installations Feb 2012

Checklist for PV Installations Feb 2012 Checklist for PV Installations Feb 2012 Installation of Solar Photovoltaic systems (PV) can generate an income in the form of the Feed In Tariff, which is paid for every kwh generated, plus a separate

More information

Feed in Tariff (FIT) Terms and Conditions

Feed in Tariff (FIT) Terms and Conditions Feed in Tariff (FIT) Terms and Conditions 1. Definitions The following definitions shall apply: Accreditation means the process of accreditation via either the MCS or ROO-FIT route and Accredited shall

More information

How to get a CfD: Allocation Process and the Transition from the RO 11/06/14

How to get a CfD: Allocation Process and the Transition from the RO 11/06/14 How to get a CfD: Allocation Process and the Transition from the RO 11/06/14 Agenda 1. EMR objectives and the CfD instrument 2. CfD supported by a robust legislative architecture 3. Already attracting

More information

Domestic Feed in Tariff (FIT) Terms and Conditions

Domestic Feed in Tariff (FIT) Terms and Conditions Domestic Feed in Tariff (FIT) Terms and Conditions 1. Definitions The following definitions shall apply: Accreditation means the process of accreditation via either the MCS or ROO-FIT route and Accredited

More information

PENSIONS ACT 2004 RESTRICTIONS ON LUMP SUM DEATH BENEFITS

PENSIONS ACT 2004 RESTRICTIONS ON LUMP SUM DEATH BENEFITS Pensions Bulletin Number 2006/27 6th July 2006 PENSIONS ACT 2004 RESTRICTIONS ON LUMP SUM DEATH BENEFITS The Pensions Regulator has confirmed that occupational pension schemes may no longer be able to

More information

EUROPEAN PARLIAMENT WORKING DOCUMENT. Committee on Budgetary Control

EUROPEAN PARLIAMENT WORKING DOCUMENT. Committee on Budgetary Control EUROPEAN PARLIAMT 2004 ««««««««««««Committee on Budgetary Control 2009 22.2.2005 WORKING DOCUMT on amendments to the Internal Rules on the implementation of the Budget of the European Parliament Committee

More information

COUNCIL DECISION of 10 December 2010 on State aid to facilitate the closure of uncompetitive coal mines

COUNCIL DECISION of 10 December 2010 on State aid to facilitate the closure of uncompetitive coal mines L 336/24 Official Journal of the European Union 21.12.2010 DECISIONS COUNCIL DECISION of 10 December 2010 on State aid to facilitate the closure of uncompetitive coal mines (2010/787/EU) THE COUNCIL OF

More information

Terms and Conditions:

Terms and Conditions: Terms and Conditions: Please read all our terms and conditions carefully and ensure you fully understand your commitment towards us. If you have any questions regarding our terms and conditions, please

More information

ISA 805 (Revised), Engagements to Report on Summary Financial Statements

ISA 805 (Revised), Engagements to Report on Summary Financial Statements International Auditing and Assurance Standards Board Exposure Draft July 2007 Comments are requested by November 30, 2007 Proposed Redrafted International Standard on Auditing ISA 805 (Revised), Engagements

More information

First Utility Feed-in Tariffs v3

First Utility Feed-in Tariffs v3 Feed-In Tariff Statement of Terms Please read these terms carefully 1 Definitions Accreditation MCS Microgeneration Certification Scheme, which certifies Microgeneration products and installers in accordance

More information

Response to the Commission s proposal for a multi-annual plan for the North Sea COM (2016) 493 Final 27th of September 2016

Response to the Commission s proposal for a multi-annual plan for the North Sea COM (2016) 493 Final 27th of September 2016 Response to the Commission s proposal for a multi-annual plan for the North Sea COM (2016) 493 Final 27th of September 2016 SUMMARY Pew welcomes the Commission s proposal for a multi-annual plan (MAP)

More information

COMMISSION DELEGATED REGULATION (EU) /... of

COMMISSION DELEGATED REGULATION (EU) /... of EUROPEAN COMMISSION Brussels, 30.10.2015 C(2015) 7554 final COMMISSION DELEGATED REGULATION (EU) /... of 30.10.2015 amending Delegated Regulation (EU) No 110/2014 on the model financial regulation for

More information

Corporate Finance. Empowering your business. A Strong Company

Corporate Finance. Empowering your business. A Strong Company Corporate Finance Empowering your business. A Strong Company Corporate Finance Who We Are? Strong Corporate Finance Ltd is part of the prestigious Strong Energy Group of Companies which includes; Wood

More information

Brexit update: Theresa May s biggest test yet?

Brexit update: Theresa May s biggest test yet? Economic and Financial Analysis Article Global Economics Brexit update: Theresa May s biggest test yet? The UK Prime Minister faces a series of challenging parliamentary votes on her plan to leave the

More information

Liechtenstein Law Gazette

Liechtenstein Law Gazette Liechtenstein Law Gazette 951.30 Year 2005 No. 156 published on 9 August 2005 Law of 19 May 2005 on Investment Undertakings (Investment Undertakings Act, IUA) I hereby grant my consent to the following

More information

2. APPLICABILITY AND SCOPE

2. APPLICABILITY AND SCOPE ANNEXURE- I MODEL PROCEDURE / GUIDELINES FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT OR DISTRIBUTION LICENSEE, AS THE CASE MAY BE, UNDER REC MECHANISM BY STATE AGENCY 1. OBJECTIVE 1.1. This

More information

Update from Ofgem E-Serve

Update from Ofgem E-Serve Update from Ofgem E-Serve ALEO SE Autumn Meeting 12 October Mark Jenner Communications and stakeholder manager, EESP Some background. Ofgem is the independent energy regulator for Great Britain. Its priority

More information

Implementation of AIFMD in the Netherlands

Implementation of AIFMD in the Netherlands Implementation of AIFMD in the Netherlands June 2013 This newsletter contains an update on the implementation status and current developments concerning the Alternative Investment Fund Management Directive

More information

2. APPLICABILITY AND SCOPE

2. APPLICABILITY AND SCOPE ANNEXURE- I MODEL PROCEDURE / GUIDELINES FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT OR DISTRIBUTION LICENSEE, AS THE CASE MAY BE, UNDER REC MECHANISM BY STATE AGENCY 1. OBJECTIVE 1.1. This

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 22.5.2018 COM(2018) 312 final 2018/0158 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the apportionment of tariff rate quotas included in

More information

Introductory Module to Economics of Ageing

Introductory Module to Economics of Ageing Introductory Module to Economics of Ageing The Budget Cycle Economic Research Institute of Northern Ireland Jose Luis Iparraguirre March 2010 Jose L. Iparraguirre (ERINI) Economics of Ageing - The Budget

More information

Financial Services (Implementation of Legislation) Bill [HL]

Financial Services (Implementation of Legislation) Bill [HL] Financial Services (Implementation of Legislation) Bill [HL] EXPLANATORY NOTES Explanatory notes to the Bill, prepared by HM Treasury, are published separately as HL Bill 143 EN. EUROPEAN CONVENTION ON

More information

UK Government Budget 2018

UK Government Budget 2018 UK Government Budget 2018 October 2018 On 29 th October 2018, Chancellor of the Exchequer Phillip Hammond MP delivered his final scheduled budget ahead of the United Kingdom leaving the European Union.

More information

Solvency II Detailed guidance notes

Solvency II Detailed guidance notes Solvency II Detailed guidance notes March 2010 Section 8 - supervisory reporting and disclosure Section 8: reporting and disclosure Overview This section outlines the Solvency II requirements for supervisory

More information

HMRC TO REQUIRE ACCELERATED TAX PAYMENTS FROM CERTAIN TAXPAYERS SUBJECT TO ENQUIRY

HMRC TO REQUIRE ACCELERATED TAX PAYMENTS FROM CERTAIN TAXPAYERS SUBJECT TO ENQUIRY HMRC TO REQUIRE ACCELERATED TAX PAYMENTS FROM CERTAIN TAXPAYERS SUBJECT TO ENQUIRY Tolley Guidance 14 th February 2014 Tolley Guidance takes every care when preparing this material. However, no responsibility

More information

HOW TO MANAGE YOUR PENSION ONLINE ALL YOU NEED TO KNOW ABOUT ONLINE MEMBER SERVICES

HOW TO MANAGE YOUR PENSION ONLINE ALL YOU NEED TO KNOW ABOUT ONLINE MEMBER SERVICES HOW TO MANAGE YOUR PENSION ONLINE ALL YOU NEED TO KNOW ABOUT ONLINE MEMBER SERVICES PUTTING THE PERSONAL TOUCH INTO CORPORATE PENSIONS PAGE 1 4 REASONS TO MAKE THE MOST OF SCOTTISH WIDOWS MEMBER SERVICES

More information

CONSULTATION PAPER NO. 5

CONSULTATION PAPER NO. 5 CONSULTATION PAPER NO. 5 December 2011 NON PROFIT INCORPORATED ORGANISATIONS CONSULTATION PAPER NO. 5 NON PROFIT INCORPORATED ORGANISATIONS Why are we issuing this paper? 1. This Consultation Paper seeks

More information

Investment Opportunities in the German Solar Industry

Investment Opportunities in the German Solar Industry Telephone Briefing Investment Opportunities in the German Solar Industry 29 March 2012 Dr. Ulrike Binder Dr. Marius Boewe Thomas Schubert, LLM Partner Partner Associate Tel. +49 69 7941 1377 Tel. +49 211

More information

Financing Energy Infrastructure: Alternative Sources and Potential Projects

Financing Energy Infrastructure: Alternative Sources and Potential Projects Financing Energy Infrastructure: Alternative Sources and Potential Projects Traditional and Renewable Energy Forum April 26, 2017 Vilnius LORDS LB ASSET MANAGEMENT MANAGEMENT COMPANY MANAGEMENT COMPANY

More information

Note. Detailed Procedure for Listing of Privately Placed Debentures. Aman Nijhawan Niddhi Parmar

Note. Detailed Procedure for Listing of Privately Placed Debentures. Aman Nijhawan Niddhi Parmar Detailed Procedure for Listing of Privately Placed Debentures Aman Nijhawan aman@vinodkothari.com Niddhi Parmar mt@vinodkothari.com Vinod Kothari & Company Corporate Law Services Group corplaw@vinodkothari.com

More information

Good Energy Feed-in Tariff Switch form

Good Energy Feed-in Tariff Switch form For internal use only For use 05/08/2016 onwards Gen ID Good Energy Feed-in Tariff Switch form Before you get started The information you give us will help us to become your FiT Licensee, that s why it

More information

current i s s u e s i n pensions

current i s s u e s i n pensions health wealth career current i s s u e s i n pensions trustee edition february 2016 health wealth career 1 in this edition first streamlined longevity hedge executed in the uk 3 eu referendum 4 contracted-out

More information

IOPS COUNTRY PROFILE: ESTONIA

IOPS COUNTRY PROFILE: ESTONIA IOPS COUNTRY PROFILE: ESTONIA DEMOGRAPHICS AND MACROECONOMICS GDP per capita (USD) 19 000 Population (000s) 1 282 Labour force (000s) 688 Employment rate 82.5 Population over 65 (%) 17.7 Dependency ratio

More information

Gap Site Incentive Scheme March This document updates the Commission s April 2010 paper on the Gap Site Incentive Scheme.

Gap Site Incentive Scheme March This document updates the Commission s April 2010 paper on the Gap Site Incentive Scheme. Gap Site Incentive Scheme March 2014 This document updates the Commission s April 2010 paper on the Gap Site Incentive Scheme. Background In Commission s 2009 Draft Determination, we laid out plans for

More information

Tax highlights. Key developments this week. 1 December Contents:

Tax highlights. Key developments this week. 1 December Contents: Tax highlights 1 December 2014 Contents: Key developments this week Key developments Japan-Australia Economic Partnership Agreement Customs Bills await Royal Assent Progress of taxrelated Bills Asia-Pacific

More information

WHAT DOES THE GDPR MEAN FOR PENSIONS? HANDY GUIDE

WHAT DOES THE GDPR MEAN FOR PENSIONS? HANDY GUIDE WHAT DOES THE GDPR MEAN FOR PENSIONS? HANDY GUIDE The General Data Protection Regulation How will the pensions industry be affected? The pensions industry processes huge amounts of personal data - member's

More information

CEA proposed amendments, April 2008

CEA proposed amendments, April 2008 CEA proposed amendments, April 2008 Amendment 1: Recital 14 a (new) The supervision of reinsurance activity shall take account of the special characteristics of reinsurance business, notably its global

More information

Direct Dial: May Your Ref: Our Ref : MP No: P12

Direct Dial: May Your Ref: Our Ref : MP No: P12 Direct Dial: 020-7901 7412 2 May 2002 The National Grid Company, BSC Signatories and Other Interested Parties Your Ref: Our Ref : MP No: P12 Dear Colleague, Modification to the Balancing and Settlement

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 12.7.2012 Official Journal of the European Union L 181/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 600/2012 of 21 June 2012 on the verification of greenhouse gas emission reports

More information

CHP LEVEL 2 DUE DILIGENCE STUDY GUIDE. Sponsored by the Hedge Fund Group (HFG)

CHP LEVEL 2 DUE DILIGENCE STUDY GUIDE. Sponsored by the Hedge Fund Group (HFG) CHP LEVEL 2 DUE DILIGENCE STUDY GUIDE Sponsored by the Hedge Fund Group (HFG) CERTIFIED HEDGE FUND PROFESSIONAL (CHP) STUDY GUIDE Please use study guide to assist in preparation for the CHP Level 2 Due

More information

WHAT DOES THE GDPR MEAN FOR PENSIONS?

WHAT DOES THE GDPR MEAN FOR PENSIONS? WHAT DOES THE GDPR MEAN FOR PENSIONS? The General Data Protection Regualtion How will the pensions industry be affected? The pensions industry processes huge amounts of personal data - member's names,

More information

THE KARACHI STOCK EXCHANGE (GUARANTEE) LIMITED

THE KARACHI STOCK EXCHANGE (GUARANTEE) LIMITED CORRESPONDENCE MANUAL FOR COMPANIES LISTED ON THE KARACHI STOCK EXCHANGE (GUARANTEE) LIMITED (Amended upto November 26, 2009) THE KARACHI STOCK EXCHANGE (GUARANTEE) LIMITED,, Karachi-74000 UAN: 111-001-122,

More information

FINANCE BILL 2012 DRAFT CLAUSES: INFORMATION POWERS

FINANCE BILL 2012 DRAFT CLAUSES: INFORMATION POWERS TAXREP 11/12 ICAEW TAX REPRESENTATION FINANCE BILL 2012 DRAFT CLAUSES: INFORMATION POWERS Comments submitted in February 2012 by ICAEW Tax Faculty to HM Revenue & Customs in response to the draft Finance

More information

FRASERS NEWSLETTER - AUGUST 2017

FRASERS NEWSLETTER - AUGUST 2017 FRASERS NEWSLETTER - AUGUST 2017 In this edition of our newsletter we report on: (iii) (iv) (v) new decree on corporate governance for public companies; a draft decree on trade promotion; a draft decree

More information

GREEK RENEWABLES SUPPORT SCHEME PROPOSALS

GREEK RENEWABLES SUPPORT SCHEME PROPOSALS BRIEFING GREEK RENEWABLES SUPPORT SCHEME PROPOSALS MARCH 2016 BRIEF OUTLINE OF THE SCHEME PHOTOVOLTAIC PROJECTS TRANSITIONAL PROVISIONS NON-INTERCONNECTED ISLANDS COMPETITIVE BIDDING PROCESS FROM 2017

More information

Iona EnvIronmEntal vct PlC

Iona EnvIronmEntal vct PlC Iona EnvIronmEntal vct PlC HALF YEARLY REPORT & ACCOUNTS 31 MARCH 2012 Half Year Report Contents Half Yearly Review 2 3 4 5 6 8 Investment Objectives and Strategy Financial Highlights Chairman s Statement

More information

Easy guide to superannuation

Easy guide to superannuation Easy guide to superannuation 2 Contents Understanding super obligations as an employer 3 Keeping records 4 Offering employees a choice of super funds 5 Superannuation Guarantee for employees 70 and over

More information

FEED-IN TARIFF MICROFIT CONTRACT Version 3.3 Part 1 Contract Details

FEED-IN TARIFF MICROFIT CONTRACT Version 3.3 Part 1 Contract Details FEED-IN TARIFF MICROFIT CONTRACT Version 3.3 Part 1 Contract Details The Independent Electricity System Operator ( IESO ) is offering the microfit Program pursuant to Ministerial Direction issued pursuant

More information

Act on Personnel Funds (934/2010)

Act on Personnel Funds (934/2010) NB: Unofficial translation Ministry of Employment and the Economy, Finland 2011 Act on Personnel Funds (934/2010) Chapter 1 General provisions Section 1 Purpose of the Act The purpose of this Act is to

More information

All Energy 2015 CfD: The New Normal?

All Energy 2015 CfD: The New Normal? All Energy 2015 CfD: The New Normal? Sarah-Jane McArthur, Associate 6 May 2015 Key Themes CfD 101 Reflections on allocation process Reflections on the auction outcome What next for the winners What next

More information

Effective 10/1/17 NEW ENGLAND POWER POOL GENERATION INFORMATION SYSTEM OPERATING RULES

Effective 10/1/17 NEW ENGLAND POWER POOL GENERATION INFORMATION SYSTEM OPERATING RULES Effective 10/1/17 NEW ENGLAND POWER POOL GENERATION INFORMATION SYSTEM OPERATING RULES TABLE OF CONTENTS Page PART 1 GENERAL... 1 Rule 1.1 Functional Requirements; Cost Allocation... 1 Rule 1.2 Definitions...

More information

Financial Services Act (FIDLEG)

Financial Services Act (FIDLEG) Financial Services Act (FIDLEG) Impact on the value chain and strategic implications September 2017 1 Financial Services Act (FIDLEG) Table of content Editorial... 03 FIDLEG At a glance... 04 Core processes

More information

Essential pensions news

Essential pensions news Financial institutions Energy Infrastructure, mining and commodities Transport Technology and innovation Life sciences and healthcare Essential pensions news Updater February 2015 Contents 01 Charge capping:

More information

STANDARD FEED IN TARIFF (FIT) STATEMENT OF TERMS for Green Energy (UK) plc

STANDARD FEED IN TARIFF (FIT) STATEMENT OF TERMS for Green Energy (UK) plc STANDARD FEED IN TARIFF (FIT) STATEMENT OF TERMS for Green Energy (UK) plc These general statement of terms for the generation and export (where applicable) feed-in-tariff by Green Energy (UK) plc (the

More information

George Moran, British Gas 28th August 2015

George Moran, British Gas 28th August 2015 CMP 251: Removing the error margin in the cap on total TNUoS recovered by generation and introducing a new charging element to TNUoS to ensure compliance with European Commission Regulation 838/2010 George

More information

CHIP CHIP HOLDINGS LTD

CHIP CHIP HOLDINGS LTD The content of this promotion has not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000. Reliance on this promotion, for the purposes of engaging in

More information

Change of Ownership for Feed in Tariffs (FIT) Form Change of Responsibility Form First Utility accepts no liability for the accuracy for this form.

Change of Ownership for Feed in Tariffs (FIT) Form Change of Responsibility Form First Utility accepts no liability for the accuracy for this form. This form should be used to notify First Utility of transfer of responsibility from the FIT Generator to another party. Examples might be where a FIT Generator no longer resides at the installation address

More information

MAS Implements Changes to the Regulatory Regime for Fund Management Companies

MAS Implements Changes to the Regulatory Regime for Fund Management Companies MAS Implements Changes to the Regulatory Regime for Fund Management Companies Introduction The Monetary Authority of Singapore (the MAS ) announced on 6 that the new enhanced regulatory regime for fund

More information

Companion Policy CP to National Instrument Shelf Distributions. Table of Contents

Companion Policy CP to National Instrument Shelf Distributions. Table of Contents Companion Policy 44-102CP to National Instrument 44-102 Shelf Distributions Table of Contents PART PART 1 PART 2 PART 3 PART 4 TITLE GENERAL 1.1 Relationship of the National Instrument to Securities Legislation

More information

(Non-legislative acts) DIRECTIVES

(Non-legislative acts) DIRECTIVES L 176/28 EN Official Journal of the European Union 10.7.2010 II (Non-legislative acts) DIRECTIVES COMMISSION DIRECTIVE 2010/42/EU of 1 July 2010 implementing Directive 2009/65/EC of the European Parliament

More information

Council of the European Union Brussels, 5 March 2015 (OR. en)

Council of the European Union Brussels, 5 March 2015 (OR. en) Council of the European Union Brussels, 5 March 2015 (OR. en) 6704/15 ECOFIN 177 UEM 81 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: COUNCIL RECOMMDATION with a view to bringing an end to the excessive

More information

Legal Alert Tax Benefits Pioneer Status To read this Alert in PDF format, please go to

Legal Alert Tax Benefits Pioneer Status To read this Alert in PDF format, please go to Legal Alert Tax Benefits Pioneer Status To read this Alert in PDF format, please go to http://oseroghoassociates.com/pdf/2009_11.pdf In this Issue: 1. Legal Alert for November, 2009 Tax Benefits of Pioneer

More information

The Retirement Account Fund range and investment proposition. For professional adviser use only

The Retirement Account Fund range and investment proposition. For professional adviser use only The Retirement Account Fund range and investment proposition For professional adviser use only What is The Retirement Account? The Retirement Account (TRA) provides a unique 3-way solution that allows

More information

DECISIONS. L 301/4 Official Journal of the European Union

DECISIONS. L 301/4 Official Journal of the European Union L 301/4 Official Journal of the European Union 18.11.2010 DECISIONS COMMISSION DECISION of 22 July 2010 establishing a common format for the second report of Member States on the implementation of Directive

More information

Questions and Answers

Questions and Answers Questions and Answers Draft Ministerial Order for the Granting of Offshore Wind Farm Permits Hollandse Kust (zuid), Sites III and IV Hollandse Kust (zuid) Wind Farm Zone, Sites III and IV Version dated

More information

EITI - THE NORWEGIAN ANNUAL ACTIVITY REPORT 2014

EITI - THE NORWEGIAN ANNUAL ACTIVITY REPORT 2014 EITI - THE NORWEGIAN ANNUAL ACTIVITY REPORT 2014 1. Background Leaders from a group of governments, companies and civil society came together a little more than ten years ago and agreed that the prudent

More information

CURRENT I S S U E S I N PENSIONS

CURRENT I S S U E S I N PENSIONS HEALTH WEALTH CAREER CURRENT I S S U E S I N PENSIONS TRUSTEE EDITION AUGUST 2015 HEALTH WEALTH CAREER 1 IN THIS EDITION SUMMER BUDGET 3 PENSION FREEDOMS: THE STORY SO FAR 4 MERCER S VALUATION SURVEY 5

More information

Official Journal of the European Union L 78/41

Official Journal of the European Union L 78/41 20.3.2013 Official Journal of the European Union L 78/41 REGULATION (EU) No 229/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 13 March 2013 laying down specific measures for agriculture in favour

More information

Welcome to the Dynamics GP Users Group Year-End Processing

Welcome to the Dynamics GP Users Group Year-End Processing Welcome to the Dynamics GP Users Group 2011 Year-End Processing Introduction Charles Allen Managing Consultant More than 20 years experience Microsoft MVP Cindy Boersma Senior Managing Consultant More

More information

Third Evaluation Round. Compliance Report on Iceland

Third Evaluation Round. Compliance Report on Iceland DIRECTORATE GENERAL OF HUMAN RIGHTS AND LEGAL AFFAIRS DIRECTORATE OF MONITORING Strasbourg, 26 March 2010 Public Greco RC-III (2010) 2E Third Evaluation Round Compliance Report on Iceland Incriminations

More information

KINGDOM OF SAUDI ARABIA. Capital Market Authority. Rules for Qualified Foreign Financial Institutions Investment in Listed Securities

KINGDOM OF SAUDI ARABIA. Capital Market Authority. Rules for Qualified Foreign Financial Institutions Investment in Listed Securities KINGDOM OF SAUDI ARABIA Capital Market Authority Rules for Qualified Foreign Financial Institutions Investment in Listed Securities English Translation of the Official Arabic Text Issued by the Board of

More information

Technical Accounting Alert

Technical Accounting Alert TA ALERT 2017-08 20 OCTOBER 2017 Technical Accounting Alert Significant global entities are now required to lodge general purpose financial statements what does this mean in practice? The Australian Taxation

More information

THE EUROPEAN UNION (WITHDRAWAL) ACT CHRIS BATES

THE EUROPEAN UNION (WITHDRAWAL) ACT CHRIS BATES CHRIS BATES JULY 2018 OVERVIEW OF THE ACT Clifford Chance briefings: The European Union (Withdrawal) Act 2018: What it does, why and how Onshoring EU financial services legislation under the European Union

More information

CONSULTATION DOCUMENT ON THE REVIEW OF THE INSURANCE MEDIATION DIRECTIVE (IMD) (EC CONSULTATION)

CONSULTATION DOCUMENT ON THE REVIEW OF THE INSURANCE MEDIATION DIRECTIVE (IMD) (EC CONSULTATION) CONSULTATION DOCUMENT ON THE REVIEW OF THE INSURANCE MEDIATION DIRECTIVE (IMD) (EC CONSULTATION) BEUC RESPONSE TO CONSULTATION Contact: Financial Services financialservices@beuc.eu Ref.: X/2011/026 04/03/11

More information

Delhi Co-operative Housing Finance Corporation Ltd.

Delhi Co-operative Housing Finance Corporation Ltd. Delhi Co-operative Housing Finance Corporation Ltd. 3/6, Siri Fort Institutional Area, August Kranti Marg, New Delhi-110049 Ph: 649 5506, 649 6507, 649 4508, 649 7509, 649 5635 Fax: 649 6332 APPLICATION

More information

Feedback Statement on CP Consultation on Second Edition of the Central Bank Investment Firms Regulations including changes related to MiFID II

Feedback Statement on CP Consultation on Second Edition of the Central Bank Investment Firms Regulations including changes related to MiFID II Feedback Statement on CP 111 - Consultation on Second Edition of the Central Bank Investment Firms Regulations including changes 2017 1 Feedback statement on CP 111 Consultation on second edition of the

More information

Planning Briefing April 2008 The New Planning Bill

Planning Briefing April 2008 The New Planning Bill Planning Briefing April 2008 The New Planning Bill Ellisons Solicitor and Planning Specialist Tom McPhie provides details of the government s latest proposals for Developer contributions towards the cost

More information