1 15 JANUARY 2019 CORPORATE DIRECTORY Non-Executive Chairman Geoff McNamara Managing Director Mark Calderwood Executive Director - Operations Mark Turner Non-Executive Directors Robert Vassie Wei (Vicki) Xie Joshua Ong Arnold Chan Joint Company Secretaries Alexei Fedotov Joanna Kiernan Media contact: Nathan Ryan NWR Communications +61 (0) RESTRUCTURE OF LITHIUM OFFTAKE AGREEMENTS Restructure provides certainty in relation to offtake arrangements and importantly allows Alliance to pursue additional offtake partners and other opportunities for projected increases in lithium concentrate production at the Bald Hill Mine. Alliance Mineral Assets Limited (Alliance or the Company) (ASX: A40; SGX: 40F) is pleased to announce that Alliance and its subsidiary Lithco No.2 Pty Ltd (Lithco) have each agreed with Burwill Lithium Company Limited (BCLC) and its parent company Burwill Holdings Limited (Burwill Holdings) that BCLC will transfer its rights and obligations as the buyer under their respective long-term offtake agreements (Lithium Offtake Agreements) to Jiangxi Bao Jiang Lithium Industrial Limited (JBJLIL). JBJLIL is owned 50:50 by BCLC and Jiangte Special Electric Motor Co., Ltd (Jiangte). The Lithium Offtake Agreements will also be amended effective 14 January 2019 (Amended Lithium Offtake Agreements). Highlights Transferring the Lithium Offtake Agreements to JBJLIL indicates strong support for the Bald Hill Mine from Jiangte which is increasing its lithium concentrate conversion capacity as it moves towards becoming a significant player in the downstream processing market in China Amended Lithium Offtake Agreements provide for a market-linked pricing mechanism, with lower and upper limits of US$680/tonne and US$1080/tonne respectively (FOB 6% Li2O), for the remaining term ending on 31 December Remaining 18,000dmt from 2018 production will be purchased by JBJLIL at the 2018 fixed price of US$880 per dmt FOB at 6% Li2O. ETA for shipping is end of January Exclusivity and pre-emptive right have been removed from the Lithium Offtake Agreements, allowing Alliance to diversify its customer base. Maximum commitment for concentrate supply under the Amended Lithium Offtake Agreements is 100,000 tonnes in 2019 (minimum 80,000 tonnes) and 140,000 tonnes for each year between 2020 and 2022 (minimum 100,000 tonnes).

2 Alliance is seeking new offtake partners to purchase remaining Stage 1 lithium and Stage 2 lithium concentrate production. Offtake interest has been strong as there is limited uncommitted, high quality, spodumene available from producers for Repayments of outstanding interest free offtake prepayments (US$8.8million) 1 frozen until Offtake prepayments remain interest free and repaid at the rate of 15% of the value of each lithium concentrate shipment from 1 January 2021 until repaid. Revised mine schedule for 2019 and 2020 to accommodate increased ore processing rates expected in the third quarter of Production guidance for the period January to June 2019 increased to between 65,000dmt to 80,000dmt lithium concentrate from 55,000dmt to 60,000dmt for the six months between July and December Mark Calderwood, Managing Director said: The offtake agreement transfer from Burwill to JBJLIL is a good outcome for Alliance as it provides certainty for the demand of our premium quality spodumene concentrate while simultaneously freeing us up to sell approximately 50% of our annual production to other customers. We continue to see a high level of interest in the premium spodumene concentrate which Bald Hill produces and this demand coincides well with our projected increases in lithium concentrate production from Q onwards. Terms of the Amended Lithium Offtake Agreements Key terms of the amended Lithium Offtake Agreements are outlined below: Price revised from US$880/dmt (FOB on 6% Li2O) (in 2018 to a market-linked pricing mechanism with a minimum price of US$680/dmt FOB and a maximum price of US$1,080/dmt (FOB on 6% Li2O) from February 2019 until 31 December Pricing formula agreed with pricing for February to June 2019 to be based on the average October to December 2018 lithium carbonate pricing. Pricing formula for July to September 2019 will be based on the average of May to June 2019 lithium carbonate pricing. For October to December 2019, the pricing formula will be referenced from both lithium carbonate and lithium hydroxide prices. If not agreed, the higher of US$880 per dmt or the floating price will apply. Price for each of the years 2020 to 2022 will be set by a formula with reference to market prices for comparable spodumene. Outstanding prepayments of US$8.8 million from BCLC frozen until Offtake prepayments remain interest free and repaid at the rate of 15% of the value of each lithium concentrate shipment from 1 January 2021 until repaid. 1 As at the date of the Amended Lithium Offtake Agreement.

3 JBJLIL committed to take the first 10,000dmt shipment under the Amended Lithium Offtake Agreements in February Exclusivity for all Bald Hill product sales removed with Amended Lithium Offtake Agreements now providing for a minimum and maximum tonnage. o o 2019 lithium concentrate quantity committed to JBJLIL is between a minimum of 80,000dmt and a maximum of 100,000dmt (at Alliance s election) to match the conversion capacity of the JBJLIL lithium carbonate conversion facility to 2022 lithium concentrate committed to JBJLIL is between 100,000dmt and 140,000dmt (at Alliance s election) to match intended increased lithium concentrate production at the Bald Hill Mine and conversion capacity at the JBJLIL lithium carbonate conversion facility. Exclusivity and pre-emptive right have been removed allowing Alliance to diversify its customer base. Jiangte 2 and Burwill Holdings will guarantee the obligations of JBJLIL severally in equal proportions. Additional Offtake As a result of the removal of the pre-emptive right and exclusivity, Alliance has commenced discussions with other parties for the balance of Stage 1 and Stage 2 lithium concentrate production from the Bald Hill Mine. About Jiangxi Bao Jiang Lithium Industrial Limited JBJLIL is an incorporated joint venture between Jiangte and Burwill Holdings. JBJLIL operates one of the three large lithium concentrate convertors at the 30 hectare Jiangte owned facility in Yuan Zhou District, Yichun, Jiangxi. When fully operational, the single JBJLIL joint venture converter should be capable of processing about 10,000tonnes of spodumene concentrate per month. The lithium concentrate converter was constructed in June 2018 and includes advanced technologies in the area of the kiln and evaporation processes to achieve industry minimum standard emissions of H2S and CO2 from tail gas. Jiangte, through its wholly-owned subsidiaries in China, Europe and Japan, is engaged in the R&D, production and sales of specialised electric motors and the production of lithium battery cathode material, electric automobile drive motor and control systems, and electric vehicles. Jiangte owns two conversion plants (including JBJLIL) in Yichun with total nameplate capacity of 45,000tpa of lithium salts from spodumene and lepidolite. It is listed on Shenzhen Stock Exchange and has a market capitalisation of approximately 10B RMB (A$2.0B). Burwill Holdings is a Hong Kong-based investment holding company principally engaged in commodities trading. It has been listed on the Hong Kong stock exchange since December Quarter Production and Guidance Production for the December 2018 quarter was impacted by the combination of slower than anticipated turnover of mining benches resulting in low grade feed to the plant and a shortage of water in late November and early December Jiangte s guarantee is subject to Jiangte shareholder approval to be obtained within 30 days.

4 Lithium concentrate production was approximately 22,570 wmt resulting in a 7% shortfall on July to December 2018 guidance 3 and a 20% reduction in production compared to the September 2018 quarter. During the last three weeks of December 2018, improved water management, lower strip ratio and improved grade from the pit resulted in a significant lift in the production rate to an average of approximately 420 tonnes of lithium concentrate per day which is consistent with the production target for the March 2019 quarter. Production for the first thirteen days of January 2019 has averaged 410tpd with a concentrate grade of 6.2% Li2O. Lithium concentrate production guidance for the period January to June 2019 is between 65,000dmt to 80,000 dmt. Stage 2 Plant Upgrade Fines Circuit Work on the Front End Engineering Design (FEED) works for Stage 2 of the plant upgrade, which involves lowering the Dense Media Separation (DMS) bottom size from 1mm to 0.5mm, is continuing to schedule. The overall effect of this expansion phase will be an increase in plant processing capacity from the current 220tph to 300tph. The flowsheet and equipment selection for the new fines plant has been finalised, and ordering of long lead mechanical equipment items has commenced. It is expected that commissioning of the fines circuit will commence in the first half of the third quarter of Revised Mining Schedule for 2019 and 2020 A revised medium-term mining schedule for 2019 and 2020 has been completed to accommodate increased ore processing rates expected in the third quarter of 2019 as a result of the completion of the Stage 2 plant upgrade. The key metrics detailed below for 2019 and 2020 represent the current medium-term forecast based on the current mining and processing schedules, which may be subject to change during the period Total/Avg Waste Mined Strip Ratio W:O Ore Mined Ore Processed SC6% Produced (6% Li2O), tonnes Concentrate Produced (Ta2O5), Lb Operating cost/tonne SC6% AUD (1) Operating cost/tonne SC6% USD (2) 27.5Mt 13.1Mt 40.6Mt Mt 3.0Mt 5.4Mt 1.8Mt 2.1Mt 3.9Mt 180, , , , , , ) Estimated total operating costs per tonne of spodumene concentrate (SC6%). All mining, processing, haulage, port and administrative costs after tantalum by-product credits. No allowances made for stockpiles or pre-strip capital adjustments. These are a non-ifrs measure of the direct costs incurred. 2) USD:AUD exchange rate of 0.73:1.0 assumed. 3) Sustaining capital expenditure not included, however this is estimated as a total of A$8.3million over the two years. 3 Refer September 2018 Quarterly Activities Report lodged by Tawana Resources NL on the ASX on 31 October 2018 and the Announcement titled Bald Hill Mine Operational Update lodged on SGX on 5 November 2018.

5 Alliance intends to release six monthly production guidance moving forward. Total Lithium Ore Reserves as stated at 6 June 2018 are 11.3Mt of lithium ore at 1.01% Li2O and 160ppm Ta2O5. Tantalum Ore Reserves stated at 6 June 2018 are 2.0Mt at 313ppm Ta2O5. Mark Calderwood Managing Director Interests of Directors, Managing Director and Chief Executive Officer, and Controlling Shareholders None of the Directors and the Managing Director and Chief Executive Officer of the Company or their associates has any interest, direct or indirect, in the Amended Lithium Offtake Agreements, save for their respective shareholding interests (if any) in the Company. The Company has no controlling shareholders as at the date of this announcement. Competent Persons Statement The Ore Reserves underpinning the Mine Schedule has been prepared by a Competent Person in accordance with the JORC Code (2012) edition and was released by the Company on SGX and by Tawana Resources NL on ASX on 6 June 2018 in an announcement titled Lithium Ore Reserve Increase of 105% at Bald Hill and further released in the Company s Independent Qualified Person s Report on SGX on 10 August 2018 and updated on 16 August 2018 and is available at and and Alliance confirms that it is not aware of any new information or data that materially affects the information included in the original announcements and, in the case of the Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. Forward-Looking Statements This announcement contains certain forward-looking statements and projections including regarding estimated resources and reserves, production and operating costs profiles, capital requirements and strategies and corporate objectives. Such forward-looking statements/projections are estimates and should not be relied upon as a representation or warranty, express or implied, of Alliance. They are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors many of which are beyond the control of Alliance. The forward-looking statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved. While the information contained in this announcement has been prepared in good faith, neither Alliance nor any of its directors, officers, agents, employees or advisors make any representation or given any warranty, express or implied as to the fairness, accuracy or completeness of the information or for any of the opinions contained in this presentation or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of the information in this announcement. Alliance disclaims any obligation to update or revise any forward-looking statements based on new information, future events or otherwise except to the extent required by applicable laws.

6 Glossary These definitions are provided to assist persons in understanding some of the expressions used in this announcement. CO 2 Dmt ETA FOB H 2S Li 2O Mt ppm SC6% Sustaining Capital Ta 2O 5 Tpa Tpd Tph Wmt W:O Carbon dioxide Dry metric tonnes Estimated time of arrival Free on Board Hydrogen sulphide Lithium oxide Million tonnes Parts per million 6% Li 2O spodumene concentrate Periodical investment of capital into the business to maintain current level of operations Tantalum pentoxide Tonnes per annum Tonnes per day Tonnes per hour Wet metric tonnes Waste to Ore ratio

Company Presentation ASX:TAW

Company Presentation ASX:TAW ASX RELEASE 16 March 2018 ASX:TAW CORPORATE DIRECTORY Non-Executive Chairman Robert Benussi Managing Director Mark Calderwood Non-Executive Directors Robert Vassie Mark Turner Wei (Vicki) Xie Joint Company

More information

Proposed Merger. Investor Presentation September 2018

Proposed Merger. Investor Presentation September 2018 Proposed Merger Investor Presentation September 2018 Disclaimers The information contained in this presentation has been prepared by Tawana Resources NL ( Tawana ) and Alliance Mineral Assets Limited (

More information

Quarterly Activities Report For the quarter to 30 June 2018

Quarterly Activities Report For the quarter to 30 June 2018 ASX RELEASE: 31 July 2018 ASX: TAW CORPORATE DIRECTORY Non-Executive Chairman Robert Benussi Managing Director Mark Calderwood Non-Executive Directors Robert Vassie Mark Turner Wei (Vicki) Xie Chief Financial

More information

Quarterly Activities Report For the quarter to 30 June 2018

Quarterly Activities Report For the quarter to 30 June 2018 Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW JSE ISIN: AU0000TAWDA9 Share code on the Australian Securities Exchange Limited:

More information

Lithium Concentrate Offtake Signed for Bald Hill Project.

Lithium Concentrate Offtake Signed for Bald Hill Project. Lithium Concentrate Offtake Signed for Bald Hill Project. Alliance Mineral Assets Limited (SGX: AMAL) is pleased to announce that on 20 April 2017 it signed a binding long-term exclusive lithium concentrate

More information

30 April 2018 Interim Condensed Financial Statements

30 April 2018 Interim Condensed Financial Statements ASX RELEASE 20 August 2018 ASX:TAW 30 April 2018 Interim Condensed Financial Statements CORPORATE DIRECTORY Non-Executive Chairman Robert Benussi Managing Director Mark Calderwood Non-Executive Directors

More information

Quarterly Activities Report For the quarter to 30 June 2017 Highlights

Quarterly Activities Report For the quarter to 30 June 2017 Highlights Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW JSE ISIN: AU0000TAWDA9 Share code on the Australian Securities Exchange Limited:

More information

Pilgangoora: a world class lithium and tantalum project

Pilgangoora: a world class lithium and tantalum project Pilgangoora: a world class lithium and tantalum project Ken Brinsden, Managing Director/CEO December Quarterly Results Presentation 25 January 2019 ASX: PLS ACCESS THE QUARTERLY INVESTOR, ANALYST AND MEDIA

More information

Pilgangoora: discovery to product shipment in under four years

Pilgangoora: discovery to product shipment in under four years Pilgangoora: discovery to product shipment in under four years Corporate Presentation - October 2018 ASX: PLS Important Notices and Competent Persons Statement Not an Offer of Securities This document

More information

GALAXY RESOURCES LIMITED

GALAXY RESOURCES LIMITED GALAXY RESOURCES LIMITED 2017 Q2 Results Presentation July 2017 ASX: GXY [xx] Slide 1 Disclaimer This document contains forward looking statements concerning the projects owned by Galaxy. Statements concerning

More information

For personal use only

For personal use only GALAXY RESOURCES LIMITED 2017 Q3 Results Presentation October 2017 ASX: GXY [xx] Slide 1 Disclaimer Caution Regarding Forward Looking Information This document contains forward looking statements concerning

More information

March 2018 Quarterly Report 17 April Summary

March 2018 Quarterly Report 17 April Summary March 2018 ly Report 17 April 2018 Summary 2 million wet metric tonnes shipped in the March C1 cash cost of A$41/wmt FOB; Full cash cost of A$62/wmt CFR Average realised price of A$59/wmt CFR, inclusive

More information

PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION

PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION ASX / MEDIA ANNOUNCEMENT 2 January 2019 PILBARA MAINTAINS GROWTH MOMENTUM WITH STRONG CUSTOMER SUPPORT TO UNDERPIN FUNDING PACKAGE FOR STAGE 2 PILGANGOORA EXPANSION Terms agreed with both Ganfeng and Great

More information

ALLIANCE MINERAL ASSETS LIMITED (Company Registration Number: ACN ) (Incorporated in Australia on 6 December 2010)

ALLIANCE MINERAL ASSETS LIMITED (Company Registration Number: ACN ) (Incorporated in Australia on 6 December 2010) ALLIANCE MINERAL ASSETS LIMITED (Company Registration Number: ACN 147 393 735) (Incorporated in Australia on 6 December 2010) Unaudited Financial Statement and Dividend Announcement For the Financial Year

More information

For personal use only

For personal use only ASX Release 29 October 2015 QUARTERLY ACTIVITIES REPORT For the quarter ended 30 September 2015 Highlights: Mt Marion Lithium Project Construction of Mt Marion Lithium concentrate operation commences following

More information

Successful Completion of Capital Raising to Advance Bald Hill

Successful Completion of Capital Raising to Advance Bald Hill ASX RELEASE 6 July 2018 ASX:TAW CORPORATE DIRECTORY Non-Executive Chairman Robert Benussi Managing Director Mark Calderwood Non-Executive Directors Robert Vassie Mark Turner Wei (Vicki) Xie Chief Financial

More information

For personal use only. ASX Code: GMM

For personal use only. ASX Code: GMM ASX Code: GMM Institutional Roadshow: December 2015 Disclaimer Forward Looking Statements General Mining Corporation Limited has prepared this announcement based on information available to it. No representation

More information

For personal use only

For personal use only ASX Code: GMM A Multi Asset, Rare Metal Development Company Disclaimer Competent Persons Statement James Bay The information in this report that relates to Mineral Resources is based on work completed

More information

June 2018 Quarterly Report

June 2018 Quarterly Report 12 July 2018 June 2018 ly Report Summary 2.1 million wmt shipped in the June C1 cash costs of A$42/wmt FOB; Full cash cost of A$62/wmt CFR Average realised price of A$59/wmt CFR, inclusive of hedging gains

More information

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY POSITIVE IMPROVEMENTS IN KEY PROJECT PARAMETERS FURTHER ENHANCES THE ECONOMICS OF THE PROJECT

More information

ANNUAL REPORT FOR THE YEAR ENDED 31 DECEMBER 2017

ANNUAL REPORT FOR THE YEAR ENDED 31 DECEMBER 2017 ANNUAL REPORT FOR THE YEAR ENDED 31 DECEMBER 2017 TAWANA RESOURCES NL ABN 69 085 166 721 WE REFLECT ON A YEAR THAT HAS BEEN TRANSFORMATIVE FOR OUR COMPANY AND SEEN US ACHIEVE A SERIES OF IMPORTANT MILESTONES

More information

For personal use only

For personal use only GALAXY RESOURCES LIMITED FY2017 Results Presentation March 2018 ASX:GXY [xx] Slide 1 Disclaimer This document contains forward looking statements concerning the projects owned by Galaxy. Statements concerning

More information

Pilbara Copper Zinc Projects

Pilbara Copper Zinc Projects Pilbara Copper Zinc Projects Right Metals Right Project Right Time Read Corporate Rising Stars Conference 30-31 May 2017 JOHN NITSCHKE, MANAGING DIRECTOR ASX: VXR 1 Disclaimers Cautionary Statement The

More information

GREAT WALL MOTOR COMPANY LIMITED *

GREAT WALL MOTOR COMPANY LIMITED * Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Developing an Advanced Lithium Project in Quebec, Canada

Developing an Advanced Lithium Project in Quebec, Canada Developing an Advanced Lithium Project in Quebec, Canada November 2017 ASX: SYA International Lithium & Graphite Conference, Hong Kong Disclaimer Forward Looking Statements This presentation may contain

More information

Investor Presentation

Investor Presentation Investor Presentation ASX Code: NMT March 2016 1 Disclaimer 2 Summary information: This document has been prepared by Neometals Ltd ( Neometals or the Company ) to provide summary information about the

More information

2017 Financial Year Presentation

2017 Financial Year Presentation Building on our sustainable production and infrastructure platform to create shareholder value Atlas Iron Limited 2017 Financial Year Presentation Disclaimer Summary Information This Presentation contains

More information

For personal use only

For personal use only September 2017 ly Report 20 October 2017 Another strong quarter sees Atlas become net cash-positive Highlights Net cash generated from operations of $15m in the September after interest and financial instruments

More information

Authier Lithium Project Advances to the Definitive Feasibility Stage

Authier Lithium Project Advances to the Definitive Feasibility Stage December 2017 ASX: SYA Authier Lithium Project Advances to the Definitive Feasibility Stage Disclaimer Forward Looking Statements This presentation may contain certain forward looking statements. Such

More information

September 2018 Quarterly Report

September 2018 Quarterly Report 25 October 2018 2018 ly Report Summary 1.9M wmt shipped in the C1 cash costs of A$40/wmt FOB; Full cash cost of A$64/wmt CFR Average realised price of A$67/wmt CFR, inclusive of hedging gains and provisional

More information

For personal use only

For personal use only 18 April 2018 CAPITAL RAISING TO ADVANCE DEVELOPMENT OF THE AUTHIER LITHIUM PROJECT Not for distribution to U.S. newswire services or for dissemination in the United States KEY HIGHLIGHTS Oversubscribed

More information

March. Report. Highlights. expected. Full Cash. Wodgina

March. Report. Highlights. expected. Full Cash. Wodgina March 2017 ly Report 18 April 2017 Strong cashflow takes Atlas cash on hand too A$108m and Term Loan debt to A$ $112m Highlights Net operating cashflow of $22m after inventory build, interest, contractor

More information

For personal use only

For personal use only 16 January 2012 GALAXY S JIANGSU PLANT COMMISSIONING ON TRACK Highlights Jiangsu plant commissioning on schedule First production on track for current quarter Cold commissioning at half way point and progressing

More information

Pathway to Production

Pathway to Production For personal use only Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B +Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13,

More information

WODGINA ORE RESERVE COMMENTARY

WODGINA ORE RESERVE COMMENTARY ASX ANNOUNCEMENT 4 May 2018 WODGINA ORE RESERVE COMMENTARY Mineral Resources Limited (ASX:MIN; MRL) refers to its announcement on 1 May 2018 titled Wodgina Mineral Resource and Ore Reserve Update and its

More information

Charging forward with Lithium. Investor Update. August Pilgangoora Lithium: World Class Near Term Production Project

Charging forward with Lithium. Investor Update. August Pilgangoora Lithium: World Class Near Term Production Project Charging forward with Lithium Investor Update August 2017 Pilgangoora Lithium: World Class Near Term Production Project Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura

More information

For personal use only

For personal use only GALAXY RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT THREE MONTHS ENDED 31 MARCH 2019 Galaxy Resources Limited (ASX: GXY, Galaxy or the Company ) is pleased to report to shareholders its activities for

More information

14 March ASX Announcements Platform Bridge Street Sydney NSW 2000

14 March ASX Announcements Platform Bridge Street Sydney NSW 2000 ABN 95 112 425 788 14 March 2016 ASX Announcements Platform Bridge Street Sydney NSW 2000 Pilbara Minerals Presentation Global Institutional Roadshow Resources Rising Stars Investor Lunch- Australia We

More information

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016 Sourcing the raw materials of the future ASX: SYA JULY 2016 Authier Lithium Project JORC Resource Overview Disclaimer COMPETENT PERSON STATEMENTS Authier - The information in this report that relates to

More information

Building on our sustainable production and infrastructure platform to create shareholder value. Atlas Iron Limited Investor Presentation March 2018

Building on our sustainable production and infrastructure platform to create shareholder value. Atlas Iron Limited Investor Presentation March 2018 Building on our sustainable production and infrastructure platform to create shareholder value Atlas Iron Limited Investor Presentation March 2018 Disclaimer Summary Information This Presentation contains

More information

For personal use only

For personal use only ASX/Media Announcement 13 February 2018 OUTSTANDING RESULTS FROM 5MTPA STAGE 2 PFS PAVES WAY FOR MAJOR EXPANSION OF PILGANGOORA LITHIUM-TANTALUM PROJECT Exceptional financial outcomes and robust economics

More information

Atlas Iron Limited Annual General Meeting 23 October 2017

Atlas Iron Limited Annual General Meeting 23 October 2017 Building on our sustainable production and infrastructure platform to create shareholder value Atlas Iron Limited Annual General Meeting 23 October 2017 Disclaimer Summary Information This Presentation

More information

The Evolution of Lithium. Lithium Supply and Markets 1 June 2017

The Evolution of Lithium. Lithium Supply and Markets 1 June 2017 The Evolution of Lithium Lithium Supply and Markets 1 June 2017 1 Disclaimer Summary information: This document has been prepared by Neometals Ltd ( Neometals or the Company ) to provide summary information

More information

o Placement and Framework Agreement Sinomine to invest A$10,000,000 via a share placement in Prospect at A$0.05 per share.

o Placement and Framework Agreement Sinomine to invest A$10,000,000 via a share placement in Prospect at A$0.05 per share. PROSPECT EXECUTES CONDITIONAL OFFTAKE AND CONDITIONAL PLACEMENT AND FRAMEWORK AGREEMENT TO FULLY FUND CONSTRUCTION OF MINE AND PLANT FOR PROSPECT S ARCADIA LITHIUM PROJECT Highlights: Prospect Resources

More information

AMG Lithium & Tantalum

AMG Lithium & Tantalum AMG Advanced Metallurgical Group N.V. Project Update December 2017 AMG Lithium & Tantalum Table of Contents Project Update 4 Spodumene II 12 CAUTIONARY NOTE This document is strictly confidential and is

More information

For personal use only

For personal use only Pilgangoora the world's leading lithium development project Corporate Presentation March 2018 Important Notices and Competent Person s Statement 2For personal use only Not an Offer of Securities This document

More information

For personal use only Arafura Resources Annual General Meeting

For personal use only Arafura Resources Annual General Meeting Arafura Resources Annual General Meeting November 2016 Agenda 1. Chairman s Address 2. Formal Business 3. Managing Director s Report 4. Shareholder Questions 2 Chairman s Address Mr Ian Kowalick Chairman

More information

The following is an Inside Briefing interview with Pilbara Minerals CEO, Mr Neil Biddle

The following is an Inside Briefing interview with Pilbara Minerals CEO, Mr Neil Biddle The Company Announcements Officer Australian Securities Exchange Ltd via electronic lodgement The following is an Inside Briefing interview with Pilbara Minerals CEO, Mr Neil Biddle In this interview,

More information

Half Year Financial Results to 31 December 2017

Half Year Financial Results to 31 December 2017 21 February 2018 Half Year Financial Results to 31 December 2017 Fortescue Metals Group Limited (ASX: FMG, Fortescue) Net profit of US$681 million and interim dividend of A$0.11 per share Fortescue has

More information

QUARTERLY ACTIVITIES REPORT September 2017

QUARTERLY ACTIVITIES REPORT September 2017 ASX ANNOUNCEMENT 30 October 2017 QUARTERLY ACTIVITIES REPORT September 2017 Altura is fully funded into production following completion of its US$110 million debt facility Successful placement to international

More information

For personal use only

For personal use only NOVEMBER 2016 Investor Presentation Charging Ahead at the Authier Lithium Project ASX: SYA Sourcing the raw materials of the future Buoyant Lithium Macro DEMAND SUPPLY Renewable grid storage Transportation

More information

For personal use only

For personal use only alturamining.com ASX : AJM ANNUAL GENERAL MEETING PRESENTATION 27 November 2014 DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura or the Company ). It should not be considered

More information

ELi Battery Grade Lithium Hydroxide Process and Mt Marion Spodumene

ELi Battery Grade Lithium Hydroxide Process and Mt Marion Spodumene ELi Battery Grade Lithium Hydroxide Process and Mt Marion Spodumene Integrated Lithium Supply Chain Chris Reed Managing Director, Neometals 1 Disclaimer Summary information: This document has been prepared

More information

Key Highlights. Significant Events Post Quarter End. Outlook

Key Highlights. Significant Events Post Quarter End. Outlook For the three months ended 30 June 2018 Key Highlights 1 August 2018 Operational A total of 5.14 million tonnes of material, comprising 0.25 million tonnes of ore and 4.89 million tonnes of waste was mined

More information

SEPTEMBER 2018 QUARTERLY REPORT

SEPTEMBER 2018 QUARTERLY REPORT ASX RELEASE October 31, 2018 ASX:PLL; NASDAQ:PLLL SEPTEMBER 2018 QUARTERLY REPORT Piedmont Lithium Limited (ASX: PLL; NASDAQ: PLLL) ( Piedmont or Company ) is pleased to present its September 2018 quarterly

More information

For personal use only

For personal use only 15 May 2018 SAL DE VIDA - UPDATED FEASIBILITY STUDY Highlights Results from the updated feasibility study for the Sal de Vida Project validate a technically superior, highly profitable, long life (40 years)

More information

For personal use only

For personal use only ALTURA MINING LIMITED INVESTOR UPDATE 20 November 2013 James Brown Managing Director www.alturamining.com ASX: AJM DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura or the

More information

INVESTOR PRESENTATION

INVESTOR PRESENTATION INVESTOR PRESENTATION NOVEMBER 2018 DISCLAIMER This investor presentation (Presentation) has been prepared by Orocobre Limited (the Company or Orocobre). It contains general information about the Company

More information

PERFORMANCE UPDATE FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013

PERFORMANCE UPDATE FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013 FROM HILLGROVE'S KANMANTOO OPERATION GREG HALL IIIII CEO & MANAGING DIRECTOR 1 MAY 2013 AUSTRALIAN AND INDONESIA FOCUS PRODUCTION AND EXPLORATION ASSETS Bird s Head project Production and cash flow in

More information

Lithium Processing Update

Lithium Processing Update 8 June 2018 ASX via Electronic Lodgement Infinity Lithium Corporation ACN 147 413 956 ASX:INF Developing the world class San Jose lithium-tin deposit in Europe. Directors: Non-Executive Chairman Kevin

More information

Overview of our Lithium Technology

Overview of our Lithium Technology Overview of our Lithium Technology April 2015 1 DISCLAIMER Cautionary Statement This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes

More information

QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018

QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018 30 April 2018 QUARTERLY ACTIVITIES REPORT AND APPENDIX 5B FOR THE QUARTER ENDING 31 MARCH 2018 The Board of European Lithium Limited (ASX:EUR, FRA:PF8, VSE:ELI)(the Company) is pleased to present its activities

More information

For personal use only

For personal use only 11 DECEMBER 2017 AUTHIER OPTIMISED PRE-FEASIBILITY STUDY DEMONSTRATES EXCELLENT RETURNS DEFINITIVE FEASIBILITY STUDY UNDERWAY Highlights Optimised PFS incorporates an updated Ore Reserve and Mineral Resource

More information

Managing Director s Review of Operations

Managing Director s Review of Operations ASX ANNOUNCEMENT Managing Director s Review of Operations 25 October 2017 Attached is a copy of the MD s review of operations as delivered at today s annual general meeting. For further information please

More information

For personal use only

For personal use only Sandfire Resources NL ABN 55 105 154 185 Level 2, 31 Ventnor Ave, West Perth Western Australia 6005 Phone: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: info@sandfire.com.au Web: www.sandfire.com.au ASX/Media

More information

Mount Peake A major new resource project in Australia

Mount Peake A major new resource project in Australia Mount Peake A major new resource project in Australia Highlights: DFS completed: A$4.9 billion NPV, 41% IRR Binding off-take agreements under negotiation Financing discussions underway 9 th Annual Mining

More information

Sustainable Competitive and Reliable Supplier of Iron Ore

Sustainable Competitive and Reliable Supplier of Iron Ore Sustainable Competitive and Reliable Supplier of Iron Ore Forward looking statements Disclaimer Important Notice The purpose of this presentation is to provide general information about Fortescue Metals

More information

For personal use only

For personal use only FY18 Results Investor Presentation August 2018 1 Agenda Contents 1 FY18 Key Headlines 2 3 4 FY18 Financial & Safety Performance FY18 Operating & Commodity Performance Where we are going in FY19 5 Project

More information

For personal use only

For personal use only February 2018 ASX: SYA Authier Lithium Project Fast Tracking Towards Production and Cashflow Disclaimer Forward Looking Statements This presentation may contain certain forward looking statements. Such

More information

Bald Hill on track for lithium production in Q1 Calendar Year 2018

Bald Hill on track for lithium production in Q1 Calendar Year 2018 28 Nvember 2017 Bald Hill n track fr lithium prductin in Q1 Calendar Year 2018 Tawana Resurces NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited (SGX:AMA) (AMAL) are pleased t prvide an update

More information

ALLIANCE MINERAL ASSETS LIMITED (Company Registration Number: ACN ) (Incorporated in the Australia on 6 December 2010)

ALLIANCE MINERAL ASSETS LIMITED (Company Registration Number: ACN ) (Incorporated in the Australia on 6 December 2010) ALLIANCE MINERAL ASSETS LIMITED (Company Registration Number: ACN 147 393 735) (Incorporated in the Australia on 6 December 2010) ANNOUNCEMENT PURSUANT TO RULE 704(4) OF THE CATALIST RULES (AS DEFINED

More information

Fortescue Metals Group

Fortescue Metals Group Fortescue Metals Group March 2019 Together we are Fortescue Forward looking statements Disclaimer Important Notice The purpose of this presentation is to provide general information about Fortescue Metals

More information

For personal use only

For personal use only ASX/Media Announcement 28 February 2018 LANDMARK DEAL WITH POSCO CEMENTS PILBARA S GROWTH RUNWAY AND OPENS UP KOREAN LITHIUM MARKET Multi-pronged agreement includes binding off-take from Stage 2 5Mtpa

More information

For personal use only

For personal use only ACN 072 692 365 Report for September Quarter 26 October 2016 ASX Code: HEG, HEGOA CORPORATE A subscription agreement was signed with Bao Industry Pty Ltd (01.08.2016) for a number of placements to raise

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 March 2017 ASX: CXO Test work Produces High Quality 6% Spodumene Concentrate HIGHLIGHTS Initial metallurgical test work demonstrates the Grants Prospect at the Finniss Lithium Project

More information

FRONTIER LITHIUM INC. ANNOUNCES POSITIVE PRELIMINARY FEASIBILITY STUDY FOR THE PAK LITHIUM PROJECT, NORTHWESTERN ONTARIO

FRONTIER LITHIUM INC. ANNOUNCES POSITIVE PRELIMINARY FEASIBILITY STUDY FOR THE PAK LITHIUM PROJECT, NORTHWESTERN ONTARIO FRONTIER LITHIUM INC. ANNOUNCES POSITIVE PRELIMINARY FEASIBILITY STUDY FOR THE PAK LITHIUM PROJECT, NORTHWESTERN ONTARIO Sudbury, Ontario, March 2, 2018 Frontier Lithium Inc. (TSXV: FL) ( Frontier or the

More information

A US Critical Materials Company

A US Critical Materials Company A US Critical Materials Company Corporate Presentation September 2018 ASX: PLL NASDAQ: PLLL ABN 50 002 664 495 Highlights Strong Lithium Markets Electric vehicle adoption accelerating Contract lithium

More information

Presentation August ASX Code: TNG

Presentation August ASX Code: TNG Presentation August 2011 ASX Code: TNG Disclaimer Forward-Looking Statements This presentation has been prepared by TNG Ltd. This document contains background information about TNG Ltd current at the date

More information

Lithium: Producer ALLIANCE MINERAL ASSETS LTD (A40) A40.asx Accumulate

Lithium: Producer ALLIANCE MINERAL ASSETS LTD (A40) A40.asx Accumulate Lithium: Producer A40.asx Accumulate Alliance Mineral Assets Ltd (A40) ALLIANCE MINERAL ASSETS LTD (A40) Tawana effectively relists as A40, Alliance Mineral Assets Ltd Alliance Mineral Assets Ltd (A40)

More information

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management ASX ANNOUNCEMENT 31 October 2017 ASX Code: HOR Management Mr Michael Fotios Non-Executive Chairman Mr Neil Porter Non-Executive Director Mr Alan Still Non-Executive Director Issued Capital Shares: 194.6

More information

Half Year Results, FY18 Guidance Confirmed 27 February 2018

Half Year Results, FY18 Guidance Confirmed 27 February 2018 Half Year Results, FY18 Guidance Confirmed 27 February 2018 Summary On track to meet FY18 guidance Term Loan B debt reduced to A$103m at (H1 FY17: A$172m), with an additional repayment of A$20m in early

More information

Isabel Nickel Project. Corporate Presentation March 2016

Isabel Nickel Project. Corporate Presentation March 2016 Isabel Nickel Project Corporate Presentation March 2016 1 Disclaimer This presentation has been prepared and is provided by Axiom Mining Limited ( the Company ). It should not be considered as an offer

More information

For personal use only

For personal use only Perth, Australia 5 July 2012 INTRODUCING A GLOBAL LITHIUM COMPANY Galaxy Resources Limited (ASX: GXY, Galaxy ) following the successful merger with Lithium One Inc (TSX-V: LI, Lithium One ) is pleased

More information

Galaxy Resources. Mt Cattlin - early mover in lithium project pipeline. Innovation in lithium concentrate processing

Galaxy Resources. Mt Cattlin - early mover in lithium project pipeline. Innovation in lithium concentrate processing Galaxy Resources Mt Cattlin - early mover in lithium project pipeline Contract signed Metals & mining Galaxy (GXY) has signed binding agreements for 2017 delivery for 120,000 tonnes of lithium concentrate

More information

Offtake and Mining FINNISS LITHIUM PROJECT

Offtake and Mining FINNISS LITHIUM PROJECT Offtake and Mining FINNISS LITHIUM PROJECT Company Update December 2017 ASX code: CXO DISCLAIMER The information in this report that relates to Exploration Results and Mineral Resources is based on information

More information

US$335,000, % Senior Secured Notes Due 2018 (Issued February 2011) Nomura Fixed Income Corporate Day 15 November 2012

US$335,000, % Senior Secured Notes Due 2018 (Issued February 2011) Nomura Fixed Income Corporate Day 15 November 2012 US$335,000,000 11.5% Senior Secured Notes Due 2018 (Issued February 2011) Nomura Fixed Income Corporate Day 15 November 2012 Disclaimer This presentation has been prepared by Atlantic Ltd ( Atlantic )

More information

O 5. LPS (p) (0.50) (0.036)

O 5. LPS (p) (0.50) (0.036) Mining Speculative Buy, 3.375p, Market Cap. 3.66m* (Kennedy) is an AIM quoted investing company focused on tantalite production through the 75% stake it acquired in 2015 in African Tantalum(Pty) Limited

More information

For personal use only

For personal use only NOTICE OF MEETING ASX RELEASE 23 November 2016 ASX:TAW CORPORATE DIRECTORY Non-Executive Chairman Robert Benussi Managing Director Mark Calderwood Executive Director Michael Naylor Tawana Resources NL

More information

For personal use only. The Achmmach Tin Project A Development Ready Tin Opportunity

For personal use only. The Achmmach Tin Project A Development Ready Tin Opportunity The Achmmach Tin Project A Development Ready Tin Opportunity Austmine Presentation Perth, 5 November 2015 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation,

More information

ALTURA MINING LIMITED ANNUAL GENERAL MEETING

ALTURA MINING LIMITED ANNUAL GENERAL MEETING ALTURA MINING LIMITED ANNUAL GENERAL MEETING 19 November 2013 James Brown Managing Director www.alturamining.com ASX: AJM DISCLAIMER This presentation has been prepared by Altura Mining Limited ( Altura

More information

SEPTEMBER 2016 QUARTERLY ACTIVITIES REPORT

SEPTEMBER 2016 QUARTERLY ACTIVITIES REPORT ASX/Media Announcement 28 October 2016 SEPTEMBER 2016 QUARTERLY ACTIVITIES REPORT Pilgangoora DFS confirms outstanding technical and financial outcomes, with preliminary project site works on-track to

More information

Strong progress on construction and supply contracts puts Battery Minerals on track for commissioning in November

Strong progress on construction and supply contracts puts Battery Minerals on track for commissioning in November ASX Announcement 7 th March 2018 Montepuez Development Update Strong progress on construction and supply contracts puts Battery Minerals on track for commissioning in November TEMPORARY CONSTRUCTION CAMP

More information

ELEMENTOS. Building a profitable, robust & sustainable Tin mining company. (ASX:ELT) July Renewable energy needs Tin.

ELEMENTOS. Building a profitable, robust & sustainable Tin mining company. (ASX:ELT) July Renewable energy needs Tin. ELEMENTOS (ASX:ELT) July 2017 Building a profitable, robust & sustainable Tin mining company Renewable energy needs Tin. Why Tin? Global demand driven by sustainabilty & renewable energy trends batteries

More information

CONNECTING WITH THE EMERGING LITHIUM OPPORTUNITY PROACTIVE ONE2ONE FORUM 7 SEPTEMBER 2018

CONNECTING WITH THE EMERGING LITHIUM OPPORTUNITY PROACTIVE ONE2ONE FORUM 7 SEPTEMBER 2018 CONNECTING WITH THE EMERGING LITHIUM OPPORTUNITY PROACTIVE ONE2ONE FORUM CORPORATE 20 SEPTEMBER PRESENTATION 2018 0 7 SEPTEMBER 2018 1 IMPORTANT NOTICE DISCLAIMER The information contained in this document

More information

For personal use only

For personal use only 31 July 2012 Beacon Hill Resources Plc / ASX: BHU / AIM: BHR / Sector: Mining Beacon Hill Resources Plc ( Beacon Hill or the Group ) Commencement of Phase II Expansion, Production Update and Convertible

More information

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 DECEMBER January 2016

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 DECEMBER January 2016 MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 31 DECEMBER 2015 20 January 2016 Key Points* December quarter iron ore sales of 1.5 million wet metric tonnes (Mwmt), and quarterly ore sales

More information

For personal use only

For personal use only 30 July 2018 Quarterly Report for the period ending 30 June 2018 ASX: AVZ HIGHLIGHTS Manono Lithium Project, DRC JORC compliant Mineral Resource Estimate to be completed by end of July 2018 AVZ commences

More information

The Company also announced that executive director Mr Charles Whitfield retired from the Board effective as of 19 August 2016

The Company also announced that executive director Mr Charles Whitfield retired from the Board effective as of 19 August 2016 September 2016 QUARTERLY REPORT Highlights Significant events during the quarter Mt Cattlin commissioning ahead of schedule Sal De Vida revised DFS confirms robust operation Galaxy included in ASX 200

More information

GALAXY RESOURCES COMPANY PRESENTATION

GALAXY RESOURCES COMPANY PRESENTATION GALAXY RESOURCES COMPANY PRESENTATION NOVEMBER 2015 CAUTION REGARDING FORWARD LOOKING INFORMATION This document contains forward looking statements concerning the projects owned by Galaxy. Statements concerning

More information