TARIFF ORDER. True Up for FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY

Size: px
Start display at page:

Download "TARIFF ORDER. True Up for FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY"

Transcription

1 ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER True Up for FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY Assam Power Distribution Company Limited (APDCL) Petition No. 37/2016

2 Table of Contents INTRODUCTION CONSTITUTION OF THE COMMISSION TARIFF RELATED FUNCTIONS OF THE COMMISSION BACKGROUND MULTI YEAR TARIFF REGULATIONS, PROCEDURAL HISTORY STATE ADVISORY COMMITTEE MEETING... 7 SUMMARY OF APDCL S PETITION BACKGROUND TRUE-UP FOR FY AND FY AGGREGATE REVENUE REQUIREMENT FOR MYT CONTROL PERIOD PRAYERS OF APDCL...11 BRIEF SUMMARY OF OBJECTIONS RAISED, RESPONSE OF THE APDCL AND COMMISSION S COMMENTS...12 TRUING UP FOR FY AND FY METHODOLOGY FOR TRUING UP ENERGY SALES DISTRIBUTION LOSS ENERGY REQUIREMENT POWER PURCHASE DISALLOWED POWER PURCHASE COST DUE TO EXCESS LOSSES O&M EXPENSES DEPRECIATION INTEREST AND FINANCE CHARGES INTEREST ON WORKING CAPITAL INTEREST ON CONSUMER SECURITY DEPOSIT OTHER DEBITS NET PRIOR PERIOD EXPENSES/(INCOME) RETURN ON EQUITY...69 APDCL MYT Order for Control Period from FY to FY Page i

3 4.15 OTHER INCOME NON-TARIFF INCOME RECOVERY OF PAST REVENUE GAPS REVENUE/ GRANT SUBSIDY REVENUE FROM SALE OF POWER ARR AFTER TRUING UP OF FY AND FY ARR FOR MYT CONTROL PERIOD FROM FY TO FY INTRODUCTION ENERGY SALES CATEGORY-WISE ENERGY PROJECTED SALES DISTRIBUTION LOSS ENERGY BALANCE POWER PURCHASE OPERATION AND MAINTENANCE (O&M) EXPENSES CAPITAL INVESTMENT & FINANCING OF CAPITAL INVESTMENT DEPRECIATION INTEREST AND FINANCE CHARGES INTEREST ON WORKING CAPITAL INTEREST ON CONSUMERS SECURITY DEPOSIT PROVISION FOR BAD AND DOUBTFUL DEBTS RETURN ON EQUITY NON-TARIFF INCOME INCOME FROM MISCELLANEOUS CHARGES OPERATIONAL FUNDING SUPPORT REVENUE FROM SALE OF ELECTRICITY AGGREGATE REVENUE REQUIREMENT (ARR) AND REVENUE GAP/(SURPLUS) CUMULATIVE REVENUE GAP TILL FY & TARIFF FOR FY CUMULATIVE REVENUE GAP TARIFF FOR FY COST OF SUPPLY TARIFF PHILOSOPHY AND DESIGN CATEGORY-WISE CROSS-SUBSIDY FUEL PRICE AND POWER PURCHASE ADJUSTMENT CHARGES (FPPPA) APDCL MYT Order for Control Period from FY to FY Page ii

4 WHEELING CHARGES AND CROSS-SUBSIDY SURCHARGE INTRODUCTION ALLOCATION MATRIX WHEELING CHARGES APPLICABLE WHEELING LOSSES CROSS-SUBSIDY SURCHARGE APPLICABILITY OF TARIFF DIRECTIVES TARIFF SCHEDULE ANNEXURES ANNEXURE 1 - MINUTES OF THE 21 ST MEETING OF THE STATE ADVISORY COMMITTEE 177 APDCL MYT Order for Control Period from FY to FY Page iii

5 LIST OF TABLES Table 1: ARR for FY and for True Up as submitted by APDCL... 8 Table 2: ARR for FY to as submitted by APDCL (Rs. Crore)... 9 Table 3: Revenue Gap to be considered for recovery as submitted by APDCL (Rs. Crore)..10 Table 4: Energy Sales for FY and FY as submitted by APDCL (MU)...42 Table 5: Energy Sales for FY and FY approved by the Commission (MU) 44 Table 6: HT:LT ratio of Sales as submitted by APDCL (MU)...46 Table 7: Actual Distribution Loss for FY and FY computed by the Commission...47 Table 8: Distribution Loss for FY and FY Table 9: Energy Requirement approved by the Commission after True-Up for FY (MU)...48 Table 10: Energy Requirement approved by the Commission after True-Up for FY (MU)...49 Table 11: Power Purchase approved by the Commission after True-Up for FY (MU)...52 Table 12: Power Purchase approved by the Commission after True-Up for FY (MU)...54 Table 13: Excess Power Purchase Cost Disallowed by the Commission after True-Up for FY and FY (Rs. Crore)...56 Table 14: O&M Expenses for FY and FY as submitted by APDCL (Rs. Crore)...57 Table 15: O&M Expenses for FY and FY approved by the Commission (Rs. Crore)...60 Table 16: Depreciation for FY approved by the Commission (Rs. Crore)...62 Table 17: Depreciation for FY approved by the Commission (Rs. Crore)...62 Table 18: Interest and Finance Charges as submitted by APDCL for FY and FY (Rs. Crore)...63 APDCL MYT Order for Control Period from FY to FY Page iv

6 Table 19: Interest on GoA and R-APDRP computed by the Commission for FY and FY (Rs. Crore)...64 Table 20: Interest and Finance Charges approved by the Commission for FY and FY (Rs. Crore)...65 Table 21: IoWC as submitted by APDCL for FY and FY (Rs. Crore)...66 Table 22: IoWC approved by the Commission for FY and FY (Rs. Crore).66 Table 23: Interest on CSD claimed by APDCL for FY and FY (Rs. Crore) 67 Table 24: Other Debits as submitted by APDCL (Rs. Crore)...68 Table 25: Prior Period Expenses/(Income) approved by the Commission for FY and FY (Rs. Crore)...69 Table 26: RoE approved by the Commission for FY and FY (Rs. Crore)...70 Table 27: Past Period Adjustments approved by the Commission (Rs. Crore)...72 Table 28 Revenue Grant/Subsidy for FY and FY as submitted by APDCL (Rs. Crore)...73 Table 29: ARR & Revenue Gap/(Surplus) approved in the Truing up for FY (Rs. Crore)...74 Table 30: ARR & Revenue Gap/(Surplus) approved in the Truing up for FY (Rs. Crore)...75 Table 31: Category-wise Growth Rates considered by APDCL for Sales Projection...78 Table 32: Category-wise Energy Sales Projected by APDCL for the Control Period (MU)...78 Table 33: Category-wise Energy Sales Projected by the Commission for the Control Period (MU)...80 Table 34: Distribution Losses Projected by APDCL for the Control Period...82 Table 35: Distribution Losses approved by the Commission for the Control Period...82 Table 36: Energy Balance for FY to FY as Projected by APDCL (MU)...83 Table 37: Energy Balance for FY to FY approved by the Commission (MU)...83 Table 38: RPO considered by APDCL for the Control Period from FY to FY (%)...85 APDCL MYT Order for Control Period from FY to FY Page v

7 Table 39: Power Purchase Quantum and Cost for the Control Period from FY to FY as submitted by APDCL...86 Table 40: RPO considered by the Commission for the Control Period from FY to FY (%)...91 Table 41: REC Purchase considered by the Commission for the Control Period from FY to FY Table 42: Power Purchase Quantum and Cost approved by the Commission for the Control Period from FY to FY Table 43: Approved Employee Expenses for the Control Period (Rs. Crore)...99 Table 44: Approved R&M Expenses for Control Period (Rs. Crore)...99 Table 45: Approved A&G Expenses for the Control Period (Rs. Crore) Table 46: Capital Investment Plan for FY to FY (Rs. Crore) Table 47: Funding for Capital Expenditure Schemes as submitted by APDCL (Rs. Crore). 102 Table 48: Capital Expenditure and Capitalisation achieved by APDCL (Rs. Crore) Table 49: Percentage of Capitalisation achieved by APDCL (Rs. Crore) Table 50: Capital Expenditure and capitalisation approved by the Commission (Rs. Crore) Table 51: Funding of Capitalised Works approved by the Commission (Rs. Crore) Table 52: Depreciation claimed by APDCL for the Control Period (Rs. Crore) Table 53: Depreciation approved for FY (Rs. Crore) Table 54: Depreciation approved for FY (Rs. Crore) Table 55: Depreciation approved for FY (Rs. Crore) Table 56: Salient Features of UDAY Scheme as submitted by APDCL (Rs. Crore) Table 57: Loan Schedule for the Control Period from FY to FY as submitted by APDCL (Rs. Crore) Table 58: Interest and Finance Charges as submitted by APDCL for Period from FY to FY (Rs. Crore) Table 59: Computation of Normative loan outstanding as on April 1, 2016 (Rs. Crore) APDCL MYT Order for Control Period from FY to FY Page vi

8 Table 60: Treatment of Loans under UDAY MoU as considered by the Commission (Rs. Crore) Table 61: Approved Interest on Loan Capital for FY to FY (Rs. Crore) Table 62: IoWC for the Control Period as Projected by APDCL (Rs. Crore) Table 63: Revised IoWC for the Control Period as Projected by APDCL (Rs. Crore) Table 64: IoWC approved by the Commission for the Control Period (Rs. Crore) Table 65: Interest on CSD for the Control Period as Projected by APDCL (Rs. Crore) Table 66: Interest on CSD for the Control Period approved by the Commission (Rs. Crore) Table 67: Provision for Bad and Doubtful Debts as Projected by APDCL (Rs. Crore) Table 68: Return on Equity projected by APDCL for the Control Period (Rs. Crore) Table 69: Return on Equity approved by the Commission for the Control Period (Rs. Crore) Table 70: Non-Tariff Income as submitted by APDCL for the Control Period (Rs. Crore) Table 71: Non-Tariff Income approved by the Commission for the Control Period (Rs. Crore) Table 72: Miscellaneous Income approved by the Commission for the Control Period (Rs. Crore) Table 73: Operational Funding Support considered by APDCL for the Control Period (Rs. Crore) Table 74: Revenue from Sale of Electricity for the Control Period (Rs. Crore) Table 75: ARR & Revenue Gap/(Surplus) for APDCL for the Control Period approved by the Commission (Rs. Crore) Table 76: Revenue Gap to be considered for recovery as submitted by APDCL (Rs. Crore) Table 77: Cumulative Revenue Gap/(Surplus) till FY approved by the Commission (Rs. Crore) Table 78: VCoS as submitted by APDCL for the Control Period (Rs./kWh) Table 79: Voltage-wise losses as submitted by APDCL for the Control Period (Rs./kWh) APDCL MYT Order for Control Period from FY to FY Page vii

9 Table 80: VCoS computed by the Commission for the Control Period (Rs./kWh) Table 81: ACoS approved by the Commission for FY Table 82: Full Cost Tariff approved by the Commission for FY Table 83: Category-wise Cross-Subsidy approved for FY Table 84: Allocation Matrix for Separation of ARR for Wires Business and Retail Supply Business for FY Table 85: Separation of ARR for Wires Business and Retail Supply Business for FY (Rs. crore) Table 86: Wheeling Charges approved by the Commission for FY Table 87: Wheeling Losses approved by the Commission for FY Table 88: Cross-Subsidy Surcharge for HT I and HT II Industry category for FY APDCL MYT Order for Control Period from FY to FY Page viii

10 List of Abbreviations A&G ABC ABITA ABT ABP ABR ACoS ADB AEGCL AERC APDCL APDRP APGCL APM APR ARR APSEIP APSIP APTEL ASEB AT&C ATPA BPL CAEDCL CAGR CAIDI CAIFI CBDF CEA CERC CGRF CGS Administrative & General Aerial Bunched Conductors Assam Branch of Indian Tea Association Availability Based Tariff Average Basic Pay Average Billing Rate Average Cost of Supply Asian Development Bank Assam Electricity Grid Corporation Limited Assam Electricity Regulatory Commission Assam Power Distribution Company Limited Accelerated Power Development Programme Assam Power Generation Corporation Limited Administered Pricing Mechanism Annual Performance Review Aggregate Revenue Requirement Assam Power Sector Enhancement Investment Programme Assam Power Sector Investment Programme Appellate Tribunal for Electricity Assam State Electricity Board Aggregate Technical and Commercial Assam Tea Planters Association Below Poverty Line Central Assam Electricity Distribution Company Limited Compound Aggregate Growth Rate Customer Average Interruption Duration Index Customer Average Interruption Frequency Index Collection Based Distribution Franchisee Central Electricity Authority Central Electricity Regulatory Commission Consumer Grievance Redressal Forum Central Generating Station APDCL MYT Order for Control Period from FY to FY Page ix

11 COD Date of Commercial Operation CPC Central Pay Commission CPI Consumer Price Index CPSU Central Public Sector Utility CSD Consumer Security Deposit CSS Cross-subsidy Surcharge CTU Central Transmission Utility CWIP Capital Work In Progress DA Dearness Allowance D/C Double Circuit DD Demand Draft DDUGJY Deendayal Upadhyay Gram Jyoti Yojana DELP Domestic Efficient Lighting Programme DISCOM Distribution Company DMS Distribution Management System DPR Detailed Project Report DSM Demand Side Management DT/DTR Distribution Transformer EA, 2003 The Electricity Act, 2003 ECBC Energy Conservation Building Code EE Energy Efficiency EHV Extra High Voltage EPC Engineering Procurement & Construction ERP Enterprise Resource Planning ERS Emergency Restoration System FINER Federation of Industry & Commerce of North Eastern Region FPPPA Fuel Price and Power Purchase Adjustment FY Financial Year GFA Gross Fixed Assets GMRETCL GMR Energy Trading Company Limited GoA Government of Assam GoI Government of India GPF General Provident Fund APDCL MYT Order for Control Period from FY to FY Page x

12 HEP HH HP HT HV HVCMS IOCL IPDS ISTS IT IWC/IoWC JICA JNNSM kv kva kw kwh LAEDCL LED LOA LT LTC LV MAT MIS MNRE MoP MOU MRI MU MW MYT NEEPCO Hydro Electric Project Household Horse Power High Tension High Voltage High Value Consumer Management System Indian Oil Corporation Limited Integrated Power Development Scheme Inter State Transmission System Information Technology Interest on Working Capital Japan International Cooperation Agency Jawaharlal Nehru National Solar Mission kilo Volt kilo Volt Ampere kilo Watt kilo Watt Hour Lower Assam Electricity Distribution Company Limited Light Emitting Diode Letter of Award Low Tension Leave Travel Concession Low Voltage Minimum Alternate Tax Management Information System Ministry of New and Renewable Energy Ministry of Power Memorandum of Understanding Meter Reading Instruments Million Unit Mega Watt Multi-Year Tariff North Eastern Electric Power Corporation Limited APDCL MYT Order for Control Period from FY to FY Page xi

13 NEP NERPSIP NESSIA NHPC NLCPR NTPC O&M OA OEM OPGW PFA PFC PGCIL PLF PTCIL R&M RAPDRP REC RGGVY ROE ROW RPO Rs. SAC SAIDI SBI PLR S/C SECI SHEP SOP SPV STU National Electricity Policy North Eastern Region Power System Improvement Project North Eastern Small Scale Industries Association NHPC Ltd. Non-lapsable Central Pool of Resources NTPC Ltd. Operation and Maintenance Open Access Original Equipment Manufacturer Optical Ground Wire Power for All Power Finance Corporation Limited Power Grid Corporation of India Limited Plant Load Factor PTC Indian Limited Repairs and Maintenance Restructured Accelerated Power Development & Reforms Programme Renewable Energy Certificate Rajiv Gandhi Grameen Vidyutikaran Yojana Return on Equity Right of Way Renewable Purchase Obligation Rupees State Advisory Committee System Average Interruption Duration Index State Bank of India Prime Lending Rate Single Circuit Solar Corporation of India Limited Small Hydro Electric Project Standards of Performance Special Purpose Vehicle State Transmission Utility APDCL MYT Order for Control Period from FY to FY Page xii

14 SLDC TBCB TOD TVS UAEDCL UI UDAY VCoS WB WPI State Load Dispatch Centre Tariff Based Competitive Bidding Time of Day Technical Validation Session Upper Assam Electricity Distribution Company Limited Unscheduled Interchange Ujwal DISCOM Assurance Yojana Voltage-wise Cost of Supply The World Bank Wholesale Price Index APDCL MYT Order for Control Period from FY to FY Page xiii

15 ASSAM ELECTRICITY REGULATORY COMMISSION Guwahati Present Shri Naba Kumar Das, Chairperson Shri Dipak Chakravarty, Member Shri Subhash C. Das, Member Petition No. 37/2016 Assam Power Distribution Company Limited (APDCL) - Petitioner ORDER (Passed on March 31, 2017) (1) The Commission, vide its Order dated November 21, 2013, approved the Multi Year Tariff applicable for the Assam Power Distribution Company Limited (hereinafter referred to as APDCL ), for the period from FY to FY Subsequently, the Commission has issued the Tariff Order for FY on November 21, 2014, and for FY on July 24, 2015 in accordance with the provisions of the Assam Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) Regulations, 2006 (herein after referred as Tariff Regulations, 2006 ). (2) The Commission, in exercise of the powers conferred under Section 61 read with Section 181(2) (zd) of the Act, has notified the Assam Electricity Regulatory Commission (Terms and Conditions for determination of Multi Year Tariff) Regulations, 2015 (hereinafter referred as MYT Regulations, 2015 ) on June 2, These Regulations are applicable for determination of Tariff for Generation, Transmission, SLDC, Wheeling and Retail Supply for the Control Period of three financial years from April 1, 2016 onwards up to APDCL MYT Order for Control Period from FY to FY Page xiv

16 March 31, These Regulations are applicable to all existing and future Generating Companies, Transmission Licensees and Distribution Licensees within the State of Assam. (3) Regulation 6 of the MYT Regulations, 2015 requires the Generating Company, Transmission Licensee, SLDC Business and Distribution Licensee to file the Business Plan for the entire Control Period by 1 st July of the year preceding the first year of the Control Period, i.e., before the filing of Multi Year Tariff (MYT) Petition. (4) However, considering that APDCL was preparing and filing the Business Plan for the first time, the Commission vide letter dated August 29, 2015 directed APDCL to file the Business Plan Petition by November 1, (5) APDCL, vide Letter dated October 30, 2015, requested for time extension for filing of Business Plan Petition for the Control Period. Thereafter, on direction of the Commission, APDCL filed a Petition for condonation of delay and time extension on November 16, The Commission granted time extension as sought by APDCL and directed APDCL to submit the Business Plan Petition for the Control Period from FY to FY by December 10, (6) APDCL filed the Business Plan Petition for the Control Period from FY to FY on December 10, 2015 along with a Petition for condonation of delay. (7) The Commission carried out preliminary analysis of the Business Plan Petition submitted by APDCL as mentioned above. Thereafter, APDCL was directed to submit replies on all observations and clarifications sought by the Commission by February 12, The same was submitted on April 8, (8) The Commission conducted the Technical Validation Session (TVS) on the Business Plan Petition on April 27, 2016 and directed APDCL to submit additional information and the revised Petition, duly approved by the Board of Directors, giving the realistic Business Plan after incorporating all revisions in technical and financial parameters. (9) Based on the discussions held during the TVS and after incorporating the additional information/clarifications, APDCL submitted revised Business Plan along with the replies to the queries raised during the Technical Validation Session on May 25, APDCL MYT Order for Control Period from FY to FY Page xv

17 (10) Further, APDCL submitted the copy of the Board Resolution approving the revised Business Plan duly certified by the Company Secretary, during the hearing held on July, 26, This process delayed the issuance of Business Plan Order. (11) The Commission issued the Order on the said Business Plan on September 1, 2016 and directed APDCL to file the MYT Petition, including the forecast of Aggregate Revenue Requirement for FY to FY , true-up for FY and FY , actuals of FY (6 months), and projected tariff for FY and FY (12) As per directives of the Commission vide Order dated September 1, 2016, APDCL has to file its MYT Petition (Petition No. 37/2016) for Control Period from FY to FY on or before November 1, APDCL has filed the Petition for approval of the ARR and tariff for the Control Period from FY to FY on November 2, (13) The Commission conducted preliminary analysis of the Petition submitted by APDCL and found that the Petition was incomplete in material particulars. Therefore, additional data and clarifications on the MYT Petition were sought from APDCL vide letter dated December 1, 2016 and December 8, 2016 and these were submitted by them on December 15, 2016 & December 22,2016 respectively. (14) The Commission observes that there were several inconsistencies in the Petition, and even the revised Petition submitted by APDCL contained discrepancies. In the interest of time, the Commission admitted the Petition and raised additional queries in order to clarify the discrepancies, inconsistencies, and data gaps, and also directed APDCL to submit the consolidated revised documents in order to avoid confusion. However, APDCL did not submit the duly reconciled consolidated revised documents, and the replies to queries also contained inconsistencies. As the regulatory process has to be completed within the stipulated time, the Commission has relied upon data considered to be more accurate/reliable within the multiple conflicting data available with the Commission, and has made appropriate assumptions wherever necessary. The Commission may be constrained to reject such Petitions in the future, and APDCL should take the necessary due diligence before submitting the Petitions and replies. (15) The Commission held an Admissibility Hearing on December 17, 2016, and admitted the Petition (Petition No. 37/2016) vide Order dated December 17, On admission of the Petitions, in accordance with Section 64 of the Electricity Act 2003, the Commission APDCL MYT Order for Control Period from FY to FY Page xvi

18 directed APDCL to publish a summary of the ARR and Tariff filings in local dailies to ensure due public participation. A copy of the Petitions and other relevant documents were also made available to the consumers and other interested Parties at the office of the Managing Director of APDCL, and offices of the Deputy General Manager of each circle of APDCL. A copy of the Petition was also made available on the websites of the Commission and APDCL. (16) Accordingly, a Public Notice was issued by the APDCL inviting objections/suggestions from objectors to be submitted on or before January 30, The notice was published in six (6) leading newspapers of the State on January 7, (17) Meanwhile the Commission received requests for extending the time limit for filing objections/suggestions from some consumers/consumer organizations. The Commission positively considered the requests from different stakeholders, and extended the time limit for filing objections/suggestions up to February 7, (18) The Commission received suggestions and objections from eight (8) stakeholders on the Petitions filed by APDCL. The objectors were notified about the place, date and time of Hearing, to enable them to take part in the Hearing to be held at District Library Auditorium, Guwahati on February 28, The Hearing was held as scheduled. The details are discussed in the relevant Chapters of this Tariff Order. (19) The Petitions were also discussed in the meeting of the State Advisory Committee (SAC) (constituted under Section 87 of the Electricity Act, 2003) held on March 4, 2017 at Assam Administrative Staff College, Khanapara, Guwahati. (20) The Commission, now in exercise of its powers vested under Sections, and 86 of the Electricity Act, 2003 and all other powers enabling it in this behalf and taking into consideration the submissions made by the Petitioner, objections and suggestions received from objectors and all other relevant materials on record, has carried out the True-up for FY and FY , approval of ARR for the Control Period from FY to FY , and determination of distribution and retail supply tariff for FY , as detailed in subsequent Chapters of this Order. (21) The Commission further directs APDCL to publish a Public Notice intimating the revised distribution and retail supply tariff before the implementation of this Order in English and Vernacular newspapers and on the website of APDCL. APDCL MYT Order for Control Period from FY to FY Page xvii

19 (22) The approved Retail Supply Tariffs, Wheeling Charges and CSS for FY shall be effective from April 10, 2017 and shall continue until replaced by another Order by the Commission. (23) Accordingly, the Petition 37/2016 stands disposed of. Sd/- (S. C. Das) Member, AERC Sd/- (D. Chakravarty) Member, AERC Sd/- (N. K. Das) Chairperson, AERC APDCL MYT Order for Control Period from FY to FY Page xviii

20 INTRODUCTION 1.1 Constitution of the Commission The Assam Electricity Regulatory Commission (hereinafter referred to as the AERC or the Commission) was established under the Electricity Regulatory Commissions Act, 1998 (14 of 1998) on February 28, The first proviso of Section 82(1) of the Electricity Act, 2003 (hereinafter referred as the Act or the EA, 2003) has ensured continuity of the Commission under the Electricity Act, The Commission is mandated to exercise the powers and functions conferred under Section 181 of the Electricity Act, 2003 (36 of 2003) and to exercise the functions conferred on it under Section 86 of the Act from June 10, Tariff related Functions of the Commission Under Section 86 of the Act, the Commission has the following tariff related functions: a) To determine the tariff for electricity, wholesale, bulk or retail, as the case may be; b) To regulate power purchase and procurement process of the distribution utilities including the price at which the power shall be procured from the generating companies, generating stations or from other sources for transmission, sale, distribution and supply in the State; c) To promote competition, efficiency and economy in the activities of the electricity industry to achieve the objects and purposes of this Act Under Section 61 of the Act in the determination of tariffs, the Commission is to be guided by the following: a) The principles and methodologies specified by the Central Commission for determination of the tariff applicable to generating companies and transmission licensees; b) That the electricity generation, transmission, distribution and supply are conducted on commercial principles; c) That factors which would encourage efficiency, economical use of the resources, good performance, optimum investments, and other matters which the State commission considers appropriate for the purpose of this Act; APDCL MYT Order for Control Period from FY to FY Page 1

21 d) The interests of the consumers are safeguarded and at the same time, the consumers pay for the use of electricity in a reasonable manner based on their customer category cost of supply; e) That the tariff progressively reflects the cost of supply of electricity at an adequate and improving level of efficiency and also gradually reduces cross subsidies; f) The National Power Plans formulated by the Central Government including the National Electricity Policy and Tariff Policy In accordance with the provisions of the Act, the Commission shall not show undue preference to any consumer of electricity in determining the tariff, but may differentiate according to the consumers load factor, power factor, voltage, total consumption of energy during any specified period or the time at which the supply is required or the geographical position of any area, the nature of supply and the purpose for which the supply is required (Section 62 of the Act) If the State Government requires the grant of any subsidy to any consumer or class of consumers in the tariff determined by the Commission, the State Government shall pay the amount to compensate the person affected by the grant of subsidy in the manner the Commission may direct as a condition for the licence or any other person concerned to implement the subsidy provided for by the State Government (Section 65 of Act 2003). 1.3 Background The Government of Assam notified Vide Memo No. PEL151/2003/Pt./165 dated December 10, 2004, the restructuring of the erstwhile Assam State Electricity Board (ASEB) into five entities, namely; (i) Assam Electricity Grid Corporation Limited (AEGCL) to carry out function as State Transmission Utility (STU) (ii) Assam Power Generation Corporation Limited (APGCL) to carry out function of generation of electricity in the State of Assam (iii) Three Electricity distribution companies, namely, Lower, Central and Upper Assam Distribution Company Limited, respectively, to carry out functions of distribution and retail supply of electricity in the districts covered under each company area All Companies are duly incorporated with the Registrar of Companies as per the APDCL MYT Order for Control Period from FY to FY Page 2

22 Companies Act Further, in exercise of power under Section 172 of the Electricity Act 2003, the State Government authorized ASEB to continue its trading functions by periodic notification till September In May 2009, as per GOA notification No PEL.41/2006/199 dated May 13, 2009, in accordance with the Assam State Reform (Transfer and merger of Distribution Functions and undertakings) scheme, 2009, CAEDCL and UAEDCL distribution companies merged with the LAEDCL, thereby forming one distribution Company for the State The name of the Company was changed from LAEDCL to Assam Power Distribution Company Limited (APDCL) vide Certificate of Incorporation dated October 23, The Government of Assam vide Notification dated March 12, 2013 dissolved ASEB under Section 131 of the Act with effect from March 31, The Commission notified the AERC (Terms and Conditions for Determination of Tariff) Regulations, 2006 (hereafter referred to as Tariff Regulations, 2006) vide Notification No. AERC.2005/19 dated April 28, 2006, which was published in the Assam Gazette on May 24, In accordance with Regulation 5.3 of the Tariff Regulations, 2006, the tariff will be determined on the basis of the principles enunciated under the Multi Year Tariff principle for a period of three years commencing from April 1, APDCL had filed the MYT Petition for the Control Period from FY to FY on January 31, The Commission, after following the due regulatory process, issued the Tariff Order on November 21, Subsequently, the Commission has issued the Tariff Order for FY on November 21, 2014 and for FY on July 24, 2015 in accordance with the provisions of the Tariff Regulations, Multi Year Tariff Regulations, The Commission, in exercise of the powers conferred under Section 61 read with Section 181(2) (zd) of the Act, has notified the Assam Electricity Regulatory Commission (Terms and Conditions for determination of Multi Year Tariff) Regulations, APDCL MYT Order for Control Period from FY to FY Page 3

23 2015 (hereinafter referred as MYT Regulations, 2015 ) on June 2, These Regulations are applicable for determination of Tariff for Generation, Transmission, SLDC, Wheeling and Retail Supply for the Control Period of three financial years from April 1, 2016 onwards up to March 31, These Regulations are applicable to all existing and future Generating Companies, Transmission Licensees and Distribution Licensees within the State of Assam Regulation 6 of the MYT Regulations, 2015 requires the Generating Company, Transmission Licensee, SLDC Business and Distribution Licensee to file the Business Plan for the entire Control Period by 1 st July of the year preceding the first year of the Control Period, i.e., before the filing of Multi Year Tariff (MYT) Petition However, considering that APDCL was preparing and filing the Business Plan for the first time, the Commission vide letter dated August 29, 2015 directed APDCL to file Business Plan Petition by November 1, APDCL, vide Letter dated October 30, 2015, requested for time extension for submission of Business Plan Petition for the Control Period. Thereafter, on direction of the Commission, APDCL filed a Petition for condonation of delay and time extension on November 16, The Commission granted time extension as sought by APDCL and directed APDCL to submit the Business Plan Petition for the Control Period from FY to FY by December 10, APDCL filed the Business Plan Petition for the Control Period from FY to FY on December 10, 2015 along with a petition for condonation of delay The Commission carried out preliminary analysis of the Business Plan Petition submitted by APDCL as mentioned above. Thereafter, APDCL was directed to submit replies on all observations and clarifications sought by the Commission by February 12, The same was submitted on April 8, The Commission conducted the Technical Validation Session (TVS) on the Business Plan Petition on April 27, 2016 and directed APDCL to submit additional information and the revised Petition, duly approved by the Board of Directors, giving the realistic Business Plan after incorporating all revisions in technical and financial parameters Based on the discussions held during the TVS and after incorporating the additional information/clarifications, APDCL submitted revised Business Plan along with the replies to the queries raised during the Technical Validation Session on May 25, Further, APDCL submitted the copy of the Board Resolution approving the revised APDCL MYT Order for Control Period from FY to FY Page 4

24 Business Plan duly certified by the Company Secretary, during the hearing held on July, 26, This process delayed the issuance of Business Plan Order The Commission issued the Order on the said Business Plan on September 1, 2016 and directed APDCL to file the MYT Petition, including the forecast of Aggregate Revenue Requirement for FY to FY , true-up for FY and FY , actuals of FY (6 months), and projected tariff for FY and FY Accordingly, APDCL has filed the present Petition for approval of Aggregate Revenue Requirement for the Control Period from FY to FY and tariff for FY as per MYT Regulations, 2015, along with True-up for FY and FY as per Tariff Regulations, Procedural History As per directives of the Commission vide Order dated September 1, 2016, APDCL has to file its MYT Petition for Control Period from FY to FY on or before November 1, APDCL has filed the Petition (Petition No. 37/2016) for approval of the ARR and tariff for the Control Period from FY to FY on November 2, The Commission conducted preliminary analysis of the Petition submitted by APDCL and found that the Petition was incomplete in material particulars. Therefore, additional data and clarifications on the MYT Petition were sought from APDCL vide letter dated December 1, 2016 and these were submitted by them on December 15, 2016 and December 22, 2016, respectively The Commission observes that there were several inconsistencies in the Petition, and even the revised Petition submitted by APDCL contained discrepancies. In the interest of time, the Commission admitted the Petition and raised additional queries in order to clarify the discrepancies, inconsistencies, and data gaps, and also directed APDCL to submit the consolidated revised documents in order to avoid confusion. However, APDCL did not submit the duly reconciled consolidated revised documents, and the replies to queries also contained inconsistencies. As the regulatory process has to be completed within the stipulated time, the Commission has relied upon data considered to be more accurate/reliable within the multiple conflicting data available with the Commission, and has made appropriate assumptions wherever necessary. The APDCL MYT Order for Control Period from FY to FY Page 5

25 Commission may be constrained to reject such Petitions in the future, and APDCL should take the necessary due diligence before submitting the Petitions and replies The Commission held an Admissibility Hearing on December 17, 2016, and admitted the Petition (Petition No. 37/2016) vide Order dated December 17, On admission of the Petition, in accordance with Section 64 of the Act, the Commission directed APDCL to publish its application in the abridged form and manner to ensure due public participation The copies of the Petition and other relevant documents were made available to consumers and other interested parties at the office of the Managing Director of APDCL, and offices of the Deputy General Manager of each circle of APDCL. APDCL was also directed to make the copy of the Petition available on its website. A copy of the Petition was made available on the website of APDCL ( and also on the website of the Commission ( in downloadable format. A Public Notice was issued by APDCL inviting objections/suggestions from stakeholders on or before January 30, 2017, which was published in the following newspapers on January 7, Date Name of Newspaper Language The Sentinel English The Assam Tribune English Asamiya Pratidin Assamese Dainik Janambhumi Assamese Purbanchal Prahari Hindi Dainik Jugasankha Bengali The time limit for submitting objections/suggestions was stipulated in accordance with the AERC (Conduct of Business) Regulations, Meanwhile the Commission received requests for extending the time limit for filing objections/suggestions from some consumers/consumer organizations. The Commission positively considered the requests from different stakeholders, and extended the time limit for filing objections/suggestions up to February 7, TVS with APDCL to discuss and sort out data gaps and shortcomings was conducted in the office of the Commission on January 28, While examining the revised APDCL MYT Order for Control Period from FY to FY Page 6

26 submission, the Commission observed additional data requirements vis-à-vis replies to original data requirement, which were sought from APDCL vide letter dated March 3, The Commission considered the objections received and sent communication to the objectors to take part in Hearing process by presenting their views in person before the Commission. Accordingly, the Commission scheduled a Hearing in the matter on February 28, 2017 at District Library Auditorium, Guwahati. In this context, Notices were dispatched to the objectors personally/by Registered Post stating the date and time of Hearing. Also, a comprehensive Notice was published in the 6 Nos. newspapers on February 8, 2017 in Assamese and English language. The Hearing was held at District Library Auditorium, Guwahati on February 28, 2017 as scheduled All objectors/respondents who participated in the Hearing were given the opportunity to express their views on the Petition. All the written representations submitted to the Commission and oral submissions made before the Commission in the Hearing and the responses of APDCL have been carefully considered while issuing this Tariff Order. The major issues raised by different consumers and consumer groups along with the response of APDCL and views of the Commission are elaborated in Chapter 3 of this Order. 1.6 State Advisory Committee Meeting A meeting of the State Advisory Committee (SAC) (constituted under Section 87 of the Act) was convened on March 4, 2017 and members were briefed on the MYT Petition of APDCL. The minutes of the SAC meeting are appended to this order as Annexure 1. APDCL MYT Order for Control Period from FY to FY Page 7

27 Summary of APDCL s Petition 2.1 Background APDCL submitted the Petition on October 31, 2016 seeking approval for Aggregate Revenue Requirement for the Control Period from FY to and determination of Retail Tariff for FY , along with True up for FY and FY True-up for FY and FY APDCL submitted True-up for FY and FY based on the audited accounts. The summary of Aggregate Revenue Requirement and Revenue Gap/(Surplus) claimed by APDCL for FY and FY is shown in the following Table: Table 1: ARR for FY and for True Up as submitted by APDCL (Rs. Crore) Sr. No. Particulars FY FY Cost of Power Purchase Operation and Maintenance Expenses Employee Cost Repair and Maintenance Administrative and General Expenses Depreciation Interest and Finance Charges 4.1 Interest on Working Capital Interest on Consumer Security Deposit Other Finance Charges Provision for Bad and Doubtful Debts 6 Net Prior Period Expenses 6.23 (95.05) 7 True-Up Adjustment 7.1 Amortization of Regulatory Asset Others Sub-Total Add: Return on Equity Total Expenses Less: Non-Tariff Income Aggregate Revenue Requirement Revenue with approved Tariff (including FPPPA) APDCL MYT Order for Control Period from FY to FY Page 8

28 Sr. No. Particulars FY FY Other Income Targeted Subsidy Other Subsidy Total Revenue after Subsidy Revenue Gap/(Surplus) Aggregate Revenue Requirement for MYT Control Period APDCL has projected Aggregate Revenue Requirement of Rs Crore for FY , Rs Crore for FY and Rs Crore for FY as detailed in the Table below: Sr. No. Table 2: ARR for FY to as submitted by APDCL (Rs. Crore) Particulars FY FY FY Cost of Power Purchase Operation and Maintenance Expenses 2.1 Employee Cost Repair and Maintenance Administrative and General Expenses Power Purchase Surcharge Interest and Finance Charges 5 Interest on PFC Loan Interest on GoA Loan Other Interest and Finance Charges Depreciation Interest on Working Capital Provision for Bad and Doubtful Debts Total Expenses Add: Return on Equity Less: Non-Tariff Income Less: Miscellaneous Income Less: Operational funding support from GoA APDCL MYT Order for Control Period from FY to FY Page 9

29 Sr. No. Particulars FY FY FY Net Aggregate Revenue Requirement Revenue from sale of surplus power Revenue from sale of power within state at present tariff (including govt. subsidy as well as paisa per unit w.e.f. December, 2016) Revenue Gap/(surplus) APDCL has thus estimated the total revenue gap as shown in the Table below: Table 3: Revenue Gap to be considered for recovery as submitted by APDCL (Rs. Sr. No. Particulars Crore) Revenue Gap 1 Revenue Gap after Truing up of FY Revenue Gap after Truing up of FY Revenue Gap estimated for FY Estimated Revenue Gap for FY Total APDCL submitted that the total revenue deficit of Rs Crore cannot be entirely recovered in a single year as it would result in a tariff shock for consumers. APDCL proposed to recover the total revenue gap of Rs Crore pertaining to FY in FY and the rest may be kept as Regulatory Assets to be liquidated in the subsequent years with adequate carrying cost In order to recover Rs crore additional revenue in FY , APDCL proposed category-wise tariffs with average increase of 6%, with no hike in tariff for Jeevan Dhara (BPL Category) consumers and minor increments in both fixed as well as energy charge for other category of consumers in such a manner so as not to burden any particular category. APDCL submitted that the fixed charge of tariff for all APDCL MYT Order for Control Period from FY to FY Page 10

30 consumer categories has not been revised for more than the last decade. Mostly, the energy charge has been increased as the power supply position was not very impressive and any increase in fixed charge would have put a lot of burden on the consumers as they would end up paying more. With the improved power supply position, APDCL has proposed increase in the fixed charge component so as to ensure full fixed cost recovery. 2.4 Prayers of APDCL APDCL, in its Petition, has prayed as reproduced below: 1. To admit this petition and determination of ARR for FY to FY To allow recovery of Revenue Gap for FY to FY as given in the petition, in addition to past period dues. 3. To allow APDCL to file the truing up petition of past years along with tariff proposal for FY by 30 th November To grant any other relief as the Hon ble Commission may consider appropriate. 5. Pass any other order as the Hon ble Commission may deem fit and appropriate under the circumstances of the case and in the interest of justice. APDCL MYT Order for Control Period from FY to FY Page 11

31 Brief Summary of Objections Raised, Response of the APDCL and Commission s Comments The Commission has received comments/suggestions from the following eight (8) stakeholders on the Petition filed by APDCL: Sr. No. Name of Objector 1 Assam Bidyut Grahak Adhikar Parishad 2 Grahak Suraksha Sanstha 3 Shri Anuj Kumar Baruah 4 Assam Branch of Indian Tea Association (ABITA), Guwahati 5 North Eastern Small Scale Industries Association (NESSIA) 6 Federation of Industry & Commerce of North Eastern Region (FINER) 7 Shri Jayanta Deka 8 Premier Cryogenics Ltd In addition to the above, Assam Tea Planters Association (ATPA) and Ulubari Smashan Committee submitted their comments on APDCL s Petition during the Public Hearing APDCL has submitted its responses to the objections/ suggestions received from the above objectors The Commission considered the objections/ suggestions received and notified the objectors to take part in the Hearing process by presenting their views in person before the Commission, if they so desired The Commission held the Hearing at Assam District Library Auditorium, Guwahati on February 28, The objector/s attended the Hearings and submitted their views/suggestions. All the written representations submitted to the Commission and the oral submissions made APDCL MYT Order for Control Period from FY to FY Page 12

32 before the Commission in the Hearing and the responses of APDCL have been carefully considered while issuing this Tariff Order The objections/suggestions made by the objectors and responses of the Petitioner are briefly dealt with in this Chapter. The major issues raised by the objectors are discussed below along with the response of the Petitioner (APDCL) and views of the Commission While all the objections/suggestions have been given due consideration by the Commission, only, major responses/objections received related to the ARR and Tariff Petition and also those raised during the course of Hearings have been grouped and addressed issue-wise, in order to avoid repetition. Issue 1: Revenue (Gap)/Surplus Objection ABITA and ATPA submitted that APDCL has claimed huge amount of Revenue Gap for FY and FY , which prima-facie seems to be unjustified as the same have no linkage with the principles set under the Tariff Regulations, ABITA submitted that APDCL has proposed to recover cumulative Revenue Gap of Rs Crore, which would translate to an increase of 26% over the existing tariff, while as per ABITA s calculation, APDCL should be in a position to earn a Revenue Surplus for all the three years of the Control Period. ABITA requested the Commission to disallow the proposed exorbitant Revenue Gap projected by APDCL, which does not have any basis. Shri Jayanta Deka submitted that as per Table 4, revenue deficit is Rs Crore (upto FY ) and APDCL has proposed to decrease the deficit by revising the tariff in FY Shri Deka added that such a huge deficit has occurred due to lapses/negligence /inaction of APDCL, who is proposing to impose such a burden upon the consumer. ATPA submitted that the Commission should true-up for FY and FY and give credit to the consumers for the excess tariff paid by the consumers. APDCL MYT Order for Control Period from FY to FY Page 13

TARIFF ORDER TRUE-UP FOR FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY

TARIFF ORDER TRUE-UP FOR FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER TRUE-UP FOR FY 2014-15 & FY 2015-16 AND ARR FOR FY 2016-17 to FY 2018-19 AND TARIFF FOR FY 2017-18 Assam Electricity Grid Corporation Limited

More information

TARIFF ORDER. TRUE-UP FOR FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY

TARIFF ORDER. TRUE-UP FOR FY & FY AND ARR FOR FY to FY AND TARIFF FOR FY ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER TRUE-UP FOR FY 2014-15 & FY 2015-16 AND ARR FOR FY 2016-17 to FY 2018-19 AND TARIFF FOR FY 2017-18 Assam Power Generation Corporation Limited

More information

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER FY Assam Electricity Grid Corporation Limited (AEGCL)

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER FY Assam Electricity Grid Corporation Limited (AEGCL) ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER FY 2014-15 Assam Electricity Grid Corporation Limited (AEGCL) Petition No. 12/2013 Petition No. 13/2014 ASSAM ELECTRICITY REGULATORY COMMISSION

More information

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER TRUING UP OF FY , APR OF FY AND ARR & TARIFF FOR FY

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER TRUING UP OF FY , APR OF FY AND ARR & TARIFF FOR FY ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) TARIFF ORDER TRUING UP OF FY 2013-14, APR OF FY 2014-15 AND ARR & TARIFF FOR FY 2015-16 Assam Power Generation Corporation Limited (APGCL) Petition No. 9/2015

More information

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL) BIHAR ELECTRICITY REGULATORY COMMISSION Case 54 of 2015 Tariff Order Truing-up for FY 2014-15, Annual Performance Review (APR) for FY 2015-16, Annual Revenue Requirement (ARR) for FY 2016-17 to FY 2018-19

More information

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2017 HESCOM ANNUAL PERFORMANCE REVIEW FOR FY16

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2017 HESCOM ANNUAL PERFORMANCE REVIEW FOR FY16 KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2017 OF HESCOM ANNUAL PERFORMANCE REVIEW FOR FY16 & REVISION OF ANNUAL REVENUE REQUIREMENT FOR FY18 & REVISION OF RETAIL SUPPLY TARIFF FOR FY18

More information

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) BUSINESS PLAN ORDER FOR THE CONTROL PERIOD FROM FY TO FY

ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) BUSINESS PLAN ORDER FOR THE CONTROL PERIOD FROM FY TO FY ASSAM ELECTRICITY REGULATORY COMMISSION (AERC) BUSINESS PLAN ORDER FOR THE CONTROL PERIOD FROM FY 2016-17 TO FY 2018-19 Assam Power Distribution Company Limited (APDCL) Petition No. 07/2016 ASSAM ELECTRICITY

More information

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2018 BESCOM ANNUAL PERFORMANCE REVIEW FOR FY17

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2018 BESCOM ANNUAL PERFORMANCE REVIEW FOR FY17 KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2018 OF BESCOM ANNUAL PERFORMANCE REVIEW FOR FY17 & REVISION OF ANNUAL REVENUE REQUIREMENT FOR FY19 & REVISION OF RETAIL SUPPLY TARIFF FOR FY19

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION Case No. TP- 41 of 2012 Order on Truing up for FY 2011-12 & Review for FY 2012-13 of erstwhile BSEB And Determination of Multi Year Aggregate Revenue Requirement

More information

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...

More information

Order on Truing up of FY

Order on Truing up of FY BIHAR ELECTRICITY REGULATORY COMMISSION Order on Truing up of FY 2012-13 For BIHAR STATE POWER HOLDING COMPANY LIMITED (BSPHCL) Case No. 21 of 2013 28 th February, 2014 CONTENTS ORDER... 1 1. Introduction...

More information

Torrent Power Limited Distribution Dahej

Torrent Power Limited Distribution Dahej g- GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY and Determination of Tariff for FY 2018-19 For Torrent Power Limited Distribution Dahej Case No. 1698 of 2018 4 th April, 2018

More information

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No.

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No. 2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case 1624 /2016 In respect of Petition for True up of & Determination of Multi-Year ARR for to & Determination of final ARR for

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case No. 1761 /2018 In respect of Petition for True up of & Mid-Term Review of ARR for to & Tariff determination for Filed by:-

More information

Case No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER

Case No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre No. 1, 13 th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E mail: mercindia@merc.gov.in Website:

More information

Determination of Tariff for Generation and Distribution

Determination of Tariff for Generation and Distribution TAMIL NADU ELECTRICITY REGULATORY COMMISSION Determination of Tariff for Generation and Distribution Order in T.P. No.1 of 2017 dated 11-08-2017 (Effective from 11-08-2017) Tamil Nadu Electricity Regulatory

More information

3.1 In FY , the transmission loss is 4.08% as compared to last year loss

3.1 In FY , the transmission loss is 4.08% as compared to last year loss ASSAM ELECTRICITY GRID CORPORATION LIMITED Truing Up for FY 2013-14, Annual Performance Review for FY 2014-15 & Revised ARR for FY 2015-16 and Transmission Tariff for FY 2015-16 1 Truing up for FY 2013-14

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True up for FY 2015-16 and Annual Performance Review of FY 2016-17 and Determination of Annual Revenue requirement (ARR) and Tariff for FY 2017-18 for Jamshedpur Utilities & Services Company Limited

More information

Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited (HPSEBL) For the period FY to FY

Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited (HPSEBL) For the period FY to FY Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited (HPSEBL) For the period FY 2014-15 to FY 2018-19 Himachal Pradesh Electricity Regulatory Commission June 12, 2014 BEFORE THE

More information

Madhya Gujarat Vij Company Limited (MGVCL)

Madhya Gujarat Vij Company Limited (MGVCL) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2016-17 and Determination of Tariff for FY 2018-19 For Madhya Gujarat Vij Company Limited (MGVCL) Case No. 1701/2018 31 st March,

More information

Dakshin Gujarat Vij Company Limited (DGVCL)

Dakshin Gujarat Vij Company Limited (DGVCL) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2016-17 and Determination of Tariff for FY 2018-19 For Dakshin Gujarat Vij Company Limited (DGVCL) Case No. 1700/2018 31 st March,

More information

Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Regulatory Commission Fourth Annual Performance Review Order For 3 rd MYT Control Period (FY15-FY19) & Determination of Tariff for FY19 & True-up of FY16 of 3 rd MYT Control Period for Himachal Pradesh State Electricity Board

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/ 65/ 69; Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case 1549 /2015 In respect of Petition for True Up of & Determination of Provisional ARR and Tariff for Under GERC (Multi Year

More information

Kandla Port Trust (KPT)

Kandla Port Trust (KPT) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order For Kandla Port Trust (KPT) Case No. 1474 of 2015 23 rd April, 2015 6 th Floor, GIFT ONE, Road 5C, GIFT City, Gandhinagar 382335 (Gujarat) India Phone:

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on Annual Performance Review for FY 2016-17 and Determination of Revised ARR and Tariff for the FY 2017-18 & FY 2018-19 for Jharkhand Bijli Vitran Nigam Limited (JBVNL) Ranchi 27.04.2018 TABLE OF

More information

ASSAM ELECTRICITY REGULATORY COMMISSION

ASSAM ELECTRICITY REGULATORY COMMISSION ASSAM ELECTRICITY REGULATORY COMMISSION FILE NO. AERC. 511/2015 Petition No.: 14/2015 ORDER SHEET 21.12.2015 Before the Assam Electricity Regulatory Commission ASEB Campus, Dwarandhar, G. S. Road, Sixth

More information

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION Tariff Order For True up for FY 2014-15 And Annual Revenue Requirement & Transmission Tariff For FY 2017-18 MEGHALAYA POWER TRANSMISSION CORPORATION LIMITED

More information

CASE No. 69 of In the matter of

CASE No. 69 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area 2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION MERGEFORMAT. Tariff Order. Truing up for FY , Approval of Final ARR for FY ,

GUJARAT ELECTRICITY REGULATORY COMMISSION MERGEFORMAT. Tariff Order. Truing up for FY , Approval of Final ARR for FY , SHAPE \* GUJARAT ELECTRICITY REGULATORY COMMISSION MERGEFORMAT Tariff Order Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY 2017-18 to FY 2020-21 and Determination

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION Determination of Intra-State Transmission Tariff and other related charges

TAMIL NADU ELECTRICITY REGULATORY COMMISSION Determination of Intra-State Transmission Tariff and other related charges TAMIL NADU ELECTRICITY REGULATORY COMMISSION Determination of Intra-State Transmission Tariff and other related charges Order in T.P. No. 2 of 2017 dated 11-08-2017 (effective from 11-08-2017) Tamil Nadu

More information

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST)

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST) BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST) EXECUTIVE SUMMARY OF Annual Performance Review for FY 2008-09 & ARR for FY 2009-10 along with Truing Up of Accounts for FY 2007-08 TO Maharashtra

More information

Gujarat Energy Transmission Corporation Limited (GETCO)

Gujarat Energy Transmission Corporation Limited (GETCO) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2014-15, Approval of Provisional ARR for FY 2016-17 For Gujarat Energy Transmission Corporation Limited (GETCO) Case No. 1545 of

More information

PETITION FOR ANNUAL REVENUE REQUIREMENT FOR THE FINANCIAL YEARS TO

PETITION FOR ANNUAL REVENUE REQUIREMENT FOR THE FINANCIAL YEARS TO PETITION FOR ANNUAL REVENUE REQUIREMENT FOR THE FINANCIAL YEARS 2007-08 TO 2009-10 And TARIFF PROPOSAL FOR THE FINANCIAL YEAR 2007-2008 Submission of Text and Affidavit To Assam Electricity Regulatory

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos.

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos. MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 TH Floor Metro Plaza, Bittan Market", Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2012-13 Petition Nos. 72/2011

More information

TARIFF ORDER of CSPDCL for FY and Final True-up for Previous Years of CSPGCL, CSPTCL, SLDC & CSPDCL

TARIFF ORDER of CSPDCL for FY and Final True-up for Previous Years of CSPGCL, CSPTCL, SLDC & CSPDCL TARIFF ORDER of CSPDCL for FY 2014-15 and Final True-up for Previous Years of CSPGCL, CSPTCL, SLDC & CSPDCL Chhattisgarh State Power Generation Company Limited [Petition No. 05 of 2014] Chhattisgarh State

More information

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003

More information

TARIFF ORDER. Petition No. 250/2017. For. Electricity Department, UT of Dadra and Nagar Haveli (Transmission Division)

TARIFF ORDER. Petition No. 250/2017. For. Electricity Department, UT of Dadra and Nagar Haveli (Transmission Division) TARIFF ORDER True-up of FY 2014-15, FY 2015-16 and FY 2016-17, Annual Performance Review of FY 2017-18 and Approval of Aggregate Revenue Requirement (ARR) and determination of tariff for FY 2018-19 Petition

More information

Case No. 67 of Dr. Pramod Deo, Chairman Shri A. Velayutham, Member Shri S. B. Kulkarni, Member O R D E R

Case No. 67 of Dr. Pramod Deo, Chairman Shri A. Velayutham, Member Shri S. B. Kulkarni, Member O R D E R Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in Case No.

More information

Paschim Gujarat Vij Company Limited (PGVCL)

Paschim Gujarat Vij Company Limited (PGVCL) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2016-17 and Determination of Tariff for FY 2018-19 For Paschim Gujarat Vij Company Limited (PGVCL) Case No. 1702/2018 31 st March,

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on Approval of Business Plan And ARR for MYT Control Period FY 2016-17 to FY 2020-21 And Transmission and SLDC Tariff for FY 2016-17 for Jharkhand Urja Sancharan Nigam Ltd (JUSNL) Ranchi February

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri. T.M.Manoharan, Chairman Sri.P.Parameswaran, Member Sri.Mathew George, Member 15 th May, 2013 Petition OP No. 42/2012 In the

More information

Petition for Final Truing-up of FY , FY & FY Provisional Truing up of FY and MYT Petition for Third MYT Control Period

Petition for Final Truing-up of FY , FY & FY Provisional Truing up of FY and MYT Petition for Third MYT Control Period Petition for Final Truing-up of FY 2012-13, FY 2013-14 & FY 2014-15 Provisional Truing up of FY 2015-16 and MYT Petition for Third MYT Control Period FY 2016-17 to FY 2019-20 (Case No. 33 of 2016) Brihan

More information

Determination of Tariff for FY , Annual Performance Review of FY and True-up of FY

Determination of Tariff for FY , Annual Performance Review of FY and True-up of FY TARIFF ORDER Determination of Tariff for FY 2017-18, Annual Performance Review of FY 2016-17 and True-up of FY 2015-16 Petition No. 226/2017 For DNH Power Distribution Corporation Limited 09 th June 2017

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015 UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015 DETERMINATION OF ANNUAL REVENUE REQUIREMENT (ARR) AND TARIFF FOR FY 2016-17 AND TRUE UP OF ARR AND REVENUE FOR FY 2013-14

More information

(i) ARR for FY as per MERC (Terms and Conditions of Tariff) Regulations, 2005, and (ii) MYT

(i) ARR for FY as per MERC (Terms and Conditions of Tariff) Regulations, 2005, and (ii) MYT THE TATA POWER COMPANY LIMITED Bombay House, 24, Homi Mody Street, Mumbai 400 001 Website: www.tatapower.com PUBLIC NOTICE Objections / Comments on Tata Power-Distribution Business' (Tata Power-D) Petition

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True up for FY 2014-15 and Annual Performance Review of FY 2015-16 and Business Plan & ARR for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 and Tariff for FY 2016-17 for Jamshedpur Utilities

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

ASSAM ELECTRICITY REGULATORY COMMISSION ORDER

ASSAM ELECTRICITY REGULATORY COMMISSION ORDER ASSAM ELECTRICITY REGULATORY COMMISSION FILE NO. AERC. 576 (B)/2016/Pt-II Petition No.: 27/2016 ORDER 30.12.2016 Before the Assam Electricity Regulatory Commission ASEB Campus, Dwarandhar, G. S. Road,

More information

Paschim Gujarat Vij Company Ltd.

Paschim Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR CASE NO. Filing of the Petition for True Up of FY 2015-16 & Determination of Multi-Year ARR for FY 2016-17 to FY 2020-21 & Determination

More information

Petition for True-Up of FY And Determination of Tariff for FY

Petition for True-Up of FY And Determination of Tariff for FY BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION, GANDHINAGAR Petition for True-Up of FY 2013-14 And Determination of Tariff for FY 2015-16 Under GERC (Multi Year Tariff) Regulations, 2011 along with

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. : 984/2014 FILED BY NOIDA POWER COMPANY LIMITED IN THE MATTER OF

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. : 984/2014 FILED BY NOIDA POWER COMPANY LIMITED IN THE MATTER OF UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. : 984/2014 FILED BY NOIDA POWER COMPANY LIMITED IN THE MATTER OF APPROVAL OF ANNUAL REVENUE REQUIREMENT AND DETERMINATION OF TARIFF

More information

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC)

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC) MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC) Tariff Order For Annual Revenue Requirement & Generation Tariff For FY 2015 16 List of Contents ORDER... 1 1. Introduction... 5 1.1 1.2 1.3 1.4

More information

MYT PETITION FOR JUBILANT INFRASTRUCTURE LTD

MYT PETITION FOR JUBILANT INFRASTRUCTURE LTD BEFORE THE HON BLE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD Filing No. Case No.. /2012 IN THE MATTER OF Filing of Petition under section 62 of the Electricity Act, 2003 for Aggregate Revenue

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True up for FY 2015-16, And Annual Performance Review of FY 2016-17, And ARR and Tariff for FY 2017-18 for Tata Steel Limited (TSL) Ranchi 18 May, 2018 THIS SPACE IS INTENTIONALLY LEFT BLANK 2

More information

Jharkhand State Electricity Regulatory Commission. Multi Year Order for Determination of ARR from FY to FY

Jharkhand State Electricity Regulatory Commission. Multi Year Order for Determination of ARR from FY to FY Multi Year Order for Determination of ARR from FY 2013-14 to FY 2015-16 and Retail Supply Tariff for DVC Command area of Jharkhand Damodar Valley Corporation (DVC) Ranchi September 2014 TABLE OF CONTENTS

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True-up for 2006-07 to 2013-14 And Annual Performance Review for 2014-15 for DVC Command Area of Jharkhand Damodar Valley Corporation (DVC) Ranchi April 2017 DVC Order on True-up for 2006-07 to

More information

Jammu & Kashmir State Electricity Regulatory Commission

Jammu & Kashmir State Electricity Regulatory Commission Jammu & Kashmir State Electricity Regulatory Commission Order on True-Up for FY 2013-14, Annual Performance Review for FY 2014-15 and Determination of ARR and Tariff for FY 2015-16 for Power Development

More information

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

State Load Dispatch Centre (SLDC)

State Load Dispatch Centre (SLDC) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for, Approval of Provisional ARR for FY 2016-17 For State Load Dispatch Centre (SLDC) Case No. 1546 of 2015 31 st March, 2016 6 th Floor,

More information

Jammu & Kashmir State Electricity Regulatory Commission

Jammu & Kashmir State Electricity Regulatory Commission Jammu & Kashmir State Electricity Regulatory Commission Order on Annual Performance Review FY 2014-15 And transmission tariff for FY 2015-16 for Power Development Department Transmission, Govt. of J&K

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

Case No. 100 of 2009 MERC Order for RInfra-T for APR of FY and ARR for FY Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Case No. 100 of 2009 MERC Order for RInfra-T for APR of FY and ARR for FY Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

Order in Petition No. 192/2016

Order in Petition No. 192/2016 Order in Petition No. 192/2016 Order on True up for FY 2014-15, Review of FY 2015-16 Aggregate Revenue Requirement for 1 st MYT Control Period (FY 2016-17 to FY 2018-19) & Wheeling & Retail Supply Tariff

More information

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur ANNUAL REVENUE REQUIREMENT AND TARIFF PROPOSAL PETITION FOR FY 2015-16 Submitted By: Madhya Pradesh Power Management Company Limited Shakti Bhawan, Vidyut Nagar, Jabalpur Madhya Pradesh Poorv Kshetra Vidyut

More information

ORDER. Case No. 112 of 2008

ORDER. Case No. 112 of 2008 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022-22163964/6569 Fax 022-22163976 Email: mercindia@mercindia.org.in

More information

AMENDMENT ORDER DATED

AMENDMENT ORDER DATED KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM Petition No. : OP 37/2013 In the matter of Petitioner : Amendment to ARR & ERC of M/s Kanan Devan Hills Plantations Company Limited for

More information

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY *********

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY ********* AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY 2016-17 ********* Submitted by: - Madhya Pradesh Power Management Company Limited, Shakti Bhawan, Vidyut Nagar, JABALPUR Madhya Pradesh Poorva Kshetra

More information

Tariff Order. For. True up for FY and Determination of ARR and Generation Tariff for FY

Tariff Order. For. True up for FY and Determination of ARR and Generation Tariff for FY MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION Tariff Order For True up for FY 2014-15 and Determination of ARR and Generation Tariff for FY 2017-18 MEGHALAYA POWER GENERATION CORPORATION LIMITED CONTENTS

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

Multi Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19

Multi Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19 Multi Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19 Himachal Pradesh Electricity Regulatory Commission 10 th June, 2014 Himachal Pradesh Electricity

More information

TARIFF ORDER FOR MANIPUR STATE POWER DISTRIBUTION COMPANY LIMITED. Petition (ARR & Tariff) No.2 of 2016

TARIFF ORDER FOR MANIPUR STATE POWER DISTRIBUTION COMPANY LIMITED. Petition (ARR & Tariff) No.2 of 2016 TARIFF ORDER True up for FY 2014-15 and FY 2015-16, Review for FY 2016-17, Determination of Aggregate Revenue Requirement & Retail Tariff for FY 2017-18 FOR MANIPUR STATE POWER DISTRIBUTION COMPANY LIMITED

More information

Executive Summary. Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11

Executive Summary. Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11 RInfra-Distribution (RInfra-D) Wire and Retail Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11 Executive Summary Filed with Maharashtra

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM RP 6/2017 In the matter of : Review petition filed by M/s Kanan Devan Hill Plantations Company Private Limited (KDHPCL) seeking review

More information

BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION

BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION In the Matter of: Petitioner : Review Petition against KSERC order dated 14 August 2014 on Petition OP No. 9 of 2014 on ARR & ERC of

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on approval of Business plan and determination of ARR for the control period to (including True up for 2015-16 ) for Tata Power Company Limited (TPCL) Ranchi 19 February 2018 to (including True up

More information

Gujarat Energy Transmission Corporation Limited (GETCO)

Gujarat Energy Transmission Corporation Limited (GETCO) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2011-12 and For Gujarat Energy Transmission Corporation Limited (GETCO) Case No. 1262 of 2012 28 th 1st Floor, Neptune Tower, Opp.:

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

Gujarat Energy Transmission Corporation Limited (GETCO)

Gujarat Energy Transmission Corporation Limited (GETCO) GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2015-16, Approval of Final ARR for FY 2016-17, Approval of Multi-Year ARR for FY 2016-17 to 2020-21, and Determination of Tariff

More information

Case No. 158 of 2011 IN THE MATTER OF

Case No. 158 of 2011 IN THE MATTER OF Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th Floor, Cuffe Parade, Mumbai - 400 005 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in Case

More information

PETITION FOR ANNUAL REVENUE REQUIREMENT

PETITION FOR ANNUAL REVENUE REQUIREMENT PETITION FOR ANNUAL REVENUE REQUIREMENT And TARIFF PROPOSAL FOR THE FINANCIAL YEAR 2006-2007 Submission of Text and Affidavit To Assam Electricity Regulatory Commission By Assam State Electricity Board

More information

Order in Petition No. 193/2016

Order in Petition No. 193/2016 Order in Petition No. 193/2016 Order on True up for FY 2014-15, Review of FY 2015-16 Aggregate Revenue Requirement for 1 st MYT Control Period (FY 2016-17 to FY 2018-19) & Wheeling & Retail Supply Tariff

More information

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 60 / 13-14

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 60 / 13-14 TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR 2014 2015 IN CASE NO: TP 60 / 13-14 IN RE THE TARIFF APPLICATION OF THE WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY. Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY. Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF DETERMINATION OF ANNUAL REVENUE REQUIREMENT (ARR) AND

More information

ORDER ON TRUE-UP OF ARR FOR THE PERIOD April 06 to March 07

ORDER ON TRUE-UP OF ARR FOR THE PERIOD April 06 to March 07 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 ORDER ON TRUE-UP OF ARR FOR THE PERIOD April 06 to March 07 Petition Nos. PRESENT: 22/08

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Provisional Tariff Order on Annual Revenue Requirement for FY 2007-08, FY 2008-09, FY 2009-10, FY 2010-11 and FY 2011-12 and Determination of Provisional Tariff for FY 2011-12 for Jharkhand State Electricity

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM Application No : OA 12/2017 In the matter of : Applicant Application for the approval of revised ARR & ERC for the year 2017-18 filed by

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True up for FY 2013-14 and Annual Performance Review of FY 2014-15 and Revised ARR and Tariff for FY 2015-16 for Tata Steel Limited (TSL) Ranchi 31 st May 2015 THIS SPACE IS INTENTIONALLY LEFT

More information

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1 TABLE OF CONTENTS 1. BACKGROUND... 4 1.1. Introduction... 4 1.2. Objective of the present MYT Petition... 4 2. TRUING UP OF FY 2014-15... 4 2.1. Operational Performance for FY 2014-15... 5 2.2. Fuel Cost

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2014-15 Petition Nos. Petition

More information

NOTIFICATION. No.HPERC/dis/479: Shimla the 30 th March, 2012

NOTIFICATION. No.HPERC/dis/479: Shimla the 30 th March, 2012 HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA NOTIFICATION No.HPERC/dis/479: Shimla the 30 th March, 2012 WHEREAS the Distribution Licensee incurs an extra power purchase cost vis-a- vis the

More information

Uttar Gujarat Vij Company Limited

Uttar Gujarat Vij Company Limited GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order:, For Uttar Gujarat Vij Company Limited Suo - Motu Case No.1194 of 2012 2 nd 1 st Floor, Neptune Tower, Opp.: Nehru Bridge, Ashram Road Ahmedabad-380

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Tariff Order on True up for 2011-12 & 2012-13 and ARR for Multi-Year Tariff Period from 2013-14 to 2015-16 and Tariff for 2013-14 for Tata Steel Limited (TSL) Ranchi June 2014 TABLE OF CONTENTS A1: INTRODUCTION...

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Provisional Tariff Order on Annual Revenue Requirement for Financial Years 2010-11, 2011-12 & 2012-13 and Determination of Distribution Tariff for Financial Year 2012-13 for SAIL-Bokaro Ranchi August 2012

More information

Vidarbha Industries Power Limited - Transmission

Vidarbha Industries Power Limited - Transmission Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed

More information

(Multi Year Distribution Tariff)

(Multi Year Distribution Tariff) JAMMU & KASHMIR STATE ELECTRICITY REGULATORY COMMISSION Draft (Multi Year Distribution Tariff) REGULATIONS, 2012. JKSERC www.jkserc.nic.in 1 Contents PART-I PRELIMINARY 1. Short Title and Commencement

More information

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016 1 BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016 IN THE MATTER OF: Petition under Section 86 read with Section 181 of the Electricity Act, 2003 for amendment of