1 Damage to Existing Property WELCAR 2001 Asia Offshore Energy Conference 26 September 2014 Barry Stimpson Partner
2 What are the issues? Introduction to DTEP issue Contractual background WELCAR 2001 coverage under Sections I and II Existing Property exclusion and Buyback
3 Contractual Regime Sub/Contractor Other Assured Existing Project Tie-In + Crossover Company Principal Assured Logic K4K PROJECT Operational Property Insurers WELCAR S.II
4 Introduction to DTEP issue Existing Property exposure for Owner/Operator Tie-ins to owned or partially-owned property at location Historically dealt with in Liability section of CAR policies
5 LOGIC Company and Contractor definitions Permanent Works
6 LOGIC Indemnities Indemnity regime on a knock-for-knock basis except for third party liabilities arising from fault of Contractor or Company
7 Tie-In and Pipeline Agreement(s) Indemnity given to existing field operator by project operator Extent of indemnity usually assumes all responsibility for damage to existing property arising from tie-in or cross over activities irrespective of negligence Scope of indemnity can often extend to loss of revenue and loss of use, as well as pollution and clean-up liability
8 WELCAR 2001 Section I and II distinct and not always placed together S.1 - primary/s. 2 - excess Scope of Insurance for Sections I and II covers activities undertaken in the course of the Project provided such are within insured values.
9 WELCAR Section 1 Section I - Insured Property includes works in performance of all contracts relating to the Project, provided included in contract values, including all temporary works and insured equipment and/or property that is not for incorporation into the contract works shall be covered whilst it is being utilised in the Project - Not covered: - Existing property which does not form part of Project Works and has not been declared to contract values
10 WELCAR Section II Coverage to indemnify the Assured for Ultimate Net Loss which Assured is obligated to pay by reason of: i. Liability imposed upon the Assured by law and/or ii. Express Contractual Liability for bodily injury of Property Damage caused by an occurrence and arises out of activities described in Scope of Insurance
11 WELCAR Section II Cross Liabilities of each Assured to the other is covered with limited exceptions In no case shall this Section II of the Policy provide coverage for any physical loss of or physical damage to or defects discovered in the property insured under Section I. Exclusion 21 Section II does not apply to actual or alleged liability for damage to or loss of or loss of use of property owned, used or in control, custody or control of Assured
12 DTEP Buyback (in Section II) Existing Property/Contractual Exclusion Buyback Nothwithstanding Existing Property/Contractual Exclusion contained in this Policy, it shall not apply to any claim for: physical loss of and/or physical damage to existing property identified on the attached schedule of insured property. DTEP buyback intended to provide cover for liability for damage caused to existing property and negates effect of Exclusion 21
13 Liability issues 1. Arguably there remains no trigger of cover under Section II due to (i) the absence of the Assured s liability to another party, and (ii) the absence of an obligation to pay 2. Also, Section II is an excess cover so should the Assured s operational policy not respond first? - Digby v General Accident [1940] CA LLLR at But, insurers have taken premium to provide indemnity for liability for loss/damage to Assured s existing property!
14 100% owned by same Company Sub/Contractor Other Assured Existing Project Company Principal Assured Logic K4K PROJECT Operational Property Insurers WELCAR S.II DTEP buy-back required
15 100% Third party Existing Property Sub/Contractor Other Assured Existing Project Company Principal Assured Logic K4K PROJECT Operational Property Insurers WELCAR S.II No DTEP buyback required
16 Partly owned by same Company Sub/Contractor Other Assured Existing Project Company Principal Assured Logic K4K PROJECT Operational Property Insurers WELCAR S.III? WELCAR S.II DTEP buy-back required
17 Reinsurance Absence of legal liability could impact insurers ability to recover Section II Buy back payments from their reinsurers Exxon Valdez liabilities - King Syndicate v Brandywine
18 Possible Solutions?
19 Disclaimer The views expressed by the author are his own and do not necessarily reflect that of ReedSmith LLP. The information in this presentation does not constitute legal advice and no reliance should be made on the contents of the presentation. Specific legal advice should be sought in every instance.
Braemar Adjusting DAMAGE TO EXISTING PROPERTY UNDER WELCAR 2001 SOME ISSUES. Tim Taylor, Clyde & Co LLP 14 November 2013
Braemar Adjusting DAMAGE TO EXISTING PROPERTY UNDER WELCAR 2001 SOME ISSUES Tim Taylor, Clyde & Co LLP 14 November 2013 WELCAR 2001 Scope of WELCAR Sections I and II Practical problems with Existing Property
More informationDamage to Existing Property Coverage Property Damage or Third Party Liability?
Damage to Existing Property Coverage Property Damage or Third Party Liability? Frank Streidl Head of Offshore Energy AOEC - 26 September 2014 Disclaimer Please Read "Whilst all reasonable care has been
More informationINDEMITY AND HOLD HARMLESS AGREEMENT
INDEMITY AND HOLD HARMLESS AGREEMENT (Individual / Group / Contractor) agrees to release, indemnify, and hold harmless the CITY OF VENTNOR and/or the Atlantic County Municipal Joint Insurance Fund, and
More informationINDEMNITY AGREEMENT THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS COUNTY OF NUECES
INDEMNITY AGREEMENT THE STATE OF TEXAS COUNTY OF NUECES KNOW ALL MEN BY THESE PRESENTS WHEREAS, Section iii of said standards, entitled Procedure and Permit Requirements, requires a contractor for a permit
More informationCoverage for Contractual Risk Transfer and Additional Insured Issues
Coverage for Contractual Risk Transfer and Additional Insured Issues Jeffrey J. Vita and Edwin L. Doernberger Tracy Alan Saxe Saxe, Doernberger & Vita, P.C. Introduction Outline Contractual Indemnity Additional
More informationTRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS
TRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS These Insurance & Indemnification Terms & Conditions ( Terms ) are hereby incorporated in and made a part of each and every written
More informationINSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Effective Date: April 23, 2018
INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Effective Date: April 23, 2018 The contract documents for each construction project will identify the standard specifications to be used for that specific
More informationSAMPLE SUBCONTRACTOR AGREEMENT
SAMPLE SUBCONTRACTOR AGREEMENT This Agreement, as negotiated herein, is entered into by and between, Subcontractor and, Contractor on this day of, 20. Subcontractor,, agrees to provide the following described
More informationLNG CONDITIONS OF USE
LNG CONDITIONS OF USE BRIDGING THE GAP Alec Kyrle-Pope, Senior Claims Executive 1 Leadership in Action 1 The Issues 1. Terminal Conditions - The Good, The Bad & The Ugly 2. Insurance - P&I Club Rules &
More informationSubcontractor Work Authorization Form
Subcontractor Work Authorization Form Date: Project Name and Address Project Owner and Address: Project Lender and Address: (if any - use address of branch) Direct Contractor Name and Address: (if direct
More informationRISK and. Contractor Insurance
RISK and Contractor Insurance Who Am I and What Do I Do Why Am I Here Title of Presentation 3 Liability versus Workers Compensation An Example A worker is on a tower site. He works for a subcontractor
More informationRisk Allocation in Offshore Construction Contracts 0
0 24 October 2013 Allocation of Risk Issues in Offshore Construction Contracts Asia Offshore Energy Conference 2013 Mark Errington 24 October 2013 Risk Allocation - General Standard approach to risk allocation
More informationW.E. O Neil Construction Co. of Arizona c/o (Project Coordinator) 4511 E. Kerby Avenue Phoenix, AZ Fax (480)
W.E. O NEIL CONSTRUCTION CO. OF ARIZONA INSURANCE REQUIREMENTS Project Name Project Address City, State Zip Subcontractor SHALL NOT COMMENCE WORK at the site until it has obtained and provided all insurance
More informationSubcontract Agreement
S THIS AGREEMENT made as of the day of, 2012 BETWEEN the Contractor: TCL Partners 5212 123 rd Place SE Everett, WA 98208 and the For the Following Project: The Architect for the Project: The Contractor
More informationGLOBAL WARMING AND CLIMATE CHANGE: POTENTIAL ISSUES UNDER CGL POLICIES. Robert A. Kole Choate, Hall & Stewart LLP
GLOBAL WARMING AND CLIMATE CHANGE: POTENTIAL ISSUES UNDER CGL POLICIES Robert A. Kole Choate, Hall & Stewart LLP 1 Primary Issues Four significant issues dominate the landscape with regard to the interrelationship
More informationAPPENDIX D ENQUIRY NO. : PUBLIC TENDER NO.: S E R V I C E S TERMS AND CONDITIONS OF PURCHASE ( INCLUDING THIS PAGE )
APPENDIX D TO ENQUIRY NO. : PUBLIC TENDER NO.: S E R V I C E S TERMS AND CONDITIONS OF PURCHASE 11 PAGES ( INCLUDING THIS PAGE ) Appendix D to Schedule C General Terms and Conditions of Purchase Page 1
More information3/4/2016. Claims for Breach of Contract. Claims for Breach of Contract
Indiana State Bar Association BIG 10 CONSTRUCTION & SURETY LAW CLE CONSTRUCTION CONTRACTING WITHOUT BORDERS March 10, 2016 Illinois Construction Law Overview Daniel S. Brennan Laurie & Brennan LLP Two
More informationSAFETY FIRST GRANT CONTRACT
SAFETY FIRST GRANT CONTRACT This agreement (the Contract ) is made this day of, by and between (the Contractor ) and (the Owner ), for the (Name of Parish Corporation, ABN or high school corporation) purpose
More informationSingle Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy
Single Project Professional Indemnity Insurance Proposal Form Note: This is a proposal form for a claims made policy Please provide any necessary explanations or additional details by attaching separate
More informationSTRUCTURAL ENGINEERS ASSOCIATION OF ARIZONA. Gail S. Kelley, P.E., Esq., LEED AP June 3, 2017
STRUCTURAL ENGINEERS ASSOCIATION OF ARIZONA Gail S. Kelley, P.E., Esq., LEED AP June 3, 2017 2 Engineer shall indemnify, defend, and hold harmless the Client Suggested changes: Delete the word defend Edit
More informationAllocating Risk in Real Estate Leases: Contractual Indemnities, Additional Insured Endorsements and Waivers of Subrogation
Presenting a live 90-minute webinar with interactive Q&A Allocating Risk in Real Estate Leases: Contractual Indemnities, Additional Insured Endorsements and Waivers of Subrogation Structuring Lease Provisions
More informationINDOOR BLEACHER SAFETY RAILS MANDATORY WALK-THRU ON MONDAY, MAY 16, 2016 AT 10:00 A.M. AT CENTRAL OFFICE ANNEX, 24 SCHOOL RD.
SPECIFICATIONS AND BID FORMS FOR INDOOR BLEACHER SAFETY RAILS MANDATORY WALK-THRU ON MONDAY, MAY 16, 2016 AT 10:00 A.M. AT CENTRAL OFFICE ANNEX, 24 SCHOOL RD., WESTON, CT 06883 BID: #16-007- BOE Due on
More informationSAMPLE NET CONTRIBUTION CLAUSES
SAMPLE NET CONTRIBUTION CLAUSES Net contribution clauses have been included in consultants conditions of engagement and collateral warranties for some years. They are included in the standard terms of
More informationTHE ROLE OF INSURANCE AND COST REDUCTION IN EPC CONTRACTS
THE ROLE OF INSURANCE AND COST REDUCTION IN EPC CONTRACTS Matthew Smith, Partner K&L Gates LLP Copyright 2016 by K&L Gates LLP. All rights reserved. KEY ROLE OF INSURANCE IN EPC CONTRACTS To optimise the
More informationSharing the Misery: Defects with Construction Defect Coverage
CLM 2016 National Construction Claims Conference September 28-30, 2016 San Diego, CA Sharing the Misery: Defects with Construction Defect Coverage I. A brief history of the law regarding insurance coverage
More informationRail Owner Controlled Insurance Program Manual
Rail Owner Controlled Insurance Program Manual Addendum No. 4 to June 2013 Edition (Updated 08-21-17) Update to Section 5 Enrolled and Excluded Contractor Required Coverage for Package P Contract Section
More informationInsurance Requirements
SECTION A. CONSULTANT shall procure, pay for and maintain the follow ing insurance w ritten by companies approved by the State of Texas and acceptable to CITY. The insurance shall be evidenced by delivery
More informationWho s Responsible? Negotiating Indemnity Agreements with Design Professionals Spring City Attorney Conference May 2, 2012 Hollywood, CA
Who s Responsible? Negotiating Indemnity Agreements with Design Professionals Spring City Attorney Conference May 2, 2012 Hollywood, CA Presented by: Michael N. Conneran Hanson Bridgett LLP mconneran@hansonbridgett.com
More informationCONTRACT. Owner and Contractor agree as follows: 1. Scope of Work.
CONTRACT This agreement (the "Contract") is made this day of, by and between (the "Contractor") and (name of parish corporation, ABN or high school corporation) (the "Owner"), for the purpose of stating
More informationALLOCATION AMONG MULTIPLE CARRIERS IN CONSTRUCTION DEFECT LITIGATION
ALLOCATION AMONG MULTIPLE CARRIERS IN CONSTRUCTION DEFECT LITIGATION FRED L. SHUCHART COOPER & SCULLY, P.C. 700 Louisiana Street, Suite 3850 Houston, Texas 77002 7th Annual Construction Law Symposium January
More informationMega Energy Projects What s in the Contract? Bali, Indonesia, October 2013 Glen Warwick, Partner, Clyde & Co Australia
Mega Energy Projects What s in the Contract? Bali, Indonesia, October 2013 Glen Warwick, Partner, Clyde & Co Australia Megaprojects definition A project that costs more than US$1 billion and that attracts
More informationShould the Company in its absolute discretion elect to accept the return of any goods, the following will apply -
MANUFACTURER'S WARRANTY 1.1 Slogging International warrants that:- 1. under normal operating conditions and circumstances the product "Wheel Slogger" carries a 5 year manufacturer warranty as set out in
More informationIN THE SUPREME COURT OF TEXAS
IN THE SUPREME COURT OF TEXAS 444444444444 No. 06-0867 444444444444 PINE OAK BUILDERS, INC., PETITIONER, V. GREAT AMERICAN LLOYDS INSURANCE COMPANY, RESPONDENT 4444444444444444444444444444444444444444444444444444
More informationADDENDUM A. Subcontractor Insurance Requirements
ADDENDUM A Subcontractor Insurance Requirements Certificates and endorsements must be received and approved prior to the start of any work. No payments will be released until all insurance documents are
More informationINSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i
INSURANCE AND INDEMNIFICATION MANUAL Supplement to Policy 560 Table of Contents.1 INTRODUCTION... 1.2 EXHIBIT I INSURANCE AND INDEMNITY REQUIREMENTS FOR CONSTRUCTION AND SERVICE CONTRACTS... 1 2.1 INDEMNIFICATION/HOLD
More informationThe Gas Advantage Partner Program Agreement
The Gas Advantage Partner Program Agreement This Agreement is entered into this day of, 20 by and between Piedmont Natural Gas Company, Inc. ( Piedmont or "Company") and. Piedmont offers area natural gas
More informationEnvironmental Insurance for Consulting & Construction Projects Empower Results
Environmental Insurance for Consulting & Construction Projects 30th Annual Environmental Permitting Summer School 7/20/16 session Risk Management for Environmental Consultants Contract Requirements Indemnification
More informationBUILDING SERVICES AGREEMENT
BUILDING SERVICES AGREEMENT THIS BUILDING SERVICES AGREEMENT (the Agreement ) is made this day of, 2015, by and between the City of Panama City, a municipality of the State of Florida (the City ) and E.
More informationDECENNIAL LIABILITY INSURANCE
INSURANCE DECEMBER 2018 DECENNIAL LIABILITY INSURANCE As has been reported recently, the Insurance Authority (IA) in the UAE is considering introducing mandatory requirements for decennial liability insurance
More informationThis Agreement is made on between: (date)
This Agreement is made on between: (date) 1. The University of Technology, Sydney (ABN: 77 257 686 961) of 15 Broadway, NSW 2007 (UTS) 2. the Organisation specified in the Placement Summary Form and 3.
More informationPresenting a 90-Minute Encore Presentation of the Teleconference with Live, Interactive Q&A
Presenting a 90-Minute Encore Presentation of the Teleconference with Live, Interactive Q&A Builder's Risk and CGL Insurance for Construction Projects: Mitigating Developer and Contractor Risks Evaluating
More informationBernards (Project Name) CCIP Insurance Manual
Bernards (Project Name) CCIP Insurance Manual Policy Year: xxxx-xxxx Alliant Version 01 1 Table of Contents 1.1 INTRODUCTION... 3 1.2 Overview... 3 1.3 About this Manual... 4 2.0 PROJECT DIRECTORY... 5
More informationLOSS OF OR DAMAGE TO EQUIPMENT FOR A SUM OR VALUE SUFFICIENT TO PROVIDE FOR THEIR REPLACEMENT AT THE SITE.
Risks and Insurances THE PROVIDES THESE INSURANCES FROM THE INSURANCE TABLE THE AMOUNT OF COVER FOR INSURANCE IN RESPECT OF LOSS OF OR DAMAGE TO PROPERTY (EXCEPT THE WORKS, PLANT AND MATERIALS AND EQUIPMENT)
More informationMCGOUGH STANDARD INSURANCE REQUIREMENTS
MCGOUGH STANDARD INSURANCE REQUIREMENTS B1. Insurance. Prior to commencing any Subcontract Work hereunder, the Subcontractor shall procure, maintain and pay for insurance of the type and with the minimum
More informationCity of Rolling Hills INCORPORATED JANUARY 24, 1957
City of Rolling Hills INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CA 90274 (310) 377-1521 FAX (310) 377-7288 Permit requirements and application for collection and disposal
More informationColusa Veterans Hall Bathrooms and Kitchen Remodel Contract
This services contract to remodel the Colusa Veterans Hall bathrooms and kitchen ( Contract ) is between the County of Colusa ( County ), a political subdivision of the State of California and ( Contractor
More informationProfessional Indemnity Insurance. Single Project Proposal Form
Professional Indemnity Insurance Single Project Proposal Form LIABILITY OF THE COMPANY DOES NOT COMMENCE UNTIL THE PROPOSAL HAS BEEN ACCEPTED AND THE PREMIUM HAS BEEN RECEIVED IN A ACCORDANCE WITH THE
More informationEXHIBIT B. Insurance Requirements for Environmental Contractors and/or Consultants
EXHIBIT B Insurance Requirements for Environmental Contractors and/or Consultants Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons
More informationCITY OF CAMPBELL Recreation & Community Services REQUEST FOR PROPOSAL FOR CAMPBELL COMMUNITY CENTER SPINNING BIKES FOR FITNESS PROGRAMS
CITY OF CAMPBELL Recreation & Community Services REQUEST FOR PROPOSAL FOR CAMPBELL COMMUNITY CENTER SPINNING BIKES FOR FITNESS PROGRAMS Contact name: Aaron Bueno Address: 1 W. Campbell Ave. #C-31, Campbell
More informationOPTIMA TRADE PLUS SUMMARY OF COVER
OPTIMA TRADE PLUS SUMMARY OF COVER This document is a guide to the cover provided under your Optima Trade Plus policy. It is only a summary and does not contain the full terms and conditions of the contract.
More informationLeased Line Charge Control (LLCC) Model
Leased Line Charge Control (LLCC) Model Review of financial model July 2012 DISCLAIMER NOTICE This report ( Report ) was prepared by Ernst & Young LLP for the Office of Communications (Ofcom), under Ofcom
More informationAllocating Risk in Real Estate Leases: Contractual Indemnities, Additional Insured Endorsements and Waivers of Subrogation
Presenting a live 90-minute webinar with interactive Q&A Allocating Risk in Real Estate Leases: Contractual Indemnities, Additional Insured Endorsements and Waivers of Subrogation Structuring Lease Provisions
More informationFATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006
FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006 1. CONTRACT. Fatigue Technology Inc. s, hereinafter called FTI, purchase order, or change order to a purchase order, collectively
More information5.0 TERREBONNE PARISH CONSOLIDATED GOVERNMENT, DEFINED.
ARTICLE 5 - Bonds and Insurance 5.0 TERREBONNE PARISH CONSOLIDATED GOVERNMENT, DEFINED. For the purposes of this Article, the terms Terrebonne Parish Consolidated Government, TPCG, and OWNER shall include,
More informationInsurance Requirements
SECTION A. CONTRACTOR shall procure, pay for and maintain the following insurance written by companies approved by the State of Texas and acceptable to CITY. The insurance shall be evidenced by delivery
More informationFILM / TV APPLICATION
City of Ventnor City FILM / TV APPLICATION Mayor Beth Holtzman Commissioner Lance Landgraf Commissioner Tim Kriebel City of Ventnor 6201 Atlantic Avenue Ventnor City, New Jersey 08406 PROCEDURES PERMIT
More informationRISK TRANSFER PROVISIONS
RISK TRANSFER PROVISIONS ARE YOU PROTECTED? ARE YOU EXPOSED? JONATHAN A. CASS JOHN A. GREENHALL TRAVIS SHAFFER OCTOBER 1, 2018 TOPICS The basics on contractual indemnifications and insurance requirements
More informationRIMS DFW Chapter Luncheon 6/22/2011
Blake S. Evans Schubert & Evans, P.C. 900 Jackson St., Suite 630 Dallas, TX 75202 www.schubertevans.com RIMS DFW Chapter Luncheon 6/22/2011 1 Indemnity Provisions Why are they important? An enforceable
More informationEDUCATION AND ADVANCED EDUCATION (PUBLIC SCHOOL DISTRICTS AND PUBLIC POST SECONDARY INSTITUTIONS) OWNER INSURED CONSTRUCTION PROJECTS
EDUCATION AND ADVANCED EDUCATION (PUBLIC SCHOOL DISTRICTS AND PUBLIC POST SECONDARY INSTITUTIONS) OWNER INSURED CONSTRUCTION PROJECTS Indemnification and Insurance Clauses (to be included in Supplementary
More informationSUBCONTRACTOR INFORMATION SHEET
For KCS West Use: 250 East 1 st Street, Suite 600 Phone: (323) 269-0020 Fax: (213) 972-4076 Proof of Review (please initial): Estimating/PreConst. or Project Mgmt. and Safety Dept. (Must be reviewed by
More information2. Attachments a) Design Drawings Drawing(s) Revision Revision Date Specifications (T1.1-T2.8) N/A N/A A /06/17 A1.1 N/A N/A A2.
contractor ract and Scope of Work 8.812 ract To: contractor: LBA Construction LLC 2733 Ross Clark Circle Dothan, Alabama 36301 Scope: Window Film: Provide and install 7 mil shatter resistant window film
More informationROCHESTER SCHOOLS MODERNIZATION PROJECT PHASE 2b School Without Walls Commencement Academy INSURANCE REQUIREMENTS
INSURANCE REQUIREMENTS 00 73 16-1 SECTION 00 73 16 - INSURANCE REQUIREMENTS Contractor shall obtain at its own cost and expense all the insurance described below (the Required Insurance ) that will protect
More informationCARPINTERIA VALLEY WATER DISTRICT RANCHO MONTE ALEGRE (RMA) PHASE 4C LANDSLIDE MITIGATION PROJECT. Bid Addendum 1
CARPINTERIA VALLEY WATER DISTRICT RANCHO MONTE ALEGRE (RMA) PHASE 4C LANDSLIDE MITIGATION PROJECT Bid Addendum 1 This addendum is hereby made a part of the Contract Documents to the same extent as though
More informationAddendum Clauses referred to in Charterers Certificates of Entry or Endorsement Slips.
Addendum Clauses referred to in Charterers Certificates of Entry or Endorsement Slips. This Addendum contains full wordings of clauses which may be incorporated, where contractually agreed, in the terms
More informationNOT FINAL UNTIL TIME EXPIRES TO FILE REHEARING MOTION AND, IF FILED, DETERMINED OF FLORIDA
NOT FINAL UNTIL TIME EXPIRES TO FILE REHEARING MOTION AND, IF FILED, DETERMINED IN THE DISTRICT COURT OF APPEAL OF FLORIDA SECOND DISTRICT JAMES MOTZENBECKER, ELIZABETH MOTZENBECKER, CHELSEA ACKERMECHT,
More informationI SIGNED THAT? SCARY STORIES & SOLUTIONS
I SIGNED THAT? SCARY STORIES & SOLUTIONS Contract Clauses and Practices That Impact Your Insurance Costs and Bottom Line Geoffrey S. Gavett Gavett, Datt & Barish, P.C. Presented by Chesapeake Region Safety
More informationDrexel University Independent Contractor Service Provider Agreement. Name: [ ] Limited Liability Company [ ] Professional Corporation
This is a form agreement for discussion purposes only. It does not constitute a binding offer or contract of Drexel University until all of the terms have been approved and this agreement is executed by
More informationSUBCONTRACTOR CONTRACT THIS AGREEMENT, Made as of (Current Date), In the Year of (Current Year),
SUBCONTRACTOR CONTRACT THIS AGREEMENT, Made as of (Current ), In the Year of (Current Year), Between the Contractor: And the Sub-Contractor: For the Project: Owner s Name Sub-Contractor s Name License
More informationEXHIBIT G. Insurance Requirements. [with CCIP]
SECTION 1 GENERAL INSURANCE REQUIREMENTS EXHIBIT G Insurance Requirements [with CCIP] A. CCIP. Contractor has implemented a Contractor Controlled Insurance Program ( CCIP ) to furnish certain insurance
More informationFIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE
Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE 1. DEFINITIONS 1 2. COMPOSITION OF THE ARCHITECT-ENGINEER 1 3. INDEPENDENT CONTRACTOR 1 4. RESPONSIBILITY OF THE ARCHETECT-ENGINEER
More informationInsurer Liable To Indemnify Main Contractor For Sub-contractor Worker s Injury
Insurer Liable To Indemnify Main Contractor For Sub-contractor Worker s Injury Introduction Mohammed Shahid Late Mahabubur Rahman v Lim Keenly Builders Pte Ltd (Tokio Marine Insurance Singapore Ltd, third
More informationOffshore Contracting Guide
www.standard-club.com Offshore Contracting Guide October 2017 The Standard for service and security Introduction Ian Billington Underwriting Director T +44 20 3320 2229 E ian.billington@ctplc.com Sarah
More informationTERREBONNE PARISH CONSOLIDATED GOVERNMENT INSURANCE REQUIREMENTS CONTRACTORS
TERREBONNE PARISH CONSOLIDATED GOVERNMENT INSURANCE REQUIREMENTS CONTRACTORS ARTICLE 5- Bonds and Insurance 5.1 PERFORMANCE AND OTHER BONDS: 5.1.1 CONTRACTOR shall furnish performance and payment Bonds,
More informationCoverage for Contractual Risk Transfer and Additional Insured Issues. Jeffrey J. Vita and Edwin L. Doernberger Saxe, Doernberger & Vita, P.C.
Coverage for Contractual Risk Transfer and Additional Insured Issues Jeffrey J. Vita and Edwin L. Doernberger Saxe, Doernberger & Vita, P.C. 1 Outline Introduction Contractual Indemnity Additional Insured
More informationINDEMNIFICATION AND INSURANCE AGREEMENT BY AND BETWEEN CITY OF XX AND RENEWABLE FUNDING, LLC
INDEMNIFICATION AND INSURANCE AGREEMENT BY AND BETWEEN CITY OF XX AND RENEWABLE FUNDING, LLC This Indemnification and Insurance Agreement (the Agreement ) is entered into by and between the City of XX
More informationRLI PROFESSIONAL SERVICES GROUP PROFESSIONAL LEARNING EVENT PSGLE 107. How To Design Your Insurance Program
RLI PROFESSIONAL SERVICES GROUP PROFESSIONAL LEARNING EVENT PSGLE 107 How To Design Your Insurance Program Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction,
More informationContract Good Practice. an ACE guide
Contract Good Practice an ACE guide Contents 3 3 4 4 4 5 6 7 7 7 8 8 Introduction Professional Indemnity Insurance Duty of Carer Fitness for Purpose Joint and Several Liability Unlimited Liability Indemnities
More informationGreat Parks of Hamilton County Mulching Landscape Beds and Tree Rings Request for Proposal February 1, 2019
Great Parks of Hamilton County Mulching Landscape Beds and Tree Rings Request for Proposal February 1, 2019 A. Introduction Great Parks of Hamilton County (GPHC) is requesting proposals to apply mulch
More informationR&Q Commercial Risk Services Limited Contractors All Risks and Liability Combined Insurance Summary of Cover
R&Q Commercial Risk Services Limited Contractors All Risks and Liability Combined Insurance Summary of Cover July 2016 Edition Contractors All Risks and Liability Combined Liability Insurance Policy Overview
More informationElements of Contractual Risk Transfer
Elements of Contractual Risk Transfer DENISE SIMPSON JUNE 13, 2016 2016 ARTHUR J. GALLAGHER & CO. BUSINESS WITHOUT BARRIERS What is Risk? Risk- the uncertainty about outcomes that can either be negative
More informationContractor shall provide new thermal fused plastic laminate doors for each interior opening as scheduled. All openings are to receive new hardware.
contractor ract and Scope of Work 8.801, 8.802, 8.803, and 8.804 ract To: LBA Construction LLC 2733 Ross Clark Circle Dothan, Alabama 36301 contractor: Scope: Doors, Frames, and Door Hardware Provide and
More informationSUBCONTRACT. by and between. to perform the Work identified in Article 2 in accordance with the Projects Contract documents.
Phone 800 555-5555 Fax 999 555-5551 TO: 4320 Eucalyptus Way Santa Rosa CA 95401 SUBCONTRACT PROJECT: 186 Williams Post Office 19420 Williams Rd. Monte Rio CA 95462 This agreement entered into this day
More informationWESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT
WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT This Equipment Purchase Agreement ( Agreement ) is entered into this day of, 20, by and between the Western Riverside Council of Governments,
More informationFor Insurance purposes we can assume that Projects are made up of Contracts or Packages.
Guiding Note to Risks and Insurance: Disclaimer: These guidelines are provided for information and convenience only and do not supersede any conflicting terms and conditions declared under contract and/or
More informationIncrease your Bottom Line: Avoiding and Minimizing Construction Defect Claims Webinar
Increase your Bottom Line: Avoiding and Minimizing Construction Defect Claims Webinar Welcome We will begin shortly! Primerus Contact/Moderator: Chris Dawe, Esq. Primerus Member Services Coordinator (cdawe@primerus.com)
More informationY063202QBE0116A - PL Y063202QBE0116A - EL FI & FI & FI PI. Date for Renewal: 1 September 2017
& Insurance Details Policy Summary Insurance Type: Contractors All Risks Public Liability Employers Liability Professional Indemnity Policy Numbers: Insurance Company: 025443012016 - CAR Y063202QBE0116A
More informationDichotomizing CGL Coverage for Construction Defects
Dichotomizing CGL Coverage for Construction Defects AGC of America - Surety Bonding and Risk Management January 31, 2018 Patrick J. Wielinski 2 Dichotomies Topics for Today Learning to: Recognize basic
More informationLIABILITY. Policy Summary
LIABILITY Policy Summary 2 Liability Policy Summary LIABILITY Policy Summary This policy is an annually renewable Liability insurance, underwritten by Royal & Sun Alliance Insurance plc. which may be renewed
More informationRequest for Proposal
San Mateo County Mosquito and Vector Control District Request for Proposal Professional Auditing Services Date of Issuance: December 8, 2017 Submittal Deadline: January 19, 2018 4:00 PM 1 I. INTRODUCTION
More informationEXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Prior to Project Completion Except as set forth below, the Developer will obtain and
More informationSTANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS
STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS 1. Scope of Application These terms and conditions of sale ( T&C ) apply to all sales by our company ( Supplier ) of goods
More informationWill Deepwater Horizon Change a Long Standing Rule of Law? ACCIDENT. Insurance Provisions in the Drilling Contract
Will Deepwater Horizon Change a Long Standing Rule of Law? In re Deepwater Horizon, 710 F.3d 338 (5 th Cir. 2013, withdrawn on r hrg). r In re Deepwater Horizon, 728 F.3d 491 (5 th Cir. 2013). ACCIDENT
More informationThird Party Insurance and Indemnification: What You Need to Have in Your City s Contracts
Third Party Insurance and Indemnification: What You Need to Have in Your City s Contracts Third Party Insurance and Indemnification: What You Need to Have in Your City s Contracts Oregon City Attorneys
More informationOHIO. Breach of Contract. Breach of Contract
Big 10 Construction & Surety Law CLE OHIO Construction Contracting Without Borders Peter W. Hahn Dinsmore & Shohl, LLP Columbus, Ohio Breach of Contract Claims by Contractor Standard No different from
More informationKey Findings: Civil liability, financial security and compensation claims for offshore oil and gas activities in the EEA
Preventing major offshore accidents & limiting their consequences Key Findings: Civil liability, financial security and compensation claims for offshore oil and gas activities in the EEA Ivan PEARSON European
More informationAGREEMENT FOR SERVICES
AGREEMENT FOR SERVICES This AGREEMENT FOR SERVICES (the Agreement ) made as of the date stated below, between the Village of South Lebanon, Ohio, 10 N. High Street, South Lebanon, OH 45065 (the Village
More informationConstruction Insurance 2018 Construction Certification Review Course. Christopher Mueller Taylor, Day, Grimm & Boyd
Construction Insurance 2018 Construction Certification Review Course Christopher Mueller Taylor, Day, Grimm & Boyd Typical Types of Insurance Comprehensive general liability Builder s risk coverage Errors
More informationSingle Project Full Proposal Form for Professional Indemnity Insurance
Single Project Full Proposal Form for Professional Indemnity Insurance July 2013 Note: this is a proposal for a claims made policy Stalker Hutchison Admiral (Pty) Ltd is an authorised financial services
More informationTHE NEW INDIA ASSURANCE COMPANY LIMITED
THE NEW INDIA ASSURANCE COMPANY LIMITED Registered & Head Office- 87, M.G. Road, Fort, Mumbai-400001. PRODUCT LIABILITY POLICY 1. OPERATIVE CLAUSE : WHEREAS the Insured named in the Schedule hereto and
More informationTHE TRIPARTITE RELATIONSHIP: ETHICAL CONSIDERATIONS AND THE INSURED CLIENT S RIGHTS
THE TRIPARTITE RELATIONSHIP: ETHICAL CONSIDERATIONS AND THE INSURED CLIENT S RIGHTS I. THE TRIPARTITE RELATIONSHIP A. Defined: Monica A. Sansalone msansalone@gallaghersharp.com The tripartite relationship
More information