PUBLIC INQUIRY DOCUMENT

Size: px
Start display at page:

Download "PUBLIC INQUIRY DOCUMENT"

Transcription

1 M4 Corridor around Newport PUBLIC INQUIRY DOCUMENT REFERENCE NO. : PIQ/152 RAISED BY: The Inspectors DATE: 05/11/17 RESPONDED BY: Stephen Bussell DATE: 30/01/18 SUBJECT: Updated Economic Appraisal of Objectors Suggested Alternatives Purpose Each of the Objectors Suggested Alternatives to the Published Scheme were appraised against the Welsh Government s criteria as set out in WelTAG (Welsh Transport Appraisal Guidance). This was published in the M4CaN Objectors Suggested Alternatives Report (WG 4.7.2) in March At that time, 22 alternatives had been put forward. A cost estimate for each alternative was provided and a Benefit to Cost Ratio (BCR) calculated. At a relatively early stage of the PLI, two further alternatives were put forward. Although these were not included in the Alternatives Report (WG 4.7.2) these (alternatives 23 and 24), were subject to a full appraisal. Subsequently four further alternatives were put forward in discussions at the Punlic Local Inquiry and in late correspondence. Due to their late submission and the fact that qualitative assessments could be undertaken, these alternatives (namely alternatives 25 28), were not subject to full appraisals. WG responded to these alternatives in the following documents: Alt 25, Mr Phillips, PIQ/112; Alt 26, Mrs Picton, PID/103; Alt 27, Mr Waller, REB/0707; Alt 28, Mr McDougall, PID/165. Since the publication of the Alternatives Report, the Welsh Government updated its assessment of the Published Scheme to account for two main factors. Firstly, the Welsh Government updated its cost estimate for the Scheme to account for the costs of the proposed mitigation measures at Newport Docks. Secondly, forecast traffic flows have been revised to take account of the UK Government s announcement that the tolls on the Severn Crossings will be abolished. Details of the changes are provided in the Revised Economic Appraisal Report Supplement No.3 (WG 2.8.8). The revisions to the Published Scheme necessitates an update to the economic appraisal of the Suggested Alternatives which are still maintained and for which a BCR was calculated. This document sets out the updated results of this exercise. Alternatives 8 10 and have been withdrawn. Accordingly, this note provides results for the 19 remaining alternatives for which a BCR calculation was originally undertaken. These are as listed in Table 1. Qualitative comments on the implications of the changes for remaining alternatives have been provided.

2 Table 1 Objectors Suggested Alternatives Alternative Description 1 Blue Route 2 Blue Route (Phase 1) 3 Green Route (West of Wilcrick Route and M48 / B4245 Connection) 4 North and West of Wilcrick Route 5 Move Part of J23 between Rogiet and Caldicot 6 M48 / B4245 / Severn Tunnel Junction Station Connection 7 Direct Access to Severn Tunnel Junction Station from J23 11 J23A Westbound On Slip 12 Move Main Alignment South at Meadows Road 13 Northern Dock Route 1 14 Northern Dock Route 2 17 Remove Docks Way Junction and Link 18 Free flow J23 and Connection at J23A (2006 TR111 Route) 19 Online Widening of Existing M4 including Brynglas Tunnels 20 Tunnel from Magor to Castleton 21 South of Magor Route 22 Closure of Existing M4 Junctions 23 Blue Route & Dyffryn Link 24 Amber Route Updates to Scheme Costs Assumptions As noted, the capital cost of the Scheme has been updated to account for additional works at Newport Docks in respect of the creation of new quayside, the provision of a moveable bridge to facilitate the movement of vehicles across the Junction Cut, costs related to the relocation of tenants and other facilities and bridge protection works. Futher information is provided in the Scheme Evidence Update of the Welsh Government s Chief Witness, Matthew Jones (WG 1.1.8). Where Suggested Alternatives follow the same alignment as the Published Scheme through Newport Docks, an equivalent adjustment has been made to account for the Docks mitigation costs. For Alternatives which do not pass through the Docks, no such adjustment has been made. Alternatives 13 and 14 pass through Newport Docks but follow an alignment further to the north. For these options, an indicative assessment has been made as to the level of land and compensation costs that would be incurred in respect of ABP Newport. Alternative 17 follows the Published Scheme alignment but removes the Docks Junction. This option would require Docks mitigation works similar to the Published Scheme although an adjustment has been applied to reflect the reduced impact of this option on ABP tenants. The costs used in the economic appraisal of the Published Scheme have also been increased to reflect the extended Public Local Inquiry process. This adjustment has been applied to each of the Alternatives with the exception of the Blue Route variants (for which a bespoke assessment of design stage costs has been undertaken) and Alternative 22 (Closure of M4 Junctions) which does not involve construction of a new road. The cost estimates for the Objectors Alternatives have been derived by applying deductions and additions to the Published Scheme costs to take account of differences in design. Cost deductions include Published Scheme allowances for risk and optimism bias which are assumed to apply at a rate equivalent to the Scheme as a whole. In accounting for the additional Docks mitigation costs, the Welsh Government has undertaken a review of the risk allowances in the project cost estimate. A number of risk items, which had previously been identified in the Employer s Risk budget, have now been realised and further work has been undertaken on developing the design

3 of the proposed Scheme. This has resulted in a slight reduction in the cost deductions applied to generate the cost estimates for the Alternatives. The expenditure profile for the Published Scheme has also been updated to take account of the extension to the Public Local Inquiry process and the requirement to undertake additional works in Newport Docks in advance of the construction of the proposed Usk Crossing. To retain consistency and comparability between the appraisal of the Published Scheme and Alternatives, the updated expenditure profile for the Published Scheme has been applied in all cases. Further information on the treatment of design stage costs and Docks mitigation measures is provided in Appendix A to this note. Updates to Scheme Benefits Assumptions The UK Government has announced that the Severn Crossing tolls will be removed no later than 31 December In view of this, the economic appraisal of the Scheme has been updated such that it is based on a no toll traffic growth scenario. Each of the Alternatives has now been modelled under the no toll scenario and the calculation of economic benefits adjusted accordingly. Scheme benefits are calculated over a 60 year period from the scheme opening year. The December 2016 Revised Economic Appraisal Report assumed an opening year of 2022 and as such benefits were calculated for the period 2022 to Due to the additional works within the Newport Docks, the new section of motorway will not be open to traffic until December In view of this, the appraisal period has been revised such that it spans the period 2024 (the first full year of operation) to This change has been applied to both the Published Scheme and the Alternatives. Results The updated capital cost estimates and BCRs for the Published Scheme and each of the Objectors Suggested Alternatives are set out in Table 2. A comparison of the updated results and the results included in the March 2017 Objectors Suggested Alternatives Report is provided in Appendix B and a detailed breakdown of economic appraisal results is provided in Appendix C.

4 Table 2 Updated Capital Costs and BCRs Scheme Option Project Estimate (Q Prices) Costs for the Economic Appraisal 1 Benefit Cost Ratio Published Scheme 1,093 1, Alternative 1 Blue Route Alternative 2 Blue Route (Phase 1) Alternative 3 Green Route (West of Wilcrick Route 1,141 1,376 and M48 / B4245 Connection) 1.34 Alternative 4 North and West of Wilcrick Route 1,158 1, Alternative 5 Move Part of J23 between Rogiet 1,140 1,372 and Caldicot 1.66 Alternative 6 M48 / B4245 / Severn Tunnel 1,104 1,332 Junction Station Connection 1.75 Alternative 7 Direct Access to Severn Tunnel 1,096 1,324 Junction Station from J Alternative 11 J23A Westbound On Slip 1,108 1, Alternative 12 Move Main Alignment South at 1,095 1,323 Meadows Road 1.68 Alternative 13 Northern Dock Route 1 1,287 1, Alternative 14 Northern Dock Route 2 1,456 1, Alternative 17 Remove Docks Way Junction and 1,019 1,244 Link 1.51 Alternative 18 Free flow J23 and Connection at 1,126 1,358 J23A (2006 TR111 Route) 1.37 Alternative 19 Online Widening of Existing M including Brynglas Tunnels 0.15 Alternative 20 Tunnel from Magor to Castleton 9,810 9, Alternative 21 South of Magor Route 1,183 1, Alternative 22 Closure of Existing M4 Junctions Negative 3 Alternative 23 Blue Route & Dyffryn Link Alternative 24 Amber Route 1,169 1, Where applicable this includes adjustments for Key Stage 3 / 4 Design Stages and Statutory Processes, Reclassification and reconfiguration of Caerleon Junction, Newport Docks Mitigation Works and associated contingencies. 2 The BCR for the Published Scheme (as set out in the Revised Economic Appraisal Report Supplement No.3) is This includes impacts during construction and maintenance and accident benefits. These impacts are very slight and have not been assessed for the alternative options. For comparative purposes, the BCR for the Published Scheme when these impacts are excluded is This alternative results in an overall negative impact on transport users (i.e. negative benefits). As such the BCR for this alternative is negative.

5 As noted, quantified appraisals have not been undertaken for Alternatives 25 to 28. Instead, a qualitative comment has been made on the implication of the changes for these options. From a traffic perspective, both Alternatives 25 (an alternative to replace the Brynglas Tunnels with a cutting) and 28 (a northern loop connecting Junction 25 and Junction 27) are similar in nature to Alternative 19. Based on the results for the re appraisal of Alternative 19, whilst these options would not be subject to any Docks mitigation costs, it is considered unlikely that the effect of removing the tolls would have a positive impact on the economic efficiency of these options. The economic case for Alternative 26 (M4 Junction 24 to 26 Tunnel) would be slightly improved relative to the published scheme as a result of the documented changes, although this would not alter the conclusion that the BCR for this option would be significantly less than 1. Alternative 27 comprises a range of measures including junction closures, online widening, local road improvements and public transport measures. The results for Alternative 22 (Closure of Existing M4 Junctions) suggests that the additional traffic which would result from removing the tolls, would have a negative effect on this option. However, given the range of other measures proposed, the performance of Alternative 27 may be slightly improved relative to the Published Scheme.

6 APPENDIX A Costs for the Economic Appraisal Table 3 Cost Estimates Applied for the Economic Appraisal Project Estimate ( m Q4 2015) Key Stage 3 and 4 Design and Statutory Processes Updated Economic Analysis Allowance for Additional Works in Newport Docks Reclassification and reconfiguration of Caerleon Junction (including OB) Costs for the Economic Appraisal Published Scheme 4 1, ,321 Alternative NA NA 838 Alternative NA NA 803 Alternative 3 1, ,376 Alternative 4 1, ,393 Alternative 5 1, ,373 Alternative 6 1, ,332 Alternative 7 1, ,324 Alternative 11 1, ,335 Alternative 12 1, ,323 Alternative 13 1, ,431 Alternative 14 1, ,600 Alternative 17 1, ,244 Alternative 18 1, ,358 Alternative NA NA 743 Alternative 20 9, NA 16 9,889 Alternative 21 1, ,418 Alternative NA NA 12 Alternative NA NA 916 Alternative 24 1, NA NA 1,231 4 See Table 1 of the Scheme Evidence Update of Matthew Jones (WG 1.8.1) for further information.

7 APPENDIX B Comparison with the March 2017 Results Table 4 Comparison with the March 2017 Alternatives Report March 2017 Objectors Suggested Alternatives Report Project Estimate ( m Q4 2015) Costs for the Economic Appraisal ( m Q4 2015) Present Value Benefits ( m 2010 prices and values) Present Value Costs ( m 2010 prices and values) Benefit Cost Ratio Project Estimate ( m Q4 2015) Updated Economic Analysis Present Value Benefits ( m 2010 prices and values) Costs for the Economic Appraisal ( m Q4 2015) Present Value Costs ( m 2010 prices and values) Benefit Cost Ratio Published Scheme 1,093 1,131 1, ,093 1,321 1,822 1, Alternative Alternative Alternative 3 1,138 1,182 1, ,141 1,376 1,503 1, Alternative 4 1,155 1,200 1,361 1, ,158 1,393 1,584 1, Alternative 5 1,139 1,182 1, ,140 1,373 1,850 1, Alternative 6 1,104 1,142 1, ,104 1,332 1,891 1, Alternative 7 1,096 1,135 1, ,096 1,324 1,834 1, Alternative 11 1,108 1,146 1, ,108 1,335 1,832 1, Alternative 12 1,095 1,134 1, ,095 1,323 1,809 1, Alternative 13 1,274 1,290 1,286 1, ,288 1,432 1,471 1, Alternative 14 1,443 1,458 1,331 1, ,456 1,600 1,568 1, Alternative 17 1,017 1,055 1, ,019 1,244 1,540 1, Alternative 18 1,123 1,166 1, ,126 1,358 1,516 1, Alternative Alternative 20 9,820 9,898 1,088 7, ,810 9,889 1,177 7, Alternative 21 1,179 1,225 1,298 1, ,183 1,418 1,532 1, Alternative Negative Negative Alternative 23 NA Alternative 24 NA 1,169 1,

8 APPENDIX C Detailed Breakdown of Appraisal Results Table 5 Cost Estimates Applied for the Economic Appraisal Published Scheme (Supplementary Scheme Order No.2) Alternative 1 Blue Route Alternative 2 Blue Route, Phase 1 Alternative 3 Green Route Alternative 4 North and West of Wilcrick Route Alternative 5 Move Part of J23 Between Rogiet and Caldicot Alternative 6 M48 / B4245 / Severn Tunnel Jct Station Connection Alternative 7 Direct access to Severn Tunnel Jct Station from J23 Alternative 11 Roadchef Option 4 (J23A westbound slip only) Alternative 12 Move Main Alignment South at Meadows Rd User Benefits (Commuters) 280, , , , , , , , , ,407 Travel Time 292, , , , , , , , , ,747 Vehicle Operating Costs 11,720 20,314 16,698 20,232 20,545 11,181 10,186 12,486 11,462 12,340 User Benefits (Other) 727, , , , , , , , , ,830 Travel Time 732, , , , , , , , , ,984 Vehicle Operating Costs 4,264 52,079 37,922 14,279 30,945 2,776 5,881 3,011 1,332 5,154 User Benefits (Business) 815, , , , , , , , , ,297 Travel Time 686, , , , , , , , , ,743 Vehicle Operating Costs 128,869 32,720 35,852 84,480 67, , , , , ,554 Wider Public Finances ,845 21,567 13,879 28,927 2,191 6,975 1,238 2, Greenhouse Gases 1,234 16,381 12,765 8,662 16, , ,884 Present Value of Benefits (PVB) 1,821, , ,521 1,502,679 1,583,835 1,849,904 1,890,834 1,833,855 1,831,698 1,809,062 Revenue (Severn Crossing Tolls) Maintenance and Operating Costs 66, ,363 66,363 66,363 66,363 66,363 66,363 66,363 Investment Costs 1,008, , ,521 1,051,152 1,064,676 1,048,676 1,017,127 1,011,251 1,019,860 1,010,576 Present Value Costs (PVC) 1,075, , ,521 1,117,515 1,131,039 1,115,039 1,083,490 1,077,614 1,086,223 1,076,939 Net Present Value (NPV) 746,468 2,123 81, , , , , , , ,123 Benefit Cost Ratio (BCR)

9 Alternative 13 ABP Northern Dock Route 1 (High, no junction) Alternative 14 ABP Northern Dock Route 1 (High, with junction) Alternative 17 Remove Docks Way junction and link Alternative 18 Free flow J23 and Connection at J23A Alternative 19 Online Widening of Existing M4 Including Brynglas Tunnels Alternative 20 Tunnel from Magor to Castleton Alternative 21 South of Magor Route Alternative 22 Closure of Existing M4 Junctions Alternative 23 Blue Route + Duffryn Link Alternative 24 Amber Route (Blue Route variation) User Benefits (Commuters) 203, , , ,248 78, , , , , ,195 Travel Time 220, , , ,025 54, , , , , ,311 Vehicle Operating Costs 17,096 16,194 15,229 16,777 23,982 16,196 15,656 27,609 23,151 23,116 User Benefits (Other) 596, , , ,469 31, , , ,904 56,442 5,076 Travel Time 613, , , ,567 83, , , ,089 2,221 75,667 Vehicle Operating Costs 17,218 18,888 11,933 22,098 52,310 13,546 23,212 66,815 58,664 80,753 User Benefits (Business) 665, , , , , , , , , ,782 Travel Time 571, , , , , , , , , ,364 Vehicle Operating Costs 94,339 92, , ,865 9, , ,193 29,345 31,044 38,418 Wider Public Finances 15,925 16,487 5,661 15,104 63,059 2,218 5,043 70,511 37,060 48,718 Greenhouse Gases 9,884 10,211 4,479 9,449 33, ,249 37,420 20,558 36,616 Present Value of Benefits (PVB) 1,470,729 1,568,149 1,539,736 1,515,601 83,075 1,177,405 1,531, , , ,003 Revenue (Severn Crossing Tolls) Maintenance and Operating Costs 66,363 66,363 66,363 66, , Investment Costs 1,092,720 1,220, ,302 1,037, ,214 7,530,663 1,083,802 9, , ,294 Present Value Costs (PVC) 1,159,083 1,287,154 1,016,665 1,104, ,214 7,530,663 1,150,165 9, , ,294 Net Present Value (NPV) 311, , , , ,139 6,353, , , , ,291 Benefit Cost Ratio (BCR) Negative

PUBLIC INQUIRY DOCUMENT

PUBLIC INQUIRY DOCUMENT M4 Corridor around Newport PUBLIC INQUIRY DOCUMENT REFERENCE NO. : ID/184 RAISED BY: The Inspectors DATE: 17/01/2018 RESPONDED BY: Matthew Jones DATE: 02/02/2018 SUBJECT: Project Costs, Risk and Optimism

More information

PUBLIC INQUIRY QUESTION

PUBLIC INQUIRY QUESTION M4 Corridor around Newport PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ/164 RAISED BY: The Inspector DATE: 26/02/2018 RESPONDED BY: Matthew Jones DATE: 20/03/2018 SUBJECT: List of questions from the Inspectors

More information

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201-

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201- Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

This update fully addresses the issues raised by DfT in its response to the February 2008 submission.

This update fully addresses the issues raised by DfT in its response to the February 2008 submission. Executive Summary Introduction 1. This document forms the Major Scheme Business Case (MSBC) submission to the Department for Transport (DfT), seeking Programme Entry for Croxley Rail Link. It is the culmination

More information

Updated Economic Case for HS2. August 2012

Updated Economic Case for HS2. August 2012 Updated Economic Case for HS2 August 2012 Contents 1 INTRODUCTION...1 2 WHAT HAS CHANGED?...1 3 WHAT HAS BEEN MODELLED?...2 4 THE ECONOMIC CASE FOR THE Y NETWORK...2 5 THE ECONOMIC CASE FOR HS2 LONDON

More information

Lancashire County Council. A682 Centenary Way Viaduct Refurbishment Scheme. Benefit Cost Analysis and Gross Value Added Assessment Technical Note

Lancashire County Council. A682 Centenary Way Viaduct Refurbishment Scheme. Benefit Cost Analysis and Gross Value Added Assessment Technical Note Lancashire County Council A682 Centenary Way Viaduct Refurbishment Scheme Benefit Cost Analysis and Gross Value Added Assessment Technical Note March 2015 Document Control Sheet BPP 04 F8 Version 15; March

More information

Annex A TUBA Time Savings Summary

Annex A TUBA Time Savings Summary Annex A TUBA Time Savings Summary Annex A: TUBA Time Savings Summary Profile of Time Benefits The scale of discounted benefits over time is shown in the two figures below for both the full and no decay

More information

WRCCA decision making tool User Guide. Draft Date: 14/03/2018

WRCCA decision making tool User Guide. Draft Date: 14/03/2018 WRCCA decision making tool User Guide Draft Date: 14/03/2018 Draft Quality Assurance and version Model file name Issue date Analyst Reviewed by WRCCA decision making tool v0.8.xlsm 14/03/2018 (draft for

More information

Response to Finance Committee s Request for additional information

Response to Finance Committee s Request for additional information Response to Finance Committee s Request for additional information 1. Reclassification of the trunk road network Our current trunking and de-trunking strategy identifies the core network of existing roads

More information

Capital Project Business Case Gilden Way Upgrading, Harlow

Capital Project Business Case Gilden Way Upgrading, Harlow Capital Project Business Case Gilden Way Upgrading, Harlow The template This document provides the business case template for projects seeking funding which is made available through the South East Local

More information

11,879 NPV=PVB-PVC Benefit to Cost Ratio (BCR) BCR=PVB/PVC

11,879 NPV=PVB-PVC Benefit to Cost Ratio (BCR) BCR=PVB/PVC Analysis of Monetised Costs and Benefits (,000) Present Value of Benefits (PVB - 000's) 13,358 Present Value of Costs (PVC - 000's) 1,479 Net Present Value (NPV - 000's) 11,879 NPV=PVB-PVC Benefit to Cost

More information

South East Local Enterprise Partnership Business Case Review Pro-Forma: Strategic Case

South East Local Enterprise Partnership Business Case Review Pro-Forma: Strategic Case INDEPENDENT TECHNICAL EVALUATION (GATE 1 & 2) Scheme Name: Date Completed: Completed By: South East Local Enterprise Partnership Business Case Review Pro-Forma: Strategic Case Question Value / Source R/A/G

More information

A51 Tarvin-Chester Improvements Scheme

A51 Tarvin-Chester Improvements Scheme A51 Tarvin-Chester Improvements Scheme Outline Business Case Independent Review Cheshire West and Chester Council March 2018 Quality information Prepared by Checked by Approved by Timothy Vincent Senior

More information

APP/P2.1 Neil Chadwick Economic Case/Value for Money Main Proof of Evidence

APP/P2.1 Neil Chadwick Economic Case/Value for Money Main Proof of Evidence APP/P2.1 APP/P2.1 Neil Chadwick Economic Case/Value for Money Main Proof of Evidence PROOF OF EVIDENCE FOR WEST MIDLANDS COMBINED AUTHORITY NEIL CHADWICK, DIRECTOR STEER DAVIES GLEAVE ECONOMIC CASE/VALUE

More information

CEN/P2.2/ECO. Economic Case / Value for Money Summary Proof of Evidence Neil Chadwick

CEN/P2.2/ECO. Economic Case / Value for Money Summary Proof of Evidence Neil Chadwick Economic Case / Value for Money Summary Proof of Evidence Neil Chadwick SUMMARY OF EVIDENCE NEIL CHADWICK ECONOMIC CASE / VALUE FOR MONEY CASE TRANSPORT AND WORKS ACT 1992 MIDLAND METRO (BIRMINGHAM CITY

More information

A Summary of Changes to the HS2 Economic Case

A Summary of Changes to the HS2 Economic Case A Summary of Changes to the HS2 Economic Case April 2011 Contents 1 Introduction 4 2 Cost Changes 6 3 Appraisal Changes 7 4 Summary of Changes 9 Annex 1: Capital Costs 10 Annex 2: Operating Costs 13 Annex

More information

Wichelstowe Southern Access

Wichelstowe Southern Access On behalf of Swindon Borough Council Project Ref: 24177/5511 Rev: AA Date: January 2018 Office Address: Caversham Bridge House, Waterman Place, Reading, Berkshire RG1 8DN T: +44 (0)118 950 0761 E: reading@peterbrett.com

More information

CEN/P2.1/ECO. Economic Case / Value for Money Main Proof of Evidence Neil Chadwick

CEN/P2.1/ECO. Economic Case / Value for Money Main Proof of Evidence Neil Chadwick Economic Case / Value for Money Main Proof of Evidence Neil Chadwick PROOF OF EVIDENCE NEIL CHADWICK ECONOMIC CASE / VALUE FOR MONEY CASE TRANSPORT AND WORKS ACT 1992 MIDLAND METRO (BIRMINGHAM CITY CENTRE

More information

Keswick to Penrith Railway

Keswick to Penrith Railway Keswick to Penrith Railway Stage 2 Report: Business Case Executive Summary Stage 2 Report Business Case Executive Summary 11 1 Introduction Background 1.1 The railway between Keswick and Penrith was part

More information

Weston Package Phase 1 Major Scheme Business Case. The Financial Case. Scheme cost, financial risk and funding sources

Weston Package Phase 1 Major Scheme Business Case. The Financial Case. Scheme cost, financial risk and funding sources Weston Package Phase 1 Major Scheme Business Case 6 The Financial Case Scheme cost, financial risk and funding sources 6.1 Introduction This Section sets out how the council proposes to finance the Weston

More information

I-66 RFI Response Vinci Concessions USA 25 November 2013

I-66 RFI Response Vinci Concessions USA 25 November 2013 General: 1. Please describe your firm, its experience in relation to public-private partnership projects, and its potential interest in relation to the Project (e.g., design/engineering firm, construction

More information

Marsh Barton Rail Station Draft Benefits Realisation Plan and Monitoring and Evaluation Plan

Marsh Barton Rail Station Draft Benefits Realisation Plan and Monitoring and Evaluation Plan Draft Benefits Realisation Plan and Monitoring and Evaluation Plan May 2014 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD Contents 1 Scheme Background and Context... 3 1.1 Description

More information

Appendix J Western Corridor Regeneration Scheme. Benefits Realisation Plan & Monitoring and Evaluation Plan

Appendix J Western Corridor Regeneration Scheme. Benefits Realisation Plan & Monitoring and Evaluation Plan Appendix J Western Corridor Regeneration Scheme Benefits Realisation Plan & Monitoring and Evaluation Plan April 2014 [Final Report] Strategic Transportation Planning Torbay Council 2nd Floor Electric

More information

IN THE HIGH COURT OF JUSTICE QUEEN S BENCH DIVISION PLANNING COURT BETWEEN R (otao FRIENDS OF THE EARTH ENGLAND, WALES. AND NORTHERN IRELAND Ltd.

IN THE HIGH COURT OF JUSTICE QUEEN S BENCH DIVISION PLANNING COURT BETWEEN R (otao FRIENDS OF THE EARTH ENGLAND, WALES. AND NORTHERN IRELAND Ltd. IN THE HIGH COURT OF JUSTICE CO/ /2014 QUEEN S BENCH DIVISION PLANNING COURT BETWEEN R (otao FRIENDS OF THE EARTH ENGLAND, WALES AND NORTHERN IRELAND Ltd.) v Claimant THE WELSH MINISTERS Defendant CLAIMANT

More information

Assessment of Wider Economic Impacts for the Wellington Northern Corridor RoNS. FINAL REPORT Version 1.0. Submitted by Richard Paling Consulting

Assessment of Wider Economic Impacts for the Wellington Northern Corridor RoNS. FINAL REPORT Version 1.0. Submitted by Richard Paling Consulting Assessment of Wider Economic Impacts for the Wellington Northern Corridor RoNS FINAL REPORT Version 1.0 Submitted by Richard Paling Consulting August 2013 Assessment of Wider Economic Impacts for the Wellington

More information

PROJECT INITIATION DOCUMENT (PID)

PROJECT INITIATION DOCUMENT (PID) Appendix to Agenda Item 5 Project Documentation PROJECT INITIATION DOCUMENT (PID) Local Plan Review Release: Fourth Draft Date: 19 April 2016 Author: Approved by: Mike Allgrove Andrew Frost Note: the completion

More information

Greater Bristol Bus Network Major Scheme Business Case. Chapter 1. Developing the Full Approval Major Scheme Business Case

Greater Bristol Bus Network Major Scheme Business Case. Chapter 1. Developing the Full Approval Major Scheme Business Case Greater Bristol Bus Network Major Scheme Business Case Chapter 1 Developing the Full Approval Major Scheme Business Case i ii 1. The Case for Full Approval INTRODUCTION 1.1.1 Bath and North East Somerset,

More information

Options for Breich Station. Appraisal Report

Options for Breich Station. Appraisal Report Options for Breich Station Appraisal Report Updated document dated August 2017 Contents Executive Summary 3 Introduction and Objectives 5 Scheme Options and Base Case 8 Costs and Benefits 11 Appraisal

More information

Tiverton EUE Access Draft Benefits Realisation Plan and Monitoring and Evaluation Plan

Tiverton EUE Access Draft Benefits Realisation Plan and Monitoring and Evaluation Plan Draft Benefits Realisation Plan and Monitoring and Evaluation Plan October 2014 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD Contents 1 Scheme Background and Context... 3 1.1 Description

More information

Keswick to Penrith Railway

Keswick to Penrith Railway Keswick to Penrith Railway Stage 2 Report: H6-08 Keswick to Penrith Railway Stage 2 Report: JMP CONSULTING MINERVA HOUSE, EAST PARADE, LEEDS, LS1 5PS. T 0113 244 4347 F 0113 242 3753 E leeds@jmp.co.uk

More information

THE COBA 2018 USER MANUAL PART 1 ECONOMIC CONCEPTS IN COBA. Contents. Chapter. 1. The COBA Method. 2. The Do-Minimum and Do-Something Options

THE COBA 2018 USER MANUAL PART 1 ECONOMIC CONCEPTS IN COBA. Contents. Chapter. 1. The COBA Method. 2. The Do-Minimum and Do-Something Options THE COBA 2018 USER MANUAL PART 1 ECONOMIC CONCEPTS IN COBA Contents Chapter 1. The COBA Method 2. The Do-Minimum and Do-Something Options 3. The Fixed Trip Matrix 4. Discounting and the Price Basis 5.

More information

PUBLIC INQUIRY DOCUMENT

PUBLIC INQUIRY DOCUMENT M4 Corridor around Newport REFERENCE NO. : ID/163 PUBLIC INQUIRY DOCUMENT RAISED BY: Mathew Jones DATE: 06/12/17 RESPONDED BY: DATE: SUBJECT: Correspondence between Welsh Government and NRW (OBJ0268) Please

More information

Department for Transport. Transport Analysis Guidance (TAG) Unit Guidance on Rail Appraisal

Department for Transport. Transport Analysis Guidance (TAG) Unit Guidance on Rail Appraisal Department for Transport Transport Analysis Guidance (TAG) Unit 3.13.1 Guidance on Rail Appraisal August 2007 1 Contents 1 Introduction 3 1.1 Background 3 1.2 Scope and Structure 3 2 SRA Appraisal Criteria

More information

Metz Way to Abbeymead Avenue Improvements: Full Business Case and Due Diligence Assessment Report

Metz Way to Abbeymead Avenue Improvements: Full Business Case and Due Diligence Assessment Report Capability Gloucestershire County Council August, 2016 Metz Way to Abbeymead Avenue Improvements: Full Business Case and Due Diligence Assessment Report Prepared by:... Checked by:... Stephen Payne Nick

More information

APP/P2.1/ECO. Economic Case Main Proof of Evidence Neil Chadwick

APP/P2.1/ECO. Economic Case Main Proof of Evidence Neil Chadwick Economic Case Main Proof of Evidence Neil Chadwick PROOF OF EVIDENCE NEIL CHADWICK ECONOMIC CASE/VALUE FOR MONEY TRANSPORT AND WORKS ACT 1992 MIDLAND METRO (WOLVERHAMPTON CITY CENTRE EXTENSION) ORDER

More information

An Approach for the Assessment of the Maximum Probable Loss for Insurance Purposes

An Approach for the Assessment of the Maximum Probable Loss for Insurance Purposes 1. INTRODUCTION An Approach for the Assessment of the Maximum Probable Loss for Insurance Purposes During the last decades, the financing of the construction and maintenance of new motorways in various

More information

Distribution of Crossrail Benefits. 1 delivering a world-class, affordable railway

Distribution of Crossrail Benefits. 1 delivering a world-class, affordable railway Distribution of Crossrail Benefits 1 Crossrail Benefits Crossrail delivers: A robust Economic Appraisal approved by DfT (Benefit Cost Ratio = 2)* Wider Economic Benefits (WEBs) worth around 15bn The following

More information

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project

SR 520 BRIDGE. Investment Grade Traffic and Revenue Study Update. SR 520 Bridge and the Eastside plus West Approach Bridge Project SR 520 BRIDGE Investment Grade Traffic and Revenue Study Update SR 520 Bridge and the Eastside plus West Approach Bridge Project February 16, 2017 Photographs Courtesy of WSDOT Table of Contents Executive

More information

Project Appraisal Guidelines

Project Appraisal Guidelines Project Appraisal Guidelines Unit 9.0 Post Project Review August 2011 Project Appraisal Guidelines Unit 9.0 Post Project Review Version Date Comments 1.0 August 2011 New Guidance This document is available

More information

PUBLIC INQUIRY DOCUMENT

PUBLIC INQUIRY DOCUMENT M4 Corridor around Newport REFERENCE NO. : ID/218 PUBLIC INQUIRY DOCUMENT RAISED BY: Mathew Jones DATE: 06/03/18 RESPONDED BY: DATE: SUBJECT: New correspondence from Gwent Wildlife Trust (OBJ0270) Please

More information

Impact Assessment (IA)

Impact Assessment (IA) Title: Amendment of the Road Traffic Act (RTA) 1988 to remove the requirement of a policyholder to return a motor insurance certificate if they cancel their policy mid term IA No: DfT00223 Lead department

More information

Greenlane East Interchange/Great South Road Improvements. Approved Organisation: NZTA (HNO) and Auckland Transport (Auckland City Council)

Greenlane East Interchange/Great South Road Improvements. Approved Organisation: NZTA (HNO) and Auckland Transport (Auckland City Council) Post implementation reviews completed in 2011/12 Reviews represent the views of independent consultants and are used by the NZTA to identify potential opportunities for improvements. Greenlane East Interchange/Great

More information

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

Draft Environmental Impact Statement. Appendix G Economic Analysis Report Draft Environmental Impact Statement Appendix G Economic Analysis Report Appendix G Economic Analysis Report Economic Analyses in Support of Environmental Impact Statement Carolina Crossroads I-20/26/126

More information

Independent Technical Evaluator Growth Deal Business Case Assessment (Q1 2015/16 Starting Projects)

Independent Technical Evaluator Growth Deal Business Case Assessment (Q1 2015/16 Starting Projects) Independent Technical Evaluator Growth Deal Business Assessment (Q1 2015/16 Starting Projects) South East Local Enterprise Partnership Gate 2 Report March 2015 Our ref: 22790501 Independent Technical

More information

LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK. Michele Cyna

LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK. Michele Cyna October I992 Transport No. RD-12 TRANSPORTATION, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK Michele Cyna Delays in the completion

More information

TECHNICAL NOTE. 1 Purpose of This Document. 2 Basic Assessment Specification

TECHNICAL NOTE. 1 Purpose of This Document. 2 Basic Assessment Specification TECHNICAL NOTE Project MetroWest Phase 1 Modelling & Appraisal Date 23 rd July 2014 Subject MetroWest Phase 1 Wider Impacts Assessment Ref 467470.AU.02.00 Prepared by CH2MHILL 1 Purpose of This Document

More information

Phase 2 Preliminary Business Case. Appendix E Wider Impacts Report

Phase 2 Preliminary Business Case. Appendix E Wider Impacts Report Phase 2 Preliminary Business Case Appendix E Wider Impacts Report July 2015 MetroWest Phase 2 MetroWest Phase 2 Preliminary (Strategic Outline) Business Case Wider Economic Impacts Prepared for West of

More information

HEADING FOR THE OPEN ROAD: COSTS AND BENEFITS FOR TRANSITIONS IN SCHOLARLY COMMUNICATIONS APRIL Report Annexes

HEADING FOR THE OPEN ROAD: COSTS AND BENEFITS FOR TRANSITIONS IN SCHOLARLY COMMUNICATIONS APRIL Report Annexes HEADING FOR THE OPEN ROAD: COSTS AND BENEFITS FOR TRANSITIONS IN SCHOLARLY COMMUNICATIONS APRIL 2011 Report Annexes ANNEX A: INCREASED ACCESS The increases in standardised and useful access derived by

More information

Representations on the Draft Submission Version of the North Warwickshire Local Plan 2017 on behalf of the North Warwickshire Labour Group.

Representations on the Draft Submission Version of the North Warwickshire Local Plan 2017 on behalf of the North Warwickshire Labour Group. Representations on the Draft Submission Version of the North Warwickshire Local Plan 2017 on behalf of the North Warwickshire Labour Group. Introduction The North Warwickshire Labour Group comprises the

More information

A TOURISM TAX FOR WALES?

A TOURISM TAX FOR WALES? A TOURISM TAX ABSTRACT The UK tourism industry has one of the world s highest tax burdens. Most European countries have significantly reduced VAT on their tourism industries to encourage growth, employment

More information

Report of Commissioning Director - Environment

Report of Commissioning Director - Environment Environment Committee 24 September 2015 Title Local Implementation Plan (LIP) 2016/17 Annual Spending Submission Report of Commissioning Director - Environment Wards All Status Urgent No Key Enclosures

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 4.14 Economic and Fiscal Impacts This section evaluates potential impacts to local and regional economies during construction and operation of each project alternative.

More information

Motorway Communications Services PFI Study

Motorway Communications Services PFI Study Motorway Communications Services PFI Study Final Report Volume 3 - Financial Analysis Author Various Checker Name Redacted under Sec 40 of the FOIA Exemptions Personal Information Approver Name Redacted

More information

Cost Benefit Analysis TAG Unit 3.5.4

Cost Benefit Analysis TAG Unit 3.5.4 TAG Unit 3.5.4 June 2003 Department for Transport Transport Analysis Guidance (TAG) This Unit is part of a family which can be accessed at www.webtag.org.uk Contents 1 Introduction 1 2 1 3 The Method of

More information

The Region s Transport Authority

The Region s Transport Authority Agenda Item No. 8 The Region s Transport Authority Meeting: Finance, Delivery & Performance Monitoring Committee Date: 31 March 2014 From: Subject: Lead Member: Head of Programme Management LTP Monitoring

More information

Executive Summary. Prepared by: The Ohio Department of Transportation

Executive Summary. Prepared by: The Ohio Department of Transportation Executive Summary Prepared by: The Ohio Department of Transportation Table of Contents Executive Summary 1 Project History 1 Purpose and Need 1 Alternatives Analysis 1 Recommendations 3 Subdivision of

More information

Cambourne to Cambridge Better Bus Journeys Scheme: Strategic Outline Business Case Financial Case City Deal Partnership.

Cambourne to Cambridge Better Bus Journeys Scheme: Strategic Outline Business Case Financial Case City Deal Partnership. Cambourne to Cambridge Better Bus Journeys Scheme: Strategic Outline Business Case City Deal Partnership 21 September 2016 Notice This document and its contents have been prepared and are intended solely

More information

STUDY SCHEDULE STUDY PURPOSE

STUDY SCHEDULE STUDY PURPOSE STUDY SCHEDULE This Open House is the last of three public meetings for the Route Centennial Bridge Study. The material presented previously at the second Open House in July 2015 focused upon Corridor

More information

Project Appraisal Guidelines for National Roads Unit Guidance on using COBALT

Project Appraisal Guidelines for National Roads Unit Guidance on using COBALT Project Appraisal Guidelines for National Roads Unit 6.4 - Guidance on using COBALT October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is

More information

Project Summary Project Name: Route 37 Corridor Safety Sweep Project Number:

Project Summary Project Name: Route 37 Corridor Safety Sweep Project Number: Project Summary This project summary page details the benefit cost analysis (BCA) for the Route 37 Corridor Safety Sweep Project. A BCA provides estimates of the anticipated benefits that are expected

More information

Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream

Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream Title Authors Topics Case Study: Risk based approach for the design of a transport infrastructure Edmund Ang, Imperial College

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT COMBINED MONTHLY AND QUARTERLY PROGRESS REPORT FOR QUARTER ENDING JUNE 30, 2014 GEORGE MASSEY TUNNEL MONTHLY STATUS REPORT SEPTEMBER 2017 FOREWORD TO MONTHLY STATUS REPORT On September 6, 2017, the Minister

More information

Environmental Planning Statement

Environmental Planning Statement Operational Programmes for Malta Cohesion Policy 2007 2013 Investing in Our Future This Project is being considered for European Union part-financing Operational Programme I Cohesion Policy 2007-2013 Investing

More information

I-44/US-75 Interchange and Related Improvements on I-44 in Tulsa County

I-44/US-75 Interchange and Related Improvements on I-44 in Tulsa County I-44/US-75 Interchange and Related Improvements on I-44 in Tulsa County Cost-Effectiveness Analysis Supplementary Documentation FASTLANE Discretionary Grant Program I-44/US-75 Interchange and Related Improvements

More information

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa Briefing Memorandum: Second Nile Crossing at Jinja- Uganda ICA Meeting: Financing Transport for Growth in Africa December 3-4, 2007 TABLE OF CONTENTS 1. Summary 2. Economic Rationale 3. The Project 4.

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative SOUND TRANSIT STAFF REPORT MOTION NO. M2007-126 D Street-to-M Street Track & Signal Project Preferred Alternative Meeting: Date: Type of Action: Staff Contact: Phone: Board 12/13/07 Discussion/Possible

More information

Irish Rail Kildare Route Project

Irish Rail Kildare Route Project Irish Rail Kildare Route Project Supplementary Development Contributions Scheme (SDCS) Planning and Development Act 2000 December 2007 South Dublin County Council Comhairle Chontae Atha Cliath Theas CONTENTS

More information

Metro Vancouver Mayors Council on Regional Transportation

Metro Vancouver Mayors Council on Regional Transportation Metro Vancouver Mayors Council on Regional Transportation Mayors Transportation and Transit Plan: Regional Funding of Planned Projects Final Report March, 2015 This document was developed by a joint working

More information

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Introduction The formal benefit cost analysis has been conducted using best

More information

Appendix 1 In-Depth Checks

Appendix 1 In-Depth Checks Appendix 1 In-Depth Checks The following appendix sets out the In-Depth Checks undertaken by the Department for the 2016 Quality Assurance Report. The three projects/programmes selected for review are:

More information

Strategic Transport Forum 15 th September Agenda Item 4: National Investment Programmes - Roads

Strategic Transport Forum 15 th September Agenda Item 4: National Investment Programmes - Roads Strategic Transport Forum 15 th September 2017 englandseconomicheartland@b uckscc.gov.uk Agenda Item 4: National Investment Programmes - Roads Recommendation: It is recommended that the meeting agree (subject

More information

ANNUAL REPORT ARRIVING SAFELY TOGETHER

ANNUAL REPORT ARRIVING SAFELY TOGETHER ANNUAL REPORT ARRIVING SAFELY TOGETHER CONSOLIDATED BALANCE SHEET ASSETS 31 Dec. 2015 31 Dec.2014 NON-CURRENT ASSETS 15,323,685,490.35 14,909,063,681.38 Intangible assets 14,556,760,108.69 14,164,577,514.84

More information

RMTA FY2017 Annual Traffic and Toll Revenue Report

RMTA FY2017 Annual Traffic and Toll Revenue Report Richmond Metropolitan Transportation Authority RMTA FY217 Annual Traffic and Report Richmond Metropolitan Transportation Authority uary 218 Final Report RMTA FY217 Annual Traffic and Report Project No:

More information

SAN FRANCISCO PLANNING DEPARTMENT

SAN FRANCISCO PLANNING DEPARTMENT REMARKS Addendum #2 to Environmental Impact Report Addendum Date: June 11, 2015 Case No.: 2011.0558E Project Title: Transit Effectiveness Project, Modified TTRP.5 Moderate Alternative, McAllister Street

More information

analysis The,.inclusion of benefits from reduced accident rates in highwa cos5bne'fit liti-e

analysis The,.inclusion of benefits from reduced accident rates in highwa cos5bne'fit liti-e : '. r, ', ' :',. ' ' '. '. ;..... p. -(. ' i ' - -:(,:, '. ; "'- -.-;" ;.......:" ' ".. :-',-.; ',, ' ' -.. TRANSPORT RESEARCH LABORATORY I A I N 3 R ' -.; - liti-e The,.inclusion of benefits from reduced

More information

Transportation Investment Corporation Service Plan 2012/ /15

Transportation Investment Corporation Service Plan 2012/ /15 Service Plan 2012/13 2014/15 TABLE OF CONTENTS MESSAGE FROM THE CHAIR... 3 ORGANIZATIONAL OVERVIEW... 5 Mandate and Enabling Legislation... 5 Our Vision... 5 Our Values... 5 TI CORP LOCATIONS... 7 CORPORATE

More information

South Wye Transport Package Compulsory Purchase Order & Side Roads Order South Wye Transport Package A4194 Southern Link Road

South Wye Transport Package Compulsory Purchase Order & Side Roads Order South Wye Transport Package A4194 Southern Link Road South Wye Transport Package Compulsory Purchase Order 2018 & Side Roads Order 2018 South Wye Transport Package A4194 Southern Link Road Submission by E Morawiecka for Here for Hereford November 2018 REBUTTAL

More information

ELLESMERE PORT ONE PUBLIC ESTATE. Summary

ELLESMERE PORT ONE PUBLIC ESTATE. Summary ELLESMERE PORT ONE PUBLIC ESTATE Summary 1. At its meeting on 21 November, the P&I Committee had a short report on progress with the Ellesmere Port One Public Estate (OPE) programme and concluded that

More information

Savings Planning Powys County Council

Savings Planning Powys County Council Savings Planning Powys County Council Audit year: 2016-17 Date issued: March 2017 Document reference: 695A2016 This document has been prepared as part of work performed in accordance with statutory functions.

More information

Economic impact of the National Cycle Network

Economic impact of the National Cycle Network Economic impact of the National Cycle Network This report identifies some of the benefits of the National Cycle Network (NCN), from the wider economic benefits of the whole network to the impact on the

More information

Financing Transport Infrastructure. September 2014

Financing Transport Infrastructure. September 2014 Financing Transport Infrastructure September 2014 Financing Transport Infrastructure PPP Definition Project Risks Contract Structures Case Studies Key Issues Conclusions 2 PPP Definition Public Private

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared by: Mayor and City Council Charles Ozaki, City and County Manager David Allen, Deputy Director of Public

More information

Economic Assessment of a Fixed Link across the Fehmarn Belt

Economic Assessment of a Fixed Link across the Fehmarn Belt Danish Ministry of Transport Economic Assessment of a Fixed Link across the Fehmarn Belt Summary Report March 2004 in cooperation with Danish Ministry of Transport Economic Assessment of a Fixed Link across

More information

Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Final Submission January 2015 Document Control Contract Name Contract Number C066

More information

AUDIT OF THE EVERGREEN LINE RAPID TRANSIT PROJECT

AUDIT OF THE EVERGREEN LINE RAPID TRANSIT PROJECT Report 15: March 2013 AUDIT OF THE EVERGREEN LINE RAPID TRANSIT PROJECT www.bcauditor.com 8 Bastion Square Victoria, British Columbia Canada V8V 1X4 Telephone: 250-419-6100 Facsimile: 250-387-1230 Website:

More information

I-75 at Overpass Road Interchange

I-75 at Overpass Road Interchange Benefit-Cost Analysis Supplementary Documentation TIGER Grant Program I-75 at Overpass Road Interchange Pasco County, FL October 16, 2017 0 Benefit-Cost Analysis Supplementary Documentation 1. Introduction

More information

Section 106 & CIL. Chapter 10. new pedestrian bridge across the river. new social infrastructure. new linear park. improved road environment

Section 106 & CIL. Chapter 10. new pedestrian bridge across the river. new social infrastructure. new linear park. improved road environment Chapter 10 Section 106 & CIL Mayor of London 141 new pedestrian bridge across the river new social infrastructure Chapter 10 Section 106 & CIL new linear park improved road environment improved river walk

More information

RMTA FY2016 Annual Traffic and Toll Revenue Report

RMTA FY2016 Annual Traffic and Toll Revenue Report RMTA Richmond Metropolitan Transportation Authority RMTA RMTA FY216 Annual Traffic and Report Richmond Metropolitan Transportation Authority August 216 Final Report RMTA FY216 Annual Traffic and Report

More information

Differences in public sector transport spending across England

Differences in public sector transport spending across England Differences in public sector transport spending across England This note sets out some key statistics on public spending on transport across England. It also sets out why a number of different reports

More information

Strategic planning for flood risk management. Adrian Philpott Team Leader Flood Risk Management Environment Agency Wales 28 th April 2010

Strategic planning for flood risk management. Adrian Philpott Team Leader Flood Risk Management Environment Agency Wales 28 th April 2010 Strategic planning for flood risk management Adrian Philpott Team Leader Flood Risk Management Environment Agency Wales 28 th April 2010 My presentation Flood risk Trehafod 1979 Flood defence to flood

More information

Receive and file capital works report CW providing an update on the Burloak grade separation.

Receive and file capital works report CW providing an update on the Burloak grade separation. Page 1 of Report CW-13-17 SUBJECT: Burloak Grade Separation Project Update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-17 Wards Affected: 5 File Numbers: 570.02-818 Date to Committee:

More information

Research: Research and Technology Transfer Office Sept. 1, 1996-Dec. 31, 1996 P.O. Box 5080

Research: Research and Technology Transfer Office Sept. 1, 1996-Dec. 31, 1996 P.O. Box 5080 1. Report No. 2. \.10vemment Accession No. 3. Recipient's Catalog No. FHWA/TX-99/1756-4 Technical Report Documentation Page 4. Title and Subtitle 5. ReportDate SUGGESTED GUIDELINES FOR REVIEWING PRIVATE

More information

Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget. Suburban Suburban

Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget. Suburban Suburban v System Status Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget 6 4 2 0-2 -4-6 -8 Suburban Suburban Suburban ADA Suburban ADA ADA ADA Revenue Expenses Funding Required Net Funding

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

1 Introduction This TAG Unit provides background material on a number of aspects of cost benefit analysis. The topics covered are:

1 Introduction This TAG Unit provides background material on a number of aspects of cost benefit analysis. The topics covered are: Cost Benefit Analysis TAG Unit 3.5.4 February 2006 Contents 1. Introduction 2. Cost Benefit Analysis 3. Method of Cost Benefit Analysis to Be Employed in Multi-Modal Transport Studies 4. Framework for

More information

1. The Planning (Hazardous Substances) (Determination of Procedure) (Wales) Order 2017;

1. The Planning (Hazardous Substances) (Determination of Procedure) (Wales) Order 2017; Appeals Explanatory Memorandum to: 1. The Planning (Hazardous Substances) (Determination of Procedure) (Wales) Order 2017; 2. The Town and Country Planning (Fees for Applications, Deemed Applications and

More information

Title of Document Greater Dublin Area Draft Transport Strategy Task Order 61 Outline Transport User Benefits Assessment

Title of Document Greater Dublin Area Draft Transport Strategy Task Order 61 Outline Transport User Benefits Assessment DOCUMENT IDENTIFICATION TABLE Client/Project owner National Transport Authority Title of Document Greater Dublin Area Draft Transport Strategy 2015-2035 Task Order 61 Task Outline Transport User Benefits

More information

This report was produced by Atkins Ltd for the Highways Agency for the specific purpose of a Meta-analysis of POPE findings.

This report was produced by Atkins Ltd for the Highways Agency for the specific purpose of a Meta-analysis of POPE findings. December 2008 Notice This report was produced by Atkins Ltd for the Highways Agency for the specific purpose of a Meta-analysis of POPE findings. This report may not be used by any person other than the

More information

Impact assessment

Impact assessment Localism Bill: creating a single housing ombudsman Impact assessment www.communities.gov.uk Localism Bill: creating a single housing ombudsman Impact assessment January 2011 Department for Communities

More information

A Benefit Cost Analysis of the 45th Street at Calumet Avenue Grade Separation Project. Presented to the Town of Munster

A Benefit Cost Analysis of the 45th Street at Calumet Avenue Grade Separation Project. Presented to the Town of Munster A Benefit Cost Analysis of the 45th Street at Calumet Avenue Grade Separation Project Presented to the Town of Munster June 3, 2015 Table of Contents Executive Summary... 3 Project Description and Cost...

More information