A new chapter in public sector procurement. Client guide. sidframework.co.uk

Size: px
Start display at page:

Download "A new chapter in public sector procurement. Client guide. sidframework.co.uk"

Transcription

1 A new chapter in public sector procurement Client guide sidframework.co.uk

2 Framework members The Framework has been procured through a fully compliant OJEU process. OJEU Notice published on 16 October Contract award notice , published on the 25 August Through this process five constructors have been appointed as Framework Members. Membership of the Framework is as follows: Bouygues UK Elizabeth House 39 York Road London SE1 7NQ E info@bouygues-uk.com W bouygues-uk.com CCG 1 Cambuslang Road Cambuslang Investment Park Glasgow G32 8NB E admin@c-c-g.co.uk W c-c-g.co.uk Morgan Sindall Kent House Market Place London W1W 8AJ E info@msinvestments.co.uk W msinvestments.co.uk Wates Wates House Station Approach Leatherhead Surrey KT22 7SW E info@wates.co.uk W wates.co.uk Wilmott Dixon Suite 401 The Spirella Building Bridge Road Letchworth Herts SG6 4ET E jim.brunt@primeplace.co.uk W willmottdixon.co.uk 2 sidframework.co.uk

3 Contents Introduction 4 The Framework 4 Accessing the Framework 5 Use of the Framework by relevant bodies 6 Flexibility 7 Call off processes 7 Pre-selection 7 Tender evaluation 11 Access fees 13 Framework management 14 Framework Manager duties 14 Value and duration of the Framework 14 Client duties 15 Brokers 16 E-tendering 17 Instruction procedures 17 Due diligence 18 The procurement process 18 3 sidframework.co.uk

4 Introduction The main aim of the Social Infrastructure Development (SID) Framework is to deliver social infrastructure using the development value of surplus public or third sector assets and to make the procurement of a developer as quick and efficient as possible for the Client. The Framework has been procured through a fully compliant OJEU process. Five constructors have been appointed as Framework members. This guide should be read in conjunction with the Framework member prospectus. The Framework Public or charitable bodies (Clients) will identify land assets for transfer to the Framework Member. Clients can then use value generated from developing those assets to deliver tangible benefits using the same Framework Member as part of one coherent deal, across multiple sites or in different locations, and negating the need for multiple procurements. A key dimension of the Framework will be to deliver both the released capital and service/ assets at pace. The Framework is intended to be used for the procurement and development of surplus sites for residential housing and other uses, and for the construction of additional social assets on other sites within the Client s ownership. This will include all activities necessary to design, finance, develop and construct community assets to include civic estate, further education colleges, nursing care homes and facilities, civil engineering, emergency services (eg police and fire), housing, and associated energy and other infrastructure. The development of surplus public, community and charitable sector assets will include but not limit: l raising of development finance l taking development risk l obtaining planning permission l supply chain management l design and construction of community assets and associated infrastructure l refurbishment and remodelling of community assets l development and disposal of sites l demolition, site remediation and enabling works to prepare sites for residential or mixed-use development l self-build enabling as part of a larger development l site management l construction project management. 4 sidframework.co.uk

5 Accessing the Framework The Framework is accessible by all public bodies and charitable organisations within the boundary of the United Kingdom as identified in the remainder of this document. Clients will identify land for transfer and shape an outline scheme and development brief prior to engaging a Framework Member, generally through a mini-competition process. Clients may choose to work through a third party adviser or Broker to provide the resources and capacity to develop the project so it is sufficiently defined to allow for a mini-competition. The benefit of using a third party Broker is that, in some circumstances, projects can be worked up at risk with no direct upfront cost to the public authority. Should the project proceed, the costs of working up the scheme can be reimbursed to the Broker from the development gain generated through the project. Public authorities may of course choose to do this work in-house or seek external professional support on an upfront fee basis. At the mini-competition stage, Framework Members will be required to confirm that they have no actual or potential conflicts of interest with the Client or Broker, should one be involved in the project. Once selected, further to the mini-competition process, the Framework Member will be offered an option or conditional sale agreement on a site or sites by the Client and will then stimulate value by developing and delivering a scheme which incorporates, for example, new build housing, but which also may include delivery of additional public asset/s on other sites remaining in the Client s ownership. This may, for example, include the provision of new school buildings wholly, or partly funded by the housing development, or the delivery of wider public benefits, such as supporting the creation of local social enterprises, as part of the deal. The Framework Member and the Client will share any additional value created. 5 sidframework.co.uk

6 Use of the Framework by other relevant bodies The Framework Agreement will be open to the entire public sector, other public bodies, such as the Police, Fire and Rescue Service, NHS Bodies and registered charities within the UK and to those central government departments and their agencies that wish to use it. Any bodies described below may utilise the resulting Framework Agreement from the commencement date. Local Authority Councils: County, Unitary, District, Borough and Metropolitan Councils l (Parish and Community Councils are also permissible users) Central Government departments and their agencies: l Educational establishments: Nursery School, Primary School, Middle or High School, Secondary School, Academy, Special School, Pupil Referral Unit (PRU), Further Education, College, University. l l l l Police, Fire and Rescue, Maritime and Coastguard Agency emergency services: NHS bodies, the HSC (Northern Ireland) and Ambulance Services: l l l l l l l l l NHS bodies, Scotland and Wales NHS and Ambulance Service: l l l Registered charities: Registered social landlords: Government-funded, not-for-profit organisations that provide affordable housing. They include housing associations, trusts and cooperatives. l l l l 6 sidframework.co.uk

7 Flexibility Call off processes Pre-selection Clients will approach NPS Group to discuss requirements and potential to use the Framework. Key project outcomes, requirements, cost, time, and key drivers will be established at this stage and the service requirements agreed. The Client will execute the Access Agreement. The call off process will then commence. There will be subsequent support from the NPS Group Framework management team in evidencing delivery of the strategic initiatives and measurement of KPIs. There will also be a debrief session. A call off Contract will be awarded using either a mini-competition or a direct call off negotiation process. There are two routes the process can take: Route one: direct call off (through negotiation) Route two: mini-competition In order for Clients to access the Framework, an Access Agreement will need to be in place between NPS and the relevant Client.The call off process will commence with an Expression of Interest. NPS Group anticipate tender lists for each project to consist of all Framework Members. Framework Members invited to participate in a mini-competition or negotiate a direct call off will be required to: l satisfy both NPS Group and the Client with regard to its technical capability and capacity to satisfactorily deliver a Project (this assessment will take account of the Framework Member s recent performance as part of the Framework) l satisfy both NPS Group and the Client that it can deliver the Project within acceptable Tendered Rates if it were to subsequently enter into a Project Call Off Agreement. This assessment will consider issues such as financial standing, workload, turnover, as well as the size and the characteristics of the Project in question l demonstrate that it has achieved an acceptable standard following a health and safety assessment l demonstrate that it has achieved an acceptable standard in relation to their processes and procedures with regards to records, supply of information and forecasts l confirm that it wishes to participate in the mini-competition/direct call off in question. l the Client reserves the right to require that the Framework Member enters into a Parent Company Guarantee and/or Performance Bond as appropriate/ necessary to the delivery of a particular Project. 7 sidframework.co.uk

8 Route one: direct call off (through negotiation) Fully developed scheme has been prepared. Qualifying body wishes to negotiate direct with a single Framework Member. Access SID Framework Call Off Process Project Delivery Contact Framework Manager to discuss requirements Complete detailed project brief Confirm single Framework Member interest Carry out pre-selection due diligence checks on Framework Member Carry out negotiation Pre-start meeting using SID standard templates and documents Client team manages pre-construction requirements and site performance Confirm procurement service requirements Finalise KPIs and employment and skills plan Tender evaluation and report Framework Manager collates KPIs, employment and skills plan data Agree access fee and sign access agreement Contract award Complete project call off agreement Contract completion and handover Apply, negotiate and secure planning consents if not already in progress 8 sidframework.co.uk

9 Route two: mini-competition Fully developed scheme has been prepared. Access SID Framework Call Off Process Project Delivery Contact Framework Manager to discuss requirements Complete detailed project brief Confirm Framework Member interest Carry out pre-selection due diligence checks on Framework Members Carry out mini-competition Pre-start meeting using SID standard templates and documents Client team manages pre-construction requirements and site performance Confirm procurement service requirements Finalise KPIs and employment and skills plan Tender evaluation and report Framework Manager collates KPIs, employment and skills plan data Agree access fee and sign access agreement Contract award Complete project call off agreement Contract completion and handover Apply, negotiate and secure planning consents if not already in progress 9 sidframework.co.uk

10 Example: Journey of an undeveloped project through the Framework (either route one or route two) Basic client project details in outline form are known. Access SID Framework Project Development Call Off Process Project Delivery Contact Framework Manager to discuss requirements Develop concept and undertake feasibility assessment* Project inception Develop outline brief and appoint design team Obtain site specific information, surveys and reports Confirm Framework Member interest Carry out pre-selection due diligence checks on Framework Members Pre-start meeting using SID standard templates and documents Complete detailed project brief Project scoping Design development and cost checks Carry out negotiation or mini-competition Client team manages pre-construction requirements and site performance Confirm procurement service requirements Is project viable? YES Client approval? YES Finalise KPIs and employment and skills plan Tender evaluation and report Framework Manager collates KPIs, employment and skills plan data NO NO Contract award Agree access fee and sign access agreement END END Complete project call off agreement Contract completion and handover *Client appoints approved broker or commissions its own feasibility and design development work Apply, negotiate and secure planning consents if not already in progress 10 sidframework.co.uk

11 Tender evaluation NPS Group will carry out a mini-competition using the process set out. The tender documents will require that a Framework Member submits a response that includes a priced tender and a quality submission. Evaluation criteria used for the case study within the original Invitation to Tender (ITT) will be carried forward to mini-competitions for development and construction work procured through the Framework, although the criteria may be varied to suit the nature of the individual construction or development projects. The table below details the approach to this. The exact weightings of the evaluation criteria and sub-criteria to be used will be detailed within each Project Specific Invitation to Tender. The following illustrates some of the factors that may influence the weightings defined: l where qualitative factors have less overall importance, financial offer may be weighted higher l where qualitative factors have greater importance, financial offer may be weighted lower l where the relative importance of the qualitative factors change, the evaluation criteria may be varied to reflect this. Quality and Financial evaluation at minicompetition stage will use sub-criteria similar to that used in the Framework tender evaluation which will be applied pro rata to the Tender weighting of Price/Quality selected. Table showing extent of variability of evaluation criteria from ITT to mini-competition evaluation Financial evaluation at the mini-competition stage will focus on the land value rather than on the constituent parts, i.e. build costs, sales values and overheads and profit. The Key Commercial Parameters, submitted as part of the financial proposal, will establish a set of parameters that Framework Members will have to meet as a minimum when submitting a response to any mini-competition. Framework Members may at that stage offer more advantageous commercial position for the public sector Client, but may not offer a less advantageous position. Framework ITT weighting Quality 50% 30-70% Financial Offer 50% 30-70% Total Score 100% 100% Mini-competition Project Specific Tender weighting range 11 sidframework.co.uk

12 Other financial parameters (not included in the Key Commercial Parameters), will be developed during the mini-competition process and be benchmarked against relevant indices as part of that evaluation process. NPS Group and the Client will evaluate the submissions received as follows: 1. Any response may be discounted without further consideration (subject to this being provided for in the instructions for tendering) if it: l is withdrawn by a Framework Member l does not comply with the requirements of the instructions for tendering l is so much higher in price than the lowest priced response that it would be unable to score high enough overall marks to be selected for the Project (even if it obtained a maximum quality score and the lowest priced response were to receive a zero quality score) 2. Any responses not discounted will be assessed in accordance with the project quality specific selection criteria. 3. The scores of the responses evaluated will then be ranked, with the highest scoring response being ranked first. Following the ranking of the responses, NPS and the Client may: l award the Project to the highest ranking Framework Member l not award the Project and elect to re-run the mini-competition l elect to procure the Project outside of the Framework or not proceed with the Project. NPS Group and the Client may, either prior to issuing tender documents or during the response period, opt to provide briefing sessions so as to respond to queries and clarify issues relating to the mini-competition. NPS Group will use an e-tendering system to manage all mini-competitions. All opportunities offered to Framework Members from Clients, will be offered via this system. Framework Members must not accept mini-competition opportunities unless they are offered through this system.the Framework Member selected through the process will be appointed by the Client (independently of NPS Group) through a separate contract comprising separate project specific contractual agreements that will be put in place at the conclusion of the minicompetition. The call off contract will include (but not be limited to): l a Property Agreement l a Project Call Off Agreement l a Development Agreement provided l and the JCT Standard Form of Building Contract with Contractor s Design (together with ancillary documents including collateral warranties and/ or Private Company Guarantee). 12 sidframework.co.uk

13 Access fees Framework Members will be notified by NPS Group of the Framework Access Fee applicable to the Project when they are invited to tender. The Framework Access Fee will be listed as a separate item on the tender summary for the Project. Up to 3m = 2.5% 3m 10m = 1.5% 10m 20m = 0.75% Above 20m = 0.5% (Capped at 150,000) Construction Cost 13 sidframework.co.uk

14 Framework management The Framework will be managed by NPS Group. Contact details are as follows: SID Framework Manager NPS Group Gateway Plaza Sackville Street Barnsley S70 2RD E: T: W: sidframework.co.uk Framework Manager duties The Framework Manager duties are to: l provide procurement advice relating to the development l carry out employment and skill plan co-ordination/monitoring l provide briefings on Framework procedures in relation to the Client s first project call-off l provide post-project Call-Off Agreement advice regarding Framework operation only l carry out performance measurement and management l provide standard documents (including call-off pro-formas, typical scoring regimes, tender documentation and contract administration forms) l provide briefing documentation and meetings for tenderers l collate responses to clarification requests from tenderers l submit clarifications from evaluators l provide an evaluation report and recommendations based on tender submissions. NPS Group will have no liability for works procured by public bodies and charitable organisations using the Framework. Value and duration of the Framework The Framework will run for a period of 4 years ending on 30 July It is likely that many of the projects procured through the Framework will have long build-out durations and it is anticipated that some of these will take longer than 4 years to complete. The social outcomes that form part of this Framework may only be capable of achievement over longer periods of time than 4 years. It is anticipated that the Framework may be used to procure up to 3bn of development and construction with projects ranging from 3m - 50m in value. 14 sidframework.co.uk

15 Client duties The duties of the Client are to: l complete a detailed Project Brief l appoint a Broker (if required) l confirm procurement service requirements l provide project specific documentation as required to complete a call off process. This may include: l Site plan l Land title information l Indicative scheme layout l Project programme l Project financial model l User brief l Design brief l Outline/detailed design if necessary for planning application l Stakeholder management plan l Liaison with statutory bodies l Planning Development Brief l Soft Market Testing l Site Surveys l Risk Management Plan l agree access fee and sign Access Agreement l provide/carry out project specific due diligence checks on Framework Members (financial appraisal, insurances, health and safety) 15 sidframework.co.uk

16 Brokers To engage successfully with the Framework, many public and charitable bodies may find it helpful to use the services of a Broker. A Broker will provide the resources and capacity to develop the project or scheme so it is sufficiently defined to allow for a call off process through the Framework. This may also give the potential for the Client to de-risk the scheme prior to procuring a Framework Member by carrying out due diligence and, in some cases, securing planning permissions, thereby increasing the potential development gain and social value. This additional support can, in some circumstances, be provided without a direct upfront cost to the Client and can include the following: l working at risk to assess viability of an existing scheme or schemes l identifying and assessing opportunities to develop surplus land l options appraisals to deliver housing and public assets both on individual surplus sites and as a portfolio of opportunities l carrying out development appraisals and identifying how to secure best value for sites in financial terms and in respect of delivering a positive social impact from their redevelopment l developing initial scheme designs and engaging relevant stakeholders l commissioning site surveys and securing pre-planning application advice l preparing and submitting planning applications including supporting planning consultation activity l producing a development brief and proposals that Framework Members can respond to through soft market testing l obtaining necessary approvals from regulatory bodies such as government ministers for release of public land l acting as an agent for the Client in procuring through the Framework, including developing the procurement strategy and documentation and evaluating bids l providing best value for services to the client. The Client will be responsible for appointing a Broker (if required). Contact the Framework Manager for more information on the appointment of a Broker. l carrying out initial planning assessments and feasibility studies 16 sidframework.co.uk

17 E-tendering system NPS Group will use a web based e-tendering system to administer the procurement process. Instruction procedure For a sufficiently defined project the Client must submit to NPS a Project Brief together with the following: l site location l site boundaries showing area for provision of the public asset and areas for development and sale l title information (including title report). The Client must also submit to NPS, any of the following relevant information that it is in possession of as at the date of instruction: l topographic surveys l geo-technical and utility survey details l ecology and archaeological reports l flood risk Assessments l noise/vibration/air quality reports l planning consent and s106 agreements if available l accommodation schedule and scheme designs l employers requirements l relevant policies. 17 sidframework.co.uk

18 Due diligence The procurement process The Framework has been procured through a fully compliant OJEU process. OJEU Notice published on 16 October Contract award notice , published on the 25 August The first stage of the process was the issue of a Pre-Qualification Questionnaire (PQQ) with an accompanying Memorandum of Information. The PQQ was used to establish the experience and capabilities of the prospective Framework Members. Questions were asked on: l Business and Professional Standing l Insurances l Equal Opportunity and Diversity l Health and Safety l Quality and Environmental Accreditation l Financial Standing l Business Capabilities l Maximising social value from infrastructure projects l Delivering community assets l Capacity and Resources Track Record From this stage 10 constructors were short listed and invited to submit their tender proposals. Bidders were provided with a case study for a fictional housing development and school redevelopment scheme based in the South East of England. Although fictional, the case study was based on a real life scenario. Bidders were asked to demonstrate how they would deliver and price the scheme, including any additional social dividend or benefits. Tenders were assessed against the following evaluation criteria: Evaluation Criteria Summary Quality 50% Design and Construction Approach 15% Site Management 7% Housing Development Optimisation 15% Delivering Social Value 10% Framework Promotion 3% Financial 50% Offer for the Housing Land 15% Ancillary Works Costs 15% Key Commercial Parameters 20% Overage Methodology Pass/Fail Questions on business capabilities covered the following: l Experience and Technical Ability l Development gain through financed social infrastructure 18 sidframework.co.uk

19 The financial evaluation covered key financial parameters: l Profits on private sales units l Profits on affordable rented units (eg social rented, affordable rented) l Profits on intermediate affordable units (eg shared ownership, equity discount market sale) l Overheads and profits on build costs for public sector assets (eg school buildings) l Overheads on public sector assets l Profits on public sector assets l Overheads and profits on build costs for market housing (including the affordable element) l Overheads on market housing l Overheads on affordable housing l Profits on market housing l Profits on affordable housing l Development management fees (where additional or separate from overhead and profit) l Development management on market housing l Development management on affordable housing l Preliminaries l Prelims for public sector assets l Prelims for housing l Contingency l Contingency for public sector assets l Contingency for housing These parameters are the maximum or minimum (as appropriate) that a Framework Member will have to meet when submitting a response to a project call off. The delivery partner may at any stage offer a more advantageous commercial position to the Client but may not offer a less advantageous position. 19 sidframework.co.uk

20 Contact SID Framework Manager E: T: W: sidframework.co.uk 20 sidframework.co.uk

ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 30 th November 2015

ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 30 th November 2015 ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 30 th November 2015 Title Report of BARNET DEVELOPMENT PIPELINE PROCUREMENT STAGE 4 ENTER INTO TRANCHE 1 PRE- CONSTRUCTION SERVICES AGREEMENTS (5 No.) Commissioning

More information

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction

More information

USER GUIDE NATIONAL FRAMEWORK SOFTWARE PRODUCTS AND ASSOCIATED SERVICES. Ref: Y17038 LET S KEEP THE CONVERSATION GOING...

USER GUIDE NATIONAL FRAMEWORK SOFTWARE PRODUCTS AND ASSOCIATED SERVICES. Ref: Y17038 LET S KEEP THE CONVERSATION GOING... USER GUIDE NATIONAL FRAMEWORK SOFTWARE PRODUCTS AND ASSOCIATED SERVICES Ref: Y17038 LET S KEEP THE CONVERSATION GOING... Freephone 0808 281 9439 Email sales@kcs4ps.co.uk Online kcs4ps.co.uk 2 CONTENTS

More information

You get a better view with over 200 years experience

You get a better view with over 200 years experience You get a better view with over 200 years experience An innovative property consultancy with traditional beliefs A specialised business with diverse skills and expertise Over our long history we have provided

More information

Charities Act 2006 Review call for evidence The definition of charity and the public benefit requirement

Charities Act 2006 Review call for evidence The definition of charity and the public benefit requirement Charities Act 2006 Review call for evidence The definition of charity and the public benefit requirement Issue The Charities Act 2006 provided a new statutory definition of charity, based on a list of

More information

CIPS South Yorkshire branch Procurement Law Update

CIPS South Yorkshire branch Procurement Law Update CIPS South Yorkshire branch Procurement Law Update Mary Mundy and Tim Dennis 21 May 2015 Legal background EU directives Concession Directive 2014/23/EC Public directive 2014/24/EC Utilities Directive 2014/25/EC

More information

Cabinet. 27 July Classification: Part Exempt (Appendix 1 Exempt) Report of: Corporate Director Place. Housing Capital Projects: Pipeline schemes

Cabinet. 27 July Classification: Part Exempt (Appendix 1 Exempt) Report of: Corporate Director Place. Housing Capital Projects: Pipeline schemes Cabinet 27 July 2017 Report of: Corporate Director Place Classification: Part Exempt (Appendix 1 Exempt) Housing Capital Projects: Pipeline schemes Lead Member Originating Officer(s) Wards affected Community

More information

Admitted Body Guidance

Admitted Body Guidance Admitted Body Guidance A guide for employers and prospective employers involved in obtaining admitted body status within the Local Government Pension Fund Dated July 2015 1 CONTENTS INTRODUCTION... 3 TYPES

More information

Better Government Series. Audit v other forms of assurance. Special Report BUSINESS WITH CONFIDENCE

Better Government Series. Audit v other forms of assurance. Special Report BUSINESS WITH CONFIDENCE Better Government Series Audit v other forms of assurance Special Report BUSINESS WITH CONFIDENCE icaew.com ICAEW 2016 All rights reserved. If you want to reproduce or redistribute any of the material

More information

Authorised Officer is any officer permitted by an Appropriate Officer to authorise orders and contracts as per clause 2.5.

Authorised Officer is any officer permitted by an Appropriate Officer to authorise orders and contracts as per clause 2.5. PART 3G Contracts Standing Orders 2018/19 Definitions Aggregation is the combining together of the total contract valuespend from separate contracts where they meet a single requirement for works, goods

More information

ENABLE Guarantees Programme. A Request for Proposals

ENABLE Guarantees Programme. A Request for Proposals ENABLE Guarantees Programme A Request for Proposals 05 September 2017 1. Introduction... 3 1.1 British Business Bank... 3 1.2 ENABLE Guarantees Programme... 3 1.3 Objectives of the Programme... 4 2. Process

More information

Zero Waste: Edinburgh and Midlothian - Award of Food Waste Treatment Contract

Zero Waste: Edinburgh and Midlothian - Award of Food Waste Treatment Contract The City of Edinburgh Council 10.00 am, Thursday 13 December 2012 Zero Waste: Edinburgh and Midlothian - Award of Food Waste Treatment Contract Item number Report number Wards City wide Links Coalition

More information

PFI Procurement. Centralisation and Modernisation of Acute Services on the Broomfield Hospital Site

PFI Procurement. Centralisation and Modernisation of Acute Services on the Broomfield Hospital Site PFI Procurement Centralisation and Modernisation of Acute Services on the Broomfield Hospital Site Pre-Qualification Questionnaire January 2003 Version 1.00 INTRODUCTION 1 Responses 2 Layout of PQQ 3 SECTION

More information

Flitwick Leisure Centre

Flitwick Leisure Centre Meeting: Executive Date: 14 May 2013 Subject: Flitwick Leisure Centre Report of: Cllr Spurr, Executive Member for Sustainable Communities Services Summary: To procure a consultant in project management

More information

Education Funding Agency

Education Funding Agency Education Funding Agency Pre-Qualification Questionnaire Funding Advisory Services to provide advice on the structuring of a capital markets or other financing solution to support the delivery of the Priority

More information

Arthur J. Gallagher - Education Practice

Arthur J. Gallagher - Education Practice t Arthur J. Gallagher - Education Practice Insurance Procurement For Colleges PHILIP WEBSTER Executive Director - Education Direct Dial: Mobile: Email: 01924 234 028 07717 802 518 Phil_Webster@ajg.com

More information

Title Aggregated Procurement

Title Aggregated Procurement Policy and Resources Committee 02 September 2016 Title Aggregated Procurement Report of Chief Operating Officer Wards All Status Public Urgent No Key Yes Enclosures None Officer Contact Details Chris Smith

More information

Capital Project Approval Request

Capital Project Approval Request Capital Project Approval Request PMP T07 Project Number MAJ 0000 Project Title Project Description Existing Approvals EC Approval Court Approval Approved Gateway 0 To proceed to GW1 Prepare OBC / Feasibility

More information

UK-Leeds: construction work 2008/S CONTRACT NOTICE. Works

UK-Leeds: construction work 2008/S CONTRACT NOTICE. Works 1/8 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:317753-2008:text:en:html UK-Leeds: construction work 2008/S 239-317753 CONTRACT NOTICE Works SECTION I: CONTRACTING AUTHORITY I.1)

More information

PPP IN THE UK HEALTH SECTOR. Section Head, Capital Investment Branch, Department of Health, UK Government. Susan Peak

PPP IN THE UK HEALTH SECTOR. Section Head, Capital Investment Branch, Department of Health, UK Government. Susan Peak PPP IN THE UK HEALTH SECTOR Susan Peak Section Head, Capital Investment Branch, Department of Health, UK Government December 2007 Areas covered in presentation: Context the use of PFI (Private Finance

More information

Finance Platforms Call for Expressions of Interest

Finance Platforms Call for Expressions of Interest Finance Platforms Call for Expressions of Interest 11 th of August 2017 1. Introduction 1.1 Role of the British Business Bank In the March 2016 Budget, the Chancellor announced the Government s intention

More information

Technical Enquiry Service- Frequently Asked Question

Technical Enquiry Service- Frequently Asked Question Technical Enquiry Service- Frequently Asked Question As a CIPFA member, what audit rights do I have? The attached table sets out the qualification requirements for the person signing the audit of various

More information

Lisburn Primary and Community Care Project

Lisburn Primary and Community Care Project Lisburn Primary and Community Care Project Appointment Business Case DRAFT v0.2 Section 1 Executive Summary 0 Contents 1 Executive Summary... 1 Introduction... 1 Project Background... 1 Section 2: Update

More information

Why VFM needs great Asset Management. Karen Heaney: Director of Asset Management Home Group

Why VFM needs great Asset Management. Karen Heaney: Director of Asset Management Home Group Why VFM needs great Asset Management Karen Heaney: Director of Asset Management Home Group Who is Home Group? Our Footprint Our Asset Profile: General Needs Unknown

More information

NHS Pensions - Qualifying for Protection in the 1995/2008 Scheme because of Previous Public Service Membership (PPSM) - FAQs

NHS Pensions - Qualifying for Protection in the 1995/2008 Scheme because of Previous Public Service Membership (PPSM) - FAQs NHS Pensions - Qualifying for Protection in the 1995/2008 Scheme because of Previous Public Service Membership (PPSM) - FAQs Q. I had protection in my previous public service pension scheme but you have

More information

Award of Contract - Development of Biggleswade South Gypsy and Traveller Site

Award of Contract - Development of Biggleswade South Gypsy and Traveller Site Central Bedfordshire Council EXECUTIVE 20 June 2017 Award of Contract - Development of Biggleswade South Gypsy and Traveller Site Report of: Cllr Carole Hegley, Executive Member for Social Care and Housing

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

ScotWind leasing - new offshore wind leasing for Scotland

ScotWind leasing - new offshore wind leasing for Scotland November 2018 ScotWind leasing - new offshore wind leasing for Scotland Summary of Discussion Document responses and update on leasing design In May 2018 we published a Discussion Document setting out

More information

Community Infrastructure Levy Neighbourhood Planning Toolkit

Community Infrastructure Levy Neighbourhood Planning Toolkit Community Infrastructure Levy Neighbourhood Planning Toolkit Written by Lorraine Hart, Community Land Use Table Of Contents Introduction... 3 Essential background... 4 The links between neighbourhood planning

More information

INVITATION TO TENDER FOR THE CO-ORDINATION OF THE STUDENT ENTERPRISE AWARDS

INVITATION TO TENDER FOR THE CO-ORDINATION OF THE STUDENT ENTERPRISE AWARDS INVITATION TO TENDER FOR THE CO-ORDINATION OF THE STUDENT ENTERPRISE AWARDS PROGRAMME 2017-2019 Tender Guidelines 1. Introduction The Student Enterprise Awards (hereafter referred to as SEA) is a national

More information

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2017 Qtr 1

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2017 Qtr 1 Audit Department Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2017 Qtr 1 To be leaders in building public trust in our civic government TABLE OF CONTENTS History...1

More information

Plunkett s brief guide to Legal Structures, The Plunkett Model Rules and Community Shares

Plunkett s brief guide to Legal Structures, The Plunkett Model Rules and Community Shares Plunkett s brief guide to Legal Structures, The Plunkett Model Rules and Community Shares Committees In the early days, a committee is required to take on the responsibility of managing and leading a community

More information

Public Private Partnerships (PPPs) Projects

Public Private Partnerships (PPPs) Projects Development Process of Public Private Partnerships (PPPs) Projects By Dr Paul H K Ho 1 Disclaimer Funded by Commerce, Industry and Technology Bureau, The Government of the Hong Kong Special Administrative

More information

Memorandum of Understanding between the Scottish Charity Regulator and the Charity Commission for Northern Ireland

Memorandum of Understanding between the Scottish Charity Regulator and the Charity Commission for Northern Ireland Memorandum of Understanding between the Scottish Charity Regulator and the Charity Commission for Northern Ireland Purpose of the Memorandum of Understanding The purpose of this memorandum of understanding

More information

STUDENT HOUSING SOLUTIONS SUPPORTED BY CBRE BUILDING CONSULTANCY

STUDENT HOUSING SOLUTIONS SUPPORTED BY CBRE BUILDING CONSULTANCY STUDENT HOUSING SOLUTIONS SUPPORTED BY CBRE BUILDING CONSULTANCY C STUDENT HOUSING SOLUTIONS CBRE Building Consultancy is uniquely placed to assist developers, operators, lenders, and private and institutional

More information

MULTI-PARTY FRAMEWORK AGREEMENT FOR ROAD MARKINGS

MULTI-PARTY FRAMEWORK AGREEMENT FOR ROAD MARKINGS MULTI-PARTY FRAMEWORK AGREEMENT FOR ROAD MARKINGS TABLE OF CONTENTS 1.0 AGREEMENT... 3 2.0 THE CENTRAL PURCHASING BODY AND THE CONTRACTOR AGREE AS FOLLOWS:... 4 2.1 ENTIRE AGREEMENT... 4 2.2 FRAMEWORK

More information

The Landscape Consultant s Appointment

The Landscape Consultant s Appointment The Landscape Consultant s Appointment The Landscape Institute 33 Great Portland Street London W1W 8QG Tel: +44 (0)20 7299 4500 Fax: +44 (0)20 7299 4501 Email: mail@landscapeinstitute.org Web: www.landscapeinstitute.org

More information

UK-Beverley: construction work 2008/S CONTRACT NOTICE. Works

UK-Beverley: construction work 2008/S CONTRACT NOTICE. Works 1/8 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:317750-2008:text:en:html UK-Beverley: construction work 2008/S 239-317750 CONTRACT NOTICE Works SECTION I: CONTRACTING AUTHORITY

More information

Public Contracts Regulations 2015 New requirements relating to Pre Qualification Questionnaires to help businesses access Public Sector contracts

Public Contracts Regulations 2015 New requirements relating to Pre Qualification Questionnaires to help businesses access Public Sector contracts Public Contracts Regulations 2015 New requirements relating to Pre Qualification Questionnaires to help businesses access Public Sector contracts 1. Introduction The Public Contracts Regulations 2015 contain

More information

Kier Group. Interim results for the six months ended 31 December March 2018

Kier Group. Interim results for the six months ended 31 December March 2018 Kier Group Interim results for the six months ended 31 December 2017 15 March 2018 Kier Group plc Interim results for the six months ended 31 December 2017 1 Disclaimer No representation or warranty, expressed

More information

NPD Model Explanatory Note

NPD Model Explanatory Note NPD Model Explanatory Note March 2015 FOREWORD In recent years a number of public authorities in Scotland have procured privately financed infrastructure projects using the non-profit distributing or NPD

More information

Decision on Electricity Network Connection Policy

Decision on Electricity Network Connection Policy Decision on Electricity Network Connection Policy DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: QUERIES TO: Decision Paper CER/09/138 25 August 2009 John Orme (distribution@cer.ie) The Commission for Energy

More information

Hertfordshire County Council

Hertfordshire County Council Hertfordshire County Council Annual Audit Letter for the year ended 31 March 2015 23 October 2015 Ernst & Young LLP Contents Ernst & Young LLP One Cambridge Business Park Cambridge CB4 0WZ Tel: 01223 394400

More information

PROVISION OF NEW PURPOSE BUILT LEASEHOLD PREMISES FOR GP OCCUPATION IN SCOTLAND A ROADMAP FOR GPs, PRIMARY CARE TRUSTS AND HEALTH BOARDS

PROVISION OF NEW PURPOSE BUILT LEASEHOLD PREMISES FOR GP OCCUPATION IN SCOTLAND A ROADMAP FOR GPs, PRIMARY CARE TRUSTS AND HEALTH BOARDS PROVISION OF NEW PURPOSE BUILT LEASEHOLD PREMISES FOR GP OCCUPATION IN SCOTLAND A ROADMAP FOR GPs, PRIMARY CARE TRUSTS AND HEALTH BOARDS Introduction This roadmap has been produced to assist Scottish GPs,

More information

DUBLIN DOCKLANDS DEVELOPMENT AUTHORITY

DUBLIN DOCKLANDS DEVELOPMENT AUTHORITY DUBLIN DOCKLANDS DEVELOPMENT AUTHORITY Engineering and Business Consultant services for the design and development of a Floating Village Marina and Swimming Pool in the River Liffey, Dublin Docklands.

More information

New Organisational Arrangements

New Organisational Arrangements New Organisational Arrangements National Driver Offender Retraining Scheme With effect from 1 Apr 2014 the intent is to place the National Driver Offender Retraining Scheme (NDORS) under new organisational

More information

Doing the right projects how the five case model can help

Doing the right projects how the five case model can help Doing the right projects how the five case model can help 1 Agenda JL 1. Characteristics of the right projects. 2. The five case model and the development of the business case. 3. Identifying the right

More information

Microsites Programme: Phase 1 project (Public)

Microsites Programme: Phase 1 project (Public) Nov 2017 THE BARNET GROUP Microsites Programme: Phase 1 project (Public) Business Justification Case (BJC) Nov 2017 Author: Nick Fletcher Date: Nov 2017 Service / Dept: Barnet Homes Development (New Build)

More information

Development finance. A best practice guide to lending. Constructing Excellence South West A

Development finance. A best practice guide to lending. Constructing Excellence South West A Development finance A best practice guide to lending Constructing Excellence South West A Contents This guide has been produced by Constructing Excellence South West s Lean Forum led by their drafting

More information

ITEM 5(c) MKDP Quarterly Update June Executive Summary

ITEM 5(c) MKDP Quarterly Update June Executive Summary ITEM 5(c) MKDP Quarterly Update June 2018 Executive Summary Milton Keynes Development Partnership (MKDP) is an independent legal entity wholly owned and accountable to Milton Keynes Council. The publication

More information

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 3

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 3 Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 3 To be leaders in building public trust in our civic government Audit Department TABLE OF CONTENTS History...5

More information

Manchester Health and Care Commissioning. Finance Committee. Terms of Reference

Manchester Health and Care Commissioning. Finance Committee. Terms of Reference Manchester Health and Care Commissioning Finance Committee Terms of Reference 1.0 Name The Committee shall be known as the Finance Committee. 2.0 Overview The Finance Committee forms a key element of the

More information

Contract Award for Enablement (contract reference: 50259) and Home and Community Support (contract reference: 50254) Cabinet Member for Adults

Contract Award for Enablement (contract reference: 50259) and Home and Community Support (contract reference: 50254) Cabinet Member for Adults AGENDA ITEM: 5 Pages 1 11 Meeting Cabinet Resources Committee Date 19 July 2010 Subject Report of Summary Contract Award for Enablement (contract reference: 50259) and Home and Community Support (contract

More information

Credit Reference Agencies Call for information

Credit Reference Agencies Call for information Credit Reference Agencies Call for information 1 July 2016 1. Introduction 1.1 Role of the British Business Bank In the 2015 Autumn Statement, the Government announced plans to designate the first round

More information

Full year results to 31 December Morgan Sindall Group plc 22 February 2018

Full year results to 31 December Morgan Sindall Group plc 22 February 2018 Full year results to 31 December 2017 Morgan Sindall Group plc 22 February 2018 Agenda Introduction John Morgan FY 2017 Financial and Operational Review Steve Crummett Investments John Morgan 2 Summary

More information

Management of Risk and Uncertainty (MoRU)

Management of Risk and Uncertainty (MoRU) Management of Risk and Uncertainty (MoRU) Training Courses 2010 A two-day certified risk management training programme accredited by the Institute of Risk Management and delivered in Scotland by Offrisk

More information

Strategic Business Case. Estates Guidance and Activity DataBase

Strategic Business Case. Estates Guidance and Activity DataBase Strategic Business Case Estates Guidance and Activity DataBase November 2016 You may re-use the text of this document (not including logos) free of charge in any format or medium, under the terms of the

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 20, 2015

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 20, 2015 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 20, 2015 Item 17, Report No. 35, of the Committee of the Whole which was adopted, as amended, by the Council of the City of Vaughan on October

More information

UK-Worcester: Repair and maintenance services 2013/S Contract notice. Works

UK-Worcester: Repair and maintenance services 2013/S Contract notice. Works 1/11 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:202312-2013:text:en:html UK-Worcester: Repair and maintenance services 2013/S 119-202312 Contract notice Works Directive 2004/18/EC

More information

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 2

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 2 Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 2 Leaders in building public trust in civic government Audit Department TABLE OF CONTENTS History...5

More information

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1698 SESSION MAY HM Treasury and Cabinet Office. Assurance for major projects

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1698 SESSION MAY HM Treasury and Cabinet Office. Assurance for major projects REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1698 SESSION 2010 2012 2 MAY 2012 HM Treasury and Cabinet Office Assurance for major projects 4 Key facts Assurance for major projects Key facts 205 projects

More information

NHS Pensions Re-Procurement Programme

NHS Pensions Re-Procurement Programme NHS Pensions Re-Procurement Programme Pensioner Payroll Supplier Boot Camp 7 th October 2015 Introduction to NHS Business Services Authority Steven Pink Director of Change and Commercial Delivery Project

More information

CLIENT INFORMATION HANDBOOK & TERMS & CONDITIONS

CLIENT INFORMATION HANDBOOK & TERMS & CONDITIONS Updated: - March 2015 FEE REFERENCE: - SFA/19.05.2015 MGL- ARCHITECTS. CLIENT INFORMATION HANDBOOK & TERMS & CONDITIONS Contents: - 1) Services - Scope of Work 2) Fees - Cost of Work 3) MGL - Terms & Conditions

More information

Outline Capital Investment Strategy

Outline Capital Investment Strategy Outline Capital Investment Strategy INDEX FOREWORD 1. INTRODUCTION 2. PURPOSE 3. SUMMARY 4. INFLUENCES ON CAPITAL INVESTMENT 5. CURRENT CAPITAL EXPENDITURE 6. COMMERCIAL PROPERTY INVESTMENT STRATEGY 7.

More information

Policy Terms & Conditions. Legal Expenses s - Property Disputes

Policy Terms & Conditions. Legal Expenses s - Property Disputes Policy Terms & Conditions Legal Expenses s - Property Disputes Legal Expenses Property Disputes This Insurance provides legal expenses for property owners and is available as an additional cover; your

More information

Commercial (QS) Core Competencies (Feb 17)

Commercial (QS) Core Competencies (Feb 17) 01 Financial and commercial processes in civil engineering Optimum Activity Detail of A K E Management of budgets for civil engineering works. Cost forecasting, management and control processes including

More information

Peter Timmins - Assistant Executive Director (Finance) Wendy Poole - Head of Risk Management and Audit Services

Peter Timmins - Assistant Executive Director (Finance) Wendy Poole - Head of Risk Management and Audit Services Report To: AUDIT PANEL Date: 1 March 2016 Reporting Officer: Peter Timmins - Assistant Executive Director (Finance) Wendy Poole - Head of Risk Management and Audit Services Subject: LOCAL AUDIT AND ACCOUNTABILITY

More information

VALUE FOR MONEY REPORT 2017

VALUE FOR MONEY REPORT 2017 VALUE FOR MONEY REPORT 2017 1 CONTENTS EXECUTIVE SUMMARY 1 EXECUTIVE SUMMARY INTRODUCTION 3 Our Value for Money approach 3 Our operating environment 4 OVERALL PERFORMANCE 5 Operating surplus 5 Operating

More information

ANNEX 2 to the Call for Expression of Interest No JER-00. Part I: Description of the Financial F

ANNEX 2 to the Call for Expression of Interest No JER-00. Part I: Description of the Financial F Investícia do Vašej budúcnosti ANNEX 2 to the Call for Expression of Interest No JER-00 First Loss Portfolio Guarantee Financial Instrument: Description and Selection Criteria Part I: Description of the

More information

Housing Committee 26 June 2017

Housing Committee 26 June 2017 Housing Committee 26 June 2017 Title Key Worker Housing Report of Wards Status Commissioning Director Growth and Development All Public Urgent No Key No Enclosures Appendix1 Key Worker Housing Options

More information

Cheshire Pension Fund Business Plan

Cheshire Pension Fund Business Plan Cheshire Pension Fund Business Plan 2013/14 Published by: Cheshire Pension Fund, Cheshire West and Chester Council, HQ, Chester CH1 2NP Page 1 of 24 Contents Page Part 1 Introduction, Context and Budgets

More information

WESTMINSTER ADULT EDUCATION SERVICE. Subcontractor Management Fee Policy

WESTMINSTER ADULT EDUCATION SERVICE. Subcontractor Management Fee Policy WESTMINSTER ADULT EDUCATION SERVICE Subcontractor Management Fee Policy Lead Responsibility Director of Income Generation and External Business Approved by Executive Board Version 2 Date of approval 7

More information

A new approach to public private partnerships: PF2. OECD Annual Meeting of Senior PPP Officials

A new approach to public private partnerships: PF2. OECD Annual Meeting of Senior PPP Officials A new approach to public private partnerships: PF2 OECD Annual Meeting of Senior PPP Officials 15 April 2013 Concerns with the Private Finance Initiative In some cases the returns to equity investors in

More information

Addendum No. 2 Q&A Responses ADDENDUM NO. 2. State of Florida Department of Management Services

Addendum No. 2 Q&A Responses ADDENDUM NO. 2. State of Florida Department of Management Services Addendum No. 2 Q&A Responses ADDENDUM NO. 2 State of Florida Department of Management Services INVITATION TO Negotiate (ITN) No. 02 973 000 A Management Consulting and Auditing Services August 30, 2012

More information

NORTHERN TRUST EUROPE FUNDAMENTAL INDEX FUND. a Sub-Fund of NORTHERN TRUST UCITS COMMON CONTRACTUAL FUND

NORTHERN TRUST EUROPE FUNDAMENTAL INDEX FUND. a Sub-Fund of NORTHERN TRUST UCITS COMMON CONTRACTUAL FUND NORTHERN TRUST EUROPE FUNDAMENTAL INDEX FUND a Sub-Fund of NORTHERN TRUST UCITS COMMON CONTRACTUAL FUND Supplement dated 18 December 2017 to the Prospectus dated 23 June 2017 For Northern Trust UCITS Common

More information

Bedfordshire Pension Fund Guide to outsourcing staff in the LGPS. May 2017

Bedfordshire Pension Fund Guide to outsourcing staff in the LGPS. May 2017 Guide to outsourcing staff in the LGPS May 2017 Contents 1. Introduction... 1 2. The Procurement Process... 3 3. Principles of Pension Protection... 5 4. The Admission Agreement... 12 5. Bonds and Guarantees...

More information

Request for Proposals Health Insurance Broker/Consultant Services

Request for Proposals Health Insurance Broker/Consultant Services Request for Proposals Health Insurance Broker/Consultant Services Deadline: Wednesday, June 2, 2010, at 4:30 p.m. City of Hyattsville Administration Department Elaine Murphy, City Administrator 4310 Gallatin

More information

Value for Money Statement Year to 30 th September 2017

Value for Money Statement Year to 30 th September 2017 Value for Money Statement Year to 30 th September 2017 Introduction The Hyelm Group is committed to finding ways to provide excellent services whilst at the same time seeking to reduce costs and improve

More information

Kier Group. Bev Dew CFO Louise Turner-Smith IR. April Kier Group plc North America roadshow April

Kier Group. Bev Dew CFO Louise Turner-Smith IR. April Kier Group plc North America roadshow April Kier Group Bev Dew CFO Louise Turner-Smith IR April 2018 Kier Group plc North America roadshow April 2018 1 Disclaimer No representation or warranty, expressed or implied, is made or given by or on behalf

More information

Credit Services Association (CSA) Trade association for the debt collection and purchase industry. Training Brochure

Credit Services Association (CSA) Trade association for the debt collection and purchase industry. Training Brochure Credit Services Association (CSA) Trade association for the debt collection and purchase industry Training Brochure Setting standards for debt collection professionals 2 Contents Introduction 4 Level 2

More information

i TELECOMMUNICATIONS (UNIVERSAL SERVICE FUND) REGULATIONS, 2008 ARRANGMENT OF REGULATIONS PART I PRELIMINARY PART II UNIVERSAL SERVICE FUND

i TELECOMMUNICATIONS (UNIVERSAL SERVICE FUND) REGULATIONS, 2008 ARRANGMENT OF REGULATIONS PART I PRELIMINARY PART II UNIVERSAL SERVICE FUND i TELECOMMUNICATIONS (UNIVERSAL SERVICE FUND) REGULATIONS, 2008 ARRANGMENT OF REGULATIONS PART I PRELIMINARY REGULATION 1. Citation 2. Commencement 3. Interpretation 4. Purpose PART II UNIVERSAL SERVICE

More information

LGPS CENTRAL POOL CHAIRS, VICE-CHAIRS & SECTION 151 OFFICERS MEETING. 24 May 2016

LGPS CENTRAL POOL CHAIRS, VICE-CHAIRS & SECTION 151 OFFICERS MEETING. 24 May 2016 LGPS CENTRAL POOL CHAIRS, VICE-CHAIRS & SECTION 151 OFFICERS MEETING 24 May 2016 AGENDA UPDATE Timeline/decisions made to date Work undertaken BUSINESS CASE Vision Proposals in business case - Scale -

More information

PUBLIC SECTOR AUDIT IN THE UNITED KINGDOM

PUBLIC SECTOR AUDIT IN THE UNITED KINGDOM PUBLIC SECTOR AUDIT IN THE UNITED KINGDOM Introduction In the UK England, Wales, Scotland and Northern Ireland have their own external public audit agencies. Each of these operates within its own statutory

More information

NHS Carbon and Energy Fund ( CEF ) Outline for Trusts wishing to consider using the CEF

NHS Carbon and Energy Fund ( CEF ) Outline for Trusts wishing to consider using the CEF NHS Carbon and Energy Fund ( CEF ) Outline for Trusts wishing to consider using the CEF November 2012 Page 1 Introduction The Carbon and Energy Fund is a NHS initiative to make it easier for Trusts to

More information

ENABLE Funding Programme

ENABLE Funding Programme ENABLE Funding Programme an SME finance funding vehicle A Request for Proposals 21 November 2016 1. Introduction... 3 1.1 British Business Bank... 3 1.2 ENABLE Funding Programme... 3 1.3 Objectives of

More information

Energy Contract Review and Authorisation to Procure Energy from LASER Full Business Case (Presentation to Policy & Resources Committee, 9 July 2015)

Energy Contract Review and Authorisation to Procure Energy from LASER Full Business Case (Presentation to Policy & Resources Committee, 9 July 2015) Energy Contract LASER Full Business Case Energy Contract Review and Authorisation to Procure Energy from LASER Full Business Case (Presentation to Policy & Resources Committee, 9 July 2015) Approvals By

More information

Finance Committee. Inquiry into methods of funding capital investment projects. Submission from PPP Forum

Finance Committee. Inquiry into methods of funding capital investment projects. Submission from PPP Forum About Finance Committee Inquiry into methods of funding capital investment projects Submission from Established in 2001, the is an industry body representing over 110 private sector companies involved

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style Operation Phakisa Initiative 2 - Saldanha Supply Base Facility Presentation of the RFP TNPA 2016/04/013/CM 1 Introduction This presentation (the Presentation) sets out

More information

Recommendations. 2. It is vital that relevant findings or any changes are communicated to residents and other key stakeholders.

Recommendations. 2. It is vital that relevant findings or any changes are communicated to residents and other key stakeholders. The recent events at Grenfell Tower are tragic with wide-reaching impact and we have had a number of queries from customers, brokers, government and other parties. We have created a multi-disciplinary

More information

Outsourcing Factsheet

Outsourcing Factsheet Outsourcing Factsheet Are you considering outsourcing a function of your organisation which contains members of the LGPS? If the answer is yes, then this factsheet should assist you in ensuring that the

More information

Creation of a Pan Scotland Local Authority Business Loan Fund Progress Update

Creation of a Pan Scotland Local Authority Business Loan Fund Progress Update Cabinet Tuesday 22 November 2016 Item No 6.1 Creation of a Pan Scotland Local Authority Business Loan Fund Progress Update Report by Ian Johnson, Head of Communities and Economy 1 Purpose of Report 1.1

More information

DIRECTORATE OF ESTATES AND FACILITIES

DIRECTORATE OF ESTATES AND FACILITIES DIRECTORATE OF ESTATES AND FACILITIES PROCEDURE AND INFORMATION MANUAL EPM PM4 Client Representative (University Project Manager) for Capital Projects Scope of Services Document Originated: April 2006

More information

One Public Estate. Craig Egglestone, Local Government Association John Goulston, Croydon Health Services NHS Trust

One Public Estate. Craig Egglestone, Local Government Association John Goulston, Croydon Health Services NHS Trust One Public Estate Craig Egglestone, Local Government Association John Goulston, Croydon Health Services NHS Trust https://www.local.gov.uk/topics/housing-and-planning/one-publicestate/about-one-public-estate

More information

ANNUAL REPORT & ACCOUNTS

ANNUAL REPORT & ACCOUNTS ANNUAL REPORT & ACCOUNTS 2016 2017 We are delighted with the continued progress across all of our 21 operating companies. The Group has now started delivering on its new five-year strategic plan with a

More information

2012 No EDUCATION, ENGLAND

2012 No EDUCATION, ENGLAND STATUTORY INSTRUMENTS 2012 No. 1115 EDUCATION, ENGLAND The Education (Induction Arrangements for School Teachers) (England) Regulations 2012 Made - - - - 18th April 2012 Laid before Parliament 20th April

More information

Industrial Income Trust Inc.

Industrial Income Trust Inc. UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 10-Q (Mark One) QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the quarterly period

More information

Quality Assurance Report for Expenditure in 2016 Department of Transport, Tourism and Sport

Quality Assurance Report for Expenditure in 2016 Department of Transport, Tourism and Sport Quality Assurance Report for Expenditure in 2016 Department of Transport, Tourism and Sport Submitted to the Department of Public Expenditure and Reform in Compliance with the Public Spending Code Certification

More information

The cost of public sector pensions in Scotland

The cost of public sector pensions in Scotland The cost of public sector pensions in Scotland Prepared for the Auditor General for Scotland and the Accounts Commission February 2011 Auditor General for Scotland The Auditor General for Scotland is the

More information

Appointment of a First Level Controller - Statement of Requirements (SOR)

Appointment of a First Level Controller - Statement of Requirements (SOR) Territorial Co-operation Programmes 2014-2020 Appointment of a First Level Controller - Statement of Requirements (SOR) Introduction Beneficiaries participating in Territorial Co-operation Programmes are

More information

FRAMEWORK BRIEF. Radiopharmaceuticals

FRAMEWORK BRIEF. Radiopharmaceuticals FRAMEWORK BRIEF Radiopharmaceuticals FRAMEWORK OVERVIEW HealthTrust Europe s Radiopharmaceuticals are agents used to diagnose certain medical problems or treat certain diseases. They may be given to the

More information