1 Subcontractor Pre-Qualification Index & Instructions (what is enclosed in this package) Beck Cover Letter describing our Pre-Qualification Process Subcontractor Qualification Statement (SQS) o Must be completed o Send as instructed on page 6 Subcontractor Information Release Authorization o Only to be completed if subcontractor has within the last 12 months been prequalified through SureTec via another General Contractor. Required Attachments o Financial Statements for prior two years o Letter from Surety or Surety Agent (not applicable to Suppliers) o Work in Progress Report (anticipated during the same duration as contemplated project) o Major Projects in the last 5 years o Commitment Report (actual work awarded) Revised October 2008 Page 1 of 7
2 Re: Subcontractor Risk Management Pre-Qualification Program Dear Subcontractor: For over 94 years of business, HCBeck, Ltd. has consistently strived to treat our subcontracting partners fairly and with respect, a practice we are absolutely committed to continuing. With the growth of our company, we now have less time to devote to the important task of assessing the financial health of our subcontractors. We have therefore decided to outsource this function to SureTec Information Systems Inc. ( SISCO ), the newest member of our company s team of risk management, financial, legal, and surety professionals. We are requesting all of our subcontractors, as a condition of working with us, to demonstrate to us their financial resources and financial capacity, similar to that which they would demonstrate to their own sureties. Once completed, please send directly to SISCO at the address shown on the Questionnaire for their review and analysis. In some cases, they may contact you for clarifications and/or additional information. SISCO will be preparing for Beck a confidential qualification assessment. If within the past 12 months you have provided this information to another general contractor using SISCO s services, they may, with your consent, use the information already held on file. Any questions in that regard should be directed to Bill Alley, or Shelly Mulanex of SISCO at (512) The experience of other general contractors leads us to believe that most of our subcontractors will be cooperative. Some subcontractors are very sensitive about their financials and may choose not to furnish any information, while others are pleased to show their financial strength. Some may provide limited, but not all of the requested financial information. Please note that with limited or no information, SISCO may only be able to qualify you at a lower single or aggregate subcontract size than is necessary for you to work with us, if they are able to qualify you at all. In such cases, we may have to subcontract elsewhere or limit the number of subcontracts we have with your company. We trust that you will view this effort not as an invasion of your company s privacy, but as an effort to make sure that we have assembled a network of the most highly qualified subcontractors available to participate in our projects. We know that you, like Beck, would prefer to compete and work alongside other financially strong and qualified subcontractors. If you have any questions or concerns, please feel free to give me a call. Your assistance in this task is much appreciated. Kind Regards, Project Manager Revised October 2008 Page 2 of 7
3 Exhibit E Beck Project Name: Project Manager: Beck Project Number: CHECK HERE IF SUPPLIER SUBCONTRACTOR / SUPPLIER QUALIFICATION STATEMENT Name of Business: Street Address: GENERAL INFORMATION City, State, Zip: Phone Number: Contact Name: Address: SIC Code: Fed. Employer I.D. No: State Sales Tax No: Company Web Site: Date business started: Type of business: (partner, Corp., etc) County: Fax No: OWNERSHIP Name of Owner & Percent Ownership # of Employees Is your company a M/WBE? Yes / No If Yes, please check. Is your company Union or NonUnion? General Contractors References: Women-owned Business Enterprise Minority Business Enterprise Disadvantaged Minority Disadvantaged Business Enterprise Small Business Enterprise Small Disadvantaged Business Emerging Small Business HUB Zone Veteran Other Revised October 2008 Page 3 of 7
4 BANK/FINANCIAL INFORMATION Name of primary banking relationship: Contact Name & Phone Location How long with this bank? Do you have a line of credit with this bank? Yes / No If yes, amount of Line $ Expiration / Renewal Date FINANCIAL STATEMENTS FOR PRIOR TWO YEARS (Attach) Audited Financials are preferred Name of Bonding Company: How long with this surety? SURETY INFORMATION (IF YOU ARE A SUPPLIER NO NEED TO COMPLETE THIS SECTION) Name and Address of Agent: Bonding Capacity Single Job Limit $ What percent of your work is bonded? Largest bonded Job $ Aggregate Limit $ Has a payment and performance bond been issued within the last 12 months to Beck? Date of Bond: Project Name: Yes No Letter from Surety or Surety Agent must be attached indicating that you are bondable. Letter must identify single project and aggregate bonding capacity. Revised October 2008 Page 4 of 7
5 EXPERIENCE List the categories of work that your organization normally performs with its own forces. Total Value of Work in Progress $ Please attached a complete schedule of Work in Progress showing: name of project, owner, architect, contract amount, percent complete, scheduled completion date, and if they are bonded. On a separate sheet, list the five (5) major projects your organization has completed in the past five (5) years, giving the name of the project, owner, architect, contract amount, date of completion, percentage complete, the cost of the work performed with your own forces, and if the project was bonded. State average annual amount of construction work performed during the past five (5) years: $ On a separate sheet, list the construction projects that your organization has committed to work on (include project name, contract amount, city, state and approximate start and end dates). CLAIMS Claims and Suits. (If the answer to any of the questions below is yes, please attach details.) 1. Has your organization ever failed to complete any work awarded to it? No Yes 2. Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? 3. Has your organization filed any lawsuits or requested arbitration with regard to construction contracts within the last five (5) years? Within the last five (5) years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If yes, please attach details.) No No No Yes Yes Yes Revised October 2008 Page 5 of 7
6 REFERENCES A. Trade References: B. Bank References: EXPERIENCE MODIFIER RATE (EMR) (IF YOU ARE A SUPPLIER NO NEED TO COMPLETE THIS SECTION) Please provide the last three years of your EMR Year 1 Year 2 Year 3 Rate Rate Rate CONTRACT DOCUMENTS Confirm your company can sign and abide by the following: Beck Subcontractor Agreement Yes No Have not seen Beck Insurance Requirements Yes No Have not seen RELEASE AUTHORIZATION WE CERTIFY THAT ALL INFORMATION IN THIS QUESTIONNAIRE AND THE ATTACHMENTS IS TRUE AND CORRECT. WE HEREBY AUTHORIZE SURETEC INFORMATION SYSTEMS AND ITS REPRESENTATIVES TO INVESTIGATE DIRECTLY WITH THE REFERENCES GIVEN HEREIN, ANY INFORMATION PERTAINING TO THE UNDERSIGNED AND/OR THE INDIVIDUALS INVOLVED THEREIN. WE AUTHORIZE OUR FINANCIAL INSTITUTIONS, PRIOR AND EXISTING SURETIES, CUSTOMERS, CREDITORS AND SUPPLIERS TO RELEASE CREDIT HISTORY AND OTHER UNDERWRITING/QUALIFICATION INFORMATION. Subcontractor Signature: Print Name and Title: Date: PLEASE COMPLETE CAREFULLY, ATTACH REQUESTED INFORMATION AND SUBMIT DIRECTLY TO: Attn: Bill Alley, SureTec 9737 Great Hills Trail, Suite 320 Austin, TX Phone: Fax: balley@suretec.com With Copy to: Beck Project Manager at [ ]@beckgroup.com Beck Risk Management at RM@beckgroup.com Revised October 2008 Page 6 of 7
7 NOTE: This form is utilized when a subcontractor has already been pre-qualified but for a different general contractor, but wants to make the existing pre-qualification report available to Beck. INFORMATION RELEASE AUTHORIZATION This Information Release is made and executed this day of, 200_ by ( Subcontractor ). Whereas Subcontractor has previously provided certain financial information on Subcontractor to ( General Contractor ) for review and evaluation by SureTec Information Systems, Inc. ( SISCO ) for General Contractor; and Whereas Subcontractor desires to make this information available to (your co. name) and SISCO in connection with SISCO s review and evaluation of Subcontractor for (your co. name); Now, therefore, to facilitate (your co. name) pre-qualification of Subcontractor, Subcontractor authorizes SISCO to utilize the information previously furnished to General Contractor in the normal course of its review and evaluation for the benefit of (your co. name). Subcontractor Name By: Its: Revised October 2008 Page 7 of 7
APPLICATION FOR AUBURN UNIVERSITY S REGISTERED CONTRACTOR'S LIST For Projects $50,000 and Greater
2016-2018 APPLICATION FOR AUBURN UNIVERSITY S REGISTERED CONTRACTOR'S LIST For Projects $50,000 and Greater THIS IS NOT PRE-QUALIFICATION TO BID A SPECIFIC PROJECT. AFTER ADDITION TO THE AU REGISTERED
More informationContractor s Statement of Qualifications for (Insert Project Name) (Insert Owners Name Here) (Insert Owners City and State Here)
Contractor s Statement of Qualifications for (Insert Project Name) (Insert Owners Name Here) (Insert Owners City and State Here) This form must be returned to (Insert Architect s Name and Address here)
More informationSubcontractor Prequalification Checklist
Subcontractor Prequalification Checklist The following information is required by Gilmore Construction in order to qualify your bid and / or enter into a Contract Agreement: Completed Subcontractor s Pre-qualification
More informationShook Subcontractor Prequalification Form
Email info@shookconstruction.com with any questions. The undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. Section 1 -
More information** completed qualification form to City: State: Zip: Telephone: Fax:
**Email completed qualification form to subs@hammondconstruction.com Company Name: : Address: City: State: Zip: : Fax: Federal ID#: Email Address: Type of work qualified to perform: (masonry, steel, etc.)
More informationPROPOSER'S QUALIFICATIONS STATEMENT
PROPOSER'S QUALIFICATIONS STATEMENT PROJECT TITLE: High Pressure Loop Transmission Line Phase 1 PROPOSAL SUBMITTED BY: (Print or Type Name of Bidder) The undersigned certifies the truth and correctness
More informationSUBCONTRACTOR PRE-QUALIFICATION SURVEY
SUBCONTRACTOR PRE-QUALIFICATION SURVEY Thank you for your interest in J. Calnan & Associates. JC&A strives to develop long lasting beneficial relationships with its many subcontractors as well as our clients.
More informationSubcontractor Questionnaire
Subcontractor Questionnaire Please complete and submit the following questionnaire to be considered for bidding work with SDV. Please fax the following additional items with your completed questionnaire
More informationCONTRACTOR QUESTIONNAIRE
CONTRACTOR QUESTIONNAIRE 1. Name of Company: 2. Business Yr. Ends: 3. Physical Address: Street City State Zip Code 4. Mailing Address: Street City State Zip Code 5. Phone: Fax: 6. Type of Work: 7. Contact
More informationPRE-QUALIFICATION REQUIREMENTS FOR BIDDERS Qualification Criteria
PRE-QUALIFICATION REQUIREMENTS FOR BIDDERS Qualification Criteria Contractors desiring to bid are required to complete the attached BIDDER QUALIFICATION QUESTIONNAIRE. These forms will be used to determine
More informationContractor s Qualification Statement
THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A305 Contractor s Qualification Statement 1986 EDITION This form is approved and recommended by The American Institute of Architects (AIA) and The Associated
More informationSubcontractor Pre-Qualification Form
Subcontractor Pre-Qualification Form Date: Firm Name: E-Mail: Website/Social Media: 1) Trades Performed 2) Union Labor Do you have a union affiliation? Yes No If yes, provide name, address, phone & contact
More informationSUBCONTRACTOR/SUPPLIER QUALIFICATION STATEMENT
35 S. 100 E. American Fork, UT 84003 PHONE: (801) 766-3233 FAX: (801) 766-3240 SUBCONTRACTOR/SUPPLIER QUALIFICATION STATEMENT We appreciate the recent interest you have expressed in being added to Acadian
More informationContractor s Qualification Statement
THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A305 Contractor s Qualification Statement 1986 EDITION This form is approved and recommended by The American Institute of Architects (AIA) and The Associated
More informationSUBCONTRACTOR PREQUALIFICATION PACKAGE
PAGE 1 SUBCONTRACTOR PREQUALIFICATION PACKAGE To Potential Subcontractors/Vendors: Thank you for your interest in joining the Foresight Construction team of quality subcontractors. We understand that our
More informationState of North Carolina Prequalification for Single Prime Contractors
Failure to answer all of the following questions may result in disqualification. If general contractor has any questions, contact the person listed below under Submitted to. Completing this questionnaire
More informationPart A: PRIME CONTRACTOR PROJECT SUMMARY FORM
Part A: PRIME CONTRACTOR PROJECT SUMMARY FORM Name of Bidder (Offeror): Fed. ID: Address: Telephone: Cell: Email: Fax: Contracting Agency BALTIMORE CITY PUBLIC SCHOOLS Contract (Project) Title Contract
More informationDate: Subcontractor or Supplier. Shiel Sexton Company, Inc.
Date: To: From: Subject: Subcontractor or Supplier Shiel Sexton Company, Inc. Subcontractor & Supplier Information Form Shiel Sexton has taken pride over the years to provide top quality buildings to its
More informationContractor's Questionnaire
Contractor's Questionnaire Thank you for your interest in obtaining bonds through Artisan Bonding & Insurance Services The following items are required for a complete submission. 1. 2 years CPA prepared
More informationPREVIEW PLEASE DO NOT COPY THIS DOCUMENT THANK YOU. LegalFormsForTexas.Com
Dissolution of a limited liability company 1. A limited liability company will be dissolved when the first of the following occurs: a. the expiration of the limited liability company s duration, or b.
More informationBIDDER S QUALIFICATION AND EXPERIENCE STATEMENT
BIDDER S QUALIFICATION AND EXPERIENCE STATEMENT The OWNER will require supporting evidence regarding Bidder s Qualifications and competency. The Bidder will be required to furnish all of the applicable
More informationCONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE
SECTION 1: CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE Contractors seeking to provide construction services to HAKS must complete this form and submit it to HAKS Marketing Department (marketing@haks.net)
More informationPREDETERMINATION OF RESPONSIBILITY UNIVERSITY OF PITTSBURGH {SALK HALL RENOVATION PHASE II} DGS PROJECT NO. { }
PREDETERMINATION OF RESPONSIBILITY UNIVERSITY OF PITTSBURGH {SALK HALL RENOVATION PHASE II} DGS PROJECT NO. {1103-385.4} BID PACKAGE {ELECTRICAL CONSTRUCTION} STATEMENT OF BIDDERS QUALIFICATIONS (Predetermination
More information2018 GENERAL CONTRACTOR PREQUALIFICATION APPLICATION FOR NON STATE FUNDED PROJECTS > $1 MILLION. December 12, 2017
2018 GENERAL CONTRACTOR PREQUALIFICATION APPLICATION FOR NON STATE FUNDED PROJECTS > $1 MILLION PART A 2018 Instructions; Appeals Process PART B 2018 Questionnaire PART C 2018 Questionnaire Scoring PART
More informationMadera Unified School District
Madera Unified School District Contractor Prequalification Procedures Prequalification Application PREQUALIFICATION PROCEDURES tice is hereby given by Madera Unified School District ( District ) that general
More informationBUSINESS INFORMATION OFFICER INFORMATION
BUSINESS INFORMATION Name of Firm: E-mail Address: Firm Address: Web Site: http:// State of Incorporation: Year Started: Tax ID: Is your firm union? Yes No Contracting Specialty: Geographic Area(s) of
More informationDALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR
DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR LIFE SAFETY UPGRADE OF FLIGHT SERVICES FACILITY AND EXECUTIVE CONFERENCE ROOM IN TERMINAL A CONTRACT
More informationSubcontractor Qualification Questionnaire
N44255 15 R 6004 Building 435 Central Fire Station Seismic Upgrades, Naval Base Kitsap, Bremeron, WA DM15004 Subcontractor Qualification Questionnaire Complete this form (adding attachments as necessary)
More informationFOCUS DESIGN BUILDERS CONTRACTOR S QUALIFICATION STATEMENT
FOCUS DESIGN BUILDERS CONTRACTOR S QUALIFICATION STATEMENT PROJECT (if applicable): Date: / / Up to what size single project do you want to be prequalified for? FIRM NAME: Address: City: State: Zip: Phone:
More informationCONTRACTOR QUESTIONNAIRE
CONTRACTOR QUESTIONNAIRE 1100 Via Callejon Suite A San Clemente, CA 92673 surety@southcoastsurety.com www.southcoastsurety.com (949) 361-1692 Fax (949) 361-9926 DOI Lic# 0B57612 1. Name of Firm: Tax I.D.
More informationADDENDUM TO INVITATION FOR BIDS Fortuna Union High School District Proposition 39 LED Lighting Retrofit Bid No Addendum #2 February 23, 2017
ADDENDUM TO INVITATION FOR BIDS Fortuna Union High School District Proposition 39 LED Lighting Retrofit Bid No. 17-001 Addendum #2 February 23, 2017 To All Prospective Bidders: The Fortuna Union High School
More informationCONTRACTOR QUESTIONNAIRE
CONTRACTOR QUESTIONNAIRE 1. Name of Firm: 2. Address: 3. Fiscal Year End (City) (State) (Zip) 4. Phone: ( ) 4a. Fax: ( ) 5. Contracting Specialty: 6. Contact Person: 7. Title: 8. Year Business Started:
More informationCOMMERCIAL BOND APPLICATION
COMMERCIAL BOND APPLICATION 109 River Landing Drive, Suite 200, Charleston, SC 29492 Email address: underwritingapproval@palmettosurety.net Phone: (843) 971-5441 Fax number: (843) 377-8019 Agency Code:
More informationCONTRACTOR PRE QUALIFICATION QUESTIONNAIRE
CONTRACTOR PRE QUALIFICATION QUESTIONNAIRE Contractors seeking to provide subcontractor related services to HAKS must complete this form and submit it to HAKS Marketing Department (marketing@haks.net)
More informationVECTREN ENERGY DELIVERY ( Vectren ) Pool Operator Credit Application
VECTREN ENERGY DELIVERY ( Vectren ) Pool Operator Credit Application Please forward this completed and signed Pool Operator Registration Form and Credit Application to the following address: Vectren Energy
More informationState of North Carolina Prequalification for Single Prime Contractors
Failure to answer all of the following questions may result in disqualification. If general contractor has any questions, contact Dan Fields, the Project Principal at dfields@bjac.com. Completing this
More informationIMPORTANT GENERAL INSTRUCTIONS
IMPORTANT GENERAL INSTRUCTIONS 1. Each prospective bidder is required to file a prequalification questionnaire consisting of an Experience Record, Financial Statement, and Equipment Schedule, on a form
More informationSBA 504 LOAN APPLICATION
222 N. 32 nd Street, Suite 200 Billings, MT 59101 Phone (406) 869-8403 Fax (406) 256-6877 www.bigskyfinance.org Last Chance Helena, MT 59601 Phone (406) 441-5447 Fax (406) 256-6877 www.bigskyfinance.org
More informationAPPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT
APPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT NORTH ORANGE COUNTY COMMUNICTION COLLEGE DISTRICT PURCHASING DEPARTMENT 1830 WEST ROMNEYA DR.
More informationResponsibility Determination for General Contractors Who May Desire to Submit Bid Proposals for the Construction of [PROJECT TITLE]
Responsibility Statement and Questionnaire CITY OF NAPA PUBLIC WORKS DEPARTMENT NAPA, CALIFORNIA [DATE] Responsibility Determination for General Contractors Who May Desire to Submit Bid Proposals for the
More informationSubcontractor Prequalification Packet
Subcontractor Prequalification Packet WELCOME TO HGC CONSTRUCTION! Please fill out the attached Subcontractor Information Packet and submit to subs@hgcconstruction.com If you have any questions, please
More informationAddendum #3 To Request for Proposal For Social Work Roof Replacement: Project Dated May 17, 2018
Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 June 8, 2018 Addendum #3 To Request for
More informationState of North Carolina Prequalification for First Tier Subcontractors under CM at Risk
NC General Statute 143.128.1.c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publicly advertise as prescribed in G.S. 143-129; and
More informationEXPERIENCE AND QUALIFICATION STATEMENT OF
EXPERIENCE AND QUALIFICATION STATEMENT OF (Legal Name of Bidder) SUBMITTED TO: Oakland County Water Resources Commissioner Building 95 West One Public Works Drive Waterford, Michigan 48328-1907 REGARDING:
More informationAddress: Phone: Fax: Estimating. Address: Contact: Partnership Corporation. If LLC: Sole Proprietorship
SUBCONTRACTOR QUALIFICA ATION STATEMENT This Qualification Statement must be completed and returned before your Firm can be entered into our database, allowing your Firm to bid our projects. Please send
More informationSUBCONTRACTOR PREQUALIFICATION FORM
SUBCONTRACTOR PREQUALIFICATION FORM All subcontractors are required to complete this questionnaire. The contents of this questionnaire will be considered and used solely to determine your firm s qualification
More informationSTATEMENT OF BIDDER S QUALIFICATIONS (GENERAL CONTRACTOR)
HOUSING AUTHORITY OF THE COUNTY OF SAN BERNARDINO CAPITAL FUND PROGRAM 715 E. BRIER DRIVE SAN BERNARDINO, CA 92408-2841 (909) 890-0644 FAX (909) 915-1831 STATEMENT OF BIDDER S QUALIFICATIONS (GENERAL CONTRACTOR)
More informationNJ REGISTERED GENERAL CONTRACTOR APPLICATION
NJ REGISTERED GENERAL CONTRACTOR APPLICATION Please Print Date A. Business Name Corporation LLC Sole Proprietorship Partnership Address City, State, Zip Phone Fax Email Employer s Tax No. B. Principals
More informationCONTRACTOR QUESIONNAIRE. 1. Name of Firm: 2. Address: 3. Fiscal Year End. (City) (State) (Zip. 4. Phone: ( ) 5. Contracting Specialty:
CONTRACTOR QUESIONNAIRE 1. Name of Firm: 2. 3. Fiscal Year End (City) (State) (Zip 4. Phone: ( ) 5. Contracting Specialty: 6. Contact Person: 7. Title: 8. Year Business Started: 9. Type of Business: Corp
More informationITB ADDENDUM NO. 1. Addendum No. 1 to ITB MEDART LIFT STATION BYPASS Issued January 18, 2018
ITB 2018-02 ADDENDUM NO. 1 Addendum No. 1 to ITB 2018-02 MEDART LIFT STATION BYPASS Issued January 18, 2018 SECTION 2.0 SCHEDULE OF EVENTS See dates added in RED below Failure to comply with this or any
More informationIMPORTANT GENERAL INSTRUCTIONS
IMPORTANT GENERAL INSTRUCTIONS 1. Each prospective bidder is required to file a prequalification questionnaire consisting of an Experience Record, Financial Statement, and Equipment Schedule, on a form
More informationCONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION for MEASURE M BOND PROJECTS
CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION for MEASURE M BOND PROJECTS Hollister School District will be soliciting bids for reconstruction and new construction on Measure M Bond Projects.
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2019 PRE-QUALIFICATION QUESTIONNAIRE
PART B. 2019 QUESTIONNAIRE PREQUALIFICATION FOR GENERAL CONTRACTORS AND MECHANICAL, ELECTRICAL AND PLUMBING SUBCONTRACTORS CONTACT INFORMATION Firm Name: Check One: (As it appears on license) Corporation
More informationPO Box 2279 Concord, NH
PO Box 2279 Concord, NH 03302-2279 Each month, we require our subcontractors to submit a lien waiver before payment is released, in accordance with our subcontractor contract terms, which can be found
More informationPrequalification Questionnaire
Prequalification Questionnaire MODESTO CITY SCHOOLS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE MEP SUBCONTRACTORS (Date) Pursuant to Public Contract Code section 20111.6, each prospective contractor
More informationPRE-QUALIFICATION SUBMITTAL PACKAGE FOR GENERAL CONTRACTOR PRE-QUALIFICATION FOR THE VETERANS SPORTS PARK AT TUSTIN LEGACY, CIP NO.
PRE-QUALIFICATION SUBMITTAL PACKAGE FOR GENERAL CONTRACTOR PRE-QUALIFICATION FOR THE VETERANS SPORTS PARK AT TUSTIN LEGACY, CIP NO. 20043 IN THE CITY OF TUSTIN 300 CENTENNIAL WAY TUSTIN, CALIFORNIA 92780
More informationVenture General Contracting, LLC Pre-Qualification Form
Thank you for your interest in Venture General Contracting, LLC. In order to develop a more complete knowledge of your Company and better match future Company opportunities to your Company s capabilities
More informationOr
SUBCONTRACTOR PRE QUALIFICATION COVER SHEET Thank you for your interest in working with TSA Contracting, Inc. We are a commercial building contractor specializing in ground-up and tenant improvement construction.
More informationSurety Bond Application Checklist
256 East 3 rd Street 2nd Floor Mt. Vernon, NY 10553 Tel: (914) 667-7700 www.blaisebonds.com Surety Bond Application Checklist 1. Contractor Questionnaire 2. Personal Financial Statement 3. Contracts in
More informationBCWS REQUEST FOR QUALIFICATIONS/INTEREST CONSTRUCTION & OPERATION OF A SOLID WASTE PROCESSING AND PELLETIZATION FACILITY
BCWS REQUEST FOR QUALIFICATIONS/INTEREST CONSTRUCTION & OPERATION OF A SOLID WASTE PROCESSING AND PELLETIZATION FACILITY June 2, 2014 SOLD WASTE PROCESSING AND PELLETIZATION ADVERTISEMENT SOLID WASTE PROCESSING
More informationSECTION 1.A BID FOR LUMP SUM CONTRACT
SECTION 1.A BID FOR LUMP SUM CONTRACT Date: BID OF (hereinafter called "Bidder") a corporation* organized and existing under laws of the State of, a partnership* consisting of, an individual* trading as,
More informationC740 (13002F) REQUEST FOR PRE-QUALIFICATION BIDDERS
SILICON VALLEY BERRYESSA EXTENSION PROJECT C740 (13002F) REQUEST FOR PRE-QUALIFICATION OF BIDDERS Milpitas Station Surface Parking and Roadway Issued September 25, 2014 REQUEST FOR PRE-QUALIFICATION OF
More informationIn addition to completing our Subcontractor Qualification, you will need to submit the following documents:
EXEMPLARY BUSINESS RELATIONSHIPS EXCEPTIONAL PERFORMANCE SUSTAINED EMPLOYEE OWNERSHIP Dear Sir/Madam, Exemplary business relationships and exceptional performance are not possible without highly qualified
More informationEL RANCHO UNIFIED DISTRICT PREQUALIFICATION QUESTIONNAIRE PACKET
EL RANCHO UNIFIED DISTRICT PREQUALIFICATION QUESTIONNAIRE PACKET In accordance with California Public Contract Code section 20111.6, all prime or general contractors and mechanical, electrical and plumbing
More informationBALFOUR OWNERS CORP ND DRIVE FOREST HILLS, NEW YORK, 11375
BALFOUR OWNERS CORP. 112-20 72ND DRIVE FOREST HILLS, NEW YORK, 11375 PROCEDURES FOR REFINANCE INCREASE REQUIREMENTS FOR REFINANCING IN EXCESS OF YOUR CURRENT LOAN AMOUNT INCLUDING: LINE OF CREDIT Send
More informationSBA 504 LOAN APPLICATION
222 N. 32 nd Street, Suite 200 Billings, MT 59101 Phone (406) 869-8403 Fax (406) 256-6877 www.bigskyfinance.org 825 Great Northern Blvd, Ste 301 Helena, MT 59601 Phone (406) 441-5447 Fax (406) 449-5678
More informationBackground Information And Authorization
Background information Please respond to all questions for you personally and any organization over which you have exercised control. If you answer yes to any questions, you must attach a signed and dated
More informationWHEREAS, the District desires to adopt the Prequalification Process, including the Questionnaire, Rating System, and Appeal Process.
RESOLUTION NO. 18-009 OF THE BERKELEY UNIFIED SCHOOL DISTRICT ADOPTING PREQUALIFICATION PROCESS FOR PRIME CONTRACTORS PURSUANT TO PUBLIC CONTRACT CODE SECTION 20111.6 WHEREAS, the Berkeley Unified School
More informationDenver Public Schools Facility Management / Purchasing S. Acoma St. Denver, Colorado S. Acoma St. Denver, Colorado 80223
Denver Public Schools Facility Management / Purchasing 1617 S. Acoma St. Denver, Colorado 80223 Date: March 4, 2014 RFQ Number: RFQ Title: RFQ will be received: 2014 DPS Contractor RFQ RFQ Construction
More informationBusiness Credit Application You win the contract, we fund it
IMPORTANT INSTRUCTIONS: Mobilization Capital Gov Contract Financing, LLC 6608 Brynhurst Drive Tucker, GA 30084 wwwmobilizationcapitalcom 404-723-8410 spatel@mobilizationcapitalcom Business Credit Application
More informationCONTRACTOR/SUPPLIER QUALIFICATION STATEMENT
CONTRACTOR/SUPPLIER QUALIFICATION STATEMENT Statement of Qualifications and Financial Conditions Date Form Filled Out: Date Form Received by BOND: I. NAME OF FIRM: Street Address: Mailing Address (if different):
More informationSubcontractor / Vendor / Professional Services PREQUALIFICATION FORM
Subcontractor / Vendor / Professional Services PREQUALIFICATION FORM GENERAL INFORMATION Company Name Address If Corporate Office check here Primary Contact Phone Email Estimating Contact Email Corporate
More informationSubcontractor Prequalification Statement
Subcontractor Prequalification Statement NAME FAX WEBSITE IS THIS YOUR HEADQUARTERS? Yes No (if no, include below) FAX NUMBER OF YEARS YOU VE BEEN IN BUSINESS NUMBER OF YEARS UNDER YOUR CURRENT NAME DESIGNATED
More informationExhibit B-1 MEP Subcontractor Questionnaire
Exhibit B-1 MEP Subcontractor Questionnaire SAN RAFAEL CITY SCHOOLS PREQUALIFICATION QUESTIONNAIRE AND CERTIFICATION FOR PROSPECTIVE MEP SUBCONTRACTORS Due before 2:00pm, day,, 2017 Pursuant to Public
More informationADVERTISEMENT FOR BIDS
CITY OF NORTH KANSAS CITY, MO Department of Public Works 2010 Howell Street North Kansas City, Missouri 64116 Telephone: (816) 274-6004 ADVERTISEMENT FOR BIDS Sealed bids for: Construction of a New Parks
More informationBlack Hills Community Economic Development 504 Loan Application
Black Hills Community Economic Development 504 Loan Application Company Information Company Name: Address: City: State: Zip: Principal in Charge: Phone: Fax: Secondary Contact Person: Phone: Fax: Email
More informationCONTRACTOR QUESTIONNAIRE
CONTRACTOR QUESTIONNAIRE 1. of Firm: 2. 3. Fiscal Yr. End: (City) (State) (Zip) 4. 5. Contracting Specialty: Fax: 6. Contact Person: 7. Title: 8. Year Business Started: 9. Type of Business: Corp. Part.
More informationSubcontractor / Vendor Prequalification Statement Company Name:
Subcontractor / Vendor Prequalification Statement Company Name: Type of Work Company Performs: State of Incorporation: Date of Incorporation: Street Address (No PO Boxes): City State Zip: Office Number:
More informationEXHIBIT P CONSULTANT S APPLICATION FOR PAYMENT *INSTRUCTION SHEET*
EXHIBIT P CONSULTANT S APPLICATION FOR PAYMENT *INSTRUCTION SHEET* **IMPORTANT** PLEASE REMOVE TOP PAGE BEFORE COMPLETING APPLICATION CONSULTANT NAME PROJECT NAME CONTRACT NUMBER As stated in the Agreement
More informationAttached please find the r.k. Miles, Inc. Application for Credit.
Attached please find the r.k. Miles, Inc. Application for Credit. 618 Depot Street PO Box 1125 Manchester Center, Vermont 05255 tel 802 362 1952 toll free 888 447 5645 fax 802 362 6434 88 Exchange Street
More informationCADA DEALER BOND INSTRUCTIONS
CADA DEALER BOND INSTRUCTIONS 1) Complete Pages 1-2: CADA DEALER Bond Application (*Required) 2) Complete Pages 3-4 : HCC Colorado Application for License, Permit and Misc Bonds (*Required) Page 3 : Section
More informationPREQUALIFICATION QUESTIONAIRE
CITY HALL FIRST FLOOR COMMUNITY DEVELOPMENT REMODEL PREQUALIFICATION QUESTIONAIRE PROJECT DESCRIPTION Beverly Hills Community Development Facility was last remodeled in 2007, and contains approximately
More informationContractor s Bond Questionnaire
Contractor s Bond Questionnaire We appreciate the opportunity to be the broker of record in providing surety bond credit to your company. The purpose of this questionnaire is to assist us, and the designated
More informationSUBCONTRACTOR PRE-QUALIFICATION CHECKLIST
SUBCONTRACTOR PRE-QUALIFICATION CHECKLIST The following information is required by TWC Construction, Inc. in order to qualify your bid and/or enter into a Contract Agreement: Completed Subcontractor Pre-qualification
More information(City) (State) (Zip) (City) (State) (Zip) Contact : Phone: Cell Phone: Contact Phone: Cell Phone: Contact Phone: Cell Phone:
Thank you for your interest in Environmental Design & Construction, LLC. In order to develop a more complete knowledge of your Company and better match future EDC opportunities to your Company s capabilities
More informationLIST OF REQUIRED DOCUMENTS FROM CONTRACTORS FOR 203K S:
LIST OF REQUIRED DOCUMENTS FROM CONTRACTORS FOR 203K S: 1. BID TO MATCH SCOPE OF WORK 2. BUYER-CONTRACTOR AGREEMENT 3. COPY OF YOUR GENERAL CONTRACTOR IDENTIFICATION CARD 4. CONTRACTOR PROFILE 5. RENOVATION
More informationCustomized Delivery Solutions Mail Order
Mail Order Welcome to Apogee Bio Pharm s Mail Order Service! Our program is designed for members who are taking medications on an ongoing basis, such as medication to reduce blood pressure or to treat
More informationSUBCONTRACTOR PREQUALIFICATION APPLICATION GENERAL INFORMATION
Date of Response: Company name: SUBCONTRACTOR PREQUALIFICATION APPLICATION GENERAL INFORMATION DBA: Phone: E-mail: Main Office Address: State: ZIP Code: Website: Sole Proprietorship: Partnership: Corporation:
More informationProposal No:
City of Spartanburg Procurement and Property Division Post Office Drawer 1749, SC 29304-1749 P (864)-596-2049 F (864) 596-2365 Legal Notice Request Proposal Demolition Asbestos /Abatement of Two (2) Structures
More informationB. B.E.P.D. means an entity certified as a Business enterprise owned or operated by people with disabilities as defined in MCC
CITY OF CHICAGO Department of Procurement Services Jamie L. Rhee, Chief Procurement Officer 121 North LaSalle Street, Room 403 Chicago, Illinois 60602-1284 Fax: 312-744-3281 TARGET MARKET SPECIAL CONDITIONS
More informationPRE-QUALIFICATION FORMS
PRE-QUALIFICATION FORMS F:\commitdocs\21664\00003\G191511-V004.DOC/e /4/5/2008 12:45 PM THE STATE OF ISRAEL BUILD, OPERATE AND TRANSFER (BOT) TENDER FOR THE DESIGN, FINANCE, CONSTRUCTION, OPERATION AND
More informationNEW VENDOR PACKET. Dear Vendor:
NEW VENDOR PACKET Dear Vendor: This Subcontractor information pack must be filled out to perform any services or receive any payments from Brother s Group. Failure to return the pack will delay any payments
More informationMICROLOAN APPLICATION
MICROLOAN APPLICATION Send Completed Application To: Wyoming Women s Business Center Attn: Waldo Smith PO Box 764 Laramie, WY 82073 Or via Fax or Email to: Fax: 307-460-3945 Email: wsmith34@uwyo.edu Questions?
More informationHelena Public Schools. Helena, MONTANA REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR
Helena Public Schools P a g e 1 Helena Public Schools Helena, MONTANA REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR/CONSTRUCTION MANAGER SERVICES FOR ALTERNATIVE PROJECT DELIVERY FOR NEW CENTRAL ELEMENTARY
More informationSANDHILLS COMMUNITY COLLEGE REQUEST FOR PROPOSALS RFP #
SANDHILLS COMMUNITY COLLEGE REQUEST FOR PROPOSALS RFP # 02182019 TITLE: USING AGENCY: Steed Hall Greenhouse Renovations Sandhills Community College ISSUE DATE: February 18, 2019 ISSUING AGENCY: Sandhills
More informationINTERIM WAIVER AND RELEASE UPON PAYMENT. The undersigned mechanic and/or materialman has been employed by Pattillo Construction
AL Form Subcontractor INTERIM WAIVER AND RELEASE UPON PAYMENT STATE OF ALABAMA COUNTY OF The undersigned mechanic and/or materialman has been employed by Pattillo Construction Corporation to furnish for
More informationAPPLICATION FOR CHANGE OF STATUS Lee County Contractor Licensing P.O. Box 398, Fort Myers, Florida (239)
APPLICATION FOR CHANGE OF STATUS Lee County Contractor Licensing P.O. Box 398, Fort Myers, Florida 33902 (239) 533-8895 Contractorlicensing@leegov.com Please place a check next to the change you are requesting:
More informationTHE SCHOOL DISTRICT OF PALM BEACH COUNTY, FLORIDA RENEWAL VENDOR PREQUALIFICATION PROGRAM
THE SCHOOL DISTRICT OF PALM BEACH COUNTY, FLORIDA RENEWAL VENDOR PREQUALIFICATION PROGRAM Pursuant to State Requirements for Educational Facilities, Chapter 4, Section 4.1 Prequalification of Contractors
More informationSUBCONTRACTOR QUALIFICATION FORM
3555 E. 42nd Stravenue Tucson, AZ 85713 (520) 571-0101 (520) 571-0505 (fax) Date : Attn : Linda King SUBCONTRACTOR QUALIFICATION FORM It is our policy, before we use quotes or sign subcontracts, that we
More informationCharlotte-Mecklenburg Schools Capital Program Services. Request for Qualifications Architectural Design Services
Charlotte-Mecklenburg Schools Capital Program Services Request for Qualifications Architectural Design Services February 25, 2019 Contents Section 1 - ADVERTISEMENT...1 Section 2 - INTRODUCTION AND OVERVIEW...1
More information