1 Responsibility Statement and Questionnaire CITY OF NAPA PUBLIC WORKS DEPARTMENT NAPA, CALIFORNIA [DATE] Responsibility Determination for General Contractors Who May Desire to Submit Bid Proposals for the Construction of The City of Napa (City) will only receive construction bids from general contractors who have been approved to be on the Final Bidders List for this project. General contractors interested in submitting a construction bid for this project must first submit a Responsibility Statement and Questionnaire as described in this document. Firms interested in submitting bids as a subcontractor or material supplier do not need to submit a Responsibility Statement and Questionnaire. Local agencies are using an early responsibility determination procedure to comply with the requirement that they only hire responsible contractors. This procedure allows the local agency to consider the responsibility and capacity of a contractor to perform the work on a given project before the contractor has invested the time and expense necessary to submit a bid. This procedure also provides a mechanism for a reasonable, objective and fair process for determining the ability of interested contractors to satisfactorily complete the project. If you have any questions about the responsibility determination process or the documents to be submitted, please contact the City s project manager, Mark Andrilla, of this office, at (707) Approved for publication Date

2 Responsibility Statement and Questionnaire for the Construction of TABLE OF CONTENTS PART A. NOTICE REGARDING SUBMISSION OF RESPONSIBILITY QUESTIONNAIRE... A-1 PART B. INSTRUCTIONS FOR PREPARING 1. Project Description... B-1 2. Submittal Requirements... B-1 3. Review of Submitted Responsibility Statements and Questionnaires... B-2 4. Protest of City s Decisions... B-2 5. Anticipated Project Time Line... B-3 6. Evaluation Form... B-3 PART C. FORM Contractors desiring to submit bid proposals for this project must complete and submit the forms in Part C as specified in Part A and Part B. 1. Contractor Information... C-1 2. Experience Information... C-2 Present Construction Information Form... C-3 Completed Construction Information Form... C-4 3. Financial Data... C-5 4. Safety Review... C-6 5. Insurance Requirements... C Litigation History... C-8 7. Bonding Requirements... C-8 8. Prevailing Wage Rate Requirements... C-9 9. Integrity Requirements... C-10

3 PART A Page A-1 NOTICE REGARDING SUBMISSION OF Notice is hereby given that sealed Responsibility Statements and Questionnaires will be received by the City of Napa at the Public Works Department, Engineering Division, 1600 First Street, Napa, California, 94559, until 5:00 p.m., [DATE], for the project described herein. Responsibility Statements and Questionnaires should be placed in a sealed enveloped. The following information should be visible on the envelope: Your company name and address Responsibility Statement and Questionnaire For the Construction of Contractors submitting a Responsibility Statement and Questionnaire shall be notified by [DATE], whether or not they have been approved to be placed on the Final Bidders List for this construction project. PROJECT MANAGER: Bidders may discuss the Responsibility Statement and Questionnaire and Contract Documents with the City s Project Manager,, tel:. (Note: Construction Bid Documents will not be issued until approximately [DATE] for the ). In preparing their submittal of a Responsibility Statement and Questionnaire, contractors shall only rely upon the written documents obtained from the Internet site. There is no charge for downloading a copy of these documents from this website. CLARIFICATIONS AND ADDENDA: The City may issue addenda as appropriate for clarification or other reasons during the responsibility process. All requests for clarification or interpretation of the documents must be submitted at least three (3) days before the deadline for receipt of Responsibility Statement and Questionnaires. NOTICE REGARDING RECEIPT OF CONSTRUCTION BIDS The anticipated time line for issuing bid documents and receiving bids for the construction of the project is described in Part B of this document. FINAL BIDDERS LIST: The City will only receive construction bids from general contractors who have been approved to be on the Final Bidders List for this project. General contractors interested in submitting a construction bid for this project must first submit a Responsibility Statement and Questionnaire as described in this document. Firms interested in submitting bids as a subcontractor or material supplier do not need to submit a Responsibility Statement and Questionnaire. If a responsibility protest is filed by a potential bidder, the City will conduct a review as described below in Part B, Section 4. Should the City still maintain that a potential bidder is not approved and they do submit a bid, it will not be opened. A BIDDERS' BOND is not required to be submitted with the Responsibility Questionnaire. However, a Bidders Bond shall be submitted by the bidders approved to be on the Final Bidders List at the time of bid submission. CONTRACTORS LICENSE: The Contractor shall possess a Class A and any other required Contractors Licenses at the time the contract is awarded.

4 PART B Page B-1 INSTRUCTIONS FOR PREPARING 1. PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT is to construct and including necessary roadway improvements connected with the bridge construction. THE WORK CONSISTS OF constructing [PROJECT DESCRIPTION]. THE CONSTRUCTION COST RANGE of this project is [AMOUNT] to [AMOUNT]. THE CONSTRUCTION TIME FRAME for this project is anticipated to be [DATE] to [DATE]. Preliminary plans for this project are available for review at the City of Napa, Public Works Department, in the Community Services Building at 1600 First Street, Napa, California SUBMITTAL REQUIREMENTS Responsibility Statement and Questionnaire submittals must contain 1. All of the information requested in this document, and 2. The completed form presented in Part C of this document along with any other requested information, including, but not limited to, resumes of key staff that will be working on the project, and financial records. The various required documents that must be attached are described within the form in Part C and are also listed on the last page of that form. The submittal deadline and location is defined above in Part A. Failure to provide required information that is complete and accurate at the time, date and location set forth shall constitute grounds for rejection of the submitted Responsibility Statement and Questionnaire. It shall be the sole responsibility of the contractor to insure that the City has received the required documents. The City is not responsible for any misdirection, late delivery or non-delivery of mail or other communications to City. Notifications regarding the City s determination of which contractors are approved or not-approved to be on the Final Bidders List will be made via facsimile on the date stated below. It shall be the sole responsibility of the contractor to insure City has his proper address and phone number. In preparing their submittal of a Responsibility Statement and Questionnaire, contractors shall only rely upon the written documents issued by the City for this process. 3. REVIEW OF SUBMITTED RESPONSIBILITY STATEMENTS AND QUESTIONNAIRES The City will evaluate the information contained in each applicant s questionnaire and may request additional information pertinent to the questionnaire. The City s decision will be based on the evaluation of several factors including, but not limited to, the items listed in the various forms of this document. The sole and discretionary judgment of the City will determine if the applicant is approved to be included in the Final Bidders List. Should the applicant not be approved, the applicant may protest that decision. This protest must be filed as described below in Section 4. The City s evaluation of the firm s ability, trustworthiness, fitness and capacity to satisfactorily perform the proposed work applies only to this project. During the evaluation of the Responsibility Questionnaire, should any additional information be requested by the City, the applicant must provide that information within two working days of the request. Failure to provide the information within the specified time period may result in disqualification from the process. In order to respect the confidentiality of the information submitted, the City will not publish the information contained in the submitted Responsibility Questionnaires, so far as permitted by law.

5 PART B Page B-2 Notifications regarding the City s determination of which contractors are approved or not-approved to be on the Final Bidders List will be made on [DATE], by facsimile, and by certified mail to the contractor s address as listed on contractor s submittal. It is the sole responsibility of the contractor to insure City has contractor s proper address. 4. PROTEST OF CITY S DECISIONS Protests regarding the City s decisions shall be processed as follows: 1. Any protest concerning the non approval of a contractor must be made in writing by [TIME] on [DATE], to the Public Works Department, City of Napa, 1600 First Street, Napa, California; Attention: Jacques R. LaRochelle. The protest shall set forth the reasons for the protest, and must clearly identify the protesting party. 2. Upon receipt of such a written protest, the Public Works Director or his designee shall hear the case of the contractor on [DATE]. If the contractor is not present at the hearing it will be assumed that the written protest is the contractor s complete protest. Should the contractor desire to appeal the decision made by the Public Works Director or his designee, the contractor may appeal to the City Council by submitting a written request by the close of business on [DATE], to the Public Works Department, City of Napa, 1600 First Street, Napa, California; Attention: Jacques R. LaRochelle. 3. The City Council will then hear and determine the protest on [DATE].

6 PART B Page B-3 5. ANTICIPATED PROJECT TIME LINE (SAMPLE) Event Date Responsibility Statement and Questionnaire Document Available for Distribution to Contractors Due Date of Responsibility Statement and Questionnaire City Notifies Contractors, Approved and Not Approved Contractors Submit Request for Appeal (by 12:00 Noon) City Staff Hears Appeals Contractor Submit Request for Appeal to City Council City Council Hears Appeals City Advertises Allen Road Bridge over the Napa River for construction bids Bid Opening for Allen Road Bridge over the Napa River (anticipated date) City Council Awards Agreement for Construction of the Project (anticipated date) 5. EVALUATION FORM The City of Napa will evaluate each contractor by use of the evaluation form presented on the following three pages. A threshold approval requirement has been established for several of the evaluation items; other evaluation items are subjective. Based on the information provided in their Responsibility Statement and Questionnaire, contractors will be scored on the various approval requirements. Contractors who meet or exceed the requirements will be approved to be on the Final Bidders List for this project. The Evaluation Form is provided below for information only; contractors DO NOT need to fill out or submit the Evaluation Form.

7 PART B Page B-4 Evaluation Form for (Contractor Name): Page 1 of 3 Date: Prepared by: Responsibility Item Approval Requirement CONTRACTOR INFORMATION Corporation, Partnership, Owner Years In Business Contractor s Data or Score Comments Other Business Names Trade Work With Own Forces License Class A EXPERIENCE INFORMATION Current Projects Projects Past Three Years Key Personnel FINANCIAL DATA Evaluation Item Approval Requirement Yr Yr Yr Comments Current Ratio > 1.5 Quick Ratio Debt Ratio Gross Profit Margin Net Profit Margin Net Worth Leverage < 2.5 Working Capital (Wc) 3-Year Trend Profitability V.S. Volume 3-Year Trend BKLOG / WC < 20 Steady/Up Gross/Vol. Steady/Up

8 PART B Page B-5 Evaluation Form for (Contractor Name): Page 2 of 3 SAFETY REVIEW Experience Modification Rate LTIR IR EMR Last Year < 1.0 EMR 4 Year Average < 1.0 EMR 4-Year Trend Steady/Down < 6 Per 200k Hrs < 13 Per 200k Hrs Inspections/Safety/Meetings INSURANCE A.M. Best Rating A:VII General Liability Limits Per Occurrence $1 million Aggregate Deductible Value Automobile Limits $1 million Excess Liability Limits Workers Compensation $1 million LITIGATION Default Termination Pending Litigation Litigation Filed City/County Of Napa None No Major No Major No Major

9 PART B Page B-6 Evaluation Form for (Contractor Name): Page 3 of 3 BONDING Surety s Name California-Admitted Yes A.M. Best Rating Underwriting Capacity A > Contract Value Total Bond Capacity Available Bond Capacity Bonding Rate <3% > Contract Value Staff s Recommendation: Approve Contractor for Final Bidders List Do Not Approve Contractor for Final Bidders List for the following reasons: Division Head s Review / Approval: Mark Andrilla, Senior Civil Engineer I concur with Staff s Recommendation above. I make the following modification of Staff s Recommendation:

10 PART C Page C-1 General contractors desiring to be submit bid proposals for this project must 1) complete the form presented in this Part C, 2) attach the required additional information as indicated below, and 3) submit the same to the City for review per the instructions stated above in Part A and Part B. All information submitted for responsibility evaluation will be considered official information acquired in confidence and the City of Napa will maintain its confidentiality to the extent permitted by law. 1. CONTRACTOR INFORMATION Contractor s Name Contractor must be licensed in the State of California. If a joint venture, the joint venture must be licensed. Provide the following information: Name of license holder exactly as on file with the California State License Board Contractor License Number and Classification Structure of Company (please check one and provide information accordingly) CORPORATION Date of Incorporation: State of Incorporation: President Name: Vice-President's Name: Secretary's Name: Treasurer's Name: PARTNERSHIP Date of Organization: Name and Address of Principals (state whether general or limited partnership): INDIVIDUAL If other than a Corporation or Partnership, describe organization and name of Principals: How many years has your Organization been in business as a Contractor? Years

11 PART C Page C-2 How many years has your Organization been in business under its present business name? Years Under what other entities or former names has your Organization operated? Name Years Name Years Name Years List the type of work normally performed with your own forces: 2. EXPERIENCE INFORMATION One of the criteria to be used to evaluate a contractor s responsibility shall be the contractor s overall company experience and assigned key personnel experience in similar construction. This is of prime importance. However, there will be other criteria, as listed below, that the City deems necessary to ascertain the capabilities and past performance of each contractor. Using the Present Construction Information Form (on the next page), provide information for all major projects currently being performed including, but not limited to, any City of Napa contracts, and other bridge construction projects over $ dollars in construction value. Using the Completed Construction Information Form (on the second next page), provide information for all major projects completed in the past ten years and operational for at least one year including, but not limited to, any City of Napa contracts, and other bridge construction projects over $ dollars in construction value. Attach a list of key personnel who will likely be assigned to the Project. Attach a copy of their resumes.. Key staff to be committed on this Project must have experience in field and engineering coordination and managing work where contractor was acting in a similar role on a Project of similar scope and magnitude listed in Present Construction Information Form and the Completed Construction Information Form.

12 PART C Page C-3 COMPANY EXPERIENCE PRESENT CONSTRUCTION INFORMATION FORM Provide the following information for all projects which involve bridge construction work with a value in excess of $ dollars and are presently under construction. Project Title: Location: Project Description: Project Owner Information: Name: Contact: Telephone: Describe Your Work on the Project: Total Construction Value: $ Percent Complete: % If Your Work Was Performed As A Subcontractor: General Contractor Information: Name: Contact: Telephone Initial Subcontract Value: Final Subcontract Value: Name of Design Architect/Engineer: Contact: Phone No.: Address: Dollar Amount Of Claims: Submitted $ Settled $ Project Title: Location: Project Description: Project Owner Information: Name: Contact: Telephone: Describe Your Work on the Project: Total Construction Value: $ Percent Complete: % If Your Work Was Performed As A Subcontractor: General Contractor Information: Name: Contact: Telephone Initial Subcontract Value: Final Subcontract Value: Name of Design Architect/Engineer: Contact: Phone No.: Address: Dollar Amount Of Claims: Submitted $ Settled $ COPY ADDITIONAL PAGES AS NEEDED

13 PART C Page C-4 COMPANY EXPERIENCE COMPLETED CONSTRUCTION INFORMATION FORM Provide the following information for all projects which involve bridge construction work with a value in excess of $ dollars and completed within the last 10 years and operational for at least one year. Project Title: Location: Project Description: Project Owner Information: Name: Contact: Telephone: Describe Your Work on the Project: Total Construction Value: $ If Your Work Was Performed As A Subcontractor: General Contractor Information: Name: Contact: Telephone Initial Subcontract Value: Final Subcontract Value: Name of Design Architect/Engineer: Contact: Phone No.: Address: Dollar Amount Of Claims: Submitted $ Settled $ Project Title: Location: Project Description: Project Owner Information: Name: Contact: Telephone: Describe Your Work on the Project: Total Construction Value: $ If Your Work Was Performed As A Subcontractor: General Contractor Information: Name: Contact: Telephone Initial Subcontract Value: Final Subcontract Value: Name of Design Architect/Engineer: Contact: Phone No.: Address: Dollar Amount Of Claims: Submitted $ Settled $ COPY ADDITIONAL PAGES AS NEEDED

14 3. FINANCIAL DATA PART C Page C-5 Attach copies of your last three years audited financial statements (Income Statement, Balance Sheet and Cash Flow) and include the most recent financial statement (Income statement, Balance Sheet and Cash Flow) of the current calendar year. If your firm has been in business less than three years, submit financial statements (Income Statement, Balance Sheet and Cash flow) for your firm from the date of inception, including the most recent financial statement (Income Statement, Balance sheet and Cash Flow) for the current Calendar year. You may provide any additional information not contained in the footnotes to the financial statements that would explain any unusual circumstances that may have impacted, either positively or negatively, the financial status of your firm during this period. It is mandatory that this financial information be provided, except as noted above. Supplemental Financial Information Volume of Work (total of construction contracts) for the last three years Net Income for each of the last three years 2008 $ 2008 $ 2009 $ 2009 $ 2010 $ 2010 $ Amount of work currently on backlog, with percent complete as appropriate. For purposes of this evaluation, backlog shall be defined as work the contractor has been ordered, awarded, or contracted to do but which has not yet started. Current Total Project Backlog $ Indicate the size of Project you are most competitive in performing. $ Bank Reference. Provide bank reference, including contact person, address and phone number. Bank: Branch: Address: Telephone: Contact: Other References. Provide list of project owners, architects, engineers, suppliers and trade subcontractors, including contact person, address and phone number. Company Contact Address Phone Company Contact Address Phone Company Contact Address Phone Company Contact Address Phone

15 4. Safety Review PART C Page C-6 Provide your company's experience modification rate (EMR) for the past three years and current year. Attach a letter from your insurance carrier or State Fund on their letterhead verifying the EMR data. YEAR EMR YEAR EMR Are the above rates interstate or intrastate? If intrastate, which state? Describe your company's injury experience for the past three years and the current year. YEAR LTIR IR Has your company been cited by OSHA in the past five years? No Yes How Often? If yes, for what? Name of your proposed senior site representative who will be assigned to this project. List the locations, OSHA incident frequency rates, and lost time frequency rates for each of his/her last three projects. A. B. C. Will your insurance company's loss control specialist visit the project site? No Yes If yes, how often? Monthly Quarterly Annually Do you require documented safety meetings be held for: A. Field Supervisor: No Yes Frequency B. Employees: No Yes Frequency C. New Hires: No Yes Frequency D. Subcontractors: No Yes Frequency Do you conduct documented safety inspections? No Yes How often? Do you have home office safety representatives who visit/audit the job? No Yes How often? Do you have an Injury and Illness Prevention Program (IIPP)? No Yes

16 5. Insurance Requirements PART C Page C-7 Attach evidence of coverage by a qualified Liability Insurer in at least the amounts shown below. The following is an excerpt of the City s construction agreement. This is the minimum insurance that the contractor constructing the project will be required to procure and maintain for the duration of the project. INSURANCE and BONDS. In addition to any other insurance or bond required under this Agreement, the CONTRACTOR shall procure and maintain for the duration of this Agreement the following types and limits of insurance ("basic insurance requirements") herein: a) Automobile liability insurance, providing coverage on an occurrence basis for bodily injury, including death, of one or more persons, property damage and personal injury, with limits of not less than One Million Dollars ($1,000,000) per occurrence; and the policy shall: i) Provide coverage for owned, non-owned and hired autos. b) Broad form commercial general liability insurance, unless otherwise approved by the CITY s Risk Manager, providing coverage on an occurrence basis for bodily injury, including death, of one or more persons, property damage and personal injury, with limits of not less than One Million Dollars ($1,000,000) per occurrence; and the policy shall: i) Provide contractual liability coverage for the terms of this Agreement. ii) Provide products and completed operations coverage. iii) Contain an additional insured endorsement in favor of the CITY, its mayor, council, officers, agents, employees and volunteers. c) Workers' compensation insurance with statutory limits and employer's liability insurance with limits of not less than One Million Dollars ($1,000,000) per accident; and the policy shall contain a waiver of subrogation in favor of the CITY, its mayor, council, officers, agents, employees and volunteers. d) All policies required of the CONTRACTOR shall be primary insurance as to the CITY, its mayor, council, officers, agents, employees, or designated volunteers and any insurance or self-insurance maintained by the CITY, its mayor, council, officers, agents, employees, and designated volunteers shall be excess of the CONTRACTOR's insurance and shall not contribute with it. e) Except for workers compensation, insurance is to be placed with insurers with a Bests' rating as approved by CITY s Risk Manager, but in no event less than A-:VII. Any deductibles, self-insured retentions or insurance in lesser amounts, or lack of certain types of insurance otherwise required by this Agreement, or insurance rated below Bests' A-:VII, must be declared prior to execution of this Agreement and approved by the CITY in writing. f) Unless otherwise approved by CITY s Risk Manager, all policies shall contain an endorsement providing the CITY with thirty (30) days written notice of cancellation or material change in policy language or terms. All policies shall provide that there shall be continuing liability thereon, notwithstanding any recovery on any policy. Copies of policies shall be delivered to CITY on demand. g) The insurance required hereunder shall be maintained until all work required to be performed by this Agreement is satisfactorily completed as evidenced by written acceptance by the CITY. h) The CONTRACTOR shall furnish the City Risk Manager with a certificate of insurance and required endorsements evidencing the insurance and bonds required. The CITY may withdraw its offer of contract if certificates of insurance and endorsements and bonds required have not been provided as required by the Special Provisions. i) Full compensation for all premiums which the CONTRACTOR is required to pay on all the insurance described herein shall be considered as included in the prices paid for the various items of work to be performed under the Agreement, and no additional allowance will be made therefor or for additional premiums which may be required by extensions of the policies of insurance. j) It is further understood and agreed by the CONTRACTOR that its liability to the CITY shall not in any way be limited to or affected by the amount of insurance obtained and carried by the CONTRACTOR in connection with this Agreement.

17 PART C Page C-8 k) Unless otherwise approved by the CITY, if any part of the work under this Agreement is subcontracted, the "basic insurance requirements" set forth above shall be provided by, or on behalf of, all subcontractors even if the CITY has approved lesser insurance requirements for CONTRACTOR. l) CONTRACTOR shall provide performance, labor and material bonds in amounts and in a form suitable to the CITY. CITY shall approve in writing all such security instruments prior to the commencement of work on the Project. 6. Litigation History List any history of claims, litigation disputes, arbitration and/or termination for cause associated with any work contracted on any project in the past 5 years. If Contractor has no history of litigation, claims or disputes, please so state. Have you ever had a contract terminated for default within the past 5 years? No If yes, why and when: Yes Are there any judgments, claims, arbitration proceedings, or suits pending or outstanding against your organization? No Yes (If Yes, attach an explanation.) Has your organization filed any law suits, requested arbitrations or been involved in any litigation with regard to your contract activity within the last five years? If not applicable, check No. No Yes Comments: Are any of the above with the County of Napa or the City of Napa? No Yes 7. Bonding Requirements Attach a certified letter from your bonding company identifying the bonding rate per $1,000, the aggregate and single project bonding capacity of the company together with a list of all currently bonded projects together with their bond penal sum. At the time of bid submission, Contractor must be capable of providing cash, a certified or cashier's check, or a Contractor s bond for 10%of bid amount, not including any alternates. Prior to receiving a Notice to Proceed from the City, Contractor must provide Payment Bond for Public Works and Performance Bond.

18 PART C Page C-9 The "Payment Bond for Public Works shall be in an amount of one hundred percent (100%)of the Contract price as determined from the prices in the Bid Form, as specified in the Award, and shall inure to the benefit of persons performing labor or furnishing materials in connection with the Work of the proposed Contract. This bond shall be maintained in full force and effect until all Work under the Contract is completed and accepted by Owner, and until all claims for materials and labor have been paid. The Performance Bond shall be in an amount of one hundred percent (100%) of the Contract price as determined from the prices in the Bid Form, as specified in the Award, and shall be so conditioned as to insure the faithful performance by the Contractor of all Work under the contract. It shall also insure the replacing, or making acceptable, of any defective materials or faulty workmanship through the end of the guarantee period. Attach documentation from the Contractor's surety, identifying: 1. Name of bonding company/surety. 2. Name and address of agent. 3. a. (1) Whether it is a California admitted surety. (2) Whether it is listed in the current edition of the Federal Register. (3) Its A. M. Best Rating: A:V or better. (4) Its Standard and Poor Rating. OR b. It is an admitted surety insurer which complies with the provisions of the Code of Civil Procedure, Section OR c. It is a company of equal financial size and stability that is approved by the City 's Risk Manager. 4. The Contractor's total bonding capacity. 5. The Contractor's available bonding capacity. 6. The Contractor's bond rate. 8. Prevailing Wage Rate Requirements Pursuant to Labor Code Sections 1770, et seq., the Director of the Department of Industrial Relations has determined the general prevailing rate of wages in the City of Napa for each craft, classification or type of workman needed to execute the contract. The Director s schedule of prevailing rates is on file and open for inspection at the City of Napa, Department of Public Works, 1600 First Street, Napa, California. It shall be mandatory upon the Contractor and upon any Subcontractors under them, to pay not less than the said specific rates to all laborers, workers or mechanics employed by them on the execution of this contract. Describe any instances in which your organization has been fined, penalized or otherwise found to have violated any prevailing wage provisions within the last five (5) years.

19 9. Integrity Requirements PART C Page C-10 If any portion of his responsibility statement and questionnaire is found to have any intentionally misleading information or material discrepancies, the Contractor will be deemed disqualified. The Undersigned declares under penalty of perjury that all of the information submitted on and with this form is true and correct and that this Declaration was executed by an officer of the Company on the day of, 20. Signature Typed or Printed Name and Title Firm Name Address (for delivery of certified mail) City, State, and Zip Code Telephone Number Fax Number The following documents are attached to this Contractor s completed and submitted Responsibility Statement and Questionnaire. An X in the box indicates that the Contractor has attached the indicated documents to this form. List of key personnel and their resumes (required documents) Financial statements (required documents) Letter verifying EMR data (required documents) Evidence of insurance coverage (required documents) Explanation regarding judgments, claims, arbitration proceedings, or suits pending or outstanding against Contractor (if applicable) Bonding information (required documents)

PROPOSAL DOCUMENTS FOR JANITORIAL SERVICES CONTRACT

PROPOSAL DOCUMENTS FOR JANITORIAL SERVICES CONTRACT West Valley Sanitation District PROPOSAL DOCUMENTS FOR JANITORIAL SERVICES CONTRACT 1. INTRODUCTION A. West Valley Sanitation District of Santa Clara County (District) is accepting proposals for janitorial

More information

PRE-QUALIFICATION SUBMITTAL PACKAGE FOR GENERAL CONTRACTOR PRE-QUALIFICATION FOR THE VETERANS SPORTS PARK AT TUSTIN LEGACY, CIP NO.

PRE-QUALIFICATION SUBMITTAL PACKAGE FOR GENERAL CONTRACTOR PRE-QUALIFICATION FOR THE VETERANS SPORTS PARK AT TUSTIN LEGACY, CIP NO. PRE-QUALIFICATION SUBMITTAL PACKAGE FOR GENERAL CONTRACTOR PRE-QUALIFICATION FOR THE VETERANS SPORTS PARK AT TUSTIN LEGACY, CIP NO. 20043 IN THE CITY OF TUSTIN 300 CENTENNIAL WAY TUSTIN, CALIFORNIA 92780

More information

PREQUALIFICATION PACKAGE FOR

PREQUALIFICATION PACKAGE FOR PREQUALIFICATION PACKAGE FOR THERMAL ENERGY STORAGE TANK REHABILITATION (REVISED) PROJECT 17-59 Due Date and Location for Submittal: 2:00 pm on Monday, December 18, 2017 City Clerk City of Beverly Hills

More information

Madera Unified School District

Madera Unified School District Madera Unified School District Contractor Prequalification Procedures Prequalification Application PREQUALIFICATION PROCEDURES tice is hereby given by Madera Unified School District ( District ) that general

More information

ATTACHMENT 6 PREQUALIFICATION QUESTIONNAIRE. Firm Name: Check One: Corporation (as it appears on license) Sole Prop.

ATTACHMENT 6 PREQUALIFICATION QUESTIONNAIRE. Firm Name: Check One: Corporation (as it appears on license) Sole Prop. ATTACHMENT 6 PREQUALIFICATION QUESTIONNAIRE CONTACT INFORMATION Firm Name: Check One: Corporation (as it appears on license) Partnership Sole Prop. Contact Person: Address: Phone: Fax: If Firm is a sole

More information

2018 GENERAL CONTRACTOR PREQUALIFICATION APPLICATION FOR NON STATE FUNDED PROJECTS > $1 MILLION. December 12, 2017

2018 GENERAL CONTRACTOR PREQUALIFICATION APPLICATION FOR NON STATE FUNDED PROJECTS > $1 MILLION. December 12, 2017 2018 GENERAL CONTRACTOR PREQUALIFICATION APPLICATION FOR NON STATE FUNDED PROJECTS > $1 MILLION PART A 2018 Instructions; Appeals Process PART B 2018 Questionnaire PART C 2018 Questionnaire Scoring PART

More information

CITY OF SAN MATEO PUBLIC WORKS APRIL

CITY OF SAN MATEO PUBLIC WORKS APRIL REQUEST FOR PROPOSAL PRE-QUALIFICATION OF CONTRACTORS SEEKING TO BID ON THE CITY OF SAN MATEO S WASTEWATER TREATMENT PLANT DIGESTER GAS TO COMPRESSED NATURAL GAS INFRASTRUCTURE AND VEHICLE FUELING SYSTEM

More information

PREQUALIFICATION QUESTIONAIRE

PREQUALIFICATION QUESTIONAIRE CITY HALL FIRST FLOOR COMMUNITY DEVELOPMENT REMODEL PREQUALIFICATION QUESTIONAIRE PROJECT DESCRIPTION Beverly Hills Community Development Facility was last remodeled in 2007, and contains approximately

More information

STATEMENT OF BIDDER S QUALIFICATIONS (GENERAL CONTRACTOR)

STATEMENT OF BIDDER S QUALIFICATIONS (GENERAL CONTRACTOR) HOUSING AUTHORITY OF THE COUNTY OF SAN BERNARDINO CAPITAL FUND PROGRAM 715 E. BRIER DRIVE SAN BERNARDINO, CA 92408-2841 (909) 890-0644 FAX (909) 915-1831 STATEMENT OF BIDDER S QUALIFICATIONS (GENERAL CONTRACTOR)

More information

CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION for MEASURE M BOND PROJECTS

CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION for MEASURE M BOND PROJECTS CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION for MEASURE M BOND PROJECTS Hollister School District will be soliciting bids for reconstruction and new construction on Measure M Bond Projects.

More information

EL RANCHO UNIFIED DISTRICT PREQUALIFICATION QUESTIONNAIRE PACKET

EL RANCHO UNIFIED DISTRICT PREQUALIFICATION QUESTIONNAIRE PACKET EL RANCHO UNIFIED DISTRICT PREQUALIFICATION QUESTIONNAIRE PACKET In accordance with California Public Contract Code section 20111.6, all prime or general contractors and mechanical, electrical and plumbing

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Issued: December 2, 2016 City Auditorium Bathroom Remodel Project Design-Build Project STATEMENTS OF QUALIFICATIONS ARE DUE BY 3:00 P.M. TUESDAY, JANUARY 10, 2017 1.0 REQUEST

More information

PREQUALIFICATION FOR GENERAL CONTRACTORS

PREQUALIFICATION FOR GENERAL CONTRACTORS PREQUALIFICATION FOR GENERAL CONTRACTORS Central Union School District Admiral Akers Elementary School Page 0 of 17 CONTACT INFORMATION Firm Name: Check One: Corporation (As it appears on license) Partnership

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES CONSTRUCTION CONTRACTS

LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES CONSTRUCTION CONTRACTS LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES CONSTRUCTION CONTRACTS PRIME CONTRACTOR PREQUALIFICATION QUESTIONNAIRE OVERVIEW By submitting this Prime Contractor Prequalification Questionnaire to the

More information

APPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT

APPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT APPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT NORTH ORANGE COUNTY COMMUNICTION COLLEGE DISTRICT PURCHASING DEPARTMENT 1830 WEST ROMNEYA DR.

More information

WHEREAS, the District desires to adopt the Prequalification Process, including the Questionnaire, Rating System, and Appeal Process.

WHEREAS, the District desires to adopt the Prequalification Process, including the Questionnaire, Rating System, and Appeal Process. RESOLUTION NO. 18-009 OF THE BERKELEY UNIFIED SCHOOL DISTRICT ADOPTING PREQUALIFICATION PROCESS FOR PRIME CONTRACTORS PURSUANT TO PUBLIC CONTRACT CODE SECTION 20111.6 WHEREAS, the Berkeley Unified School

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2019 PRE-QUALIFICATION QUESTIONNAIRE

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2019 PRE-QUALIFICATION QUESTIONNAIRE PART B. 2019 QUESTIONNAIRE PREQUALIFICATION FOR GENERAL CONTRACTORS AND MECHANICAL, ELECTRICAL AND PLUMBING SUBCONTRACTORS CONTACT INFORMATION Firm Name: Check One: (As it appears on license) Corporation

More information

C740 (13002F) REQUEST FOR PRE-QUALIFICATION BIDDERS

C740 (13002F) REQUEST FOR PRE-QUALIFICATION BIDDERS SILICON VALLEY BERRYESSA EXTENSION PROJECT C740 (13002F) REQUEST FOR PRE-QUALIFICATION OF BIDDERS Milpitas Station Surface Parking and Roadway Issued September 25, 2014 REQUEST FOR PRE-QUALIFICATION OF

More information

PRE-QUALIFICATION REQUIREMENTS FOR BIDDERS Qualification Criteria

PRE-QUALIFICATION REQUIREMENTS FOR BIDDERS Qualification Criteria PRE-QUALIFICATION REQUIREMENTS FOR BIDDERS Qualification Criteria Contractors desiring to bid are required to complete the attached BIDDER QUALIFICATION QUESTIONNAIRE. These forms will be used to determine

More information

GUADALUPE RIVER PARK AND GARDENS IDENTIFICATION, INTERPRETIVE AND WAY FINDING SYSTEMS SINGAGE PROJECT CITY OF SAN JOSE REDEVELOPMENT AGENCY

GUADALUPE RIVER PARK AND GARDENS IDENTIFICATION, INTERPRETIVE AND WAY FINDING SYSTEMS SINGAGE PROJECT CITY OF SAN JOSE REDEVELOPMENT AGENCY CITY OF SAN JOSE REDEVELOPMENT AGENCY REQUEST FOR PRE-QUALIFICATION OF EXTERIOR SIGN FABRICATION BIDDERS GUADALUPE RIVER PARK AND GARDENS IDENTIFICATION, INTERPRETIVE AND WAY FINDING SYSTEMS SINGAGE PROJECT

More information

EL CENTRO ELEMENTARY SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE AND CERTIFICATION FOR GENERAL CONTRACTORS FOR MULTIPLE PROJECTS

EL CENTRO ELEMENTARY SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE AND CERTIFICATION FOR GENERAL CONTRACTORS FOR MULTIPLE PROJECTS EL CENTRO ELEMENTARY SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE AND CERTIFICATION FOR GENERAL CONTRACTORS FOR MULTIPLE PROJECTS Due 2:00pm, January 11, 2018 Pursuant to Public Contract Code section

More information

ADDENDUM NO. 1. Date: March 7, Accessible Ramp at Saddleback College. Bid No South Orange County Community College District

ADDENDUM NO. 1. Date: March 7, Accessible Ramp at Saddleback College. Bid No South Orange County Community College District ADDENDUM NO. 1 Date: March 7, 2018 Accessible Ramp at Saddleback College Bid. 2071 South Orange County Community College District General-All project documents including contract documents, drawings, and

More information

Prequalification Questionnaire

Prequalification Questionnaire Prequalification Questionnaire MODESTO CITY SCHOOLS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE MEP SUBCONTRACTORS (Date) Pursuant to Public Contract Code section 20111.6, each prospective contractor

More information

Exhibit B-1 MEP Subcontractor Questionnaire

Exhibit B-1 MEP Subcontractor Questionnaire Exhibit B-1 MEP Subcontractor Questionnaire SAN RAFAEL CITY SCHOOLS PREQUALIFICATION QUESTIONNAIRE AND CERTIFICATION FOR PROSPECTIVE MEP SUBCONTRACTORS Due before 2:00pm, day,, 2017 Pursuant to Public

More information

PART 1: COMPANY DETAILS

PART 1: COMPANY DETAILS PART 1: COMPANY DETAILS Legal Name of Company (per your W-9): Legal Parent Company: Federal Employee Identification Number: Website: Year Company Started *: Date of Incorporation: State of Incorporation:

More information

THE PROVISION OF CRACK SEAL MATERIAL 2017/2018 NOTICE TO BIDDERS. This entire Bid Package, which includes the following:

THE PROVISION OF CRACK SEAL MATERIAL 2017/2018 NOTICE TO BIDDERS. This entire Bid Package, which includes the following: THE PROVISION OF CRACK SEAL MATERIAL 2017/2018 NOTICE TO BIDDERS This entire Bid Package, which includes the following: Notice Inviting Bids, Bid Proposal Forms, and County of Inyo Standard Contract No.

More information

CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION

CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION Purchasing Services 1830 South Nogales Street Rowland Heights CA 91748 Phone: (626) 854-8387 Fax: (626) 854-8587 www.rowlandschools.org Governing Board Cary C. Chen Lynne Ebenkamp Donna Freedman David

More information

NOTICE TO CONTRACTORS INVITATION TO BID DEMOLITION OF BUILDINGS. Date: January 7, 2018 Demolition Property Addresses: 2557 Grant Ave Ogden UT 84401

NOTICE TO CONTRACTORS INVITATION TO BID DEMOLITION OF BUILDINGS. Date: January 7, 2018 Demolition Property Addresses: 2557 Grant Ave Ogden UT 84401 NOTICE TO CONTRACTORS INVITATION TO BID DEMOLITION OF BUILDINGS Date: January 7, 2018 Demolition Property Addresses: 2557 Grant Ave Ogden UT 84401 The Ogden City Redevelopment Agency (the RDA ) is funding

More information

IRFQ #R15-04: FRIDAY NIGHT LIVE

IRFQ #R15-04: FRIDAY NIGHT LIVE IRFQ #R15-04: FRIDAY NIGHT LIVE INSTRUCTIONS: The Fillable Forms Template must be submitted in total with all required ATTACHMENTS and documents. Bidders that do not comply with the requirements, and/or

More information

CONTRACTORS PRE-QUALIFICATION QUESTIONNAIRE FOR PALM BEACH COUNTY

CONTRACTORS PRE-QUALIFICATION QUESTIONNAIRE FOR PALM BEACH COUNTY Board of County Commissioners Paulette Burdick, Mayor County Administrator Verdenia C. Baker Melissa McKinlay, Vice Mayor Hal R. Valeche Dave Kerner Steven L Abrams, Mary Lou Berger Mack Bernard CONTRACTORS

More information

CONTRACTORS PRE-QUALIFICATION QUESTIONNAIRE FOR PALM BEACH COUNTY

CONTRACTORS PRE-QUALIFICATION QUESTIONNAIRE FOR PALM BEACH COUNTY Board of County Commissioners Shelley Vana, Mayor County Administrator Verdenia C. Baker Mary Lou Berger Vice Mayor Hal R. Valeche Paulette Burdick Sleven L Abrams, Melissa McKinlay Priscilla A. Taylor

More information

SUBCONTRACTOR PREQUALIFICATION FORM

SUBCONTRACTOR PREQUALIFICATION FORM SUBCONTRACTOR PREQUALIFICATION FORM All subcontractors are required to complete this questionnaire. The contents of this questionnaire will be considered and used solely to determine your firm s qualification

More information

SUBCONTRACTOR/SUPPLIER QUALIFICATION STATEMENT

SUBCONTRACTOR/SUPPLIER QUALIFICATION STATEMENT 35 S. 100 E. American Fork, UT 84003 PHONE: (801) 766-3233 FAX: (801) 766-3240 SUBCONTRACTOR/SUPPLIER QUALIFICATION STATEMENT We appreciate the recent interest you have expressed in being added to Acadian

More information

Request for Proposals: Environmental Site Assessment for Single Property

Request for Proposals: Environmental Site Assessment for Single Property OBDD RFP No. C2019048 Request for Proposals: Environmental Site Assessment for Single Property Proposal due date: January 29, 2019 at 3:00 p.m. Pacific Time 1.0 SOLICITATION INFORMATION AND REQUIREMENTS

More information

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT TEMPORARY ENCROACHMENT PERMIT

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT TEMPORARY ENCROACHMENT PERMIT COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT TEMPORARY ENCROACHMENT PERMIT 1. Applicant shall submit a completed Temporary Encroachment Permit application and obtain an executed Temporary

More information

BIDDER S QUALIFICATION AND EXPERIENCE STATEMENT

BIDDER S QUALIFICATION AND EXPERIENCE STATEMENT BIDDER S QUALIFICATION AND EXPERIENCE STATEMENT The OWNER will require supporting evidence regarding Bidder s Qualifications and competency. The Bidder will be required to furnish all of the applicable

More information

State of North Carolina Prequalification for Single Prime Contractors

State of North Carolina Prequalification for Single Prime Contractors Failure to answer all of the following questions may result in disqualification. If general contractor has any questions, contact the person listed below under Submitted to. Completing this questionnaire

More information

CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION

CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION 501 N. Crescent Way Anaheim CA 92801 Phone: (714) 999-3511 www.auhsd.us www..org Office of the Superintendent Governing Board Annemarie Randle-Trejo Anna L. Piercy Katherine H. Smith Brian O'Neal Al Jabbar

More information

LONE TREE SCHOOL FLOORING REPLACEMENT

LONE TREE SCHOOL FLOORING REPLACEMENT WHEATLAND SCHOOL DISTRICT REQUEST FOR PROPOSAL LONE TREE SCHOOL FLOORING REPLACEMENT PROPOSAL DUE DATE: May 12, 2011 1:30 p.m. 1 The WHEATLAND SCHOOL DISTRICT wishes to replace flooring at its Lone Tree

More information

TOWN OF CENTREVILLE Queen Anne s County, Maryland. Centreville Wastewater Treatment Plant Expansion Preliminary Engineering Report. Invitation for Bid

TOWN OF CENTREVILLE Queen Anne s County, Maryland. Centreville Wastewater Treatment Plant Expansion Preliminary Engineering Report. Invitation for Bid TOWN OF CENTREVILLE Queen Anne s County, Maryland Centreville Wastewater Treatment Plant Expansion Preliminary Engineering Report Invitation for Bid Documents Available: Mandatory Pre-bid Meeting: Proposal

More information

CONTRA COSTA COMMUNITY COLLEGE DISTRICT 500 Court St, Martinez, CA CONTRACTOR INFORMATION

CONTRA COSTA COMMUNITY COLLEGE DISTRICT 500 Court St, Martinez, CA CONTRACTOR INFORMATION 500 Court St, Martinez, CA 94553 CONTRACTOR PREQUALIFICATION APPLICATION FORM (CUPCCAA, PCC 22000) INFORMAL BIDDING PROCEDURES (PCC 22030) CONTRACTOR INFORMATION Firm / Company Name: (as it appears on

More information

EXHIBIT B. Insurance Requirements for Construction Contracts

EXHIBIT B. Insurance Requirements for Construction Contracts EXHIBIT B Insurance Requirements for Construction Contracts Contractor shall procure and maintain for the duration of the contract, and for 3 years thereafter, insurance against claims for injuries to

More information

PROPOSAL LIQUID CALCIUM CHLORIDE

PROPOSAL LIQUID CALCIUM CHLORIDE Gary Hammond, P.E. Commissioner of Public Works Tioga County Department of Public Works 477 Route 96 Owego, New York 13827 (607) 687-0302 Fax (607) 687-4453 Richard Perkins, P.E. Deputy Commissioner of

More information

Subcontractor Prequalification Statement

Subcontractor Prequalification Statement Subcontractor Prequalification Statement NAME FAX WEBSITE IS THIS YOUR HEADQUARTERS? Yes No (if no, include below) FAX NUMBER OF YEARS YOU VE BEEN IN BUSINESS NUMBER OF YEARS UNDER YOUR CURRENT NAME DESIGNATED

More information

Documents For HVAC Bid HVAC Bid # Proposal Opening Date & Time: Thursday, March 12, 2:00 p.m.

Documents For HVAC Bid HVAC Bid # Proposal Opening Date & Time: Thursday, March 12, 2:00 p.m. Merced Community College District Purchasing Department 3600 M Street Merced, CA 95348 Phone: (209) 384-6300 FAX: (209) 384-6310 Documents For HVAC Bid 2015-03 HVAC Bid #2015-03 Proposal Opening Date &

More information

REQUEST FOR PROPOSALS FOR General Counsel Legal Services

REQUEST FOR PROPOSALS FOR General Counsel Legal Services REQUEST FOR PROPOSALS FOR General Counsel Legal Services RFP Issued: October 6, 2017 RFP Submission Deadline: November 1, 2017 Issued by: Colusa Groundwater Authority 100 Sunrise Blvd., Suite A Colusa,

More information

DOCUMENT MOUNTAIN VIEW-WHISMAN SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. December 1, 2018

DOCUMENT MOUNTAIN VIEW-WHISMAN SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. December 1, 2018 DOCUMENT 00 45 13 FOR PROSPECTIVE BIDDERS December 1, 2018 The Mountain View-Whisman School District ( District ) has determined that contractors ( Contractor(s) or Firm(s) ) on projects during the calendar

More information

(City) (State) (Zip) (City) (State) (Zip) Contact : Phone: Cell Phone: Contact Phone: Cell Phone: Contact Phone: Cell Phone:

(City) (State) (Zip) (City) (State) (Zip) Contact : Phone: Cell Phone:   Contact Phone: Cell Phone:   Contact Phone: Cell Phone: Thank you for your interest in Environmental Design & Construction, LLC. In order to develop a more complete knowledge of your Company and better match future EDC opportunities to your Company s capabilities

More information

State of North Carolina Prequalification for Single Prime Contractors

State of North Carolina Prequalification for Single Prime Contractors Failure to answer all of the following questions may result in disqualification. If general contractor has any questions, contact Dan Fields, the Project Principal at dfields@bjac.com. Completing this

More information

EXHIBIT B. Insurance Requirements for Environmental Contractors and/or Consultants

EXHIBIT B. Insurance Requirements for Environmental Contractors and/or Consultants EXHIBIT B Insurance Requirements for Environmental Contractors and/or Consultants Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons

More information

SUBCONTRACTOR INFORMATION SHEET

SUBCONTRACTOR INFORMATION SHEET For KCS West Use: 250 East 1 st Street, Suite 600 Phone: (323) 269-0020 Fax: (213) 972-4076 Proof of Review (please initial): Estimating/PreConst. or Project Mgmt. and Safety Dept. (Must be reviewed by

More information

Request for Bid/Proposal

Request for Bid/Proposal Request for Bid/Proposal Hall of Science Lab Renovations Bids/Proposals Due: April 24, 2018 Mark Mehler Director of Procurement Services Drew University 36 Madison Ave, Madison, NJ 07940 973-408-3309 mmehler@drew.edu

More information

SUBCONTRACT (SHORT FORM)

SUBCONTRACT (SHORT FORM) SUBCONTRACTOR: PHONE SUBCONTRACT (SHORT FORM) PROJECT: LOCATION: This agreement is made and effective, by and between SUN CONSTRUCTION & FACILITY SERVICES, INC. (Contractor) and (Subcontractor) which are

More information

Shook Subcontractor Prequalification Form

Shook Subcontractor Prequalification Form Email info@shookconstruction.com with any questions. The undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. Section 1 -

More information

LONE TREE SCHOOL BELL SYSTEM

LONE TREE SCHOOL BELL SYSTEM WHEATLAND SCHOOL DISTRICT REQUEST FOR PROPOSAL LONE TREE SCHOOL BELL SYSTEM PROPOSAL DUE DATE: NOVEMBER 16, 2010 1:00 p.m. The WHEATLAND SCHOOL DISTRICT wishes to attain a Bell system for its Lone Tree

More information

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT 1. Applicant shall provide one (1) set of approved CVWD Drawings. 2. Applicant shall submit a completed Permanent

More information

CITY OF LIVERMORE BID #4050 FOR: FIRE AND BURGLAR ALARM MONITORING NOTICE TO BIDDERS

CITY OF LIVERMORE BID #4050 FOR: FIRE AND BURGLAR ALARM MONITORING NOTICE TO BIDDERS NOTICE TO BIDDERS Notice is hereby given that the City of Livermore invites sealed bids for FIRE AND BURGLAR ALARM MONITORING SERVICES IN CITY OWNED BUILDINGS. Each bid shall be in accordance with the

More information

EXPERIENCE AND QUALIFICATION STATEMENT OF

EXPERIENCE AND QUALIFICATION STATEMENT OF EXPERIENCE AND QUALIFICATION STATEMENT OF (Legal Name of Bidder) SUBMITTED TO: Oakland County Water Resources Commissioner Building 95 West One Public Works Drive Waterford, Michigan 48328-1907 REGARDING:

More information

Attachment A Application for Prequalification of Hazardous Material and Building Removal Contractors

Attachment A Application for Prequalification of Hazardous Material and Building Removal Contractors Attachment A Application for Prequalification of Hazardous Material and Building Removal Contractors S201-RFQ3 Request for Qualifications Page 1 of 23 APPLICATION FOR PRE-QUALIFICATION OF HAZARDOUS MATERIAL

More information

SUBCONTRACTOR PREQUALIFICATION APPLICATION GENERAL INFORMATION

SUBCONTRACTOR PREQUALIFICATION APPLICATION GENERAL INFORMATION Date of Response: Company name: SUBCONTRACTOR PREQUALIFICATION APPLICATION GENERAL INFORMATION DBA: Phone: E-mail: Main Office Address: State: ZIP Code: Website: Sole Proprietorship: Partnership: Corporation:

More information

EXHIBIT C PROFESSIONAL SERVICES CONTRACT TEMPLATE

EXHIBIT C PROFESSIONAL SERVICES CONTRACT TEMPLATE EXHIBIT C PROFESSIONAL SERVICES CONTRACT TEMPLATE AGREEMENT BETWEEN THE City OF BEVERLY HILLS AND [Consultant S NAME] FOR [BRIEFLY DESCRIBE PURPOSE OF THIS CONTRACT] NAME OF Consultant: insert name of

More information

CITY OF COVINGTON REQUEST FOR PROPOSAL HURRICANE ISAAC VEGETATIVE DEBRIS REDUCTION & TRANSPORTATION

CITY OF COVINGTON REQUEST FOR PROPOSAL HURRICANE ISAAC VEGETATIVE DEBRIS REDUCTION & TRANSPORTATION CITY OF COVINGTON REQUEST FOR PROPOSAL HURRICANE ISAAC VEGETATIVE DEBRIS REDUCTION & TRANSPORTATION OVERVIEW The City of Covington is soliciting proposals for the reduction of Hurricane Isaac vegetative

More information

ANNEX A Standard Special Conditions For The Salvation Army

ANNEX A Standard Special Conditions For The Salvation Army ANNEX A Standard Special Conditions For The Salvation Army TO BE ATTACHED TO AIA B101-2007 EDITION ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT 1. Contract Documents. This Annex supplements,

More information

CONTRACTOR PRE-QUALIFICATION FORM

CONTRACTOR PRE-QUALIFICATION FORM Doc..: Rev../Date: C 3/28/2017 Page: 1 of 13 GENERAL INFORMATION 1 Person Completing this PQF: Title: Telephone: Fax: E-mail Address: 2 Contact for Requesting Bids: Title: Telephone: Fax: E-mail Address:

More information

REQUEST FOR QUALIFICATIONS NATURAL RESOURCES, TECHNICAL AND/OR ENGINEERING SERVICES FOR MINING PERMIT APPLICATIONS RFQ#

REQUEST FOR QUALIFICATIONS NATURAL RESOURCES, TECHNICAL AND/OR ENGINEERING SERVICES FOR MINING PERMIT APPLICATIONS RFQ# REQUEST FOR QUALIFICATIONS NATURAL RESOURCES, TECHNICAL AND/OR ENGINEERING SERVICES FOR MINING PERMIT APPLICATIONS RFQ# 2018-19 Issued By: Baker County Board of County Commissioners 55 North 3 rd Street

More information

Contractor s Statement of Qualifications for (Insert Project Name) (Insert Owners Name Here) (Insert Owners City and State Here)

Contractor s Statement of Qualifications for (Insert Project Name) (Insert Owners Name Here) (Insert Owners City and State Here) Contractor s Statement of Qualifications for (Insert Project Name) (Insert Owners Name Here) (Insert Owners City and State Here) This form must be returned to (Insert Architect s Name and Address here)

More information

INDOOR BLEACHER SAFETY RAILS MANDATORY WALK-THRU ON MONDAY, MAY 16, 2016 AT 10:00 A.M. AT CENTRAL OFFICE ANNEX, 24 SCHOOL RD.

INDOOR BLEACHER SAFETY RAILS MANDATORY WALK-THRU ON MONDAY, MAY 16, 2016 AT 10:00 A.M. AT CENTRAL OFFICE ANNEX, 24 SCHOOL RD. SPECIFICATIONS AND BID FORMS FOR INDOOR BLEACHER SAFETY RAILS MANDATORY WALK-THRU ON MONDAY, MAY 16, 2016 AT 10:00 A.M. AT CENTRAL OFFICE ANNEX, 24 SCHOOL RD., WESTON, CT 06883 BID: #16-007- BOE Due on

More information

Williams Unified School District 499 Marguerite Street, Suite C, Williams, CA (530) (530) fax

Williams Unified School District 499 Marguerite Street, Suite C, Williams, CA (530) (530) fax Williams Unified School District 499 Marguerite Street, Suite C, Williams, CA 95987 (530) 473-2550 (530) 473-5894 fax February 21, 2017 REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS ARCHITECTURAL SERVICES

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS Jefferson County School District No. R-1, State of Colorado, hereinafter called the "Owner", has advertised for bids to be submitted for the construction work specified in the advertisement.

More information

MIDLAND COUNTY REQUEST FOR PROPOSAL JUVENILE CARE CENTER PHYSICIAN

MIDLAND COUNTY REQUEST FOR PROPOSAL JUVENILE CARE CENTER PHYSICIAN MIDLAND COUNTY REQUEST FOR PROPOSAL JUVENILE CARE CENTER PHYSICIAN SEALED BIDS DUE: SEPTEMBER 27, 2018 BY 2:00 PM Procurement & Contracts Administrator Department of Finance Midland County Services Building

More information

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR SANTA BARBARA UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR Multi-Purpose Building Renovation Projects at Harding University Partnership School and Roosevelt

More information

TOWN OF PEMBROKE PARK REQUEST FOR PROPOSALS (RFP) PROFESSIONAL FINANCIAL ACCOUNTING SERVICES

TOWN OF PEMBROKE PARK REQUEST FOR PROPOSALS (RFP) PROFESSIONAL FINANCIAL ACCOUNTING SERVICES TOWN OF PEMBROKE PARK REQUEST FOR PROPOSALS (RFP) PROFESSIONAL FINANCIAL ACCOUNTING SERVICES I. PROJECT DESCRIPTION Town of Pembroke Park, Florida ( Town ) is soliciting proposals from interested accounting

More information

REQUEST FOR PROPOSALS (RFP) FOR TEMPORARY STAFFING SERVICES

REQUEST FOR PROPOSALS (RFP) FOR TEMPORARY STAFFING SERVICES REQUEST FOR PROPOSALS (RFP) FOR TEMPORARY STAFFING SERVICES Request For Proposals Number: CAPK HR 2017-001 April 11, 2017 Community Action Partnership of Kern 5005 Business Park North Bakersfield, California

More information

REQUEST FOR PROPOSALS (RFP) No. LHFC_RT2017_0818_3 BUILDING DEMOLITION SERVICES REQUEST FOR PROPOSALS FOR DEMOLITION SERVICES

REQUEST FOR PROPOSALS (RFP) No. LHFC_RT2017_0818_3 BUILDING DEMOLITION SERVICES REQUEST FOR PROPOSALS FOR DEMOLITION SERVICES REQUEST FOR PROPOSALS FOR DEMOLITION SERVICES Introduction and Preface The Laredo Housing Facilities Corporation (LHFC), a subsidiary of the Laredo Housing Authority (LHA), will receive sealed proposals

More information

BID DOCUMENTS FOR THE LONG BEACH UNIFIED SCHOOL DISTRICT FOR BID SCHEDULE NO. FAC# New Construction Educare Los Angeles at Long Beach (Barton)

BID DOCUMENTS FOR THE LONG BEACH UNIFIED SCHOOL DISTRICT FOR BID SCHEDULE NO. FAC# New Construction Educare Los Angeles at Long Beach (Barton) Business Department - Facilities Development and Planning 2425 Webster Ave., Long Beach, CA 90810 Phone 562-997-7550 Fax 562-595-8644 BID DOCUMENTS FOR THE LONG BEACH UNIFIED SCHOOL DISTRICT FOR BID SCHEDULE

More information

Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC CONTRACTOR PREQUALIFICATION APPLICATION

Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC CONTRACTOR PREQUALIFICATION APPLICATION Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC 29651 CONTRACTOR PREQUALIFICATION APPLICATION Terminal Drop-off Improvements August 15, 2018 REQUEST FOR QUALIFICATIONS FOR LANDSCAPE

More information

Request for Proposals

Request for Proposals RFP #G058 Request for Proposals A/E Design Consulting Services Issued by: Golden Empire Transit District 1830 Golden State Ave Bakersfield, CA 93301 Proposals must be submitted No later than 1:00 PM March

More information

Exhibit B-2. MEP Subcontractor Rating System SAN RAFAEL CITY SCHOOLS PREQUALIFICATION QUESTIONNAIRE AND CERTIFICATION FOR PROSPECTIVE BIDDERS, 201

Exhibit B-2. MEP Subcontractor Rating System SAN RAFAEL CITY SCHOOLS PREQUALIFICATION QUESTIONNAIRE AND CERTIFICATION FOR PROSPECTIVE BIDDERS, 201 Exhibit B-2 MEP Subcontractor Rating System SAN RAFAEL CITY SCHOOLS PREQUALIFICATION QUESTIONNAIRE AND CERTIFICATION FOR PROSPECTIVE BIDDERS, 201 Name of Subcontractor: 1. Confirm Prequalification Statement

More information

Cheyenne Wyoming RFP-17229

Cheyenne Wyoming RFP-17229 L A R A M I E COUNTY COMMUNITY COLLEGE Cheyenne Wyoming Request for Proposals (RFP) t o provide Contract Services t o Comp lete t h e Boiler Plant Burner Replacement RFP-17229 Solicited by: Department

More information

BID DOCUMENTS FOR THE LONG BEACH UNIFIED SCHOOL DISTRICT FOR BID SCHEDULE NO. FAC Jordan Plus- Conversion (Head Start)

BID DOCUMENTS FOR THE LONG BEACH UNIFIED SCHOOL DISTRICT FOR BID SCHEDULE NO. FAC Jordan Plus- Conversion (Head Start) Business Department - Facilities Development and Planning 2425 Webster Ave., Long Beach, CA 90810 Phone 562-997-7550 Fax 562-595-8644 BID DOCUMENTS FOR THE LONG BEACH UNIFIED SCHOOL DISTRICT FOR BID SCHEDULE

More information

RENEWABLE WATER RESOURCES

RENEWABLE WATER RESOURCES RENEWABLE WATER RESOURCES Purchasing Department 561 Mauldin Road Greenville, South Carolina 29607 REQUEST FOR QUALIFICATION For Indefinite Delivery Contract Construction Services For Process (WRRFs) and

More information

Request for Proposal # Executive Recruitment Services

Request for Proposal # Executive Recruitment Services Request for Proposal # 2019-001 Executive Recruitment Services Due Date: July 19, 2018 Time: 2:00 pm EST Receipt Location: Government Center Administrative Services Procurement Division 500 N. Main Street,

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS The Bidder's attention is called to the forms and documents listed below which must be executed in full as required. Signature by the Bidder indicates that the information provided

More information

SAFETY FIRST GRANT CONTRACT

SAFETY FIRST GRANT CONTRACT SAFETY FIRST GRANT CONTRACT This agreement (the Contract ) is made this day of, by and between (the Contractor ) and (the Owner ), for the (Name of Parish Corporation, ABN or high school corporation) purpose

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00 0110 TABLE OF CONTENTS Division Section Title INTRODUCTORY INFORMATION BIDDING REQUIREMENTS 00 0101 Title Page 00 0110 Table of Contents 00 0115 Drawing List 00 1113 Notice Inviting Bids 00

More information

City of Henderson PO Box 716 Henderson, Kentucky REQUEST FOR PROPOSALS # 14-25

City of Henderson PO Box 716 Henderson, Kentucky REQUEST FOR PROPOSALS # 14-25 City of Henderson PO Box 716 Henderson, Kentucky 42419 September 14, 2014 REQUEST FOR PROPOSALS # 14-25 Social Media Services for the City of Henderson s Community Visionary Plan and Comprehensive Plan

More information

CITY OF MONTEREY REQUEST FOR PROPOSALS FINANCIAL ADVISORY SERVICES. City of Monterey Finance Department 735 Pacific Street, Suite A Monterey, CA 93940

CITY OF MONTEREY REQUEST FOR PROPOSALS FINANCIAL ADVISORY SERVICES. City of Monterey Finance Department 735 Pacific Street, Suite A Monterey, CA 93940 CITY OF MONTEREY REQUEST FOR PROPOSALS FINANCIAL ADVISORY SERVICES City of Monterey Finance Department 735 Pacific Street, Suite A Monterey, CA 93940 City Contact: Julie Porter, Finance Director Ph. (831)

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS REVEREND PETER ATKINS PARK BATHROOM PROJECT CCE PROJECT NO. 117-106 NOVEMBER 2, 2017 PREPARED BY: CITY OF COVINGTON 317 NORTH JEFFERSON AVENUE COVINGTON, LOUISIANA 70433 1.0 INTRODUCTION

More information

TOWN OF FARMINGTON REQUEST FOR PROPOSALS INSURANCE / RISK MANAGEMENT SERVICES

TOWN OF FARMINGTON REQUEST FOR PROPOSALS INSURANCE / RISK MANAGEMENT SERVICES TOWN OF FARMINGTON REQUEST FOR PROPOSALS INSURANCE / RISK MANAGEMENT SERVICES GENERAL INFORMATION 1. Issuing Office: This Request for Proposals (RFP) is issued by the Town of Farmington, Finance Office.

More information

Request for Proposal #2036. Orange Coast College Exterior Lighting Energy Efficiency Project Implementation

Request for Proposal #2036. Orange Coast College Exterior Lighting Energy Efficiency Project Implementation Request for Proposal #2036 Orange Coast College Exterior Lighting Energy Efficiency Project Implementation I. NOTICE A. Statement of Proposal NOTICE IS HEREBY GIVEN that Coast Community College District

More information

Acknowledgment Form - page 1 of 2

Acknowledgment Form - page 1 of 2 Acknowledgment Form - page 1 of 2 RFQu - Construction Services for Josiah Henson Park The Proposer must include this signed acknowledgment that the Proposer has reviewed all the terms and conditions of

More information

SECTION A NOTICE INVITING SEALED BIDS

SECTION A NOTICE INVITING SEALED BIDS SECTION A NOTICE INVITING SEALED BIDS SECTION A CITY OF TUSTIN, CALIFORNIA NOTICE INVITING SEALED BIDS FOR THE MOFFETT DRIVE EXTENSION BRIDGE AND ROADWAY CONSTRUCTION PROJECT CIP NO. 70224 NOTICE IS HEREBY

More information

DD Endowment Trust Fund The Arc of Washington State REQUEST FOR PROPOSALS (RFP) RFP Number: 14-01

DD Endowment Trust Fund The Arc of Washington State REQUEST FOR PROPOSALS (RFP) RFP Number: 14-01 DD Endowment Trust Fund The Arc of Washington State REQUEST FOR PROPOSALS (RFP) RFP Number: 14-01 PROJECT TITLE: Marketing and Outreach Proposal PROPOSAL DUE DATE: February 27, 2015 by 4:00 P.M. Mailed,

More information

CITY OF BRENHAM, TEXAS. Invitation for Bid. Purchase and Installation of Forty (40) Ton Air Conditioning Unit

CITY OF BRENHAM, TEXAS. Invitation for Bid. Purchase and Installation of Forty (40) Ton Air Conditioning Unit CITY OF BRENHAM, TEXAS Invitation for Bid Purchase and Installation of Forty (40) Ton Air Conditioning Unit IFB Number: 15-002 Response Deadline: 2:00 P.M. (CST) Tuesday, January 6, 2015 Responses will

More information

SAN DIEGO CONVENTION CENTER CORPORATION

SAN DIEGO CONVENTION CENTER CORPORATION SAN DIEGO CONVENTION CENTER CORPORATION REQUEST FOR PROPOSALS FOR CONSTRUCTION PROJECT MANAGEMENT RFP # 19-1159 Issue Date: Friday, October 5, 2018 Pre-Bid Conference: Pre-Bid Question Deadline: Bid Deadline:

More information

PURCHASING DEPARTMENT

PURCHASING DEPARTMENT PURCHASING DEPARTMENT Hill Education Center #243 136 Almon C. Hill Dr. Cumming, GA 30040 Phone: 770-781-6603 / Fax: 770-888-0222 www.forsyth.k12.ga.us RFP P18-03 ADDITIONAL WIDE AREA NETWORK (WAN) February

More information

CITY OF SACRAMENTO NONPROFESSIONAL SERVICES AGREEMENT LESS THAN $25,000

CITY OF SACRAMENTO NONPROFESSIONAL SERVICES AGREEMENT LESS THAN $25,000 PROJECT NAME: AGREEMENT TERM: AUTHORIZED RENEWALS: DEPARTMENT: DIVISION: CITY OF SACRAMENTO NONPROFESSIONAL SERVICES AGREEMENT LESS THAN $25,000 THIS AGREEMENT is made at Sacramento, California, as of,

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS The Bidder's attention is called to the forms and documents listed below which must be executed in full as required. Signature by the Bidder indicates that the information provided

More information

EL PASO COUNTY COMMUNITY COLLEGE DISTRICT POST OFFICE BOX EL PASO, TEXAS GENERAL CONDITIONS OF CONTRACT

EL PASO COUNTY COMMUNITY COLLEGE DISTRICT POST OFFICE BOX EL PASO, TEXAS GENERAL CONDITIONS OF CONTRACT EL PASO COUNTY COMMUNITY COLLEGE DISTRICT POST OFFICE BOX 20500 EL PASO, TEXAS 79998-0500 GENERAL CONDITIONS OF CONTRACT All Offerors must agree to the conditions as stated without alterations. Proposed

More information

SANDY CITY CENTENNIAL PARKWAY SANDY, UTAH DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING MARCH 2017

SANDY CITY CENTENNIAL PARKWAY SANDY, UTAH DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING MARCH 2017 SANDY CITY 10000 CENTENNIAL PARKWAY SANDY, UTAH 84070 DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING MARCH 2017 INVITATION FOR BID: This is a formal solicitation of sealed bids which will

More information