1 Safety Risk Assessment for High Hazard Industries: To Quantify or Not To Quantify?

2 About ARCADIS ARCADIS was established in the Netherlands more than a century ago Our global reach extends across Europe, North and South America, the middle East and Asia IMAGE With over 21,000 staff, we rank in the top 10 management and engineering companies Our extensive network enables us to share information, innovation and market trends to the benefit of all our clients worldwide ARCADIS has a specialist team dealing with safety and systems assurance, applying risk assessment techniques across a range of industries. Staff within the ARCADIS team also have experience in project risk management, commercial risk and operational risk. 2 of May ARCADIS Newtown Creek waste water treatment facility, New York NY

3 Definition of Safety Risk A hazard is a situation with the potential to cause harm Risk of hazard = likelihood (probability, frequency) x consequence (severity) Model Development Prior to a risk assessment we create a model (of the situation, system, operation, etc., as appropriate) Determine the boundaries and scope. Focus on the Safety Functions Consider physical or functional interfaces, and the surrounding environment/geography/local ambient conditions. Consider whether to do a full QRA, partial QRA, or none at all. Must demonstrate that risk is tolerably low

4 Accuracy of Model vs. Precision of Results to Support Decision Making

5 Deciding When to Quantify Is data available for the model? Is it any good? What are the [perceived] high consequence/risk events? Has the client asked for QRA? Is it merited? Is client aware of alternatives? Is there a regulatory and/or industry expectation/ requirement? Are there quantitative targets to meet? What are the safety objectives how will these be met? Where are we in the project lifecycle? Is there a time restriction or cost factor?

6 Types of Quantitative Risk Assessment Full QRAs involve a probabilistic approach and uses mathematical techniques Partial QRAs will typically involve a Risk Class Matrix approach Qualitative Assessment of Risks (QAR) may also use a matrix approach as above, but without numerical bands.

7 Options Target No QRA No Target No QRA - Yes Target Yes QRA - No Target Yes QRA - Yes

8 Target - No QRA No There is no quantitative target and we don t need to know the numerical safety risk for any other reason Carry out a purely qualitative risk assessment Example: Passenger Emergency Alarm Covers Before Risk Assessment Following Risk Assessment

9 Target - No QRA -Yes There is no quantitative target but for some reason we need to know the numerical risk For example, comparison of risks of different types (normalising risks in differing categories) Carry out full or partial QRA

10 Target - Yes QRA No (or Partial) There is a quantitative target, but data is sparse or of poor quality In absence of good data, consider whether quantification is beneficial Can a robust qualitative assessment be made? Rely on engineering judgement, DID, argumentation, other techniques, to conclude that a quantitative target can be met.

11 Target - Yes QRA - Yes There is a quantitative target generally driven by known or perceived high hazards In the nuclear industry, numerical risk targets include BSOs and BSLs associated with annual risk of death to workers and the general public Similar targets in other industries, e.g. Rail Air Oil & Gas Process/chemical Good quality data generally available Full or partial QRA?

12 Both QRA and QAR support decision-making processes. Take-Away Messages QAR can be used at any time in the project lifecycle. The application of QRA is more limited, but usually highly focussed Even when there are targets, you may not always do a full QRA When there are no targets, you may still decide to do QRA. Accuracy of model more important than the precision of the numerical risk data output from it In an ideal world, all hazards would be eliminated by design therefore QRA wouldn t be needed. However, this doesn t happen in real life.

13 Thank you For further information contact:

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol The following presentation was given at: SCAF Workshop Integrated Cost and Schedule Risk Analysis Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol Released for distribution by the Author www.scaf.org.uk/library

More information

Table of Contents Advantages Disadvantages/Limitations Sources of additional information. Standards, textbooks & web-sites.

Table of Contents Advantages Disadvantages/Limitations Sources of additional information. Standards, textbooks & web-sites. Table of Contents Table of Contents 1. Consequence Analysis & Risk Reduction Option Selection 1.1. A description of the techniques, including its purpose 1.1.0.. Introduction 1.1.0.3. Consequence Analysis

More information

Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream

Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream Title Authors Topics Case Study: Risk based approach for the design of a transport infrastructure Edmund Ang, Imperial College

More information

RISK MANAGEMENT ON USACE CIVIL WORKS PROJECTS

RISK MANAGEMENT ON USACE CIVIL WORKS PROJECTS RISK MANAGEMENT ON USACE CIVIL WORKS PROJECTS Identify, Quantify, and 237 217 200 237 217 200 Manage 237 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112

More information

APPENDIX 1. Transport for the North. Risk Management Strategy

APPENDIX 1. Transport for the North. Risk Management Strategy APPENDIX 1 Transport for the North Risk Management Strategy Document Details Document Reference: Version: 1.4 Issue Date: 21 st March 2017 Review Date: 27 TH March 2017 Document Author: Haddy Njie TfN

More information

Intro Public-Private Partnership (P3) Finance Course

Intro Public-Private Partnership (P3) Finance Course Intro Public-Private Partnership (P3) Finance Course Identifying P3 Projects and Knowing the Atmosphere Kylee Anastasi Director, Capital Projects and Infrastructure Advisory PricewaterhouseCoopers LLP

More information

CEPA S200 The Risk-based Approach

CEPA S200 The Risk-based Approach CEPA S200 The Risk-based Approach Presented by Ertugrul Alp, Ph.D., P.Eng. February 24, 2004 Toronto, Ontario Incorporated Change Agents in Risk Management, Specialists in Risk Assessment 87 Topham Crescent,

More information

Classification Based on Performance Criteria Determined from Risk Assessment Methodology

Classification Based on Performance Criteria Determined from Risk Assessment Methodology OFFSHORE SERVICE SPECIFICATION DNV-OSS-121 Classification Based on Performance Criteria Determined from Risk Assessment Methodology OCTOBER 2008 This document has been amended since the main revision (October

More information

A Holistic Approach to Risk Management. Dono Tong & Jeff Chan

A Holistic Approach to Risk Management. Dono Tong & Jeff Chan A Holistic Approach to Risk Management Dono Tong & Jeff Chan 1 Agenda Business Today & Tomorrow Evolution of Risk Management Process Risk Management in MTR 2 Business in the 21 st Century Changing Business

More information

Project Theft Management,

Project Theft Management, Project Theft Management, by applying best practises of Project Risk Management Philip Rosslee, BEng. PrEng. MBA PMP PMO Projects South Africa PMO Projects Group www.pmo-projects.co.za philip.rosslee@pmo-projects.com

More information

ISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Information security risk management

ISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Information security risk management INTERNATIONAL STANDARD ISO/IEC 27005 Second edition 2011-06-01 Information technology Security techniques Information security risk management Technologies de l'information Techniques de sécurité Gestion

More information

Catastrophe Risk Modelling. Foundational Considerations Regarding Catastrophe Analytics

Catastrophe Risk Modelling. Foundational Considerations Regarding Catastrophe Analytics Catastrophe Risk Modelling Foundational Considerations Regarding Catastrophe Analytics What are Catastrophe Models? Computer Programs Tools that Quantify and Price Risk Mathematically Represent the Characteristics

More information

Unexploded Ordnance (UXO) Risk Management Hazard and Risk Assessments in Offshore European Waters. Lee Gooderham Principal Consultant

Unexploded Ordnance (UXO) Risk Management Hazard and Risk Assessments in Offshore European Waters. Lee Gooderham Principal Consultant Unexploded Ordnance (UXO) Risk Management Hazard and Risk Assessments in Offshore European Waters Lee Gooderham Principal Consultant Agenda Introduction Risk tolerability and applying ALARP. Current best

More information

risk management and assessment for business Risk Reduction Practical Solutions Egyptian Petroleum Ministry, Cairo, Egypt 14 th October 2014

risk management and assessment for business Risk Reduction Practical Solutions Egyptian Petroleum Ministry, Cairo, Egypt 14 th October 2014 Risktec Solutions risk management and assessment for business Risk Reduction Practical Solutions Egyptian Petroleum Ministry, Cairo, Egypt 14 th October 2014 Gareth Book, Director, Risktec Solutions Risk

More information

Guidance on the Preparation of Risk Assessments within Railway Safety Cases

Guidance on the Preparation of Risk Assessments within Railway Safety Cases Guidance on the Preparation of Risk Assessments within Railway Safety Cases Synopsis This document provides guidance on how the risk assessments that support and are described within Railway Safety Cases

More information

Application of Triangular Fuzzy AHP Approach for Flood Risk Evaluation. MSV PRASAD GITAM University India. Introduction

Application of Triangular Fuzzy AHP Approach for Flood Risk Evaluation. MSV PRASAD GITAM University India. Introduction Application of Triangular Fuzzy AHP Approach for Flood Risk Evaluation MSV PRASAD GITAM University India Introduction Rationale & significance : The objective of this paper is to develop a hierarchical

More information

Managing Project Risk DHY

Managing Project Risk DHY Managing Project Risk DHY01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or

More information

Project Management Certificate Program

Project Management Certificate Program Project Management Certificate Program Risk Management Terry Skaggs ( Denver class) skaggst@centurytel.net 719-783-0880 Lee Varra-Nelson (Fort Collins class) lvarranelson@q.com 970-407-9744 or 970-215-4949

More information

Product Recall Risk Assessment By Tony Munns. Product recall is a key area of risk for today s company. With greater focus

Product Recall Risk Assessment By Tony Munns. Product recall is a key area of risk for today s company. With greater focus Product Recall Risk Assessment By Tony Munns Product recall is a key area of risk for today s company. With greater focus on, and understanding of the impact of products and their raw materials on individuals,

More information

The Risky Business of. Risk Management

The Risky Business of. Risk Management The Risky Business of Risk Management 1 About Me: Jan Holt, PMP Project Management Professional (PMP) since 2005 Project Management Institute (PMI) Michiana Chapter President PMP Prep Class Instructor

More information

Risk Analysis Introduction

Risk Analysis Introduction Risk Analysis Introduction Aron Larsson SU/DSV and ITM/MIUN What is risk? An awkward feeling? An uncertainty? A probability? A measure? A numerical value? 1 Risk A pertinent event for which there is a

More information

ACTUAL METHODS ON TECHNOLOGICAL RISK ASSESSMENT

ACTUAL METHODS ON TECHNOLOGICAL RISK ASSESSMENT ACTUAL METHODS ON TECHNOLOGICAL RISK ASSESSMENT Marco Nicola Carcassi First European Summer School on Hydrogen Safety Belfast UK, 15th - 21st August 2006 Presentation Outline Technological Risk Categories

More information

CERA Module 1 Exam 2016

CERA Module 1 Exam 2016 CERA Module 1 Exam 2016 You can reach 90 points in total. 45 points are required in order to pass the exam. Good luck! Case study Filling the role of CRO Assume that you have been appointed CRO of the

More information

Zurich Hazard Analysis (ZHA) Introducing ZHA

Zurich Hazard Analysis (ZHA) Introducing ZHA Introducing ZHA March 8, 2019 21st Annual Master Property Program Annual Loss Control Workshop Michael Fairfield, CSP Zurich North America - Risk Engineering Introducing ZHA Objectives After this introduction,

More information

IAEA-TECDOC Risk informed regulation of nuclear facilities: Overview of the current status

IAEA-TECDOC Risk informed regulation of nuclear facilities: Overview of the current status IAEA-TECDOC-1436 Risk informed regulation of nuclear facilities: Overview of the current status February 2005 IAEA SAFETY RELATED PUBLICATIONS IAEA SAFETY STANDARDS Under the terms of Article III of its

More information

What will Basel II mean for community banks? This

What will Basel II mean for community banks? This COMMUNITY BANKING and the Assessment of What will Basel II mean for community banks? This question can t be answered without first understanding economic capital. The FDIC recently produced an excellent

More information

Predicting and Preventing Credit Card Default

Predicting and Preventing Credit Card Default Predicting and Preventing Credit Card Default Project Plan MS-E2177: Seminar on Case Studies in Operations Research Client: McKinsey Finland Ari Viitala Max Merikoski (Project Manager) Nourhan Shafik 21.2.2018

More information

Risk & uncertainty management in the context of auction models how to increase success

Risk & uncertainty management in the context of auction models how to increase success Risk & uncertainty management in the context of auction models how to increase success Raya Peterson K2 Management Offshoretage, 15 March 2017 Heiligendamm, Germany Outline K2 Management About us Risk

More information

The Frontier Line. Environmental, Social & Governance Survey. Thought leadership and insights from Frontier Advisors.

The Frontier Line. Environmental, Social & Governance Survey. Thought leadership and insights from Frontier Advisors. The Frontier Line Thought leadership and insights from Frontier Advisors Environmental, Social & Governance Survey December 2013 Natasha Kronouer is a Consultant working in our equities and governance

More information

FAQ SHEET - LAYERS OF PROTECTION ANALYSIS (LOPA)

FAQ SHEET - LAYERS OF PROTECTION ANALYSIS (LOPA) FAQ SHEET - LAYERS OF PROTETION ANALYSIS (LOPA) Acronyms and Abbreviations Used ANSI - American National Standards Institute IPL - Independent Protection Layer ISA - International Society for Automation

More information

APPLICATION OF LOPA AND SIL ASSESSMENT TO A NEW COMAH PLANT

APPLICATION OF LOPA AND SIL ASSESSMENT TO A NEW COMAH PLANT APPLICATION OF LOPA AND ASSESSMENT TO A NEW COMAH PLANT Jerry Mullins Principal Consultant, Abbott Risk Consulting, Manchester, UK High hazard industries such as those regulated by COMAH face a number

More information

What is Your SIS Doing When You re Not Watching? Monitoring and Managing Independent Protection Layers and Safety Instrumented Systems

What is Your SIS Doing When You re Not Watching? Monitoring and Managing Independent Protection Layers and Safety Instrumented Systems What is Your SIS Doing When You re Not Watching? Monitoring and Managing Independent Protection Layers and Safety Instrumented Systems Bill Hollifield Principal Alarm Management and HMI Consultant What

More information

RISK AND BUSINESS CONTINUITY MANAGEMENT

RISK AND BUSINESS CONTINUITY MANAGEMENT RISK AND BUSINESS CONTINUITY MANAGEMENT EFFECTIVE: 18 MAY 2010 VERSION: 1.4 FINAL Last updated date: 29 September 2015 Uncontrolled when printed 2 Effective: 18 May 2010 CONTENTS 1 POLICY STATEMENT...

More information

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS Guidance Paper No. 2.2.x INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS GUIDANCE PAPER ON ENTERPRISE RISK MANAGEMENT FOR CAPITAL ADEQUACY AND SOLVENCY PURPOSES DRAFT, MARCH 2008 This document was prepared

More information

DEVELOPING THE RISK APPETITE FRAMEWORK OF A LIFE INSURANCE BUSINESS

DEVELOPING THE RISK APPETITE FRAMEWORK OF A LIFE INSURANCE BUSINESS DEVELOPING THE RISK APPETITE FRAMEWORK OF A LIFE INSURANCE BUSINESS Paul Caputo, Joshua Corrigan, David Creaven and Meera Sardana (Life Risk Appetite Working Party) Working Party Members David Creaven,

More information

Subject ST4 Pensions and Other Employee Benefits

Subject ST4 Pensions and Other Employee Benefits Institute of Actuaries of India Subject ST4 Pensions and Other Employee Benefits For 2018 Examinations Subject ST4 Pensions and other Benefits Specialist Technical Syllabus Aim The aim of the Pensions

More information

Project Risk Management

Project Risk Management Project Risk Management Introduction Unit 1 Unit 2 Unit 3 PMP Exam Preparation Project Integration Management Project Scope Management Project Time Management Unit 4 Unit 5 Unit 6 Unit 7 Project Cost Management

More information

STANDARDISATION OF RISK ASSESSMENT PROCESS BY MODIFYING THE RISK MATRIX

STANDARDISATION OF RISK ASSESSMENT PROCESS BY MODIFYING THE RISK MATRIX STANDARDISATION OF RISK ASSESSMENT PROCESS BY MODIFYING THE RISK MATRIX C. S.SatishKumar 1, Dr S. Shrihari 2 1,2 Department of Civil Engineering National institute of technology Karnataka (India) ABSTRACT

More information

BERGRIVIER MUNICIPALITY. Risk Management Risk Appetite Framework

BERGRIVIER MUNICIPALITY. Risk Management Risk Appetite Framework BERGRIVIER MUNICIPALITY Risk Management Risk Appetite Framework APRIL 2018 1 Document review and approval Revision history Version Author Date reviewed 1 2 3 4 5 This document has been reviewed by Version

More information

European Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC SAF)

European Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC SAF) European Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC-02-2007-SAF) The Director, Having regard to the Directive 2004/49/EC 1 of the European Parliament, Having regard

More information

Master Class: Construction Health and Safety: ISO 31000, Risk and Hazard Management - Standards

Master Class: Construction Health and Safety: ISO 31000, Risk and Hazard Management - Standards Master Class: Construction Health and Safety: ISO 31000, Risk and Hazard Management - Standards A framework for the integration of risk management into the project and construction industry, following

More information

UNDERSTANDING RISK TOLERANCE CRITERIA. Paul Baybutt. Primatech Inc., Columbus, Ohio, USA.

UNDERSTANDING RISK TOLERANCE CRITERIA. Paul Baybutt. Primatech Inc., Columbus, Ohio, USA. UNDERSTANDING RISK TOLERANCE CRITERIA by Paul Baybutt Primatech Inc., Columbus, Ohio, USA www.primatech.com Introduction Various definitions of risk are used by risk analysts [1]. In process safety, risk

More information

Environmental impact methodology

Environmental impact methodology Environmental impact methodology For Australian wholesale investors only June 2016 second edition 1 Environmental impact methodology for the 2 Scope and reporting boundaries 3 Methodology 4 Exclusions

More information

Quality Risk Management from Concept to Practical Strategies*

Quality Risk Management from Concept to Practical Strategies* Quality Risk Management from Concept to Practical Strategies* H. Gregg Claycamp, Ph.D. Director Div. of Compliance Risk Management and Surveillance and Associate Director, CDER Office of Compliance gregg.claycamp@fda.hhs.gov

More information

There are many definitions of risk and risk management.

There are many definitions of risk and risk management. Definition of risk There are many definitions of risk and risk management. The definition set out in ISO Guide 73 is that risk is the effect of uncertainty on objectives. In order to assist with the application

More information

for the Oak Ridge Environmental Restoration Program Joyce L. Dail

for the Oak Ridge Environmental Restoration Program Joyce L. Dail -. \-- -_ ",TheBevelopment and Application of a Risk-based Prioritization Model *- DE%:2 8 19% for the Oak Ridge Environmental Restoration Program Joyce L. Dail University of Tennessee, Knoxville, Tennessee

More information

Presented to: Eastern Idaho Chapter Project Management Institute. Presented by: Carl Lovell, PMP Contract and Technical Integration.

Presented to: Eastern Idaho Chapter Project Management Institute. Presented by: Carl Lovell, PMP Contract and Technical Integration. Project Risk Management Tutorial Presented to: Eastern Idaho Chapter Project Management Institute Presented by: Carl Lovell, PMP Contract and Technical Integration March 2009 Project Risk Definition An

More information

The Concept of Risk and its Role in Rational Decision Making on Nuclear Safety Issues

The Concept of Risk and its Role in Rational Decision Making on Nuclear Safety Issues The Concept of Risk and its Role in Rational Decision Making on Nuclear Safety Issues George Apostolakis Head, Nuclear Risk Research Center apostola@criepi.denken.or.jp NRRC Symposium September 2, 1 1

More information

Job Safety Analysis Preparation And Risk Assessment

Job Safety Analysis Preparation And Risk Assessment Job Safety Analysis Preparation And Risk Assessment Sample Only Reference CPL_PCR_JSA_Risk_Assessment Revision Number SAMPLE ONLY Document Owner Sample Date 2015 File Location Procedure Revision Date Major

More information

Presented at the 2010 ISPA/SCEA Joint Annual Conference and Training Workshop -

Presented at the 2010 ISPA/SCEA Joint Annual Conference and Training Workshop - Abstract Risk Identification and Visualization in a Concurrent Engineering Team Environment Jairus Hihn 1, Debarati Chattopadhyay, Robert Shishko Mission Systems Concepts Section Jet Propulsion Laboratory/California

More information

Methodological and organizational problems of professional risk management in construction

Methodological and organizational problems of professional risk management in construction Methodological and organizational problems of professional risk management in construction Evgeny Sugak 1* 1 Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia

More information

Common Safety Methods CSM

Common Safety Methods CSM Common Safety Methods CSM A common safety method on risk evaluation and assessment Directive 2004/49/EC, Article 6(3)(a) Presented by: matti.katajala@safetyadvisor.fi / www.safetyadvisor.fi Motivation

More information

1 Scope and objectives

1 Scope and objectives 1 Scope and objectives 1.1 Introduction This chapter of the Report defines the scope. This includes what kinds of risk are covered, who the intended readers are and what, in broad terms, the Report seeks

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy Updated: April 2018 Date of next Review: April 2019 Policy Lead: Bursar Checked by: Middle Leadership Team 1. INTRODUCTION Beachborough School will have hazards which if not controlled

More information

Risk Workshop Session 1. Malcolm Leinster

Risk Workshop Session 1. Malcolm Leinster Risk Workshop Session 1 Malcolm Leinster Risk Workshop Team Ashfaque Chowdhury Olivia King-Strydom Matthew Le Lacheur Malcolm Leinster Kevin O Malley Introduction What is risk? Workshop Outline How can

More information

Defining the Safety Integrity Level of Public Safety Monitoring System Based on the Optimized Three-dimension Risk Matrix

Defining the Safety Integrity Level of Public Safety Monitoring System Based on the Optimized Three-dimension Risk Matrix Available online at www.sciencedirect.com Procedia Engineering ( ) 9 International Symposium on Safety Science and Engineering in China, (ISSSE-) Defining the Safety Integrity Level of Public Safety Monitoring

More information

PRINCE2 Sample Papers

PRINCE2 Sample Papers PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined

More information

Catastrophe Risk Engineering Solutions

Catastrophe Risk Engineering Solutions Catastrophe Risk Engineering Solutions Catastrophes, whether natural or man-made, can damage structures, disrupt process flows and supply chains, devastate a workforce, and financially cripple a company

More information

A Second Runway for Gatwick Appendix. A21 Programme Risk Management

A Second Runway for Gatwick Appendix. A21 Programme Risk Management A Second Runway for Gatwick Appendix A21 Programme Risk Management London Gatwick Airport Expansion Airport Commission Programme Risk Management Report Turner & Townsend 7 Savoy Court London WC2R 0EX

More information

RISK MANAGEMENT. Budgeting, d) Timing, e) Risk Categories,(RBS) f) 4. EEF. Definitions of risk probability and impact, g) 5. OPA

RISK MANAGEMENT. Budgeting, d) Timing, e) Risk Categories,(RBS) f) 4. EEF. Definitions of risk probability and impact, g) 5. OPA RISK MANAGEMENT 11.1 Plan Risk Management: The process of DEFINING HOW to conduct risk management activities for a project. In Plan Risk Management, the remaining FIVE risk management processes are PLANNED

More information

A.1 INFORMATION ON THE TOP FIVE EXECUTION VENUES

A.1 INFORMATION ON THE TOP FIVE EXECUTION VENUES ORDER PLACING PROFESSIONAL CLIENTS - DISCLOSURE OF TOP FIVE EXECUTION VENUES AND QUALIT OF EXECUTION OBTAINED A.1 INFORMATION ON THE TOP FIVE EXECUTION VENUES Class of Instrument Equities Shares & Depositary

More information

ALFI response to ESMA s Discussion Paper on UCITS share classes

ALFI response to ESMA s Discussion Paper on UCITS share classes Luxembourg, 27 March 2015 ALFI response to ESMA s Discussion Paper on UCITS share classes General Remarks The Association of the Luxembourg Fund Industry (ALFI) is the representative body of the Luxembourg

More information

Objectives. What is Risk? But a Plan is not Reality. Positive Risks? What do we mean by Uncertainty?

Objectives. What is Risk? But a Plan is not Reality. Positive Risks? What do we mean by Uncertainty? Objectives RISK MANAGEMENT What is risk? Why should risk be managed? How do we identify risk? How do we manage risk? What is Risk? Definition: An uncertain event or condition that, if it occurs, has a

More information

Risk & Analytics. Trends within Insurance Companies Risk Management. Marc Paasch June Willis Towers Watson. All rights reserved.

Risk & Analytics. Trends within Insurance Companies Risk Management. Marc Paasch June Willis Towers Watson. All rights reserved. Risk & Analytics Trends within Insurance Companies Risk Management Marc Paasch June 2017 2017 Willis Towers Watson. All rights reserved. Key drivers & benefits Outcomes from an analytical approach to own

More information

WHITE PAPER FOUR PRACTICAL WAYS TO CAPTURE AND MONITOR RISK APPETITE

WHITE PAPER FOUR PRACTICAL WAYS TO CAPTURE AND MONITOR RISK APPETITE WHITE PAPER FOUR PRACTICAL WAYS TO CAPTURE AND MONITOR RISK APPETITE 90 CAPTURE AND MONITOR RISK APPETITE 2 FOUR PRACTICAL WAYS TO CAPTURE AND MONITOR RISK APPETITE Many organisations are grappling with

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 16/9/16 (Information paper) English and Spanish only 1 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 33: Aviation safety and air navigation

More information

Common Safety Method (CSM) for risk assessment (Regulations 352/2009 & 402/2013)

Common Safety Method (CSM) for risk assessment (Regulations 352/2009 & 402/2013) Common Safety Method (CSM) for risk assessment (Regulations 352/2009 & 402/2013) inland transport of dangerous goods - Lille, 8-9 th October 2013 E-mail: CSM.risk_assessment@era.europa.eu Slide n 1 Introduction

More information

OVERVIEW OF DETAILED APPRAISAL PROCESS

OVERVIEW OF DETAILED APPRAISAL PROCESS Section 3 OVERVIEW OF DETAILED APPRAISAL PROCESS 3.1 Introduction The detailed appraisal stage aims to provide a basis for a decision on whether to proceed with a project in principle or not. It includes

More information

Risk Based Approaches for Levees in the U.S. and Abroad: Lessons for the NFIP

Risk Based Approaches for Levees in the U.S. and Abroad: Lessons for the NFIP Proud Platinum Sponsor of the ASFPM 2017 Annual Conference Risk Based Approaches for Levees in the U.S. and Abroad: Lessons for the NFIP Mike Seering (AECOM) David Powers (HR Wallingford) ASFPM 2017 Annual

More information

PRINCE2 Sample Papers

PRINCE2 Sample Papers PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined

More information

ALARP Guidance Part of the Petroleum Safety Framework and the Gas Safety Regulatory Framework

ALARP Guidance Part of the Petroleum Safety Framework and the Gas Safety Regulatory Framework ALARP Guidance Part of the Petroleum Safety Framework and the Gas Safety Regulatory Framework DOCUMENT TYPE: Policy Proposal Document REFERENCE: CER/15/212 DATE PUBLISHED: 6 October 2015 VERSION 3.0 QUERIES

More information

METHODOLOGY For Risk Assessment and Management of PPP Projects

METHODOLOGY For Risk Assessment and Management of PPP Projects METHODOLOGY For Risk Assessment and Management of PPP Projects December 26, 2013 The publication was produced for review by the United States Agency for International Development. It was prepared by Environmental

More information

Fonds de Compensation FDC SICAV Obligations EUR Actif 3

Fonds de Compensation FDC SICAV Obligations EUR Actif 3 Fonds de Compensation FDC SICAV Obligations EUR Actif 3 Sustainable Approach March 2018 Amundi Sustainable Approach Sustainable and Responsible Investing has been a long standing and essential part of

More information

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone:   Last revised: for the Prepared by: Title: Address: Phone: E-mail: Last revised: Document Information Project Name: Prepared By: Title: Reviewed By: Document Version No: Document Version Date: Review Date:

More information

Business Auditing - Enterprise Risk Management. October, 2018

Business Auditing - Enterprise Risk Management. October, 2018 Business Auditing - Enterprise Risk Management October, 2018 Contents The present document is aimed to: 1 Give an overview of the Risk Management framework 2 Illustrate an ERM model Page 2 What is a risk?

More information

ORSA An International Development

ORSA An International Development ORSA An International Development 25.02.14 Agenda What is an ORSA? Global reach Comparison of requirements Common challenges Potential solutions Origin of ORSA FSA ICAS Solvency II IAIS ICP16 What is an

More information

Procedure: Risk management

Procedure: Risk management Procedure: Risk management Purpose To outline the procedures involved for identification, assessment and management of risks. Procedure Introduction 1. This procedure outlines the University s Risk Awareness

More information

The Approach of a Regulatory Authority to the Concept of Risk

The Approach of a Regulatory Authority to the Concept of Risk The Approach of a Regulatory Authority to the Concept of Risk by H.J. Dunster Risk is a poorly defined term and is commonly used in at least two quite different ways. I shall use risk in a qualitative

More information

The basics of verification. Richard Nott Lloyd s Register EMEA

The basics of verification. Richard Nott Lloyd s Register EMEA The basics of verification Richard Nott Lloyd s Register EMEA Introductions Richard Nott Manager, Compliance and Engineering Services Lloyd s Register EMEA Agenda The Offshore Installation (Safety Case)

More information

Integrating Contract Risk with Schedule and Cost Estimates

Integrating Contract Risk with Schedule and Cost Estimates Integrating Contract Risk with Schedule and Cost Estimates Breakout Session # B01 Donald E. Shannon, Owner, The Contract Coach December 14, 2015 2:15pm 3:30pm 1 1 The Importance of Estimates Estimates

More information

Connecting Risk and Levels of Service at the Region of Peel BY LEANNE BRANNIGAN, THE REGION OF PEEL

Connecting Risk and Levels of Service at the Region of Peel BY LEANNE BRANNIGAN, THE REGION OF PEEL TANGIBLE CAPITAL ASSETS Photo: Kai Schreiber Connecting Risk and Levels of Service at the Region of Peel BY LEANNE BRANNIGAN, THE REGION OF PEEL Organizational asset management for municipalities is very

More information

Uncertainty aspects in process safety analysis

Uncertainty aspects in process safety analysis Uncertainty aspects in process safety analysis A.S. Markowski*,M.S. Mannan**, A.Bigoszewska* and D. Siuta* *Process and Ecological Safety Division Faculty of Process and Environmental Engineering Technical

More information

AACE Chinook Dinner Meeting Calgary, Alberta, Canada Projects, Risks and Contingency

AACE Chinook Dinner Meeting Calgary, Alberta, Canada Projects, Risks and Contingency AACE Chinook Dinner Meeting Calgary, Alberta, Canada Projects, Risks and Contingency Riskcore Calgary March 2017. Quotes He who is not courageous enough to take risks will accomplish nothing in life The

More information

ก ก Tools and Techniques for Enterprise Risk Management (ERM)

ก ก Tools and Techniques for Enterprise Risk Management (ERM) ก ก Tools and Techniques for Enterprise Risk Management (ERM) COSO ERM ISO ERM 31 2554 10:45 12:15.. 301, 302, 307 ก ก COSO Internal Control ERM Integrated Framework Application Technique ISO 31000 Guide

More information

REPORT ON THE RESULTS OF THE INFLATION EXPECTATION SURVEY July 2017

REPORT ON THE RESULTS OF THE INFLATION EXPECTATION SURVEY July 2017 REPORT ON THE RESULTS OF THE INFLATION EXPECTATION SURVEY July 217 Belgrade, August 217 C O N T E N T S Introductory note... 3 Summary... 4 Inflation expectations of the financial sector... 5 Inflation

More information

PENSIONS TECHNICAL ACTUARIAL STANDARD

PENSIONS TECHNICAL ACTUARIAL STANDARD PENSIONS TECHNICAL ACTUARIAL STANDARD PENSIONS TAS Status This standard (the Pensions TAS) is a Specific Technical Actuarial Standard (Specific TAS), as defined in the Scope & Authority of Technical Standards

More information

Quantitative Risk Analysis with Microsoft Project

Quantitative Risk Analysis with Microsoft Project Copyright Notice: Materials published by ProjectDecisions.org may not be published elsewhere without prior written consent of ProjectDecisions.org. Requests for permission to reproduce published materials

More information

client user GUIDE 2011

client user GUIDE 2011 client user GUIDE 2011 STEP ACTION Accessing Risk Register 1. Type https://www.scm rms.ca/riskregister/login.aspx 2. Click in the Username field on the Risk Register home page. 3. Type your Username and

More information

Crowe, Dana, et al "EvaluatingProduct Risks" Design For Reliability Edited by Crowe, Dana et al Boca Raton: CRC Press LLC,2001

Crowe, Dana, et al EvaluatingProduct Risks Design For Reliability Edited by Crowe, Dana et al Boca Raton: CRC Press LLC,2001 Crowe, Dana, et al "EvaluatingProduct Risks" Design For Reliability Edited by Crowe, Dana et al Boca Raton: CRC Press LLC,2001 CHAPTER 13 Evaluating Product Risks 13.1 Introduction This chapter addresses

More information

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com

More information

Quality Control & Compliance Initiative. This document is publicly available to any staff member on the following network path:

Quality Control & Compliance Initiative. This document is publicly available to any staff member on the following network path: Quality Control & Compliance Initiative RISK ASSESSMENT Author: Phonovation Quality Control Group Gavin Carpenter Effective Date: 20 th Nov 2013 Revised: 20 th Jan 2015 Revised by: To: Pedro Quintas All

More information

CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY GROUP RISK AND ASSURANCE SERVICES GROUP RISK MANAGEMENT POLICY

CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY GROUP RISK AND ASSURANCE SERVICES GROUP RISK MANAGEMENT POLICY CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY Effective Date 1 July 2015 TABLE OF CONTENTS 1. POLICY STATEMENT... 3 2. POLICY CONTEXT... 4 3. PURPOSE... 5 4. POLICY SCOPE AND APPLICATION... 6 5. RISK

More information

Final draft RTS on the assessment methodology to authorize the use of AMA

Final draft RTS on the assessment methodology to authorize the use of AMA Management Solutions 2015. All rights reserved. Final draft RTS on the assessment methodology to authorize the use of AMA European Banking Authority www.managementsolutions.com Research and Development

More information

Using Monte Carlo Analysis in Ecological Risk Assessments

Using Monte Carlo Analysis in Ecological Risk Assessments 10/27/00 Page 1 of 15 Using Monte Carlo Analysis in Ecological Risk Assessments Argonne National Laboratory Abstract Monte Carlo analysis is a statistical technique for risk assessors to evaluate the uncertainty

More information

Department of Energy s

Department of Energy s Department of Energy s An Introduction to Current Practices at DOE James O Brien DOE / HSS Workshop on Risk Assessment and dsafety Decision i Making Under Uncertainty t September 2010 DOE Nuclear Safety

More information

Risk Management Framework. Group Risk Management Version 2

Risk Management Framework. Group Risk Management Version 2 Group Risk Management Version 2 RISK MANAGEMENT FRAMEWORK Purpose The purpose of this document is to summarise the framework which Service Stream adopts to manage risk throughout the Group. Overview The

More information

Disaster Risk Finance Analytics Project

Disaster Risk Finance Analytics Project Disaster Risk Finance Analytics Project Development of core open source Disaster Risk Finance quantitative tools Terms of Reference 1. Background Developing countries typically lack financial protection

More information

CAPITAL STRUCTURE AND RETURN ON EQUITY

CAPITAL STRUCTURE AND RETURN ON EQUITY Filed: 0-0- EB-0-000 Page of 0 CAPITAL STRUCTURE AND RETURN ON EQUITY.0 PURPOSE This evidence describes the methodology that OPG has used to determine its capital structure and return on equity ( ROE )

More information

FRBSF ECONOMIC LETTER

FRBSF ECONOMIC LETTER FRBSF ECONOMIC LETTER 2010-19 June 21, 2010 Challenges in Economic Capital Modeling BY JOSE A. LOPEZ Financial institutions are increasingly using economic capital models to help determine the amount of

More information

Project Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP

Project Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP Project Management for the Professional Professional Part 3 - Risk Analysis Michael Bevis, JD CPPO, CPSM, PMP What is a Risk? A risk is an uncertain event or condition that, if it occurs, has a positive

More information