THE CROWN CORPORATIONS PUBLIC REVIEW AND ACCOUNTABILITY ACT July 28, G. Lane C.A., Chair R. Mayer Q.C., Vice-Chair L.

Size: px
Start display at page:

Download "THE CROWN CORPORATIONS PUBLIC REVIEW AND ACCOUNTABILITY ACT July 28, G. Lane C.A., Chair R. Mayer Q.C., Vice-Chair L."

Transcription

1 MANITOBA THE PUBLIC UTILITIES BOARD ACT THE MANITOBA HYDRO ACT THE CROWN CORPORATIONS PUBLIC REVIEW AND ACCOUNTABILITY ACT July 28, 2004 Before: G. Lane C.A., Chair R. Mayer Q.C., Vice-Chair L. Evans, Member AN ORDER IN RESPECT OF AN APPLICATION BY MANITOBA HYDRO FOR INCREASED RATES WITH FURTHER DIRECTIVES AND REASONS TO FOLLOW

2 Page 1 Table of Contents Page 1.0 INTRODUCTION BACKGROUND APPLICATION TWO-STAGE ORDER KEY INFORMATION 8 DROUGHT REVENUE REQUIREMENT FINANCIAL TARGETS COST OF SERVICE DEMAND SIDE MANAGEMENT BOARD FINDINGS REVENUE REQUIREMENT AND GENERAL RATES CUSTOMER CLASS RATES RATE STRUCTURE FINANCIAL TARGETS COST OF SERVICE STUDY DEMAND SIDE MANAGEMENT FUTURE STUDY SURPLUS ENERGY AND CURTAILABLE RATES PROGRAMS CONCLUDING REMARKS OTHER FINDINGS IT IS THEREFORE ORDERED THAT:.. 36 SCHEDULE A APPENDICES APPEARANCES.... A WITNESSES FOR HYDRO... B INTERVENORS OF RECORD..C INTERVENOR WITNESSES D CAC/MSOS MIPUG TREE/RCM PRESENTERS E

3 Page Introduction The increase in consumers rates sought in the General Rate Application of Manitoba Hydro (MH or the Corporation) was influenced by the highest loss ever experienced by a Manitoba Crown Corporation. The loss arose as a result of a severe drought that reduced power generation and export potential. The financial effects of the drought were first felt in 2002/03 in reduced net income, and more fully realized in fiscal 2003/04 with MH incurring a loss in excess of $400 million. The financial impact extended into fiscal 2004/05, with a reported loss of $33 million in MH s first quarter. The drought s impact on the Corporation s retained earnings, and a related and increased realization by The Public Utilities Board (the Board) of the financial and operating risks faced by MH, were the primary factors contributing to the Board s decision to grant MH rate increases, as outlined in this Order. As a result of the proceedings leading to this Order, the Board is more fully apprised of the importance of, and relationship among, water storage and flow levels, natural gas prices, and American wholesale electricity pricing to MH s financial situation and rates. MH is Manitoba s largest and oldest provincial Crown Corporation. It is an integrated energy company, providing electricity and natural gas to approximately 500,000 and 250,000 electricity and gas customers, respectively. In recent years, MH acquired Centra Gas Manitoba Inc. and Winnipeg Hydro, and integrated these operations with those of its pre-existing electric operations. The Corporation operates fourteen hydroelectric, two thermal and four remote diesel generating stations, and has plans for additional hydroelectric generation and transmission.

4 Page 3 MH s consolidated annual revenues exceed $1.75 billion, with the majority of its revenues coming from Manitoba s residential, commercial and industrial electricity customers. The Corporation is also involved in the export and import of power. MH s assets approach $10 billion at historical depreciated cost, and the Corporation is one of Manitoba s largest employers with a personnel complement forecast to approach 6,000 employees. MH is administered through a Board of Directors appointed by the Lieutenant Governor-in- Council, and is funded not only by revenue from energy sales but also from borrowings guaranteed by the Province. These borrowings, which the Corporation services from operating income, enable the Corporation to develop generating, transmission and distribution capacity. This capacity is required to provide reliable service to the Corporation s Manitoba and export customers. Because MH is a capital intensive utility, many of its costs are fixed for the medium to long term. Consistent with the importance of MH to Manitoba, there is considerable oversight of its operations. MH is subject to the direction and/or oversight of the legislature, the Government of Manitoba, its Board of Directors, Crown Corporations Council, The Public Utilities Board and currently, the Clean Environment Commission. Two members of the Public Utilities Board sit on the Clean Environment Commission, in its hearing on the proposed Wuskwatim generating station and transmission project.

5 Page 4 MH s annual revenue requirement (the sum required to fund its operations and provide for its risks) and rates are subject to the approval of The Public Utilities Board. With respect to its electricity operations, MH has a significant involvement in and reliance on export energy sales, with Manitoba consumers rates benefiting from export profitability. The Corporation prices its electrical sales to Manitoba customers using a methodology based on cost, which is usually not representative of the market value for energy in North America. 2.0 Background MH last appeared before the Board seeking a rate increase in 1996; average increases in Consumers General Rates were approved of 1.5% effective April 1, 1996 and a further 1.3% effective April 1, Six years passed before the Corporation returned to appear before the Board. In 2002, MH provided the Board with an update of its situation, financial forecasts, costing methodologies, processes and other matters. On February 3, 2003, the Board issued Order 7/03, arising out of the 2002 Status Update Filing. This Order, among other directives, required MH to file a revised Schedule of Rates to be effective April 1, The Board directed rate decreases of 2.0% for the General Service Large Classes served at greater than 30 kv, and 1.0% for the General Service Small Class. The rationale for the decreases was the then recent positive economic returns experienced by the Corporation and an indication that the classes for which rate decreases were granted had been levied rates that were higher than were justified by the Corporation s rate-setting methodology.

6 Page 5 On March 19, 2003, concerned with financial loss development related to a drought that began subsequent to the 2002 Update hearing, the Corporation filed an Application pursuant to subsection 44(3) of The Public Utilities Board Act, asking the Board to rescind the rate decreases. By Order 154/03 of October 31, 2003, in the absence of an amended rate setting methodology and with the developing financial losses having been realized after the 2002 hearing had occurred, the Board upheld its decisions regarding rate decreases. It also reduced the winter ratchet from 80% to 70%, and addressed other issues brought forward by Corporation. Board Order 01/04 of January 6, 2004 confirmed the direction, resulting in a reduction in Annual General Consumer Revenue of approximately $6.5 million. Since MH s 2002 Status Update filing, MH has faced a series of challenges. These included the integration of Winnipeg Hydro, negotiation of a coordination agreement with the Midwest Independent System Operator ( MISO ), related to the Corporation s export and import of power to and from the United States, and contract renewals with its five staff bargaining Units. And, as indicated and more importantly for the purposes of this Order, the Corporation also suffered through a drought, an event resulting in an operating loss for the fiscal year ended March 31, 2004 in the range of $400 to $430 million.

7 Page Application On January 29, 2004, MH filed an application ( the Application ) with the Board for an Order pursuant to The Crown Corporations Public Review & Accountability Act and Manitoba Hydro Act. The Application sought: (a) Approval of electricity rate increases to be effective as of April 1, 2004 and The proposed rates were projected to result in an annual aggregate revenue increase of approximately $28 million (3.0%) for the fiscal year April 1, 2004 to March 31, 2005, and an additional revenue increase of $24 million or 2.5% for the fiscal year April 1, 2005 to March 31, MH also sought differentiated rate increases by customer class, and a further upward adjustment of those 2004/05 increases to raise the overall 3% revenue increase requested for the fiscal year over the remainder of the fiscal year. This was to compensate for the fact that the Board s Order was not expected until well into 2004/05. MH opined that the 3.0% and 2.5% increases requested, an accumulated noncompounded average rate increase of 5.5% over two years, represented the minimum rate increases prudence required. (b) Final approval of interim approved ex parte Orders issued since January 15, 2003 relating to the Curtailable Rate Program, Surplus Energy Program and Order 153/03, which deals with various rate matters. (c) Extension of the Surplus Energy Program Terms and Conditions to March 31, 2007.

8 Page 7 As indicated, the revenue increases applied for were differentiated by customer class, as follows: Class 2004/ /06 Residential 4.01% 3.51% General Service Small Non-Demand 2.15% 1.52% General Service Small Demand 2.09% 1.49% General Service Medium 2.57% 2.11% General Service Large <30 kv 4.00% 3.50% General Service Large kv 2.11% 1.50% General Service Large >100 kv 1.95% 1.47% Area and Roadway Lighting 2.03% 1.51% Overall General Revenue Increase Average 3.00% 2.50% And, as indicated, the rates sought for fiscal 2004/05 were to be adjusted upwards to compensate for the fact that the Board s Order was not expected until well into the fiscal year. The hearing extended over thirteen days, and involved five active Intervenors representing seven ratepayer constituencies, and three independent expert witnesses. The Board was assisted by Counsel from Fillmore Riley, professional accountants from PricewaterhouseCoopers and a professional engineer from Dillon Consulting. 4.0 Two-Stage Order In recognition of the deterioration of the Corporation s fiscal situation arising out of the recent drought, the Board will issue its decisions arising out of the Corporation s General Rate Application in two parts. By this approach, the Board reflects its desire to bring about a timely increase in MH s revenue.

9 Page 8 Accordingly, this Order provides direction on the rates to be implemented August 1, 2004, and conditionally provides for two subsequent rate increases. It also indicates the Board s direction with respect to certain other significant matters. The second Order will follow at a later date, and provide further rationale for the Board s directives regarding rates, as well as direction with respect to certain outstanding matters arising out of the Application. Among the topics to be addressed in the second Order will be the issues related to Outstanding Board Directives, Revenue Requirement, Cost of Service Studies, Financial Targets, Demand Side Management, Rate Structures, the Surplus Energy Program, the Curtailable Rates Program, the positions taken by Intervenors and Presenters, and other matters examined during the hearing. 5.0 Key Information 5.1 Drought Prior to this Application, MH had not sought a rate increase since 1997; favourable export revenues had more than offset increased operating costs. Net income levels had been very good, providing support for two important acquisitions and a special payment or dividend to the Province. However, beginning in the fall of 2002, and particularly in the 2003/04 fiscal year, the Corporation sustained severe financial losses due to drought, making it unable to meet its future revenue requirements without rate increases.

10 Page 9 The drought significantly increased MH s need to import power, reduced export sales, and drove its net income into a deficit position while depressing retained earnings. Although the spring and summer of 2002 may have experienced sufficient rainfall in most parts of southern Manitoba for some purposes, there were insufficient amounts of water runoff to fill MH s storage reservoir system of lakes and rivers. Overall water supplies over large portions of the Churchill/Nelson River basin fell in the fall and winter of 2002/03 to lows that, on average, were expected by MH to occur only once in every 50 years. Going into the winter of 2003/04, reservoirs were at or near historic lows. While the entire watershed was not in a similar drought condition, the overall water storage situation was in a state experienced only once before in the last thirty years. This reduced MH s generating capacity and, eventually impacted on its financial situation. The drought reversed the Corporation s progress towards achievement of its financial targets. The Corporation s Integrated Financial Forecast projected that even with the increases sought through these proceedings, and further annual rate increases in the range of 2.5% through to and including fiscal 2013/14, the Corporation would not reach its targeted debt to equity ratio. In summary, the financial effects of the drought were felt in 2002/03 through reduced net income, in 2003/04 with a net loss in excess of $400 million, and continued into 2004/05 depressing MH s first quarter results. Despite the advantages of MH s ability to sell export power, the experience of fiscal 2003/04 confirms the Corporation s vulnerability to the whims of nature, general economic circumstances, and, the fluctuations of the wholesale electricity market.

11 Page 10 MH has estimated that a repeat of the worst drought on record, would cost MH at least $2 billion. (The drought of was the third worst on record.) With minimal cash reserves, MH would have to increase its borrowings to meet such a loss, and the additional financing charges would increase the cost of such a drought by a further $200 million. Droughts of this severity are statistically predictable events. Based solely on Lake Winnipeg inflow records, it would appear that comparable, or worse, droughts took place in , , , , and The drought resulted in significantly increased imported power costs to meet domestic load and export commitments. Import prices rose as MH became an importer, with increased American demand and rising natural gas prices, further depressing net export income. The drought followed the lowering of water storage levels to seize profitable export sales opportunities in the fall of 2002, a decision that improved the Corporation s profitability in fiscal 2002/03 but, in hindsight and though understandable, proved expensive. Generating and selling storage water in 2002 meant MH has less water to meet 2003/04 domestic and export commitments from Manitoba generation, and had to import additional power to meet those commitments and ensure domestic reliability. In 2003/04, the Corporation imported far more power than it has ever had to before. In one year, the Corporation spent more on imported power than it had in the previous ten. As a result of lower water storage levels in 2002, MH entered the winter of 2002/03 with well below optimal water levels and was unable to recover until very recently.

12 Page 11 On a net basis, export/import operations moved from the substantial profits of recent years to a significant loss. At the hearing, the Corporation displayed that it had learned from this experience, a time portrayed as the perfect storm (drought, high natural gas prices, high import prices, and low water storage). It is anticipated that some new insight was gained into the following:! Low snowfall accumulation usually is a precursor to a drought! Significant snowfall accumulation does not necessarily preclude a drought! High energy prices can be a blessing if hydro generation is high! High energy prices can be a curse if hydro generation is low! Energy shortages may have high on-peak and high off peak export price consequences! Energy surpluses accompanied by high energy prices can be very profitable, while surpluses accompanied by low energy prices suggest caution in expanding export sales. The Corporation acted to protect Manitoba ratepayers and its retained earnings once it fully apprehended the situation. By its actions, it proved its commitment to domestic supply and reliability. It acted in the futures market to reduce its export delivery requirements, and, by so doing, prevented the 2003/04 loss from reaching $1 billion. MH engaged in forward purchases of imported power and buybacks of contracted export sales. By taking these and other steps, MH avoided having to pay ten cents a kilowatt hour and higher prices related to MH becoming a major importer of energy, rather than exporter. MH did not have to resort to its even higher priced thermal generation (gas) to satisfy domestic and firm export loads.

13 Page 12 MH substantially curtailed its export sales to firm commitments in the second half of 2003/04, when off-peak on-peak trading ceased being economically advantageous. The Corporation has also increased its staffing for export trading operations, and engaged an independent expert to survey its approach to drought. The criteria MH used for export sales, after it realized the extent of the drought and the export pricing situation, curbed unprofitable energy sales after August Its risk mitigation actions minimized unfavourable energy trading losses, and allowed the Corporation to retain in storage enough water to guard against the risk that the drought would continue into 2004/05. Through all of this, energy reliability to Manitobans and firm export commitments was maintained. Notwithstanding the highly unfavourable experience of 2003/04, export sales over the longer term have been good for MH and its ratepayers. In fact, MH relies upon net export revenue to maintain below market rates for its domestic grid customers. Typically, only approximately 85% of MH s annual revenue requirement is met by domestic sales revenue (calculating net export revenue after an allocation of generation and transmission costs to export sales). Exports subsidize the rates of domestic grid customers. With the loss experience of 2003/04, MH s retained earnings are expected to fall from $1.17 billion as of March 31, 2003 to below $750 million as of March 31, MH s peak retained earnings level was $1.302 billion, reached as of March 31, By the conclusion of this hearing, MH was able to indicate that it was reasonably confident that the recent drought is over, and forecast that, if the rate increases sought were granted, it would

14 Page 13 meet its 2004/05 budgeted net income of $40 million. However, there is no guarantee unfavourable circumstances can be avoided. Precipitation levels could decrease again, leading to additional financial problems. While such a recovery from a loss of in excess of $400 million would be welcome, a net income of $40 million largely attributable to a rate increase is minimal for a Corporation with assets of approximately $10 billion. 5.2 Revenue Requirement MH s rate requests are based on forecast revenue requirements, and represent the Corporation s projections of how much additional revenue it requires from its customers to meet expenses and build sufficient reserves to provide for its operating risks. Consumers Association of Canada (Manitoba) Inc. and Manitoba Society of Seniors Inc. (CAC/MSOS), an Intervenor representing residential customers, challenged MH s contention that it required additional rate-related revenues of $28 million for 2004/05. CAC/MSOS submitted that an $11 million arithmetical error was included in the 2003 Integrated Financial Forecast, and suggested that the error and an ongoing annual pension expense savings in the order of $5 million had not been incorporated into the forecast. This Intervenor argued the 2004/05 revenue requirement and rate increase should be significantly reduced for 2004/05. MH did not dispute the CAC/MSOS contention, but indicated that only $3.5 million of the savings would reduce the annual cost of operations.

15 Page 14 As well, the Corporation suggested that any reduction to forecast revenue requirements related to the matters raised by CAC/MSOS would be offset by other cost pressures. In short, the Corporation stood by its submission that an additional $28 million in rate-related revenue was required for fiscal 2004/ Financial Targets In recent years, a number of major events changed the financial position of MH: a) Centra Gas Manitoba Inc. and Winnipeg Hydro were acquired during the period, and both acquisitions were funded by debt; b) Similar to other jurisdictions with Crown owned utilities, a special payment or dividend was paid to the Province, after the Corporation had enjoyed a series of years of increasing net income results and export revenue gains, with no drought on the horizon; c) Interest in pursuing additional new generation and transmission developed; and d) A major drought deteriorated the retained earnings and debt:equity ratio. While the acquisitions and plans improved MH s operational prospects, they also impacted on the Corporation s debt:equity ratio. The payment to the Province, though having justification given the good results of prior years, also had that effect. In the two fiscal years before the dividend was announced, MH s export revenues and net income were the highest in the Corporation s history, and far above MH s average net income. In fiscal 2000/01 and 2001/02 MH reported net income of $270 million and $214 million respectively. By contrast MH s current forecast of net income anticipates annual net income

16 Page 15 levels below $100 million through to 2009/10, despite projected annual consumer rate increases through that period. The drought made it more difficult to achieve MH s debt:equity target of 75:25 within the ten-year forecast period. By itself, the loss associated with the drought pushed back the date of realizing a 75:25 debt:equity ratio by several years. 5.4 Cost of Service The Cost of Service Study (COSS) is a tool used by the Corporation to assist in evaluating and setting rates for each customer class. The COSS analyzes the components of MH s revenues and costs, and makes allocations to the various customer classes. The intent of the COSS is to evaluate the relative fairness of rates between customer classes. Revenue to Cost Coverage Ratios (RCC) are determined from the COSS, and indicate the proportion of costs recovered from the revenue arising from each customer class. A Zone of Reasonableness (ZOR) concept has been developed to assist in evaluating the RCC ratios. Customer classes having RCC ratios that are between 95% and 105% of allocated costs are deemed to have average rates that are within the zone of reasonableness. In short, as long as a particular customer class has a ZOR between 95 and 105, it is considered to be reasonably fairly assessed relative to the other classes. The Corporation uses this methodology in developing its recommended rates. However, as the Corporation had not sought a rate increase for many years, seven for the residential class, twelve for the industrial classes, a fairly wide range of RCCs has developed, bringing into question the

17 Page 16 fairness of customer class rates relative to other customer class rates. (The loss experienced in 2003/04 was very large, and if it were distributed to the various customer classes pursuant to the current Cost of Service methodology no customer class would have an adequate revenue to cost ratio.) That being said, COSS involves a number of debatable allocation and forecasting procedures, and its value depends in large part on the all aspects of the COSS making sense, and being accepted by the Corporation, the customer classes and the Board. MH filed COSS data incorporating most of the Board Directives from Order 7/03. However, Winnipeg Hydro financial, customer and load data was not fully incorporated. The Corporation had some concerns with respect to the incorporation of Winnipeg Hydro data into its COSS model. One of the concerns related to the application of load research results from the rest of the system to the former Winnipeg Hydro customer base, and another difficulty experienced related to the allocation of direct costs to the Area and Roadway Lighting customer class for the former Winnipeg Hydro s territory. As well, the current COSS methodology does not include an Export Class, which was discussed in Board Order 7/03. With export sales and related imports representing a significant business area of operation, there is a strong argument for this business segment to be considered a customer class for COSS modelling purposes. When the export class is established and the other amendments to the COSS model effected, the Board anticipates that the methodology will arrive at significantly different revenue to cost ratios

18 Page 17 for the customer classes. Again, and in combination with the effects of the drought, this supports an across-the-board increase for August 1, 2004, rather than rate increases differentiated by customer class. With respect to export sales from existing generating and transmission assets, the Board recognizes that entering into short term export sales contracts on the basis of immediate incremental revenue potential represents the appropriate response. In short, the assessment of the value of an immediate export sale opportunity should take into account only incremental costs and revenues. Included in the evidence in the GRA, MH filed a 2004 report by National Economic Research Associates (NERA) titled Classification and Allocation Methods for Generation and Transmission in Cost of Service Studies (the NERA Report). The report reviews alternative methodologies and provides recommendations for amendments to the COSS methodology. MH did not revise its Application to reflect the recommendations of the NERA report, though it did provide some modelling of its effects. The Corporation and the Intervenors, in a view shared by the Board, agreed that the Cost of Service methodology is in a state of flux, and that NERA s recommendations require further consideration, analysis and review. A comparison prepared by MH of the RCC s based on MH s proposed Cost of Service Study and the NERA Report follows:

19 Page 18 Class RCC Existing Methodology March 31, 2004 RCC Reflecting the NERA Report March 31, 2004 Residential 90.6% 93.8% General Service Small Non Demand 104.9% 108.1% General Service Small Demand 109.7% 110.2% General Service Medium 104.8% 103.5% General Service Large 0-30 kv 99.9% 96.6% General Service Large kv 109.5% 101.3% General Service Large > 100kV 113.8% 106.8% General Service Large > 100kV Curtailed 114.6% 107.9% Interruptible 94.2% 97.1% Area and Roadway Lighting 108.9% 110.8% Diesel 38.3% 54.9% The above representation of NERA Report does not reflect the cost of uniform rates being made a first charge against net export revenue, nor the division of generation costs between low and high cost generation as suggested by the Intervenors. The Table does not reflect the formulation of net export revenues on a five year rolling average. With respect to assessing the value of export sales, and utilizing the net benefit arising out of export and import activities in determining Manitoba-based customer class rates, the NERA model proposes an export class, with that class to be allocated export associated costs. Costs associated with export activities include generation, transmission, operating, maintenance and administrative costs, water rentals and capital taxes. Contrary to a position taken at the Status Update Hearing, MH indicated support for the concept of an export class, as did a number of the Intervenors. The Board is of the view that without an export class, and the assigning of appropriate revenues and costs to it, and in the absence of a

20 Page 19 reasonable method of allocating the net income arising out of export activities, the COSS and its development of customer class RCCs is suspect. Furthermore, there is the potential conflict between arithmetically driven decisions and public policy directives. CAC/MSOS contended that the existing COSS methodology, which assigns virtually the full $14 million cost of the uniform rate policy, implemented through legislation, to residential customers, is inappropriate and was neither the intent of the Legislature nor the Government. CAC/MSOS proposed that the cost associated with a uniform residential rate for grid customers throughout Manitoba be considered a first charge against net export income. In that way, all customer classes would bear a portion of the cost of this public policy initiative. Other suggestions with respect to the COSS methodology were discussed at the hearing. Time to Respect Earth s Ecosystems/Resource Conservation Manitoba (TREE/RCM) opined that the allocation of generation and transmission costs should be further governed by an accounting convention, one that would assign the higher cost of newer and more costly generation and transmission assets to the export class. TREE/RCM expressed the view that this would ensure that domestic ratepayers benefited from lower cost generation assets, and that the marginal costs associated with export sales generation would be more properly assigned to export activities. 5.5 Demand Side Management Efforts to enhance the efficiency of the use of electricity in Manitoba, connoted as Demand Side Management ( DSM ), have proved reasonably successful to-date.

21 Page 20 The reduced consumption of electricity arising out of DSM provides savings for residential and commercial customers, and frees up Manitoba energy generation for export sales, which are primarily to the United States. While it was indicated at the hearing that the Corporation s current approach to DSM differs between its electricity-based and gas-based operations, MKO called for an integrated approach, one recognizing that customers avail themselves of various energy sources and that conservation and efficiency are useful objectives in all circumstances. The Corporation indicated during the Application proceedings that it was in the process of preparing a new plan to guide its DSM activities, and suggested that this new plan would call for further investments in DSM. Intervenors suggested that further review of and customer involvement in this plan was imperative, and the Corporation agreed. As well, TREE/RCM proposed and other Intervenors generally agreed that changing the pricing approach for electricity sales would likely enhance DSM effectiveness, to the benefit of all. Currently, pricing schedules provide for reduced rates as volumes increase. An alternate approach would have rates increasing with increasing volumes. Such an approach may address the risk of inefficient usage associated with rates set below marginal cost. It was recognized by all parties that an inverted rate schedule, whereby higher usage would bring higher rates and costs associated with that usage, required considerable study before being implemented. Though such an approach could be implemented on an overall revenue neutral

22 Page 21 basis, implications could range from higher bills for some customers to impacts on commercial and industrial activities. 6.0 Board Findings 6.1 Revenue Requirement and General Rates The Board accepts the CAC/MSOS comments with respect to arithmetical errors in MH s integrated financial forecast. Nonetheless, the Board accepts the overall forecast for net income for 2004/05 and 2005/06 provided by MH as being reasonable, having been based on macro assumptions. While the costs pointed out by CAC/MSOS may be over estimated, there may be offsetting items in the IFF. As well, the Board is of the view that there is a need for MH to rebuild retained earnings, particularly depressed as a result of the drought and required to meet on-going risks. The Board has reasonable confidence in MH s efforts to project expenses. That being said, one of the goals of the hearing process is to best ensure that such confidence in the Corporation s forecasting is also shared by the Intervenors. The Board finds that a more detailed examination of MH s cost experience and forecasts in future rate hearings would be in the public interest. The Corporation is engaged in a number of concurrent activities, projects and research initiatives, all requiring a substantial investment in personnel and consultants. Cognizant of the necessity for the Corporation to meet its challenges effectively, managing the export activities being a prime example, the Board is reluctant, in fact unable on the record of

23 Page 22 this proceeding, to provide critical judgement on the appropriateness of the current and projected departmental and functional personnel complement and cost levels. The Board acknowledges that it is not alone in its oversight of the Corporation, and that its jurisdiction is limited. Accordingly, the Board finds it necessary and reasonable to rely upon the Corporation s Board, the Government, and Crown Corporations Council with respect to administrative oversight of MH s operating and capital expenditures. Nonetheless, noting the ongoing and substantial increases in MH s operating, maintenance and administration expenses, and observing the continuing material negative differential between the costs per customer between MH and BC Hydro (as reported during the hearing), a more detailed examination of costs at future rate hearings represents a reasonable objective. Rate Increases On an overall basis, the Board finds the financial impact of the drought on MH to have been extremely significant, and, combining this with other factors results in the requested rate increases being insufficient. Additional revenue is immediately required to begin the rebuilding of MH s retained earnings, towards the broadly accepted debt to equity ratio target of 75:25. The Board will expect MH to maintain vigilance over its costs, so that the additional revenues contribute as they are intended to move towards achieving the debt to equity target more quickly than suggested in MH s 2003 Integrated Financial Forecast. Accordingly, and after careful reflection and realizing the additional burden that will placed on the economy, the Board has determined to vary MH s rate increase requests.

24 Page 23 The Board will direct MH to file a rate schedule reflecting annual revenue increases of 5% for all customer classes effective August 1, The Board will also grant MH a conditional and interim rate increase of 2.25% for all customer classes, effective April 1, 2005, and a further conditional and interim increase of 2.25% for all customer classes effective October 1, The April 1, 2005 conditional interim rate increase will be subject to MH filing a revised Integrated Financial Forecast and its second and third quarter fiscal 2004/05 financial statements with the Board by no later than January 31, An October 1, 2005 additional interim rate increase will be subject to MH filing its 2004/05 audited financial statements, an updated forecast for fiscal 2005/06 and its first quarter fiscal 2005/06 financial statements with the Board no later than July 31, Recognizing the concerns of Intervenors and ratepayers, the Board will review the financial performance of MH at those times to determine whether the conditional rate increases should be adjusted downward. The Board s decision to confirm or vary the conditionally granted increases will be predicated upon its assessment of MH s financial condition, and its progress towards the 75:25 debt:equity ratio relative to the Board s understanding of MH s forecasts for future fiscal results. The Board will not adjust the conditional rate increases upwards in the absence of a new rate application from the Corporation. The Board will invite written comments from registered Intervenors at the time it considers each conditional rate increase. In making the last two increases conditional, the Board provides a level of protection for the long-term interests of ratepayers.

25 Page 24 At the same time, these conditional increases provide reasonable assurance to MH that its revenue base will be strengthened if the need is present. In particular, conditional increases recognize the uncertainties present with respect to forecasting export sales and net income. These uncertainties are related to water levels and storage issues, export demand, pricing and other related matters. The Board accepts MH s contention that while current water levels and water storage levels are promising, weather conditions can quickly change, as can export demand and pricing. The export sales potential, gross and net, for 2004/05 and 2005/06 is uncertain. Even more uncertain are the forecasts of results five and ten years out in time. MH s projected rate increases for the years beyond 2006 are in the nature of place marks, and more experience will be required before the need for such increases can be confirmed. The upwardly varied rate increases will reduce the risk that future rate increases will have to be higher, or have to occur as they are now forecast. The Board had two concerns when dealing with MH s Applications, the interests of the utility s ratepayers and the financial health of the utility. Together, and in the broadest interpretation, these interests represent the general public interest. In a sense, Manitoba and ratepayers are fortunate that the objective of avoiding rate shock plays a role in rate setting; in the case of other commodities (oil and gas), market price changes ignore the concept.

26 Page 25 MH provides electricity to Manitoba s residences and businesses at advantageous prices, and the advantage relative to other North American jurisdictions will continue even with the rate increases provided in this Order. Furthermore, the current rate schedules provide for lower energy charges as volumes increase, the last block being far below the average and marginal costs of production and sale. (In this Application, MH proposed that the residential energy use blocks be consolidated in 2005, as a first step towards a possible future change to an inverted rate schedule after 2006.) As indicated, MH s previous residential grid rate increases were 1.5% and 1.3%, effective as of April 1, 1996, and 1997 respectively. A 2003 Board directed rate decrease of 2.0% and 1.0% for certain commercial and industrial customers came after the previous increase for industrial customers took place in So, as indicated above, MH rates have been stable and low for many years. The increases the Board will approve leave the average MH rate well below the rates charged by utilities in most, if not all, other North American jurisdictions. The other two low cost utilities in Canada, BC Hydro and Hydro-Quebec, both requested rate increases in The BC Utilities Commission approved an interim rate increase of 7.23% effective April 1, 2004 for BC Hydro; and, BC Hydro also applied for a further increase of 2.0% effective April 1, Hydro- Quebec received and is pursuing across the board rate increases amount to approximately 6%. Aggregate MH rate increases since 1992, including those granted, firm and conditional, by this Order, are one-quarter to one-third of the accumulated increase in the Consumer Price index during the period. The MH rate increases are dwarfed in comparison with commodity price

27 Page 26 increases in other sectors: oil, natural gas, propane, coal and uranium; for example, since 1997 natural gas prices have tripled. Provinces and American states served by other forms of generated electricity, such as coal and gas fired plants, have experienced far higher increases than those processed by the hydroelectric utilities of Canada, with Manitoba Hydro offering the lowest average rates among this group. 6.2 Customer Class Rates During the hearing, persuasive evidence was presented that indicated the cost of service study (COSS) used to assess and recommend rates was in need of amendment. Notwithstanding this, the rate differentiation sought by MH reflected the use of existing COSS methodology that does not segregate the revenues and costs associated with exports and imports, resulting in flawed results. As well, the current methodology does not meet the Board s interpretation of the intent of the uniform residential rate legislation. Therefore, the Board agrees that the cost of service methodology requires further analysis and amendment. This further analysis should include a thorough consideration of the NERA recommendations, along with offsetting the financial impact of uniform rates by a first charge on net export revenues. All Manitoba customer classes have benefited from export revenues, and all these customer classes require the support of a financially healthy utility.

28 Page 27 Because the COSS methodology is in a current state of flux, and, in the Board s view incomplete, the Board is not prepared to adopt the current methodology in assessing the revenue to cost ratios of each customer class. The process to address the fairness of the COSS and the appropriate revenue to cost ratios for the Manitoba customer classes is acknowledged to be lengthy. However, it is important that in the end the methodology be correct, appropriate, and supported. As further hearings occur, there will be ample opportunity to further consider the ratios and the appropriate use of the ratios in rate setting, after the Board has accepted and confirmed the COSS methodology. Presumably this can be achieved by the time of consideration of the first conditional rate increase, as the Board prefers to begin the process of utilizing the COSS in rate setting at that time. In the interest of fairness and recognizing the unusual severity of the effects of the recent drought, the Board has determined that the impacts of the drought should be borne by all the rate classes, and that sharing should be reflected in all customer classes receiving the same percentage rate increase on August 1, As indicated, future rate increases may differentiate between classes. In coming to a decision on the rate increases, firm and conditional, the Board considered the issue of rate shock, and opines that the rate increases for most customers will be within the thresholds put forth by the Intervenors (i.e. no more than 8-9% for any customers for the August 1, 2004 increase, and much less for most).

29 Page 28 Compared to the price shocks experienced by oil and natural gas purchasers (Bank of Canada s Commodity Price Index for energy natural gas, oil and coal - has increased by in excess of 100% since 1997), the rate increases, firm and conditional, provided in this Order are modest, particularly given the twelve and seven year rate freeze that industrial and residential customers, respectively, have enjoyed. The Board shares the concerns of MH and Manitoba Keewatinowi Okimakanak Inc. (MKO), the Intervenor representing the interests of the diesel-served and other First Nations communities, regarding the rates charged to diesel communities. However, the Board is of the view that as the initial rate block for the diesel communities is provided at the same rate as enjoyed by MH customers connected to the electricity grid, diesel rates increases should correspond to the grid rate increase. The Board is sympathetic to the situation faced by these communities, and is aware of discussions between the federal and provincial governments and MH. The Board expects a resolution for outstanding matters will be found quickly. 6.3 Rate Structure The Board notes that the Intervenors were generally supportive of the rate structure changes, i.e. the distribution of rate increases between the demand and energy segments of invoices, proposed by MH. The Board is of the view that MH s proposals regarding rate structures and the shift in the balance between demand and energy charges within the customer classes are reasonable,

30 Page 29 promote conservation, and should be reflected in the revised rate schedules filed by MH. That being said, the Board will review the rate schedules to be filed by the Corporation arising out of this Order, and confirm or vary such schedules if and as deemed appropriate. 6.4 Financial Targets A drought can occur in any year, and MH has projected that a five-year drought of the same proportions as the 2003/04 drought could risk the reduction of its retained earnings by in excess of $2 billion. It is instructive to note that the Corporation has reported that in the absence of the hedging transactions and other mitigating actions it carried out in response to the drought, as the Corporation realized its severity, its loss for 2003/04 would have approached $1 billion. It is also noted that there have been worse droughts in history. With a debt:equity ratio of 75:25 ratepayers would have increased assurance of future rate stability. Increased retained earnings would provide for a continuation of advantageous interest rates and finance costs. It would also provide increased confidence that a direct financial contribution to MH s capital would not be sought from the Province. Any calls on the Province would mean pressure on taxes, not that a call is expected. The ratepayers of MH are also the taxpayers of the Province; the fortunes and prospects of MH and the Province are, to some degree, co-mingled (in time, with continued repayment of the non-hydro provincial debt, all of the Province s debt may be related to MH).

31 Page 30 As of March 31, 2004, MH s debt:equity ratio is forecast to rise to 86:14, far above the established target. At the hearing, MH portrayed the current level of its retained earnings as being unacceptably low; and the Board concurs in this view. MH is not just another corporation, it is representative in some ways of Manitoba s future, and its stability needs to be better assured as it pursues expanded export opportunities. Another critical financial indicator is the coverage of MH s interest payments by net income. Based on MH s projections, the interest coverage ratio will not reach reasonably safe levels for five years. Along with the very real risk of another drought, there are other factors supporting the need for a major increase in retained earnings: (a) To some extent, particularly with respect to business interruption and insurance risk exclusions, MH self-insures. The corporation carries mainly property and general liability insurance, it has, understandably, no insurance against the financial and operating consequences of a drought; (b) Currently, MH has two HVDC transmission lines from the north. These lines are located in close proximity to each other, and transport 70% of MH s generating capacity to southern Manitoba. Until another line is constructed, particularly one geographically separated from the current lines, MH is subject to a substantial business and financial risk not covered by insurance; (c) The differential between on and off-peak wholesale electricity prices varies with market conditions, adequate financial margins available to MH from non-firm export sales are always at risk; (d) The conditions governing access to export markets are subject to the potential of future adverse or beneficial amendment. To the extent that such changes could disadvantage MH, (no such risk is currently evident) a material risk exists for a corporation dependent upon net export sales to restrain domestic pricing (rates);

32 Page 31 (e) Until new generation capacity comes on line, Manitoba electricity load increases will reduce export sales potential (average export prices have exceeded domestic rates); (f) Interest rates are at historic lows; some of MH s debt carries rates of 3% or less. At some point rates will increase; (g) MH has a substantial portfolio of U.S. dollar debt, while this currently provides reduced interest costs and a hedge with respect to export sales, there remains a degree of foreign exchange risk; (h) MH reports substantial pressure on operating and maintenance expenditures, partly related to the myriad of responsibilities placed on the Corporation, and partly to aging plant. Upgrades and renovations to generating, transmission and distribution assets are much more expensive than in the past, with reliability and safety standards increasing; and (i) MH lacks material liquid assets to meet the risk of future losses; any such losses would require additional borrowings. (MH s balance sheet includes a significant aggregate amount of deferred costs and goodwill, representing historically determined value but illiquid.) Achieving a debt:equity ratio of 75:25 would provide increased rate stability benefits, and hold down financial charges. The 75:25 benchmark represents a modest target, one comparable to the current debt:equity ratios of similar Crown hydroelectric utilities in other Canadian provinces (B.C. Hydro and Hydro Quebec). In summary, meeting this target within a reasonable period of time would reduce long-term pressure on domestic electricity rates, better assure bondholders and thus constrain financial charges and provide a hedge against a future drought (which is certain from a statistical probability perspective).

33 Page Cost of Service Study As previously indicated, the Board heard persuasive evidence that the cost of service study (COSS) methodology presently employed by MH requires review and amendment, and now provides known distortions in cost allocation. Therefore, the Board directs MH to file no later than January 30, 2005 three separate 2006 COSS, reflecting the following: (a) MH s existing methodology; (b) The implementation of the NERA recommendations; (c) The allocation of less expensive generation costs all to domestic customers, with higher cost generation being allocated between domestic and export customers on an in-service date basis as suggested by TREE/RCM; and (d) MH s preferred approach and methodology, including supporting rationale. In preparing these studies, MH shall allocate a sufficient share of net export revenue to offset the cost of the implementation of residential uniform rates. Net export revenue shall be taken into account over a five year rolling average, given the wide fluctuations experienced to date. 6.6 Demand Side Management The Board anticipates receiving MH s revised DSM plan by December 31, 2004, and that this plan will include a review of the option of integrating the approach to natural gas and other alternate fuels, and extending DSM to diesel communities.

Manitoba Hydro 2015 General Rate Application

Manitoba Hydro 2015 General Rate Application Manitoba Hydro 2015 General Rate Application OVERVIEW & REASONS FOR THE APPLICATION Darren Rainkie Vice-President, Finance & Regulatory Manitoba Hydro Why Rate Increases are Needed 2 Manitoba Hydro is

More information

Supplement to the 2019/20 Electric Rate Application Index February 14, 2019 MANITOBA HYDRO 2019/20 ELECTRIC RATE APPLICATION. 1.0 Overview...

Supplement to the 2019/20 Electric Rate Application Index February 14, 2019 MANITOBA HYDRO 2019/20 ELECTRIC RATE APPLICATION. 1.0 Overview... 0 0 Supplement to the 0/0 Electric Rate Application Index February, 0 MANITOBA HYDRO 0/0 ELECTRIC RATE APPLICATION SUPPLEMENT TO THE APPLICATION INDEX.0 Overview....0 Reasons for the Rate Increase....0

More information

Graham F.J. Lane, B. A., C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B., Member

Graham F.J. Lane, B. A., C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B., Member MANITOBA THE PUBLIC UTILITIES BOARD ACT January 31, 2006 Before: Graham F.J. Lane, B. A., C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B., Member AN APPLICATION BY CENTRA GAS

More information

November 30, 2018 Index MANITOBA HYDRO 2019/20 ELECTRIC RATE APPLICATION

November 30, 2018 Index MANITOBA HYDRO 2019/20 ELECTRIC RATE APPLICATION MANITOBA HYDRO 0/0 ELECTRIC RATE APPLICATION November 0, 0 Index 0 0 0 INDEX.0 Overview and Reasons for the Requested Rate Increase....0 Manitoba Hydro s Financial Position and Outlook.... 0/ Actual Financial

More information

M A N I T O B A ) Order No. 1/10 ) THE PUBLIC UTILITIES BOARD ACT ) January 5, 2010

M A N I T O B A ) Order No. 1/10 ) THE PUBLIC UTILITIES BOARD ACT ) January 5, 2010 M A N I T O B A ) Order No. 1/10 ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham F.J. Lane, C.A., Chairman Robert Mayer, Q.C., Vice-Chair Dr. Kathi Avery Kinew, Member ELECTRICITY RATES (FOUR COMMUNITIES,

More information

GSS/GSM rebuttal on all issues of Manitoba Hydro s 2015 cost of service methodology review proceeding

GSS/GSM rebuttal on all issues of Manitoba Hydro s 2015 cost of service methodology review proceeding GSS/GSM rebuttal on all issues of Manitoba Hydro s 2015 cost of service methodology review proceeding prepared for Hill Sokalski Walsh Olson LLP August 8, 2016 Upon review of the intervenor evidence of

More information

M A N I T O B A ) Order No. 138/06 ) THE PUBLIC UTILITIES BOARD ACT ) October 2, 2006

M A N I T O B A ) Order No. 138/06 ) THE PUBLIC UTILITIES BOARD ACT ) October 2, 2006 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) October 2, 2006 BEFORE: Graham F. J. Lane, C.A., Chairman Monica Girouard, C.G.A., Member Susan Proven, P.H.Ec., Member INTERIM PROPANE RATES FOR STITTCO

More information

Comprehensive Review of BC Hydro: Phase 1 Final Report

Comprehensive Review of BC Hydro: Phase 1 Final Report Comprehensive Review of BC Hydro: Phase 1 Final Report ii Table of Contents 1. Executive Summary 1 1.1 Enhancing Regulatory Oversight of BC Hydro 1 1.2 New Rates Forecast 3 1.3 Next Steps 5 2. Strategic

More information

MANITOBA Order No. 15/01. THE PUBLIC UTILITIES BOARD ACT February 1, G. D. Forrest, Chair M. Girouard, Member M.

MANITOBA Order No. 15/01. THE PUBLIC UTILITIES BOARD ACT February 1, G. D. Forrest, Chair M. Girouard, Member M. MANITOBA Order No. 15/01 THE PUBLIC UTILITIES BOARD ACT February 1, 2001 Before: G. D. Forrest, Chair M. Girouard, Member M. Santos, Member AN APPLICATION BY CENTRA GAS MANITOBA INC. FOR AN ORDER APPROVING

More information

Order No. 59/18 FINAL ORDER WITH RESPECT TO MANITOBA HYDRO S 2017/18 AND 2018/19 GENERAL RATE APPLICATION. May 1, 2018

Order No. 59/18 FINAL ORDER WITH RESPECT TO MANITOBA HYDRO S 2017/18 AND 2018/19 GENERAL RATE APPLICATION. May 1, 2018 FINAL ORDER WITH RESPECT TO MANITOBA HYDRO S 2017/18 AND 2018/19 GENERAL RATE APPLICATION BEFORE: Robert Gabor, Q.C., Chair Marilyn Kapitany, B.Sc., (Hon), M.Sc., Vice Chair Hugh Grant, Ph.D., Member Shawn

More information

M A N I T O B A ) Order No. 148/11 ) THE PUBLIC UTILITIES BOARD ACT ) October 20, 2011

M A N I T O B A ) Order No. 148/11 ) THE PUBLIC UTILITIES BOARD ACT ) October 20, 2011 M A N I T O B A ) Order No. 148/11 ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane C.A., Chairman Robert Mayer Q.C., Vice-Chair Dr. Kathi Avery Kinew, Member INTERIM ORDER IN RESPECT OF THE RESIDENTIAL

More information

MIPUG INTERROGATORIES TO CAC/MSOS 2010/11 & 2011/12 MANITOBA HYDRO GENERAL RATE APPLICATION DECEMBER 17TH, 2010

MIPUG INTERROGATORIES TO CAC/MSOS 2010/11 & 2011/12 MANITOBA HYDRO GENERAL RATE APPLICATION DECEMBER 17TH, 2010 MIPUG INTERROGATORIES TO CAC/MSOS 2010/11 & 2011/12 MANITOBA HYDRO GENERAL RATE APPLICATION DECEMBER 17TH, 2010 MIPUG/CAC/MSOS (Matwichuk) I - 1 and the Manitoba Society of Seniors, Question 7, pages 5-6

More information

MANITOBA HYDRO DEBT MANAGEMENT STRATEGY 2009/ /11

MANITOBA HYDRO DEBT MANAGEMENT STRATEGY 2009/ /11 MANITOBA HYDRO DEBT MANAGEMENT STRATEGY 2009/10-2010/11 Finance & Administration November 2009 Table of Contents 1.0 Purpose of this Document... 3 2.0 Overview of Manitoba Hydro s Capital Program... 3

More information

M A N I T O B A ) Order No. 169/07 ) THE PUBLIC UTILITIES BOARD ACT ) December 28, 2007 THE CITY OF BRANDON REVISED WATER AND SEWER RATES

M A N I T O B A ) Order No. 169/07 ) THE PUBLIC UTILITIES BOARD ACT ) December 28, 2007 THE CITY OF BRANDON REVISED WATER AND SEWER RATES www.pub.gov.mb.ca M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) December 28, 2007 BEFORE: Graham F. J. Lane, CA, Chairman Monica Girouard, CGA, Member Susan Proven, P.H.Ec., Member THE CITY OF BRANDON

More information

Quarterly Report for the three months ended June 30, 2017

Quarterly Report for the three months ended June 30, 2017 The Manitoba Hydro-Electric Board Quarterly Report for the three months ended, 2017 Comments by The Chair of the Board and by The President and Chief Executive Officer Financial Overview Manitoba Hydro

More information

M A N I T O B A ) Order No. 140/07 ) THE PUBLIC UTILITIES BOARD ACT ) October 29, 2007

M A N I T O B A ) Order No. 140/07 ) THE PUBLIC UTILITIES BOARD ACT ) October 29, 2007 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) October 29, 2007 BEFORE: Graham Lane, B.A., C.A., Chairman Leonard Evans, LL.D., Member Monica Girouard, C.G.A., Member CENTRA GAS MANITOBA INC. PRIMARY

More information

Index January 23, 2014 MANITOBA HYDRO 2015/16 & 2016/17 GENERAL RATE APPLICATION

Index January 23, 2014 MANITOBA HYDRO 2015/16 & 2016/17 GENERAL RATE APPLICATION 0 0 0 Tab Index January, 0 MANITOBA HYDRO 0/ & 0/ GENERAL RATE APPLICATION FINANCIAL RESULTS & FORECASTS INDEX.0 Overview.... Summary of Financial Results & Forecast.... General Consumers Revenue.... Extraprovincial

More information

M A N I T O B A ) Order No. 56/11 ) THE PUBLIC UTILITIES BOARD ACT ) April 14, 2011

M A N I T O B A ) Order No. 56/11 ) THE PUBLIC UTILITIES BOARD ACT ) April 14, 2011 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane, C.A., Chairman Len Evans, LLD, Member Monica Girouard, C.G.A., Member CENTRA GAS MANITOBA INC. FUNDING PARAMETERS LOWER INCOME

More information

1.0 Topic: Qualifications to provide expert evidence Reference: Exhibit C3-7, AMCS-RDOS Evidence, pages 1 and 51 of pdf

1.0 Topic: Qualifications to provide expert evidence Reference: Exhibit C3-7, AMCS-RDOS Evidence, pages 1 and 51 of pdf C2-7 REQUESTOR NAME: BC Sustainable Energy Association and Sierra Club BC INFORMATION REQUEST ROUND NO: 1 TO: ANARCHIST MOUNTAIN COMMUNITY SOCIETY AND REGIONAL DISTRICT OF OKANAGAN-SIMILKMEEN (AMCS RDOS)

More information

M A N I T O B A ) Order No. 147/09 ) THE PUBLIC UTILITIES BOARD ACT ) October 29, 2009

M A N I T O B A ) Order No. 147/09 ) THE PUBLIC UTILITIES BOARD ACT ) October 29, 2009 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane, CA, Chairman Leonard Evans, LLD, Member Monica Girouard, CGA, Member CENTRA GAS MANITOBA INC.: PRIMARY GAS RATES, EFFECTIVE NOVEMBER

More information

MANITOBA HYDRO DEBT MANAGEMENT STRATEGY 2012/13 AND 2013/14

MANITOBA HYDRO DEBT MANAGEMENT STRATEGY 2012/13 AND 2013/14 MANITOBA HYDRO DEBT MANAGEMENT STRATEGY 2012/13 AND 2013/14 Finance & Administration Treasury Division April 2012 Table of Contents 1.0 Purpose of this Document... 3 2.0 Overview of Manitoba Hydro s Capital

More information

IN THE MATTER OF the Ontario Energy Board Act;

IN THE MATTER OF the Ontario Energy Board Act; Ontario Energy Board Commission de l Énergie de l Ontario RP-2003-0063 EB-2004-0480 IN THE MATTER OF the Act; AND IN THE MATTER OF an application by Union Gas Limited for an order or orders approving or

More information

M A N I T O B A ) Order No. 81/10 ) THE PUBLIC UTILITIES BOARD ACT ) July 28, 2010

M A N I T O B A ) Order No. 81/10 ) THE PUBLIC UTILITIES BOARD ACT ) July 28, 2010 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane, CA, Chairman Leonard Evans, LLD, Member Monica Girouard, CGA, Member CENTRA GAS MANITOBA INC.: PRIMARY GAS RATES, EFFECTIVE AUGUST

More information

M A N I T O B A Order No. 44/11 THE PUBLIC UTILITIES BOARD ACT THE MANITOBA PUBLIC INSURANCE ACT

M A N I T O B A Order No. 44/11 THE PUBLIC UTILITIES BOARD ACT THE MANITOBA PUBLIC INSURANCE ACT M A N I T O B A Order No. 44/11 THE PUBLIC UTILITIES BOARD ACT THE MANITOBA PUBLIC INSURANCE ACT THE CROWN CORPORATIONS PUBLIC REVIEW AND ACCOUNTABILITY ACT March 31, 2011 Before: Graham Lane, CA, Chairman

More information

Quarterly Report for the three months ended June 30, 2016

Quarterly Report for the three months ended June 30, 2016 The Manitoba Hydro-electric Board Quarterly Report for the three months ended, 2016 Comments by the The Chair of the Board and by The President and Chief Executive Officer Financial Overview Manitoba Hydro

More information

BC HYDRO FISCAL 2017 TO FISCAL 2019 REVENUE REQUIREMENTS APPLICATION JUNE 8, RICHARD McCANDLESS

BC HYDRO FISCAL 2017 TO FISCAL 2019 REVENUE REQUIREMENTS APPLICATION JUNE 8, RICHARD McCANDLESS BC HYDRO FISCAL 2017 TO FISCAL 2019 REVENUE REQUIREMENTS APPLICATION JUNE 8, 2017. RICHARD McCANDLESS THE BC UTILITIES COMMISSION SHOULD NOT APPROVE ANY DISCRETIONARY REQUESTS PENDING A NEW APPROACH TO

More information

Manitoba Hydro 2017/18 & 2018/19 Electric General Rate Application Reply. February 14, 2018

Manitoba Hydro 2017/18 & 2018/19 Electric General Rate Application Reply. February 14, 2018 Manitoba Hydro 2017/18 & 2018/19 Electric General Rate Application Reply February 14, 2018 Introduction Manitoba Hydro adopted the evidence of its witnesses at the outset of the process Manitoba Hydro

More information

Additional examples of government support on projects has been provided on the record in response to MH/MIPUG I-3.

Additional examples of government support on projects has been provided on the record in response to MH/MIPUG I-3. 0 0 REFERENCE: Undertaking #, Transcript page 0, QUESTION: a) MIPUG panel to provide brief summary of various examples of government support or intervention in projects to deal with rate pressures; also

More information

A FINAL ORDER WITH RESPECT TO MANITOBA HYDRO S APPLICATION FOR INCREASED 2010/11 AND 2011/12 RATES AND OTHER RELATED MATTERS

A FINAL ORDER WITH RESPECT TO MANITOBA HYDRO S APPLICATION FOR INCREASED 2010/11 AND 2011/12 RATES AND OTHER RELATED MATTERS MANITOBA Board Order 5/12 THE PUBLIC UTILITIES BOARD ACT THE MANITOBA HYDRO ACT THE CROWN CORPORATIONS PUBLIC REVIEW AND ACCOUNTABILITY ACT Before: Graham Lane CA, Chairman Robert Mayer Q.C., Vice-Chair

More information

The Manitoba Hydro-Electric Board. for the three months ended June 30, 2012

The Manitoba Hydro-Electric Board. for the three months ended June 30, 2012 The Manitoba Hydro-Electric Board Q U A R T E R L Y R E P O R T for the three months ended June 30, 2012 Comments by THE CHAIRMAN OF THE BOARD and by THE PRESIDENT AND CHIEF EXECUTIVE OFFICER Financial

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontari o Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Hydro One Remote Communities

More information

Manitoba Hydro 2017/18 & 2018/19 General Rate Application

Manitoba Hydro 2017/18 & 2018/19 General Rate Application Manitoba Hydro 2017/18 & 2018/19 General Rate Application Undertaking #65 (Transcript pages 6459-6465) Exhibit MIPUG-30 February 1, 2018 MIPUG to provide a table similar to Board counsel book of documents

More information

THE PUBLIC UTILITIES BOARD ACT July 27, Graham Lane, CA, Chairman Len Evans, LL.D., Member Eric Jorgensen, Member

THE PUBLIC UTILITIES BOARD ACT July 27, Graham Lane, CA, Chairman Len Evans, LL.D., Member Eric Jorgensen, Member MANITOBA Order No. 99/07 THE PUBLIC UTILITIES BOARD ACT July 27, 2007 Before: Graham Lane, CA, Chairman Len Evans, LL.D., Member Eric Jorgensen, Member CENTRA GAS MANITOBA INC. 2007/08 AND 2008/09 GENERAL

More information

PRE-FILED TESTIMONY OF P. BOWMAN. IN REGARD TO MANITOBA HYDRO 2012/13 and 2013/14 GENERAL RATE APPLICATION. Submitted to: on behalf of.

PRE-FILED TESTIMONY OF P. BOWMAN. IN REGARD TO MANITOBA HYDRO 2012/13 and 2013/14 GENERAL RATE APPLICATION. Submitted to: on behalf of. PRE-FILED TESTIMONY OF P. BOWMAN IN REGARD TO MANITOBA HYDRO 0/ and 0/ GENERAL RATE APPLICATION Submitted to: The Manitoba Public Utilities Board on behalf of Manitoba Industrial Power Users Group Prepared

More information

Dear Shareholder: H. Stanley Marshall President and Chief Executive Officer Fortis Inc.

Dear Shareholder: H. Stanley Marshall President and Chief Executive Officer Fortis Inc. Dear Shareholder: Fortis achieved another significant milestone in the second quarter with the acquisition of two regulated electric utilities in western Canada. Since the acquisition closed on May 31st,

More information

MH/HELIOS I-1. Reference: Section 6, Summary and Discussion. Preamble to IR (If Any):

MH/HELIOS I-1. Reference: Section 6, Summary and Discussion. Preamble to IR (If Any): MH/HELIOS I-1 Reference: Section 6, Summary and Discussion Preamble to IR (If Any): At page 36, Mr. Raphals recommends the PUB require Manitoba Hydro to deepen its research on affordability mechanisms,

More information

January 16, Mr. D. Christie Secretary and Executive Director Public Utilities Board Portage Avenue Winnipeg, Manitoba R3C 0C4

January 16, Mr. D. Christie Secretary and Executive Director Public Utilities Board Portage Avenue Winnipeg, Manitoba R3C 0C4 Manitoba Hydro PU Box 815 Winnipeg, Manitoba Canada R3C 2P4 Street Location for DELiVERY: 221u1 floor 360 Portage Ave Telephone / N de téléphone: (204) 360-3633 Fax IN de télécopieur: (204) 360-6147 ofernandes@hydro.mb.ca

More information

CENTRALLY HELD COSTS

CENTRALLY HELD COSTS Filed: 00-0- EB-00-000 Exhibit F Tab Schedule Page of 0 0 0 CENTRALLY HELD COSTS.0 PURPOSE This evidence presents OPG s centrally held costs. Centrally held costs primarily consist of: Certain pension

More information

ISSN Preface

ISSN Preface ISSN 0843-4050 Preface This 2000 Annual Report, together with my Special Report on Accountability and Value for Money that was tabled November 21, 2000, meet my annual reporting mandate for the year ended

More information

MANITOBA HYDRO 2017/18 AND 2018/19 GENERAL RATE APPLICATION PRELIMINARY BUDGET SUBMISSION FOR THE MANITOBA INDUSTRIAL POWER USERS GROUP

MANITOBA HYDRO 2017/18 AND 2018/19 GENERAL RATE APPLICATION PRELIMINARY BUDGET SUBMISSION FOR THE MANITOBA INDUSTRIAL POWER USERS GROUP MANITOBA HYDRO 2017/18 AND 2018/19 GENERAL RATE APPLICATION PRELIMINARY BUDGET SUBMISSION FOR THE MANITOBA INDUSTRIAL POWER USERS GROUP As requested by the Public Utilities Board in Procedural Order 70/17

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontari o Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by PowerStream Inc. for

More information

MANITOBA Order No. 170/01. THE PUBLIC UTILITIES BOARD ACT October 31, G. D. Forrest, Chairman M. Girouard, Member M.

MANITOBA Order No. 170/01. THE PUBLIC UTILITIES BOARD ACT October 31, G. D. Forrest, Chairman M. Girouard, Member M. MANITOBA Order No. 170/01 THE PUBLIC UTILITIES BOARD ACT October 31, 2001 BEFORE: G. D. Forrest, Chairman M. Girouard, Member M. Santos, Member AN APPLICATION BY CENTRA GAS MANITOBA INC. FOR AN ORDER APPROVING

More information

Quarterly Report for the six months ended September 30, 2018

Quarterly Report for the six months ended September 30, 2018 The Manitoba Hydro-Electric Board Quarterly Report for the six months ended, 2018 Report from The Chair of the Board and by The President and Chief Executive Officer Financial Overview Manitoba Hydro s

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2016/17 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

Quarterly Management Report. First Quarter 2010

Quarterly Management Report. First Quarter 2010 Quarterly Management Report First Quarter 2010 INTERIM MANAGEMENT DISCUSSION and ANALYSIS For the Three Months Ended March 31, 2010 This interim Management Discussion and Analysis ( MD&A ) dated April

More information

M A N I T O B A ) Order No. 92/05 ) THE PUBLIC UTILITIES BOARD ACT ) June 7, 2005

M A N I T O B A ) Order No. 92/05 ) THE PUBLIC UTILITIES BOARD ACT ) June 7, 2005 www.pub.gov.mb.ca M A N I T O B A ) Order No. 92/05 ) THE PUBLIC UTILITIES BOARD ACT ) June 7, 2005 BEFORE: Graham F. J. Lane, C.A., Chairman S. Proven, P.H.Ec., Member THE TOWN OF LAC DU BONNET WATER

More information

M A N I T O B A ) Order No. 23/05 ) THE PUBLIC UTILITIES BOARD ACT ) February 14, 2005

M A N I T O B A ) Order No. 23/05 ) THE PUBLIC UTILITIES BOARD ACT ) February 14, 2005 M A N I T O B A ) Order No. 23/05 ) THE PUBLIC UTILITIES BOARD ACT ) February 14, 2005 BEFORE: Graham F. J. Lane, C.A., Chairman M. Girouard, C.G.A., Member S. Proven, P.H.Ec., Member THE TOWN OF CHURCHILL

More information

Financial Statement Discussion and Analysis Report

Financial Statement Discussion and Analysis Report PROVINCE OF BRITISH COLUMBIA 11 Highlights The highlights section provides a summary of the key events affecting the financial statements based on information taken from the Summary Financial Statements

More information

City of Waterloo Financial Dashboard

City of Waterloo Financial Dashboard City of Waterloo Financial Dashboard Result for Change from On annual A. Overall Financial Position 2013 2012 BMA Study? 1 Financial Position per Capita Positive Positive Trend Yes 2 Financial Position

More information

PUBLIC UTILITIES BOARD OF THE NORTHWEST TERRITORIES ANNUAL REPORT. For the year ending December 31, 2017

PUBLIC UTILITIES BOARD OF THE NORTHWEST TERRITORIES ANNUAL REPORT. For the year ending December 31, 2017 PUBLIC UTILITIES BOARD OF THE NORTHWEST TERRITORIES ANNUAL REPORT For the year ending December 31, 2017 TABLE OF CONTENTS PUBLIC UTILITIES BOARD OF THE NORTHWEST TERRITORIES... 1 REGULATORY JURISDICTION...

More information

INTERIM MANAGEMENT DISCUSSION and ANALYSIS For the Three Months Ended March 31, 2014

INTERIM MANAGEMENT DISCUSSION and ANALYSIS For the Three Months Ended March 31, 2014 First Quarter 2014 INTERIM MANAGEMENT DISCUSSION and ANALYSIS For the Three Months Ended March 31, 2014 Dated May 8, 2014 The following interim Management Discussion and Analysis ( MD&A ) should be read

More information

3.04. Electricity Sector Stranded Debt. Chapter 3 Section. Background. Detailed Review Observations HOW DID THE STRANDED DEBT ARISE?

3.04. Electricity Sector Stranded Debt. Chapter 3 Section. Background. Detailed Review Observations HOW DID THE STRANDED DEBT ARISE? Chapter 3 Section 3.04 Ministry of Finance Electricity Sector Stranded Debt Background We provided updates in past Annual Reports on the electricity sector s stranded debt, defined as that portion of the

More information

M A N I T O B A ) Order No. 148/08 ) THE PUBLIC UTILITIES BOARD ACT ) October 30, 2008

M A N I T O B A ) Order No. 148/08 ) THE PUBLIC UTILITIES BOARD ACT ) October 30, 2008 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) October 30, 2008 BEFORE: Graham Lane, C.A., Chairman Leonard Evans, LL.D., Member Monica Girouard, CGA, Member SWAN VALLEY GAS CORPORATION: NATURAL

More information

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance February 16, 2018 Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance Full-year 2017 financial results on target excluding the effects of the Tax Cuts and Jobs

More information

SURPLUS ENERGY PROGRAM TERMS AND CONDITIONS

SURPLUS ENERGY PROGRAM TERMS AND CONDITIONS SUR ENERGY PROGRAM TERMS AND CONDITIONS SUR ENERGY PROGRAM INDUSTRIAL LOAD - OPTION 1 TABLE OF CONTENTS Program Duration...1 Eligibility...1 Reference Demand...1 Billing...2 Interruptions...4 Metering

More information

CHAPTER 17. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey:

CHAPTER 17. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey: CHAPTER 17 AN ACT concerning clean energy, amending and supplementing P.L.1999, c.23, amending P.L.2010, c.57, and supplementing P.L.2005, c.354 (C.34:1A-85 et seq.). BE IT ENACTED by the Senate and General

More information

2017/18 and 2018/19 General Rate Application Response to Intervener Information Requests

2017/18 and 2018/19 General Rate Application Response to Intervener Information Requests GSS-GSM/Coalition - Reference: MPA Report Page lines - Preamble to IR (If Any): At page, MPA writes: 0 Explicit endorsement by the PUB of policies around reserves, cash flows, and rate increases will help

More information

Budget Paper D An UPDAte on FiscAl transfer ArrAngements

Budget Paper D An UPDAte on FiscAl transfer ArrAngements Budget Paper D An Update on Fiscal Transfer Arrangements An Update on Fiscal Transfer Arrangements Contents the importance of transfers... 1 Recent Changes to Major Transfer Programs... 5 Looking Forward...

More information

Q FINANCIAL REPORT

Q FINANCIAL REPORT Q3 2017 FINANCIAL REPORT Table of Contents 02 Section 1: Corporate Overview 04 Section 2: Financial Highlights and Recent Developments 10 Section 3: Consolidated Financial Results 13 Section 4: Segmented

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

Additional Agenda. City of Mississauga. General Committee. Date June 27, 2018 Time 9:00 A.M. Location Council Chamber 2 nd Floor 300 City Centre Drive

Additional Agenda. City of Mississauga. General Committee. Date June 27, 2018 Time 9:00 A.M. Location Council Chamber 2 nd Floor 300 City Centre Drive City of Mississauga Additional Agenda General Committee Date June 27, 2018 Time 9:00 A.M. Location Council Chamber 2 nd Floor 300 City Centre Drive REMOVAL OF DEPUTATION 5.5 Kevin Sherwin, Chair of the

More information

W. Harper - Pg. 33 Schedule 18 Key Financial Outlook Results

W. Harper - Pg. 33 Schedule 18 Key Financial Outlook Results MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE APPLICATION PUBLIC UTILITIES BOARD INTERVENER EVIDENCE INFORMATION REQUESTS COALITION (HARPER) NOVEMBER 15, 2017 PUB/COALITION - 14 Reference: W. Harper -

More information

REPORT TO THE PUBLIC UTILITIES BOARD

REPORT TO THE PUBLIC UTILITIES BOARD REPORT TO THE PUBLIC UTILITIES BOARD CURTAILABLE RATE PROGRAM APRIL 1, 2011 MARCH 31, 2012 JULY 2012 TABLE OF CONTENTS Page No. SUMMARY... 1 BACKGROUND... 1 PERFORMANCE FOR 2011/12... 3 Curtailment Options...3

More information

Integrated Financial Forecast (IFF12)

Integrated Financial Forecast (IFF12) November 2012 Integrated Financial Forecast (IFF12) 2012/13-2031/32 Financial Planning Finance & Administration INTEGRATED FINANCIAL FORECAST (IFF12) 2012/13 2031/32 FINANCIAL PLANNING DEPARTMENT CORPORATE

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public

More information

SUMMARY OF APPLICATION

SUMMARY OF APPLICATION Filed: September, 00 EB-00-00 Schedule Page of SUMMARY OF APPLICATION Hydro One Networks ( Hydro One or Hydro One Transmission ) is applying for an Order approving the revenue requirement, cost allocation

More information

MANITOBA ) Order No. 15/02 ) THE PUBLIC UTILITIES BOARD ACT ) January 30, G. D. Forrest, Chairman M. Girouard, Member M.

MANITOBA ) Order No. 15/02 ) THE PUBLIC UTILITIES BOARD ACT ) January 30, G. D. Forrest, Chairman M. Girouard, Member M. MANITOBA ) Order No. 15/02 ) THE PUBLIC UTILITIES BOARD ACT ) January 30, 2002 BEFORE: G. D. Forrest, Chairman M. Girouard, Member M. Santos, Member AN APPLICATION BY CENTRA GAS MANITOBA INC. FOR AN INTERIM

More information

Annual Report

Annual Report Annual Report 2013 0 Mandate Ontario Electricity Financial Corporation (OEFC or the Corporation) is one of five entities established by the Electricity Act, 1998 (the Act) as part of the restructuring

More information

PUB/Consumers Association of Canada (Manitoba) (Mr. Harper) 1

PUB/Consumers Association of Canada (Manitoba) (Mr. Harper) 1 Needs For and Alternatives To PUB/Consumers Association of Canada (Manitoba) (Mr. Harper) 1 Reference: " the [Wuskwatim] Projects will likely have negligible impact on MH s financial stability and will

More information

2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL

2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL 2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL Receive a presentation from Lewis Young Robertson & Burningham regarding the 2017 Utility Rate Study The purpose of the Council

More information

Public Accounts of the Province

Public Accounts of the Province CHAPTER FIVE Public Accounts of the Province INTRODUCTION The Public Accounts for each fiscal year, ending March 31, are prepared under the direction of the Minister of Finance as required by the Ministry

More information

Public Accounts of the Province

Public Accounts of the Province Public Accounts of the Province Introduction The Public Accounts for each fiscal year, ending March 31, are prepared under the direction of the Minister of Finance, as required by the Ministry of Treasury

More information

ONTARIO POWER GENERATION REPORTS 2002 EARNINGS

ONTARIO POWER GENERATION REPORTS 2002 EARNINGS March 31, 2003 ONTARIO POWER GENERATION REPORTS 2002 EARNINGS [Toronto]: Ontario Power Generation Inc. ( OPG ) today reported its financial and operating results for the year ended December 31, 2002. Earnings

More information

City of Waterloo Financial Dashboard

City of Waterloo Financial Dashboard City of Waterloo Financial Dashboard Result for Change from Result for On BMA Study? 2017 2016 2016 A. Overall Financial Position 1 Financial Position per Capita Positive improving Positive Yes 2 Financial

More information

Dear Shareholder: H. Stanley Marshall President and Chief Executive Officer Fortis Inc.

Dear Shareholder: H. Stanley Marshall President and Chief Executive Officer Fortis Inc. Dear Shareholder: Earnings applicable to common shares grew to $39.2 million for the first quarter of 2005, almost double earnings of $20.3 million for the same quarter last year. Earnings per common share

More information

Financial Statement Discussion and Analysis Report

Financial Statement Discussion and Analysis Report PROVINCE OF BRITISH COLUMBIA 11 Highlights The highlights section provides a summary of the key events affecting the financial statements based on information taken from the Summary Financial Statements

More information

SASKENERGY INCORPORATED

SASKENERGY INCORPORATED SASKENERGY INCORPORATED THIRD QUARTER REPORT, 2017 TABLE OF CONTENTS VISION, MISSION AND VALUES As a Crown corporation, SaskEnergy is committed to ensuring that all corporate activities align with the

More information

OFFICE OF THE AUDITOR GENERAL

OFFICE OF THE AUDITOR GENERAL OFFICE OF THE AUDITOR GENERAL Report to the House of Assembly on the Audit of the Financial Statements of the Province of Newfoundland and Labrador For the Year Ended March 31, 2016 Office of the Auditor

More information

IN THE MATTER OF the Ontario Energy Board Act 1998, S.O.1998, c.15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act 1998, S.O.1998, c.15, (Schedule B); Ontario Energy Board Commission de l Énergie de l Ontario RP-2003-0249 IN THE MATTER OF the Ontario Energy Board Act 1998, S.O.1998, c.15, (Schedule B); AND IN THE MATTER OF an Application pursuant to

More information

Brookfield Renewable Energy Partners L.P. ANNUAL REPORT 2012

Brookfield Renewable Energy Partners L.P. ANNUAL REPORT 2012 Brookfield Renewable Energy Partners L.P. ANNUAL REPORT 2012 TABLE OF CONTENTS Letter To Shareholders 1 Financial Review For The Year Ended December 31, 2012 11 Analysis Of Consolidated Financial Statements

More information

The Manitoba Hydro-Electric Board

The Manitoba Hydro-Electric Board Rating Report Previous Report: November 29, 2007 The Manitoba Analysts Robert Filippazzo +1 416 597 7340 rfilippazzo@dbrs.com Michael Caranci +1 416 597 7304 mcaranci@dbrs.com The Utility The Manitoba

More information

PROJECT DEVELOPMENT AGREEMENT

PROJECT DEVELOPMENT AGREEMENT BENEFITS, RISKS and SAFEGUARDS W U S K W A T I M PROJECT DEVELOPMENT AGREEMENT Between Nisichawayasihk Cree Nation and Manitoba Hydro and Others March 2006 [ For complete details please refer to the full

More information

POLICY BRIEFING The Private Finance Initiative: Treasury Select Committee report

POLICY BRIEFING The Private Finance Initiative: Treasury Select Committee report The Private Finance Initiative: Treasury Select Committee report Date: 23 August 2011 Author: Janet Sillett Overview In a statement accompanying the publication of the Treasury Select Committee's report

More information

Energy ACCOUNTABILITY STATEMENT MINISTRY OVERVIEW

Energy ACCOUNTABILITY STATEMENT MINISTRY OVERVIEW Energy ACCOUNTABILITY STATEMENT This business plan was prepared under my direction, taking into consideration the government s policy decisions as of March 3, 2017. original signed by Margaret McCuaig-Boyd,

More information

The following are the comments of Westcoast Energy Inc. ( Westcoast ) with respect to the referenced Application.

The following are the comments of Westcoast Energy Inc. ( Westcoast ) with respect to the referenced Application. C5-2 KIRSTEN B. JARON Director, Regulatory BC Pipeline and Field Services Divisions Duke Energy Gas Transmission Fifth Avenue Place, East Tower Suite 2600, 425 1 st Street SW Calgary, AB T2P 3L8 Telephone:

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S. O. 1998, c.15, Schedule B;

IN THE MATTER OF the Ontario Energy Board Act, 1998, S. O. 1998, c.15, Schedule B; Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S. O. 1998, c.15, Schedule B; AND IN THE MATTER OF an application by Hydro One Networks Inc.

More information

INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017

INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017 Second Quarter 2017 INTERIM MANAGEMENT DISCUSSION AND ANALYSIS For the Three and Six Month Periods Ended June 30, 2017 Dated July 28, 2017 The following interim Management Discussion and Analysis ( MD&A

More information

Ontario Energy Board Commission de l énergie de l Ontario

Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER HYDRO ONE NETWORKS INC. Application for electricity distribution rates and other charges beginning January 1, 2017 BEFORE:

More information

Ontario s Fiscal Competitiveness in 2004

Ontario s Fiscal Competitiveness in 2004 Ontario s Fiscal Competitiveness in 2004 By Duanjie Chen and Jack M. Mintz International Tax Program Institute for International Business J. L. Rotman School of Management University of Toronto November

More information

Electricity Power System Planning

Electricity Power System Planning Chapter 3 Section 3.02 Ministry of Energy Electricity Power System Planning Standing Committee on Public Accounts Follow-Up on Section 3.05, 2015 Annual Report The Committee held a public hearing in November

More information

BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008

BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008 BROOKFIELD RENEWABLE POWER INC. MANAGEMENT S DISCUSSION AND ANALYSIS MARCH 31, 2008 Attached is management s discussion and analysis of Brookfield Renewable Power Inc. (formerly Brookfield Power Inc. and

More information

Combined Financial Statements of NEW BRUNSWICK POWER HOLDING CORPORATION. For the year ended March 31, 2013

Combined Financial Statements of NEW BRUNSWICK POWER HOLDING CORPORATION. For the year ended March 31, 2013 Combined Financial Statements of NEW BRUNSWICK POWER HOLDING CORPORATION Independent Auditor s Report To the Honourable Graydon Nicholas, Lieutenant-Governor of New Brunswick, Fredericton, New Brunswick

More information

M A N I T O B A ) Order No. 108/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 29, 2010

M A N I T O B A ) Order No. 108/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 29, 2010 M A N I T O B A ) Order No. 108/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 29, 2010 BEFORE: Graham Lane, C.A., Chairman Leonard Evans, LL.D., Member Monica Girouard, CGA, Member SWAN VALLEY GAS CORPORATION:

More information

ALBERTA ENERGY AND UTILITIES BOARD

ALBERTA ENERGY AND UTILITIES BOARD re: CANADIAN WESTERN NATURAL GAS COMPANY LIMITED In the matter of an application by Canadian Western Natural Gas Company Limited for approval of a 199511996 winter period Gas Cost Recovery Rate and a 1996

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2017/18 THIRD QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

Annual Financial Report

Annual Financial Report Annual Financial Report of the Government of Canada Fiscal Year 2000 2001 Her Majesty the Queen in Right of Canada (2001) All rights reserved All requests for permission to reproduce this document or any

More information

WHITBY HYDRO ELECTRIC CORPORATION

WHITBY HYDRO ELECTRIC CORPORATION Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER WHITBY HYDRO ELECTRIC CORPORATION Applications for an order approving just and reasonable rates and other charges for electricity

More information

BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009

BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009 BChgdro FOR GEt\JE lor\js B-1 Joanna Sofield Chief Regulatory Officer Phone: (0) -0 Fax: (0) -0 bchydroregulatorygroup@bchydro.com September 0,009 Ms. Erica M. Hamilton Commission Secretary British Columbia

More information

Ontario Energy Board

Ontario Energy Board Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Filing Requirements For Electricity Transmission Applications Chapter 2 Revenue Requirement Applications February 11, 2016

More information

SENATE, No STATE OF NEW JERSEY. 214th LEGISLATURE INTRODUCED NOVEMBER 8, 2010

SENATE, No STATE OF NEW JERSEY. 214th LEGISLATURE INTRODUCED NOVEMBER 8, 2010 SENATE, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED NOVEMBER, 00 Sponsored by: Senator BOB SMITH District (Middlesex and Somerset) SYNOPSIS Requires that contracts by non-utility load serving entities

More information