1 White Paper on Project Financing Published by American Subcontractors Association, Inc. Foundation of the American Subcontractors Association, Inc Duke Street Alexandria VA (703) Copyright 2016 by the American Subcontractors Association, Inc. and the Foundation of the American Subcontractors Association, Inc. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the American Subcontractors Association, Inc. Disclaimer: This publication does not contain legal advice. The discussion is intended to provide information and guidance to individual subcontractors. Specific circumstances vary widely, so subcontractors may need to consult their attorneys before acting on the premises described herein. Each subcontractor should decide for itself the contract terms and conditions which it believes will best protect its interests. Subcontractors should not agree among themselves as to the form of contract terms and conditions they will use. Such agreements may violate federal or state antitrust laws and could result in the imposition of civil and/or criminal penalties.

2 Project Financing Introduction Think of an unsecured credit card that has no annual fee, no interest and a sky-high spending limit. Most people would assume that only the most creditworthy clients could qualify to receive such a card. Surely, they would think, the bank would conduct a rigorous investigation of any applicant for this card and exclude 99 percent of applicants. Most people wouldn t even try to apply for the card, thinking it wasn t worth their time just to be rejected in the end. But now imagine that the bank made an incredible offer: Anyone who just submitted an application could get the card. No pre-qualification required. It wouldn t be long before the Postal Service could not even deliver all the applications the volume of applications would be too great. This credit card offer would be crazy from the perspective of any bank that wanted to stay in business long, right? Right. When you think about the credit terms that some construction subcontractors offer their clients, it s not much different than the too-good-to-be-true credit card offer. Subcontractors foot the bill for labor, equipment and materials for a project on a promise that the funding will come through. The subcontractors that do so without checking the creditworthiness of the project owner essentially are offering the same credit terms as the issuer of the imaginary credit card. If the subcontractor doesn t have any assurances that the funding even exists to pay it, it is gambling when it finances its portion of the project. And ensuring that funding is in place is just the first step. Even if the funding is there, the subcontractor still needs the assurance that it will be able to collect its due when its work is complete. Banks ensure creditworthiness and effective collections in several ways: They investigate prospective customers, draft credit terms that establish the banks (and customers ) rights, and lobby to make sure that the laws allow them to collect monies due if the customers that refuse to pay are able to pay. Naturally, the banks favored manner of managing the risk of financial loss on credit is to exclude high-risk debtors in the first place. It s much easier and less expensive for them to obviate problems with an initial credit examination than to collect funds after extending credit. Likewise, subcontractors have different options to ensure the creditworthiness of their potential customers. Some are easier to implement than others. It s much easier for a subcontractor to request project financing information up-front from the prime contractor and to incorporate contract terms that will help it collect this information than it is for the subcontractor to get laws passed that will assure it of 1

3 adequate project financing and timely final and progress payments. The main reason that it s easier for subcontractors to tackle credit risks early is that they haven t yet fully extended their company credit in case they detect problems with project financing before their companies start work. Surety payment bonds and mechanics lien laws provide assurances too, but by the time these options are exercised, subcontractors already have substantial interest invested in a project. Plus, the claims process can be very complex and frustrating. The subcontractor that wants to investigate project financing has some excellent tools at its disposal. ASA s Addendum to Subcontract, which is one of documents in ASA s Subcontract Documents Suite, includes a model provision for contract modifications or addenda: The subcontract is subject to credit approval by Subcontractor, and Subcontractor shall be provided with the legal description of the property; the name, address and representative of the project owner; evidence of adequate owner project financing; and a copy of Customer s payment bond for the project, if any. Customer shall promptly notify Subcontractor of material changes in the project owner s identity or financial arrangements. Subcontractor shall not be obligated to commence or continue Subcontract Work absent adequate assurances of payment. Such language is especially important when the proposed contract includes a contingent payment clause, especially pay-if-paid (but also pay-when-paid). The subcontractor takes an enormous risk of nonpayment (or delayed or partial payment) when such clauses are included in the contract. Just as a bank would investigate a seemingly high-risk customer under a microscope, subcontractors may seek full and continuing disclosure of the financial situation of the construction owner. If the prime contractor questions the subcontractor s requirement of project financing disclosure, the subcontractor may point out that many industry documents, including documents from ASA, ConsensusDocs and the American Institute of Architects contain project financing disclosure terms. These documents allow the contractor not to commence work unless the project financing information is provided. They even allow contractors to stop work if the financing information is not provided in a timely manner. Since a subcontractor will effectively be extending credit, and at the same time does not have a contract with the owner, the only assurance of obtaining the information is through the subcontract agreement. On publicly-funded projects, it is a good idea to check the records of public agencies to ensure that full appropriations have been secured. If the funding has not been appropriated, consider modifying the contract to deal with the possibility that the funds do not come through. As a general rule, the more quality project financing information the subcontractor can obtain, the better. For example, the actual loan agreements for construction and 2

4 permanent financing are preferable over a simple commitment letter, because the loan documents will include all of the lender conditions and requirements. In addition to contractual recourse, commercial services like Dun & Bradstreet, public services such as the business center at a local library, and not-for-profit services such as the Business Practices Interchanges conducted by many ASA chapters, may be helpful to subcontractors in the quest for quality project financing information. In general, customizing contracts to make project financing information available, and obtaining project financing information, are ideas you can bank on. ASA Member Concerns Construction project insolvency is a major concern of construction subcontractors because they provide large amounts of labor and material to the prime contractor on credit. Complete disclosure by a project owner showing adequate project financing is, therefore, crucial to obtain the most competitive bids from responsible contractors. A 2015 ASA survey revealed that slow final payment, slow progress payments, and pay-if-paid subcontract clauses are among the top concerns of ASA members. All three of these concerns can be traced back to the adequacy of project financing (at least absent predatory behavior by those controlling the cash flow). Pay-if-paid clauses, for example, are used by contractors to shift the risk of project insolvency to subcontractors, which have no contract with, and thus no recourse against, the owner, by making owner payment of the contractor a condition precedent to contractor payment of subcontractors. Prime contractors frequently are aggressive in insisting on the inclusion of pay-if-paid provisions in their subcontract forms. Contractors use of pay-ifpaid terms in their subcontracts underscores their concern that owner financing arrangements may be inadequate to compensate subcontractors fully for the labor and materials that they provide on credit, and that they bill in arrears. Economically-rational construction bidders will place a high value on information that the owner has a fully adequate source of financing to pay project-related invoices as they become due. Moreover, those same rational bidders will interpret any lack of transparency in the owner s financial arrangements as a warning of potential troubles. Contractors that are not satisfied that disclosed financial commitments will be sufficient to complete a project may either refuse to bid, or will add sufficient contingency amounts to their bids to account for the likelihood that they will pay substantial interest charges to float the owner s project while awaiting late payments, or while awaiting longdelayed approvals of change order requests. Industry Policies Payment delays (including delayed owner approval of change orders) are a wellrecognized source of conflict on a construction project. The Guideline on Owner s Ability to Pay, part of the Guidelines for a Successful Construction Project jointly published by ASA, Associated General Contractors of America, and the Associated Specialty Contractors, states: 3

5 Delays or defaults by owners in meeting contractual payment obligations to contractors is a growing cause of litigation, liens, long delays in completion of construction, abandonment of contracts, and bankruptcy of contractors and subcontractors. Qualified contractors often are unwilling to bid on projects for owners whose financial capacity and credit rating are not widely known. This results in reduced competition and the possibility of higher bids to the detriment of the owners. A trouble-free arrangement from the beginning to the completion of the construction requires that the owner have a sufficient commitment from a lending institution or other source of construction capital. This includes funding to make all progress payments, release of retainage, and final payment promptly as provided for in the contract documents, as well as a sufficient reserve to pay for changes and any claims for which the contractors are entitled to reimbursement. It is improper for a payment delay of even one day to occur because of administrative lapses or because release of funds is deliberately delayed while waiting for certificates of deposit or investments to mature. Such actions pass on to contractors the responsibility of financing the project, which should not be a contractor obligation. In order to obtain the most competitive bids, owners should furnish current written information needed by contractors and subcontractors to enforce lien and bond rights. Invitations for bids must contain clear statements that the owner has made sufficient financial arrangements for completion of the project and administrative arrangements for timely disbursement of every payment, including change orders and claims. Bidders should be invited to make inquiry about these arrangements so that they may satisfy themselves about financial details. Inquiries from contractors who have been invited to bid the project should be answered quickly and candidly by the owner or its construction lender. In the case of governmental bodies, confirmation is needed that necessary funds have been appropriated for the financing of the project by legislative bodies having funding authority or that necessary bonds have been sold, and adequate funds are on deposit. Many contractors who once felt confident in bidding to governmental bodies have lost that confidence because of the number of governments that have defaulted or approached default on obligations. Because of the reputation of many governmental bodies for delaying payments due to procedural red tape and funding technicalities, it is especially important that bidders on public works have clear assurances that such delays will not occur. 4

6 The introduction to AGC s Guidelines for Obtaining Owner Financial Information (1998) aptly notes: In any contractual venture, each party has a legitimate interest and responsibility in ascertaining whether the other party is fully capable of performing all of its contractual obligations. In an owner/contractor relationship, before entering into a contract with a contractor, an owner often requires financial statements and bank references from the contractor, and may require a surety bond which guarantees both project performance and payment obligations. The proven ability to pay is just as important as the proven ability to perform. A contractor, therefore, has an equally valid interest in receiving assurances that a project owner has sufficient funds available to make payments in accordance with the terms of the construction contract. Of course, AGC s Guidelines are directed at contractors that have a direct contractual relationship with the owner. Subcontractors, however, also have a genuine interest in assuring the owner s capacity to keep current with the general contractor s payment requisitions, especially considering the nearly universal industry practice of shifting the risk of payment delays to subcontractors using either pay-when-paid or pay-if-paid subcontract terms. Industry Practice Provisions assuring that a prime contractor will have the right to disclosure of project financing arrangements are common in industry standard documents. Subcontractor rights have been less well-defined, although the use of either pay-when-paid or pay-ifpaid terms in construction subcontracts has become essentially universal. Prompt pay laws governing payment of subcontractors, which regulate public procurement, private construction, or both, generally require payment of subcontractors within a certain number of days after the contractor is paid, and so any payment delays from the top translate into payment delays to all of the contractor s subcontractors. Thus, the state and federal prompt pay laws governing payment of subcontractors essentially institutionalize pay-when-paid payment terms. Model subcontract forms published by ConsensusDocs and AIA also incorporate pay-when-paid payment terms. Public Procurement Federal law has long provided that no federal agency can enter a contract for the erection, repair, or furnishing of any public building, or for any public improvement which shall bind the Government to pay a larger sum of money than the amount in the Treasury appropriated for the specific purpose. Thus, the federal government requires construction projects to be fully funded from commencement. In fact, it is an implied term of every federal government contract that the contract amount is subject to the amount appropriated. The federal policy is mirrored in states and localities throughout the country. Indeed, it is the prevailing view that state and local governments risk rendering their contracts void 5

7 and unenforceable if they fail to comply with laws requiring them to have funding before incurring an indebtedness. In the public procurement context, then, contractors and subcontractors may be lulled into thinking they have adequate assurances of project financing in the form of public appropriations laws, statutes and ordinances. However, there are sufficient instances in which sufficient funding was not in place because of poor planning or overspending. Thus, contractors and subcontractors on public work are advised to assure that sufficient funding is in place, particularly on a project with extensive change orders. Model Contract Forms Popular construction contract forms published by all segments of the construction industry, including ConsensusDocs and AIA, not only recognize the importance of adequate information to assess the financial viability of a construction project, but actually allow the contractor to stop work if the owner fails to provide that information on request. ConsensusDocs and AIA forms also explicitly obligate the owner to give notice of any changes in project financing. The ConsensusDocs 200, Standard Agreement and General Conditions Between Owner and Constructor (Lump Sum Price) (2012, at 4.2, also affords condition precedent protection for the contractor s right to seek project financing disclosures: Prior to commencement of the Work and thereafter at the written request of the Constructor, the Owner shall provide the Constructor with evidence of Project financing. Evidence of such financing shall be a condition precedent to the Constructor s commencing or continuing the Work. The Constructor shall be notified prior to any material change in Project financing. AIA s A , General Conditions of the Contract for Construction, at 2.2.1, provides: Prior to commencement of the Work, the Contractor may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner s obligations under the Contract. Thereafter, the Contractor may only request such evidence if (1) the Owner fails to make payments to the Contractor as the Contract Documents require; (2) a change in the Work materially changes the Contract Sum; or (3) the Contractor identifies in writing a reasonable concern regarding the Owner s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor. By making financial disclosure a condition precedent to either commencing or continuing work, the ConsensusDocs and AIA documents make project financing 6

8 disclosures perhaps the most easily enforced of any rights provided to the contractor in the general conditions. ASA s Addendum to Subcontract, also seeks to promote the trend favoring financial disclosures down the contractual chain. Like the protection afforded to prime contractors in the ConsensusDocs and AIA, the addendum sets up the contractor s obligation to provide disclosures to the subcontractor as a condition precedent to the subcontractor s performance. Protecting Your Business ASA s Subcontractor Negotiating Tip on Evidence of Owner Financing provides subcontractors with arguments to use at the negotiating table when pursuing owner financing information: When the GC Says: The owner is my customer. If I m comfortable with his wherewithal, you should be, too. The Sub Should Say: Your subcontract refers directly to payment by the owner as the trigger for when I get paid. You re asking me to rely on the credit of your customer. How can I rely on the credit of the owner without investigating it? When the GC Says: I ve already agreed to eliminate the pay-if-paid clause in my subcontract, so I m ultimately on-the-line for payment to you. The Sub Should Say: And I appreciate your working with me. But even with the pay-when-paid clause to which we ve agreed, the timing of my payment is dependent on the credit of the owner. If the owner pays late, everyone gets paid late, which puts pressure on my cash flow. If you want me to base my payment on the owner s cash flow, then the owner s financial status is very much my business. When the GC Says: How do you expect me to convince the owner to provide me with this information? The Sub Should Say: It s standard practice in the construction industry for the owner to provide financial information to its GC. After all, you re extending credit to him. Both the ConsensusDocs and AIA general conditions require the owner to provide you with reasonable evidence that it can meet its financial obligations. I m confident that you re enough on your toes to negotiate for this important right with your customer. ASA s Subcontractor Negotiating Tip on Pay-if-Paid Clauses closely ties credit judgments with the use of pay-if-paid language. The tip sheet provides subcontractors with arguments to use at the negotiating table when dealing with pay-if-paid subcontract terms: When the GC Says: The subcontractor should share in the risk of owner insolvency. The Sub Should Say: My credit risk is with you. There s no justification for me to also extend credit to the owner. I don t have a contractual relationship with the 7

9 owner. You did the credit check on the owner and your decision to go forward is strictly your responsibility. When the GC Says: A subcontractor s lien rights and the job s payment bond will offer payment protection. The Sub Should Say: Bonding companies routinely deny claims on pay-if-paid terms, reasoning that no money is owed when an owner fails to pay. Liens also are often challenged using the same logic. When the GC Says: You should always be willing to wait for your money until I m paid. The Sub Should Say: I can t wait until you pay me to issue checks to my jobsite workers, office staff, utility companies and suppliers. If I m supposed to finance you, I ve become a banker, not a builder. When the GC Says: Pay-if-paid is a valid concept. The Sub Should Say: Contingent payment terms are void in some states as being against the public interest and fair contracting practice. Even widely-endorsed model documents, such as ConsensusDocs and AIA, do not include a pay-if-paid clause. I would have to be a pretty lousy business person to agree to such a questionable concept as pay-if-paid. A subcontractor must understand the link between pay-if-paid language and the credit judgments it must make before becoming obligated to perform work on a project. Even absent pay-if-paid terms, a subcontractor should investigate the financial commitments on which the project depends, because pay-when-paid payment terms will likely transfer all the risk of late payments to subcontractors. Finally, a subcontractor should consider providing two prices for its work at bid time when bidding to contractors who employ pay-if-paid subcontract language: one price for bearing the risk of owner insolvency, and a cheaper price for more favorable, paywhen-paid subcontract language. Getting Financial Information A subcontractor should collect information from each prime contractor about its creditworthiness and the solvency of the contemplated project. With regard to the owner, a subcontractor should seek sufficient information to enforce mechanics liens and bonds, as well as information concerning the identity of the owner s lender and the type. This information should include: Name of project Address (legal description of real property) Project owner s name and address Owner s agent name and address Has the prime contractor provided the owner with a performance bond? Has the prime contractor provided the owner with a payment bond? 8

10 The percentage of the bond Name and address of surety company Name and address of surety company agent Construction loan information, including source, contact and address Permanent loan, including source, contact and address Name, agent and address of any municipal or government agency involved in the funding of the project AGC s resources suggest that contractors should look beyond loan commitments. AGC s Guidelines for Obtaining Owner Financial Information states that the actual loan agreements for construction and permanent financing are preferable over a simple commitment letter, because the loan documents will include all of the lender conditions and requirements. Of significance are the requirements for notification to the lender, whether the lender must approve changes, and assignment of the contract to the lender. The AGC Guidelines also provide tips for evaluating loan commitments and other documents, such as: 10. Beware of a loan commitment that covers items other than construction. 11. Request a lender s set-aside letter that acknowledges the portion of construction loan proceeds available exclusively for payment of construction draws Ask for a copy of the owner s agreement with the architect. This will assist in assessing whether sufficient funds are available to cover the owner s financial obligations, particularly if loan proceeds can be used to pay design costs. It will also identify the architect s contract administration responsibilities and whether the architect s responsibilities are consistent with the provisions of the general conditions for the project. AGC s Guidelines also suggest obtaining the owner s credit report, and are distributed with an Owner Financial Questionnaire that provides a checklist including such items as the owner s Dun & Bradstreet rating, bank references and certified financial statements. A subcontractor should consider the terms of its subcontracts (e.g., pay-if-paid vs. paywhen-paid), as well as the information contained in disclosures that they do obtain, when deciding whether to be satisfied with a loan commitment letter or loan agreement, or to seek additional evidence of adequate project financing and owner creditworthiness. Conclusion The terms for the extensions of credit typically made by contractors and subcontractors are stated in the payment terms of a construction contract. Those terms generally require construction contractors and subcontractors to have fully completed any work 9

11 which is the subject of an invoice, with written certification from either the project architect or another owner representative that the work has, in fact, been properly completed. Those terms also generally require lien waivers or a sworn certification from the party seeking payment, showing that all lower-tier laborers and suppliers have already been paid in full. Thus, the extension of credit by contractors and subcontractors is a requirement of most, if not all, construction contracts and subcontracts. Laborers must be paid on a regular basis or civil and criminal penalties can result. Equipment and machinery must be maintained in productive, moneygenerating activity to pay for rental and upkeep. Crucial material suppliers must be kept current. Any sizable construction project entails a huge credit risk from the standpoint of any construction contractor or subcontractor. Payment terms like pay-when-paid that shift the burden of late payments to subcontractors, and pay-if-paid clauses that shift the burden of project insolvency to subcontractors, must be considered when deciding whether to bid work, what the price should be, and what financial disclosures should be required. On every project, subcontractors should assert their right to adequate disclosures of the owner s financial arrangements. Such disclosures ultimately will benefit owners in the form of lower prices and better quality services. 10

Contingent Payment Frequently Asked Questions

Contingent Payment Frequently Asked Questions August 2015 Contingent Payment Frequently Asked Questions Subcontractors continue to report that one of the most objectionable subcontract provisions they face is a clause that legally prevents them from

More information

FINISHING CONTRACTORS ASSOCIATION

FINISHING CONTRACTORS ASSOCIATION FINISHING CONTRACTORS ASSOCIATION GETTING PAID IN TROUBLED TIMES: IMPORTANT CONTRACTUAL ISSUES It is more important than ever for subcontractors to do everything they can to ensure their rights to payment.

More information

Consolidated Insurance Programs: Using ASA Tools to Address Costs and Hidden Risks

Consolidated Insurance Programs: Using ASA Tools to Address Costs and Hidden Risks Consolidated Insurance Programs: Using ASA Tools to Address Costs and Hidden Risks Authored by Richard B. Usher Principal Managing Member Hill & Usher LLC Phoenix, Arizona Published by American Subcontractors

More information

AIA Document A103 TM 2007

AIA Document A103 TM 2007 AIA Document A103 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work plus a fee without a Guaranteed Maximum Price AGREEMENT made as of the

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):

More information

Mastering Subcontract Performance and Scope Requirements

Mastering Subcontract Performance and Scope Requirements Mastering Subcontract Performance and Scope Requirements Published by American Subcontractors Association, Inc. Foundation of the American Subcontractors Association, Inc. 1004 Duke Street Alexandria VA

More information

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition Document A232 2009 SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address)

More information

Document A201 TM 2007 SP

Document A201 TM 2007 SP AIA Document A201 TM 2007 SP General Conditions of the Contract for Construction, for use on a Sustainable Project for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status

More information

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition Document A232 2009 General Conditions of the Contract for Construction, Construction Manager as Adviser Edition for the following PROJECT: (Name, and location or address) THE CONSTRUCTION MANAGER: (Name,

More information

Trade Association Form Subcontracts: The Good, The Not So Bad, And the Ugly

Trade Association Form Subcontracts: The Good, The Not So Bad, And the Ugly KILLER CONTRACT CLAUSES Donald W. Gregory, Esq. KEGLER, BROWN, HILL & RITTER Attorneys & Counselors at Law 65 E. State Street, Suite 1800 Columbus, OH 43215 (614) 462-5400 Trade Association Form Subcontracts:

More information

ConsensusDocs Guidebook

ConsensusDocs Guidebook ConsensusDocs Guidebook ConsensusDocs 410 Agreement and General Conditions Between Owner and Design-Builder (Cost of the Work Plus Fee with GMP) August 2013 Edition Page 1 of 10 Copyright 2013 by ConsensusDocs

More information

Construction Law: Greensboro Builders Association Remodelers Counsel

Construction Law: Greensboro Builders Association Remodelers Counsel Construction Law: Greensboro Builders Association Remodelers Counsel February 25, 2010 J. Patrick Haywood Carruthers & Roth, P.A. 235 N. Edgeworth Street Greensboro, NC 27401 Direct Line: (336) 478-1177

More information

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE Page 1 of 37 for the following PROJECT: (Name and location or address) EXAMPLE THE OWNER: (Name and address) Example, THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3

More information

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated:

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated: Document A142 2014 Standard Form of Agreement Between Design-Builder and Contractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Design-Builder: (Name,

More information

AGC TEXT COPY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA AGC DOCUMENT NO. 603 STANDARD SHORT FORM AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR

AGC TEXT COPY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA AGC DOCUMENT NO. 603 STANDARD SHORT FORM AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA AGC DOCUMENT NO. 603 STANDARD SHORT FORM AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor Assumes Risk of Owner Payment) The original text

More information

Understanding the Risks of Construction Management (CM)

Understanding the Risks of Construction Management (CM) PROFESSIONAL LIABILITY UPDATE A Loss Prevention Newsletter for the Design Profession MSP PL 07/02: Understanding the Risks of Construction Management (CM) July, 2002 Understanding the Risks of Construction

More information

ANNEX A Standard Special Conditions For The Salvation Army

ANNEX A Standard Special Conditions For The Salvation Army ANNEX A Standard Special Conditions For The Salvation Army TO BE ATTACHED TO AIA B101-2007 EDITION ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT 1. Contract Documents. This Annex supplements,

More information

Managing design professional risks arising out of the Prime/Subcontractor relationship

Managing design professional risks arising out of the Prime/Subcontractor relationship Managing design professional risks arising out of the Prime/Subcontractor relationship June 22, 2017 Gail S. Kelley P.E., Esq., LEED AP J. Kent Holland, J.D. ConstructionRisk, LLC Copyright Information

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): A201 conversion Michigan State University East Lansing, MI THE OWNER:

More information

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address) Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) Case Western Reserve University

More information

Better Contracts, Better Projects: The ConsensusDocs Solution

Better Contracts, Better Projects: The ConsensusDocs Solution Better Contracts, Better Projects: The ConsensusDocs Solution Better Contracts, Better Projects: The ConsensusDocs Solution Richard H. Lowe Duane Morris LLP This session is eligible for 1 Contact Hour.

More information

DATE ISSUED: 10/20/ of 13 UPDATE 103 CV(LEGAL)-P

DATE ISSUED: 10/20/ of 13 UPDATE 103 CV(LEGAL)-P Note: For information on procuring goods and services under Education Code Chapter 44, see CH. Board Authority Delegation of Authority Contracts Valued at or Above $50,000 A district may adopt rules as

More information

INVITATION TO BID. Pre-Bid Showing: Enter Date and Time Here. Please call by Enter Date and Time Here to reserve a bid packet and confirm attendance.

INVITATION TO BID. Pre-Bid Showing: Enter Date and Time Here. Please call by Enter Date and Time Here to reserve a bid packet and confirm attendance. INVITATION TO BID Notice to Bidders: Bids will be received by the Port of Shelton, 21 W Sanderson Way, Shelton, WA 98584 for the following work order: Work Order: Enter # and Name Here Pre-Bid Showing:

More information

Shutting Down the Construction Project

Shutting Down the Construction Project White Paper Real Estate August 2012 Shutting Down the Construction Project by Robert A. James, Amy L. Pierce and Noa L. Clark Article originally appeared in Perspectives on Real Estate, Spring 2010 edition.

More information

ConsensusDocs 750 vs. AIA A : Which is Best For You?

ConsensusDocs 750 vs. AIA A : Which is Best For You? ConsensusDocs 750 vs. AIA A401 2007: Which is Best For You? Presented for the AGC NE Building Chapter by Kory George and Brian Koerwitz Woods & Aitken LLP Omaha, Lincoln, Denver, Washington D.C. kgeorge@woodsaitken.com

More information

FACILITIES CONSTRUCTION (LEGAL)

FACILITIES CONSTRUCTION (LEGAL) Note: For information on procuring goods and services under Education Code Chapter 44, see CH. For additional legal requirements applicable to purchases with federal funds, see CBB. Board Authority Delegation

More information

WHEN CAN YOU STOP WORK FOR NONPAYMENT?

WHEN CAN YOU STOP WORK FOR NONPAYMENT? WHEN CAN YOU STOP WORK FOR NONPAYMENT? PLANNING AHEAD When an owner or general contractor has not paid a roofing contractor the sums it is owed under the contract, the roofing contractor is faced with

More information

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR Job No. [ ] Subcontract No. [ ] This Agreement is made this [ ] day of [ ], [ ], by and between CONSTRUCTOR, L&L Builders

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name and address) THE ARCHITECT: (Name and address) TABLE

More information

Why is Credit Management important?

Why is Credit Management important? Why is Credit Management important? Cash flow is crucial for the survival and success of any business. It is generally accepted that cash flow is the single most pressing concern of most small and medium-sized

More information

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) this Agreement; (2) the prime Contract, consisting of the Agreement between the Owner and Contractor and the other Contract

More information

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR GENERAL INSTRUCTIONS. These instructions are solely for the information and convenience of ConsensusDocs users, and

More information

Document A South Carolina Division of Procurement Services, Office of the State Engineer Version of

Document A South Carolina Division of Procurement Services, Office of the State Engineer Version of South Carolina Division of Procurement Services, Office of the State Engineer Version of Document A201 2007 General Conditions of the Contract for Construction This version of AIA Document A201 2007 is

More information

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project Document A105 2007 Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

ENERGY EFFICIENCY CONTRACTOR AGREEMENT

ENERGY EFFICIENCY CONTRACTOR AGREEMENT ENERGY EFFICIENCY CONTRACTOR AGREEMENT 2208 Rev. 2/1/13 THIS IS AN AGREEMENT by and between PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY (the District ) and a contractor registered with the State

More information

In every contract over $10,000, the provisions in A. and B. below apply: A. During the performance of this contract, the vendor agrees as follows:

In every contract over $10,000, the provisions in A. and B. below apply: A. During the performance of this contract, the vendor agrees as follows: The following Terms and Conditions are MANDATORY and shall be incorporated verbatim in any contract award: 1. APPLICABLE LAWS AND COURTS: This solicitation and any contract resulting from this solicitation

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

IFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3

IFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3 JUNE 23, 2016 ATTENTION ALL PROPONENTS: IFB F2015017 B-WING RENOVATIONS IFB F2015007 9C OFFICES BUILD OUT Addendum 3 The purpose of this Amendment is to advise all offertories of the following: 1. In Project

More information

AIA Document A101 TM 2007

AIA Document A101 TM 2007 AIA Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month

More information

SUBCONTRACT FOR BUILDING CONSTRUCTION

SUBCONTRACT FOR BUILDING CONSTRUCTION SUBCONTRACT FOR BUILDING CONSTRUCTION TABLE OF ARTICLES 1. AGREEMENT 2. SCOPE OF WORK 3. SCHEDULE OF WORK 4. CONTRACT PRICE 5. PAYMENT 6. CHANGES, CLAIMS AND DELAYS 7. CONTRACTOR'S OBLIGATIONS 8. SUBCONTRACTOR'S

More information

! " # $ " % made as of the 24 day of May in the year 2006 (In words, indicate day, month and year) the Owner: (Name, address and other information)

!  # $  % made as of the 24 day of May in the year 2006 (In words, indicate day, month and year) the Owner: (Name, address and other information) ! " # $ " % made as of the 24 day of May in the year 2006 (In words, indicate day, month and year) the Owner: (Name, address and other information) Wynne Public Schools P.O. Box 69 Wynne, AR 72396 Telephone

More information

Document A Exhibit A

Document A Exhibit A Design-Build Amendment Document A141 2014 Exhibit A This Amendment is incorporated into the accompanying AIA Document A141 2014, Standard Form of Agreement Between Owner and Design-Builder dated the day

More information

Washington University in St. Louis

Washington University in St. Louis Washington University in St. Louis Construction Terms and Conditions A. AGREEMENT. The Purchase Order, these Terms and Conditions, any special conditions, Owner s Policies, Design Standards and Insurance

More information

Document A Instructions

Document A Instructions TM Document A103 2007 Instructions Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price GENERAL INFORMATION

More information

I SIGNED THAT? SCARY STORIES & SOLUTIONS

I SIGNED THAT? SCARY STORIES & SOLUTIONS I SIGNED THAT? SCARY STORIES & SOLUTIONS Contract Clauses and Practices That Impact Your Insurance Costs and Bottom Line Geoffrey S. Gavett Gavett, Datt & Barish, P.C. Presented by Chesapeake Region Safety

More information

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of. (Date of issuance of Owner s Purchase Order) BETWEEN the

More information

The Toler Firm LLC A Construction Law Firm Timothy N. Toler September 23, 2015

The Toler Firm LLC A Construction Law Firm Timothy N. Toler September 23, 2015 The Toler Firm LLC A Construction Law Firm Timothy N. Toler September 23, 2015 Negotiating 8 Key Contract Clauses from the Contractor s Perspective (Part 1 of 2) 1 This is the first of a two-part overview

More information

Mini-Brooks Qualifications Based Selection Supplement of Design/Build Statutes

Mini-Brooks Qualifications Based Selection Supplement of Design/Build Statutes The Supplement Presentation as of August, 2015 Mini-Brooks Qualifications Based Selection Supplement of Design/Build Statutes (the full Statutes for Design/Build approaches with an analysis of each) David

More information

Document A Standard Form of Agreement Between Contractor and Subcontractor

Document A Standard Form of Agreement Between Contractor and Subcontractor Document A401 2017 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name, legal

More information

Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor Document A401 2007 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the in the year (In words, indicate day, month and year.) day of BETWEEN the Contractor: (Name, legal

More information

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk CMAA Document CMAR-1 Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk 2004 EDITION This document is to be used in connection with CMAA Standard Form of Contract

More information

520 - Purchasing Policy

520 - Purchasing Policy 520 - Purchasing Policy Table of Contents 1.0 Purpose... 2 2.0 General Responsibilities... 2 2.1 General Authority... 2 2.2 Written Contracts / When Required... 2 3.0 Open Market Purchases... 2 3.1 General

More information

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures. Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures. Contractor City, Zip Work Phone Number: Cell Phone Number: Fax Number: Email

More information

NC General Statutes - Chapter 143 Article 8 1

NC General Statutes - Chapter 143 Article 8 1 Article 8. Public Contracts. 143-128. Requirements for certain building contracts. (a) Preparation of specifications. Every officer, board, department, commission or commissions charged with responsibility

More information

CLAUSE AND EFFECT BASIC CONTRACT LAW PRINCIPLES AND KILLER CONTRACT CLAUSES

CLAUSE AND EFFECT BASIC CONTRACT LAW PRINCIPLES AND KILLER CONTRACT CLAUSES CLAUSE AND EFFECT BASIC CONTRACT LAW PRINCIPLES AND KILLER CONTRACT CLAUSES Presented to: Insulation Contractors Association of America 2016 Annual Convention and Trade Show Denver, Colorado September

More information

The "Standard" Form Contract: Exploring the Decennial 2017 Changes to the AIA Contract Forms

The Standard Form Contract: Exploring the Decennial 2017 Changes to the AIA Contract Forms The "Standard" Form Contract: Exploring the Decennial 2017 Changes to the AIA Contract Forms Daniel Lund III Carys A. Arvidson February 1, 2018 CPM Conference New Orleans What happens when the construction

More information

Sand Purchase for Golf Course Bunker Renovation. Hoffman Estates Park District

Sand Purchase for Golf Course Bunker Renovation. Hoffman Estates Park District Hoffman Estates Park District BID DATE: 12/5/16 BID TIME: 10am CST PREPARED BY: Brian Bechtold Director of Golf Operations 847-781-3679 HOFFMAN ESTATES PARK DISTRICT 1685 W. Higgins Road Hoffman Estates

More information

ADDENDUM TO AGCC3. Unless otherwise stated, the contract price includes all taxes.

ADDENDUM TO AGCC3. Unless otherwise stated, the contract price includes all taxes. ADDENDUM TO AGCC3 This is an Addendum to the AGCC3 Long Form Standard Subcontract and shall amend and modify the Subcontract and any Contract Documents. 1. Section 3: Add the following language: Unless

More information

MASTER SUBCONTRACT AGREEMENT

MASTER SUBCONTRACT AGREEMENT Back s Construction, Inc. 1602 Front Street, Suite 100 San Diego, CA 92101 Phone: 619-713-2566 Fax: 619-713-0992 MASTER SUBCONTRACT AGREEMENT This subcontract made and entered into this Monday, January

More information

AIA Document A201 TM 2007

AIA Document A201 TM 2007 AIA Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) Pre-Construction and Construction Management at Risk Services Lafayette

More information

CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION. THIS AGREEMENT, made this day of, 2018,

CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION. THIS AGREEMENT, made this day of, 2018, CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION THIS AGREEMENT, made this day of, 2018, signed between Nampa & Meridian Irrigation District, hereafter referred to as "NMID" and, of (address), hereinafter

More information

RECENT CHANGES TO THE AIA CONTRACT DOCUMENTS. R. DOUGLAS REES COOPER & SCULLY, P.C. 900 Jackson Street, Suite 100 Dallas, Texas 75202

RECENT CHANGES TO THE AIA CONTRACT DOCUMENTS. R. DOUGLAS REES COOPER & SCULLY, P.C. 900 Jackson Street, Suite 100 Dallas, Texas 75202 R. DOUGLAS REES COOPER & SCULLY, P.C. 900 Jackson Street, Suite 100 Dallas, Texas 75202 4 th Annual Construction Symposium January 30, 2009 Dallas, Texas TABLE OF CONTENTS Page I. Introduction... 1 II.

More information

Preventing and Managing the Risk of a Subcontractor Default A Best Practices Checklist

Preventing and Managing the Risk of a Subcontractor Default A Best Practices Checklist Tough times have depleted balance sheets and left working capital levels dangerously low for many subcontractors. Defaults are on the rise and expected to increase; a trend that has somewhat been masked

More information

The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY

The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY From Financial Management & Accounting for the Construction Industry, CFMA. Accounts Payable Obligations to pay for goods and services that have

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) THE ARCHITECT: (Name, legal

More information

STRUCTURAL ENGINEERS ASSOCIATION OF ARIZONA. Gail S. Kelley, P.E., Esq., LEED AP June 3, 2017

STRUCTURAL ENGINEERS ASSOCIATION OF ARIZONA. Gail S. Kelley, P.E., Esq., LEED AP June 3, 2017 STRUCTURAL ENGINEERS ASSOCIATION OF ARIZONA Gail S. Kelley, P.E., Esq., LEED AP June 3, 2017 2 Engineer shall indemnify, defend, and hold harmless the Client Suggested changes: Delete the word defend Edit

More information

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE 1. DEFINITIONS 1 2. COMPOSITION OF THE ARCHITECT-ENGINEER 1 3. INDEPENDENT CONTRACTOR 1 4. RESPONSIBILITY OF THE ARCHETECT-ENGINEER

More information

Document A701 TM. Instructions to Bidders

Document A701 TM. Instructions to Bidders Instructions to Bidders Document A701 TM 1997 for the following PROJECT: (Name and location or address) St. Croix Regional Education District Technology Bid Package St. Croix River Educational District

More information

Public Review Draft PORT OF HOOD RIVER RULE PUBLIC PRIVATE PARTNERSHIPS FOR BRIDGE PROJECTS AND BRIDGE PROJECT ACTIVITIES

Public Review Draft PORT OF HOOD RIVER RULE PUBLIC PRIVATE PARTNERSHIPS FOR BRIDGE PROJECTS AND BRIDGE PROJECT ACTIVITIES PORT OF HOOD RIVER RULE PUBLIC PRIVATE PARTNERSHIPS FOR BRIDGE PROJECTS AND BRIDGE PROJECT ACTIVITIES. PURPOSE AND INTENT OF RULE () The primary purpose of this Rule is to describe the process for developing

More information

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor Document A401 TM 2007 Standard Form of Agreement Between Contractor and Subcontractor AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Contractor: (Name,

More information

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between SHORT FORM STANDARD SUBCONTRACT This Agreement is made this day of, 20, between (Contractor) and (Subcontractor). The work described in Section I below shall be performed in accordance with the prime contract

More information

Chapter Survey. Required Contract Elements. Offer and Acceptance

Chapter Survey. Required Contract Elements. Offer and Acceptance Contract Management Chapter Survey Required Contract Elements Contract Provisions Breach of Contract Boilerplate Provisions Provisions to Limit Risk What Are Recitals? Types of Construction Contracts Contracting

More information

This Webcast Will Begin Shortly

This Webcast Will Begin Shortly This Webcast Will Begin Shortly If you have any technical problems with the Webcast or the streaming audio, please contact us via email at: splemoderator@smartpros.com Thank You! 1 KEY ISSUES IN NEGOTIATING

More information

Educational Use Only S A M P L E S A M P L E

Educational Use Only S A M P L E S A M P L E CONSENSUSDOCS 750 STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR This document was developed through a collaborative effort of entities representing a wide cross-section of the construction

More information

Credit Enhancements: Beyond the Personal Guaranty. Thomas R. Fawkes and Brian J. Jackiw Goldstein & McClintock LLLP

Credit Enhancements: Beyond the Personal Guaranty. Thomas R. Fawkes and Brian J. Jackiw Goldstein & McClintock LLLP Credit Enhancements: Beyond the Personal Guaranty Thomas R. Fawkes and Brian J. Jackiw Goldstein & McClintock LLLP Warning Signs of Impending Default Deviations in the manner or timing of counterparty

More information

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 TM 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the day of in the year (In words, indicate day, month and

More information

Introduction and Overview

Introduction and Overview Introduction to Public Contracting Procurement and Public Works Presented by Barbara R. Gadbois, Esq. and Theodore L. Senet, Esq. County Counsels Association of California March 17, 2016 2016 Gibbs Giden

More information

SUPPLIER - TERMS AND CONDITIONS Materials and Goods

SUPPLIER - TERMS AND CONDITIONS Materials and Goods SUPPLIER - TERMS AND CONDITIONS Materials and Goods 1. BINDING EFFECT; ACCEPTANCE. This purchase order and all subsequent purchase orders delivered by Buyer to Seller (each, an "order"), shall be governed

More information

Texas Lien & Bond Law Booklet

Texas Lien & Bond Law Booklet Texas Lien & Bond Law Booklet Presented by: Jason C. Spencer Telephone: (512) 900-3032 Facsimile: (512) 900-3082 jspencer@andrewsmyers.com www.andrewsmyers.com AUTHOR BIO Jason C. Spencer is a shareholder

More information

L O S S C O N T R O L

L O S S C O N T R O L L O S S C O N T R O L CONTRACTORS' ADVISORY INFORMATION GENERAL AND SUBCONTRACTORS INDEMNITY AND INSURANCE AGREEMENTS INTRODUCTION To meet the needs of many of our Producers or Agents who have developed

More information

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope TM Document A107 2007 Instructions Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope GENERAL INFORMATION Purpose. AIA Document A107 2007 establishes the agreement between

More information

Welcome to SURETY 101

Welcome to SURETY 101 Welcome to SURETY 101 1 Today we will provide an overview of Surety Bonds covering: Simple definitions Understanding the differences between bonds and insurance The concept of indemnity and how it relates

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: Proposed Renovations to a Portion of the Township Municipal Building 175 West Valley Forge Road King

More information

SUBCONTRACTOR EXPECTATIONS IN FEDERAL CONTRACTING

SUBCONTRACTOR EXPECTATIONS IN FEDERAL CONTRACTING SUBCONTRACTOR EXPECTATIONS IN FEDERAL CONTRACTING Reducing Risk & Meeting Requirements as Government Subcontractor AGENDA ointroduction othe Process oproposal Phase onegotiations ocompliance and Accountability

More information

REQUEST FOR PROPOSAL: 8/25/2012 NUMBER OF COPIES TO SUBMIT: TWO (2) Page 1

REQUEST FOR PROPOSAL: 8/25/2012 NUMBER OF COPIES TO SUBMIT: TWO (2) Page 1 A REQUEST TO SUBMIT PROPOSALS FOR DEMOLITION CONTRACTORS FOR DEMOLITION OF PROPERTIES WITH COMMUNITY DEVELOPMENT BLOCK GRANT ( CDBG ) FUNDS FOR THE CITY OF PONTIAC This is a Federally Funded project. The

More information

Subcontract Agreement

Subcontract Agreement S THIS AGREEMENT made as of the day of, 2012 BETWEEN the Contractor: TCL Partners 5212 123 rd Place SE Everett, WA 98208 and the For the Following Project: The Architect for the Project: The Contractor

More information

Payment Terms: Entitlement, Timing and Security

Payment Terms: Entitlement, Timing and Security Payment Terms: Entitlement, Timing and Security Introduction: Progress Payments and Final Payment Payments to construction subcontractors can be divided into two categories: progress payments and final

More information

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents:

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents: In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents: A101-2017: Standard Form of Agreement Between Owner and Contractor where

More information

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office and

More information

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties. SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of, 20 by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office

More information

SECTION NOTICE TO BIDDERS

SECTION NOTICE TO BIDDERS SECTION 00 0030 NOTICE TO BIDDERS MAQUOKETA COMMUNITY SCHOOL AG LEARNING CENTER MAQUOKETA, IA NOTICE IS HEREBY GIVEN: Sealed bids for a Lump Sum Bid under a Single Construction Contract for the Maquoketa

More information

The Battle Royal: AGC Consensus Contracts vs. AIA Documents

The Battle Royal: AGC Consensus Contracts vs. AIA Documents The Battle Royal: AGC Consensus Contracts vs. AIA Documents David A. Ericksen, Esq. Severson & Werson, A Professional Corporation One Embarcadero Center, 26th Floor, San Francisco, CA 94111 Direct Line:

More information

Document A Exhibit A Insurance and Bonds

Document A Exhibit A Insurance and Bonds Document A101 2017 Exhibit A Insurance and Bonds This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor, dated the day of in the year (In words, indicate day, month

More information

CONSTRUCTION CONTRACT EXAMPLE

CONSTRUCTION CONTRACT EXAMPLE P a g e 1 CONSTRUCTION CONTRACT EXAMPLE THIS AGREEMENT, made and entered into this date, by and between, hereinafter called CONTRACTOR, and NPC QUALITY BURGER, INC., hereinafter called OWNER. IT IS HEREBY

More information

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents. the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor. 2.2.2

More information

1 Exam Prep AIA A-701 Questions

1 Exam Prep AIA A-701 Questions 1 Exam Prep AIA A-701 Questions 1. Written or graphic instruments used by the architect prior to the execution of the contract which modify or interpret the bidding documents by additions, deletions, clarifications

More information

SUBCONTRACTOR AGREEMENT

SUBCONTRACTOR AGREEMENT SUBCONTRACTOR AGREEMENT THIS AGREEMENT MADE THIS DAY OF IN THE YEAR OF 2016 (In words, indicate day, month and year) BETWEEN DeWitt & Associates, Inc. 1256 South Barnes Springfield, Missouri 65804 AND:

More information

Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor Standard Form of Agreement Between Contractor and Subcontractor GENERAL TERMS AND CONDITIONS ARTICLE 1 THE SUBCONTRACT DOCUMENTS 1.1 The Subcontract Documents consist of (1) these General Terms and Conditions,

More information

Contract No BO0. A. Definitions. As used in this Contract the terms are defined as follows:

Contract No BO0. A. Definitions. As used in this Contract the terms are defined as follows: A. Definitions Contract No. 13139BO0 As used in this Contract the terms are defined as follows: 1. County and/or Owner shall mean the Board of County Supervisors of Prince William County, Virginia, or

More information

RULES FOR CONSTRUCTING PROJECTS UNDER THE GEORGIA LOCAL GOVERNMENT PUBLIC WORKS CONSTRUCTION LAW

RULES FOR CONSTRUCTING PROJECTS UNDER THE GEORGIA LOCAL GOVERNMENT PUBLIC WORKS CONSTRUCTION LAW 1075 Peachtree Street, N.E. Suite 2500 Atlanta, GA 30309-3962 (404) 885-1500 Fax (404) 892-7056 http:/www.seyfarth.com/ 404.888.1883 direct 404.892.7056 fax danmcrae@mindspring.com dmcrae@seyfarth.com

More information