1 Economic Framework for Power Quality Dr. R Venkatesh, Deputy General Manager, Switchgear-6 and Power Quality Business, Crompton Greaves Ltd., Aurangabad. 1. Background With the increasing emphasis on energy conservation, widening demand-supply gap in energy, proliferation of non-linear loads, increasing awareness of power quality aspects, stringent standards and guidelines have made power conditioning a necessity today. There is a distinct shift from the two-dimensional power (quantity & cost) to a three dimensional power (quantity, quality and cost) and the importance of power quality improvement is well understood and appreciated. But the actual improvement initiatives has not picked up due to the perceived high capital investment in power conditioning devices and not so clear benefits that could be directly quantified into monetary benefits for the purpose of computation of pay back period or cost benefit analysis. This has created an immediate need to establish a conceptual framework to quantify the cost of poor power quality or the benefits of power quality improvement / power conditioning. This paper aims at identifying and classifying the benefits of power conditioning and establishes a basic framework for the computation and quantification of benefits of power quality improvement. 2. Aspects of power quality The essential elements of quantification of cost of poor power quality include identification of the various aspects of power quality and their implications and evolve from first principles the cost associated with each of the aspect (issue) of power quality and the benefits of improvement. By the basic definition power quality is the product of voltage quality and current quality and the elements of voltage and current quality are: Voltage quality: Magnitude (steady state, short duration & transient) Shape (frequency, frequency content) Current quality: Magnitude (steady state, short duration & transient)

2 Shape (frequency, frequency content) The changes in magnitude and shape factor of voltage and current manifest itself in the form of certain common power quality issues as: Reactive power / power factor Harmonics Transients Unbalance Flicker Sags & swells Sequence components Frequency excursions Steady state voltage limits Black outs & brown outs Of all the aspects the three most common are the low power factor, harmonic distortion and transients and for illustrative purpose only two aspects namely reactive power (power factor) and harmonics are considered. 3. Implications of poor power quality Some of the implications of power quality, especially related to power factor and harmonics are: Increase in line & equipment current leading to additional ohmic loses Increase in line & equipment current leading to blocked capacity and/or increased capital investment. Increased losses leading to higher operating temperatures and consequent reduction in life of equipment. Premature failure of equipment due to increased electrical and thermal stresses. Mal function of equipment Poor quality of production Unplanned outages leading to loss of production 4. Solutions for power conditioning /Custom power solutions Most of the power conditioning devices are custom built to meet a certain customer technical performance requirement and a target cost. While the technical performance is driven by the statutory & regulatory requirements, compliance to standards etc., in most cases the major driver

3 is the financial incentive arising out of power conditioning. This requires that the solution is optimal and offers the highest benefit to cost ratio. To ensure optimality of the solution it is necessary to capture all the performance requirements, cost and benefit elements and arrive at an optimal solution through an iterative process within the specified boundary conditions. To facilitate such an iterative process one important aspect s to understand and quantify all the benefit and cost elements and define the boundary conditions. While the method of defining the boundary conditions and developing the iterative process is important, this paper deals only with the capturing and quantifying the benefit and cost elements to serve as a base for the development of a holistic economic fame work for power conditioning solutions. 5. Choosing the appropriate solution Tools & Techniques Most of the business decisions, especially those related to purchase decisions revolve around two main questions, To buy or not to buy and which is the best buy. These two questions an be further broken down to a series of questions related to what to buy?, when to buy?, from whom to buy?, what should be he target cost? Etc. The concept of Value for Money in its simplistic form can be converted into a more industrial language and aims at answering the fundamental questions 1. Where to invest the money: to compare, evaluate and choose amongst the competing customer / user requirements with a limed funds to spend. (Decision to choose the area) 2. Where to source the product/service from?: Having chosen the area for spend to compare, evaluate and choose among competing products /technologies. (Decision to chose the supplier) The basic tools se for these are i. Benefit-Cost analysis ii. Pay back calculation iii. Life cycle costing. While the first two tools are generally used for identifying the best investment area the last tool is best used for comparing and evaluating competing products / suppliers. 5.1 Benefit-Cost analysis This is a very simple technique used to compare amongst competing needs to identify the best investment. The technique an also be used for comparing competing products / technologies using marginal cost marginal benefit method.

4 The area / the product that offers the highest benefit to cost ratio (BCR) is the obvious choice. In any case it is expected that the ratio is more than 1 and higher the ratio better the investment. While using the tool it should be ensured that all benefits (tangible & tangible) and costs (direct & indirect, quantifiable & non-quantifiable) are captured to facilitate a correct decision. One variation of the technique could use two separate rations for tangible & intangible benefits and corresponding factors on cost. The tool can be used also to compare competing products using marginal/incremental cost to marginal benefit ratios. 5.2 Pay Back Calculation This is similar to ROI calculation and aims at computing the period over which the investment would pay for itself and then start making profits. Here again the benefit and costs are quantified in monetary terms and additional parameters such as cost of finance, interest, depreciation etc. are used to arrive at the pay back period. This technique also requires that all benefits & cost be captured and quantified. 5.3 Life Cycle costing The fundamental of life cycle costing is to identify and quantify the various cost elements in purchasing and using a particular product or service and estimating the annualized life cycle cost. Here again the trick les in identifying and quantifying the various cost elements correctly and estimating the added dimension of estimated /probable useful life. 6. Cost of power conditioning some aspects As illustrated above all the techniques require that the cost elements are captured and quantified. The various elements of the cost are Pre-Purchase cost Purchase cost Installation cost Operating cost Maintenance cost Disposal cost Apart from these cost elements we also need to estimate the most probable lie to compute the annualized life cycle cost. The various elements are illustrated in this section.

5 Pre-Purchase cost This involves the cost incurred from the time of decision to but to the actual purchase decision. This involves the cost associated with evaluating the need, understanding requirements, drafting specifications, tendering, evaluating vendors, releasing order etc. The cost is negligible for standard items and can be a very significant part for customized industrial products. In some cases this could involve consultants fees for specifying products and evaluating suppliers. Due credit should be given to suppliers who do a part of understanding the requirements, help select the appropriate product, do application engineering and offer a value added package. Purchase cost Is the actual landed cost and is the most clearly visible part of the total cost. This included the basic price, taxes and duties, freight & insurance etc. It would be gross mistake if only this cost is considered for evaluating the competing vendors / products/technologies as this could represent only a small fraction of the total cost. Installation cost Is the cost that is required to install the product as to enable it function properly. This cost includes cost of civil work, structural work, cabling, ducting, auxiliaries, labor for erection etc. Obviously that product that offers a complete solution, is easy to handle, transport, store & install gets a higher score (or a lower installation cost in absolute terms). In some cases the physical space required for installation (compactness) can be a major cost factor where space is at a premium. Operating cost This is the second most important cost element after purchase cost. This includes the money that has to be spent over the entire life for the proper operation / functioning of the equipment. This typically includes consumption of resources such as energy/power, water, air, oil etc. This could also include the training cost, cost of skilled personnel for operation etc. This is an important consideration for energy efficient equipment such as motors and transformers. Typically for a motor this fraction of the cost represents about 90% to 95% of the total life cycle cost as against only 2% to 8% of the cost fraction assignable to the purchase cost. Maintenance cost This is the third most important factor and this includes the cost of maintenance including consumption of material, labor, training cost for maintenance team etc. Obviously products that are maintenance free have a higher score and contribute to a lower absolute value in the life cycle

6 costing. The cost also could include factors such as MTDF, reliability & average life of the equipment. As an example dry type products current transformers score better than their oil filled counterparts in this cost factor. Disposal cost This is the cost that needs to be incurred in disposing off the product at the end of useful life. This cost factor could have a positive or a negative sign. Where one needs to pay to get the products disposed off, the cost has a positive sign and if the product could be sold off (either as scrap or seconds) then the cost has a negative sign. The cost of disposal should consider the product life cycle, eco-friendliness, and environmental aspects in assigning a cost to this fraction. Products that contain materials that are banned / expected to be banned/that are not easily bio-degradable should be assigned a higher cost of disposal. Life Estimation-Probable life It is possible to estimate the probable life of given equipment within a certain confidence interval under a given set of operating conditions using analytical techniques. This requires a thorough understanding of the failure modes and ageing mechanisms, knowledge of operating stress and system conditions, proficiency in stochastic and life estimation techniques etc. Also this is a rigorous technique fraught with dangers of wrong estimation and excludes sudden failures and abnormal conditions. In most cases his rigorous technique can be substitutes by a more simplistic and empirical technique without much loss of accuracy. The empirical technique is based on the correction factor applied to average life. The average life is based on historical data covering all products (of similar nature & function) from large number of suppliers spanning a sufficiently large time scale to preclude distortion due to random events. The correction factor is based on a set of quality estimates with a suitable weighting factor. The weighting factor depends upon the product under consideration

7 7. Benefits of power conditioning The benefits of power conditioning can be classified into four distinct types of benefits. The purpose of this classification is to capture all benefits and study their sensitivity to external factors. The success of the quantification would also depend upon converting more factors from the non-quantifiable to quantifiable benefits and identifying more parameters in the direct quantifiable / technical benefits. The classification also helps computation of payback (cost-benefit analysis) under two different heads, quantifiable and non-quantifiable for both the cost as well as the benefits. The four types of benefits are as illustrated in figure 1. Non- Quantifiable Improved voltage stability margins Reduction in equipment failure rates Reduction in equipment mal-function Compliance to standards & Regulations Quantifiable Reduction in equipment losses Release of blocked capacity Depreciation benefits Incentives Penalties Statutory levies Tariff benefits Technical Non-Technical Technical benefits are those that accrue due to improvements in operating efficiency and are directly related to fundamental laws of physics and are invariant with policies and guidelines to a large extent. Examples of this include reduction in line & equipment currents and consequent reduction in ohmic losses due to reactive power compensation (power factor improvement) and harmonic filtering. Non-technical benefits are those that accrue due to fiscal income due to regulatory norms and compliance to norms and are largely dependent upon existing policies and norms. Though some of the non-technical benefits have their roots in technical aspects of power conditioning (such as penalty for low power factor or incentive for high power factor), these to a large extent depend upon

8 government/utility policies are ad dependent on time & space. Examples of this include penalty / incentive for power factor, tax benefits (accelerated depreciation for some power conditioning / energy saving devices), compliance to standards & guidelines etc. Quantifiable benefits are those that can be easily and directly quantified in terms of monetary value and can be verified and validated easily. These include reduction in equipment losses and consequent reduction in energy bills, release of blocked capacity and avoided capital investment etc. Non-Quantifiable benefits are those that are difficult to be converted in fiscal benefits directly and are difficult to verify and are in most cases dependent on other external factors. Examples of this would include improvement in voltage stability margins, reduction in operating temperature of power equipment and consequent increase in life / reliability, reduction in equipment malfunction rate (due to harmonics in system) etc. The general benefits of power quality improvement include: Reduction in line & equipment currents and losses and hence lower energy bills Release of blocked capacity and consequent avoided cost of capital investment Improvement in power factor and avoided penalty for low power factor or incentive for high power factor. Reduction in maximum demand and reduction in demand charges. Tax benefits such as accelerated depreciation benefits for installation of power conditioning / energy saving devices. Improvement in voltage profile and consequent efficient operation of power equipment. Reduction in harmonic distortion and consequent reduction in copper loss, core loss and stray loss. Prevention of mal function of equipment and avoided loss of production. Elimination of unplanned outages and reduction in loss of production and revenue. Reduction / elimination of failure of equipment due to reduced electrical and thermal stress. Enhanced life / reliability of equipment due to lower operating temperature due to lower losses 8. Benefits of reactive power compensation & quantification of benefits The salient benefits of reactive power compensation and their quantification is as illustrated:

9 5.1. Reduction in current and losses. The reduction in line current due to power factor improvement / reactive power compensation can be directly computed from the first principles and the basic relationship with various power parameters as illustrated. S = V I P = V I cosϕ Q = V I sinϕ cosϕ = power factor = P/S = P/ (P 2 +Q 2 ) =cos(atan{q/p}) It is evident from the basic relationships that for the same real power flow, the line currents decrease with the increase in power factor. But considering the fact that there will be some losses associated with the flow of current proportional to the real power, for computing the benefits of power factor improvement, one needs to compute the marginal reduction in current due to power factor improvement. To compute the marginal reduction in line currents and associated losses the difference in losses is computed with the two different currents Reduction in current and blocked capacity Due to increase in line currents the capacity of the equipment (measured in terms of its current carrying capacity or the apparent power handling capacity) gets blocked. The blocked capacity can be computed as shown below: S1 = V I cosϕ1 S2 = V I cosϕ2 S = S2-S1, is the blocked capacity. Costing of released capacity can be computed either by the marginal cost of the increased capacity or the cost required to release the capacity Reduction in demand and demand charges The reduction in demand charges can be directly computed from the reduction in demand and the tariff rate for demand.

10 5.4. Tariff related Power factor improvement benefits The tariff elated benefits related to power factor improvement could either be the incentive for improved power factor or avoided penalty for poor power factor. These are again calculated directly from the utility tariff structure Reduction in losses and operating temperature and improved life of equipment Though difficult to compute and quantify, it is possible to estimate the loss of life due to thermal ageing due to operation at higher temperatures arising out of higher equipment currents and associated higher losses Tax benefits The benefits due to certain financial incentives (such as accelerated depreciation benefits) can be computed directly from the incentive structure Improved voltage stability margins Reactive power compensation / power factor improvement improves the regulation and voltage stability margins. Though difficult to quantify the direct and indirect benefits of improved voltage stability margins can be computed. 9. Benefits of harmonic filtering and quantification of benefits The salient benefits of harmonic fltering and their quantification is as illustrated: The method is similar to that used for quantification of benefit of reactive power compensation / power factor improvement Reduction in current and losses. The reduction in currents due to harmonic filtering in most cases s due to both the reduction in fundamental current (due to reactive power compensation, which is an essential part of most harmonic filtering solutions) as well as harmonic currents Reduction in current and blocked capacity 6.3. Reduction in demand and demand charges

11 6.4. Reduction in copper, core & stray losses Due to reduction in harmonic distortion there is a significant reduction in copper losses, core losses and stray losses. The reduction in copper losses is due to both the reduction in rms currents as well as due to reduction in resistance itself due to skin & proximity effects. The reduction in copper losses can again be quantified from the knowledge of reduction in currents and resistance. The reduction in core losses can again be computed from the knowledge of the eddy and hysteresis losses and their dependence on frequency. The stray loss reduction is also significant in most cases and can be computed from the knowledge of the harmonic spectrum and the characteristics of the losses Reduction in mal-function, nuiscence tripping and forced outages and consequent loss of production Tariff related Power factor improvement benefits 6.7. Reduction in losses and operating temperature and improved life of equipment 6.8. Tax benefits 6.9. Improved voltage stability margins 10. Summary The paper highlights the various benefits of power conditioning and some directions to quantify the benefits. To accurately estimate the viability or need for power conditioning it is required that the benefits and costs associated are fully captured, quantified and evaluated. Also illustrated are he various cost elements associated with the installation and se of power conditioning devices. With the proper quantification of the benefits of power quality improvement and costing of power conditioning devices (to capture all the costs associated and compute the life cycle cost) it is possible to use scientific tools such as benefit-cost analysis, pay back period or annualized life cycle costing and chose an appropriate power conditioning device.

DATA GAPS AND NON-CONFORMITIES

DATA GAPS AND NON-CONFORMITIES 17-09-2013 - COMPLIANCE FORUM - TASK FORCE MONITORING - FINAL VERSION WORKING PAPER ON DATA GAPS AND NON-CONFORMITIES Content 1. INTRODUCTION... 3 2. REQUIREMENTS BY THE MRR... 3 3. TYPICAL SITUATIONS...

More information

Chapter 8: Lifecycle Planning

Chapter 8: Lifecycle Planning Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance

More information

ENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK

ENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK ANNEXURE A ENTERPRISE RISK MANAGEMENT POLICY FRAMEWORK CONTENTS 1. Enterprise Risk Management Policy Commitment 3 2. Introduction 4 3. Reporting requirements 5 3.1 Internal reporting processes for risk

More information

STATISTICAL FLOOD STANDARDS

STATISTICAL FLOOD STANDARDS STATISTICAL FLOOD STANDARDS SF-1 Flood Modeled Results and Goodness-of-Fit A. The use of historical data in developing the flood model shall be supported by rigorous methods published in currently accepted

More information

Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures

Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures EBA/GL/2017/16 23/04/2018 Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures 1 Compliance and reporting obligations Status of these guidelines 1. This document contains

More information

UPDATED IAA EDUCATION SYLLABUS

UPDATED IAA EDUCATION SYLLABUS II. UPDATED IAA EDUCATION SYLLABUS A. Supporting Learning Areas 1. STATISTICS Aim: To enable students to apply core statistical techniques to actuarial applications in insurance, pensions and emerging

More information

THE INSTITUTE OF ACTUARIES OF AUSTRALIA A.B.N

THE INSTITUTE OF ACTUARIES OF AUSTRALIA A.B.N THE INSTITUTE OF ACTUARIES OF AUSTRALIA A.B.N. 69 000 423 656 PROFESSIONAL STANDARD 200 ACTUARIAL REPORTS AND ADVICE TO A LIFE INSURANCE COMPANY APPLICATION Appointed Actuaries of life insurance companies

More information

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone:   Last revised: for the Prepared by: Title: Address: Phone: E-mail: Last revised: Document Information Project Name: Prepared By: Title: Reviewed By: Document Version No: Document Version Date: Review Date:

More information

CAPITAL BUDGET NUCLEAR

CAPITAL BUDGET NUCLEAR Updated: 00-0- EB-00-00 Tab Page of 0 0 CAPITAL BUDGET NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear capital project budget for the historical year,

More information

Recommended Edits to the Draft Statistical Flood Standards Flood Standards Development Committee Meeting April 22, 2015

Recommended Edits to the Draft Statistical Flood Standards Flood Standards Development Committee Meeting April 22, 2015 Recommended Edits to the 12-22-14 Draft Statistical Flood Standards Flood Standards Development Committee Meeting April 22, 2015 SF-1, Flood Modeled Results and Goodness-of-Fit Standard AIR: Technical

More information

STATEMENT OF STANDARD ACCOUNTING PRACTICE. First issued May 1975, Part 6 added August Revised september Contents

STATEMENT OF STANDARD ACCOUNTING PRACTICE. First issued May 1975, Part 6 added August Revised september Contents Parts Contents Paragraphs Part 1 - Explanatory note 1-15 Part 2 - Definition of terms 16-25 Part 3 - Standard accounting practice 26-33 Part 4 - Note on legal requirements in Great Britain and Northern

More information

Brooks, Introductory Econometrics for Finance, 3rd Edition

Brooks, Introductory Econometrics for Finance, 3rd Edition P1.T2. Quantitative Analysis Brooks, Introductory Econometrics for Finance, 3rd Edition Bionic Turtle FRM Study Notes Sample By David Harper, CFA FRM CIPM and Deepa Raju www.bionicturtle.com Chris Brooks,

More information

S atisfactory reliability and cost performance

S atisfactory reliability and cost performance Grid Reliability Spare Transformers and More Frequent Replacement Increase Reliability, Decrease Cost Charles D. Feinstein and Peter A. Morris S atisfactory reliability and cost performance of transmission

More information

3.0 APPROACH TO THE ECONOMIC ANALYSIS

3.0 APPROACH TO THE ECONOMIC ANALYSIS 3.0 APPROACH TO THE ECONOMIC ANALYSIS 3.1 IDEAL APPROACH This section outlines the ideal approach that would be applied to the project if there were no limitations in terms of data or knowledge gaps. The

More information

Post Completion Review

Post Completion Review 6 April 1994 Post Completion Review CONTENTS Paragraphs EXECUTIVE SUMMARY INTRODUCTION... 1-3 SECTION 1 SCOPE AND PURPOSE OF POST COMPLETION REVIEWS... 4-15 SECTION 2 THE POST COMPLETION REVIEW DECISION...

More information

MANAGING THE RISKS ON TRANSFORMER ASSETS

MANAGING THE RISKS ON TRANSFORMER ASSETS MANAGING THE RISKS ON TRANSFORMER ASSETS by ARUN D YARGOLE & TONY McGRAIL DOBLE ENGINEERING COMPANY ayargole@doble.com What is an Asset? In commercial terms- It is an Entity that gives the owner the revenue

More information

UPDATE OF QUARTERLY NATIONAL ACCOUNTS MANUAL: CONCEPTS, DATA SOURCES AND COMPILATION 1 CHAPTER 4. SOURCES FOR OTHER COMPONENTS OF THE SNA 2

UPDATE OF QUARTERLY NATIONAL ACCOUNTS MANUAL: CONCEPTS, DATA SOURCES AND COMPILATION 1 CHAPTER 4. SOURCES FOR OTHER COMPONENTS OF THE SNA 2 UPDATE OF QUARTERLY NATIONAL ACCOUNTS MANUAL: CONCEPTS, DATA SOURCES AND COMPILATION 1 CHAPTER 4. SOURCES FOR OTHER COMPONENTS OF THE SNA 2 Table of Contents 1. Introduction... 2 A. General Issues... 3

More information

What will Basel II mean for community banks? This

What will Basel II mean for community banks? This COMMUNITY BANKING and the Assessment of What will Basel II mean for community banks? This question can t be answered without first understanding economic capital. The FDIC recently produced an excellent

More information

RISK MITIGATION IN FAST TRACKING PROJECTS

RISK MITIGATION IN FAST TRACKING PROJECTS Voorbeeld paper CCE certificering RISK MITIGATION IN FAST TRACKING PROJECTS Author ID # 4396 June 2002 G:\DACE\certificering\AACEI\presentation 2003 page 1 of 17 Table of Contents Abstract...3 Introduction...4

More information

Guideline. Earthquake Exposure Sound Practices. I. Purpose and Scope. No: B-9 Date: February 2013

Guideline. Earthquake Exposure Sound Practices. I. Purpose and Scope. No: B-9 Date: February 2013 Guideline Subject: No: B-9 Date: February 2013 I. Purpose and Scope Catastrophic losses from exposure to earthquakes may pose a significant threat to the financial wellbeing of many Property & Casualty

More information

Distribution Tariff Determination and Rationalization

Distribution Tariff Determination and Rationalization Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 28 August, 2010 Forum of

More information

Article from: Risk Management. March 2014 Issue 29

Article from: Risk Management. March 2014 Issue 29 Article from: Risk Management March 2014 Issue 29 Enterprise Risk Quantification By David Wicklund and Chad Runchey OVERVIEW Insurance is a risk-taking business. As risk managers, we must ensure that the

More information

BEYOND THE 4% RULE J.P. MORGAN RESEARCH FOCUSES ON THE POTENTIAL BENEFITS OF A DYNAMIC RETIREMENT INCOME WITHDRAWAL STRATEGY.

BEYOND THE 4% RULE J.P. MORGAN RESEARCH FOCUSES ON THE POTENTIAL BENEFITS OF A DYNAMIC RETIREMENT INCOME WITHDRAWAL STRATEGY. BEYOND THE 4% RULE RECENT J.P. MORGAN RESEARCH FOCUSES ON THE POTENTIAL BENEFITS OF A DYNAMIC RETIREMENT INCOME WITHDRAWAL STRATEGY. Over the past decade, retirees have been forced to navigate the dual

More information

Fundamentals of Risk Management

Fundamentals of Risk Management Fundamentals of Risk Management EWF-644-08 FUNDAMENTALS OF RISK MANAGEMENT Fundamentals of Risk Management 2 INDEX 1. INTRODUCTION...4 2. RISK MANAGEMENT PROCESS PHASES...5 2.1 Context definition...5 2.2

More information

8.6 FORMULATION OF PROJECT REPORT. 160 // Management and Entrepreneurship

8.6 FORMULATION OF PROJECT REPORT. 160 // Management and Entrepreneurship 160 // Management and Entrepreneurship (9) Raw material: List of raw material required by quality and quantity, sources of procurement, cost of raw material, tie-up arrangements, if any for procurement

More information

3.0 APPROACH TO THE ECONOMIC ANALYSIS

3.0 APPROACH TO THE ECONOMIC ANALYSIS 3.0 APPROACH TO THE ECONOMIC ANALYSIS 3.1 IDEAL APPROACH This section outlines the ideal approach that would be applied to the project if there were no limitations in terms of data or knowledge gaps. The

More information

Guidelines. on PD estimation, LGD estimation and the treatment of defaulted exposures EBA/GL/2017/16 20/11/2017

Guidelines. on PD estimation, LGD estimation and the treatment of defaulted exposures EBA/GL/2017/16 20/11/2017 EBA/GL/2017/16 20/11/2017 Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures 1 Contents 1. Executive summary 3 2. Background and rationale 5 3. Guidelines on PD estimation,

More information

ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA. Examiner's Report. Final Examination July 2013 SECTION A. Management Accounting (75 marks)

ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA. Examiner's Report. Final Examination July 2013 SECTION A. Management Accounting (75 marks) ASSOCIATION OF ACCOUNTING TECHNICIANS OF SRI LANKA Examiner's Report Final Examination July 2013 (59) Management Accounting and Business Finance SECTION A Management Accounting (75 marks) Question No.

More information

Guidance consultation FSA REVIEWS OF CREDIT RISK MANAGEMENT BY CCPS. Financial Services Authority. July Dear Sirs

Guidance consultation FSA REVIEWS OF CREDIT RISK MANAGEMENT BY CCPS. Financial Services Authority. July Dear Sirs Financial Services Authority Guidance consultation FSA REVIEWS OF CREDIT RISK MANAGEMENT BY CCPS July 2011 Dear Sirs The financial crisis has led to a re-evaluation of supervisory approaches and standards,

More information

Final draft RTS on the assessment methodology to authorize the use of AMA

Final draft RTS on the assessment methodology to authorize the use of AMA Management Solutions 2015. All rights reserved. Final draft RTS on the assessment methodology to authorize the use of AMA European Banking Authority www.managementsolutions.com Research and Development

More information

DiCom Software 2017 Annual Loan Review Industry Survey Results Analysis of Results for Banks with Total Assets between $1 Billion and $5 Billion

DiCom Software 2017 Annual Loan Review Industry Survey Results Analysis of Results for Banks with Total Assets between $1 Billion and $5 Billion DiCom Software 2017 Annual Loan Review Industry Survey Results Analysis of Results for Banks with Total Assets between $1 Billion and $5 Billion DiCom Software, LLC 1800 Pembrook Dr., Suite 450 Orlando,

More information

Comments: SNA 2008 (1993 Rev 1), from AEG member Robin Lynch, 28 April 2008

Comments: SNA 2008 (1993 Rev 1), from AEG member Robin Lynch, 28 April 2008 Comments: SNA 2008 (1993 Rev 1), from AEG member Robin Lynch, 28 April 2008 General comment The style is clear, but could give problems for a non-english speaking reader. The main barrier is the use of

More information

Subsidies in the fiscal system would be considerably understated if one

Subsidies in the fiscal system would be considerably understated if one Conclusions Subsidies in the fiscal system would be considerably understated if one looked only at the explicit budgetary provisions of subsidies. The hidden subsidies are exposed by measuring subsidies

More information

Guidelines for Asset Liability Management (ALM) System in Financial Institutions (FIs)

Guidelines for Asset Liability Management (ALM) System in Financial Institutions (FIs) Guidelines for Asset Liability Management (ALM) System in Financial Institutions (FIs) In the normal course, FIs are exposed to credit and market risks in view of the asset-liability transformation. With

More information

Guidance paper on the use of internal models for risk and capital management purposes by insurers

Guidance paper on the use of internal models for risk and capital management purposes by insurers Guidance paper on the use of internal models for risk and capital management purposes by insurers October 1, 2008 Stuart Wason Chair, IAA Solvency Sub-Committee Agenda Introduction Global need for guidance

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

F19: Introduction to Monte Carlo simulations. Ebrahim Shayesteh

F19: Introduction to Monte Carlo simulations. Ebrahim Shayesteh F19: Introduction to Monte Carlo simulations Ebrahim Shayesteh Introduction and repetition Agenda Monte Carlo methods: Background, Introduction, Motivation Example 1: Buffon s needle Simple Sampling Example

More information

NATIONAL BANK OF ROMANIA

NATIONAL BANK OF ROMANIA NATIONAL BANK OF ROMANIA REGULATION No.26 from 15.12.2009 on the implementation, validation and assessment of Internal Ratings Based Approaches for credit institutions Having regard to the provisions of

More information

COST ACCOUNTING INTERVIEW QUESTIONS

COST ACCOUNTING INTERVIEW QUESTIONS www.globalcma.in Learning Platform for Cost Accountants (CMA) Explain cost sheet? Cost Sheet is a periodical statement of cost designed to show in detail the various elements of cost of goods produced

More information

Challenges and Possible Solutions in Enhancing Operational Risk Measurement

Challenges and Possible Solutions in Enhancing Operational Risk Measurement Financial and Payment System Office Working Paper Series 00-No. 3 Challenges and Possible Solutions in Enhancing Operational Risk Measurement Toshihiko Mori, Senior Manager, Financial and Payment System

More information

Draft Small Customer Aggregation Program Rules

Draft Small Customer Aggregation Program Rules Draft Small Customer Aggregation Program Rules 1. Aggregations must be at least 2.0 MW for DADRP, 1.0 MW for RTDRP, 100 kw for SCR and 100 kw for EDRP. In each case the requirement is zone-specific. The

More information

Download from

Download from Standard No 2 - Inventories GENERAL PROVISIONS Standard No. 2 INVENTORIES 01. This standard aims to prescribe and guide the principles and method of accounting the inventories, including: determination

More information

RESERVE BANK OF MALAWI

RESERVE BANK OF MALAWI RESERVE BANK OF MALAWI GUIDELINES ON INTERNAL CAPITAL ADEQUACY ASSESSMENT PROCESS (ICAAP) Bank Supervision Department March 2013 Table of Contents 1.0 INTRODUCTION... 2 2.0 MANDATE... 2 3.0 RATIONALE...

More information

Supersedes: 9/01/11 (Rev.5) Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise

Supersedes: 9/01/11 (Rev.5) Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise Procedure No.: BC032.019 Page: 1 of 12 Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise Manager, North America Process Safety Center of Expertise Sr. Vice President,

More information

Contents Introduction Chapter 1 - Security Policy... 6

Contents Introduction Chapter 1 - Security Policy... 6 Policy statement Contents Introduction... 5 PURPOSE... 5 SYSTEM OPERATOR POLICIES TO ACHIEVE THE PPOS and dispatch objective... 5 Avoid Cascade Failure... 5 Frequency... 6 Other Standards... 6 Restoration...

More information

Development of health inequalities indicators for the Eurothine project

Development of health inequalities indicators for the Eurothine project Development of health inequalities indicators for the Eurothine project Anton Kunst Erasmus MC Rotterdam 2008 1. Background and objective The Eurothine project has made a main effort in furthering the

More information

Cogeneration and Small Power Production Parallel Operation, Power Sales and Interconnection Agreement

Cogeneration and Small Power Production Parallel Operation, Power Sales and Interconnection Agreement between and Lincoln Electric System This Power Sales and Interconnection, hereinafter called the, is made and entered into as of the day of, 20, by and between, hereinafter referred to as the Owner of

More information

VENTURE ANALYSIS WORKBOOK

VENTURE ANALYSIS WORKBOOK VENTURE ANALYSIS WORKBOOK ANALYSIS SECTION VERSION 1.2 Copyright (1990, 2000) Michael S. Lanham Eugene B. Lieb Customer Decision Support, Inc. P.O. Box 998 Chadds Ford, PA 19317 (610) 793-3520 genelieb@lieb.com

More information

Lesson Plan for Simulation with Spreadsheets (8/31/11 & 9/7/11)

Lesson Plan for Simulation with Spreadsheets (8/31/11 & 9/7/11) Jeremy Tejada ISE 441 - Introduction to Simulation Learning Outcomes: Lesson Plan for Simulation with Spreadsheets (8/31/11 & 9/7/11) 1. Students will be able to list and define the different components

More information

Resale Price and Cost-Plus Methods: The Expected Arm s Length Space of Coefficients

Resale Price and Cost-Plus Methods: The Expected Arm s Length Space of Coefficients International Alessio Rombolotti and Pietro Schipani* Resale Price and Cost-Plus Methods: The Expected Arm s Length Space of Coefficients In this article, the resale price and cost-plus methods are considered

More information

ENTERPRISE RISK AND STRATEGIC DECISION MAKING: COMPLEX INTER-RELATIONSHIPS

ENTERPRISE RISK AND STRATEGIC DECISION MAKING: COMPLEX INTER-RELATIONSHIPS ENTERPRISE RISK AND STRATEGIC DECISION MAKING: COMPLEX INTER-RELATIONSHIPS By Mark Laycock The views and opinions expressed in this paper are those of the authors and do not necessarily reflect the official

More information

NEW ZEALAND SOCIETY OF ACTUARIES PROFESSIONAL STANDARD NO. 20 DETERMINATION OF LIFE INSURANCE POLICY LIABILITIES MANDATORY STATUS

NEW ZEALAND SOCIETY OF ACTUARIES PROFESSIONAL STANDARD NO. 20 DETERMINATION OF LIFE INSURANCE POLICY LIABILITIES MANDATORY STATUS NEW ZEALAND SOCIETY OF ACTUARIES PROFESSIONAL STANDARD NO. 20 DETERMINATION OF LIFE INSURANCE POLICY LIABILITIES MANDATORY STATUS EFFECTIVE DATE: 1 JANUARY 2007 1 Introduction... 2 2 Effective Date...

More information

FINANCIAL ADMINISTRATION MANUAL

FINANCIAL ADMINISTRATION MANUAL Issue Date: November 2017 Effective Date: Immediate Responsible Agency: Office of the Comptroller General Chapter: ACCOUNTING FOR EXPENDITURES Directive No: 700 Directive Title: CHAPTER INDEX 703 Recording

More information

Advanced Operational Risk Modelling

Advanced Operational Risk Modelling Advanced Operational Risk Modelling Building a model to deliver value to the business and meet regulatory requirements Risk. Reinsurance. Human Resources. The implementation of a robust and stable operational

More information

RATIO ANALYSIS. The preceding chapters concentrated on developing a general but solid understanding

RATIO ANALYSIS. The preceding chapters concentrated on developing a general but solid understanding C H A P T E R 4 RATIO ANALYSIS I N T R O D U C T I O N The preceding chapters concentrated on developing a general but solid understanding of accounting principles and concepts and their applications to

More information

State Bank Of India Administrative Office, Varanasi NOTICE

State Bank Of India Administrative Office, Varanasi NOTICE State Bank Of India Administrative Office, Varanasi NOTICE NAME OF BRANCH HIRING OF GENERATOR SETS Sealed tenders are hereby invited for hiring of...kva Gen Sets with CPCB compliant acoustic canopy to

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy Updated: April 2018 Date of next Review: April 2019 Policy Lead: Bursar Checked by: Middle Leadership Team 1. INTRODUCTION Beachborough School will have hazards which if not controlled

More information

EXCERPTS from the SAMS-SPCS SPS Technical Reference

EXCERPTS from the SAMS-SPCS SPS Technical Reference Problem Statement The existing NERC Glossary of Terms definition for a Special Protection System (SPS or, as used in the Western Interconnection, a Remedial Action Scheme or RAS) lacks clarity and specificity

More information

STRESS TESTING GUIDELINE

STRESS TESTING GUIDELINE c DRAFT STRESS TESTING GUIDELINE November 2011 TABLE OF CONTENTS Preamble... 2 Introduction... 3 Coming into effect and updating... 6 1. Stress testing... 7 A. Concept... 7 B. Approaches underlying stress

More information

INTERMEDIATE EXAMINATION

INTERMEDIATE EXAMINATION INTERMEDIATE EXAMINATION GROUP II (SYLLABUS 2008) SUGGESTED ANSWERS TO QUESTIONS JUNE 2012 Paper- 8 : COST AND MANAGEMENT ACCOUNTING Time Allowed : 3 Hours Full Marks : 100 The figures in the margin on

More information

CHAPTER 4. INTERNATIONAL TRANSACTIONS REPORTING SYSTEM

CHAPTER 4. INTERNATIONAL TRANSACTIONS REPORTING SYSTEM 84 CHAPTER 4. INTERNATIONAL TRANSACTIONS REPORTING SYSTEM 4.1 The international transactions reporting system (ITRS) 1 is part of the broader institutional data collection framework of many countries.

More information

Issue Date: Effective Date: Supersedes: GEN-30

Issue Date: Effective Date: Supersedes: GEN-30 Bulletin Category: GENERAL Bulletin: GEN-30 (rev. 1) Page: 1 of 7 The copy of this document located on Measurement Canada s website is considered to be the controlled copy. Policy on prepayment meters

More information

Designing Global Supply Chain Networks. PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 6e

Designing Global Supply Chain Networks. PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 6e 6 Designing Global Supply Chain Networks PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 6e 6 1 Learning Objectives 1. Identify factors that need to be included in total

More information

PRINCE2 Sample Papers

PRINCE2 Sample Papers PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined

More information

TRANSGRID PRICING METHODOLOGY 2015/ /18. Contents

TRANSGRID PRICING METHODOLOGY 2015/ /18. Contents Pricing Methodology TRANSGRID PRICING METHODOLOGY 2015/16 2017/18 Contents Pricing Methodology 1 Introduction 3 2 Duration 3 3 Which services are subject to this pricing methodology? 4 4 Overview of the

More information

Using Fractals to Improve Currency Risk Management Strategies

Using Fractals to Improve Currency Risk Management Strategies Using Fractals to Improve Currency Risk Management Strategies Michael K. Lauren Operational Analysis Section Defence Technology Agency New Zealand m.lauren@dta.mil.nz Dr_Michael_Lauren@hotmail.com Abstract

More information

MINI GUIDE. Project risk analysis and management

MINI GUIDE. Project risk analysis and management MINI GUIDE Project risk analysis and management Association for Project Management January 2018 Contents Page 3 Introduction What is PRAM? Page 4 Page 7 Page 9 What is involved? Why is it used? When should

More information

AN INTRODUCTION TO RISK CONSIDERATION

AN INTRODUCTION TO RISK CONSIDERATION AN INTRODUCTION TO RISK CONSIDERATION Introduction This cookbook aims at recalling basic concepts and providing simple tools and possibilities of applying the "considering of risks and opportunities" in

More information

SIL and Functional Safety some lessons we still have to learn.

SIL and Functional Safety some lessons we still have to learn. SIL and Functional Safety some lessons we still have to learn. David Craig, Amec This paper reflects AMEC s recent experience in undertaking functional safety assessments (FSA) (audits against IEC 61511)

More information

BLAST FURNACE RELINE IMPLEMENTATION STRATEGY + + Copyright Hatch All Rights Reserved.

BLAST FURNACE RELINE IMPLEMENTATION STRATEGY + + Copyright Hatch All Rights Reserved. BLAST FURNACE RELINE IMPLEMENTATION STRATEGY + + September 12-14, 2016 LINZ, AUSTRIA Blast Furnace Life Cycle Campaign Extension Operating Practises Supplemental Cooling Refractory Repairs Performance

More information

Estimate Considerations. Estimate Considerations

Estimate Considerations. Estimate Considerations Estimate Considerations Estimate Considerations Every estimate, whether it is generated in the conceptual phase of a project or at bidding time, must consider a number of issues Project Size Project Quality

More information

How do EU-15 Member States Benefit from the Cohesion Policy in the V4?

How do EU-15 Member States Benefit from the Cohesion Policy in the V4? How do EU-15 Member States Benefit from the Cohesion Policy in the V4? Annex 1. Methodology of macroeconomic and microeconomic analysis This study is co-financed by the Cohesion Fund under Operational

More information

Follow-Up on VFM Section 3.05, 2014 Annual Report RECOMMENDATION STATUS OVERVIEW

Follow-Up on VFM Section 3.05, 2014 Annual Report RECOMMENDATION STATUS OVERVIEW Chapter 1 Section 1.05 Ministry of Infrastructure (formerly the Ministry of Economic Development, Employment and Infrastructure) Infrastructure Ontario Alternative Financing and Procurement Follow-Up on

More information

Braindumps.PRINCE2-Foundation.150.QA

Braindumps.PRINCE2-Foundation.150.QA Braindumps.PRINCE2-Foundation.150.QA Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 29.1 http://www.gratisexam.com/ I was a little apprehensive at first about an online

More information

CHAPTER 6 PROJECT CASH FLOW

CHAPTER 6 PROJECT CASH FLOW CHAPTER 6 PROJECT CASH FLOW In the previous chapters, techniques for project planning, scheduling, resources management, and timecost trade off have been introduced. This chapter deals with project cash

More information

Power dissipation comparable to SOT23 Package height typ mm AEC-Q101 qualified

Power dissipation comparable to SOT23 Package height typ mm AEC-Q101 qualified Rev. 1 12 October 2017 Preliminary data sheet 1 Product profile 1.1 General description General-purpose Zener diode, encapsulated in an SOD882D leadless ultra small Surface-Mounted Device (SMD) plastic

More information

Characterization of the Optimum

Characterization of the Optimum ECO 317 Economics of Uncertainty Fall Term 2009 Notes for lectures 5. Portfolio Allocation with One Riskless, One Risky Asset Characterization of the Optimum Consider a risk-averse, expected-utility-maximizing

More information

Parameter Sensitivities for Radionuclide Concentration Prediction in PRAME

Parameter Sensitivities for Radionuclide Concentration Prediction in PRAME Environment Report RL 07/05 Parameter Sensitivities for Radionuclide Concentration Prediction in PRAME The Centre for Environment, Fisheries and Aquaculture Science Lowestoft Laboratory Pakefield Road

More information

MEASUREMENT AND VERIFICATION AND THE IPMVP

MEASUREMENT AND VERIFICATION AND THE IPMVP MEASUREMENT AND VERIFICATION AND THE IPMVP EPC TOOLKIT FOR HIGHER EDUCATION APRIL 2009 INDEX IPMVP: THE PRINCIPLES IPMVP: THE DIFFERENT OPTIONS THE COSTS OF M&V 3 4 7 With permission from the author, this

More information

CAS-3 : Overheads 1. Introduction

CAS-3 : Overheads 1. Introduction 1 CAS-3 : Overheads 1. Introduction 2. Object In Cost Accounting the analysis and collection overheads, their allocation and apportionment to different cost centres and absorption to products or services

More information

A New Resource Adequacy Standard for the Pacific Northwest. Background Paper

A New Resource Adequacy Standard for the Pacific Northwest. Background Paper A New Resource Adequacy Standard for the Pacific Northwest Background Paper 12/6/2011 A New Resource Adequacy Standard for the Pacific Northwest Background Paper CONTENTS Abstract... 3 Summary... 3 Background...

More information

Adjusting for Quality in the Benchmarking of Electricity Network Companies

Adjusting for Quality in the Benchmarking of Electricity Network Companies Adjusting for Quality in the Benchmarking of Electricity Network Companies Endre Bjørndal, NHH Bonn, May 27, 2014 Outline Introduction Implementation of quality costs in the Norwegian incentive regulation

More information

BERGRIVIER MUNICIPALITY. Risk Management Risk Appetite Framework

BERGRIVIER MUNICIPALITY. Risk Management Risk Appetite Framework BERGRIVIER MUNICIPALITY Risk Management Risk Appetite Framework APRIL 2018 1 Document review and approval Revision history Version Author Date reviewed 1 2 3 4 5 This document has been reviewed by Version

More information

RED CLASSIC TRANSPORTATION SERVICES, LLC ( Broker )

RED CLASSIC TRANSPORTATION SERVICES, LLC ( Broker ) RED CLASSIC TRANSPORTATION SERVICES, LLC ( Broker ) TERMS AND CONDITIONS OF PROPERTY BROKERAGE SERVICE BETWEEN POINTS IN NORTH AMERICA (EXCEPT MEXICO) ALL FEES, SUMS & VALUATIONS STATED IN U.S. DOLLARS

More information

APPENDIX A - GLOSSARY

APPENDIX A - GLOSSARY APPENDIX A - GLOSSARY 1. Photovoltaic (PV) or Solar (interchangeable): These are devices that generate electricity directly from sunlight via an electronic process that occurs naturally in certain types

More information

PRINCE2. Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version:

PRINCE2. Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version: PRINCE2 Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version: 1.0 Exam M QUESTION 1 Identify the missing word(s) from the following sentence. A project is a temporary organization that is

More information

AACE International 48th Annual Meeting Washington, DC June 2004 DEVELOPING & MANAGING CONTIGENCY ON THE BASIS OF RISK. Robert Tichacek, P.E.

AACE International 48th Annual Meeting Washington, DC June 2004 DEVELOPING & MANAGING CONTIGENCY ON THE BASIS OF RISK. Robert Tichacek, P.E. AACE International 48th Annual Meeting Washington, DC June 2004 DEVELOPING & MANAGING CONTIGENCY ON THE BASIS OF RISK Robert Tichacek, P.E. Presentation Outline Review of Basic Project Risk Management

More information

Table of Contents Advantages Disadvantages/Limitations Sources of additional information. Standards, textbooks & web-sites.

Table of Contents Advantages Disadvantages/Limitations Sources of additional information. Standards, textbooks & web-sites. Table of Contents Table of Contents 1. Consequence Analysis & Risk Reduction Option Selection 1.1. A description of the techniques, including its purpose 1.1.0.. Introduction 1.1.0.3. Consequence Analysis

More information

THE INSTITUTE OF ACTUARIES OF AUSTRALIA A.B.N

THE INSTITUTE OF ACTUARIES OF AUSTRALIA A.B.N THE INSTITUTE OF ACTUARIES OF AUSTRALIA A.B.N. 69 000 423 656 PROFESSIONAL STANDARD 300 ACTUARIAL REPORTS AND ADVICE ON GENERAL INSURANCE TECHNICAL LIABILITIES A. INTRODUCTION Application 1. This standard

More information

CAS 22 COST ACCOUNTING STANDARD ON MANUFACTURING COST

CAS 22 COST ACCOUNTING STANDARD ON MANUFACTURING COST CAS 22 COST ACCOUNTING STANDARD ON MANUFACTURING COST The following is the COST ACCOUNTING STANDARD 22 (CAS - 22) issued by the Council of The Institute of Cost Accountants of India for determination of

More information

REQUIREMENTS FOR OPERATION OF PARALLEL GENERATION FACILITIES (COGENERATION AND SMALL POWER PRODUCERS)

REQUIREMENTS FOR OPERATION OF PARALLEL GENERATION FACILITIES (COGENERATION AND SMALL POWER PRODUCERS) Original Sheet No. D-3.00 REQUIREMENTS FOR OPERATION OF PARALLEL GENERATION FACILITIES (COGENERATION AND SMALL POWER PRODUCERS) In order to provide for the safety of customers, utility personnel, and others,

More information

(recast) (Text with EEA relevance)

(recast) (Text with EEA relevance) 29.3.2014 Official Journal of the European Union L 96/107 DIRECTIVE 2014/31/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February 2014 on the harmonisation of the laws of the Member States relating

More information

Risk Management. Credit Risk Management

Risk Management. Credit Risk Management Credit Risk Management Credit risk is defined as the risk of loss arising from any failure by a borrower or a counterparty to fulfill its financial obligations as and when they fall due. Credit risk is

More information

Power Quality Report - EN 50160

Power Quality Report - EN 50160 200 0 Power Quality Report - EN 50160 Report Report number: 26/2014 Start date: 24.06.2014 End date: 28.06.2014 : Failed Status: Not complete Monitoring time: 16:30:00 Evaluation: All deviations Flicker

More information

PhD DISSERTATION THESES

PhD DISSERTATION THESES PhD DISSERTATION THESES KAPOSVÁR UNIVERSITY FACULTY OF ECONOMIC SCIENCES Doctoral (PhD) School for Management and Organizational Science Head of PhD School Prof. Dr. SÁNDOR KEREKES University teacher,

More information

COMPARISION OF OFFSHORE REQUIREMENTS

COMPARISION OF OFFSHORE REQUIREMENTS Key to Table COMPARISION OF OFFSHORE REQUIREMENTS (Comparison based on GB Grid Code Issue 4 Revision 13 only and ENSTO - E RFG Internal Version dated 26 June 2012) (Note Does not include other Industry

More information

Ultrafast epitaxial rectifier diode in a SOT226 (I2PAK) plastic package. Discontinuous Current Mode (DCM) Power Factor Correction (PFC)

Ultrafast epitaxial rectifier diode in a SOT226 (I2PAK) plastic package. Discontinuous Current Mode (DCM) Power Factor Correction (PFC) Rev. 01 4 February 2010 Product data sheet 1. Product profile 1.1 General description Ultrafast epitaxial rectifier diode in a SOT226 (I2PAK) plastic package 1.2 Features and benefits Fast switching High

More information

BANDERA ELECTRIC COOPERATIVE, INC. Tariff for Electric Service. Sheet No. Section III 1.0

BANDERA ELECTRIC COOPERATIVE, INC. Tariff for Electric Service. Sheet No. Section III 1.0 1.0 340. Small Power Production Sections 340-345 of this tariff apply to the interconnection and parallel operation of all small power generating installations. All installations must meet all system performance

More information

Title of the Paper: Integrating Management and cost management to arrive at a realistic Estimate at Completion Theme: Project Management leadership -> To accelerate Economic Growth Keywords: Cost overrun,

More information

Tender Adjustment. The Concept

Tender Adjustment. The Concept Tender Adjustment This document explains the concept of Tender Adjustment and how to balance an estimate in Candy to take advantage of anticipated changes in quantity. NOTE: Moving monies between bill