1 Form : HPF-OSP-002 Revision: 6 : 12/1/2009 Radiological Work Permit Page 1 of Serial Number: 2011-S011 Start : 1/1/2011 Expiration :12/31/2011 Work Area/Description of Work: Any location within JLab complex, to include Accelerator tunnel, Hall-A, Hall-B, Hall-C, Hall D, Free Electron Laser, CHL. This RWP applies to all operations that involve contractor services to perform non-destructive testing(ndt), such as soil density measurements(sdm), or any other jobs that involve bringing radiation generating devices(rgd s) or radioactive materials on to Jlab property. Task Description: Under conditions defined above and the attached Memo Of Understanding(MOU), this RWP is applicable to the following activities, contingent on RadCon Review: 1) Contractor to perform NDT, on Jefferson Lab property. 2) RadCon RCT s to perform contractual service agreement verification and intermittent job coverage. 3) Contractor, SOTR, or COTR or other JLab trained personnel to serve as escort to untrained. Work Area Radiological Conditions: _*_Radiation Levels * Contamination Levels n/a Airborne Maximum Maximum Maximum Contact Location Location Whole Body Other *To be assessed by RCT or verified by contractor license for source to be used. ALARA Estimate: (whole body dose rate is an estimate of average conditions) (Total Man-hours) X (Whole Body Exposure Rate) = Man-mrem Expected cumulative dose less than 100mrem to any contracting individual. Training Requirements for Entry on this RWP: _ Radiation Worker I Radiation Worker II Respirator Qualified GERT Training required for non-jlab employees prior to performing NDT Dosimetry Requirements for Entry: * Dosimeter SRPD _Multiple Dosimetry (as specified below): Extremity Dosimetry( as specified below):
2 Form : HPF-OSP-002 Revision: 6 : 12/1/2009 Protective Clothing Requirements: N/A Radiological Work Permit RWP # 2011-S011 Page 2 of Full Protective Clothing (coveralls, booties, overshoes, cotton liners, rubber gloves, hood) Partial protective clothing (as specified below): Special protective clothing (as specified below): Respiratory equipment (as specified below): Radiological Controls Coverage Requirements: * Continuous * Intermittent None * To be determined by RCT or RadCon Coordinator at the time of work Special Instructions/ Consideration /Stay-time Controls: Dose Tracking required * Pre-job briefing required Other (as specified below) Pre-Work Package and Notifications: 1. A copy of applicable licenses for the materials expected to be brought to the JLab site. 2. Identification by model and serial number of the specific sources expected to be used, and the isotope and activit for each source 3. Copies of the results of the most recent leak tests on the applicable sources. 4. The names of the operators who may conduct the testing. 5. For radiographers, copies of certifications and evidence of current annual refresher training. 6. A signed statement containing an estimate of the current radiation dose for each operator. 7. Documents indicating device-specific training for the operators listed. Normally, this information should be provided at least ten business days prior to the expected date of arrival on site 8. When NDT is scheduled, the subcontractor or his/her representative (SOTR, JLab supervisor, etc.) will notify RadCon approximately hours in advance of the work with an estimate of the arrival date/time. *See continuation form for RadCon Checklist *RCM approval required for any worker with an incomplete current year s dose record. Waste Production and Disposal: Routine Y / N Description N/A Approx. amount expected lbs cu. ft. Characteristics: N/A Oily Bulk liquids Lead *Requires RCM notification > 1 M dpm H 3 Metal > 250 mr/hr Mixed * Radiological Conditions that may void this RWP Individual/Contractor dose greater than 100 mrem Approvals: Submitted by: Work Supervisor N/A RCD Approved by RCD Manager (or designee) Cancellation: This RWP is cancelled as of by RCD Manager(or designee)
3 Revision: 3 : 4/06/2006 Page 3 0f 5 RWP Number: 2011-S011 Issued: 1/1/2011 RadCon Pre-work Checklist(24-48hrs prior to arrival on-site) 1. Upon notification of impending work(step 8 of Pre-work package) - Verify training in accordance with MOU - Verify dosimeter issuance - Gather pertinent information on test, and make arrangements for job coverage as necessary RadCon Checklist(upon arrival on-site) 1. Review available contractor s information on file - Personnel status(current on all required on-site and contractor excepted training) - Dosimetry status(jlab & subcontractor) - Source verification(model, serial number, leak test) - Portable instrument verification(calibration dates, physical integrity) - Posting and signage integrity( are posting materials adequate for conveying radiological conditions) 2. RadCon Job coverage: - Ensure proper dosimetry prior to commencement of work. - RCT to have survey instrumentation adequate for type of radiation hazard (i.e. NG-2 for gamma and neutron survey) - Perform pre-job survey of source holder/instrument. - Provide job coverage as required by MOU or RadCon Manager or his designee. - Ensure area is adequately cleared of unnecessary personnel, and if necessary provide postings, guard and access control. - Update information on continuation form. - Perform post-job survey.
4 Revision: 4 : 12/1/09 Page: of RWP Number: 2011-S011 Issued: 1/1/2011
5 Revision: 4 : 12/1/09 Page: of RWP Number: 2011-S011 Issued: 1/1/2011
6 Revision: 4 : 12/1/09 Page: of RWP Number: 2011-S011 Issued: 1/1/2011
7 Revision: 4 : 12/1/09 Page: of RWP Number: 2011-S011 Issued: 1/1/2011
8 Form : HPF-OSP-006 Revision: 6 : 12/1/09 Briefing Sheet Page of NOTE: RCT should sign verifying that all attendees of the brief have signed the briefing sheet. RWP Number: 2011-S011 Issued: 1/1/2011 Name (Please print) Signature Task #
9 Form: HPF-OSP-009 Revision: 6 : 12/1/09 Name (please print) Pre-Work dose estimate (mrem) TJNAF Radiation Control Group Radiological Work Permit Closeout Analysis RWP No S011 Total Net Dosimeter (mrem) Individual (e.g., type of work) Page: of Lessons Learned/Suggested Improvements/Comparison of totals from previous job (if applicable): After some initial glitches with respect to the SOTR and contractor communication with actual NDT Subcontractor, the performance of soil density measurements were carried out with few problems. Most of the NDT subs were given the Field Operations Coordinator number after being briefed on RWP, and were ask to provide an additional layer of pre-planning by calling upon request for services. Continuous coverage by RCT s was provided to contractors who were on-site for the first time to assess their level of professionalism and safety consciousness, while performing measurements. After determining their work methods were acceptable, intermittent coverage was provided after verifying dosimetry, current leak test, and instrument requirements. To complete this training click here to certify.
Calhoun Operations. Radiation Protection Program
Effective: Revised: 08/01/00 Calhoun Operations Radiation Protection Program I. Introduction Employees of and visitors to Bowater Incorporated (Bowater) face few potential radiation hazards at the Calhoun
More informationPERSONAL EXPOSURE INVESTIGATIONS AND REPORTING
RI-46 PERSONAL EXPOSURE INVESTIGATIONS AND REPORTING PURPOSE This procedure specifies the requirements and responsibilities for conducting, documenting and reporting investigations of actual or suspected
More informationGuidelines on Occupational Safety and Health Management at the TEPCO Fukushima Daiichi Nuclear Power Plant
Guidelines on Occupational Safety and Health Management at the TEPCO Fukushima Daiichi Nuclear Power Plant Enactment: Labour Standards Bureau Notification No. 0826-1, 26 August 2015 Section 1 Objectives
More informationRPR 46 PERSONAL EXPOSURE INVESTIGATIONS AND REPORTING
RPR 46 PERSONAL EXPOSURE INVESTIGATIONS AND REPORTING PURPOSE This document identifies the criteria used to determine when an investigation of a radiation exposure to an individual, based on exceeding
More informationPART O DECOMMISSIONING
Sec. O.1 - O.3 SSRCR Volume I August 2000 PART O DECOMMISSIONING Sec. O.1 - Purpose. This Part provides for removing safely from service a facility or site having radioactive material, a radiation-producing
More informationPreventing Contractor Exposures When No NORM-Specific Regulations Exist. Geri Blanchard
Preventing Contractor Exposures When No NORM-Specific Regulations Exist Geri Blanchard PREVENTING CONTRACTOR EXPOSURES WHEN NO NORM-SPECIFIC REGULATIONS EXIST GERI BLANCHARD, MS, REM, CSP Nuclear Regulatory
More informationSAN DIEGO STATE UNIVERSITY. Radiation Safety Training For Personnel Using Radiation Producing Machines
SAN DIEGO STATE UNIVERSITY Radiation Safety Training For Personnel Using Radiation Producing Machines December 2017 TABLE OF CONTENTS PART 1- ORGANIZATION AND RESPONSIBILITIES License Radiation Safety
More informationSmithsonian Institution National Air and Space Museum
STATEMENT OF WORK Smithsonian Institution National Air and Space Museum Statement of Work Collections Management Contractor November 21, 2017 REVISED The Smithsonian s National Air and Space Museum (NASM)
More informationRegulation IO-10.0: EHS Radioactive Source Monitoring Protocol
Regulation IO-10.0: EHS Radioactive Source Monitoring Protocol 10.1 Introduction 10.2 Objectives 10.3 Scope 10.4 References 10.5 Definitions 10.6 The Regulatory Body 10.7 Regulatory Functions 10.8 Responsibilities
More information<Tentative Translation>
Overview of the Guidelines on Protecting Workers Engaged in Works under Designated Dose Rate (Director of the Labour Standards Bureau, Notification 0615, No. 6, dated June 15, 2012)
More informationTHROUGH: Roland G. Fletcher, Program Manager IV, Radiological Health Program (RHP)
DATE: May 14, 2013 TO: All State Licensed Private Inspectors All State Registered Service Providers THROUGH: Roland G. Fletcher, Program Manager IV, Radiological Health Program (RHP) FROM: Eva Nair, Chief,
More informationDEPARTMENT OF ENVIRONMENTAL SAFETY, SUSTAINABILITY & RISK. Chargeback Procedures
DEPARTMENT OF ENVIRONMENTAL SAFETY, SUSTAINABILITY & RISK I. Introduction Chargeback Procedures The Department of Environmental Safety, Sustainability & Risk (ESSR) provides environmental health and safety
More informationAdministered by UNIVERSITY OF MAINE SYSTEM Office of Strategic Procurement REQUEST FOR BIDS TRASH CAN LINERS UNIVERSITY OF MAINE RFB # 09-08
Administered by UNIVERSITY OF MAINE SYSTEM Office of Strategic Procurement REQUEST FOR BIDS TRASH CAN LINERS UNIVERSITY OF MAINE RFB # 09-08 ISSUE DATE: December 4, 2007 BIDS MUST BE RECEIVED BY: December
More informationPeralta Community College District AP 6300
ADMINISTRATIVE PROCEDURE 6300 GENERAL ACCOUNTING A. Functions The Accounting Office, under the direction of the Vice Chancellor for Finance and Administration and the Associate Vice Chancellor for Finance
More informationAdministrative Records Relating to Research: Retention and Disposition Requirements Last Updated: December 2016
INSTITUTIONAL ANIMAL CARE AND USE COMMITTEE (IACUC) RECORDS Minutes Records of attendance Activities of the committee Committee deliberations Applications Proposed activities involving animals (including
More informationFISCAL MANAGEMENT (Replaces current SBCCD AP 6300)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 AP 6300 AP 6300 San Bernardino Community College District Administrative Procedure
More informationCHAPTER 35 LEAD-BASED PAINT MANAGEMENT RULES SUBCHAPTER 1. GENERAL PROVISIONS
CHAPTER 35 LEAD-BASED PAINT MANAGEMENT RULES SUBCHAPTER 1. GENERAL PROVISIONS 35-101. Purpose The rules in this Chapter implement the Cherokee Nation Lead-Based Paint Program Act, L-98, 63 CNCA. Article
More informationHaving regard to the Treaty establishing the European Atomic Energy Community, and in particular Articles 31 and 32 thereof,
L 219/42 COUNCIL DIRECTIVE 2014/87/EURATOM of 8 July 2014 amending Directive 2009/71/Euratom establishing a Community framework for the nuclear safety of nuclear installations THE COUNCIL OF THE EUROPEAN
More informationChapter 26. The Contract
Chapter 26. The Contract Summary This chapter identifies, in general terms, the required elements of a contract entered into for the procurement of goods or services. The specific elements of a contract
More informationIndustrial Radiography Radiation Safety Personnel Certification Application
Industrial Radiography Radiation Safety Personnel Certification Application ASNT Identification Number If you have previously been given an ASNT identification number, please enter it in this box: Contact
More informationJefferson Science Associates, LLC Earned Value Management System 2013 Surveillance Plan
Jefferson Science Associates, LLC Earned Value Management System 2013 Surveillance Plan 4-5 December, 2013 V1 Earned Value Management System Surveillance Plan The Department of Energy (DOE) certified the
More informationImplementation of Financial Guarantees for Licensees
Implementation of Financial Guarantees for Licensees Discussion Paper DIS-11-01 Implementation of Financial Guarantees for Licensees Discussion Paper DIS-11-01 Minister of Public Works and Government Services
More informationRadiation Control Regulation 2013
New South Wales under the Radiation Control Act 1990 Her Excellency the Governor, with the advice of the Executive Council, has made the following Regulation under the Radiation Control Act 1990. ROBYN
More informationInvoices will be sent to the CUSTOMER s Accounts Payable Department at the following address: Order number (for reference purposes only)
Date of Issue: HPA CRCE Reference: RADIATION PROTECTION ADVISER CONTRACT It is agreed that a contract exists between the Health Protection Agency, Centre for Radiation, Chemical and Environmental Hazards,
More informationForm SFL 6075 (November 2009)
Special Supplementary Conditions Applicable To Work Subject To The Ionising Radiations Regulations 1999 (Controlled And Supervised Areas Designated By SFL) Form SFL 6075 (November 2009) Table of Contents
More informationInvestigation into a high dose rate during x-ray radiography at the Solvent Recovery Plant.
Title of document OF Investigation into a high dose rate during x-ray radiography at the Solvent Recovery Plant. Project Assessment Report: ONR-SDFW-PAR-17-008 Revision A July 2017 Template Ref: ONR-DOC-TEMP-005
More informationOregon State University Radiation Safety Manual
Oregon State University Radiation Safety Manual 1. RADIATION SAFETY PROGRAM... 1 1.1. UNIVERSITY POLICY CONCERNING IONIZING RADIATION... 1 1.2. SCOPE OF THE RADIATION SAFETY PROGRAM... 1 1.3. SCOPE OF
More informationModule 2 Lesson 1 HMO Analyzing the Incident Administration Page
Module 2 Lesson 1 HMO Analyzing the Incident Administration Page INSTRUCTOR S NOTE: Refer the participants to this Administration Page for more detail on this lesson; however, it is not necessary to review
More informationRE: How and When To Prepare an Incident Report and Make Appropriate Notifications
May 1, 2015 Security Staff Training Memo RE: How and When To Prepare an Incident Report and Make Appropriate Notifications Dear Staff Officers: Pursuant to your assignment, all security officers may encounter
More informationOverview of results of supervision and instruction activities
PRESS RELEASE 13 April 2016 Fukushima Prefectural Labour Bureau Ministry of Health, Labour and Welfare Results of supervision and instruction activities for employers of decommissioning and decontamination
More informationProcedures for NEPA Consultant hired by the County or the City
Procedures for NEPA Consultant hired by the County or the City IMPORTANT: A NEPA REQUEST WITH A LOCAL GOVERNMENT CHECKLIST AND A FOOTPRINT NEEDS TO BE SUBMITTED TO ENVIRONMENTAL PROGRAMS DIVISION AND A
More informationOFFSHORE SERVICE VESSEL DYNAMIC POSITIONING AUTHORITY
Form T-3-001, the Version 1 Date Effective: December 10, 2015 Section: N/A Page 1 of 11 BoD: YES TAC: YES December 8, 2015 OFFSHORE SERVICE VESSEL DYNAMIC POSITIONING AUTHORITY, THE AUTHENTICATION AND
More informationBriefing to Citizens of Canon City
Briefing to Citizens of Canon City Superfund Process Current Status What the 2014 RI/FS Settlement Agreement is What the 2014 RI/FS Settlement Agreement is not Public Participation Statement of Work (SOW)
More informationREQUEST FOR QUALIFICATIONS Environmental and/or Industrial Hygiene Consultants September 2018 September 2021
The San Francisco Unified School District (SFUSD) is seeking the services of multiple qualified to support asbestos and lead-impacting construction projects as well as other industrial hygiene support
More informationADOPTED REGULATION OF THE STATE BOARD OF HEALTH. LCB File No. R Effective May 7, 2010
ADOPTED REGULATION OF THE STATE BOARD OF HEALTH LCB File No. R185-08 Effective May 7, 2010 EXPLANATION Matter in italics is new; matter in brackets [omitted material] is material to be omitted. AUTHORITY:
More informationSOUTH CAROLINA AERONAUTICS COMMISSION Request for Qualifications (RFQ) Land Surveying Services for Airport Development IDC State Project #U30-D008-MJ
SOUTH CAROLINA AERONAUTICS COMMISSION Request for Qualifications (RFQ) Land Surveying Services for Airport Development IDC State Project #U30-D008-MJ The South Carolina Aeronautics Commission (SCAC) seeks
More informationSite-Specific Health and Safety Agreement
: Company Site Name Complete pre-start This agreement establishes the basis on which businesses (including trades and other organisations) agree to work on a specific construction site. A Site-Specific
More informationHIGH RISK CONSTRUCTION WORK
CONTRACTOR WHS SYSTEM STANDARD HIGH RISK CONSTRUCTION WORK EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION
More informationREQUEST FOR QUALIFICATIONS (RFQ) FOR 2015 PROFESSIONAL SERVICES ON-CALL LIST
REQUEST FOR QUALIFICATIONS (RFQ) FOR 2015 PROFESSIONAL SERVICES ON-CALL LIST I. OVERVIEW The District is seeking qualified firms to provide On-Call Professional Services in support of Capital Improvement
More informationNon Tax Levy Guidelines
Non Tax Levy Guidelines Before You Begin: Please be sure that there are sufficient funds in your budget to cover the request. Email FBSC@brooklyn.cuny.edu if you are unsure of your account balance. Requests
More informationCONSTRUCTION SUBCONTRACT. (Subcontract No.) EXHIBIT "F" ENVIRONMENT, SAFETY AND HEALTH PROVISIONS. (Date)
CONSTRUCTION SUBCONTRACT (Subcontract No.) EXHIBIT "F" ENVIRONMENT, SAFETY AND HEALTH PROVISIONS (Date) Revised: 8/9/13 SAVANNAH RIVER REMEDIATION LLC EXHIBIT "F" ENVIRONMENT, SAFETY AND HEALTH PROVISIONS
More informationATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR FIRE SPRINKLER SYSTEM INSPECTIONS ITB NO.: DMS-14/15-004
4050 Esplanade Way Tallahassee, Florida 32399-0950 Tel: 850.488.2786 Fax: 850. 922.6149 Rick Scott, Governor Craig J. Nichols, Agency Secretary ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR FIRE
More informationCOMMERCIAL FACADE IMPROVEMENT PROGRAM GUIDELINES AND APPLICATION
CITY OF SOUTH GATE COMMUNITY DEVELOPMENT DEPARTMENT 8650 CALIFORNIA AVENUE SOUTH GATE, CALIFORNIA 90280 (323) 563-9535 COMMERCIAL FACADE IMPROVEMENT PROGRAM GUIDELINES AND APPLICATION City of South Gate
More informationKENNECOTT UTAH COPPER
14.1 INTRODUCTION 14.1.1 This standard provides guidelines and requirements to KUC employees who contemplate using a contractor to provide services for Kennecott. The standard is supported by the Contractor
More informationPART R RADON. Sec. R.2 - Definitions. As used in Part R, these terms have the definitions set forth below:
Sec. R.1 - R.2 SSRCR Volume I February 2010 PART R RADON Sec. R.1 - Purpose and Scope. a. Except as otherwise specifically provided, these regulations apply to all business entities and other persons located
More informationINVITATION TO BID COMMERCIAL FLOORING CONTRACTORS
FACILITIES COORDINATOR 800 Church Street, Suite B60, Waycross, GA 31501 Phone: 912 287 4480 Cell: 912 281 9964 Fax: 912 287 4482 Email: sbaxley@warecounty.com INVITATION TO BID COMMERCIAL FLOORING CONTRACTORS
More informationAccident Prevention Plans (APP) Appendix A EM (15 SEPTEMBER 2008 edition)
Accident Prevention Plans (APP) Appendix A EM 385-1-1 (15 SEPTEMBER 2008 edition) FEAD/ROICC/FSC/OICC offices with the new safety requirements of EM 385 dated 15 SEPTEMBER 2008 assist our Contractors in
More informationGOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA. N$21.60 WINDHOEK - 18 November 2011 No. 4835
GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA N$21.60 WINDHOEK - 18 November 2011 No. 4835 CONTENTS Page GOVERNMENT NOTICES No. 220 Commencement of Atomic Energy and Radiation Protection Act, 2005... 1
More informationSection 15 Residential Sewer and Water Infrastructure Connection Program
Section 15 Residential Sewer and Water Infrastructure Connection Program Policies City of Modesto Citizens Housing & Community Development Committee: Recommended September 13, 2018 City of Modesto City
More informationThe University Maryland Baltimore County
The University Maryland Baltimore County Office of Sponsored Programs Subaward Policies and Procedures Purpose The purpose of the University Maryland Baltimore County Subaward Policies and Procedures is
More informationSubchapter 7. General Industry Safety Orders Group 16. Control of Hazardous Substances Article 109. Hazardous Substances and Processes
Subchapter 7. General Industry Safety Orders Group 16. Control of Hazardous Substances Article 109. Hazardous Substances and Processes 5191. Occupational Exposure to Hazardous Chemicals in Laboratories.
More informationMember Organization Guidelines
Member Organization Guidelines Before You Begin: Please be sure that there are sufficient funds in your budget to cover the request. Email FBSC@brooklyn.cuny.edu if you are unsure of your account balance.
More informationCONTRACTOR PRE-QUALIFICATION FORM
Doc..: Rev../Date: C 3/28/2017 Page: 1 of 13 GENERAL INFORMATION 1 Person Completing this PQF: Title: Telephone: Fax: E-mail Address: 2 Contact for Requesting Bids: Title: Telephone: Fax: E-mail Address:
More informationIn addition to the definitions set forth in Annex C, the following terms shall have the definitions set forth as follows:
Page 1 of 6 Mandate The Contractor shall comply with and shall ensure that its Subcontractor(s) to comply with all Applicable Laws (including Transport Canada regulations) and GTAA safety and security
More informationAppendix C Title Occupational Exposure to Hazardous Chemicals in Laboratories. Found at:
Appendix C Title 8 5191 Occupational Exposure to Hazardous Chemicals in Laboratories Found at: http://www.dir.ca.gov/title8/5191.html Subchapter 7. General Industry Safety Orders Group 16. Control of Hazardous
More informationTxDOT Internal Audit Construction Contract Administration Audit (1201-5) Department-wide Report
Construction Contract Administration Audit (1201-5) Department-wide Report Introduction This report was prepared for the Transportation Commission, TxDOT Administration and Management. The report presents
More informationCOUNCIL OF THE EUROPEAN UNION. Brussels, 4 June /14 Interinstitutional File: 2013/0340 (NLE) ATO 45
COUNCIL OF THE EUROPEAN UNION Brussels, 4 June 2014 10410/14 Interinstitutional File: 2013/0340 (NLE) ATO 45 NOTE from: General Secretariat of the Council to: Delegations No. Cion prop.: 15030/13 ATO 119
More informationAdopt-A-Road Program. For more information, please contact:
ADOPT-A-ROAD is a volunteer litter control program sponsored by the City of Apopka. Adopt-A- Road allows citizens to enhance the level of community pride in their surrounding area by reducing litter. Participants
More informationCABINET OF MINISTERS OF UKRAINE ENACTMENT of 6 December 2000, No Kyiv
CABINET OF MINISTERS OF UKRAINE ENACTMENT of 6 December 2000, No. 1782 Kyiv On approval of the Order of licensing of particular activities in the use of nuclear energy (With changes made according to Enactments
More informationAPPLICATION FOR RIGHT-OF-WAY CONSTRUCTION PERMIT
PERMIT NUMBER INSPECTOR: Phone # APPLICATION FOR RIGHT-OF-WAY CONSTRUCTION PERMIT Registration form must be completed and approved prior to submitting a ROW permit application. Please refer to the ROW
More informationHAZARD IDENTIFICATION AND ASSESSMENT
SOP-28 Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 11 Purpose To provide guidelines for identifying, assessing and controlling workplace hazards; To ensure the potential
More informationCh. 435a KEY, GAMING & NONGAMING EMPLOYEES a.1. CHAPTER 435a. KEY, GAMING AND NONGAMING EMPLOYEES; BOARD-ISSUED CREDENTIALS
Ch. 435a KEY, GAMING & NONGAMING EMPLOYEES 58 435a.1 CHAPTER 435a. KEY, GAMING AND NONGAMING EMPLOYEES; BOARD-ISSUED CREDENTIALS Sec. 435a.1. 435a.2. 435a.3. 435a.4. 435a.5. 435a.6. 435a.7. 435a.8. 435a.9.
More informationWORKING WITH CONTRACTORS POLICY AND PROCEDURE
WORKING WITH CONTRACTORS POLICY AND PROCEDURE CROWN SECURITY CONTRACTORS & OSH (i) Preface Contract work is becoming increasingly common in the modern workplace management culture, and has been a feature
More informationSan Antonio Water System PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM
PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM SEPTEMBER 2007 TABLE OF CONTENTS INTRODUCTION... 2 SAFETY RESPONSIBILITIES, AUTHORITY AND ACCOUNTABILITY... 3 REGULATORY AGENCIES... 3 SAWS... 4
More informationBUYER: Alicia Waymack, Senior Buyer ESTIMATED BID TAB POSTING DATE: February 1, 2017
SUBMIT BIDS TO: University of West Florida Office of Procurement and Contracts ATTN: Alicia Waymack Building 20W, Room 159 11000 University Parkway Pensacola, FL 32514 Access Bid Info on the Web: http://uwf.edu/offices/procurement/vendorsonly/open-solicitations/
More informationWorkday Benefits Training
Workday Benefits Training Day-to-Day Administration Leslie Ruth Sr Consultant June 9, 2016 Reflection Experience is the worst teacher; it gives the test before presenting the lesson. By Vernon Law. 2 Agenda
More informationREQUEST FOR SUPPLIER QUALIFICATION
PHYSICAL RESOURCES REQUEST FOR SUPPLIER QUALIFICATION Contractor Vendor of Record (VOR) List for Various Projects Issue Date: January 2018 TABLE OF CONTENTS 1.0 Introduction...3 2.0 Categories...3 3.0
More informationMinnesota Department of Health Division of Environmental Health Indoor Environments and Radiation Section
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/sonar/sonar.asp Minnesota Department
More informationSurvey on the Use of Dose Constraints and Reference Levels Made in the Context of the European ALARA Network
Survey on the Use of Dose Constraints and Reference Levels Made in the Context of the European ALARA Network Stephen Fennell Radiological Protection Institute of Ireland October 24 26, 2011 ICRP Symposium
More informationBURNET COUNTY ACCIDENT PREVENTION PLAN & SAFETY POLICY
BURNET COUNTY ACCIDENT PREVENTION PLAN & SAFETY POLICY TABLE OF CONTENTS MANAGEMENT COMPONENT... 1 Safety Policy Statement Safety Committee Members Authority and Accountability Statement RECORDKEEPING
More informationPOLICY. Student, Academic Data... 5 Type of Records... 5 Recommended Retention... 5 Enforcement Policy Purpose... 11
POLICY Policy Name Policy Category Policy Sub-Category Responsible Department Policy to be Approved By Responsible VP Responsible AVP or Director Original Policy Date: N/A Date of Policy Review: 12/19/2017
More informationMINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLAN
APPENDIX A MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLAN An APP is, in essence, a safety and health policy and program document. The following areas are typically addressed in an APP, but a plan shall
More informationCONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]
CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category] RFP Language Contract Language 1. Contractor recognizes the importance of performing the work in a safe and responsible manner
More informationPROCEDURE V.3 NOV 2016
PROCEDURE V.3 NOV 2016 CATEGORIZATION OF EXPOSED EMPLOYEES, ASSESSMENT OF THE EXPOSURE AND MEDICAL SUPERVISION OF A-WORKERS INTRODUCTION In the Radiation Protection Act ( Besluit stralingsbescherming or
More informationMedical Identity Theft Prevention Policy
SUBJECT: NUMBER: EFFECTIVE DATE: SUPERSEDES SPP: APPROVED BY: DISTRIBUTION: Medical Identity Theft Prevention Policy (signature) DATED: I. STATEMENT OF PURPOSE: To define medical identity theft and outline
More informationSection 6: Incident Reporting & Investigation
2012 Section 6: Incident Reporting & Investigation Total Oilfield Rentals LP 10/1/2012 This page left blank intentionally. 6.0. Incident Reporting & Investigation Rev B October 1, 2012 Table of Contents
More informationAPPLICATION FOR PERMIT FOR ACCESS ENTRANCE TO A COUNTY PUBLIC RIGHT-OF-WAY
OFFICE USE ONLY APPLICATION FOR PERMIT FOR ACCESS ENTRANCE TO A COUNTY PUBLIC RIGHT-OF-WAY Permit No.: Date Received Received By Application Fee $ Cash Check No. of (Approach Owner) (Address) APPROACH
More informationATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)
ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS) Swinerton Builders, Inc. (SWINERTON) constantly strives to provide a safe and productive work environment.
More informationUACES Subrecipient Monitoring Policy Statement
UACES Subrecipient Monitoring Policy Statement UACES monitors the financial and programmatic performance of Subrecipients, and evaluates their capacity to effectively manage a Subaward. The university
More informationTHE AGENCY'S HEALTH AND SAFETY MEASURES
International Atomic Energy Agency Distr. GENERAL INFCIRC/18 31 May 1960 Original: ENGLISH THE AGENCY'S HEALTH AND SAFETY MEASURES The Agency's health and safety measures as approved by the Board of Governors
More information2010 IPA Horizontal Programme on Nuclear Safety and Radiation Protection PF1 Albania - Final Project Fiche No. 1
Project Fiche No. 1 Further steps to approximate the Albanian legislation and regulations in accordance with the EU acquis in the field of radiation protection, nuclear safety and security 1. Basic information
More informationPART 6 - INTERNAL CONTROL
PART 6 - INTERNAL CONTROL INTRODUCTION The A-102 Common Rule and OMB Circular A-110 (2 CFR part 215) require that non-federal entities receiving Federal awards (i.e., auditee management) establish and
More informationCPR Part 26 Security of Radioactive Sources
CPR Part 26 Security of Radioactive Sources TABLE OF CONTENTS I. GENERAL PROVISIONS Section 1. Purpose 1 Section 2. Scope 1 Section 3. Exemptions 2 Section 4. Definitions 2 Section 5. Interpretation 4
More informationAppendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University
Appendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University Employee: Supervisor: NOTE: Ensure that employees/students who use English
More information25 TEXAS ADMINISTRATIVE CODE Licensing of Radioactive Material. Texas Regulations for Control of Radiation
25 TEXAS ADMINISTRATIVE CODE 289.252 Licensing of Radioactive Material Texas Regulations for Control of Radiation (revisions effective September 1, 2004 are shown as shaded text) 289.252(a) Purpose...
More informationRFP Representations and Certifications Noncommercial Items for Government Programs (FAR/DFARS)
RFP Representations and Certifications Noncommercial Items for Government Programs (FAR/DFARS) 1. FAR 52.215-6 PLACE OF PERFORMANCE a. The Offeror or Respondent, in the performance of any contract resulting
More informationSUBMITTAL TO THE BOARD OF SUPERVISORS COUNTY OF RIVERSIDE, STATE OF CALIFORNIA
SUBMITTAL TO THE BOARD OF SUPERVISORS COUNTY OF RIVERSIDE, STATE OF CALIFORNIA ITEM 3.39 (ID # 5928) FROM : TLMA-PLANNING: MEETING DATE: Tuesday, December 12, 2017 SUBJECT: TRANSPORTATION & LAND MANAGEMENT
More informationGas Cooling Application - July 1, 2016 through June 30, 2017
Gas Cooling Application - July 1, 2016 through June 30, 2017 Customer Information Company Name (as listed on utility bill) Doing Business as (if applicable) Installation Start Date: Installation Completion
More informationIf you have any questions contact Jeff Eady of the City of Forest Park Public Works Department at (404)
City of Forest Park Request for Proposals for the Forest Park Urban Redevelopment Agency (URA) Installation Ft. Gillem Forest Park, Georgia 30297 Mandatory Pre-Proposal Conference September 29, 2015 at
More informationRSU # 78 RFP # 1 BASELINE ASSESSMENT OF FACILITY
RSU # 78 RFP # 1 BASELINE ASSESSMENT OF FACILITY RFP Coordinator: Brian Foster, Superintendent Tel: (207) 864-3312 e-mail: bfoster@rangeleyschool.org Fax: _(207) 864-2451 From the time this RFP is issued
More informationOffice of Purchasing and Contracts PROCEDURES MANUAL January 16, 2015
Office of Purchasing and Contracts PROCEDURES MANUAL January 16, 2015 INTRODUCTION The Edinboro University Office of Purchasing and Contracts will provide for the needs of our faculty, staff and students
More informationAGREEMENT FOR WORK TO BE PERFORMED BY KING COUNTY ROAD SERVICES DIVISION
AGREEMENT FOR WORK TO BE PERFORMED BY KING COUNTY ROAD SERVICES DIVISION THIS AGREEMENT is made and entered into by and between King County ( the County ) and the City of Medina, ( the City ). RECITALS
More informationBadge Distribution Plan
Badge Distribution Plan Re-Entry Pass Terrebonne Economic Development Authority 319 Roussell Street Houma, LA 70360 985-873-6890 985-873-6815 fax www.tpeda.org September 30, 2008 Revised: March 16, 2010
More informationOKLAHOMA CITY COMMUNITY COLLEGE HAZARD COMMUNICATION PROGRAM. Environmental Health and Safety
OKLAHOMA CITY COMMUNITY COLLEGE HAZARD COMMUNICATION PROGRAM Environmental Health and Safety Established: December 1994 Revised: December 1998 Revised: January 31, 2008 Reviewed: May 12, 2009 Revised:
More informationCASH HANDLING. These procedures apply to any individual handling or processing University or Auxiliary Organization cash or cash equivalents.
PURPOSE To provide procedures and guidance for accepting cash and cash equivalents, providing physical and electronic security of cash and cash equivalents and ensuring appropriate segregation of duties
More informationUPDATE ON THE ENFORCEMENT REGIME OF THE PRICE ANDERSON AMENDMENTS ACT OF J. C. Person Person & Craver LLP Washington, D.C.
UPDATE ON THE ENFORCEMENT REGIME OF THE PRICE ANDERSON AMENDMENTS ACT OF 1988 J. C. Person Person & Craver LLP Washington, D.C. USA ABSTRACT The purpose of this paper is to identify the present-day contours
More informationREQUEST FOR LETTERS OF INTEREST. Brownfields Services On Going. Solicitation Identification Number PD
ESCAMBIA COUNTY FLORIDA REQUEST FOR LETTERS OF INTEREST Brownfields Services On Going Solicitation Identification Number PD 06-07.038 Letters of Interest Will Be Received Until: Continuous Basis Office
More informationBuilding Permit Check Sheet
Building Permit Check Sheet Tenant: Contractor: Please initial all items enclosed: Completed and signed Application-Required Construction Drawings-Required Project Schedule-Required Certificate of Insurance
More information(Revised December 9, 2005) HAZARD WARNING LABELS (DEC 1991)
252.223-7000 Reserved. (Revised December 9, 2005) 252.223-7001 Hazard Warning Labels. As prescribed in 223.303, use the following clause: HAZARD WARNING LABELS (DEC 1991) (a) Hazardous material, as used
More informationPROFESSIONAL SERVICES CONSULTANT TYPE OF RETAINER AGREEMENT UNIVERSITY OF ILLINOIS
PROFESSIONAL SERVICES CONSULTANT TYPE OF RETAINER AGREEMENT UNIVERSITY OF ILLINOIS THIS AGREEMENT, made and entered into in the City of, State of Illinois, as of the date of the last signature of the parties
More information