2014 Modification Assessment Cost and Accounting Report July 1, 2015

Size: px
Start display at page:

Download "2014 Modification Assessment Cost and Accounting Report July 1, 2015"

Transcription

1 2014 Modification Assessment Cost and Accounting Report July 1, 2015 Prepared by: Raeann Quadro Version: 1 California Independent System Operator

2 Table of Contents 1. Executive Summary 1.1. Purpose and Scope 1.2. Background 1.3. Process Modification Assessment Cost and Accounting Report 2.1 Cost 2.2 Timing 2.3 Outcomes Doc ID: XWK2E22ZZR Page 1 of 6

3 1.0 Executive Summary 1.1 Purpose and Scope The CAISO evaluates a variety of modification requests for Customers generator projects. In doing so, the CAISO coordinates with the relevant Participating TO(s) and Affected System Operator(s), if any. Effective December 3, 2013, the CAISO Tariff requires that Customers themselves bear the costs of these modification assessments. To provide transparency, the Tariff also requires the CAISO to publish cost data for modification assessments. This report contains a description of the number, types, duration, and costs of modification requests in Background The CAISO generally uses the same process and criteria to review modification requests for all generation projects. 1 A high level-depiction of the modification process is below: Customers are required to provide a $10,000 deposit for the modification assessment, and after the modification assessment is complete, the CAISO invoices for the actual costs of the modification assessment. The invoices include an itemized account of expenses incurred, including those incurred by the CAISO, the Participating TOs, and third parties at the direction of the CAISO or Participating TO). Whenever the actual cost of performing the modification assessment exceeds the modification assessment deposit, the invoice directs the Customer to pay the excess amount. However, it is far more common for the deposit to exceed the invoice, 2 in which case the Customer is refunded the balance. 1 The modification assessments discussed in this report are governed by CAISO Tariff Appendix S, Section 1.3.4; Appendix T, Section 3.4.5; Appendix U, Section 4.4.3; Appendix Y, Section ; or Appendix DD, Article as applicable, and the BPM for Generator Management. 2 Or the Customer withdraws its modification request before most costs are incurred. Doc ID: XWK2E22ZZR Page 2 of 6

4 1.3 Process Types of Modifications The Customer must submit to the CAISO, in writing, a request to modify any information provided in the Request. 3 The variety, content, and scope of modification requests are as unique and complex as the Generating Facilities themselves, but for the purpose of this report, modification requests have been grouped into three buckets : 1) Commercial Operation Date ( COD ) extensions and/or requests for project Phasing; 2) Technology changes, e.g., inverter, transformer, and equipment changes; and 3) changes, e.g., generation tie route changes, Point of changes, Point of Change of Ownership Changes, and Site Location changes. Time The modification assessment commences when the CAISO and Participating TO (1) deem the modification request (including all of the necessary technical documents) valid and data complete, and (2) receive the Customer s modification assessment deposit. Per the Tariff, the CAISO targets providing a written response to the Customer within 45 days of commencement. If the modification assessment cannot be completed within that period, the CAISO notifies the Customer and provides an estimated completion date and explains why additional time is required. 3 Please note that, inter alia, requests to increase the maximum output of a project are not permitted in the modification process. Doc ID: XWK2E22ZZR Page 3 of 6

5 Modification Assessment Cost and Accounting Report 2.1 Cost The CAISO completed 94 modification assessments in Of those requests, 51 were charged the actual costs of their assessment. The remaining 43 requests were initiated before the CAISO obtained Tariff Authority to charge for the requests. The average cost for the 51 modification assessments that were charged was $2, The highest cost modification assessment was $14, The lowest cost modification assessment was $ The average cost for Commercial Operation Date ( COD ) modifications was $1, The average cost for technology changes was $2, The average cost for interconnection changes was $8, The average cost for a combined COD and technology changes was $1, The average cost of a combined COD, technology, and interconnection changes was $ $10, $8, $6, $4, $2, $0.00 Total COD COD & Technology Technology COD, Technology, & 4 The CAISO tariff requires that The Participating TO(s) shall invoice the CAISO for any assessment work within seventy-five (75) calendar days of completion of the assessment. These values include modification assessments where the ISO received no invoice from the Participating TO. Doc ID: XWK2E22ZZR Page 4 of 6

6 2.2 Timing The average time for the 94 modification assessments completed in 2014 was 88 days. However, it is important to note that these figures may be unrepresentative of the CAISO s current process because the CAISO formerly tracked when the request arrived and not when the data for the request was complete. As such, the times from the previous data set are long. The quickest modification assessment was completed in 10 days. The longest modification assessment was 335 days. The average time for COD modifications was 92 days. The average time for technology changes was 76 days. The average time for interconnection changes was 42 days. The average time for COD and technology changes was 100 days. The average time of COD, technology, and interconnection changes was 87 days COD COD & Technology COD, Technology, & 20 Technology 0 Total Doc ID: XWK2E22ZZR Page 5 of 6

7 2.3 Outcomes Of the 94 modification assessments completed in 2014, 30 were approved, 61 were conditionally approved, 1 was partially approved, 5 and 2 were denied. Total Approved Conditional Approval Denied Partially Approved Conditional approval was generally based on the following conditions: Execute the Generator Agreement within a certain period. Continue to make payments and postings for Network Upgrades. Propose different CODs from the request due to Participating TO construction times. For storage devices, respond to CAISO dispatch, a mechanism in place to ensure that the project does not deliver more to the CAISO controlled grid than studied, and separate metering and telemetry. For inverter changes, install a mechanism to ensure that the project does not deliver more to the CAISO controlled grid than studied. 5 One or more components of a multi-part request was denied. Doc ID: XWK2E22ZZR Page 6 of 6

2015 Modification Assessment Cost and Accounting Report March 1, 2017

2015 Modification Assessment Cost and Accounting Report March 1, 2017 2015 Modification Assessment Cost and Accounting Report March 1, 2017 Prepared by: Raeann Quadro California Independent System Operator Table of Contents 1. Executive Summary 1.1. Purpose and Scope 1.2.

More information

Business Practice Manual For. Queue Management. Version 12

Business Practice Manual For. Queue Management. Version 12 Business Practice Manual For Queue Management Version 12 Revision Date: March 4June 27, 2014 Approval History Approval Date: February, 2014 Effective Date: March, 2014 BPM Owner: Deb Le Vine BPM Owner

More information

Business Practice Manual For. Generator Management. Version 76

Business Practice Manual For. Generator Management. Version 76 Business Practice Manual For Generator Management Version 76 Revision Date: April 30, 3015June 1, 2015 Approval History Approval Date: February, 2014 Effective Date: March, 2014 BPM Owner: Deb Le Vine

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 25. Interconnection of Generating Units and Facilities... 2 25.1 Applicability... 2 25.1.1 Interconnection Request and Generating Unit Requirements... 2 25.1.2 Affidavit Requirements...

More information

Business Practice Manual For. Generator Management. Version Revision Date: August 7September 8, Page i

Business Practice Manual For. Generator Management. Version Revision Date: August 7September 8, Page i Business Practice Manual For Generator Management Version 2021 Revision Date: August 7September 8, 2017 Page i Approval History Approval Date: February, 2014 Effective Date: March, 2014 BPM Owner: Deb

More information

Business Practice Manual For. Generator Management. Version 8

Business Practice Manual For. Generator Management. Version 8 Business Practice Manual For Generator Management Version 8 Revision Date: June 30, 2015 Approval History Approval Date: February, 2014 Effective Date: March, 2014 BPM Owner: Deb Le Vine BPM Owner s Title:

More information

Business Practice Manual For. Generator Management. Version Revision Date: July 5October 1, Page i

Business Practice Manual For. Generator Management. Version Revision Date: July 5October 1, Page i Business Practice Manual For Generator Management Version 2223 Revision Date: July 5October 1, 2018 Page i Approval History Approval Date: February, 2014 Effective Date: March, 2014 BPM Owner: Deb Le Vine

More information

Interconnection Process Enhancements. Draft BPM Language Topic 15 Material Modification Review

Interconnection Process Enhancements. Draft BPM Language Topic 15 Material Modification Review Interconnection Process Enhancements Draft BPM Language Topic 15 Material Modification Review November 18, 2013 1 Table of Contents 9. Overview of Modification Provisions... 4 9.1. Timing of Modification

More information

Generator Interconnection and Deliverability Allocation Procedures (GIDAP) Business Practice Manual (BPM) 6.1.4

Generator Interconnection and Deliverability Allocation Procedures (GIDAP) Business Practice Manual (BPM) 6.1.4 1 2 3 Estimated schedule. Does not include Generator Interconnection Agreement, construction and New Resource Interconnection (NRI) process (full network model, metering and telemetry, etc.) which is 6/7

More information

2018 Interconnection Process Enhancements (IPE) Issue Paper

2018 Interconnection Process Enhancements (IPE) Issue Paper 2018 Interconnection Process Enhancements (IPE) Issue Paper Stakeholder Meeting January 24, 2018 10:00 a.m. 4:00 p.m. (Pacific Time) Agenda Time Item Speaker 10:00-10:10 Stakeholder Process and Schedule

More information

2018 Interconnection Process Enhancements (IPE) Stakeholder Call May 21, :00 a.m. 4:00 p.m. (Pacific Time)

2018 Interconnection Process Enhancements (IPE) Stakeholder Call May 21, :00 a.m. 4:00 p.m. (Pacific Time) 2018 Interconnection Process Enhancements (IPE) Stakeholder Call May 21, 2018 10:00 a.m. 4:00 p.m. (Pacific Time) Agenda Time Item Speaker 10:00-10:10 Stakeholder Process and Schedule Jody Cross 10:10-10:15

More information

California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff

California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff Table of Contents 10. Metering... 2 10.1 General Provisions... 2 10.1.1 Role Of The CAISO... 2 10.1.2 Meter Data Retention By The CAISO... 2 10.1.3 Netting... 2 10.1.4 Meter Service Agreements... 4 10.1.5

More information

California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff

California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff Table of Contents 10. Metering... 2 10.1 General Provisions... 2 10.1.1 Role of the CAISO... 2 10.1.2 Meter Data Retention by the CAISO... 2 10.1.3 Netting... 3 10.1.4 Meter Service Agreements... 4 10.1.5

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Fernando E. Cornejo fernando.cornejo@sce.com Southern California Edison June 8, 2018 Please use this template to provide your written comments

More information

Interconnection Process Enhancements Initiative

Interconnection Process Enhancements Initiative Interconnection Process Enhancements Initiative Stakeholder Web Conference March 30, 2015 Agenda Time Topic Speaker 1:00-1:10 Introduction, Stakeholder Process Kristina Osborne 1:10-2:50 Issue Paper Topic

More information

2018 Interconnection Process Enhancements. Addendum #2 to Draft Final Proposal

2018 Interconnection Process Enhancements. Addendum #2 to Draft Final Proposal 2018 Interconnection Process Enhancements Addendum #2 to Draft Final Proposal December 21, 2018 Table of Contents 1. Introduction... 2 2. Stakeholder Process... 2. Scope... 7. Interconnection Financial

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix F Rate Schedules... 2 Schedule 1... 2 Grid Management Charge... 2 Part A Monthly Calculation of Grid Management Charge (GMC)... 2 Part B Quarterly Adjustment, If Required...

More information

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix H. Grandfathered Metering & Settlement Provisions

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix H. Grandfathered Metering & Settlement Provisions Grandfathered Metering & Settlement Provisions FOR TRADING DAYS PRIOR TO NOVEMBER 1, 2009 1. Grandfathering of Metering and Settlement Provisions for Trading Days Prior to November 1, 2009. Notwithstanding

More information

Business Practice Manual for Settlements & Billing

Business Practice Manual for Settlements & Billing Business Practice Manual for Settlements & Billing Version 110 Last Revised: August 27April 1, 20132 Version 101 Last Revised: August April 271, 20123 Page 1 Approval History: Approval Date: 8-30-2012

More information

Business Practice Manual For The Energy Imbalance Market. Version 89

Business Practice Manual For The Energy Imbalance Market. Version 89 Business Practice Manual For The Energy Imbalance Market Version 89 Revision Date: Jan 02, 2018May 31, 2017 Approval History Approval Date: October 2, 2014 Effective Date: October 2, 2014 BPM Owners: Mike

More information

Business Practice Manual For The Energy Imbalance Market. Version 78

Business Practice Manual For The Energy Imbalance Market. Version 78 Business Practice Manual For The Energy Imbalance Market Version 78 Revision Date: March 31May 31, 2017 Approval History Approval Date: October 2, 2014 Effective Date: October 2, 2014 BPM Owners: Mike

More information

Link to Generator Interconnection and Deliverability Allocation Procedures Cluster Process Summary provided

Link to Generator Interconnection and Deliverability Allocation Procedures Cluster Process Summary provided 1 2 3 Link to Generator Interconnection and Deliverability Allocation Procedures Cluster Process Summary provided 4 This is how you enter our Interconnection Study Process, a.k.a. the queue. App DD Section

More information

Smart Grid Small Generator Interconnection Procedures For Distributed Generators Less than 10 MW Connected in Parallel with LIPA s Radial

Smart Grid Small Generator Interconnection Procedures For Distributed Generators Less than 10 MW Connected in Parallel with LIPA s Radial Smart Grid Small Generator Interconnection Procedures For Distributed Generators Less than 10 MW Connected in Parallel with LIPA s Radial Distribution Systems Revised January 1, 2017 TABLE OF CONTENTS

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 26. Transmission Rates and Charges... 2 26.1 Access Charge... 2 26.1.1 Publicly Owned Electric Utilities Access Charge... 5 26.1.2 Regional Access Charge Settlement... 6 26.1.3 Distribution

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Fernando E. Cornejo fernando.cornejo@sce.com Southern California Edison February 7, 2018 Please use this template to provide your written

More information

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, NW Washington, DC Fax:

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, NW Washington, DC Fax: ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404 202-756-3300 Fax: 202-756-3333 Bradley R. Miliauskas Direct Dial: 202-756-3405 Email: bradley.miliauskas@alston.com December

More information

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 9.1 Nature of Relationship. Each Participating TO shall enter into

More information

Business Practice Manual For. Generator Management. PRR: Clarifying changes to Generator Retirement Process

Business Practice Manual For. Generator Management. PRR: Clarifying changes to Generator Retirement Process Business Practice Manual For Generator Management PRR: Clarifying changes to Generator Retirement Process Page 1 11. Retirement PLEASE NOTE Scenario 4 creates a process for a Generating Unit that wants

More information

150 FERC 61,056 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

150 FERC 61,056 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 150 FERC 61,056 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Chairman; Philip D. Moeller, Tony Clark, Norman C. Bay, and Colette D. Honorable.

More information

Temporary Suspension of Resource Operations. Issue Paper

Temporary Suspension of Resource Operations. Issue Paper Temporary Suspension of Resource Operations May 10, 2017 Market & Infrastructure Policy Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 3 3. Background and Scope of Initiative...

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification CRR Auction Efficiency 1B Date Created: 8/3/2018 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 27 Disclaimer All information contained in this draft Business Requirements Specification

More information

Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA Distribution Systems

Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA Distribution Systems Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA Distribution Systems -1- TABLE OF CONTENTS Section I. Application Process..

More information

Frequency Response Straw Proposal Stakeholder Meeting

Frequency Response Straw Proposal Stakeholder Meeting Frequency Response Straw Proposal Stakeholder Meeting October 19, 2015 October 19, 2015 stakeholder meeting agenda Time Topic Presenter 1:00-1:05 Introduction Kim Perez 1:05-1:10 Updated schedule Kim Perez

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 28. Inter-SC Trades... 2 28.1 Inter-SC Trades Of Energy... 2 28.1.1 Purpose... 2 28.1.2 Availability Of Inter-SC Trades Of Energy... 2 28.1.3 Submission Of Inter-SC Trades Of Energy...

More information

Regulation Director FERC Rates & Regulation. January 27, 2012

Regulation Director FERC Rates & Regulation. January 27, 2012 Regulation Director FERC Rates & Regulation January 27, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant to

More information

Smart Grid Compressed Air Energy Storage Demonstration Project Request for Offers

Smart Grid Compressed Air Energy Storage Demonstration Project Request for Offers Smart Grid Compressed Air Energy Storage Demonstration Project Request for Offers (CAES RFO) 2015 PARTICIPANTS WEBINAR October 29, 2015 Q&A / Audio Replay PG&E will take questions via email only during

More information

J.P. Morgan Comments on CAISO Straw Proposal on Data Release & Accessibility Phase 1: Transmission Constraints

J.P. Morgan Comments on CAISO Straw Proposal on Data Release & Accessibility Phase 1: Transmission Constraints J.P. Morgan Comments on CAISO Straw Proposal on Data Release & Accessibility Phase 1: Transmission Constraints Submitted by Company Date Submitted Steve Greenleaf (916) 802-5420 J.P. Morgan December 16,

More information

Frequently Asked Questions for: Settlement Dispute System Submittal Process

Frequently Asked Questions for: Settlement Dispute System Submittal Process Frequently Asked Questions for: Settlement Dispute System Submittal Process California ISO. Copyright 2016. All Rights Reserved TABLE OF CONTENTS SETTLEMENT DISPUTE SYSTEM... 3 Q1: What is a settlement

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 36. Congestion Revenue Rights... 3 36.1 Overview Of CRRs And Procurement Of CRRs... 3 36.2 Types Of CRR Instruments... 3 36.2.1 CRR Obligations... 3 36.2.2 CRR Options... 3 36.2.3 Point-To-Point

More information

RENEWABLE MARKET ADJUSTING TARIFF POWER PURCHASE AGREEMENT

RENEWABLE MARKET ADJUSTING TARIFF POWER PURCHASE AGREEMENT [This contract has been approved by the California Public Utilities Commission in Decision 13-05-034. Modification of the terms and conditions of this contract will result in the need to obtain additional

More information

Capacity Procurement Mechanism Risk-of-Retirement Process Enhancements. Issue Paper

Capacity Procurement Mechanism Risk-of-Retirement Process Enhancements. Issue Paper Capacity Procurement Mechanism Risk-of-Retirement Process Enhancements May 10, 2017 Market & Infrastructure Policy Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 3 3.

More information

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fifth Revised Sheet No. 26 Canceling P.S.C. MO. No. 7 Fourth Revised Sheet No.

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fifth Revised Sheet No. 26 Canceling P.S.C. MO. No. 7 Fourth Revised Sheet No. P.S.C. MO. No. 7 Fifth Revised Sheet No. 26 Canceling P.S.C. MO. No. 7 Fourth Revised Sheet No. 26 PURPOSE: The Market Based Demand Response Program (MBDR) offers qualified business demand response (BDR)

More information

Amendment to extend exceptional dispatch mitigated energy settlement rules and modify residual imbalance energy settlement rules

Amendment to extend exceptional dispatch mitigated energy settlement rules and modify residual imbalance energy settlement rules California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Nancy Saracino, Vice President, General Counsel & Chief Administrative Officer Date: September 7, 2012 Re:

More information

Settlements Training

Settlements Training Settlements Training Billing and Dispute Process Massih Ahmadi Client Representative 916-608-1265 mahmadi@caiso.com Presentation Agenda Tariff Requirements Settlement and Invoicing Timelines Detail of

More information

Business Practice Manual For The Energy Imbalance Market. Version 1213

Business Practice Manual For The Energy Imbalance Market. Version 1213 Business Practice Manual For The Energy Imbalance Market Version 1213 Revision Date: October 25 November 29, 2018 Approval History Approval Date: October 2, 2014 Effective Date: October 2, 2014 BPM Owners:

More information

Clean Coalition comments on Proposed CREST PPA

Clean Coalition comments on Proposed CREST PPA Southern California Edison CREST Reform Clean Coalition comments on Proposed CREST PPA Tam Hunt, Attorney and Policy Advisor for the Clean Coalition June 22, 2011 1 Clean Coalition Comments on Proposed

More information

GIDAP Cluster Process Updated October 31, 2016

GIDAP Cluster Process Updated October 31, 2016 GIDAP Cluster Process Updated October 31, 2016 (Tariff Appendix DD Section number references shown in bold italics) Applicable portions copied into meeting minutes. All MW references in document denote

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) California Independent System ) Docket Nos. ER06-615-000 Operator Corporation ) ER07-613-000 ) ) (not consolidated) ) STATUS REPORT

More information

LARGE GENERATOR INTERCONNECTION AGREEMENT (LGIA) AMONG [INTERCONNECTION CUSTOMER] AND [PARTICIPATING TO] AND

LARGE GENERATOR INTERCONNECTION AGREEMENT (LGIA) AMONG [INTERCONNECTION CUSTOMER] AND [PARTICIPATING TO] AND (LGIA) AMONG [INTERCONNECTION CUSTOMER] AND [PARTICIPATING TO] AND CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION PROJECT: Project Name (Q#) TABLE OF CONTENTS LARGE GENERATOR INTERCONNECTION AGREEMENT...

More information

December 7, Compliance with Order No. 844 Response to Deficiency Letter

December 7, Compliance with Order No. 844 Response to Deficiency Letter California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff CAISO TARIFF APPENDIX CC

California Independent System Operator Corporation Fifth Replacement Electronic Tariff CAISO TARIFF APPENDIX CC CAISO TARIFF APPENDIX CC Large Generator Interconnection Agreement for Interconnection Requests in a Queue Cluster Window that are tendered a Large Generator Interconnection Agreement on or after July

More information

APPENDIX D POWER PURCHASE AGREEMENT COVER SHEET

APPENDIX D POWER PURCHASE AGREEMENT COVER SHEET SAMPLE DOCUMENT ONLY APPENDIX D POWER PURCHASE AGREEMENT COVER SHEET This Power Purchase Agreement ( Agreement ) is entered into between Pacific Gas and Electric Company, a California corporation ( Buyer

More information

Title Page Southern California Edison Company Tariff Title: Transmission Owners Tariff Tariff Record Title: First Revised Service Agreement No. 39 FER

Title Page Southern California Edison Company Tariff Title: Transmission Owners Tariff Tariff Record Title: First Revised Service Agreement No. 39 FER Title Page Southern California Edison Company Tariff Title: Transmission Owners Tariff Tariff Record Title: First Revised Service Agreement No. 39 FERC FPA Electric Tariff INTERCONNECTION FACILITIES AGREEMENT

More information

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study California ISO Report Regional Surplus Allocation Impact Study October 6, 2010 Regional Surplus Allocation Impact Study Table of Contents Executive Summary... 3 1 Issue and Background... 3 2 Study Framework...

More information

Business Practice Manual for Rules of Conduct Administration. Version 45

Business Practice Manual for Rules of Conduct Administration. Version 45 Business Practice Manual for Rules of Conduct Administration Version 45 Last Revised: August 2, 2010 August,October xx04, 2011 Approval History Approval Date: March 13, 2009 Effective Date: March 31, 2009

More information

POWER PURCHASE AND SALE AGREEMENT. between [BUYER S NAME] and [SELLER S NAME] (ID #[Number])

POWER PURCHASE AND SALE AGREEMENT. between [BUYER S NAME] and [SELLER S NAME] (ID #[Number]) POWER PURCHASE AND SALE AGREEMENT between [BUYER S NAME] and [SELLER S NAME] (ID #[Number]) Standard Contract for Qualifying Facilities with a Power Rating that is Less than or Equal to 20MW TERMS THAT

More information

ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT

ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT THIS STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT ( Agreement ) is made and entered

More information

4.1 Daily & Hourly Bid Components

4.1 Daily & Hourly Bid Components 4.1 Daily & Hourly Bid Components This section is based on CAISO Tariff Section 30.4 Election for Start-Up and Minimum Load Costs and Section 39.6.1.6. (Start-Up and Minimum Load Costs are not applicable

More information

UNITED STATES OF AMERICA 117 FERC 61,356 FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA 117 FERC 61,356 FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA 117 FERC 61,356 FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff.

More information

160 FERC 61,007 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

160 FERC 61,007 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 160 FERC 61,007 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur, and Robert F. Powelson. California Independent System Operator

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 43. Capacity Procurement Mechanism... 2 43.1 Applicability... 2 43.2 Capacity Procurement Mechanism Designation... 2 43.2.1 SC Failure to Show Sufficient Local Capacity Area Resource...

More information

Ms. Roni Reese Senior Contracts Analyst California Independent System Operator Corporation 151 Blue Ravine Road Folsom, CA 95630

Ms. Roni Reese Senior Contracts Analyst California Independent System Operator Corporation 151 Blue Ravine Road Folsom, CA 95630 Ms. Roni Reese January 10, 2008 Page 1 January 10, 2008 Ms. Roni Reese Senior Contracts Analyst California Independent System Operator Corporation 151 Blue Ravine Road Folsom, CA 95630 Re: Startrans IO,

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59898-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57292-E Sheet 1 GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY

More information

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts 1. Commission Directives to Submit a Market Redesign Plan The direct origin of the requirement that the CAISO

More information

Massachusetts Electric Company. Nantucket Electric Company. d/b/a National Grid. Standards for Interconnecting Distributed Generation

Massachusetts Electric Company. Nantucket Electric Company. d/b/a National Grid. Standards for Interconnecting Distributed Generation Massachusetts Electric Company Nantucket Electric Company d/b/a National Grid Standards for Interconnecting Distributed Generation M.D.P.U. No 1219 Canceling M.D.P.U. 1176 Effective: May 1, 2013 TABLE

More information

Temporary Suspension of Resource Operations BBB Issue Paper

Temporary Suspension of Resource Operations BBB Issue Paper Temporary Suspension of Resource Operations BBB Issue Paper Stakeholder Conference Call May 19, 2017 9:00 a.m. 12:00 p.m. Pacific Time Keith Johnson Infrastructure and Regulatory Policy Manager Agenda

More information

Proposal Concerning Modification to Smart Grid Small Generator Interconnection Procedures Appended to LIPA s Tariff for Electric Service

Proposal Concerning Modification to Smart Grid Small Generator Interconnection Procedures Appended to LIPA s Tariff for Electric Service Proposal Concerning Modification to Smart Grid Small Generator Interconnection Procedures Appended to LIPA s Tariff for Electric Service Requested Action: The Long Island Power Authority ( LIPA or the

More information

Technical Bulletin Disconnected Pricing Node Process. Market Issue

Technical Bulletin Disconnected Pricing Node Process. Market Issue Technical Bulletin 2010-09-02 Disconnected Pricing Node Process Market Issue September 20, 2010 Introduction Technical Bulletin 2010-09-02 Disconnected Pricing Node Process As of the August 1, 2009 trading

More information

California Independent System Operator Corporation Fifth Replacement Tariff

California Independent System Operator Corporation Fifth Replacement Tariff Table of Contents APPENDIX HH Generation Interconnection Agreement Amendment Re: Generator Downsizing... 2 1 APPENDIX HH Generation Interconnection Agreement Amendment Re: Generator Downsizing This Appendix

More information

PACIFIC GAS AND ELECTRIC COMPANY. TRANSMISSION OWNER TARIFF Sixth Revised Volume 5

PACIFIC GAS AND ELECTRIC COMPANY. TRANSMISSION OWNER TARIFF Sixth Revised Volume 5 TRANSMISSION OWNER TARIFF Sixth Revised Volume 5 First Revised Sheet No. 1 Superseding Original Sheet No. 1 TABLE OF CONTENTS 1. PREAMBLE.... 4 1.1 Transmission Access for Self-Sufficient Participating

More information

Southern California Edison Company s Testimony on Tehachapi Renewable Transmission Project (TRTP)

Southern California Edison Company s Testimony on Tehachapi Renewable Transmission Project (TRTP) Application Nos.: Exhibit No.: Witnesses James A. Cuillier Gary L. Allen (U -E) Southern California Edison Company s Testimony on Tehachapi Renewable Transmission Project (TRTP) Cost Recovery And Renewable

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59895-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57290-E GENERATING FACILITY INTERCONNECTION AGREEMENT (Non-Exporting)

More information

Management recommends the following enhancements to these modifications to the provisions for commitment costs:

Management recommends the following enhancements to these modifications to the provisions for commitment costs: California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 9, 2012 Re: Decision on Commitment

More information

FERC Order 1000: Transmission Planning & Cost Allocation Framework for NYISO Compliance

FERC Order 1000: Transmission Planning & Cost Allocation Framework for NYISO Compliance FERC Order 1000: Transmission Planning & Cost Allocation Framework for NYISO Compliance by John P Buechler NYISO Executive Regulatory Policy Advisor Joint IPTF/ESPWG Meeting February 27, 2012 Albany, NY

More information

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC

ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC ALSTON&BIRD LLP The Atlantic Building 950 F Street, NW Washington, DC 20004-1404 202-756-3300 Fax: 202-756-3333 March 2, 2011 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission

More information

April 1, 2017 Appendix G

April 1, 2017 Appendix G Table of Contents... 4 Pro Forma Reliability Must-Run Contract... 4 ARTICLE 1... 4 DEFINITIONS... 4 ARTICLE 2... 14 TERM... 14 2.1 Term... 14 2.2 Termination... 14 2.3 Effective Date of Expiration or Termination...

More information

Southern California Edison Company Tariff Title: Transmission Owner Tariff Tariff Record Title: Service Agreement No. 101 FERC FPA Electric Tariff ENGINEERING, DESIGN AND PROCUREMENT LETTER AGREEMENT BETWEEN

More information

PEAK RELIABILITY COORDINATOR FUNDING

PEAK RELIABILITY COORDINATOR FUNDING PEAK RELIABILITY COORDINATOR FUNDING Straw Proposal May 8, 2015 Assessment of 2 Peak Reliability Coordinator Charges Straw Proposal Table of Contents 1 Introduction... 3 2 Background... 3 3 Plan for Stakeholder

More information

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20,

More information

transmission system. This project is referred to in the Transition Agreement as the Transmission Interconnection.

transmission system. This project is referred to in the Transition Agreement as the Transmission Interconnection. 2 Application of Valley Electric Association, Inc. to the California Independent System Operator Corporation to Become a Participating Transmission Owner June 21, 2012 Valley Electric Association, Inc.

More information

June 21, The documents submitted with this filing consist of this letter of transmittal and all attachments hereto, and the Letter Agreement.

June 21, The documents submitted with this filing consist of this letter of transmittal and all attachments hereto, and the Letter Agreement. Karen Koyano Principal Manager FERC Rates & Compliance June 21, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64409-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58722-E Schedule NEM Sheet 1 APPLICABILITY Applicable to Eligible Customer-Generators

More information

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows: LEE COUNTY ELECTRIC COOPERATIVE STANDARD INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS GREATER THAN 100 KW AND LESS THAN OR EQUAL TO 1 MW TIER 3 This Interconnection Agreement

More information

Connection and Use of System Charge Methodology Statement ("Condition 25 Statement")

Connection and Use of System Charge Methodology Statement (Condition 25 Statement) Connection and Use of System Charge Methodology Statement ("Condition 25 Statement") Revised Effective Date: 1 st January 2016 Approved by the Authority for Electricity Regulation, Oman Connection and

More information

Business Practice Manual For. Generator Management. PRR: Clarifying changes to Generator Retirement Process. Formatted: Font: 24 pt, Kern at 14 pt

Business Practice Manual For. Generator Management. PRR: Clarifying changes to Generator Retirement Process. Formatted: Font: 24 pt, Kern at 14 pt Business Practice Manual For Generator Management Formatted: Font: 24 pt, Kern at 14 pt PRR: Clarifying changes to Generator Retirement Process Page 1 11. Retirement PLEASE NOTE Scenario 4 creates a process

More information

165 FERC 61,140 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING COMPLIANCE FILING SUBJECT TO CONDITION

165 FERC 61,140 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING COMPLIANCE FILING SUBJECT TO CONDITION 165 FERC 61,140 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur and Richard Glick. California Independent System Operator

More information

2. The Start-Up Cost Curve - this is calculated using the following information:

2. The Start-Up Cost Curve - this is calculated using the following information: 8.2.1.3 SIBR Generated Bid (Physical Bids only) In the event that SIBR must generate a Bid or Bid component to comply with Tariff requirements, SIBR will generate a Bid or Bid component for the resource.

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Adam Foltz Director of Interconnection and Transmission Sustainable Power Group 415.692.7578 AFoltz@Spower.com SPower September 24, 2018

More information

Transmission Loss Factor Methodology

Transmission Loss Factor Methodology Transmission Loss Factor Methodology Discussion Paper Operations & Reliability Draft February 9, 2005 Table of Contents 1. Introduction...3 1.1 Legislative Direction.....3 1.2 Goal and Objectives... 3

More information

California Independent System Operator Corporation Financial Statements December 31, 2018 and 2017

California Independent System Operator Corporation Financial Statements December 31, 2018 and 2017 California Independent System Operator Corporation Financial Statements Index Page(s) Report of Independent Auditors...1 2 Management s Discussion and Analysis (unaudited)...3 12 Statements of Net Position...13

More information

RE Growth Enrollment and Tariff Overview

RE Growth Enrollment and Tariff Overview RE Growth Enrollment and Tariff Overview Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Presentation

More information

BIOENERGY MARKET ADJUSTING TARIFF POWER PURCHASE AGREEMENT

BIOENERGY MARKET ADJUSTING TARIFF POWER PURCHASE AGREEMENT [This contract has been approved by the California Public Utilities Commission in Decision 15-09-004. Modification of the terms and conditions of this contract will result in the need to obtain additional

More information

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language Submitted by Company Date Submitted Will Dong Paul Gribik (415) 973-9267 (415) 973-6274 PG&E December 5, 2013 Pacific

More information

Distribution Group Study Process. August 26, 2014

Distribution Group Study Process. August 26, 2014 Distribution Group Study Process August 26, 2014 Agenda Overview Applying for DGSP DGSP Interconnection Process Applicability and Utility Contacts Questions 2 Process Overview Open Window Period Evaluation

More information

REGULATORY TOOLS TO SUPPORT COMPETITIVENESS OF RENEWABLE ENERGY SOURCES

REGULATORY TOOLS TO SUPPORT COMPETITIVENESS OF RENEWABLE ENERGY SOURCES REGULATORY TOOLS TO SUPPORT COMPETITIVENESS OF RENEWABLE ENERGY SOURCES By David Lynch, Iowa Utilities Board ENERGY REGULATORS REGIONAL ASSOCIATION MEETING Abu Dhabi, United Arab Emirates February 6-7,

More information

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001 Pacific Gas and Electric Company Statement of Estimated Cash Flows April 20, 2001 This document provides the latest forecast of cash flows for Pacific Gas and Electric Company (the Company ). The purpose

More information

Flexible Capacity Procurement. Market and Infrastructure Policy Issue Paper

Flexible Capacity Procurement. Market and Infrastructure Policy Issue Paper Flexible Capacity Procurement Market and Infrastructure Policy Issue Paper January 27, 2012 Discussion Paper Table of Contents 1 Introduction... 3 2 Background... 4 2.1 ISO Renewable Integration Studies...

More information

New York State Public Service Commission

New York State Public Service Commission PSC NO. 220 ELECTRICITY ADDENDUM TYPES: SIR NIAGARA MOHAWK POWER CORPORATION ADDENDUM NO. 7 INITIAL EFFECTIVE DATE: AUGUST 16, 2017 STAMPS: ISSUED IN COMPLIANCE WITH ORDER IN CASE 16-E-0560 Issued August

More information

New York State Public Service Commission

New York State Public Service Commission PSC NO. 220 ELECTRICITY ADDENDUM TYPES: SIR NIAGARA MOHAWK POWER CORPORATION ADDENDUM NO. 9 INITIAL EFFECTIVE DATE: NOVEMBER 2, 2018 STAMPS: ISSUED IN COMPLIANCE WITH ORDER IN CASE 18-E-0018 Issued October

More information

PEAK RELIABILITY COORDINATOR FUNDING. Draft Final Proposal. May 28, 2015

PEAK RELIABILITY COORDINATOR FUNDING. Draft Final Proposal. May 28, 2015 PEAK RELIABILITY COORDINATOR FUNDING Draft Final Proposal May 28, 2015 2 Assessment of Peak Reliability Coordinator Charges Draft Final Proposal Table of Contents 1 Introduction... 3 2 Background... 3

More information