United Nations Development Programme

Size: px
Start display at page:

Download "United Nations Development Programme"

Transcription

1 United Nations Development Programme UNDP Project Document Country: Republic of Moldova Project title: UNDAF Outcome(s): Expected CP Outcome(s) (Those linked to the project and extracted from CPAP) Implementing Partner: Responsible party: National Biodiversity Planning to Support the implementation of the CBD Strategic Plan in Republic of Moldova UNDAF Outcome 1: By 2011, public institutions with the support of civil society organizations are better able to ensure good governance, rule of law and equal access to justice and promotion of human rights. Management of environment and natural resources is improved in compliance with international/eu standards Ministry of Environment Biodiversity Office Brief description This project is part of the second generation of Biodiversity Enabling Activities (BD EA) under the GEF. Republic of Moldova has been Party to the Convention on Biological Diversity (CBD) since October The project addresses the country s need to continue to fulfill its obligations under the CBD, with particular focus on the Convention s Article 6 and the CBD COP Decision X/2. Above all, the project is a significant contribution to Moldova s efforts towards implementing the CBD Strategic Plan at the national level. The project builds on the current status and achievements of Moldova with respect to biodiversity planning and reporting. It aims to integrate Moldova s obligations under the CBD into its national development and sectoral planning frameworks through a renewed and participative biodiversity planning and strategizing process. This process is expected to produce measurable targets for biodiversity conservation and sustainable use. It will equally ensure that the value of ecosystems goods and services, as well as the challenges and opportunities for ecosystem-based adaptation and resilience are taken into consideration in the process. The project will achieve its objective through the implementation of three components, whose activities are thoroughly described in the GEF approved proposal for BD EA. They are: (1) A participative stocktaking exercise on biodiversity planning takes place and national biodiversity targets are developed in response to the global Aichi Targets; (2) The NBSAP is developed and it fully integrates new aspects of the CBD strategic plan, such as mainstreaming and anchoring the implementation of the plan into national development frameworks, valuing ecosystem services and promoting ecosystem-based adaptation and resilience; and (3) National frameworks for resource mobilization, Convention reporting and exchange mechanisms are strengthened. PRODOC_EA_BD_4874_Moldova 1

2 Programme Period: Key Result Area (Strategic Plan): Environment and sustainable development: Mainstreaming environment and energy Atlas Award ID: Atlas Project ID PIMS # 4874 Start date: January 2012 End Date December 2013 PAC Meeting Date 20 December 2011 Management Arrangements NIM 2012 AWP budget: US$ 102,500 Total required: $220,000 Total Allocated resources: $414,400 - Regular (UNDP): $2,000 - Other: o GEF: $220,000 o Government: $87,500 o NGO: $57,000 Other (UNDP in kind): $47,900 In kind contributions: $132,400 Agreed by (Ministry of Environment): Agreed by UNDP: Agreed by Biodiversity Office: PRODOC_EA_BD_4874_Moldova 2

3 Table of Contents SECTION I: Elaboration of the Narrative... 5 PART I: Situation Analysis... 5 Point of Departure... 5 Stakeholder Analysis and Engagement... 5 PART II: Strategy... 7 Project Goal, Objective, Outcomes and Outputs/activities... 7 Project Risks... 8 PART III: Management Arrangements... 8 PART IV: Monitoring and Evaluation Plan and Budget Monitoring and reporting Communications and visibility requirements PART V: Legal Context SECTION II: STRATEGIC RESULTS FRAMEWORK (SRF) AND GEF INCREMENT PART I: Strategic Results Framework, SRF (formerly GEF Logical Framework) Analysis Indicator framework as part of the SRF SECTION III: Total Budget and Workplan SECTION IV: ADDITIONAL INFORMATION Annex I: Other agreements/co-financing Letters Annex II: Approved GEF proposal for BD EA Annex III. GEF CEO Letter of Approval Overview of headings in the original proposal included in Annex II PART I: PROJECT IDENTIFIERS A. EA FRAMEWORK B. CO-FINANCING FOR THE EA BY SOURCE AND BY NAME C. GRANT RESOURCES REQUESTED BY AGENCY, FOCAL AREA AND COUNTRY D. EA MANAGEMENT COST PART II: ENABLING ACTIVITY JUSTIFICATION A. ENABLING ACTIVITY BACKGROUND AND CONTEXT B. ENABLING ACTIVITY GOALS AND OBJECTIVES C. DESCRIBE THE EA AND INSTITUTIONAL FRAMEWORK FOR PROJECT IMPLEMENTATION D. DESCRIBE, IF POSSIBLE, THE EXPECTED COST-EFFECTIVENESS OF THE PROJECT E. DESCRIBE THE BUDGETED M&E PLAN F. EXPLAIN THE DEVIATIONS FROM TYPICAL COST RANGES (WHERE APPLICABLE): PART III: APPROVAL/ENDORSEMENT BY GEF OPERATIONAL FOCAL POINT(S) AND GEF AGENCY(IES) A. RECORD OF ENDORSEMENT OF GEF OPERATIONAL FOCAL POINT(S) ON BEHALF OF THE GOVERNMENT(S): B. CONVENTION PARTICIPATION C. GEF AGENCY(IES) CERTIFICATION Annex A: CONSULTANTS TO BE HIRED FOR THE ENABLING ACTIVITY Annex B: CHRONOGAM OF ACTIVITIES PRODOC_EA_BD_4874_Moldova 3

4 Acronyms APR/PIR Annual Project Review / Project Implementation Report BD EA Biodiversity Enabling Activities CBD Convention on Biological Diversity CDR Combined Delivery Report CHM Clearing House Mechanism CO Country Office (UNDP) COP Conference of the Parties GEF Global Environment Facility NBSAP National Biodiversity Strategy and Action Plan PoWPA CBD s Programme of Work on Protected Areas QOR Quarterly Operational Reports TBW Total Budget and Workplan TEEB The Economics of Ecosystems and Biodiversity UNDP United Nations Development Programme PRODOC_EA_BD_4874_Moldova 4

5 SECTION I: Elaboration of the Narrative PART I: Situation Analysis POINT OF DEPARTURE 1. This Project Document (PRODOC) serves to operationalize at the level of UNDP and government, the proposal for Biodiversity Enabling Activities approved by the GEF on November 14, This proposal is appended to the PRODOC in Annex II and the GEF CEO Letter of Approval in Annex III. 2. The project builds on the current status and achievements of Moldova with respect to its obligations vis-à-vis the Convention on Biological Diversity (CBD), in particular the country s biodiversity planning and Convention reporting processes, and its commitment to implement, at the national level, the CBD s Strategic Plan for the period These processes and achievements are outlined in the 4 th National Report on Biological Diversity and in Annex II of the ProDoc under the heading Enabling Activity Background and Context. 3. In particular, the NBSAP for Moldova is outdated. This version of the NBSAP does not include a number of elements of the CBD Strategic Plan s Aichi Targets and newer COP guidance. The new CBD Strategic Plan, adopted at CoP-10 in 2010 in Nagoya, clearly addresses the need for updating NBSAPs, stating in Target 17 that By 2015, each Party has developed, adopted as a policy instrument, and has commenced implementing an effective, participatory and updated national biodiversity strategy and action plan. The strategic plan also covers a range of issues that will need to be incorporated into the revised NBSAPs, including guidance to countries to: a) fully realise the value of biodiversity and ecosystem services, and incorporate these values into national and local development and poverty reduction strategies (Targets 1 and 2); b) increase the global terrestrial protected area estate from 12% to 17% and the marine estate from 6% to 10% (Target 11); c) restore and safeguard key ecosystem services, especially for water, health and livelihoods (Target 14); and d) strengthen ecosystem resilience to climate change and promote ecosystem-based approaches to climate change adaptation and mitigation (Target 15). 4. The achievements and shortcomings of previsous biodiversity planning processes in Moldova are described in the GEF proposal, Annex II, under heading The Baseline Project: The Current NBSAP and the new CBD Strategic Plan. 5. Together, all of the above elements constitute the Point of Departure and general context for the current Biodiversity Enabling Activities project of Moldova. STAKEHOLDER ANALYSIS AND ENGAGEMENT 6. In its guidance to Parties on the organization of NBSAPs and preparation of national reports, the COP has repeatedly stressed that, if the necessary transition from biodiversity planning to biodiversity implementation is to be made, then everyone with a stake in the outcome of the NBSAP needs to be engaged. PRODOC_EA_BD_4874_Moldova 5

6 7. The stakeholder engagement process in Moldova will start with the CBD national focal points, the NBSAP responsible authority which is the Biodiversity Office under the Ministry of Environment entitled with NBSAP coordination and the preparation of CBD national reports; and thereafter it will expand to include a much broader range of national actors. Developing and implementing Moldova s NBSAP will be a widely inclusive and participative process. 8. A national steering committee and one working groups will be proposed for accompanying the process of developing national targets, updating the NBSAP and preparing the national reports. As far as possible, the steering committee should include representatives of all sectors. Below is an overview of the potential role of different stakeholders and the rationale for their involvement in the project. Table 1. Stakeholder Matrix Sector Agency/department Potential role in the project and rationale for involvement Biodiversity conservation Ministry of Environment/Biodiversity Office The Ministry of Environment is the key governmental agency responsible for biodiversity conservation policy and rational use of natural resources. It has established the Biodiversity Office to help coordinate the activities particularly related to NBSAP formulation and reporting under CBD. The Ministry of Environment will play a key coordinating role in implementation of the proposed project to make sure it is closely aligned with the currently ongoing national planning process and international commitments in the area of biodiversity. National finance Ministry of Finance The Ministry of Finance is the key government institution responsible for the public finance policy of the country. The Ministry is an important stakeholder which should be involved from the early stages of the NBSAP development in order to secure high buy-in and financially-sound actions plan. National Finance in the area of Environment National Environment Fund The National Environment Fund is an extrabudgetary fund created to support projects in the area of environment. Under the GEF project it will finance studies relevant for the formulation of the NBSAP to be in line with the CBD Strategic Plan. Forestry State Agency Moldsilva The State Agency Moldsilva is the main central authority responsible for management and rational use of the forest fund intended to protect the environment and satisfy the needs of the national economy. It is also assisting the local communities in creating community forest and their management. The Agency will be an important partner of the project assisting in the formulation of the NBSAP and its implementation after the closing of the project. Non-governmental Organization Ecological Movement of Moldova The Ecological Movement of Moldova is among the oldest NGOs in the environment field with a network of 26 branches throughout the country. The Movement is an PRODOC_EA_BD_4874_Moldova 6

7 Non-governmental Organization Non-governmental Organizations Sector Agency/department Potential role in the project and rationale for involvement important actor which will facilitate the consultation process for this project at the national level. Regional Environmental Center Ecospectru Regional Environment Center is an umbrella NGO networking with other nongovernmental organizations which will support public consultations for this GEF Project at all stages. The Ecospectru NGO is a nongovernmental organization which has a longstand experience in the biodiversity area and the knowledge and expertise of the people working for this institution are crucial for the success of this GEF project. PART II: Strategy PROJECT GOAL, OBJECTIVE, OUTCOMES AND OUTPUTS/ACTIVITIES 9. The project s goal is to enable Moldova to integrate its CBD obligations into national planning processes, in light of the CBD s Strategic Plan The project objective is to integrate Moldova s obligations under the Convention on Biological Diversity (CBD) into its national development and sectoral planning frameworks through a renewed and participative biodiversity planning and strategizing process, in a manner that is in line with the global guidance contained in the CBD s Strategic Plan for In order to achieve the above objective, three outcomes (corresponding to GEF components) are expected from the project: Outcome 1 A participative stocktaking exercise on biodiversity planning takes place and national biodiversity targets are developed in response to the global Aichi Targets Outcome 2 The NBSAP is developed and it fully integrates new aspects of the CBD strategic plan, such as mainstreaming and anchoring the implementation of the plan into national development frameworks, valuing ecosystem services and promoting ecosystembased adaptation and resilience Outcome 3 National frameworks for resource mobilization, Convention reporting and exchange mechanisms are established and strengthened 12. The Outcomes of the project, as well as the expected outputs and activities under those, are thoroughly described in the GEF proposal in Part II-B. PRODOC_EA_BD_4874_Moldova 7

8 PROJECT RISKS IDENTIFIED RISKS Delay in start-up of the project activities due to the proposed direct cash transfer mechanism to the implementing partner as part of the NIM implementation modality Improper use of project funds due to the selected implementation modality Table 2. Project Risks Assessment and Mitigation Measures RISK ASSESSMENT L tbd MITIGATION MEASURES The necessary institutional arrangement for this project will be initiated at an early stage before the official launch of the project. The micro-assessment to be conducted at the Ministry of Environment and its relevant implementing agencies will provide recommendations for a proper assurance plan in order to mitigate the risk incurred by the selected implementation modality. Low buy-in from the main stakeholders L In addition, the project will draw on the lessons learned with the direct cash transfer to implementing partners under other projects. A communication strategy will be developed at the initial stage of the project and organizations with a long-stand experience in public consultations will be involved. Lack of political will to include vital areas in the strategy for fear of upsetting some part of society. M Sensible issues will be publicly consulted without a delay through a well-developed public awareness campaign. Non-wiliness of the Government to pass the developed strategy L The current NBSAP is out-of-date and expires this year, therefore a new strategy have to be adopted to be in line with the assumed international commitments. Nevertheless, every stage of the NBSAP elaboration will envisage consultations with relevant government representatives and parliamentary commissions. Difficulties in procuring good and services from the local companies L A procurement plan prepared at an early stage of the project preparation should mitigate the risk related to delayed procurement of services and goods. PART III: Management Arrangements 13. The institutional and management arrangements for this project are described in the GEF proposal under Part II-C for as part of the Institutional Arrangements heading. 14. Moldova being a CPAP country the National Implementation Mechanism applies to this project as implementation modality. This means that the Government of Moldova will be responsabile for for decision-making and implementrtation of project activities, while UNDP will provide quality assurance, project inputs and support services. The Minister of Environment will act as the Implementing Partner (National Coordinator) and will represent the interests of the PRODOC_EA_BD_4874_Moldova 8

9 Government of Moldova. It will be responsible and accountable for managing the project at the highest level, including the monitoring and evaluation of projkect interventions in achieving project output. The existing within the Ministry of Environment Biodiversity Office will be appointed as the responsible party for this project, providing procurement, finance, human resources and other services necessary to produce the ouputs. 15. The project will be managed in line with the Harmonised Approach to Cash Transfers (HACT) using the direct cash transfer mechanism (DCT) and UNDP support to National Implementation. The direct cash transfer implies that funds for implementation will be transferred to the bank account and managed according to the provisions of the Moldovan legislation. 16. The replenishments to this account are done on a quarterly basis by UNDP upon receipt of the financial report (FACE form) signed by the designated project personnel (Project Director), if any. The funds advanced to the project are under the total responsibility of the implementing partner and must be used for the activities and inputs stated in the annual work plan. Specifically in the project initiation phase but also beyond if required, UNDP can provide support services for direct payments, procurement and recruitment. 17. The financial reports will be approved by the Project Board chaired by Ministry of Environment which will manage the Project at the highest level. The Project Board will meet regularly, on a quarterly basis, during the course of the Project and every time when guidance is required by the Project Manager. The project Board will also approve annual work plans (AWPs), and budget revision. In order to ensure UNDP s ultimate accountability, Project Board decisions should be made in accordance to standards that shall ensure best value to money, fairness, integrity transparency and effective international competition. This group is also consulted by the Project Manager for decisions when PM tolerances (normally in terms of time and budget) have been exceeded. 18. Based on the approved annual work plan (AWP), the Project Board may review and approve project quarterly plans when required and authorizes any major deviation from these agreed quarterly plans. It is the authority that signs off the completion of each quarterly plan as well as authorizes the start of the next quarterly plan. It ensures that required resources are committed and arbitrates on any conflicts within the project or negotiates a solution to any problems between the project and external bodies. In addition, it approves the appointment and responsibilities of the Project Manager and any delegation of its Project Assurance responsibilities. Formal minutes shall be prepared and adopted for each meeting of the Board, detailing any proposals made and decisions taken. 19. Besides the roles and responsibilities of different stakeholders outlined in this PRODOC and in the approved proposal, the following project diagram represents the expected key relationships governing the project. PRODOC_EA_BD_4874_Moldova 9

10 Project Organization Structure Senior Beneficiary: Ministry of Finance, Moldsilva Agency, civil society, academia Project Board Executive: Ministry of Environment Senior Supplier: UNDP Project Assurance (UNDP Programme Officer) Project Manager (within Biodiversity Office) Project Support (within Biodiversity Office) TEAM A Group of experts in economic and development sector Inter-ministerial coordination Working Group for CBD Project assurance: Assurance is a key element of the PRINCE2 management method, upon which the Project Management Arrangements are based. Assurance is essentially an independent audit function, whereby the Project Board is able to monitor progress against agreed work plans. The Project Assurance role supports the Project Board by carrying out objective and independent project oversight and monitoring functions. This role ensures appropriate project management milestones are managed and completed. The Project Assurance is the responsibility of each Project Board member. On behalf of UNDP, as senior project supplier, the function is delegated to a UNDP Portfolio Manager. The National Coordinator may appoint a representative (delegated authority) of the implementing partner to carry out the project assurance role on behalf of the project executive. PART IV: Monitoring and Evaluation Plan and Budget MONITORING AND REPORTING In accordance with the HACT, UNDP will use two mechanisms to provide assurance that funds provided to the implementing partner were received, expended and reported to the agreed system of internal control. These mechanisms are: Periodic on-site reviews of the partner s financial records for cash transfers; Programmatic monitoring of the implementation of the Annual Work Plan; In addition, in accordance with the programming policies and procedures outlined in the UNDP User Guide, the project will be monitored through the following: Within the annual cycle PRODOC_EA_BD_4874_Moldova 10

11 On a quarterly basis, a quality assessment shall record progress towards the completion of key results, based on quality criteria and methods captured in the Quality Management table below. An Issue Log shall be activated in Atlas and updated by the Project Manager to facilitate tracking and resolution of potential problems or requests for change. A risk log shall be activated in Atlas and regularly updated by reviewing the external environment that may affect the project implementation. Based on the above information recorded in Atlas, a Project Progress Reports (PPR) shall be submitted by the Project Manager to the Project Board through Project Assurance, using the standard report format available in the Executive Snapshot. a project Lesson-learned log shall be activated and regularly updated to ensure on-going learning and adaptation within the organization, and to facilitate the preparation of the Lessons-learned Report at the end of the project a Monitoring Schedule Plan shall be activated in Atlas and updated to track key management actions/events Annually Annual Review Report. An Annual Review Report shall be prepared by the Project Manager and shared with the Project Board and the Outcome Board. As minimum requirement, the Annual Review Report shall consist of the Atlas standard format for the QPR covering the whole year with updated information for each above element of the QPR as well as a summary of results achieved against pre-defined annual targets at the output level. Annual Project Review. Based on the above report, an annual project review shall be conducted during the fourth quarter of the year or soon after, to assess the performance of the project and appraise the Annual Work Plan (AWP) for the following year. In the last year, this review will be a final assessment. This review is driven by the Project Board and may involve other stakeholders as required. It shall focus on the extent to which progress is being made towards outputs, and that these remain aligned to appropriate outcomes. COMMUNICATIONS AND VISIBILITY REQUIREMENTS 20. Full compliance is required with UNDP s Branding Guidelines. These can be accessed at and specific guidelines on UNDP logo use can be accessed at: Amongst other things, these guidelines describe when and how the UNDP logo needs to be used, as well as how the logos of donors to UNDP projects needs to be used. For the avoidance of any doubt, when logo use is required, the UNDP logo needs to be used alongside the GEF logo. The GEF logo can be accessed at: The UNDP logo can be accessed at Full compliance is also required with the GEF s Communication and Visibility Guidelines (the GEF Guidelines ). The GEF Guidelines can be accessed at: PRODOC_EA_BD_4874_Moldova 11

12 _0.pdf. Amongst other things, the GEF Guidelines describe when and how the GEF logo needs to be used in project publications, vehicles, supplies and other project equipment. The GEF Guidelines also describe other GEF promotional requirements regarding press releases, press conferences, press visits, visits by Government officials, productions and other promotional items. 22. Where other agencies and project partners have provided support through co-financing, their branding policies and requirements should be similarly applied. PART V: Legal Context 23. This document together with the CPAP signed by the Government and UNDP which is incorporated by reference constitute together a Project Document as referred to in the SBAA and all CPAP provisions apply to this document. 24. Consistent with the Article III of the Standard Basic Assistance Agreement, the responsibility for the safety and security of the implementing partner and its personnel and property, and of UNDP s property in the implementing partner s custody, rests with the implementing partner. 25. The implementing partner shall: a) put in place an appropriate security plan and maintain the security plan, taking into account the security situation in the country where the project is being carried; b) assume all risks and liabilities related to the implementing partner s security, and the full implementation of the security plan. 26. UNDP reserves the right to verify whether such a plan is in place, and to suggest modifications to the plan when necessary. Failure to maintain and implement an appropriate security plan as required hereunder shall be deemed a breach of this agreement. 27. The implementing partner agrees to undertake all reasonable efforts to ensure that none of the UNDP funds received pursuant to the Project Document are used to provide support to individuals or entities associated with terrorism and that the recipients of any amounts provided by UNDP hereunder do not appear on the list maintained by the Security Council Committee established pursuant to resolution 1267 (1999). 28. The list can be accessed via This provision must be included in all sub-contracts or sub-agreements entered into under this Project Document. Audit clause: 29. The Audit will be conducted in accordance with the UNDP Financial Regulations and Rules and applicable audit policies on UNDP projects. PRODOC_EA_BD_4874_Moldova 12

13 SECTION II: STRATEGIC RESULTS FRAMEWORK (SRF) AND GEF INCREMENT PART I: Strategic Results Framework, SRF (formerly GEF Logical Framework) Analysis INDICATOR FRAMEWORK AS PART OF THE SRF Objective/ Outcome Indicator Baseline End of Project target Objective To integrate Moldova s obligations under the Convention on Biological Diversity (CBD) into its national development and sectoral planning frameworks through a renewed and participative biodiversity planning and strategizing process, aligning the results of the process to the global guidance contained in the CBD s Strategic Plan for The inclusion of measurable biodiversity conservation and sustainable use targets into the following sectoral planning frameworks: Agriculture, Forestry Hunting Livestock Tourism, Trade, Transport Energy Fishery Development Planning & Finance Water Presently only 4 sectoral planning frameworks envisage measurable targets, namely, agriculture, forestry, livestock, and fishery. By 2014 measurable biodiversity conservation and sustainable use targets are developed and ready to be included in 9 sectors Source of Information NBSAP Risks and assumptions Risk: The targets will not be agreed by the stakeholders Assumption: Close consultation with the main stakeholders; commitments assumed by the country under various international conventions and treaties The inclusion of measurable biodiversity conservation and sustainable use targets into the following development frameworks: Land-use management, including spatial and infrastructural development planning Development finance Poverty alleviation Rural development and livelihoods Food security Local development and decentralization Climate change mainstreaming Population & urban planning Health provision, including traditional medicine Presently only 2 development frameworks provide measurable biodiversity conservation and sustainable use targets (land-use management and urban planning) By 2014 measurable biodiversity conservation and sustainable use targets are developed and ready to be included in 9 development frameworks NBSAP Risk: The targets will not be agreed by the stakeholders Assumption: Close consultation with the main stakeholders; review of the national developing planning process at an early stage of the project. PRODOC_EA_BD_4874_Moldova 13

14 Objective/ Outcome Indicator Baseline End of Project target Outcome 1 A participative stocktaking exercise on biodiversity planning takes place and national biodiversity targets are developed in response to the global Aichi Targets Output 1.1 Output 1.2 Output 1.3 Source of Information Risks and assumptions Review and stocktaking of products and results from previous biodiversity planning processes at the national level are carried out in participative manner. In response to the global Aichi Targets, national biodiversity targets are developed in a manner that is attuned to Moldova s reality. The achievement of national targets, developed in line with the global Aichi Targets, is duly monitored during the project duration and beyond, and this is reported upon to the CBD through national reports and other means. Effective establishment of a multisectoral/multi-stakeholder working group No working group is established By end of 2012, a multi-sectoral/multistakeholder working group is established and it completes the stock-taking exercise. Project reports CBD National Reports Risk: Low wiliness of some of the key stakeholders to participate Assumption: Close cooperation with the ongoing GEF/UNDP Protected Areas System Project Outcome 2 The NBSAP is revised/updated and it fully integrates new aspects of the CBD strategic plan, such as mainstreaming and anchoring the implementation of the plan into national development frameworks, valuing ecosystem services and promoting ecosystem-based Development of a national targets in response to the global Aichi Targets No national targets have been developed PRODOC_EA_BD_4874_Moldova 14 By 2012, national targets in response to the global Aichi Targets are developed. Project reports CBD National Reports Risk: The framework of the global Aichi targets are known by a limited number of specialists Assumption: Consultation of the new National Environment Strategy (under development) should increase the awareness on the global Aichi Targets Output 2.1 A National Biodiversity Strategy and Action Plan (NBSAP) for (Country), anchored into national development frameworks, is developed, in a manner that is participative, widely disseminated and fully integrates new aspects of the CBD strategic plan, such as: (i) mainstreaming; (ii) the valuing of ecosystem goods and services; and (iii) the incorporation of challenges and opportunities linked to ecosystem-based adaptation and resilience. Output 2.2 The updated and fully endorsed NBSAPs for Moldova is submitted to the CBD preferably within the deadline set by the COP. Output 2.3 The challenges to protected Areas in the 21 st Century and the national implementation of the CBD s Programme of Work on Protected Areas (PoWPA) are integrated into the NBSAP Output 2.4 The Economics of Ecosystems and Biodiversity (TEEB) developed for assessing and capturing value in ecosystems good and

15 Objective/ Outcome Indicator Baseline End of Project target adaptation and resilience services in Moldova Source of Information Risks and assumptions Outcome 3 National frameworks for resource mobilisation, Convention reporting and exchange mechanisms are established and strengthened Status of NBSAP vis-à-vis the guidance in the CBD Strategic Plan ( ) Output 3.1 Output 3.2 NBSAP is out of date and does not consider newer guidance By early 2014, the Moldova NBSAP is fully updated, it is in line with the guidance in the CBD Strategic Plan ( ) and has been submitted to the CBD COP CBD Website. Risk: Lack of political will to include vital areas in the strategy Assumption: Early consultation of sensible areas with all stakeholders National frameworks for NBSAP implementation is in place and includes: (i) institutional leadership for implementation is established and strategic partnerships forged (nationally and internationally); (ii) a costed and prioritized Action Plan is appended to the NBS; (iii) needs assessments on capacity, technology and finance are carried out; and (iv) a strategy for resource mobilization for the implementation of the NBSAP is produced and includes a baseline assessment of existing biodiversity finance. An effective, user-friendly and easily updatable country-driven CHM site is developed; it is linked up to the CBD s global CHM networks and to other information and knowledge exchange network on biodiversity. Output 3.3. Immediate CBD reporting obligations are met by Moldova in a timely manner: (1) The Fifth National Report to the CBD by 31 March Status of the national clearinghouse mechanisms (CHM) Status of the capacity, technology and financial frameworks for implementing the revised NBSAP The Firth National Report to CBD prepared and submitted CHM is not kept up to date and is not linked up to the CBD s global CHM networks and to other information and knowledge exchange network. The existing framework is out-ofdate The Firth National Report to CBD is not available PRODOC_EA_BD_4874_Moldova 15 By early 2014, the national CHM is complete to keep upto-date and has been improved By 2014, a complete plan for implementing the NBSAP, including capacity, technology and finance needs assessment, has been produced and underpins NBSAP implementation By 31 March 2014 the report is prepared and submitted to CBD CBD Website CHM national site(s) Project APR/PIR Biodiversity Support Programme Website (being revamped) CBD website Risk: Weak financial framework for implementation of the NBSAP Assumption: Biodiversity conservation is a priority for Moldova Risk: Late submission of the 4 th National report to CBD Assumption: Sound Plan of Activities

16 Objective/ Outcome Indicator Baseline End of Project target Source of Information Risks and assumptions developed by the PM at early stages of project initiation PRODOC_EA_BD_4874_Moldova 16

17 SECTION III: TOTAL BUDGET AND WORKPLAN Award ID: Business Unit: MDA10/UNDP1 Project ID: Project Title: National Biodiversity Planning to Support the implementation of the CBD Strategic Plan in Republic of Moldova Award Title: PIMS 4874 NBP to support CBD strategic plan in RM Implementing Partner (Executing Agency) Ministry of Environment GEF Component (Outcome) /Atlas Activity Responsible Party/ Implementing Agent Fund ID Donor Name Budget Code PRODOC_EA_BD_4874_Moldova 17 Budget Description TOTAL Amount (USD) Amount Year 1 (USD) Amount Year 2 (USD) MoEnv/UNDP/Biodiversity Office GEF International Consultants 3,000 3, MoEnv/UNDP/Biodiversity Office GEF Local Consultants 3,000 3, MoEnv/UNDP/Biodiversity Office GEF Local Consultants 3,000 3, Comp 1. MoEnv/UNDP/Biodiversity Office GEF Local Consultants 1,500 1, Stocktaking and MoEnv/UNDP/Biodiversity Office GEF Travel 2,000 2, national target MoEnv/UNDP/Biodiversity Office GEF Communic & Audio Visual Equip setting MoEnv/UNDP/Biodiversity Office GEF Professional Services 1,000 1, MoEnv/UNDP/Biodiversity Office GEF Miscellaneous Expenses MoEnv/UNDP/Biodiversity Office GEF Trainings and Workshops 1,100 1, TOTAL ACTIVITY 1 (Comp 1) 15,000 15,000 0 MoEnv/UNDP/Biodiversity Office GEF International Consultants 15,000 9,000 6, MoEnv/UNDP/Biodiversity Office GEF International Consultants 18,000 9,000 9, MoEnv/UNDP/Biodiversity Office GEF Local Consultants 21,000 10,500 10, MoEnv/UNDP/Biodiversity Office GEF Local Consultants 10,000 5,000 5, MoEnv/UNDP/Biodiversity Office GEF Local Consultants 10,500 6,000 4, Comp 2. NBSAP MoEnv/UNDP/Biodiversity Office GEF Local Consultants 18,500 9,500 9, update MoEnv/UNDP/Biodiversity Office GEF Travel 11,000 6,000 5, MoEnv/UNDP/Biodiversity Office GEF Communic & Audio Visual Equip 1, , MoEnv/UNDP/Biodiversity Office GEF Supplies 1, MoEnv/UNDP/Biodiversity Office GEF Professional Services 4,500 1,500 3, MoEnv/UNDP/Biodiversity Office GEF Miscellaneous Expenses 1, MoEnv/UNDP/Biodiversity Office GEF Trainings and Workshops 3,000 1,000 2, TOTAL ACTIVITY 2 (Comp 2) 115,000 59,000 56,000 Comp 3. National frameworks for MoEnv/UNDP/Biodiversity Office GEF International Consultants 9, , MoEnv/UNDP/Biodiversity Office GEF International Consultants 6,000 3,000 3, Budget Notes

18 GEF Component (Outcome) /Atlas Activity Responsible Party/ Implementing Agent Fund ID Donor Name Budget Code Budget Description TOTAL Amount (USD) NBSAP MoEnv/UNDP/Biodiversity Office GEF Local Consultants 6,000 3,000 3, implementation, MoEnv/UNDP/Biodiversity Office GEF Local Consultants 7,000 3,500 3, CDB reporting and MoEnv/UNDP/Biodiversity Office GEF Travel 8,000 2,000 6, exchange MoEnv/UNDP/Biodiversity Office GEF Contractual Services-Companies 18,000 8,000 10, mechanisms MoEnv/UNDP/Biodiversity Office GEF Information Technology Equipmt 10, , MoEnv/UNDP/Biodiversity Office GEF Audio Visual&Print Prod Costs 7, , MoEnv/UNDP/Biodiversity Office GEF Miscellaneous Expenses 1, MoEnv/UNDP/Biodiversity Office GEF Trainings and Workshops 3,000 1,000 2, TOTAL ACTIVITY 3 (Comp 3) 75,000 21,000 54, Project Mgt MoEnv/UNDP/Biodiversity Office GEF Contractual Services - Individ 15,000 7,500 7, MoEnv/UNDP/Biodiversity Office UNDP Contractual services -Companies 2,000 2, TOTAL ACTIVITY 4 (Proj Mgt) 17,000 7,500 7,500 GRAND TOTAL GEF 220, , ,500 GRAND TOTAL UNDP 2, ,000 GRAND TOTAL (in cash) 222, , ,500 Amount Year 1 (USD) Amount Year 2 (USD) Budget Notes Budget Notes 1 Int. NBSAP Lead Consultant fees ($3000 * 1 week) 2 Nat. Technical Advisor fees ( $1000 * 3 weeks; the consultant will work 1 week per month). 3 Nat. NBSAP Review Consultant ($250* aprox. 12 weeks. ) 4 Group of experts in economic and development sectors (4-5 short term experts) (overall $200*7.5 weeks) 5 DSA and flight for international consultant + travel for national consultants. 6 Communication services 7 Translation services 8 Bank charges, insurance etc. 9 Costs of inception workshop, round tables and disscussions 10 Int. Environmental Economist & Finance Specialist fees (lumpsum $3000 * 5 weeks) 11 Int. NBSAP Lead Consultant fees ($3000 * 6 weeks) 12 Nat. Technical Advisor fees ( $1000 * 21 weeks; the consultant will work 1 week per month). 13 Nat. NBSAP Review Consultant ($250 * aprox. 40 weeks. ) 14 Environmental Economist & Finance Specialist ($300 * 35 weeks) 15 Group of experts in economic and development sectors (4-5 short term experts) (overall $200*92.5 weeks) 16 Five international flights - three for Lead Consultant, and two for Expert, Environmental Economics & Finance Specialist; total 25 days DSA + local experts travel $ 0,45/km 17 Costs of communication, including telephone costs and internet service provision. 18 Miscellaneous supplies (mainly stationary). 19 Translation services PRODOC_EA_BD_4874_Moldova 18

19 Budget Notes 20 Bank charges, etc. 21 Consultation Workshops, round tables and disscussions 22 Int. NBSAP Lead Consultant fees ($3000 * 3 weeks) 23 Int. Environmental Economist & Finance Specialist fees (lumpsum $3000 * 2 weeks) 24 BD Capacity Needs Assessment Consultant ($250*24 weeks) 25 Nat. NBSAP Review Consultant ($250* aprox. 28 weeks. ) 26 The international flight - one each for Lead Consultant and Int. Environmental Economist & Finance Specialist; 20 days DSA + local consultants travel 27 Contract with IT company for CHM and related database 28 Equipment for CHM 29 Printing of final NBSAP and 5th Report 30 Bank charges, insurance etc. 31 Consultation Workshops, round tables and disscussions 32 Salary for PM: $625/month from GEF funding and $375/month from government co-financing. 33 UNDP contribution. PRODOC_EA_BD_4874_Moldova 19

20 SECTION IV: ADDITIONAL INFORMATION Annex I: Other agreements/co-financing Letters Final GEF 5 Enabling Activity Template for Agency

21 Final GEF 5 Enabling Activity Template for Agency

22 Final GEF 5 Enabling Activity Template for Agency

23 Final GEF 5 Enabling Activity Template for Agency

24 Final GEF 5 Enabling Activity Template for Agency

25 Final GEF 5 Enabling Activity Template for Agency

26 Final GEF 5 Enabling Activity Template for Agency

27 Annex II: Approved GEF proposal for BD EA REQUEST FOR BIODIVERSITY ENABLING ACTIVITY PROPOSAL FOR FUNDING UNDER THE GEF TRUST FUND PART I: PROJECT IDENTIFIERS EA Title: National Biodiversity Planning to Support the implementation of the CBD Strategic Plan in Moldova Country(ies): Republic of Moldova GEF Project ID: 4697 GEF Agency(ies): UNDP GEF Agency Project ID: 4874 Other Executing Ministry of Environment Submission Date: October 21, 2011 Partner(s): GEF Focal Area (s): Biodiversity Project Duration (Months) 24 Check if applicable: NCSA NAPA Agency Fee ($): 22,000 A. EA FRAMEWORK EA Objective: To integrate Moldova s obligations under the Convention on Biological Diversity (CBD) into its national development and sectoral planning frameworks through a renewed and participative biodiversity planning and strategizing process, in a manner that is in line with the global guidance contained in the CBD s Strategic Plan for EA Component 1) Stocktaking and national target setting Type Expected Outcomes TA - By end of 2012, a multisectoral/multistakeholder working group is established and it completes the stock-taking exercise. - By 2012, national targets in response to the global Aichi Targets are developed. Expected Outputs 1.1 Review and stocktaking of products and results from previous biodiversity planning processes at the national level are carried out in participative manner. 1.2 In response to the global Aichi Targets, national biodiversity targets are developed in a manner that is attuned to Moldova s reality. 1.3 The achievement of national targets, developed in line with the global Aichi Targets, is duly monitored during the project duration and beyond, and this is reported upon to the CBD through national reports and other means. Grant Amount ($) Confirmed Cofinancing ($) 15,000 47,900 2) NBSAP formulation TA - By early 2014, the Moldova s NBSAP is fully updated, it is in line with the guidance in the CBD Strategic Plan ( ) and has been submitted to the CBD COP 2.1 A National Biodiversity Strategy and Action Plan (NBSAP) for Moldova, becomes anchored into national development frameworks: the new NBSAP is developed, in a manner that is participative, widely disseminated and fully integrates new aspects of the CBD strategic plan, such as: (i) mainstreaming; (ii) the valuing of ecosystem goods and services; and (iii) the incorporation of challenges and opportunities linked to ecosystembased adaptation and resilience. 2.2 The updated and fully endorsed NBSAPs for Moldova is submitted to the CBD preferably within 115,000 68,000 Final GEF 5 Enabling Activity Template for Agency

28 EA Component Type Expected Outcomes Expected Outputs the deadline set by the COP. Grant Amount ($) Confirmed Cofinancing ($) 2.3 The challenges to Protected Areas in the 21 st Century and the national implementation of the CBD s Programme of Work on Protected Areas (PoWPA) are integrated into the NBSAP 2.4 The Economics of Ecosystems and Biodiversity (TEEB) developed for assessing and capturing value in ecosystems goods and services in Moldova 3) National frameworks for NBSAP implementation, CDB reporting and exchange mechanisms - By 2014, complete plan for implementing the NBSAP, including capacity, technology and finance needs assessment - By 31 March 2014, the Fifth National Report is submitted to the CBD (beyond the project s proposed timeframe) 3.1 National frameworks for NBSAP implementation is in place and includes: (i) institutional leadership for implementation is established and strategic partnerships forged (nationally and internationally); (ii) a costed and prioritized Implementation Plan is appended to the NBSAP; (iii) needs assessments on capacity, technology and finance are carried out; and (iv) a strategy for resource mobilization for the implementation of the NBSAP is produced and includes a baseline assessment of existing biodiversity finance. 3.2 The CHM is updated and linked up to the CBD s global CHM networks and to other information and knowledge exchange network on biodiversity. 3.3 CBD reporting obligations are met by Moldova: The Fifth National Report to the CBD by 31 March ,000 40,000 Subtotal 205, ,900 EA Management Cost 1 15,000 38,500 Total EA Cost 220, ,400 a List the $ by EA components. B. CO-FINANCING FOR THE EA BY SOURCE AND BY NAME Sources of Co-financing Name of Co-financier Type of Co-financing Amount ($) Government of Moldova Ministry of Environment Grant 40,000 Government of Moldova Biodiversity Office in-kind 27,500 Government of Moldova Agency Moldsilva in-kind 20,000 NGO REC-Moldova Grant 10,000 NGO Ecospectru in-kind 37,000 NGO Ecological Movement of Moldova Grant 10,000 GEF Agency UNDP Moldova Grant 2,000 GEF Agency UNDP Moldova in-kind 47,900 Total Co-financing 194,400 1 This is the cost associated with the unit executing the project on the ground and could be financed out of trust fund or co-financing sources. Final GEF 5 Enabling Activity Template for Agency

29 C. GRANT RESOURCES REQUESTED BY AGENCY, FOCAL AREA AND COUNTRY GEF Agency UNDP Type of Trust Fund GEF TF Total Grant Resources Focal Area Biodiversity Focal Area Set-Aside Country Name/Global EA Amount (a) Agency Fee (b) Total (c)=(a)+(b) Moldova 220,000 22, ,000 D. EA MANAGEMENT COST Cost Items [GEF only] Total Estimated Person Weeks Grant Amount ($) Cofinancing ($) EA Total ($) Local consultants* ,000 36,000 51,000 International consultants* Office facilities, equipment, vehicles and communications* 0 2,500 2,500 Travel* Others** Total 15,000 38,500 53,500 * Details to be provided in Annex A. ** Other items to be clearly specified. ADDITIONAL INFORMATION FOR TABLE D, IF APPLICABLE: If costs for office facilities, equipment, vehicles and communications, travels are requesting for GEF financing, please provide justification here: The costs of the project manager will be shared between GEF and Government. See Annex A for more detail. PART II: ENABLING ACTIVITY JUSTIFICATION A. ENABLING ACTIVITY BACKGROUND AND CONTEXT (Provide brief information about projects implemented since a country became party to the convention and results achieved): Moldova is situated in the South East Europe with a temperate-continental climate and it covers a hilly plain cut deeply by streams and rivers. Its territory is located at the intersection of 3 bio-geographic zones: the Central European zone, Euro-Asiatic zone and the Mediterranean zone with a rich but vulnerable biodiversity. The overlap of these zones results in high-level of genetic diversity in plants and animals. However, many species typical for these areas are at the limit of their natural range. It is estimated that natural ecosystems of the country cover almost 20% of its territory but it is fragmented and highly deteriorated. Today, Moldova has 362,700 ha of forests covering 10.9% from the country s territory, which is a very low figure as compared to the European average (29%). Despite the commitment to increase this figure up to 13.2 % by 2015 there is slow progress mainly due to dramatic cut in public expenditures as a result of the economic crisis which has also impacted other areas of the country s economy. Nevertheless the country managed to increase the share of state protected areas from 1.96% to 4.7% in Traditionally Moldova is a rural country and agriculture continues to play an important role in the economy accounting for 27.5 of the GDP. It is at a medium development level and the HDI was in 2010 rising by only 1% in the last 40 years. The economic growth which reached its peak in It had been driven by migration and remittances. This contributed to reduction in poverty and increase of populations income. However, growth slowed down on the onset of the global economic crisis coupled with the extended political instability. Current trends indicate that it is more likely that the poverty will rise. Due to overexploitation and irrational use of the natural resources before its independence in the 1990 s, Moldova s environment became highly degraded. However, over the past 10 years, more attention has been paid to this. The biodiversity is gaining more recognition in terms of its importance to economic growth. Biodiversity became part of the country s main strategic planning documents, including the National Development Strategy for , Government s Programme for up to 2014, the Strategy for Sustainable Development of the Forest Sector ( ), the Strategy for Sustainable Development of the Agriculture Sector ( ) etc. Final GEF 5 Enabling Activity Template for Agency

United Nations Development Programme

United Nations Development Programme United Nations Development Programme Title Project Document Template Document Language English (original), French - Spanish Responsible Unit Bureau for Development Policy/Capacity Development Group Approver

More information

Project Document Format for non-cpap Countries or Projects outside a CPAP

Project Document Format for non-cpap Countries or Projects outside a CPAP Project Document Format for noncpap Countries or Projects outside a CPAP United Nations Development Programme Country: _ Project Document Project Title UNDAF Outcome(s): Expected CP Outcome(s): (Those

More information

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acronyms List AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC Acquired immunodeficiency syndrome Country Coordinating Mechanism,

More information

REQUEST FOR PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: FULL-SIZED PROJECT

REQUEST FOR PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: FULL-SIZED PROJECT REQUEST FOR PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: FULL-SIZED PROJECT THE GEF TRUST FUND Submission Date: 15 February 2008 Re-submission Date: 25 March 2008 GEFSEC PROJECT ID 1 : GEF AGENCY PROJECT

More information

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS ELEVENTH MEETING

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS ELEVENTH MEETING CBD Distr. GENERAL UNEP/CBD/COP/DEC/XI/5 5 December 2012 ORIGINAL: ENGLISH CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY Eleventh meeting Hyderabad, India, 8-19 October 2012 Agenda

More information

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT PROPOSAL PAGE 1 OF 10 Country

More information

Benin 27 August 2015

Benin 27 August 2015 Benin 27 August 2015 PAGE 1 OF 6 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Benin Submission Date 27/08/2015 NDA or Focal Point Directorate

More information

Chad 16 September 2015

Chad 16 September 2015 Chad 16 September 2015 PAGE 1 OF 7 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Chad (Africa) Submission Date 16/09/2015 NDA or Focal Point

More information

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG) UNDP Initiation Plan to programme the project preparation grant received from the GEF (otherwise called GEF PPG) effective for all PIFs approved as of GEF November work programme 2017 A. Background: The

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency

UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency INITIATION PLAN FOR A GEF PROJECT PREPARATION GRANT (PPG) UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency Country Islamic Republic of Iran Expected Outcome(s)/Indicator

More information

Executive Summary (in one page)

Executive Summary (in one page) Kenya 2015.10.28 PAGE 1 OF 6 (Please submit completed form to countries@gcfund.org) Executive Summary (in one page) Country (or region) Kenya Submission Date 28/10/2015 NDA or Focal Point Contact Point

More information

The table below shows the dates of ratification by Lebanon of the Montreal Protocol and its amendments:

The table below shows the dates of ratification by Lebanon of the Montreal Protocol and its amendments: I. SITUATION ANALYSIS 1. Objective The objective of this project is the preparation of a comprehensive HPMP (Stage-2) for Lebanon, which will incorporate the strategy and action plan for Lebanon for compliance

More information

with UNDP for the Republic of Congo 12 May 2016 NDA Strengthening & Country Programming

with UNDP for the Republic of Congo 12 May 2016 NDA Strengthening & Country Programming with UNDP for the Republic of Congo 12 May 2016 NDA Strengthening & Country Programming PAGE 1 OF 7 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region)

More information

Position paper for the 4 th meeting of the Ad Hoc Open-ended Working Group on Review of Implementation of the Convention, 7-11 May, Montreal.

Position paper for the 4 th meeting of the Ad Hoc Open-ended Working Group on Review of Implementation of the Convention, 7-11 May, Montreal. REVIEW OF IMPLEMENTATION OF THE STRATEGY FOR RESOURCE MOBILIZATION Position paper for the 4 th meeting of the Ad Hoc Open-ended Working Group on Review of Implementation of the Convention, 7-11 May, Montreal

More information

Executive Summary(in one page)

Executive Summary(in one page) Senegal 2015.10.08 PAGE 1 OF 7 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Senegal Submission Date 08/10/2015 NDA or Focal Point Contact Point

More information

Country: Serbia. Initiation Plan. Development of Youth Employment Bond

Country: Serbia. Initiation Plan. Development of Youth Employment Bond United Nations Development Programme Country: Serbia Initiation Plan Project Title: Expected CP Outcome(s): Development of Youth Employment Bond By 2020, there is an effective enabling environment that

More information

I. Basic Project Data

I. Basic Project Data I. Basic Project Data UNDP GEF APR/PIR 2006 - BIODIVERSITY (1 July 2005 to 30 June 2006) Official Title: Atoll Ecosystem-Based Conservation of Globally Significant Biological Diversity in the Maldives

More information

Annex XIV LDCF Timeline: COP guidance and GEF responses

Annex XIV LDCF Timeline: COP guidance and GEF responses Annex XIV LDCF Timeline: COP guidance and GEF responses Decision 5/CP.7 10 th November 2001 Establishes the GEF as the operating entity of the LDCF Para (11) Establishes the LDC Work Programme. This includes:

More information

UN BHUTAN COUNTRY FUND

UN BHUTAN COUNTRY FUND UN BHUTAN COUNTRY FUND Terms of Reference Introduction: 1. The UN system in Bhutan is implementing the One Programme 2014-2018. The One Programme is the result of a highly consultative and participatory

More information

Mid-Term Review of UNDP/GEF project: Strengthening the Operational and Financial Sustainability of the National Protected Area System

Mid-Term Review of UNDP/GEF project: Strengthening the Operational and Financial Sustainability of the National Protected Area System Mid-Term Review of UNDP/GEF project: Strengthening the Operational and Financial Sustainability of the National Protected Area System Evaluation conducted by Alexandra Fischer GEFSEC Project ID: PIMS 3832

More information

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming PAGE 1 OF 8 (Please submit completed form to countries@gcfund.org)

More information

UNDP Project Document. UNDP-GEF Enabling Activities Project

UNDP Project Document. UNDP-GEF Enabling Activities Project UNDP Project Document UNDP-GEF Enabling Activities Project Government of the Democratic Republic of Timor-Leste United Nations Development Programme and Global Environment Facility National Biodiversity

More information

Ethiopia One UN Fund Terms of Reference

Ethiopia One UN Fund Terms of Reference Ethiopia One UN Fund Terms of Reference I Introduction 1. The One UN process in Ethiopia was initiated in mid 2008. It was in part based on the General Assembly s: "Triennial comprehensive policy review

More information

AC workshop on the M&E of adaptation Nadi, Fiji, 9-11 September 2013

AC workshop on the M&E of adaptation Nadi, Fiji, 9-11 September 2013 AC workshop on the M&E of adaptation Nadi, Fiji, 9-11 September 2013 Input by Chakra Pani Sharma, Under Secretary, Environment Management Section, Ministry of Federal Affair and Local Development, Nepal

More information

Road and Transport Management Project Phase II SAU/10/51658

Road and Transport Management Project Phase II SAU/10/51658 UNITED NATIONS DEVELOPMENT PROGRAMME United Nations Department of Social and Economic Affaires (UNDESA) Project of the Government of the Kingdom of Saudi Arabia Ministry of Transport (MOT) Road and Transport

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2014-2021 Adopted by the EEA Financial Mechanism Committee pursuant to Article 10.5 of Protocol 38c to the EEA Agreement on 8 September 2016 and confirmed

More information

with the Development Bank of Seychelles for the Republic of Seychelles 18 December 2017 NDA Strengthening & Country Programming

with the Development Bank of Seychelles for the Republic of Seychelles 18 December 2017 NDA Strengthening & Country Programming with the Development Bank of Seychelles for the Republic of Seychelles 18 December 2017 NDA Strengthening & Country Programming PAGE 1 OF 8 (Please submit completed form to countries@gcfund.org) Executive

More information

Global Environment Facility

Global Environment Facility Global Environment Facility GEF Council June 3-8, 2005 GEF/ME/C.25/3 May 6, 2004 Agenda Item 5 FOUR YEAR WORK PROGRAM AND BUDGET OF THE OFFICE OF MONITORING AND EVALUATION FY06-09 AND RESULTS IN FY05 (Prepared

More information

Review of the fourth Strategic Plan of the Ramsar Convention

Review of the fourth Strategic Plan of the Ramsar Convention RAMSAR CONVENTION ON WETLANDS 54th Meeting of the Standing Committee Gland, Switzerland, 23 27 April 2018 Review of the fourth Strategic Plan of the Ramsar Convention Doc. SC54-8 Actions requested: The

More information

with UNDP for the Republic of Ecuador 31 May 2017 NDA Strengthening & Country Programming

with UNDP for the Republic of Ecuador 31 May 2017 NDA Strengthening & Country Programming with UNDP for the Republic of Ecuador 31 May 2017 NDA Strengthening & Country Programming PAGE 1 OF 21 ver. 19 August 2016 Readiness and Preparatory Support Proposal How to complete this document? - A

More information

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES GEF/C.8/4 GEF Council October 8-10, 1996 Agenda Item 6 FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES RECOMMENDED DRAFT COUNCIL DECISION The Council reviewed document

More information

REQUEST FOR CLIMATE CHANGE ENABLING ACTIVITY

REQUEST FOR CLIMATE CHANGE ENABLING ACTIVITY REQUEST FOR CLIMATE CHANGE ENABLING ACTIVITY PROPOSAL FOR FUNDING UNDER THE Least Developed Countries Trust Fund PART I: PROJECT IDENTIFIERS EA Title: Preparations of National Adaptation Plan of Action

More information

with UNDP for the Republic of India 29 December 2015 NDA Strengthening & Country Programming

with UNDP for the Republic of India 29 December 2015 NDA Strengthening & Country Programming with UNDP for the Republic of India 29 December 2015 NDA Strengthening & Country Programming PAGE 1 OF 14 Country (or region) (Please submit completed form to countries@gcfund.org) India Submission Date

More information

EAF-Nansen Project (GCP/INT/003/NOR)

EAF-Nansen Project (GCP/INT/003/NOR) EAF-Nansen Project (GCP/INT/003/NOR) Title : Improving the Artisanal Fisheries Management of Liberia and Sierra Leone Funded: EAF-Nansen Total Contribution: USD 50,000 1 Countries: Duration: Liberia and

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY CBD Distr. GENERAL CBD/COP/DEC/14/23 30 November 2018 ORIGINAL: ENGLISH CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY Fourteenth meeting Sharm El-Sheikh, Egypt, 17-29 November 2018

More information

Establishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region

Establishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region Project Proposal: Establishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region by the GEF/UNDP/IMO Regional Programme on Partnerships in Environmental management for

More information

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN Approved Version April 2014 Contents Contents... 2 1. Key Elements of Results Based Management in

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

Z\A REQUEST FOR CEO ENDORSEMENT UNDER THE GEF TRUST FUND. n/a B 500,000. n/a GEF Total 500,000 3,500,000 (provide details in Section b: Cofinancing)

Z\A REQUEST FOR CEO ENDORSEMENT UNDER THE GEF TRUST FUND. n/a B 500,000. n/a GEF Total 500,000 3,500,000 (provide details in Section b: Cofinancing) - 1 Z\A REQUEST FOR CEO ENDORSEMENT UNDER THE GEF TRUST FUND GEF FINANCING PLAN ($) PDF A n/a B 500,000 Project* 3,500,000 GEFSEC PROJECT ID: 2517 IA/ExA S PROJECT ID: RS-X1017 COUNTRY/IES: Costa Rica

More information

Indicative Guidelines for Country-Specific Resource Mobilization Strategies

Indicative Guidelines for Country-Specific Resource Mobilization Strategies Indicative Guidelines for Country-Specific Resource Mobilization Strategies I. GENERAL PROVISIONS 1. In decision IX/11 B, the Conference of the Parties adopted the strategy for resource mobilization (SRM)

More information

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS GEF ID: 4568 Country/Region: Madagascar Project Title: Adapting Coastal Zone Management to Climate Change in Madagascar

More information

GOVERNANCE FRAMEWORK FOR

GOVERNANCE FRAMEWORK FOR December, 2011 GOVERNANCE FRAMEWORK FOR THE STRATEGIC CLIMATE FUND Adopted November 2008 and amended December 2011 Table of Contents A. Introduction B. Purpose and Objectives C. SCF Programs D. Governance

More information

ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS

ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS August 2016 Background 1. Tier 1 'Support to National Implementation Arrangements (NIAs)' projects (hereinafter

More information

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.

More information

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase GCF/B.10/05 21 June 2015 Meeting of the Board 6-9 July 2015 Songdo, Republic of Korea Provisional Agenda item

More information

Decision 3/CP.17. Launching the Green Climate Fund

Decision 3/CP.17. Launching the Green Climate Fund Decision 3/CP.17 Launching the Green Climate Fund The Conference of the Parties, Recalling decision 1/CP.16, 1. Welcomes the report of the Transitional Committee (FCCC/CP/2011/6 and Add.1), taking note

More information

GEF SGP PROJECT PROPOSAL TEMPLATE AND GUIDELINES. Rwanda. [Date proposal]

GEF SGP PROJECT PROPOSAL TEMPLATE AND GUIDELINES. Rwanda. [Date proposal] GEF SGP PROJECT PROPOSAL TEMPLATE AND GUIDELINES Rwanda [Date proposal] i GENERAL REQUIREMENTS The Project Proposal should include the standard cover sheet, a one-page table of contents and not more than

More information

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS Informal Consultation 7 December 2015 World Food Programme Rome, Italy PURPOSE 1. This update of the country strategic planning approach summarizes the process

More information

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS GEF ID: 4492 Country/Region: Nicaragua Project Title: Adaptation of Nicaragua's Water Supplies to Climate Change GEF

More information

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF/NPIF TRUST FUNDS

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF/NPIF TRUST FUNDS GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF/NPIF TRUST FUNDS GEF ID: 5463 Country/Region: Tanzania Project Title: Securing Watershed Services Through SLM in the Ruvu and Zigi

More information

Evaluation of the European Union s Co-operation with Kenya Country level evaluation

Evaluation of the European Union s Co-operation with Kenya Country level evaluation "FICHE CONTRADICTOIRE" Evaluation of the European Union s Co-operation with Kenya Country level evaluation Recommendations Responses of Services: Follow-up (one year later) GENERAL RECOMMENDATIONS 1 Give

More information

REPORT 2015/174 INTERNAL AUDIT DIVISION

REPORT 2015/174 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/174 Audit of management of selected subprogrammes and related capacity development projects in the United Nations Economic and Social Commission for Asia and the Pacific

More information

Terms of Reference FOR INDIVIDUAL CONSULTANTS/CONTRACTORS (IC)

Terms of Reference FOR INDIVIDUAL CONSULTANTS/CONTRACTORS (IC) Terms of Reference FOR INDIVIDUAL CONSULTANTS/CONTRACTORS (IC) Post Title: Consultancy Services Terminal Evaluation for the Kenya Adaptation to Climate Change in Arid Lands (KACCAL) project Agency/Project

More information

with the United Nations Environment Programme (UNEP) for the Republic of South Sudan 01 June 2018 NDA Strengthening & Country Programming

with the United Nations Environment Programme (UNEP) for the Republic of South Sudan 01 June 2018 NDA Strengthening & Country Programming with the United Nations Environment Programme (UNEP) for the Republic of South Sudan 01 June 2018 NDA Strengthening & Country Programming READINESS AND PREPARATORY SUPPORT/PROPOSAL PAGE 1 OF 15 ver. 19

More information

11 October 2017 NDA Strengthening & Country Programming

11 October 2017 NDA Strengthening & Country Programming with UNDP for the Republic of Burundi 11 October 2017 NDA Strengthening & Country Programming PAGE 1 OF 16 ver. 19 August 2016 Readiness and Preparatory Support Proposal, Burundi SECTION 1: SUMMARY 1.

More information

TERMS OF REFERENCE. 2. Adaptation and implementation of this new methodological framework at national level

TERMS OF REFERENCE. 2. Adaptation and implementation of this new methodological framework at national level TERMS OF REFERENCE POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: National Consultant Chief Technical Advisor for BIOFIN UNDP/ The Biodiversity Finance Initiative (BIOFIN) Home-based in Thailand,

More information

This action is funded by the European Union

This action is funded by the European Union This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual

More information

Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility

Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility GCF/B.07/08 12 May 2014 Meeting of the Board 18-21 May 2014 Songdo, Republic of Korea

More information

MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS

MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS MANUAL OF PROCEDURES FOR DISBURSEMENT OF FUNDS TO PARTICIPATING PARTNERS Global Strategy to Improve Agricultural and Rural Statistics The main steps of the procedure for disbursement of funds (from the

More information

with the Ministry of Finance and Economic Development for the Republic of Mauritius 14 June 2016 NDA Strengthening & Country Programming

with the Ministry of Finance and Economic Development for the Republic of Mauritius 14 June 2016 NDA Strengthening & Country Programming with the Ministry of Finance and Economic Development for the Republic of Mauritius 14 June 2016 NDA Strengthening & Country Programming PAGE 1 OF 8 (Please submit completed form to countries@gcfund.org)

More information

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MONTENEGRO. Enhanced control and management of fisheries INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Enhanced control and management of fisheries Action summary The objective of the Action is to align the electronic data collection

More information

Strengthening LDC participation & capacity for implementing the Rio Conventions

Strengthening LDC participation & capacity for implementing the Rio Conventions Strengthening LDC participation & capacity for implementing the Rio Conventions Tom Twining-Ward United Nations Development Programme Overview of UNDP engagement with LDCs UNDP is the lead capacity development

More information

IMPLEMENTATION OF THE STRATEGY FOR RESOURCE MOBILIZATION PRELIMINARY REPORTING FRAMEWORK I. INTRODUCTION

IMPLEMENTATION OF THE STRATEGY FOR RESOURCE MOBILIZATION PRELIMINARY REPORTING FRAMEWORK I. INTRODUCTION IMPLEMENTATION OF THE STRATEGY FOR RESOURCE MOBILIZATION PRELIMINARY REPORTING FRAMEWORK I. INTRODUCTION The Preliminary Reporting Framework is intended for use by Parties for providing data on resource

More information

Toward a resource mobilization plan

Toward a resource mobilization plan Toward a resource mobilization plan Steps in mobilizing resources REVIEW BROADER CONTEXT 1a) Identify sectoral drivers of loss 1b) Assess sectoral institutions and actors 1c) Review biodiversity expenditures

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

with UNDP for the Republic of Liberia 07 December 2015 NDA Strengthening and Country Programming

with UNDP for the Republic of Liberia 07 December 2015 NDA Strengthening and Country Programming with UNDP for the Republic of Liberia 07 December 2015 NDA Strengthening and Country Programming PAGE 1 OF 7 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country

More information

I. Basic Project Data

I. Basic Project Data I. Basic Project Data UNDP GEF APR/PIR 2006 - BIODIVERSITY (1 July 2005 to 30 June 2006) Official Title: Improved Management and Conservation Practices for the Cocos Island Marine Conservation Area Country/ies:

More information

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming PAGE 1 OF 12 Country (or region) Executive Summary (in one page) Union of the Comoros Submission Date 29/05/2015

More information

with UNDP for the Republic of Guinea 16 December 2015 NDA Strengthening & Country Programming

with UNDP for the Republic of Guinea 16 December 2015 NDA Strengthening & Country Programming with UNDP for the Republic of Guinea 16 December 2015 NDA Strengthening & Country Programming PAGE 1 OF 7 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or

More information

Capacity Building and Mainstreaming of Sustainable Land Management St. Kitts and Nevis. Terminal Evaluation

Capacity Building and Mainstreaming of Sustainable Land Management St. Kitts and Nevis. Terminal Evaluation Capacity Building and Mainstreaming of Sustainable Land Management St. Kitts and Nevis Terminal Evaluation September 2013 Project Funded by: The Global Environmental Facility (GEF) The United Nations Development

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

2014 ANNUAL PROJECT PROGRESS REPORT

2014 ANNUAL PROJECT PROGRESS REPORT Strengthening the Resilience of Rural Livelihood options for Afghan Communities in Panjshir, Balkh, Uruzgan and Herat Provinces to manage Climate Change-induced Disaster Risks 2014 ANNUAL PROJECT PROGRESS

More information

Enabling Activities for the Preparation of Sierra Leone s Second National. Communications to the United Nations Framework Convention on Climate

Enabling Activities for the Preparation of Sierra Leone s Second National. Communications to the United Nations Framework Convention on Climate Terminal evaluation of the Enabling Activities for the Preparation of Sierra Leone s Second National Communications to the United Nations Framework Convention on Climate Change (UNFCCC) Project Sierra

More information

GEF-6 Funding Needs Assessment

GEF-6 Funding Needs Assessment GEF-6 Funding Needs Assessment Process, Methodology, Results Members of the CBD GEF-6 Expert Team Maria Schultz: Stockholm Resilience Centre, Sweden Dr. Pedro Leitao: FUNBIO, Brazil Prof. A. N. Damodaran:

More information

GCF Readiness Programme Fiji

GCF Readiness Programme Fiji GCF Readiness Programme Fiji In Fiji, The Programme will target two important aspects of the GCF approach, access to funds and private sector engagement. In this context the Programme focuses on a range

More information

RESOURCE MOBILIZATION DECISIONS

RESOURCE MOBILIZATION DECISIONS RESOURCE MOBILIZATION DECISIONS Montreal Workshop 12 May 2012 Ravi Sharma Principal Officer Implementation, Technical Support and Outreach Secretariat of the Convention on Biological Diversity Montreal,

More information

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project:

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project: Summary of Project/Program PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project/Program Approval Request 1. Country/Region: Zambia 2. CIF Project ID#: XPCRZM041A 3. Project/Program Title: Zambia Strengthening

More information

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY XII/3.

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY XII/3. CBD Distr. GENERAL UNEP/CBD/COP/DEC/XII/3 17 October 2014 ORIGINAL: ENGLISH CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY Twelfth meeting Pyeongchang, Republic of Korea, 6-17 October

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Guidance Paper United Nations Development Group 19 MAY 2006 TABLE OF CONTENTS Introduction A. Purpose of this paper... 1 B. Context...

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Initial Structure and Staffing of the Secretariat

Initial Structure and Staffing of the Secretariat Initial Structure and Staffing of the Secretariat GCF/B.05/10 26 September 2013 Meeting of the Board 8-10 October 2013 Paris, France Agenda item 6 Page b Recommended action by the Board It is recommended

More information

International Policies and Cooperation to Advance an Inclusive Green Economy

International Policies and Cooperation to Advance an Inclusive Green Economy Section 4 International Policies and Cooperation to Advance an Inclusive Green Economy 6 Learning Unit International Funding Sources for Green Economy The Green Economy transition requires the mobilizations

More information

CBD. Distr. GENERAL. UNEP/CBD/ICNP/3/2 12 February 2014 ORIGINAL: ENGLISH

CBD. Distr. GENERAL. UNEP/CBD/ICNP/3/2 12 February 2014 ORIGINAL: ENGLISH CBD Distr. GENERAL UNEP/CBD/ICNP/3/2 12 February 2014 OPEN-ENDED AD HOC INTERGOVERNMENTAL COMMITTEE FOR THE NAGOYA PROTOCOL ON ACCESS TO GENETIC RESOURCES AND THE FAIR AND EQUITABLE SHARING OF BENEFITS

More information

Paris Climate Change Agreement - Report back to Cabinet and Approval for Signature

Paris Climate Change Agreement - Report back to Cabinet and Approval for Signature Office of the Minister for Climate Change Issues This document has been proactively released. Redactions made to the document have been made consistent with provisions of the Official Information Act 1982.

More information

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014 I. Contents Introduction... 2 Purpose... 2 Scope... 2 Rationale... 2 Acronyms... 2 I. Funding Mechanisms... 3 A. Eligibility... 3 B. Standard Allocation...

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

REPORT 2016/062 INTERNAL AUDIT DIVISION. Audit of the management of trust funds at the United Nations Framework Convention on Climate Change

REPORT 2016/062 INTERNAL AUDIT DIVISION. Audit of the management of trust funds at the United Nations Framework Convention on Climate Change INTERNAL AUDIT DIVISION REPORT 2016/062 Audit of the management of trust funds at the United Nations Framework Convention on Climate Change Overall results relating to the effective management of trust

More information

Bangladesh 25 October 2015

Bangladesh 25 October 2015 Bangladesh 25 October 2015 PAGE 1 OF 10 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Bangladesh Submission Date 25 October 2015 NDA or Focal

More information

Guidelines for the United Nations Trust Fund for Human Security

Guidelines for the United Nations Trust Fund for Human Security Guidelines for the United Nations Trust Fund for Human Security Eighth Revision 1 30 October 2014 1 This sets out the revised Guidelines for the United Nations Trust Fund for Human Security, effective

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

Programmatic approach to funding proposals

Programmatic approach to funding proposals Meeting of the Board 28 30 June 2016 Songdo, Incheon, Republic of Korea Provisional agenda Item 12(g) GCF/B.13/18 20 June 2016 Programmatic approach to funding proposals Summary This document builds on

More information

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS Country/Region: Regional (Djibouti, Egypt, Jordan, Saudi Arabia, Sudan, Yemen) Project Title: Regional (Djibouti, Egypt, Jordan, Saudi Arabia, Sudan,

More information

with the Food and Agriculture Organization of the United Nations (FAO) for the Former Yugoslav Republic of Macedonia

with the Food and Agriculture Organization of the United Nations (FAO) for the Former Yugoslav Republic of Macedonia with the Food and Agriculture Organization of the United Nations (FAO) for the Former Yugoslav Republic of Macedonia 20 December 2017 NDA Strengthening & Country Programming PAGE 1 OF 30 Ver. 15 June 2017

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND Type of Position: Local consultant Sustainable finance expert Location: Ulaanbaatar, Mongolia Type of Contract: Individual contract Expected

More information

United Nations Development Programme. Country: Tajikistan Project Document

United Nations Development Programme. Country: Tajikistan Project Document United Nations Development Programme Empowered lives. Resilient nations. Country: Tajikistan Project Document Project Title: Access to Justice Project in Tajikistan: Provision of legal aid to marginalized

More information