Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report. An IDEV Country Strategy Evaluation

Size: px
Start display at page:

Download "Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report. An IDEV Country Strategy Evaluation"

Transcription

1 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report An IDEV Country Strategy Evaluation March 2017

2 IDEV conducts different types of evaluations to achieve its strategic objectives Impact Evaluations Evaluation Syntheses Corporate Evaluations Sector Evaluations Project Performance Evaluations (Public Sector) Thematic Evaluations Project Cluster Evaluations Regional Integration Strategy Evaluations Country Strategy Evaluations Country Strategy Evaluation Project Performance Evaluations (Private Sector)

3 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report An IDEV Country Strategy Evaluation March 2017

4 ACKNOWLEDGEMENTS Task managers Team Members Consultants Internal peer reviewer External peer reviewer Internal Bank Reference group Knowledge management officers Other assistance Special thanks to Division manager Evaluator-General Herimandimby Razafindramanana, Chief Evaluation Officer, IDEV, Overall task manager for CSPEs of Transition States: Burundi, DRC, and Togo; Mabarakissa Diomandé, Evaluation Officer, IDEV, Task manager for the DRC CSPE Clément Bansé, Evaluation Officer, IDEV; Eglantine Marcelin, Junior Consultant, IDEV. Aide à la Décision Economique (ADE) with Jérôme Coste as ADE Team Leader. Oswald Mirianaud Agbadome, Senior Evaluation Officer, IDEV Claudine Voyadzis, Senior Consultant Bruno Boedts, Chief Operations Implementation Officer, Eastern Africa regional development and business delivery office (RDGE); Gérard Bizimana, Principal Country Economist, Regional Directorate General-Central (RDGC); Frederik Teufel, Senior Political Risk and Private Sector Development Analyst, Transition States Coordination Office (RDTS); Abdourahmane Diaw, Chief Country Program Officer, RDGE; Jean Marie Dabiré, Senior Country Economist, Democratic Republic of Congo Field Office (COCD); Anatole Désiré Bizongo, Infrastructure Expert, COCD; Stanny Kolokota, Principal Social Development Expert, COCD; Jean Paterne March Ekoga, Senior Transport Economist, Transport and ICT Department (OITC); Mafouta Vurce-Arsène Lossombot, Principal Financial Management Expert, COCD. Jacqueline Nyagahima, Consultant, IDEV, Najade Lindsay, Junior Consultant, IDEV. Myrtha Diop, Administrative Assistant, IDEV; Ruby Adzobu-Agyare, and Henda Ayari, Assistants, IDEV. Sylvain Maliko, Resident Representative and the entire team of the AfDB field office in DRC (COCD) Samer Hachem Rakesh Nangia 2017 African Development Bank Group All rights reserved March 2017 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report An IDEV Country Strategy Evaluation, March 2017 Disclaimer Unless expressly stated otherwise, the findings, interpretations and conclusions expressed in this publication are those of the various authors of the publication and are not necessarily those of the Management of the African Development Bank (the Bank ) and the African Development Fund (the Fund ), Boards of Directors, Boards of Governors or the countries they represent. Use of this publication is at the reader s sole risk. The content of this publication is provided without warranty of any kind, either express or implied, including without limitation warranties of merchantability, fitness for a particular purpose, and non-infringement of third-party rights. The Bank specifically does not make any warranties or representations as to the accuracy, completeness, reliability or current validity of any information contained in the publication. Under no circumstances including, but not limited to, negligence, shall the Bank be liable for any loss, damage, liability or expense incurred or suffered which is claimed to result directly or indirectly from use of this publication or reliance on its content. This publication may contain advice, opinions, and statements of various information and content providers. The Bank does not represent or endorse the accuracy, completeness, reliability or current validity of any advice, opinion, statement or other information provided by any information or content provider or other person or entity. Reliance upon any such opinion, advice, statement, or other information shall also be at the reader s own risk. About the AfDB The overarching objective of the African Development Bank Group is to spur sustainable economic development and social progress in its regional member countries (RMCs), thus contributing to poverty reduction. The Bank Group achieves this objective by mobilizing and allocating resources for investment in RMCs and providing policy advice and technical assistance to support development efforts. About Independent Development Evaluation (IDEV) The mission of Independent Development Evaluation at the AfDB is to enhance the development effectiveness of the institution in its regional member countries through independent and instrumental evaluations and partnerships for sharing knowledge. Independent Development Evaluation (IDEV) African Development Bank Group Avenue Joseph Anoma, 01 BP 1387, Abidjan 01, Côte d Ivoire Phone: idevhelpdesk@afdb.org idev.afdb.org Layout & production: Visual Identity Original language: French Translation: AfDB Language Services Department

5 Table of contents Acknowledgments i Acronyms and Abbreviations v Executive Summary 1 Management Response 7 Introduction 19 Evaluation Purpose and Objectives 19 Methodological Approach 19 Limitations of the Evaluation 20 Country Context 21 Main Development Challenges of DRC 21 National Development Strategy 23 Bank Assistance Strategies and Program 25 Strategic orientations, Theory of Change, and Dialogue 25 Bank Portfolio in DRC 28 Results of the Evaluation of Bank Interventions 31 Relevance 31 Effectiveness 32 Sustainability 37 Efficiency 39 Knowledge and Advisory Services 40 Summary: Did the Bank Make a Difference in DRC? 40 Performance and Results-Based Management 43 Quality of CSPs and Selectivity 43 Managing for Development Results (MfDR) 44 Application of the Paris Declaration and the Principles of Good International Engagement in Fragile States 45 Complementarity and Synergies 46 Leverage Effect Mobilizing Other Resources 46 Country Performance 47 Conclusions and Recommendations 49 Main conclusions 49 Recommendations 49

6 Table of contents Annexes 53 Methodological approach 54 Rating of Projects Subject to a PRA 65 Map of DRC and Mapping of AfDB Operations 66 Total and Multilateral Official Development Assistance (ODA) received by DRC 68 Chronology of Significant Political Events in DRC and TFP Commitments 70 Some Comparative Socio-economic Indicators of the DRC 72 Factors and/or Manifestations of Fragility in Country Strategy Papers 75 Endnotes 76 List of figures Figure 1: Milestones of the Methodological Approach 20 Figure 2: Trends of DRC s Main Fragility Factors between 2004 and Figure 3: Theory of Change 26 Figure 4: Sector Breakdown of Bank Operations in DRC 29 List of tables Table 1: Strategic Guidelines and Dialogue Areas of the AfDB in DRC 25 Table 2: Relevance Ratings 31 Table 3: Effectiveness Rating 32 Table 4: Public Finance Management Scores in DRC 35 Table 5: Real GDP Growth Rate Trends in DRC (in %) 36 Table 6: Assessment of the Bank s level of Contribution to Factors of Fragility 37 Table 7: Sustainability Rating 37 Table 8: Efficiency Rating 39 Table 9: Rating of Performance and Results-Based Management 43 Table 10: Selection Criteria and Stages in the Analysis of Projects Eligible to PRA 55

7 Acronyms and abbreviations v Acronyms and abbreviations ADF African Development Fund IDEV Independent Development Evaluation AfDB African Development Bank IMF International Monetary Fund AsDB Asian Development Bank M23 March 23 Movement CAADP CBFF CEDR CODE CPIA CSP DFID DRC Comprehensive Africa Agriculture Development Program Congo Basin Forest Fund Comprehensive Evaluation of Development Results Committee on Operations and Development Effectiveness (AfDB) Country Policy and Institutional Assessment Country Strategy Paper Department for International Development (UK) Democratic Republic of Congo MAS MDG MEPSP MESU Ministry of Social Affairs Millennium Development Goal Ministry of Primary, Secondary and Vocational Education Ministry of Higher Education MONUSCO United Nations Organization Stabilization Mission in the Democratic Republic of Congo NGO OECD PAM-FP Non-Governmental Organization Organization for Economic Cooperation and Development Public Finance Modernization Support Project An IDEV Country Strategy Evaluation FSF GDP GHG GPRSP HDI HED HIPC Fragile States Facility Gross Domestic Product Greenhouse Gas Growth and Poverty Reduction Strategy Paper Human Development Index Higher Education Heavily Indebted Poor Country PAPDDS PARSAR PARSEC PASE PEASU Health Development Master Plan Support Project for Orientale Province Agricultural and Rural Sector Rehabilitation Support Project in Bas-Congo and Bandundu Provinces Socio-economic Reintegration Support Project for Ex-combatants Education Sector Support Project Semi-Urban Drinking Water Supply and Sanitation Project

8 vi Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report PEPUR Rural and Semi-Urban Electrification Project PRODAP Lake Tanganyika Development Program PMEDE PMPTR PMURR Project for Development of Electricity Market for Domestic Consumption and Export Minimum Partnership for Transition and Recovery Program Emergency Multi-Sectoral Rehabilitation and Reconstruction Program PRSP-I PSVE PUAICF RBCSP Interim Poverty Reduction Strategy Paper Primary, Secondary and Vocational Education Financial Crisis Impact Mitigation Emergency Program Results-Based Country Strategy Paper PNDS National Health Development Plan SRSS Health System Strengthening Strategy PNIA PRA PRECI National Agricultural Investment Plan Project Results assessment Institutional Capacity-Building Project on Reform Implementation SSADR TFP UA Agriculture and Rural Development Sector Strategy Technical and Financial Partner Unit of Account PRESAR PRISE Agricultural and Rural Sector Rehabilitation Project Socio-economic Infrastructure Reinforcement Project in Central Zone of DRC (West Kasaï and East Kasaï) USD WB US Dollar World Bank

9

10

11 Executive Summary 1 Executive Summary Evaluation Goal and Methodology This evaluation, initiated and conducted by the Independent Development Evaluation (IDEV), is part of a comprehensive evaluation of the development results (CEDR) of the Bank. Its goal is to review the specificity of the Bank s actions in a transition economy like DRC, and make recommendations that could help improve the effectiveness of Bank assistance while supporting the preparation and operationalization of its future strategies in DRC over the period. The evaluation covers Bank strategies, operations and policy dialogue activities implemented through various financing mechanisms in DRC over the period. ¹ The evaluation method is based on two major themes, namely: obtaining development results and performance-based management of Bank interventions. It is structured around 20 evaluation questions (Annex 1.b) which mainly focus on aspects of fragility and is based on a documentary review, discussions with experts and quick surveys on the intervention sites that included individual and group discussions, consultation workshops and direct observations. Development Context and Challenges of DRC 2 Since the mid-1990s, the country has experienced a series of political crises (flight and assassination of presidents, and challenge of election results), followed by relative calm in The current period is characterized by a new territorial redistricting and political tensions due to the postponement of presidential and legislative elections initially scheduled to be held in November According to the latest estimates, the economic growth rate has fluctuated between 2004 and 2015, rising from 6.7% in 2004 to 8.5% in 2013, before falling back to 6.9% in 2015 following a slowdown, to 2.8% in 2009 due to the global financial crisis. This economic performance, which exceeds the African average (4.8%), is essentially driven by: (i) manufacturing industries (33% of GDP in 2014), and (ii) agriculture (21% of GDP in 2014). Over the period, DRC was classified among fragile States on the harmonized lists of most international organizations. Despite positive trends, particularly in economic growth, State capacity and legitimacy, regional conflicts and armed violence, the country is still dogged by enormous challenges, namely: the fragile legitimacy of State institutions; a high poverty rate; difficult access to basic social services; economic, political and institutional instability; a poor business environment; and threats to biodiversity. An IDEV Country Strategy Evaluation Situated in Central Africa and lying astride the equator, DRC is one of the largest countries in Africa with a surface area of 2.3 million km¹. Between 2004 and 2015, the country s population increased by 25 million, rising from 52.5 million to million inhabitants. It is a youthful population (55% are under the age of 25 years) that lives predominantly in rural areas (63% in 2004 and 60% in 2015). Bank Assistance Strategy and Program in DRC Between 2004 and 2015, the Bank engaged in policy dialogue with the Government, directly and through its contribution to sector policy formulation. The four (4) Country Strategy Papers (CSP) for , , and were prepared based on growth and poverty reduction strategy papers (GPRSP I and II), priority action programs (PAP I and

12 2 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report II) and mainly sector strategies in agriculture (SSADR, PDDAA, PNIA) and health (SRSS, PNDS). The Bank intervened in DRC through 63 projects worth a total of approximately UA 1.2 billion. Economic and social infrastructure accounts for nearly 80% of the total amount invested in this portfolio. Results of Evaluation of Bank Strategies and Programs Relevance Relevance is assessed as moderately satisfactory. The Bank s CSPs during the review period reflect the fragile state of DRC, but do not provide an integrated analysis of the factors of fragility. Through its successive strategies, the Bank has supported the country through its evolution from a post-conflict situation at the beginning of the period to a development situation thereafter. The Bank s strategies and operations in DRC are globally aligned with its general orientations. The use of the Fragile States Facility (FSF) was relevant. However, considering the country s situation, the amounts for the 3rd pillar were small relative to the needs, and there was a focus on Government services to the detriment of further strengthening of private sector stakeholders and civil society organizations. Although gender inequality, youth employment, regional disparities and green growth are identified as key issues in the CSPs, the Bank s strategies and operations in DRC have remained poorly inclusive. Effectiveness Effectiveness is assessed as moderately satisfactory. As regards economic and social infrastructure, the attainment of results is satisfactory in terms of outputs and moderately satisfactory in terms of outcomes. While operations in the transport and social development sectors are most effective overall, the results are less satisfactory in the agricultural and rural development sectors. In the energy sector, the operations are not advanced enough for their effectiveness to be determined. With respect to economic and financial governance, only one of the four projects funded by the Bank, namely the Emergency Program to Mitigate the Impact of the Financial Crisis (PUAICF) was evaluated, since the others were not yet fully advanced in their implementation. This program attained its objectives by helping to restore macroeconomic balance in DRC and achieve the completion point of the HIPC Initiative (as of July 2010). It created favorable conditions for implementation of the Bank s subsequent support in public finance management area. Effects on Factors of Fragility A correlation can be established between the Bank s operations and the positive or neutral trends in factors of fragility. The positive trends relate to institutional capacity in economic governance and economic growth, while the neutral trends concern diversification of the economy and living conditions in the critical provinces. Sustainability The sustainability of Bank operations is assessed as moderately unlikely. Overall, the technical soundness of achievements is moderately unlikely. Economic and financial viability and the political and governance environment are the criteria with the poorest performance. This stems essentially from road maintenance policy shortcomings, especially for rural roads, and failure by the State (or provinces) to provide the operating budgets of facilities established through Bank operations. Institutional sustainability and capacity building, ownership and sustainability of partnerships, as well as environmental sustainability, are considered to be moderately unlikely.

13 Executive Summary 3 Efficiency Managing for Development Results The Bank s efficiency in DRC is assessed as moderately unsatisfactory. Project implementation delays are the main problem. The delays are due to three factors, namely: (i) country context; (ii) Government responsibility; and (iii) Bank responsibility. Knowledge and advisory support for policy formulation There is a wide gap between the Bank s professed intentions in DRC in terms of policy dialogue and its results. As regards economic governance, the Bank significantly engaged in policy dialogue to help DRC reach the completion point of the HIPC Initiative. In other sectors, the Bank s involvement in dialogue on sector policy implementation was limited to the production of studies that were insufficiently promoted. Furthermore, the Bank s involvement in dialogue with civil society stakeholders and the private sector remains weak. The Bank s analytical studies over the review period were neither programmed nor given any follow-up. They are few in number and their linkages to policy dialogue are not obvious. Findings: Performancebased Management Quality of CSPs and Selectivity Managing for results was increasingly factored into the Bank s strategies in DRC during the review period. However, owing to weak statistical and national monitoring/evaluation systems and a failure to implement recommendations, the Bank s monitoring and supervision mechanisms neither functioned well nor enhanced the effectiveness of strategies and programs. Implementation of the Paris Declaration and the Principles of Good International Engagement in Fragile States Implementation of the Principles of Good International Engagement in Fragile States ³ is unsatisfactory. This finding is partly due to the difficult context in DRC (weakness of the State and magnitude of needs). The Bank contributed to the implementation of principles aimed at improving aid effectiveness in DRC under the Paris Declaration (2005). Complementarity and Synergies Synergies between Bank operations in DRC are not optimal and differ from sector to sector. The potential for synergy between road, agricultural and environmental projects was not exploited. Furthermore, there was no capacity building strategy that cuts across the various areas of intervention. An IDEV Country Strategy Evaluation Overall, the quality and selectivity of CSPs have not been satisfactory despite an improvement over the review period. Bank strategies lack of consistency in the choice of pillars that change with each CSP, without any real common denominator, and by the sheer diversity of intervention areas. This situation is not conducive to consolidating experience and weakens the effectiveness of resources raised to monitor operations. Leverage Leverage effects are evident in various forms, with the outcomes varying from sector to sector. The most emblematic is the Bank s involvement in the development and promotion of the INGA 3 project which should allow for considerable investment by public and private partners. Leverage effects can also be observed in the social and transport sectors.

14 4 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Country Performance DRC performance in its cooperation with AfDB improved during the review period, mainly with development of the capacity to define and manage sector reforms. However, several shortcomings remain, in particular: weaknesses in the statistical apparatus; deficiencies in budget execution; inadequate mobilization of counterpart funds; precipitous implementation of decentralization; shortcomings in assistance coordination; and very limited involvement of line Ministries in project monitoring. Recommendations The evaluation proposes four recommendations as follows: 1. Better focus the Bank s intervention strategy in DRC on areas of comparative advantage with potential for catalytic effect on factors of fragility; 2. Improve quality at entry for Bank operations in DRC; 3. Improve the sustainability of operations through coordinated efforts at various levels, strategy formulation, preparation of interventions, and policy dialogue; and 4. Improve the monitoring/evaluation mechanisms of the Bank s strategies and interventions in DRC.

15

16

17 Management Response 7 Management Response Management welcomes the outcome of the evaluation conducted by the Independent Development Evaluation Department on the strategies and programmes implemented by the Bank in the Democratic Republic of Congo (DRC) over the period. The evaluation specifically covers the strategies, operations and policy dialogue implemented through various funding instruments in the DRC during the period. As part of the Bank's comprehensive evaluation of development results (CEDR), it seeks to examine the specific nature of the Bank's actions in the DRC, a transition state, identify recommendations to improve the Bank's assistance and inform the preparation and operationalisation of future strategies in the country. Overall, Management agrees with the conclusions of the evaluation, which highlight the need to (i) focus the Bank's intervention strategy in the DRC on the areas where it has a comparative advantage, to better address the fragility factors; (ii) enhance the quality at entry of Bank operations in the DRC; (iii) improve their sustainability; and (iv) improve the monitoring and evaluation of cooperation and intervention strategies. Introduction The evaluation approach was based on two main themes: the achievement of development outcomes and the performance-based management of Bank interventions. The evaluation examined relevance, effectiveness, efficiency, sustainability, knowledge and advice on policy formulation, whilst taking into account results-based management as well as country performance and fragility. During the evaluation period, four Country Strategy Papers (CSPs) covering the periods , , and were implemented by the Bank through 63 projects with a total funding of approximately UA 1.2 billion. Economic and social infrastructure accounts for almost 80% of the total amount committed under this portfolio. Management welcomes the recommendations of this evaluation, which will help improve the effectiveness of the Bank's assistance and the quality of its future cooperation strategy in the DRC. Relevance Management welcomes the following findings of the evaluation: The Bank's CSPs during the period under review reflect the fragility of the DRC and have accompanied the country in its transition from a post-conflict country to a country faced with development issues; The three pillars of intervention specific to fragile states, which make up the Fragile States Facility (FSF), proved relevant in the DRC; and Strategies and interventions in the DRC are broadly aligned with the country's various strategies and the Bank's overall orientation. Management recognises, however, that the Bank should make efforts to strengthen inclusiveness in the next country strategy, with a view to (i) better An IDEV Country Strategy Evaluation

18 8 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report addressing gender inequalities, youth employment, regional disparities and green growth; and (ii) obtaining an integrated analysis of the fragility factors of the country. It wishes to underscore that the fragility lens recently developed by the Bank should facilitate this analysis. Efficiency Management notes that the effectiveness of the Bank's assistance in the DRC was rated as moderately satisfactory by the evaluation. It welcomes the fact that the evaluation highlighted the effectiveness of Bank-financed projects in the transport and social development sectors. The Nsele-Lufimi and Kwango-Kenge road rehabilitation project made it possible to link the City-Province of Kinshasa with the Province of Bandundu, one of the DRC s breadbaskets, and to reduce travel times between the two regional capitals from over two weeks to just four hours, thus making it much easier to transport commonly consumed agricultural produce to Kinshasa. The project enabled nearly 200,000 additional households to engage in agricultural activities. The Eastern Province Health Care Development Master Plan Support Project (PAPDDS) has positively affected the quality of health care provision in part of the former Eastern Province by rehabilitating, building and fitting out infrastructure, and providing staff training. Finally, after the completion of the Project in Support of Post-Conflict Socio-Economic Reintegration of ex-combatants (PARSEC), pilot farms have remained active and they ensure food supply to the ex-combatant beneficiaries. These farms annually supply the local markets with around 222,000 kg of agricultural produce, kg of livestock products and 5,040 kg of fish products. Management notes the difficulties of implementing projects in the social sector; the lessons learned will help to better prepare and implement future operations in this sector. In terms of economic and financial governance, the evaluation highlights the positive outcomes achieved by the Emergency Programme to Mitigate the Impacts of the Financial Crisis (PUAICF). This programme contributed measurably to restoring the macroeconomic equilibrium of the DRC and to the country s reaching the completion point of the HIPC Initiative in July The Bank also contributed to boosting human-resource-development capacity (public administration, public finance and statistics) through a number of projects that were not sufficiently implemented to be included in the evaluation. Management notes that it is not possible to assess the performance of Bank-financed projects in the energy and industry (mining and quarrying) sectors because of their low implementation rate. In fact, the project in the industry sector was only recently approved. For the energy sector, the low level of execution can be explained by delays in the reform of the sector, particularly the reform of the National Electricity Company (SNEL), the main executing agency for the sector's projects; the complexity of operations (cross-disbursement conditions between several partners, rehabilitation operations, multiple simultaneous operations); the operational problems of the execution units; and the lack of expertise in this field within the Bank's Office in the DRC (COCD). The design of the latest energy sector operations, in particular the PAGASE Project approved in December 2016, takes into account lessons learned by: Paying attention to quality at entry (technical prerequisites, coordination). Ensuring that the execution unit is appropriately positioned and operates on the basis of collaboration with specialised national entities for the execution of certain activities and the use of international expertise for the transfer of know-how. Involving a monitoring and evaluation expert. Keeping the need for mobilising counterpart funds as low as possible. In addition, improving the governance of the energy sector through support to the undertaken reforms, is at the heart of the PAGASE project, approved by the the Bank in December 2016.

19 Management Response 9 In 2016, a recruitment process to provide COCD with expertise in energy was not successful. The issue will be revisited in the new model of development and service delivery so that an appropriate solution is definitively found. Management takes note of the concerns raised by the evaluation in the agriculture and rural development sector, where results have been less conclusive, notably because of various weaknesses in project implementation: Certain equipment acquired under the projects and supplied to the producer organisations was not used, because the farmers did not receive adequate training (e.g., in the Agricultural and Rural Sector Rehabilitation Support Project (PARSAR) in the Bas-Congo and Bandundu provinces. Infrastructure such as farm feeder-roads and market infrastructure has not been maintained. The Government s counterpart contribution has not been paid, negatively affecting project outcomes in this sector. To temporarily minimise difficulties related to the non-payment, the Bank's Management authorised the financing of all the resources earmarked for certain operations in this sector for example, for the Project for the Reinforcement of Socio-economic Infrastructure in the Central Region (PRISE) and road projects in which the Government's counterpart contribution consists only of the provision of buildings (offices) and staff to manage the project. Management will pursue dialogue with Government authorities to ensure the Government s effective contribution to the implementation of the projects. It should be noted that non-payment or partial payment of counterpart resources reflects a low degree of country ownership of the projects and is mainly due to budgetary constraints and the lack of political will. For new projects, the Bank will ensure that: (a) the country complies as far as possible with the provisions of the Bank's Expenditure Policy (10%): in the case of a project to consolidate the economic fabric currently under preparation and whose approval is expected before the end of March 2017, the amount of the national counterpart is 10% of the total cost of the project; and (b) adequate budgetary allocations are provided for in the annual budget acts for each project. The Bank will then agree with the Ministry of Finance and the sectoral Ministry on a timetable for disbursement of these resources in accordance with the timetable for project implementation. Issues related to the maintenance of infrastructure (including rural roads) are discussed in the paragraph on sustainability. Effects on Fragility Factors The Bank is a highly committed partner in the fight against fragility in the DRC. The evaluation notes that the Bank has focused on three types of fragility factors, in line with its mandate: (i) growth factors that are heavily dependent on natural resources at both national and local levels; (ii) factors related to livelihoods or the fight for survival; and (iii) factors related to the capacity and legitimacy of state institutions. Management is pleased that the Bank's assistance has yielded positive outcomes in institutional capacity, economic governance and economic growth. However, it recognises that there was little progress in diversifying the economy and improving living conditions in the critical provinces. The evaluation notes that the Bank's support did not allow the country's economic structure, still highly dependent on the international prices of its primary export ores, especially copper, to truly diversify. Concentration on state structures to the exclusion of the private sector and civil society is also viewed as a hindrance in certain programmes. Management is aware of these inadequacies and has already applied corrective measures, including Better management to ensure economic diversification by optimising support to the agriculture sector (agro industrial parks, youth entrepreneurship in agriculture and agro industries); The continuation of energy projects to remove the sector constraints; An IDEV Country Strategy Evaluation

20 10 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Support for national structures seeking to improve the investment climate; and The Bank's commitment to support the preparation of the National Strategy for Export Diversification. In addition, the Bank has involved civil society and local nongovernmental organisations more closely by recruiting local implementation agencies to implement several operations, including the Project to Strengthen the Socio-economic Infrastructure in the Central Region, the Rural Infrastructure Development Project (PADIR) and the Integrated REDD + Project in the Mbuji-Mayi Kananga (PIREDD-MBKIS) Basins, approved respectively on 10 November 2011 and 11 September 2013.The experience proved to be generally positive. The Bank will evaluate this practice at the end of these operations with a view to extending it to future rural infrastructure operations. Sustainability The evaluation of the sustainability of Bank operations in the DRC revealed many shortcomings that require Management's full attention: The limited technical soundness of certain projects: work at all stages of the process must meet international quality standards including feasibility and design studies, the procurement process and the services of supervisory and supervisory offices, technical audit, and execution of the works. Low economic and financial viability, due to weaknesses in policies governing road maintenance and, above all, to the failure of the national (or subnational) government to cover the equipment-operating budgets established in Bank operations. Low institutional sustainability: in general, DRC's systems and capacities are not yet sufficiently developed to ensure that the project's positive outcomes last after its completion. Gaps in the environmental and ecological sustainability of infrastructure developed in various sectors (transport, agriculture and, to a lesser extent, health). Emphasis should be placed on the design and construction of infrastructures that consume a minimum of non-renewable natural resources and incorporate the new climate change implications. This implies that specialists must have a good grasp of the environmental impacts of infrastructure and must share their knowledge and experience to strengthen their technical capacities. Management is aware of the need for substantial progress in ensuring the sustainability of operations. This year it will, jointly with the DRC, initiate a strategic reflection on the issue, based on the findings of this evaluation. It nevertheless wishes to highlight several initiatives the Bank has already taken in agreement with national authorities to strengthen the sustainability of its operations in the country initiatives that it will reinforce: Taking maintenance aspects into account from the design stage of new operations, particularly in energy, as in PAGASE and the Peri-Urban and Rural Electrification Project (PEPUR). Systematically conducting feasibility studies to prepare infrastructure projects and improve their quality at entry (recent feasibility studies are described in Recommendation 2). Supporting the reform of public sector companies in the fields of transport and energy that is, improving their operational performance and financial stability to ensure that investments remain sustainable. For example, PAGASE supports the reform of the National Electricity Company, and the Priority Air Safety Project supported the reform of the Régie des Voies Aériennes. Tethering project implementation units to permanent administrative structures; working collaboratively with national entities that specialise in certain activities; and looking to international

21 Management Response 11 expertise to transfer skills and knowledge, as in the PRISM, PADIR and PAGASE projects. In transport infrastructure, the second-generation National Road Maintenance Fund (FONER) owes its existence to the recommendations of the technical and financial partners of the DRC. FONER represents a major step forward in comparison with the traditional road fund, whose resources were used to finance investment work (new works, disaster response, maintenance work, capacities, etc.). The resources raised under the second-generation FONER are paid into a single account for road maintenance work, reflecting the country's willingness to finance the maintenance of road infrastructure. As lead partner of the Infrastructure Thematic Group, the Bank is very much engaged in dialogue with the Government and other partners on this issue. In new road projects, the Bank intends to finance maintenance over the two years following the final acceptance of a road; during that time, the country can set up the mechanism that will enable it to take over subsequently. Contracts for maintenance of part of the RN1 (financed by the Bank and the European Union) supported by the FONER have been awarded, and work is expected to start shortly. As for rural road maintenance, in collaboration with the financial partners the country has established a system that has been deemed effective thus far. Structures on the rural roads to be rehabilitated are now made of durable materials. Local Road Maintenance Committees (CLERs), comprising residents of the villages crossed by rural roads, have been set up. The CLERs are trained by the Farm Roads Department to maintain rural feeder roads, and they can obtain an annual subsidy from the FONER for the maintenance of rural roads. This system is already used for all new rural feeder roads financed by the Bank to ensure their sustainability. The rehabilitation works on the Kayala-Kitangua-Katanga and Kitangua-Shaytengo (80 km) roads financed by the Bank in connection with the development of the Loange-Pont Lovua road are virtually complete. The installation of the CLERs for the maintenance of these roads took place during the one-year warranty period, and as soon as the final reception of the works is pronounced, the CLERs will take over the maintenance. Efficiency The evaluation notes that the Bank's overall efficiency is not satisfactory, as most operations have experienced delays. These delays are caused by three types of factors: (i) those related to the country context, (ii) those attributable to the Government, and (iii) those attributable to the Bank. The first two factors are largely beyond the Bank's control; however, the DRC Country Office maintains an ongoing dialogue with the Government, which has resulted in recent progress in the ratification of two loan agreements by Parliament and fulfilment of the conditions precedent to the first disbursement. In newly approved projects in the agriculture and energy sectors, the Bank will pursue efforts to build on progress made in loan ratifications and to tackle the delicate question of regular and timely payment of counterpart funds. The evaluation appropriately notes that the disbursement rate under the portfolio improved when the Bank's Country Office opened in 2007, rising from 19.3% in January 2008 to 31.9% in February 2012 and then to 38.96% by the end of In addition, the overall performance of the portfolio has improved over time. The portfolio performance review conducted in December 2015 rated the overall performance satisfactory, with a rating of 2.5 on a scale of 3, up from 2.4 in 2014 and 2013 and 2.1 in COCD achieves these results through proximity monitoring involving the following: Quarterly meetings with the implementing agencies to review the implementation of the projects, particularly any difficulties encountered and the solutions to remedy them; Work sessions organised within the projects to discuss specific concerns; Regular exchanges between COCD disbursement and procurement officers and the project trust experts, to permanently strengthen their capacities and improve the quality of the files received; An IDEV Country Strategy Evaluation

22 12 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Supporting project implementation units in the use of national procedures in national tenders; the Bank is ahead of the World Bank in capitalising on its experience in this area; Support to the supervisory bodies (General Directorate of Public Contracts and Public Procurement Regulatory Authority) with a view to the full use of the country system in operations financed by the Bank. Management is aware that in the energy and governance sectors, which account for 17% and 10%, respectively, of the Bank s ongoing national-level commitments, the dearth of sector specialists constitutes a major obstacle and explains certain delays in file processing. It proposes to examine this issue as part of the implementation of the Bank's new development and service delivery model. Knowledge and advice on policymaking Management notes with satisfaction the evaluation s finding that the Bank is perceived to be an important partner of the country, particularly in the water, sanitation, transport and energy sectors. In terms of economic governance, the evaluation highlights the Bank's commitment to engaging in dialogue with the DRC authorities, notably in supporting the country s efforts to reach the decision point (2003) and subsequently the completion point (2010) of the HIPC initiative, by clearing arrears. It should be noted that, given the current difficult economic situation in the DRC, the Bank plays a leading role in the dialogue with the national authorities and other development partners to ensure that the assistance provided is adapted to the needs and challenges at hand. The evaluation also noted weaknesses in other areas: Analytical work carried out by the Bank during the review period, which was too limited to adequately support the political dialogue; and The Bank's involvement in dialogue with civil society and private sector stakeholders, including through direct support to these stakeholders. Management has noted these weaknesses, which it will address by issuing analytical and sector-specific notes to inform the Bank's future assistance strategy in the DRC. However, it wishes to emphasise that, in 2016, the Bank supported the preparation of the forward-looking studies that informed the preparation of the National Strategic Development Plan (NSDP), in particular the Vision Paper for In addition, Management will evaluate actions already taken to involve civil society and the private sector in the execution of current projects (through the local implementation agencies), with a view to replicating them in future operations. Results-based management The evaluation highlighted weaknesses in the quality and selectivity of the Country Strategy Papers (CSPs) and the implementation of resultsbased management principles. Although there was improvement over the evaluation period, Management is aware that the quality of CSPs in the DRC still needs to be improved through: An integrated analysis of the country's fragility factors, as mentioned earlier, and a demonstration of how interventions at different levels will influence these factors and strengthen the country's resilience; Greater emphasis on cross-cutting themes (in particular gender and environment); Emphasis on complementary analytical work needed to deepen the analysis; and Stronger links between the different pillars of the CSP. Management nevertheless wishes to

23 Management Response 13 emphasise that the change over time in the Bank's areas of intervention should not be perceived as inconsistency, as noted by the evaluation, but rather as evidence of the Bank's flexibility in adapting to the country's needs and priorities. Management is also aware of the need to increase strategy and portfolio selectivity. As the evaluation noted, the pillars of the different CSPs cover broad thematic clusters (economic and financial governance, economic and social infrastructure), which in fact cover a wide variety of sectors of intervention. As a result, despite the Bank's commitment to greater project selectivity, the areas covered by the portfolio remained too broad. To achieve greater impact on the ground, therefore, it is necessary to narrow the areas of intervention in future strategies and take into account the comparative advantages of the Bank. The examples below for the agriculture and energy sectors illustrate this point. The Bank is one of the principal partners in the agriculture sector in the DRC. Its previous interventions in the sector have focused mainly on the development of rural infrastructure, the revival of agricultural production and the management of natural resources, especially in the five southern provinces of the country. It has also funded the Agricultural Sector Study and the National Agricultural Investment Program, which are currently guiding the interventions of all stakeholders (e.g., World Bank and IFAD) in this sector. Finally, the Bank is very much involved in the transformation of the agriculture sector, in line with the objective of economic diversification. It supports agribusiness and the youth entrepreneurship project in the sector and finances feasibility studies for the development of agro-industrial parks. Its many previous interventions, as well as those now under preparation (feasibility studies), give the Bank a clear comparative advantage in the agriculture and rural development sector in the DRC. The Bank expects to capitalise on its experience in this area and to correct in future operations the weaknesses highlighted by the evaluation. The Bank is also one of the most active partners in the energy sector in the DRC; for nearly a decade it has been assisting the country in developing its energy sector. Its interventions in this sector, which represent about 17% of its current commitments in the country, focus mainly on electricity infrastructure. A recently approved project addresses the governance of the sector, notably by setting up key institutions to guarantee the success of reforms (in particular, reforms of the structures responsible for regulation and rural electrification). The Bank is also financing studies for the development of the Inga 3 project and has provided resources for studies on the development of renewable energies. Current interventions, as well as those under preparation (feasibility studies), give the Bank a comparative advantage in this sector in the DRC. Indeed, they constitute a bank of well-defined projects whose realisation will be essential to the development of the energy sector. The Bank will capitalise on its experience in this sector, which is essential to support the country's economic diversification and transformation. In terms of development-results-based management, the evaluation notes that the Bank paid greater attention to monitoring the results of its interventions during the period under review. However, these efforts have encountered varying difficulties at both the strategic and project levels: An inadequate national statistical system and a poor monitoring and evaluation system in the Ministry of Planning and line ministries, Inadequate indicator quality and poor coordination within the results chain, and Weak correlation between the CSP and project results frameworks. Management is already working on some of these factors; in particular, it aims to strengthen the national statistical system by implementing the Statistics and An IDEV Country Strategy Evaluation

24 14 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Public Finance Institutional Support Project (PAI-STAT- FIN), an ongoing monitoring and evaluation system for projects and programmes within the Project and Programme Monitoring Unit of the Ministry of Finance. In future, the Bank will give greater attention to the quality of logical framework indicators in CSPs and to their correlation with project indicators, in accordance with the relevant Directives. The Bank is also revising the logical framework and format of the CSPs to further enhance their quality. The Bank, through its Country Office, is highly committed to coordinating aid in the DRC. The Bank is currently the lead partner for the Infrastructure and Statistics thematic and sector groups. The Country Office actively participates in the monthly Partnership Coordination Group meetings and other sector-specific framework meetings, including in the areas of economic and financial governance, agriculture, and water and sanitation. In this respect, Management is pleased that the evaluation has highlighted the Bank's positive contribution to implementing the five Paris Declaration principles, thereby contributing to improved aid effectiveness in the DRC. Management will pursue its work to strengthen complementarities, seek to establish synergies between the Bank's interventions and those of other partners operating in the country and optimise the leveraging impact of its interventions in various sectors.

25 Management Response 15 Management Action Record Recommendation Management Response Management concurs with the main lessons and recommendations of the evaluation, which will inform the design of future strategies and operations in the Democratic Republic of Congo. RECOMMENDATION 1: Focus on the Bank's operations strategy in the DRC on areas of comparative advantage in order to act catalytically on fragility factors. The Bank's next DRC strategy should be more selective and based on an integrated analysis of fragility factors, while prioritising sectors with a comparative advantage (e.g. agriculture and rural development, or energy). Given fragility-related challenges in the DRC (lack of infrastructure, rural poverty, weak sustainable development objectives and capacity, environmental challenges, etc.) and the Bank's limited resources, a potential way forward is to prioritise a strategy focusing on structural investments that promote green growth. The areas for catalytic investment could include (i) agricultural infrastructure (farm feeder roads, structures), and/or (ii) the promotion of environmentally friendly agriculture (including agroforestry) that creates jobs (family and small processing enterprises), and / or (iii) energy production from renewable resources, including the development of the country's hydroelectric resources. Moreover, in view of the critical importance of improving economic governance (at all levels) as a key to sustainable development in the DRC, strengthening economic governance, with a capacity-building component whose impact is both significant and government-wide (central and decentralised services of the national administration and provincial administrative services) could constitute a complementary strategic component. AGREED. In line with the recommendations of the evaluation, Management will ensure that more rigorous selectivity is applied to the sectors of intervention under the future CSP. The preparation of this strategy will benefit from: The outcome of the updated study on DRC's fragility factors, conducted by RDTS in 2016, and application of the fragility lens, to reinforce the analysis of fragility factors in the strategy. (The mid-term review of the CSP, approved by CODE in June 2016, has already yielded an integrated analysis of fragility factors). The upstream preparation of analytical and sector-specific notes. The emphases proposed by the evaluation (agriculture, energy and economic governance) will inform the design of the CSP, as will close attention to green growth investments. The CSP focus areas will be selected on the basis of their alignment with four main criteria: The country's priorities, as reflected in the National Strategic Development Plan (NSDP); The Bank's long-term strategy orientations and five key priorities; The interventions of other development partners in the DRC; and The comparative advantages of the Bank highlighted in the paragraph on managing for results. An IDEV Country Strategy Evaluation

26 16 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report RECOMMENDATION 2: Improve the quality at entry of the Bank's interventions in the DRC, in particular to take into account the country's constraints. Given the limited quality at entry of the Bank's interventions in the DRC, it is necessary to improve preliminary studies, in terms of quality and resources allocated, prior to implementing operations. More specifically, these studies should provide a more precise definition (compared to past approaches) of the strategy for taking into account the various constraints affecting project implementation, namely (i) security and fiduciary risks, (ii) institutional challenges linked to the absence of governance in public policy (both at the centralised and at the decentralised levels) and (Iii) logistical problems generated by the immensity of the country s territory, coupled with generally poor infrastructure (transport, energy, etc). Therefore, future interventions should be given special attention and be presented for funding only when their quality has been deemed satisfactory. AGREED. Management has already taken several actions to improve the quality at entry of the Bank's operations in the DRC. These measures will be further strengthened in the coming years, taking into account the constraints identified by the evaluation. Studies were undertaken before implementing a number of important projects: (i) in 2016 a Project Preparation Facility of UA 0.8 million was approved to finance feasibility studies for the Youth Entrepreneurship in Agriculture and Agri-Business Project; (ii) in September 2016 a grant of UA 1.53 million was approved to finance feasibility studies for the development of agro-industrial parks in Ngandajika, Kaniama Kasese and Mweka (ED-PAI); once the studies are completed, the project could be eligible for Bank financing over the next CSP cycle; (iii) the feasibility study financed by the Bank for the project to build the Brazzaville-Kinshasa Road-Rail Bridge, scheduled in the 2017 lending programme; and (iv) studies on the development of the Inga 3 Project, which will be jointly financed by the Bank and other technical and financial partners and for which over US$50 million has already been mobilised. With respect to institutional constraints, to minimise fiduciary risk and enhance project implementation, new projects will systematically include a support and capacity-building component. Because of the size of the DRC, as of the CSP, the Bank has limited its operations to the Central Region. During project preparation, this allows the Bank to focus on a target population with well-defined concerns and incorporate area-specific and well adapted solutions.

27 Management Response 17 RECOMMENDATION 3: Improve operations sustainability through coordinated strategy development, operations preparation and policy dialogue. Implementing the first two recommendations should have a positive effect on the sustainability of operations outcomes. A better and more harmonised strategy that integrates the specificities of the DRC and ensures enhanced operations quality, should improve sustainability. In addition, the issue of sustainability should be at the core of policy dialogue and subject to rigorous analysis in the design and implementation of Bank operations. Areas of particular concern are: paved and feeder road maintenance; human resource management in public administrations to improve the sustainability of capacity-building activities; the management of public finances to ensure that the administrations supported within the framework of a project actually receive, after the end of the project, the operating and capital budgets entered in the annual budget laws. Throughout the analytical process, it should be ensured that the said budgets will be effectively used to prepare and implement Bank operations. AGREED. Management will closely monitor the issue of sustainability in ongoing and future operations. To this effect, the Bank will undertake the following actions: Organising in 2017 a brainstorming workshop with the Government to identify a roadmap on the sustainability of the outcomes of Bank-financed projects in the DRC, based on the findings of this evaluation. The workshop will also discuss issues related to recurring post-completion costs to be borne by the State and local authorities with respect to infrastructure maintenance (particularly transport infrastructure) and staff trained under the projects. Defining an exit strategy (the Bank's disengagement) for each project to be completed, starting from Consistently using durable materials for feeder road construction, and relying on Local Road Maintenance Committees (CLERs) for periodic maintenance. Pursuing dialogue with the Government and other partners on the reform of the Road Maintenance Fund to enable it to play its role more effectively. RECOMMENDATION 4: Improve the monitoring and evaluation of cooperation and intervention strategies. In order to apply results-based management principles more thoroughly, project monitoring and evaluation systems should be enhanced by adopting a precise and rigorous project approach and strengthening the monitoring of impact indicators, particularly in areas most affected by lack of data, such as: (i) capacity-building at the level of individuals and organisations (public administrations, socio-professional entities, private companies etc.); (ii) youth employment; and (iii) the socio-economic status of beneficiaries, including women. This would also inform each CSP's completion report and the development of the next CSP. Capacity enhancement of the country office should also be borne in mind, especially in the context of the ongoing decentralisation, to facilitate efficient programme implementation. AGREED. Management will: Improve the logical frameworks for future strategies and projects, in line with existing practices. Step up its assistance to the National Statistical System (NSS) by comprehensively enhancing its technical and human capacities. The Directorate will also consider, within the framework of the future country strategy, the possibility of supporting the establishment of an effective NSDP monitoring and evaluation mechanism. Strengthen COCD's workforce, particularly in the energy and governance sectors, by mapping staff to the Country Office under the implementation of the Bank's new Business Development and Delivery Model. An IDEV Country Strategy Evaluation

28

29 Introduction 19 Introduction The Bank s strategies, operations and policy dialogue activities, implemented through various funding instruments in DRC, are channels for achieving the development goals agreed upon by the Bank and DRC in the CSPs ( ). Under that agreement, this evaluation, which is also a building block of the comprehensive evaluation of the development results (CEDR) of the Bank, presents the results obtained and the attendant factors of success or failure, and also appraises performance in the management of Bank operations. Its recommendations will be useful to stakeholders, including the Bank, the Government and civil society, and will guide the preparation and implementation of the Bank s Country Strategy Paper (CSP) for in DRC. Part I of this report presents the evaluation framework (purpose, objectives, methodology, and limitations) and the context of DRC, its main challenges and national development strategy. Part II is devoted to the Bank s assistance strategies in DRC from 2004 to 2015 and the evaluation results. Lastly, the report presents its conclusions and makes recommendations to the Bank. Evaluation Purpose and Objectives The evaluation was conducted to increase the effectiveness of the Bank s development actions in a transition country like DRC. It seeks to: (i) measure the results (relevance, effectiveness, sustainability, efficiency, knowledge and advisory services) of the Bank in achieving the objectives defined in the CSPs from 2004 to 2015; (ii) analyze performance in the management of Bank interventions (quality of design, partnership and leverage, results-based management, complementarity and synergy); and (iii) make recommendations to improve the Bank s future operations and strategies. Methodological Approach 4 Overall, the evaluation approach is broken down into two levels of analysis, namely: the strategic level based on: (i) analysis of the contribution by Bank assistance to results expected from broader frameworks of action; (ii) a focus on immediate and intermediate results levels; (iii) country and sector analyses; and the operational level based on a systematic and thorough analysis of the results of a sample of projects (PRA). The evaluation was based on the theories of change reconstituted from Bank assistance (Figure 3) and various projects. It focused on 63 projects from 9 sectors in which the Bank operated between 2004 and 2015 (Figure 4). The exercise was conducted through 20 evaluation questions (Annex 1 b), which specifically include aspects of fragility and were designed to meet the expectations of CEDR and the internal practices of IDEV pertaining to the evaluation of country strategies and programs. Based on these questions grouped by evaluation criterion, indicators were defined to measure the results obtained at each analysis level. A six-point rating scale per criterion 5 was used. For triangulation purposes, these indicators were determined based on quantitative and qualitative data from several sources (country team, government, local elected officials, civil society, private sector, project beneficiaries, and development partners) and following various methods, namely: documentary review, quick survey with questionnaire and semi-structured interviews, and direct observation. The sites visited and the respondents were selected based on geographical representation (Map of the country in Annex 3), level of project implementation with preference given to projects that had matured enough to warrant an evaluation of their results, and accessibility. Hence, 8 project results assessment An IDEV Country Strategy Evaluation

30 20 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Figure 1: Milestones of the Methodological Approach 1. Structuring of evaluative questioning 1.1 Formulation of sub-questions/criteria targeting evaluation questions and indicators or collection and analysis of information 2. Analysis of strategies and interventions 2.1 Analysis of strategic documentation 2.2 Analysis of interventions of the country/regional portfolio 2.3 Sampling of projects PRA 3. Pre-filling evaluation tools and formulating initial responses to evaluative questioning 3.1 Preliminary filling of PRA template based on documentary review 3.2 Preliminary responses to evaluation questions and identification of information needs to be covered during the mission 4. Collect and information analysis on the ground 4.1 Documents, individual/collective interviews with stakeholders, site visits, meeting of beneficiaries 5. Responses to the evaluation questions 5.1 Conclusions 5.2 Recommendations 6. Technical and synthesis reports Note: Author, IDEV. (PRA) reports were produced (representing 18% of the total portfolio and 4 of the Bank s 9 intervention sectors in DRC), as well as a country analysis framework, and strategic and sector analyses at country level. This report was prepared based on these various products. Furthermore, a stakeholders consultation workshop helped to verify the validity of the data collected and encourage ownership of the results. Quality control was ensured through internal and external peer review. Limitations of the Evaluation This evaluation faced some constraints, namely: (i) logistical arrangements to visit a sufficiently representative sample of sites due to the very large size of the country; (ii) a low project implementation rate in the energy, environment, industry/mines/ quarries and public finance sectors which limited evaluation of the effectiveness of Bank action in these sectors; (iii) the lack of data on the beginning of the review period and on the impact of Bank interventions due to a weak monitoring/evaluation system; and (iv) only 8 out of 63 projects (representing 18% of the total portfolio and 4 of the Bank's 9 intervention areas in DRC) were subjected to in-depth evaluation through a PRA (project results assessment). However, in addition to the PRA, the team relied on sector and strategic analyses, as well as a country analysis framework to prepare this report. Similarly, it tried to inform the evaluation criteria by triangulating data collection sources and methods.

31 Country context 21 Country context Main Development Challenges of DRC Geographical and Political Context units increased from 11 to 26 provinces. The milestones of political life, as well as commitments by the AfDB and other technical and financial partners, are outlined in Annex 5. The DRC is the second largest country in Africa after Algeria, with a surface area of 2.3 million km 2. It is located in Central Africa and straddles the equator. Between 2004 and 2015, its population grew from 52.5 to million inhabitants. It has a youthful population (55% under 25 years old; only 5.2% are above the age of 55 years) living mostly in rural areas (63% in 2004 and 60% in 2015). 6 The population density on the national territory is very diverse: 14 inhab. /km 2 in Equateur Province compared to 60 inhab. /km 2 in South Kivu. The city of Kinshasa had over 8 million inhabitants in 2012, and its population is expected to reach 12.7 million in Since the mid-1990s, DRC has experienced a series of conflicts, some of which have been large-scale. The key events that have marked the political life of the country over the past 15 years can be summarized as follows: (i) 1997: flight of President Mobutu, who had been in power since 1965, and the coming to power of Laurent-Désiré Kabila; (ii) May 1998 to late 2002: Second Congo War, which claimed many civilian lives; 7 (iii) January 200: assassination of Laurent-Désiré Kabila, replaced by his son, Joseph Kabila; (iv) May 2006: election of Joseph Kabila as President of the Republic (elections recognized as fair), followed by re-election in November 2011 (results challenged by the Opposition and criticized by the international community); (v) 2009 to 2013: resurgence of conflict in Eastern DRC followed by relative stabilization after the military defeat of the M23 movement in November 2013; (vi) the current period is marked by political tensions ahead of the scheduled 2016 elections, thus creating an uncertain political and security situation. The new territorial redistricting has been effective since 30 June 2015, with the country's administrative Economic Performance 8 According to estimates, the economic growth rate fluctuated, rising from 6.7% in 2004 to 8.5% in 2013, before falling back to 6.9% in 2015 following a slowdown, and after having plunged to 2.8% in 2009 due to the global financial crisis. Such economic performance, which exceeds the African average (4.8%), remains dependent on agriculture (21% of GDP in 2014) which employs 70% of the population and is characterized by low productivity leading to food insecurity and a nutritional deficit (43% of under-five children suffer from stunted growth), as well as on manufacturing industries (33% of GDP in 2014) which are hamstrung by obsolete production machinery, a limited capacity to use new technologies, the impacts of foreign competition, and energy sector shortcomings. 9 Extractive industries (including mining) represented 8.5% of GDP in Public revenue from mining is insignificant relative to the country's potential. According to the World Bank, 10 the mining sector tax revenue potential is 15 20% of GDP, or over 7 times its current contribution to Central Government revenue. Despite the several factors that fuel growth, the DRC economy is still affected by world prices of minerals; economic, political and institutional instability evident in the military spending pressure on public finances; and the security situation in East DRC. This background, coupled with energy sector weaknesses, and a poor business environment erodes confidence of the business community and undermines macroeconomic stability. An IDEV Country Strategy Evaluation

32 22 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Figure 2: Trends of DRC s Main Fragility Factors between 2004 and 2015 Regional factors National factors Local factors Micro-local factors Regional conflicts and convergence of transborder interests «Uncontrolled» and «predatory» security services «Uncontrolled» and «predatory» security services Displaced persons and land conflicts Identity antagonisms «Ethnic entrepreneurs»; i.e. relying on mobilization based on identity Growth but high dependence on natural resources Growth but high dependence on natural resources Livelihoods/struggle for survival Deep social divisions (ethnic/clan/province) and clientelism Weak State capacity and legitimacy / limited State presence, weak institutions, no rule of law Note: The colours correspond to the trend (positive=green; negative=red) and not to the situation (satisfactory or not) of each factor. Source: Author, IDEV. Status of DRC s Fragility, Challenges and Development Opportunities During the period under review, DRC was ranked among fragile States on the harmonized lists of most international organizations, particularly the AfDB, World Bank, Asian Development Bank, OECD and DFID. Its score based on country policy and institutional assessment (CPIA) criteria changed very slightly between 2006 and On a scale of 6, its overall score inched up from 2.61 to 2.65 before rising to 3.0 in The country's fragility stems from the interaction of various factors at regional and national levels, as well as at local and micro-local levels. Figure 2 below presents the main factors and their trends between 2004 and Although the DRC has recorded some positive trends, especially in economic growth, State capacity, and regional conflicts/armed violence, it continues to face significant challenges in several areas, such as: The fragile legitimacy of State institutions, as was demonstrated in the January 2015 violence sparked by a possible third term for President Joseph Kabila. No access to basic social services (education, health, water and sanitation). In the UNDP s Human Development Index (HDI), DRC was ranked 186th (out of 186 countries) in 2012 and 176th (out of 188 countries) in Only 47% of households use an improved drinking water source and 14% use improved sanitation facilities. 12 Although poverty declined significantly between 2004 and 2015, it still affects the vast majority of the population: the gross national income, which stood at USD 380 per capita in 2014 (Atlas method), is one of the lowest in the world. 13 Currently, 87.7% of the population reported lives

33 Country context 23 on less than USD 1.25 per day. 14 With regard to inequalities, the Gini index which was 39% in 2005 rose to 41% in 2012, reflecting an increase in inequality 15 over this period. The threat to forest biodiversity (112 million hectares), mainly due to the excessive exploitation of forest resources, and illegal occupancy of some national parks. This is compounded by the effects of climate change on agriculture, forests and the water resources network. However, the DRC has a lot of potential for its development, namely: its territory which is exceptionally rich in mineral and forest resources; the abundance of hydroelectric resources of which only a small portion is developed; its agricultural development potential due to the sheer extent of available farmland and the diversity of ecosystems and, finally, its central regional position which transforms the country into a junction between Central Africa, East Africa and Southern Africa. National Development Strategy To address the above challenges, the Government prepared successive programs presented in the I-PRSP ( ), PMPTR ( ), GPRSP-I ( ), and GPRSP-II ( ). Interim Poverty Reduction Strategy Paper (I-PRSP ): This strategy was intended to rehabilitate basic infrastructure so as provide minimum public services and support the economic recovery which began in 2002 after the war, through: (i) reconstruction of basic infrastructure in the agricultural and social sectors; (ii) capacity-building in planning and macroeconomic management; and (iii) reform support. Minimum Partnership Program for Transition and Recovery (PMPTR ): This is the partnership framework between the Government and donors to support transition and economic recovery pending adoption by the Government of a mediumterm development strategy resulting from the I-PRSP. It seeks to: (i) ensure political stability and security; (ii) accelerate economic growth on an equitable basis; (iii) improve governance and strengthen institutions; and (iv) mitigate and address the social crisis. Growth and Poverty Reduction Strategy Paper (GPRSP-I ): To reduce poverty, the main objectives pursued are broken down into five pillars, namely: (i) promotion of good governance and peace-building; (ii) consolidation of macroeconomic stability and macroeconomic growth; (iii) improved access to social services and reduction of vulnerability; (iv) HIV/AIDS control; and (v) promotion of community dynamism. Growth and Poverty Reduction Strategy Paper (GPRSP-II ): This strategy seeks to improve the living conditions of the people by laying a foundation conducive to economic diversification through: (i) consolidation of governance and peace-building; (ii) diversification of the economy, acceleration of growth, and promotion of employment; (iii) improvement of access to basic social services and development of human capital; and (iv) environmental protection and climate change control. An IDEV Country Strategy Evaluation

34

35 Bank Assistance Strategies and Program 25 Bank Assistance Strategies and Program Strategic orientations, Theory of Change, and Dialogue Over the period, four country strategy papers (CSP) guided the Bank's cooperation with DRC. There is no dialogue note for the DRC. However, each CSP sets out the themes that need to be addressed through policy dialogue. The main pillars and areas of dialogue per CSP can be summarized as follows: Between 2004 and 2015, the Bank s overall objective was to ensure equitable and sustainable economic growth so as to fight against poverty and build peace. Figure 3 above presents the causal Table 1: Strategic Guidelines and Dialogue Areas of the AfDB in DRC relationship between this general objective and Bank operations in DRC. Indeed, the Bank has gradually invested in several sectors in DRC through two pillars, namely: (i) economic and social infrastructure, including in the transport, energy, agriculture, environment, water and sanitation, and social sectors; and (ii) economic and financial governance. The arrangements made by the Bank to achieve policy dialogue objectives are very succinctly described in the CSP. They mainly relate to: (i) participation in and contribution to formal mechanisms for aid coordination with the Government; (ii) strengthening of the Government's capacity to coordinate the CSP Pillar 1 Pillar 2 Areas of dialogue DSP Rural development Social sectors Portfolio management; Preparation and implementation of the PRSP and access to the HIPC initiative; Governance and pursuit of reforms. CSP Economic and social conditions of poor communities in rural and semi-urban areas Good economic and financial governance in the public sector Good governance in public resource management; Social equity; Portfolio performance. CSP Support for good governance Promotion of pro-poor growth Implementation of emergency structural reforms on improving public finance and the business environment; Gender and the environment. CSP Development of infrastructure that supports private investment and regional integration State capacity-building with a view to increasing public revenue and establishing an attractive framework for private investment. Economic and financial governance; sector governance; improvement of portfolio performance; Strengthening of dialogue with civil society An IDEV Country Strategy Evaluation

36 26 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Figure 3: Theory of Change Assumptions P1 IMPACT Ensure balanced and sustainable economic growth to combat poverty and build peace Infrastructure is utilized (access and usage). Agricultural competitiveness and sustainability are consolidated. Longterm environmental effects are contained. Long-term effect Improvement of access to infrastructure and services; Consolidation of regional integration; Increased diversification of economic sectors. Reduction of green house gas emissions Immediate effect Infrastructure is properly sized and designed (integration and coherence). Agricultural development outputs are adapted to rural needs and conditions. Environmental outputs are integrated geographically and within the subregional institutional framework. Improvement of the transport logistical chain; Improvement of air safety; Increase in airport revenue; Strengthening of the structures in charge of the sector. Increased supply/ reliability of electricity; Increased energy exchange between countries; Reduced energy cost; Reduced cost of cement; Increased production of cement; Increased volume of investments in the electricity sector/ Currency savings; Increased food crop production; Infrastructure rehabilitation; Local development; Reduction of deforestation and increased carbon sequestration; Institutional capacity building. Direct and temporary and permanent job creation; Capacity-building for SNEL Infrastructure is constructed (mobilising labour), utilized and maintained. The necessary adapted inputs are provided for rural development and forest protection. The implementation capacity of programmes is improved. Products: Goods, Equipment or Services as a Result of Projects Land and air transport projects. Energy and industry / mining / quarrying projects Financial and non-financial inputs (Dialogue, Expertise, etc ) Source: Author, IDEV. Agriculture and environment projects.

37 Bank Assistance Strategies and Program 27 Assumptions P2 Improvement of food security; Improvement of social conditions (schooling, peacebuilding); Improvement of health conditions (coverage, reduction of morbidity/ mortality, including for children). Maintenance of economic and social stability; Strengthening of social inclusion and equity; Improvement of domestic resource mobilization. Political and social stability, improvement of the food security situation. Favourable international and regional economic context. Improved access to water and sanitation; Strengthening of the institutional framework and the capacity of stakeholders to ensure sustainable management of the Congo basin. Reconversion of excombattants; Strengthening of community participation and the capacities of decentralized health services; Education sector reform. Modernization of public finance; Capacity-building (PF, statistics, education); Public service reform; Facilitation of the payment of urgent public expenditure. Efficient economic and institutional framework that properly manages budget resources. Constructive dialogue and transparent interactions between the economic and social sectors and the Government. Pursuit of anticorruption efforts. An IDEV Country Strategy Evaluation Government commitment to reforms. Water and sanitation projects. Social projects Multi-sector projects (Economic and financial governance).

38 28 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report interventions of development partners; (iii) search for joint project implementation mechanisms; and (iv) joint portfolio reviews with some TFPs. The documentation consulted and the interviews conducted (November 2015) do not give a clear idea of the financial and human resources, specifically allocated by the Bank to these activities. The studies conducted during the period under review include two economic sector works (ESW), namely: a study on regional economic development in Bas-Congo for decentralization in DRC; 16 and a study on the investment environment in DRC. 17 However, no other analytical study could be identified and analyzed. Bank Portfolio in DRC Over the period, the Bank intervened in DRC through 63 projects worth a total of UA 1.2 billion. The average project budget was approximately UA 18.7 million. Among these 63 projects, 55 are country-specific and 8 are multinational projects having a DRC component. As concerns the mechanisms used, the ADF is heavy predominant with 91.7% of the budget committed over the period, followed by the Congo Basin Forest Fund (CBFF) with 3.16%, the ADB with 2.68%, the Fragile State Facility (FSF) with 1.28% and other financial instruments, each representing less than 1% of the total budget. With regard to the sector distribution of Bank operations in DRC (see Figure 4 above), economic and social infrastructure largely dominates as it accounts for nearly 80% of the budget committed during the review period.

39 Bank Assistance Strategies and Program 29 Figure 4: Sector Distribution of Bank Operations in DRC Agriculture 10.30% Environment 3.20% Ind/Min/Quar 2.60% Transport 33.30% Water supply & sanitation 15.10% Source: Statistics, AfDB Energy 16.70% Finance 0.01% Multisector 15% Social 3.80% An IDEV Country Strategy Evaluation

40

41 Results of the Evaluation of Bank Interventions 31 Results of the Evaluation of Bank Interventions The results are presented per evaluation criterion. Relevance Relevance is moderately satisfactory. The Bank's strategies in DRC are aligned on its general strategies and have supported the country through its evolution from a post-conflict situation to a development situation. However, they do not sufficiently deal with all the country's factors of fragility, thus weakening the overall relevance of the portfolio of operations. Table 2: Relevance Ratings Aspects of Relevance AfDB strategy and analysis of the fragility context Adaptation of assistance to changes in factors of fragility Intervention on the factors of fragility and strengthening of resilience Alignment of operations on the Bank s general priorities Adaptation of instruments and arrangements for better response to needs Integration of the new priority objectives and cross-cutting concerns into strategies and operations (gender, youth employment, regional disparities, green growth, inclusive growth) Overall rating of relevance Rating Moderately satisfactory Satisfactory Moderately satisfactory Satisfactory Moderately satisfactory Moderately unsatisfactory Moderately satisfactory During the period under review, the Bank's strategies analyzed the causes of fragility and took into account the continuously fragile state of DRC (Annex 7). However, the quality, particularly the comprehensive character of the fragility profile described by the CSPs, varies from one CSP to another. None of the strategies proposes an integrated analysis of these factors (dispersal of the analysis within the text of the CSPs) or indicates how the targeted objectives/expected results at various levels will make it possible to act on the factors of fragility and thus help to build the country s resilience. The linkage between Bank strategies and the overall national policy framework is strong. The CSPs are aligned successively on the Interim Poverty Reduction Strategy Paper (I-PRSP, ), the Minimum Partnership Program for Transition and Recovery (PMPTR) ( ), GPRSP 1 ( ) and GPRSP 2 ( ). Hence, throughout the period under review, the Bank s intent was to support DRC in its transition from a post-conflict situation to a development situation. Indeed, after supporting a management phase of the emergency and the political transition ( ) mainly by backing the emergency program for rehabilitation and reconstruction of socio-economic infrastructure (PMURR and then PMPTR) and strengthening of national capacity in key areas of planning and macroeconomic management, the Bank considered that support to: (i) 'smart' infrastructure that promotes private sector development, social cohesion and regional integration, and (ii) agricultural projects, combined with support to governance reforms and development of the government's economic capacity would yield strong and inclusive growth. Thus, Bank assistance, as proposed in successive CSPs, has essentially sought to address the factors of fragility (Figure 2) such as: robust growth dependent on natural resources at national and local levels and the struggle for survival (livelihoods) at the micro level. However, Bank assistance focused less on crisis prevention, social aspects and human development: PASE (Education Sector Support Project) and PAPDDS (Health Development Master Plan Support Project in An IDEV Country Strategy Evaluation

42 32 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Orientale Province) were approved in Subsequently, the Bank did not approve any more projects in these areas, whereas access to education and health are among the factors of fragility and major challenges in DRC. Similarly, for crisis prevention, only PARSEC (Support Project for Socio-economic Reintegration of Ex-combatants) and PUAICF (Emergency Program to Mitigate the Impact of the Financial Crisis) were scheduled, the latter being a very cyclical support. The Bank s strategies and operations in DRC are globally aligned on its priorities and general strategies. Infrastructure operations were conducted in 5 sectors, 4 of which are central to the Bank's operational priorities during the period, namely: agriculture and rural development, transport, energy, water and sanitation. Environmental interventions are among the priority objectives pertaining to climate change. Social operations are not directly aligned on the Bank s priorities and are justified more by the need to address urgent needs. The three intervention pillars specific to fragile States, which make up the FSF, proved to be relevant to the DRC. The first pillar made it possible to raise additional funding for major projects in water and sanitation, as well as energy sectors. The second pillar contributed to attainment of the completion point of the HIPC Initiative (July 2010). The third pillar was used in five projects to build the capacity of State structures. Although these projects are highly relevant, their amounts are very low (1.28% of the Bank's total portfolio in DRC over the review period) relative to needs. Moreover, resources were concentrated on State structures to the detriment of the private sector and civil society. challenges, particularly the abundance and diversity of natural resources, are generally well identified in the various CSPs. With the establishment of the Congo Basin Forest Fund (CBFF) in 2008, the Bank and its partners had the means to intervene directly in the DRC environmental sector, but the CSPs did not serve as a framework for targeting the resources raised through this Fund. Consideration of the environment was essentially guaranteed through the categorization of projects, environmental and social studies and the mitigation measures adopted. However, the implementation and monitoring of measures and/or expected outcomes to ensure sustainable management of projects is not systematic. The CSP completion report states that analyses of the results obtained through country strategies did not consider environmental effects. Effectiveness 18 Effectiveness is moderately satisfactory. As regards support for economic and social infrastructure, the results are satisfactory in terms of achievement of outputs and moderately satisfactory as regards the outcomes. Operations in the transport and social development sectors are the most effective. However, the results are less convincing in the agricultural and rural development sectors. Operations in the energy, environment and industry/mines/quarries sectors are not sufficiently advanced to assess their effectiveness. Table 3: Effectiveness Rating During the evaluation period, the Bank s strategies and operations in DRC were not sufficiently inclusive. The CSPs identify gender inequality as a key issue, but make no provision for any concrete action in this area. The same applies to regional disparities and youth employment, except in CSP which indicates a willingness to consider these issues. In general, the CSPs do not target the environment through a specific environmental objective. Only the issues and Sector Agriculture and rural development 19 Transport 20 Social development 21 Economic and financial governance 22 Overall Effectiveness Rating Rating Moderately unsatisfactory Moderately satisfactory Moderately satisfactory Satisfactory Moderately satisfactory

43 Results of the Evaluation of Bank Interventions 33 Agriculture and Rural Development Sector Projects in this sector (Agricultural and Rural Sector Rehabilitation Support Project in Bas-Congo and Bandundu Provinces (PARSAR), Agricultural and Rural Sector Rehabilitation Project (PRESAR) and the Lake Tanganyika Development Program (PRODAP)) are moderately unsatisfactory in terms of overall effectiveness. Indeed, although the expected outputs were achieved satisfactorily with an implementation rate exceeding 75%, this has not been the case with the achievement of outcomes, which records an average implementation of less than 49%. Analysis of the field mission documents (2015) shows that, in general, basic socio-economic infrastructure was constructed and outputs relating to production development, institutional support and capacity-building were achieved. For example, according to the PCR validated by the PRA, PRESAR helped to build the capacity of agricultural structures, through the training of 614 MINAGRI employees (target: 550), 280 MFI employees (target: 300), and 125 veterinarians (target: 125); the procurement of 188 pairs of oxen; the dissemination of 23,373 tonnes of food crop seeds (target: 22,800 tonnes); and the rehabilitation of 582 km of rural roads (target:) 837 km). However, with regard to impacts, it was noted in 2015 (field mission) that the farm-to-market roads rehabilitated by PARSAR, as well as market infrastructures had suffered degradation due to lack of maintenance. Moreover, the equipment given to farmer organizations (sorting machines, polishing machines, etc.) under the project were neither installed nor used in 2015, because farmers were not trained to use them. All this undermines achievement of the expected project outcomes such as facilitation of the supply of inputs and sale of agricultural produce which closely relate to the increase in farm income. In addition, PARSAR carried out training and sensitization activities among village seed organizations (VSO). However, it is estimated that by 2015, 80% of these VSOs were no longer operational. Furthermore, non-payment of counterpart contributions by DRC negatively affected the results of projects in the sector. Indeed, this created a huge debt (owed to companies and NGOs that worked under PARSAR 23 ) that has weakened the local economic fabric and neutralized the job-creation outcomes expected from the project. It also led to the non-execution (construction of piers and docks) or partial execution (construction of fishing monitoring buildings and crossing structures, rehabilitation of rural roads, construction of latrines and water points) of some major activities of PRODAP and PRESAR. Transport Sector Road projects financed by the Bank are concentrated on National Highway No. 1 (RN1), in accordance with national priorities to rehabilitate the major highways. According to the report entitled Socio-Economic Impact Assessment by Beneficiaries, 2012, validated by PRA, the Nsélé-Lufimi and Kwango-Kengé Road Project led to the rehabilitation of 164 km of paved roads and the construction of many related facilities, including 140 km of rural roads, as initially planned. 24 It emerged from the 2015 field mission that effectiveness in the achievement of outcomes is satisfactory for the main structure (the road). However, it is necessary to execute some ancillary works (drainage of water, cleaning of gutters), protect the slope in some localities and drain the runoff water around Nsele bridge. On the other hand, the field mission (2015) noted that effectiveness was lower for related works, particularly degraded rural roads, as well as market sheds and school fences that are of poor quality. With regard to outcomes, it was noted that improvement of the state of the road resulted in a sharp increase in the flow of staple agricultural consumer products to Kinshasa: according to the PCR validated by the 2015 field mission, the average traffic volume increased from 446 to 981 vehicles per day between 2005 and Furthermore, it is estimated that, in the project area, about 200,000 additional An IDEV Country Strategy Evaluation

44 34 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report households would take up agricultural activities and that agricultural production would increase by 60%. The travel time on the Nsélé-Lufimi road section reduced from 9 hours in 2005 to 2 hours in Energy, Industry/Mines/Quarries, and Environmental Sectors Operations in these various sectors have a low implementation rate. This is why their effectiveness was not assessed. Besides, an evaluation of the Congo Basin Forest Fund is underway at IDEV. Social Development Sector Projects in this sector (Education Sector Support Project (PASE), Health Development Master Plan Support Project for Orientale Province (PAPDDS) and the Support Project for Socio-economic Reintegration of Ex-combatants (PARSEC)) present moderately satisfactory overall effectiveness. Indeed, in the education sector, PASE achieved satisfactory results for having: (i) supported the regular production of statistics on education through the establishment of a functional system for managing education system information (SIGE); (ii) strengthened the institutional and human capacities of planning structures (in 2015, the evaluation mission was able to meet several trained persons who are still in service and are responsible for statistical analysis, the definition of sector strategies, and project formulation; and (iii) allowed for the conduct of studies to formulate sub-sector strategies (five thematic studies produced by international firms for the benefit of the three Ministries involved in the project (MEPSP, MAS, MESU) were used by the Government and donors, including the World Bank, as basis for the development of sub-sector strategies (EPSP, ESU, MAS) that help to revitalize the educational system). However, difficulties were encountered in the use of skills acquired abroad. For example, of the six senior officers sent out for long-term (9 months) training in Europe (in education planning and management), five have not returned. This high rate of staff losses undermines the objective of providing the Ministries with high-level officers. As regards health, PAPDDS did not achieve all the initially planned outcomes, mainly due to: (i) failure to provide the national counterpart contribution (non-construction of the office of the Provincial Directorate for Health, and non-rehabilitation of three offices of the health districts), and (ii) underestimation of certain costs (e.g. rehabilitation of two general hospitals in Buta and Bili). Overall, PAPDDS had positive impacts on the quality of health care in part of the former Orientale Province, through the rehabilitation, construction and equipment of infrastructure; 25 staff training; and, albeit belated, supply of medicines (422 health facilities supplied). This late supply sometimes leads to expiry of medicines and reagents upon delivery. According to the PCR, the curative care utilization rate in the project area surged from 10% in 2007 to 26% in 2014 (target: 30%; the proportion of post-operative infections declined from 7% in 2007 to 3.3% in 2014 (target: 2%) and the proportion of births assisted by qualified health personnel spiraled from 10% in 2007 to 78.4% in 2014 (target: 80 %). Similarly, visits to some sites in November 2015 (Isangi Referral General Hospital (HGR) and the Health Centres (HCs) of Yalokombe, Yalolia and Lilanda) confirmed an increase in attendance of health facilities following PAPDDS operations. For example, at Yalokombe health centre, the number of births increased from 10 to 15 per month after the project, compared to 5 or 6 before the project. At Yalokombe and Lilanda, health centre officials indicate that the intake capacity is now insufficient. With regard to the reintegration of ex-combatants, the PARSEC project was aimed at facilitating the conversion of these combatants through vocational training and self-employment in agricultural activities (reintegration farms) in the five eastern provinces. Available documentation does not allow

45 Results of the Evaluation of Bank Interventions 35 (lack of benchmark and target values) for determination of the overall project implementation rate, particularly the number of persons demobilized and reintegrated. On-site comments (2015 field missions) show that reintegration farms are active and ensure food security for ex-combatants who have settled down to peaceful relations with host communities. However, several facilities provided by the project for processing agricultural produce are not operational due to lack of resources. Certain water management structures have not been completed, even though the project period has been extended four times. this project created favorable conditions for implementing the Bank s subsequent support for public finance management. Since 2010, the country has embarked on a prudent debt policy by closely monitoring new commitments and resorting mainly to concessional lending. According to the IMF, DRC moved from a high to a low debt risk in This positive assessment of PUAICF should, however, not eclipse the persistent weakness of the country in public finance management which, despite some progress, remains low, judging from CPIA (Country Performance and Institutional Assessment, Table 4 below) indicator trends. 26 Support for Economic and Financial Governance During the period under review, the Bank funded four (4) projects to improve the macroeconomic situation and public finance management. However, only the effectiveness of the Emergency Program to Mitigate the Impact of the Financial Crisis (PUAICF) could be evaluated, since implementation of the other projects is not sufficiently advanced. PUAICF was designed to support balance of payments so that, after the financial crisis, the DRC can continue to finance its imports of basic products and emergency public spending. It achieved this goal by transferring UA 65 million to the Central Bank of Congo, thus helping to restore macroeconomic balance and facilitate attainment of the HIPC Initiative completion point in July Furthermore, Effect of Bank interventions on Factors of Fragility A correlation can be established between the Bank's operations and the positive or neutral trends in factors of fragility. The Bank did not act on all DRC s factors of fragility presented above in Figure 2 and does not intend to do so. Indeed, its mandate ( Contribute to the sustainable economic development and social progress of the Regional Member Countries, individually and collectively ) does not, for example, include direct involvement in political or security issues. However, it intervened essentially in areas relating to: (i) growth that is heavily dependent on natural resources at national and local levels; (ii) livelihoods or the struggle for survival; and (iii) fragility factors pertaining to the capacity and legitimacy of State institutions, by acting: An IDEV Country Strategy Evaluation Table 4: Public Finance Management Scores in DRC Criteria Debt management Economic Management Quality of public administration Source: AfDB 27 Score on a scale of 1 to 6 (1=Low; 6=High).

46 36 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Table 5: Real GDP Growth Rate Trends in DRC (in %) Source: World Bank, Data Bank. Directly on institutional capacities in the economic sector (positive trend). Indeed, according to IDEV Evaluation of Assistance to Fragile States ( ) and the current evaluation, the AfDB has contributed positively to reforms in public finance management and clearance of arrears to facilitate progress towards attainment of the HIPC Initiative completion point. However, capacity development results are limited by the fragmented approach adopted by the Bank and the Government, mainly due to the paltry amounts allocated to projects in this sector, and a focus on State structures to the detriment of the private sector and civil society (See «Relevance», «Sustainability» and «Did the Bank Make a Difference in DRC» sections). Directly on structural transformation (neutral trend): The Bank contributed to infrastructure development, especially in the water and sanitation and road sectors, although the projects have experienced delays and implementation difficulties. 28 However, its support operations did not lead to real diversification of the national economy, which remains highly dependent on the international prices of major mineral exports, especially copper. 29 This has negatively affected the development of other sectors and governance in the country. Indirectly on sustainable and inclusive growth (positive trend): Throughout the evaluation period, the DRC economy grew steadily, except in 2009 when it plummeted on account of the international financial and economic crisis. In the areas concerned, the operations implemented during the review period boosted agricultural production and facilitated trade. The effective support provided by the Bank to stabilize the macroeconomic framework (attainment of the HIPC Initiative completion point) has indirectly had a positive effect on growth by improving the country's attractiveness to investors. However, Bank s operations alone did not lead to real diversification of the national economy, which remains highly dependent on the international prices of major mineral exports, especially copper. Moreover, available data from the INS survey (2014) on social and economic inequality between households show that economic growth is not inclusive. Indirectly on livelihoods in critical provinces and territories in terms of stability (neutral trend): Over the review period, the Bank did not intervene in critical areas to ensure stability, especially in the eastern provinces. 30 It was thanks to its overall support for the economic governance of the country that the Bank indirectly played a role in the development of these areas. Based on the IDEV Evaluation of Assistance to Fragile States ( ) and the findings of this evaluation, the table below presents a brief evaluation of the Bank's contribution to sustainable strengthening of DRC resilience.

47 Results of the Evaluation of Bank Interventions 37 Table 6: Assessment of the Bank s level of Contribution to Factors of Fragility Outcomes Level of Contribution Identifiable Contribution Functional basic infrastructure in rural and semi-urban areas Medium Macroeconomic stabilization and institutional capacity Medium PUAICF PAM-FP PRECI PEASU Pinch PAPDDS Rural development projects (PARSAR, PRESAR, PRODAP) Nsélé-Lufimi and Kwango-Kengo road. Improved livelihoods in rural areas Limited Rural development projects (PARSAR, PRESAR, PRODAP) Private Sector Development Limited Creation of Advans Bank Congo, which supports access to microcredit Source: IDEV, 2015, based on the evaluation of assistance to fragile States ( ), 2011 DRC country report. Sustainability The sustainability of operations is moderately unlikely. The economic and financial viability of the achievements funded by the Bank is particularly low, mainly because of dysfunctions in the sector policies concerned and the absence of post-project support strategies. Table 7: Sustainability Rating Sustainability of Projects 31 Technical soundness Economic and financial viability Institutional sustainability and capacity-building Political environment and governance Ownership and sustainability of partnerships Environmental and social sustainability Overall Rating Rating Moderately unlikely Unlikely Moderately unlikely Improbable Moderately unlikely Moderately unlikely Moderately unlikely Overall, the technical soundness of achievements is moderately unlikely. Indeed, even though in most projects, the works (buildings, roads, etc.) were executed according to applicable standards and compliant with the prescriptions of the bidding documents, the fact remains that the materials supplied in some projects were of poor quality. For instance, under the health project (PAPDDS), visits made (November 2015) to the four (4) health facilities revealed: (i) the weakness and rapid deterioration of delivery beds and metal cabinets; (ii) an ill-adapted power supply system based on photovoltaic panels, which did not guarantee proper conservation of vaccines. In the agricultural project (PRESAR), one of the main activities is the largescale production of improved seeds by INERA, which is not equipped for such activity. Economic and financial viability is the criterion with the weakest performance. This is mainly due to inadequacies in the maintenance policy for highways and especially rural roads. Another cause is failure by the State (or provinces) to bear the operating costs of equipment and infrastructure provided through Bank operations. In several cases An IDEV Country Strategy Evaluation

48 38 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report (PRODAP, PARSAR, PARSEC, PAPDDS), economic and financial viability was reduced by the fact that projects failed to define strategies for defraying recurrent expenses or for attendant post-project management of equipment and infrastructure by the public administration or final beneficiaries. Institutional sustainability and capacity building are generally deemed to be moderately unlikely. Indeed, most of the projects reviewed contributed to institutional capacity building, especially the road project thanks to which the infrastructure unit of the Ministry of Public Works (MTPI) now controls the design, implementation and monitoring of investments, having received advisory support from international technical assistance, computer and office automation equipment, and training. However, the country's systems and capacities are still insufficient to ensure continuous flow of project benefits after completion. For example, under PRODAP, a co-management committee including State services, the naval police, civil society institutions, and associations of fishermen and fishmongers was established to ensure greater sustainability of project achievements, but it is not functioning efficiently due to lack of funding. Similarly, under PARSAR, the field mission to Bas-Congo took note of the disorganization of administrative services, absenteeism, lack of a work plan, and shortage of equipment and human resources in the institutions, especially in provincial offices. The policy and governance environment is unlikely. For agricultural projects and especially public finance projects, some achievements have been greatly weakened by the new administrative and political redistricting of the country (30 June 2015) and the postponement of provincial elections (September 2015). These hastily implemented decisions create a lot of confusion about the prerogatives of the different entities (decentralized services of the State, provincial governments, assemblies and administrations, etc.). As regards operations relating to rural roads, highways and health, dysfunctions in the sector policies concerned hamper sustainability of actions taken. Ownership and sustainability of partnerships show highly variable performance from sector to sector. Overall, this criterion is deemed to be moderately unlikely. In the rural development sector, the effectiveness of ownership is limited by the lack of operational means for structures (farmer organizations, the Ministry of Agriculture) supported by the Bank. In the road sector, ownership of reforms is limited (road maintenance, road safety), apart from missions of the Infrastructure Unit. In economic governance, there is relative ownership of public finance reforms by the administrative entities, but such ownership would be complete if the Bank s reform support was provided through intense and regular policy dialogue. Owing to vacancy of the public finance position in the Kinshasa office from 2013, the AfDB has not been able to maintain such dialogue with the intensity commensurate with the magnitude of its support for public finance reform. In the social development sector, activities under the Socio-economic Reintegration Support Project for Ex-combatants (PARSEC) and the Education Sector Support Project (PASE) are marked by significant ownership of their outcomes by beneficiaries. Indeed, following the documentary review and interviews in the field (November 2015), the ownership of PARSEC by beneficiaries (both men and women) is strong, as evidenced by the clearing and stumping of sites and related access roads, as well as the non-re-enlistment of demobilized combatants by armed groups. This is due to the successful partnerships established by the Implementation Unit of the National Disarmament, Demobilization and Reintegration Program UEPNDDR (supported by PARSEC) with civil society organizations and donors. However, partnerships with central or provincial Ministries and with the private sector are still too limited and hamper project sustainability. Regarding PASE, the strong ownership is justified by the integrated sector approach between the various Ministries of the sector, including participation in the project by all central directorates of education. The monitoring-evaluation mechanism was established with the Steering Committee and the focal points of the three Ministries of education, working closely with the implementation unit. The regular exchange of information on the project through the Donors

49 Results of the Evaluation of Bank Interventions 39 Consultative Committee and the Education Thematic Group strengthened commitments. It is within this framework that the sub-sector strategies of TFPs, including the World Bank (with its Education Sector Recovery Support Project PARSE) were developed based on thematic studies funded by PASE. PMEDE). For some projects, the initially scheduled duration was unrealistic in light of the set objectives and the DRC context. For example, the Nsélé-Lufimi and Kwango-Kenge Road project, PARSEC and PARSAR. Apart from the above, there are three (3) types of delay factors common to most of the operations, namely: Environmental sustainability is moderately unlikely. Gaps exist in the environmental sustainability of the infrastructure constructed in various sectors (transport, agriculture and, to a lesser extent, health). The implementation and monitoring of measures and/ or expected outcomes to ensure sustainable management of projects is not systematic, sufficient or completely successful. Moreover, outcomes prejudicial to the sustainable management of forest resources, not foreseen by the preliminary environmental analysis and not covered by mitigation measures, undermine the expected medium and long-term socio-economic benefits. Efficiency The Bank s efficiency is moderately unsatisfactory. Project implementation delays are a major problem. However, the opening of the Bank s local office in 2007 helped to improve the portfolio disbursement rate. Table 8: Efficiency Rating Efficiency of Projects 32 Cost-benefit analysis Cost-efficiency analysis Timeliness Implementation status Overall efficiency Appreciation Moderately satisfactory Unsatisfactory Moderately unsatisfactory Moderately unsatisfactory Project implementation delays are the main problem. For the eight projects eligible for project results assessment (PRA), the average time overrun rate is 56%. 33 Other projects also face significant implementation delays, especially in the energy sector (PEPUR and Factors relating to the context: insecurity; incompetence of audit firms and consulting firms responsible for works control and supervision; and insufficient cash flow for works companies. Factors relating to the Congolese Government: delays in: (i) the ratification of loan agreements by Parliament; (ii) the recruitment of staff deployed to project implementation units; (iii) the fulfilment of conditions precedent to first disbursement; (iv) the provision of Government counterpart funds; weak administrative and financial management capacities; and insufficient involvement of Ministries in project monitoring. Factors relating to the Bank: cumbersome and complex internal procedures for procurements and disbursements; 34 insufficient delegation of authority to the Country Office which is understaffed relative to the size of the portfolio (lack of energy and governance experts at the end of period); irrelevant choices in some procurement processes as in the Health Development Master Plan Support Project (PAPDDS) in Orientale Province where many medicines were not used by beneficiaries due to late delivery, very close to the expiry date. 35 The opening of a Bank Office in Kinshasa (December 2006) has had a positive effect on portfolio efficiency. This decentralized entity has affected the quality of dialogue with the Government and the monitoring of project preparation and implementation, although much decision-making remains centralized at Bank headquarters particularly formal approvals at project implementation stage. Furthermore, although linkage with the opening of the Office is not automatic, 36 there has been an improvement in the portfolio An IDEV Country Strategy Evaluation

50 40 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report disbursement rate, from 19.3% in January to 31.9% in February The cost-benefit ratio of operations was calculated for two of the eight projects eligible for PRA for which data was available, namely PRESAR (agriculture sector) and the Nsélé-Lufimi and Kwango-Kenge road (transport sector) project. In both cases, the criterion is rated as satisfactory or very satisfactory. This rating is based on a calculation of the economic rate of return (ERR) estimated at 17% for PRESAR and 24.4% for the road, while the opportunity cost of capital (at time of calculation of ERR) is estimated at 12%. 39 Regarding the cost-efficiency ratio, projects eligible for PRA show relatively efficient management of resources, with the exception of PRODAP (Lake Tanganyika fisheries management) for which certain equipment cannot be used without additional equipment or resources Knowledge and Advisory Services Apart from economic governance, the Bank's involvement in policy dialogue has remained insufficient. Analytical studies are few and have no clear linkages to policy dialogue. There is a big gap between the professed intent of the Bank in terms of policy dialogue in DRC and the results obtained. During the review period, there was an improvement in the Bank's efforts in aid coordination with the Government and other TFPs, especially with the opening of a regional office of the Bank in Kinshasa which strengthened its presence and facilitated its participation in aid coordination mechanisms. In financial terms, the AfDB was ranked 8th, 40 in 2012 and 2013, among the (bilateral or multilateral) institutions providing development aid to DRC. 41 The documentary review and interviews reveal that the AfDB is recognized as a key partner of the country, overall, and in the water and sanitation, transport, and energy sectors. As regards economic governance, the Bank has made a lot of efforts in dialogue with the country s authorities, including supporting DRC to reach the decision point (2003) and, subsequently, the completion point (2010) of the HIPC initiative. In other areas, the Bank's commitment as facilitator of dialogue, supporting the country in the implementation of its sector policies has often turned out to be weak, as it is limited to the production of studies that are not sufficiently promoted. 42 Apart from the dialogue with the Government and other development partners, the Bank's involvement in dialogue with civil society stakeholders and the private sector remains weak. The preparation and the mid-term review of the latest CSP ( ) has been the subject of broad-based consultations, involving the private sector and civil society representatives. Civil society organizations positively appreciate this overture of the Bank in their regard. However, they would like the Bank to be more committed to them and give them direct support (currently, only the CBFF provides such support). The Bank's analytical studies over the review period were neither programmed nor given any special follow-up. They are few in number 43 and their linkages to policy dialogue are not obvious. Indeed, no information filtered out on the use of these analytical studies, including their possible contribution to discussions held as part of the Bank's policy dialogue with DRC authorities. Summary: Did the Bank Make a Difference in DRC? The Bank's contribution to improvement of development factors in DRC is mixed. Indeed, the Bank was one of the key partners who ensured the resumption of international aid in DRC, through its operations and contribution to dialogue with the Authorities. After more than ten years of suspension of operations in DRC (suspension of disbursements following cancellation of the portfolio in 1996), cooperation resumed in 2001 through a post-conflict reconstruction strategy. In June 2002, the Bank approved the arrears clearance mechanism of DRC, thus normalizing

51 Results of the Evaluation of Bank Interventions 41 its relations with the country. In 2003, it continued its dialogue with national authorities and other TFPs to prepare the conditions for DRC's attainment of the decision point of the HIPC Initiative. 44 The Bank s specific intervention pillars for fragile States, evidenced by the FSF, were relevant. The first pillar helped to mobilize additional funding for major projects in the water and sanitation, and energy sectors (a grant of UA 5 million for the INGA site development support project and access to electricity (PASEL energy)). The second pillar was effective as regards operations that support public finance management structural reforms (PAM FP and PRECI), and cyclical support (PUAICF) through: (i) its contribution to attainment of the HIPC Initiative completion point in 2010; (ii) restoration of macroeconomic balances; (iii) creation of conditions conducive to other Bank support for public finance management; and its contribution to growth by improving the country s attractiveness to investors. However, the Bank has indeed made a lot of efforts in dialogue with the Authorities on economic governance, but has not done same for the other sectors. The Bank s analytical studies during the period under review are insufficient, and their linkages to policy dialogue are also insufficient. Furthermore, apart from the dialogue with the Government, the Bank's involvement in dialogue with civil society stakeholders and the private sector remains weak (cf. Section 4.5). The third pillar was used for (material and human) capacity building of State structures through the construction/rehabilitation of buildings, and the provision of office equipment and supplies, vehicles, communications equipment, and staff training. This option was relevant, in light of the extremely degraded situation of public services and the magnitude of needs during the post-conflict period, which required simultaneous support to all national recovery policies in several areas (health, education, water, etc.) and the strengthening of national cohesion. However, the amounts mobilized were paltry relative to needs (less than USD 3 million). Similarly, the focus was on Government services to the detriment of real consolidation of the activities of private sector stakeholders and civil society organizations. In several areas (agriculture and rural development, for example), this undermines the effectiveness and sustainability of operations given the success of Bank-supported actions that is based largely on the actual managerial and operational capacities of the management committees (e.g. for markets, warehouses or latrines), socio-professional organizations (e.g. seed producers unions) or private companies (e.g. microfinance institutions, input marketing firms or NGOs providing technical support to farmers). Over the period, the Bank's share in total official development assistance (ODA) was 4%, and 11% for multilateral ODA received by DRC over the period (Annex 4). In some sectors such as energy, transport, and public finance, the Bank's contribution is much higher than this average. This notwithstanding, the Bank did not enjoy the policy relevance to which it should be entitled by virtue of its status (African multilateral institution) and aid volume, during the review period. This discrepancy stems from the thematic dispersal of the portfolio and the Bank s irregular involvement in policy dialogue and aid coordination mechanisms. An IDEV Country Strategy Evaluation

52

53 Performance and Results-Based Management 43 Performance and Results- Based Management The orientation of Bank actions towards performance was moderately unsatisfactory in DRC. The shortcomings mainly relate to the quality and selectivity of CSPs, as well as implementation of the principles of resultsbased management. Table 9: Rating of Performance and Results-Based Management Performance and Results- Based Management Quality of CSPs and selectivity Performance management strategy Implementation of the Paris Declaration and the Principles of Good International Engagement in Fragile States Complementarity and Synergies Leverage effect mobilizing other resources Performance and Results- Based Management Rating Unsatisfactory Unsatisfactory Moderately satisfactory Moderately unsatisfactory Moderately unsatisfactory Moderately unsatisfactory Quality of CSPs and Selectivity Overall, despite an improvement during the review period, the quality of CSPs in DRC is unsatisfactory. While the four CSPs of the period include relatively detailed contextual and needs analyses, as well as intervention logics based on these analyses, they lack an integrated approach to the factors of fragility. Indeed, as detailed above in section 4.1, the CSPs present an analysis of the causes of fragility and mention the persistent fragility of DRC. However, the quality and comprehensive character of the fragility profile described in the CSPs vary from one CSP to another. None of the CSPs proposes an integrated analysis of these factors (dispersal of such analysis in the text of the CSPs) or indicates how operations at various levels will influence the factors of fragility to build the resilience of the country. Moreover, the consideration of cross-cutting issues (including gender and the environment) remains unclear. During the evaluation period, there was an improvement in the quality of CSP analysis, except for the CSP whose quality is unsatisfactory. According to the independent evaluation report on the quality at entry of ADF operations and strategies, the quality of CSPs at start-up in DRC in 2005 was deemed unsatisfactory in Thus, even though the Bank opened its office in DRC in 2006, its expected commitment to the country did not translate into an improvement of strategy during this period. However, the evaluation report on quality at start-up for CSP awards a score of 5 out of 6 to the Bank s contextual analysis and strategy design, reflecting a significant improvement in the quality of CSPs. Country strategies present analyses in terms of strengths, weaknesses, opportunities and threats. However, these analyses do not show how the strengths and opportunities of the country will be used to respond to identified challenges and address the weaknesses of the country. Lastly, the strategies do not refer to additional analytical studies that make it possible to deepen the proposed analyses. Besides, they do not refer to the Fragility Assessment Report of the Democratic Republic of Congo (October 2012). Following review of the various CSPs and their theory of change, the lack of consistency in the selected intervention areas and the diversity of the portfolio are striking. Each CSP suggested different pillars without any real substantive common denominator. This is not conducive to building experience and weakens the efficiency of the resources mobilized to monitor interventions. An IDEV Country Strategy Evaluation

54 44 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report The evaluation of selectivity at the strategic and portfolio levels is not satisfactory. The selectivity of the various CSPs is not strong at the strategic and global levels (the pillars cover broad thematic concepts such as economic and financial governance and economic and social infrastructure ), and at the sector level. Despite the project s commitments to greater project selectivity, the portfolio remained too broad in terms of the areas covered throughout the period. Between 2003 and 2007, the Bank intervened in a large number of sectors and its portfolio showed no clear choices. This stems more from the fact that CSP and CSP rather focused more on relevance to the needs of post-conflict country reconstruction (alignment on the Government s PMURR an PMPTR priorities 45 ) and the multidimensional nature of the economic and social crisis in DRC, than on the selectivity of the Bank's portfolio. Subsequently, structuring of the portfolio into two pillars, covering broad thematic concepts ( economic and social infrastructure pillar and the economic and financial governance pillar), gave the impression that there was focus on two areas identified as priorities. However, within these two pillars, the Bank's intervention was divided into a wide variety of sectors and the program of operations remained too extensive. The economic and social infrastructure pillar, actually covered six different sectors, namely: transport, energy, water and sanitation, agriculture and rural development, social development and the environment. Furthermore, in some areas, Bank support is significant, but is not clearly identified since the amount is diluted in projects with multiple components. This is the case with the education sector, which is similar to the situation of several projects in various sectors (PASE, PMURIS, PARER, PUAICF, PMR HR, PAI-STATFIN, rural development and infrastructure projects). This dispersal among several projects of a given sector makes it difficult to construct the intervention logic and assess the effects and impacts in the sector concerned. Furthermore, it undermines the Bank s visibility as well as coordination with other stakeholders in the sector. Indeed, several strategy papers and the successive completion reports call for improved selectivity of the Bank s portfolio (CSP ; CSP ; Report on quality at entry for CSP ). Besides, the comparative advantage of the Bank relative to other donors in the specialization areas retained in DRC is not clearly shown in successive CSPs. They present a mapping of the interventions of other TFPs without a detailed analysis of the Bank's comparative advantage relative to the operations of these TFPs in each sector. Managing for Development Results (MfDR) MfDR was increasingly factored into the Bank's strategies in DRC during the period. Indeed, the Bank paid increasingly more attention to monitoring of the outcomes of its operations, seeking to go beyond simple monitoring of the achievement of outcomes to gauging the degree of attainment of effects and impacts. Several elements attest to this, in particular: 46 (i) the systematic implementation of a results-based logical framework (RBLF) integrated into CSPs and projects; (ii) use of the results of national socio-economic surveys (demographic survey and health (EDS); National Survey on Employment, the Informal Sector and Household Living Conditions; etc.) and national information systems to achieve an annual follow-up of the results referred to in the CSP; (iii) assistance to the statistical services of Ministries, including the training of project managers; and (iv) implementation of an action plan to improve portfolio performance (studies, reports, annual portfolio reviews, supervision mission, etc.). However, efforts made by the Bank to improve the quality of the performance management system encountered different kinds of difficulties at the strategic and project levels, namely: (i) significant gaps in the national statistical system and the lack of a monitoring/evaluation system at the Ministry of Planning and in the line Ministries of projects financed by the Bank (except the Ministry of Finance 47 ) with the lack of a unified institutional framework describing the division of labor and the principles of information flow between the various bodies responsible for the production and analysis of data on the outputs, effects and impacts of public action; (ii) shortcomings related to the quality of indicators and articulation of the results chain, particularly for CSP and ; the

55 Performance and Results-Based Management 45 targeting and selection of performance indicators is not always relevant and measurable; delays in establishing the Poverty Observatory as part of GPRSP monitoring did not make it possible to provide reliable recent data for measuring poverty indicators; 48 (iii) linkages between the results frameworks of CSPs and those of projects are not always sufficiently explicit and precise; (iv) the results framework focuses more on outputs and less on outcomes and impacts; for instance, under the PARSAR, the logical framework of the project lays emphasis mainly on outputs and does not provide any details on the results chain that make it possible to move from these outputs to outcomes and impacts. A single intermediate effect ( increase in agricultural production ) features in this logical framework while the description of activities shows that other effects were sought, including the increase of farmers incomes or improvement of living conditions ; (v) baseline values are missing and the target values are either too optimistic or absent. For example, in the case of PRISE, since the study to determine the baseline situation could not be conducted at project start-up (due to the lack of funds at project start-up), the outcomes and impacts in the initial logical framework were formulated only on a documentary basis. 49 For PARSEC, the outcomes and impacts have neither indicators nor target values. Consequently, it is difficult to know whether ex-combatants practise sustainable farming, live in peace with host communities, and no longer constitute a risk group (expected effect 1) or whether there is a revival of agricultural economic activities in the areas covered by the project (effect 2); (vi) insufficient attention is paid to the establishment of M&E features of projects, and major shortcomings are noted in the M&E systems of projects, mainly due to failure to budget this activity (e.g. PRISE, PMR-RH), and insufficient training of teams. 50 According to a project coordinator, projects approved during the period had no M&E mechanisms. It was not until 2013 that the AfDB organized M&E training for project teams. 51 These project design shortcomings adversely affected their management, as well as the performance of monitoring/evaluation mechanisms. Moreover, the lessons learned from previous strategies and the improvement recommendations are explicitly outlined in the CSPs, but the implementation and monitoring of corrective measures to address the challenges of the country remain very illegible (absence of mechanisms for monitoring implementation of the corrective measures proposed). Despite the efforts made by the Bank, MfDR has remained at the embryonic stage and mainly focused on the production of outputs. It is difficult to assess the real extent of the outcomes occasionally observed. Overall, the Bank's monitoring and supervision mechanisms did not function well in DRC and failed to ensure effective implementation of strategies and programs. Apart from these shortcomings, there is the poor quality at entry of many projects. Several factors account for this situation. Some stem from the Bank's responsibility, namely weak preparatory studies on the context, technique, knowledge of project areas, or the absence or poor appraisal of risk. Other factors such as the inappropriate institutional basis of project implementation units, as well as delays and irregularities in the provision of national counterpart contributions are essentially the responsibility of the Government. Application of the Paris Declaration and the Principles of Good International Engagement in Fragile States The Bank's strategy in favor of fragile States (2007) is based on the ten Principles of Good International Engagement in Fragile States adopted under the aegis of OECD in A review of the implementation status of these principles by the Bank in DRC shows unsatisfactory performance overall, even if this can be partly explained by the particularly difficult context in the country (weakness of the Government, weakness of national strategies, and magnitude of needs). The main negative points are: inadequate consideration of the factors of fragility in operations; failure to target operations at vulnerable groups or the lack of linkages between security or development policies. On the other hand, several positive points need to be underscored, especially reliability of the An IDEV Country Strategy Evaluation

56 46 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Bank's financial commitment throughout the period and its participation in aid coordination mechanisms. As concerns the Paris Declaration of 2005, the Bank contributed positively to the implementation of the five principles for improving aid effectiveness in the specific context of DRC as follows: (i) with the other TFPs, the Bank sought to provide the Government with resources to play a leading role in the design of development policies (ownership); (ii) the Bank's strategies are aligned on national strategies, although the use of national systems remains limited since such systems are not fully reliable; (iii) although it has to make more efforts to demonstrate its comparative advantage over the other donors in the CSP, the Bank considered the operations of other partners when defining its operational priorities in DRC. In some areas (energy, roads), the operations were designed in close collaboration with the other TFPs present in the country to achieve greater complementarity; (iv) the principle of results-based management was factored into the CSP, but was undermined by very weak national systems and the non-inclusion of the mechanisms in Bank operations; and (v) the principle of mutual responsibility is taken into account through the coordination mechanisms in which the Bank participates and the dialogue established with national authorities. Complementarity and Synergies Complementarity and synergies between Bank operations in DRC are suboptimal and differ from sector to sector. On the one hand, some operations did not exploit the potential for synergy (e.g. between road, agricultural and environmental projects) and, on the other hand, there is the energy sector where the PEPUR and PMEDE projects demonstrate a certain degree of complementarity. As regards economic governance, the Bank's operations are relatively complementary in terms of their formulation, but there is no internal coordination at the Bank. Moreover, the Bank has allocated a significant portion of its funds to (material and human) capacity building for Government services in all its portfolio operations. However, there was no cross-cutting capacity building strategy applicable to the various operations. Leverage Effect Mobilizing Other Resources Within the operations, leverage effects can be observed in various forms, with the outcomes varying from sector to sector. The most emblematic is the Bank s involvement in the development and promotion of the major INGA 3 project which should lead to considerable investment by public and private partners. In the education sector, the education system support project (PASE) laid the foundation for preparation of the sector s sub-sector strategies that have enabled other TFPs to engage in the sector. In the transport infrastructure sector, studies underway (Kinshasa-Brazzaville bridge, Kinshasa-Ilebo railway) will yield technical and financial analyses that would equip the DRC Government with the right arguments to convince potential (public and private) funding bodies to back these investments.

57 Country Performance 47 Country Performance DRC performance in its cooperation with the AfDB improved during the review period, mainly with development of capacity to define and manage sector reforms. However, several shortcomings remain, in particular: (i) weaknesses of the national statistical system and absence of a monitoring/ evaluation system in the Ministries (See Section «Managing for Development Results»); (ii) inappropriate institutional basis of project implementation units, major delays (See Section «Relevance») and irregularities in the fulfilment of conditions precedent to first disbursement and in the provision of national counterpart contributions (agricultural projects, Nsélé-Lufimi and Kwango-Kenge road); (iii) budget execution deficiencies (in Bas-Congo and Bandundu Provinces, the service of the Directorate for Farm-to-Market Roads (DVDA) has no resources in terms of equipment and staff); the funds earmarked for road maintenance are disbursed irregularly and in limited amounts, and the local road maintenance committees (LRMCs) are not able to perform the maintenance work; 52 (iv) the precipitous implementation of decentralization, which has affected institutional sustainability and capacity building (See Section «Sustainability»); (v) dysfunctions in aid coordination: The Government adopted a new operational framework for Sector Working Group (SWG) to increase their effectiveness mainly by strengthening Government leadership and ensuring greater involvement of civil society and the private sector. Each SWG is co-chaired by two leading entities: a Ministry and a TFP. Despite the renovation of their operational framework and the significant investments of many TFPs, the SWG find it difficult to play their role of implementing sector policies, and the meetings are described by some partners as being, more or less, a formality. This is due to the fact that most areas of public action suffer from lack of strategies and operational policies that are relevant and credible. Furthermore, the DRC Government has also failed to facilitate strong aid coordination by entrusting four different Ministries 53 with responsibilities in aid mobilization and programming. 54 An IDEV Country Strategy Evaluation

58

59 Conclusions and Recommendations 49 Conclusions and Recommendations Main conclusions The evaluation of Bank strategies and programs in DRC for the period has yielded several findings that constitute challenges which should be considered in the definition of the future cooperation strategy for both partners. The relevance of the Bank s strategies in DRC is moderately satisfactory. They were aligned on the general guidelines of the Bank, including those related to fragile States. These strategies have supported its transition from an essentially post-conflict situation at the beginning of the period to a development situation thereafter. However, these strategies did not clearly address all the country s factors of fragility (pressure on the environment, regional disparities, gender inequalities, tensions over access to resources, structural dysfunction of Government services, etc.). Accordingly, the Bank's strategies throughout the evaluation period were marked by the absence of a real common denominator and a wide range of intervention areas, with no focus on inter-sector synergies and complementarities. to the stabilization of the country s macroeconomic framework, thus having an indirect positive effect on growth. However, the Bank's operations have so far contributed little to diversification of the national economic fabric, which remains heavily dependent on mineral exports. The sustainability of operations recorded poor performance, particularly in economic and financial viability. This situation stems from dysfunctions in the conduct of Government action (shortcomings in the implementation of the road maintenance policy; underfunding of decentralized technical services, etc.), as well as little consideration given to the post-project phase during the design and implementation of operations. As regards policy dialogue, there is a significant gap between the Bank's plans and the results achieved in DRC, except in economic and financial governance. Dialogue with civil society stakeholders and the private sector, which developed at the end of the period, is not enough to address the challenges. Lastly, the linkages between the few analytical studies and policy dialogue are not evident. An IDEV Country Strategy Evaluation Overall, the effectiveness of interventions is moderately satisfactory. Indeed, it is moderately satisfactory in the transport and social development sectors, and less convincing in the agricultural and rural development sectors. Most of the operations in the energy, environment and industry/mines/quarries sectors and in economic and financial governance are not sufficiently advanced in their implementation for their effectiveness to be determined. With the Emergency Program to Mitigate the Impact of the Financial Crisis (PUAICF), the Bank made a significant contribution The efficiency of Bank operations is moderately unsatisfactory. The main problem resides in project implementation delays, stemming from a combination of factors related to the national context, Government responsibility, and the Bank's organizational system. Despite positive developments, management for development results remains embryonic and focused on the achievement of outputs.

60 50 Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Summary Report Recommendations Focus on the Bank s intervention strategy in DRC on areas of comparative advantage with a potential for catalytic effect on factors of fragility The next strategy of the Bank in DRC should be more selective and based on an integrated analysis of the factors of fragility, while giving priority to sectors of comparative advantage (e.g. agriculture and rural development, or energy). Given the challenges of fragility in DRC (lack of infrastructure, rural poverty, environmental challenges, etc.) and in light of the Bank's limited means, a strategy of transformative investments that promote green growth is one option to be explored. Possible areas of catalytic investments could include: (i) agricultural infrastructure (roads, facilities), and/or (ii) promotion of agriculture that is environmentally-friendly (including agroforestry) and job-creating (family businesses, small processing companies), and/or (iii) the promotion of green energy production, based on development of the country's hydroelectricity resources. Furthermore, in view of the critical importance of improving economic governance (at all levels) as a key to sustainable development of DRC, the strengthening of economic governance, with a significant capacity building component at all levels of the State (central and decentralized services of the national administration, provincial government services) could constitute a complementary strategy. Improve the quality at entry of the Bank s interventions in DRC, especially as regards consideration of national constraints Given the poor quality at entry of Bank interventions in DRC, there is need to increase the quality of and resources allocated to studies precedent to the implementation of operations. Such studies should especially help to define precisely (contrary to past practice) the strategy for addressing various types of constraints affecting project implementation, namely: (i) security and fiduciary risks; (ii) institutional difficulties related to lack of governance in public action (from the central to the decentralized levels); and (iii) logistical problems generated by the immense size of the territory and the substantial infrastructural shortage (transport, energy, etc.). Hence, future interventions should be carefully designed and submitted for funding only when their quality is deemed to be satisfactory. Improve the sustainability through coordinated efforts at various levels, strategy elaboration, preparation of interventions, and policy dialogue Implementation of the first two recommendations should have a positive impact on the sustainability of operational outcomes. Indeed, a better and more coherent strategy that fully accommodates the specificities of DRC, as well as better quality of interventions should improve sustainability. Furthermore, sustainability should be the focus of policy dialogue and the subject of rigorous analysis during the design and implementation of Bank operations. The areas particularly concerned are: road maintenance, especially rural roads; human resource management in Government services to improve the sustainability of capacity building activities; public finance management to ensure that the services supported under a project effectively receive, at project completion, the operating and investment budgets earmarked for them in the annual finance laws. Throughout the conduct of these analytical studies, care should be taken to ensure that they are effectively utilized in the preparation and implementation of Bank interventions. 55 Improve the monitoring and evaluation mechanisms of strategies and interventions To ensure more exhaustive application of the principles of results-based management, there is need to improve the project monitoring/evaluation mechanisms by developing more precise and rigorous intervention approaches and by strengthening the monitoring of outcomes indicators, especially in areas most affected by the lack of data, such as: (i) capacity building for individuals and organizations (Government services, socio-professional structures, private companies, etc.); (ii) youth employment; and (iii) the socio-economic situation of the beneficiaries, including women. This would also enrich the completion report of each CSP and the design of the next CSP. The capacity of the Country Office is also another element that must be taken into consideration in the current decentralization drive to ensure efficient implementation of the program.

61

62

Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation

Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program 2004 2015 Executive Summary An IDEV Country Strategy Evaluation March 2017 IDEV conducts different types of evaluations

More information

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid Evaluation of Budget Support Operations in Morocco Summary July 2014 Development and Cooperation EuropeAid A Consortium of ADE and COWI Lead Company: ADE s.a. Contact Person: Edwin Clerckx Edwin.Clerck@ade.eu

More information

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context 8 Mauritania ACRONYM AND ABBREVIATION PRLP Programme Regional de Lutte contre la Pauvreté (Regional Program for Poverty Reduction) History and Context Mauritania s Poverty Reduction Strategy Paper (PRSP)

More information

AFRICAN DEVELOPMENT BANK GROUP MADAGASCAR: HIPC APPROVAL DOCUMENT COMPLETION POINT UNDER THE ENHANCED FRAMEWORK

AFRICAN DEVELOPMENT BANK GROUP MADAGASCAR: HIPC APPROVAL DOCUMENT COMPLETION POINT UNDER THE ENHANCED FRAMEWORK AFRICAN DEVELOPMENT BANK GROUP MADAGASCAR: HIPC APPROVAL DOCUMENT COMPLETION POINT UNDER THE ENHANCED FRAMEWORK March 2005 TABLE OF CONTENTS Page I Introduction... 1 II Madagascar s Qualification for the

More information

CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER

CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER STEERING COMMITTEE ON THE POVERTY REDUCTION STRATEGY PAPER PERMANENT TECHNICAL SECRETARIAT OF

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

AFRICAN DEVELOPMENT BANK GROUP SENEGAL : HIPC APPROVAL DOCUMENT COMPLETION POINT UNDER THE ENHANCED FRAMEWORK

AFRICAN DEVELOPMENT BANK GROUP SENEGAL : HIPC APPROVAL DOCUMENT COMPLETION POINT UNDER THE ENHANCED FRAMEWORK AFRICAN DEVELOPMENT BANK GROUP SENEGAL : HIPC APPROVAL DOCUMENT COMPLETION POINT UNDER THE ENHANCED FRAMEWORK October 2004 TABLE OF CONTENTS Page I Introduction 1 II HIPC Qualification 1 III HIPC Costs

More information

THE INTERNATIONAL MONETARY FUND AND INTERNATIONAL DEVELOPMENT ASSOCIATION NIGER

THE INTERNATIONAL MONETARY FUND AND INTERNATIONAL DEVELOPMENT ASSOCIATION NIGER THE INTERNATIONAL MONETARY FUND AND INTERNATIONAL DEVELOPMENT ASSOCIATION NIGER Poverty Reduction Strategy Paper Progress Report Joint Staff Advisory Note Prepared by the Staffs of the International Monetary

More information

Organisation strategy for Sweden s cooperation with the Green Climate Fund for

Organisation strategy for Sweden s cooperation with the Green Climate Fund for Organisation strategy for Sweden s cooperation with the Green Climate Fund for 2016 2018 Appendix to Government Decision 22 June 2016 (UD2016/11355/GA) Organisation strategy for Sweden s cooperation with

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

MADAGASCAR PORTFOLIO REVIEW REPORT

MADAGASCAR PORTFOLIO REVIEW REPORT AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND MADAGASCAR PORTFOLIO REVIEW REPORT SOUTH REGION DEPARTMENT OCTOBER 2007 SCCD :N.A. i CURRENCY EQUIVALENTS (October 2007) UA1 = US$ 1.55665 UA1 = EURO 1.9786

More information

FINAL CONSULTATION DOCUMENT May CONCEPT NOTE Shaping the InsuResilience Global Partnership

FINAL CONSULTATION DOCUMENT May CONCEPT NOTE Shaping the InsuResilience Global Partnership FINAL CONSULTATION DOCUMENT May 2018 CONCEPT NOTE Shaping the InsuResilience Global Partnership 1 Contents Executive Summary... 3 1. The case for the InsuResilience Global Partnership... 5 2. Vision and

More information

Cabo Verde: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation

Cabo Verde: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation Cabo Verde: Evaluation of the Bank s Country Strategy and Program 2008 2017 Executive Summary An IDEV Country Strategy Evaluation November 2018 1 Cabo Verde: Evaluation of the Bank s Country Strategy and

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

EVALUATION AND FITNESS CHECK (FC) ROADMAP

EVALUATION AND FITNESS CHECK (FC) ROADMAP TITLE OF THE EVALUATION/FC LEAD DG RESPONSIBLE UNIT TYPE OF EVALUATION EVALUATION AND FITNESS CHECK (FC) ROADMAP Evaluation of the impact of the CAP measures towards the general objective "viable food

More information

EAP Task Force. EAP Task

EAP Task Force. EAP Task EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL

More information

FAST TRACK BRIEF. Uganda Country Assistance Evaluation,

FAST TRACK BRIEF. Uganda Country Assistance Evaluation, FAST TRACK BRIEF April 13, 2009 The IEG report Uganda Country Assistance Evaluation, 2001-07, was discussed by CODE on April 13, 2009 Uganda Country Assistance Evaluation, 2001-07 The World Bank and the

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness SURVEY GUIDANCE 2011 Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness This document explains the objectives, process and methodology agreed for the 2011 Survey on

More information

SUBMISSION BY DENMARK AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES

SUBMISSION BY DENMARK AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES SUBMISSION BY DENMARK AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES Bonn, 25 May 2012 Subject: EU Fast Start Finance Report Key Messages In accordance with developed

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 26 May 2015 Original: English 2015 session 21 July 2014-22 July 2015 Agenda item 7 Operational activities of the United Nations for international

More information

EN Official Journal of the European Union L 77/77

EN Official Journal of the European Union L 77/77 15.3.2014 EN Official Journal of the European Union L 77/77 REGULATION (EU) No 234/2014 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 March 2014 establishing a Partnership Instrument for cooperation

More information

FROM BILLIONS TO TRILLIONS:

FROM BILLIONS TO TRILLIONS: 98023 FROM BILLIONS TO TRILLIONS: MDB Contributions to Financing for Development In 2015, the international community is due to agree on a new set of comprehensive and universal sustainable development

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

At its meeting on 12 December 2013, the Council (Foreign Affairs/Development) adopted the Conclusions set out in the Annex to this note.

At its meeting on 12 December 2013, the Council (Foreign Affairs/Development) adopted the Conclusions set out in the Annex to this note. COUNCIL OF THE EUROPEAN UNION Brussels, 12 December 2013 17553/13 DEVGEN 331 ENV 1185 ACP 204 ONU 131 RELEX 1146 FIN 934 OCDE 11 WTO 340 NOTE From: General Secretariat of the Council To: Delegations Subject:

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

CÔTE D IVOIRE ARREARS CLEARANCE PLAN

CÔTE D IVOIRE ARREARS CLEARANCE PLAN AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND CÔTE D IVOIRE ARREARS CLEARANCE PLAN This document contains addenda or corrigenda (see annexes). February 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY...iv

More information

EUROPEAN COUNCIL Brussels, 26 March Delegations will find attached the conclusions of the European Council (25/26 March 2010).

EUROPEAN COUNCIL Brussels, 26 March Delegations will find attached the conclusions of the European Council (25/26 March 2010). EUROPEAN COUNCIL Brussels, 26 March 2010 EUCO 7/10 CO EUR 4 CONCL 1 COVER NOTE from : General Secretariat of the Council to : Delegations Subject : EUROPEAN COUNCIL 25/26 MARCH 2010 CONCLUSIONS Delegations

More information

Democratic Republic of Congo (DRC) Eligibility for Supplementary Support Resources under the Fragile States Facility (FSF)

Democratic Republic of Congo (DRC) Eligibility for Supplementary Support Resources under the Fragile States Facility (FSF) AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND Democratic Republic of Congo (DRC) Eligibility for Supplementary Support Resources under the Fragile States Facility (FSF) Accompanying Note to CSP 2008-2012

More information

GOVERNANCE FRAMEWORK FOR

GOVERNANCE FRAMEWORK FOR December, 2011 GOVERNANCE FRAMEWORK FOR THE STRATEGIC CLIMATE FUND Adopted November 2008 and amended December 2011 Table of Contents A. Introduction B. Purpose and Objectives C. SCF Programs D. Governance

More information

Evaluation of the European Union s Co-operation with Kenya Country level evaluation

Evaluation of the European Union s Co-operation with Kenya Country level evaluation "FICHE CONTRADICTOIRE" Evaluation of the European Union s Co-operation with Kenya Country level evaluation Recommendations Responses of Services: Follow-up (one year later) GENERAL RECOMMENDATIONS 1 Give

More information

EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID

EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID EU FUNDING PROGRAMMES IN THE FIELD OF DEVELOPMENT AID EU FORDERUNG FUR MIGRANTEN ORGANISATIONEN UND TRAGER DER PARTICIPATIONS UND INTEGRATIONS ARBEIT IN BERLIN MOVE GLOBAL 25 October 2014, Berlin About

More information

EUROPEAN PARLIAMENT Committee on Regional Development

EUROPEAN PARLIAMENT Committee on Regional Development EUROPEAN PARLIAMT 2009-2014 Committee on Regional Development 27.11.2012 MANDATE 1 for opening inter-institutional negotiations adopted by the Committee on Regional Development at its meeting on 11 July

More information

Statistical Support for Development Effectiveness And Results Measurement. Prepared by the African Development Bank

Statistical Support for Development Effectiveness And Results Measurement. Prepared by the African Development Bank Committee for the Coordination of Statistical Activities SA/2008/18 Twelfth Session 8 September 2008 Tunis, 11-12 September 2008 Items for information: Item 1 of the provisional agenda ============================================================

More information

6 th FIVE YEAR PLAN ( ) HIGHLIGHTS

6 th FIVE YEAR PLAN ( ) HIGHLIGHTS Arab Bank for Economic Development in Africa (BADEA) 6 th FIVE YEAR PLAN (2010 2014) HIGHLIGHTS 1. INTRODUCTION The Arab Bank for Economic Development in Africa (BADEA) has continued since its establishment

More information

TRADE, FINANCE AND DEVELOPMENT DID YOU KNOW THAT...?

TRADE, FINANCE AND DEVELOPMENT DID YOU KNOW THAT...? TRADE, FINANCE AND DEVELOPMENT DID YOU KNOW THAT...? The volume of the world trade is increasing, but the world's poorest countries (least developed countries - LDCs) continue to account for a small share

More information

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews The DAC s main findings and recommendations Extract from: OECD Development Co-operation Peer Reviews Luxembourg 2017 Luxembourg has strengthened its development co-operation programme The committee concluded

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

Annex 1: The One UN Programme in Ethiopia

Annex 1: The One UN Programme in Ethiopia Annex 1: The One UN Programme in Ethiopia Introduction. 1. This One Programme document sets out how the UN in Ethiopia will use a One UN Fund to support coordinated efforts in the second half of the current

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2005 International Monetary Fund September 2005 IMF Country Report No. 05/325 Burundi: Poverty Reduction Strategy Paper Preparation Status Report Poverty Reduction Strategy Papers (PRSPs) are prepared

More information

COUNTRY LEVEL DIALOGUES KEY DOCUMENTS

COUNTRY LEVEL DIALOGUES KEY DOCUMENTS COUNTRY LEVEL DIALOGUES KEY DOCUMENTS EUWI European Union Water Initiative Africa-EU Strategic Partnership on Water Affairs and Sanitation Prepared by the Working Group on Water Supply and Sanitation in

More information

METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP

METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP The 2014 policy paper of the Modernizing Foreign Assistance Network (MFAN), The Way Forward, outlines two powerful and mutually reinforcing pillars of aid reform

More information

Low proportion of donor missions are co-ordinated. Improve national information systems and plans. Low quality of poverty-related data

Low proportion of donor missions are co-ordinated. Improve national information systems and plans. Low quality of poverty-related data 16 EGYPT INTRODUCTION WITH A POPULATION OF 75 MILLION, Egypt has a gross national income (GNI) of USD 1 350 per person. According to the latest consensus, conducted in 2000, 3% of the population lived

More information

FROM BILLIONS TO TRILLIONS: TRANSFORMING DEVELOPMENT FINANCE POST-2015 FINANCING FOR DEVELOPMENT: MULTILATERAL DEVELOPMENT FINANCE

FROM BILLIONS TO TRILLIONS: TRANSFORMING DEVELOPMENT FINANCE POST-2015 FINANCING FOR DEVELOPMENT: MULTILATERAL DEVELOPMENT FINANCE DEVELOPMENT COMMITTEE (Joint Ministerial Committee of the Boards of Governors of the Bank and the Fund on the Transfer of Real Resources to Developing Countries) DC2015-0002 April 2, 2015 FROM BILLIONS

More information

Solidar EU Training Academy. Valentina Caimi Policy and Advocacy Adviser. European Semester Social Investment Social innovation

Solidar EU Training Academy. Valentina Caimi Policy and Advocacy Adviser. European Semester Social Investment Social innovation Solidar EU Training Academy Valentina Caimi Policy and Advocacy Adviser European Semester Social Investment Social innovation Who we are The largest platform of European rights and value-based NGOs working

More information

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews The DAC s main findings and recommendations Extract from: OECD Development Co-operation Peer Reviews Poland 2017 1 Towards a comprehensive Polish development effort Indicator: The member has a broad, strategic

More information

MITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING

MITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING INFRA GUIDANCE NOTES THE WORLD BANK, WASHINGTON, DC May 2009 IN-1 MITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING

More information

How the Post-Cotonou Agreement can support EU investment and private sector development in ACP countries

How the Post-Cotonou Agreement can support EU investment and private sector development in ACP countries 27 April 2018 How the Post-Cotonou Agreement can support EU investment and private sector development in ACP countries Following the European Commission s recommendation for a Council Decision authorising

More information

INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO. February 27, 2006 I. INTRODUCTION

INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO. February 27, 2006 I. INTRODUCTION INTERNATIONAL MONETARY FUND INTERNATIONAL DEVELOPMENT ASSOCIATION SERBIA AND MONTENEGRO Joint Staff Advisory Note on the Poverty Reduction Strategy Progress Reports Prepared by the Staffs of the International

More information

«FICHE CONTRADICTOIRE»

«FICHE CONTRADICTOIRE» «FICHE CONTRADICTOIRE» Evaluation of the Commission s External Cooperation with Angola (Country level evaluation) (*For details on the recommendations please refer to the main report) Recommendations STRATEGIC

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69 COUNCIL OF THE EUROPEAN UNION Brussels, 11 May 2010 9437/10 ECOFIN 249 ENV 265 POLGEN 69 NOTE from: to: Subject: The General Secretariat of the Council Delegations Financing climate change- fast start

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: 120763 Operation

More information

Council conclusions on the EU role in Global Health. 3011th FOREIGN AFFAIRS Council meeting Brussels, 10 May 2010

Council conclusions on the EU role in Global Health. 3011th FOREIGN AFFAIRS Council meeting Brussels, 10 May 2010 COUNCIL OF THE EUROPEAN UNION Council conclusions on the EU role in Global Health 3011th FOREIGN AFFAIRS Council meeting Brussels, 10 May 2010 The Council adopted the following conclusions: 1. The Council

More information

UN-OHRLLS COUNTRY-LEVEL PREPARATIONS

UN-OHRLLS COUNTRY-LEVEL PREPARATIONS UN-OHRLLS COMPREHENSIVE HIGH-LEVEL MIDTERM REVIEW OF THE IMPLEMENTATION OF THE ISTANBUL PROGRAMME OF ACTION FOR THE LDCS FOR THE DECADE 2011-2020 COUNTRY-LEVEL PREPARATIONS ANNOTATED OUTLINE FOR THE NATIONAL

More information

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.

More information

Vietnam: IMF-World Bank Relations *

Vietnam: IMF-World Bank Relations * -1- Vietnam: IMF-World Bank Relations * Partnership in Vietnam s Development Strategy The government of Vietnam s development strategy is set forth in its Comprehensive Poverty Reduction and Growth Strategy

More information

DEVELOPMENT CO-OPERATION REPORT 2010

DEVELOPMENT CO-OPERATION REPORT 2010 DEVELOPMENT CO-OPERATION REPORT 2010 Summary - January 2010 The combined effect of the food, energy and economic crises is presenting a major challenge to the development community, raising searching questions

More information

The Addis Ababa Action Agenda of the Third. United Nations Capacity Development Programme on International Tax Cooperation

The Addis Ababa Action Agenda of the Third. United Nations Capacity Development Programme on International Tax Cooperation United Nations Capacity Development Programme on International Tax Cooperation Contents Link to the Addis Ababa Action Agenda and the 2030 Agenda for Sustainable Development 1 Mandate 2 Relationship with

More information

Obecné nařízení Přílohy obecného nařízení Nařízení pro ERDF Nařízení o podpoře EÚS z ERDF Nařízení pro ESF Nařízení pro FS

Obecné nařízení Přílohy obecného nařízení Nařízení pro ERDF Nařízení o podpoře EÚS z ERDF Nařízení pro ESF Nařízení pro FS Texty nařízení předběžně schválené dánským a kyperským předsednictvím Rady EU formou částečného obecného přístupu pro fondy Společného strategického rámce a politiky soudržnosti: Obecné nařízení Přílohy

More information

TERMS OF REFERENCE FOR A JUNIOR CONSULTANT TO SUPPORT SOMALIA WORK PROGRAMME

TERMS OF REFERENCE FOR A JUNIOR CONSULTANT TO SUPPORT SOMALIA WORK PROGRAMME REQUEST FOR EXPRESSIONS OF INTEREST African Development Bank Group Eastern Africa Regional Development and Business Delivery Office (RDGE) Khushee Towers, Longonot Road Plot 11, Upper Hill P.O Box 4861-00200

More information

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE Annex to Government Decision 21 December 2017 (UD2017/21053/IU) Guidelines for strategies in Swedish development

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme

More information

A/HRC/17/37/Add.2. General Assembly. United Nations

A/HRC/17/37/Add.2. General Assembly. United Nations United Nations General Assembly Distr.: General 18 May 2011 A/HRC/17/37/Add.2 English only Human Rights Council Seventeenth session Agenda item 3 Promotion and protection of all human rights, civil, political,

More information

Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana

Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana Natural Resources & Environmental (NRE) Governance in Ghana DFID, NL, WB, EC, France, Switzerland Government of Ghana Strengthening the Development Results and Impacts of the Paris Declaration through

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Towards robust quality management for European Statistics

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Towards robust quality management for European Statistics EN EN EN EUROPEAN COMMISSION Brussels, 15.4.2011 COM(2011) 211 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Towards robust quality management for European Statistics

More information

Progress on the Strengthening of the European Integration Structures

Progress on the Strengthening of the European Integration Structures TENTH MEETING OF THE STABILISATION AND ASSOCIATION PROCESS TRACKING MECHANISM CONCLUSIONS PRISTINA, 14 JULY 2006 The tenth meeting of the Stabilisation and Association Process Tracking Mechanism was held

More information

CONSULTATIVE GROUP MEETING FOR KENYA. Nairobi, November 24-25, Joint Statement of the Government of the Republic of Kenya and the World Bank

CONSULTATIVE GROUP MEETING FOR KENYA. Nairobi, November 24-25, Joint Statement of the Government of the Republic of Kenya and the World Bank CONSULTATIVE GROUP MEETING FOR KENYA Nairobi, November 24-25, 2003 Joint Statement of the Government of the Republic of Kenya and the World Bank The Government of the Republic of Kenya held a Consultative

More information

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( )

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( ) Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 23 October 2018 Original: English Agenda item 7 WFP/EB.2/2018/7-C/Add.1 Evaluation reports For consideration

More information

AFRICAN DEVELOPMENT BANK GROUP

AFRICAN DEVELOPMENT BANK GROUP AFRICAN DEVELOPMENT BANK GROUP Ministerial Round Table Discussions Africa and the Financial Crisis: An Agenda for Action The 2009 African Development Bank Annual Meetings Ministerial Round Table Discussions

More information

Marcus Manuel. Senior Research Associate Overseas Development Institute. 203 Blackfriars Road, London, SE1 8NJ, UK

Marcus Manuel. Senior Research Associate Overseas Development Institute. 203 Blackfriars Road, London, SE1 8NJ, UK Marcus Manuel Senior Research Associate Overseas Development Institute 203 Blackfriars Road, London, SE1 8NJ, UK Tel: +44 (0)20 7922 8245 Fax: +44 (0)20 7922 0399 Nationality: British Email: m.manuel@odi.org.uk

More information

SAMOA S SMOOTH TRANSITION STRATEGY REPORT

SAMOA S SMOOTH TRANSITION STRATEGY REPORT SAMOA S SMOOTH TRANSITION STRATEGY REPORT 1 31 DECEMBER 2015 OVERALL ASSESSMENT OF THE TRANSITION PROCESS Background: Samoa graduated out of LDC status on 1 st January 2014. The Government decided that

More information

9644/10 YML/ln 1 DG E II

9644/10 YML/ln 1 DG E II COUNCIL OF THE EUROPEAN UNION Brussels, 10 May 2010 9644/10 DEVGEN 154 ACP 142 PTOM 21 FIN 192 RELEX 418 SAN 107 NOTE from: General Secretariat dated: 10 May 2010 No. prev. doc.: 9505/10 Subject: Council

More information

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015 Marche Region 2014-2020 COMMITTENTE RDP for Marche Ex Ante Evaluation report Roma, June 2015 Executive summary EXECUTIVE SUMMARY Introduction The Ex Ante Evaluation (EAE) of the Rural Development Programme

More information

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level Guidance Paper United Nations Development Group 19 MAY 2006 TABLE OF CONTENTS Introduction A. Purpose of this paper... 1 B. Context...

More information

2011 SURVEY ON MONITORING THE PARIS DECLARATION

2011 SURVEY ON MONITORING THE PARIS DECLARATION TASK TEAM ON MONITORING THE PARIS DECLARATION 2011 SURVEY ON MONITORING THE PARIS DECLARATION Revised Survey Materials Initial Annotated Draft 3 May 2010 FOR COMMENT This initial text with annotations

More information

Evolution of methodological approach

Evolution of methodological approach Mainstreaming gender perspectives in national budgets: an overview Presented by Carolyn Hannan Director, Division for the Advancement of Women Department of Economic and Social Affairs at the roundtable

More information

LAND DEGRADATION NEUTRALITY FUND An innovative fund project dedicated to sustainable land use

LAND DEGRADATION NEUTRALITY FUND An innovative fund project dedicated to sustainable land use LAND DEGRADATION NEUTRALITY FUND An innovative fund project dedicated to sustainable land use This document is intended for professional clients only in accordance with MIFID At a glance Promoted by the

More information

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$ GOOD PRACTICES INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH In this brief: Country context The whole of society approach Institutional arrangements for achieving the SDGs The Development Results

More information

Public Disclosure Authorized. Project Name Mali - Third Structural Adjustment Credit (SAC III) Public Disclosure Authorized

Public Disclosure Authorized. Project Name Mali - Third Structural Adjustment Credit (SAC III) Public Disclosure Authorized Public Disclosure Authorized Report No. PID10817 Project Name Mali - Third Structural Adjustment Credit (SAC III) Region Sector Project ID Africa Multi-sectoral MLPE72785 Borrower Republic of Mali Public

More information

TOSSD AND TYPES OF AID INVOLVING NO CROSS-BORDER RESOURCE FLOWS

TOSSD AND TYPES OF AID INVOLVING NO CROSS-BORDER RESOURCE FLOWS Organisation for Economic Co-operation and Development Development Co-operation Directorate Development Assistance Committee DCD/DAC/STAT(2018)20 English text only 26 March 2018 DAC Working Party on Development

More information

ACP-EU JOINT PARLIAMENTARY ASSEMBLY

ACP-EU JOINT PARLIAMENTARY ASSEMBLY ACP-EU JOINT PARLIAMENTARY ASSEMBLY RESOLUTION 1 ACP-EU 100.300/08/fin on aid effectiveness and defining official development assistance The ACP-EU Joint Parliamentary Assembly, meeting in Port Moresby

More information

A User Guide for Practitioners Working at the Sectoral Level

A User Guide for Practitioners Working at the Sectoral Level NATIONAL LEVEL SECTORAL LEVEL PROJECT LEVEL INTEGRATING CLIMATE CHANGE ADAPTATION INTO DEVELOPMENT CO-OPERATION A User Guide for Practitioners Working at the Sectoral Level Integrating Climate Change Adaptation

More information

SENEGAL COUNTRY STRATEGY

SENEGAL COUNTRY STRATEGY SENEGAL COUNTRY STRATEGY (Effective as of 2009) CIDA reviews all country strategies periodically and may revise them to reflect changing priorities or circumstances in countries. Canadian International

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

FAQs: The World Bank and Sudan and Southern Sudan

FAQs: The World Bank and Sudan and Southern Sudan WORLD BANK January 11, 2011 FAQs: The World Bank and Sudan and Southern Sudan Q1: What kind of assistance does the World Bank provide to Sudan? A1: Since Sudan s 2005 Comprehensive Peace Agreement (CPA),

More information

CLIMATE CHANGE SPENDING IN ETHIOPIA

CLIMATE CHANGE SPENDING IN ETHIOPIA CLIMATE CHANGE SPENDING IN ETHIOPIA Recommendations to bridge the funding gap for climate financing in Ethiopia Civil Society and government representatives attending the round table discussion on Ethiopia

More information

Policy Implementation for Enhancing Community. Resilience in Malawi

Policy Implementation for Enhancing Community. Resilience in Malawi Volume 10 Issue 1 May 2014 Status of Policy Implementation for Enhancing Community Resilience in Malawi Policy Brief ECRP and DISCOVER Disclaimer This policy brief has been financed by United Kingdom (UK)

More information

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase GCF/B.10/05 21 June 2015 Meeting of the Board 6-9 July 2015 Songdo, Republic of Korea Provisional Agenda item

More information

Survey Results Note The key contribution of regions and cities to sustainable development

Survey Results Note The key contribution of regions and cities to sustainable development Survey Results Note The key contribution of regions and cities to sustainable development From 13 December 2018 to 1 March 2019, the European Committee of the Regions (CoR) in cooperation with the Organisation

More information

2018 report of the Inter-agency Task Force Overview

2018 report of the Inter-agency Task Force Overview 2018 report of the Inter-agency Task Force Overview In 2017, most types of development financing flows increased, amid progress across all the action areas of the Addis Ababa Action Agenda (hereafter,

More information

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 SERBIA Support to participation in Union Programmes Action summary This Action will facilitate Serbian participation in EU programmes by cofinancing

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

EUROPEAN COMMISSION. Observations on the Partnership Agreement with the Netherlands

EUROPEAN COMMISSION. Observations on the Partnership Agreement with the Netherlands Ref. Ares(2014)1617982-19/05/2014 EUROPEAN COMMISSION Introduction Observations on the Partnership Agreement with the Netherlands The observations set out below have been made within the framework of the

More information

Summary report. Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals

Summary report. Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals Summary report Technical workshop on principles guiding new investments in agriculture: Screening of prospective investors and investment proposals Lilongwe, Malawi, 26-27 September 2017 1 1. Introduction

More information

BENIN: COUNTRY FINANCING PARAMETERS

BENIN: COUNTRY FINANCING PARAMETERS BENIN: COUNTRY FINANCING PARAMETERS BENIN: COUNTRY FINANCING PARAMETERS May 5, 2005 Summary 1. This note provides the supporting analysis and background for the country financing parameters under the new

More information