1 SELECTION OF CONSULTANTS SINGLE STAGE OPEN COMPETITIVE SELECTION REQUEST FOR PROPOSALS Reference No.: 842/60811 Selection of Consulting Services for: Tbilisi Solid Waste Project Tbilisi Municipal Solid Waste Strategy (issued on 16 January 2019) Client: The City of Tbilisi Country: Georgia Project: Tbilisi Solid Waste Date: 18 February 2019 CLARIFICATIONS 1 Pursuant to the provisions of Clause 11 Clarification and Amendment of the Instructions to Consultants of the Request for Proposals, the Client hereby issues the following clarifications. Q1. The RFP states that the Municipality of Tbilisi City will be the client, as this is not clear and this is not stated in the Consultancy Contract, please clarify. A1. The Client is the City of Tbilisi: Cover page of the RFP states that client is The City of Tbilisi. According to the Section 1.2. (A. General provisions; 1. Definitions; paragraph (viii)) of the RFP the Client means the executing agency that signs the Contract for the Services with the selected Consultant and according to the article 1 of the Consultancy Contract the Client: means the party to whom the Services under this Consultancy Contract shall be delivered. Q2. What is the level of EBRD s involvement under the Consultancy Contract as this is not clear? A2. Bank s role in the procurement process and administration of the Contract is specified in the EBRD Procurement Policies and Rules. Q3. Please clarify the payment procedure, because it currently appears that Tbilisi City will be the client, yet payment will be from EBRD, but only on request by the client and upon approval by the Bank. A3. The Client shall be accepting the services by issuing relevant Statement of Approval of Consultancy Services. The Bank shall make the actual payment upon receiving Client s instructions accompanied with the copies of Consultant s invoice and Statement of Approval of Consultancy Services.

2 Q4. In what currency would payment be made? A4. Euro Q5. We cannot provide copies of our insurance policy, but we would be able to provide other suitable evidence (broker s certificate) would this be suitable? A5. This shall be evaluated on a case-by-case basis. Please refer to Clause 5.15 for the Insurance requirements. Q6. The limitation of liability in the proposed contract is narrowly drafted and appears to be restricted to liability arising under Clause 5.11(b). Would the client in principle be willing to agree an overarching limitation of liability. A6. The limitation of liability refers only to the Consultant's liability under this Clause 5.11(b) (see Clause 5.11(b). Q7. Could you confirm if as per EBRD procurement procedures, local/national experts can be part of several proposals as long as they are not the lead legal entity? A7. It is acceptable. Q8. We are particularly considering teaming up with a Key Expert 2 - Local Team Leader who potentially would also be presented in our competitor s bid. Please confirm if this approach is acceptable? A8. It is acceptable. Q9. In the CONSULTANT PROFILE it is mentioned that the Consultant team should have specific experience on at least two other similar consultancy contracts within the last 5 years. Does this refer to the proposed experts or to the consulting company submitting the offer? A9. The reference is made to corporate experience. Q10. In the CONSULTANT PROFILE (ToR) position 3 & 4 are named as Solid Waste Engineers. Can you clarify if the experts would necessarily need to be Engineers or can they be experts with other diplomas e.g. Master degrees? A10. In the brackets it is indicated that they could be (technical specialists, waste logistics and recycling experts and expertise in social appraisal). Q11. In the CONSULTANT PROFILE (ToR) position 4. Solid Waste Engineer is mentioned as one expert whereas the evaluation criteria in Section 1.3 mentions plural Solid Waste Engineers. Can you clarify if it is expected to propose more than one expert for position 4 or is that up to the discretion of the bidder? A11. It is up to the discretion of the Consultants to decide number of the experts.

3 Q12. In the CONSULTANT PROFILE (ToR) Can we generally propose additional experts if we think it would be appropriate? A12. Additional non-key experts may be proposed. Q13. Would you please clarify whether the person to be proposed for local team leader should be an expert with Georgian nationality or international expert covering the requirements is also admissible for the position? A13. Term local expert is not limited to the country of origin of the expert. Q14. Concerning insurance policies to be provided for the Project, we would appreciate confirmation from client that insurance policies hired with internationally recognized insurance companies, providing worldwide coverage and with sufficient coverage limits to cover the Services, should be acceptable for this project in case of award. A14. It is acceptable. Q15. In the event of a Consortium with a local Georgian partner, we would like to confirm if the client accepts a certificate of insurance coverage of each members of the Consortium. A15. Insurance certificate should cover each member of the consortium. Q16.If withholding tax applicable to Consultants is excluded from the financial offer of the Consultant. If negative, in the event of a Consultant resident in Spain, the Tax Treaty between Georgia and Spain exempts the Consultant from withholding tax. Could you please confirm that in such a case the Consultant would not deduct any withholding tax? A16. International Treaties ratified by Georgia is integral part of Georgian legislation. Thus, the treaty provisions are applicable in this case. Q17. If VAT charged by local subcontractors of the Consultant is excluded from the financial offer of the Consultant. A17.Please see the Instructions to the consultant (para.25.2). Q18. Referring to ToR chapter 2. d.) Assess the impacts of waste prevention and recycling in terms of environmental, and social impacts alongside to be defined indicators. We understand that it is not in the scope of this assignment to perform an Environmental and Social Impact Assessment. In our understanding within the scope of this assignment the Consultant shall outline the behavior of citizens which has to be changed in the course of the implementation of waste prevention and recycling.

4 A18. As detailed in TASK 2, the Consultant is expected to develop specific, reasonable and comparable recycling scenarios and to define indicators allowing the subsequent assessment of the environmental, social and economic impacts of these scenarios. Q19. Task 1. The task to Update the waste composition data of different waste generators in the City including different spatial types and housing is not clear how this should be achieved. Does the update mean waste composition analyses or is the update done based on existing data? In case of analyses will it be possible to continue waste analyses during the next phases of the project, so that a wider base of results could be used for the update of waste composition data? A19. The update can be done based on existing data. However, if the data is not available or deemed insufficient, the Consultant would be expected to carry out waste composition analysis. It is possible to continue waste analysis during the next phases of the Project. In any case, the Consultant shall ensure to acquire reasonable and good quality data as a baseline for future projections and inputs in developing the recycling scenarios. Q20. Task 2 The task also requires to evaluate recycling targets as set out in the European Union directives.. and at national / regional level that form a basis for the definition of specific recycling scenarios. We believe that only one set of targets can be used as a basis for any strategy so does the Strategy implement EU waste management targets, or the Georgian National Waste Management Strategy ( NWMS - Objective O.5, Target T.5.2 targets for recycling of paper, plastics, glass, metals; Objective O.7, Target T.7.2 targets for recycling of packaging, waste oils, WEEE etc. via EPR schemes - set for ) and Action Plan? Also, the chapter 4.2 of the National Waste Management Action Plan sets clearly, that The AP is in line with EU policies but the timing and social-economic situation of the country are to be carefully considered for the implementation of each Target, so it sounds reasonable to adhere to the targets set in the NWMS/AP? A20. The Consultant shall develop different scenarios for waste prevention and recycling and shall carry out a sustainability assessment (assessing environmental, social and economic impacts) of these scenarios. The scenario development shall include, for example, a maximum scenario that reflects the targets set out in the circular economy package of the EU (the amended waste Directives such as Directive (EU) 2018/851 and 852). Another scenario may be a national target scenario, while other may be mixed and may consider a stepwise increase of specific recycling rates. Different scenarios for collection systems and other system infrastructure may also be proposed. The Consultant shall present the results of the waste prevention and recycling scenarios and their sustainability assessment (impacts), as well as the cost and revenue analysis (results of Tasks 2 and 3) at a workshop to the City. The City will then select preferred strategies to implement. Q21. Task 4 The ToR specify that the Action Plan also shall include recommendations for an adjustment of the reporting requirements for waste generators and subsequent stakeholders in the waste management chain according to the National Waste Management Strategy. Reporting requirements are usually based on national legislation, so the Strategy/AP can hardly divert from the valid legislation. All actions related to the Objective O.8 and Tasks T.8.1

5 and T.8.2 in the NWMS are earmarked for the national Ministry of Environment (MENPR). Is it expected just to copy the respective passages from the NWMS/its Guidelines for Waste Data Collection and Reporting to the City Strategy? A21. The Consultant shall, in collaboration with the City, provide solutions (translated into an Action Plan) to meet the national reporting and monitoring requirements. The tasks in the National Waste Management Strategy are generic and will need to be elaborated further. The Consultant shall investigate the existing data and which requirements need to be elaborated. Questions to be tackled: where and how the data for different waste generators is collected, how the data is aggregated and reported to the next level, how can the data be used for monitoring and enforcement purposes at the City level and what is needed in order to do so, etc. Q22. Task 4 The task also says that The consultant will assist the regulator entities in implementation and sets up a monitoring plan for implementation. Does implementation refers to the Action Plan developed within the project? If yes, could you clarify what kind of assistance is expected (trainings, guidance documents, some toolkits...)? A22. The Consultant shall develop the monitoring plan, in order to enable the Client and the Consultant to efficiently monitor the implementation of the Action Plan. The Consultant is expected to assist the Client in all aspects of the Action Plan implementation including trainings, guidance documents, some toolkits, etc., as necessary and appropriate. Q23. We ask for your tender documents. A23. The RFP document is available and shall be downloaded using the link included in the Procurement Notice. No other documents are provided to the prospective consultants. Q24. We kindly ask to provide us with RFP documentation in order to enable us to present a bid in a scope and format, which includes all information which you need for evaluation. A24. See the answer for Q23. Q25. Section 1.4. Technical Proposal Standard Forms: Q25. A: In TECH-3 it states that the total number of pages for combined forms TECH-3(FTP) and TECH-4 (FTP) should not exceed 40. And, later, it states that tech 4 must have a maximum of 40 on its own. Therefore, we would like to know if the maximum number of 40 pages refers only to TECH-4 (if so, what would be the limit of TECH-3 pages?) or the sum of TECHs 3 and 4. Q25. B: On the other hand, in the TECH-6 states that the limit is of 5 pages. We understand that this page limit refers to each of the CVs of the experts proposed, but we would appreciate it if you confirmed it. A25. TECH-3(FTP) and TECH-4(FTP) shall not in total exceed 40 pages. Each CV in TECH-6 shall not exceed 5 pages.

6 Q26. Consultant profile: In point 4 on page 69 of "Section 2.1 Terms of Reference" a Solid Waste Engineer is requested (singular) and in contrast, in section Evaluation Criteria is about Solid Waste Engineers (plural). Could you please clarify if there is need a single expert or a group of experts for this specific position? A26. See the answer for Q11. Q27. Can you please clarify how many person should be included in the Pool of local experts for the Tblisi Solid Waste Project? A27. The Consultants shall at their own discretion decide the number of local experts. Q28. At the stage of the offer with the following documents mentioned in the ToR would be very helpful for this: 1. Waste Management Code of Georgia and the National Waste Management Strategy ( ) adopted in year Municipal Waste Management Plan, developed with the help of CENN Caucasus. 3. The Feasibility Study that was carried out by GWCC-INTERIVAL ZT GmbH. A28. Please note the following (The reports shall be sent to the Consultants via - Please send a request by !): 1. NWMAP and WMC are public documents. You can find its official Georgian on the website of Legislation herald of Georgia year Municipal Waste Management Plan is being developed. 3. The Feasibility Study that was carried out by GWCC-INTERIVAL ZT GmbH. with the consent of the EBRD we are sharing this Report, however, the Consultant are expected not to share it with any third parties. Q29.The requested Key Experts No3 (Solid Waste Engineers), No4 (Solid Waste Engineers with experience in scenario building and sustainability assessment) and No5 (Pool of Local Experts) are stated in plural (refer to ToR and Evaluation Criteria). Question: Do we understand correctly that this means that several persons can be proposed for each of these Key Expert positions, and that firstly each person nominated for one Key Expert position will be evaluated against the criteria for the respective position, and secondly the average score of all nominated persons will be used as score for the respective Key Expert position? A29. That is correct. Q30. According to the ToR chapter 1: The Tbilisi Municipal Solid Waste Strategy ( the Strategy ) is envisaged to be based on the Waste Management Code of Georgia and the National Waste Management Strategy ( ) adopted in 2016 Question: We kindly ask to provide the Waste Management Code of Georgia and the National Waste Management Strategy ( ) adopted in These base data would be essential for preparing the proposal, and endeavoring to give each bidder equal information level.

7 A30. See answer to Q28. Q31. According to the ToR chapter 1: Within the Project, another Technical Cooperation (TC) component aims to develop a Stakeholder Engagement and Stakeholder Participation Programme, which will also include public awareness raising components. In addition, different international organizations are providing different technical assistance components to the Government of Georgia and the City of Tbilisi. For example, the EU is funding technical assistance on the implementation of an Extended Producer Responsibility Scheme (EPR). Furthermore, Tbilisi City is working on 5 year the Municipal Waste Management Plan, which was developed with the help of CENN Caucasus. The consultants shall consider the outcomes of the Plan while working on the below assignment: According to ToR chapter 3, Task 1; A): As part of the Project preparation, the Bank has conducted a Feasibility Study (the FS ) to verify that the Project is bankable. The Feasibility Study was carried out by GWCC- INTERIVAL ZT GmbH. In June 2018, the Bank has launched the Environmental and Social Due Diligence of the Project, and the results shall be available by September 2018 Question: Is it allowed that a Consultant who has been or who is still involved in one of above mentioned assignments/cooperation/assistances, submits a proposal for the current assignment: Tbilisi Solid Waste Project Tbilisi Municipal Solid Waste Strategy, as that could constitute a conflict of interest respectively would give unfair information level advantage to the respective Consultant? A31. The Consultant may participate only in one assignment related to the Project. However, involvement of the Consultant in any previous completed assignment does not represent a conflict of interest and does not limit the Consultant s eligibility to participate in the current selection. Q32. According to the ToR, Section 1.4. Technical Proposal Standard Forms, Checklist of Required Forms: The page limit for TECH 6 (Team Composition, Key Experts Inputs, and attached Curriculum Vitae (CV)) is limited with 5 pages. Question: It seems quite unrealistic to prepare Team Composition, Key Experts Inputs, and attached Curriculum Vitae (CV) for TECH 6 on only 5 pages. We kindly ask for clarification. A32. See answer to Q25. Q33. According to ToR chapter 3, Task 1; A): In June 2018, the Bank has launched the Environmental and Social Due Diligence of the Project, and the results shall be available by September Question: Is the Environmental and Social Due Diligence of the Project already completed, and can it be made available? A33. With the consent of the EBRD we are sharing this Report, however, the Consultant are expected not to share it with any third parties. Q33. According to ToR chapter 3, Task 4: The consultant will assist the regulator entities in implementation and sets up a monitoring plan for implementation.

8 Run a pilot scheme based on the selected scenario for a few weeks with limited participants and identify potential issues in disseminating the scenario to the whole service area. Question: We kindly ask to define the term assist the regulator entities in implementation more precisely. Is it e.g. meant to provide assistance only for a pilot scheme with limited participants or for the whole Project area? Taking into consideration that according to ToR chapter 4 the deliverable/milestone Implementation support period should be provided within Weeks 28 to 78 after commencement date which comprises a period of nearly 12 months, a clarification of this task would endeavor each bidder to understand the equal implementation requirement and effort of this task. A33. The first part of the question these are two different tasks. The Consultants is expected to assist the regulator entities in implementation and sets up a monitoring plan for implementation. On as separate note, the Consultants will run a pilot scheme based on the selected scenario for a few weeks with limited participants and identify potential issues in disseminating the scenario to the whole service area. So the answer is no. Assisting to implement refers to the entire Action Plan. The Pilot scheme could refer to a certain scenario of waste separation or recycling. Second part of the question the implementation should start as soon as action Plan is approved. The Consultant is expected to assist the client on each step of the Plan. Q34. In Section 1.4, the RfP states that a maximum of 2 pages is required for Tech 3A On the Terms of Reference and 40 pages for Tech 4. However, the footnote reads: For the FTP, the total number of pages for combined forms TECH-3(FTP) and TECH-4 (FTP) should not exceed 40, which appears to contradict the first bit. A34. See answer to Q25. Q35. Is the limit for Team Composition, Key Experts Inputs, and attached Curriculum Vitae (CV) really 5 pages as it is stated in TECH-6? It seems to be really short of space. A35. See answer to Q25. Q36. Submission of proposal is only accepted by mail or by hand. However, do all signatures have to be in original for the two original copies or is it valid with electronic signatures? A36. The original shall be bear original signature(s) only. Electronic signature will be accepted in the copies. Q37.On page 66 of the TOR, under Task 4 : Action Plan for the implementation of selected waste prevention activities and recycling scenarios, there is a sub-task as follows: Within this Task, the Consultant shall among other things:. Run a pilot scheme based on the selected scenario for a few weeks with limited participants and identify potential issues in disseminating the scenario to the whole service area. Question: The scope and extent of this sub-task is not entirely clear, but could represent a significant investment in man-time and resources, depending upon the interpretation. Could you please define in more detail the scope of this sub-task?

9 A37. See answer to Q33. Q38.On page 66 of the TOR, under Task 4: The Action Plan also shall include recommendations for an adjustment of the reporting requirements for waste generators and subsequent stakeholders in the waste management chain according to the National Waste Management Strategy of Georgia. Question: Can you please provide the National Waste Management Strategy of Georgia? A38. See answer to Q28. Q39.On page 62 of the TOR : On the EU is funding technical assistance on the implementation of an Extended Producer Responsibility Scheme (EPR). Furthermore, Tbilisi City is working on 5 year the Municipal Waste Management Plan, which was developed with the help of CENN Caucasus. Question: Can you please provide a report or additional information on an Extended Producer Responsibility Scheme (EPR) Technical Assistance and the Municipal Waste Management Plan, developed by CENN Caucasus? A39. See answer to Q28. Q40. In order to prepare more competitive and high-quality proposal, we kindly ask you to extend the deadline for submission of the proposals for two weeks (by March 8 th, 2019). A40. The deadline for submission of proposals is extended until 1 March 2019 at 16:00 local time.

2016 CALL FOR PROPOSALS FOR PROJECTS ON PREVENTION AND PREPAREDNESS IN CIVIL PROTECTION AND MARINE POLLUTION

2016 CALL FOR PROPOSALS FOR PROJECTS ON PREVENTION AND PREPAREDNESS IN CIVIL PROTECTION AND MARINE POLLUTION 2016 CALL FOR PROPOSALS FOR PROJECTS ON PREVENTION AND PREPAREDNESS IN CIVIL PROTECTION AND MARINE POLLUTION 1. Is Turkey eligible under the External or the internal budget? Until the EU receives information

More information

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction

More information

Standard Request for Proposals Selection of Consultants

Standard Request for Proposals Selection of Consultants STANDARD PROCUREMENT DOCUMENTS Standard Request for Proposals Selection of Consultants Caribbean Development Bank October 2011 Foreword 1. This Standard Request for Proposals ( SRFP ) has been prepared

More information

for Developing and Implementing Quality Management System (ISO)

for Developing and Implementing Quality Management System (ISO) Health Authority Abu Dhabi REQUEST FOR PROPOSALS for Developing and Implementing Quality Management System (ISO) RFP # no.: 03/CS/HAAD/PT/2010 Bid issue date: February 18, 2010 Deadline for submission

More information

Procurement of Consultancy Services

Procurement of Consultancy Services STANDARD REQUEST FOR PROPOSALS Procurement of Consultancy Services Advertising Campaign & PR Services RFP # PUBED/07/16 iii CONTENTS Preface... v Section 1. Letter of Invitation... 3 Section 2. Instructions

More information

C A R I B B E A N C O M M U N I T Y C L I M A T E C H A N G E C E N T E R ( C C C C C ) REQUEST FOR PROPOSAL

C A R I B B E A N C O M M U N I T Y C L I M A T E C H A N G E C E N T E R ( C C C C C ) REQUEST FOR PROPOSAL C A R I B B E A N C O M M U N I T Y C L I M A T E C H A N G E C E N T E R ( C C C C C ) REQUEST FOR PROPOSAL Household Baseline Survey, Bartica, Guyana Contract #29/2017/ Italian Government /CCCCC October

More information

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

Bilateral Guideline. EEA and Norwegian Financial Mechanisms Bilateral Guideline EEA and Norwegian Financial Mechanisms 2014 2021 Adopted by the Financial Mechanism Committee on 9 February 2017 09 February 2017 Contents 1 Introduction... 4 1.1 Definition of strengthened

More information

SAMPLE REQUEST FOR PROPOSALS UNDER JAPANESE ODA LOANS

SAMPLE REQUEST FOR PROPOSALS UNDER JAPANESE ODA LOANS CONSULTANTS SAMPLE REQUEST FOR PROPOSALS UNDER JAPANESE ODA LOANS SELECTION OF CONSULTANTS Japan International Cooperation Agency (JICA) September 2009 version 1.0 CONTENTS Preface... i Section 1. Letter

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

CHECKLIST 4: EA QUALITY- AND COST-BASED SELECTION (QCBS) CHECKLIST

CHECKLIST 4: EA QUALITY- AND COST-BASED SELECTION (QCBS) CHECKLIST ADB Loan/Grant No. & Project Name Contract No. & Description Consulting Firm/Consultant Name Contract Amount Prepared By Date Reviewed/Noted By Date Guidance: The responsibility for the implementation

More information

Technical Cooperation: Guidelines for Clients Managing Donor Funded Consultancy Assignments. October 2014

Technical Cooperation: Guidelines for Clients Managing Donor Funded Consultancy Assignments. October 2014 Technical Cooperation: Guidelines for Clients Managing Donor Funded Consultancy Assignments October 2014 Definitions and Abbreviations Affiliate: AICU: Assignment: Consultant(s): Commitment Number: CRF:

More information

The Packaging Regulations

The Packaging Regulations The Packaging Regulations 2018 Introduction In 1994 the EU passed a Directive on packaging and packaging waste, stipulating targets for member countries on the amount of packaging that had to be diverted

More information

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial

More information

Specifications Invitation to tender No VT/2007/003

Specifications Invitation to tender No VT/2007/003 Specifications Invitation to tender No VT/2007/003 The payout phase of funded pensions (annuities and other products) 1. Title of the contract The payout phase of funded pensions (annuities and other products)

More information

REQUEST FOR PROPOSAL (RFP) For Auditing Service

REQUEST FOR PROPOSAL (RFP) For Auditing Service REQUEST FOR PROPOSAL (RFP) For Auditing Service Issue Date: Nov, 03, 2018 Closing Date: November 15, 2018 Question Inquiry Submission Deadline: November 14, 2018 Afghanistan Payments System (APS), House

More information

SPECIAL CONDITIONS OF TENDER

SPECIAL CONDITIONS OF TENDER Page 1 SPECIAL CONDITIONS OF TENDER A. INTRODUCTION The following documents are available on http://emits.esa.int/ under "Reference Documentation" --> "Administrative Documents": ESA Procurement Regulations

More information

Council of the European Union Brussels, 4 December 2015 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Council of the European Union Brussels, 4 December 2015 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union Council of the European Union Brussels, 4 December 2015 (OR. en) Interinstitutional File: 2015/0275 (COD) 14975/15 ADD 3 COVER NOTE From: date of receipt: 3 December 2015 To: No. Cion doc.: Subject: ENV

More information

Request for Proposals (RFP)

Request for Proposals (RFP) Macroeconomic and Financial Manag ement Institute of Eastern and Southern Africa 9 Earls Road Alexandra Park P. O. Box A1419, Avondale Harare, Zimbabwe Tel: +263 4 745988-89/91-94 Fax: +263 4 745547-8

More information

GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL. SELECTION OF CONSULTANTS- Individual

GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL. SELECTION OF CONSULTANTS- Individual GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS- Individual Introduction This Standard Procurement Documentation has been prepared by the NPTA for use by the Procuring Entities

More information

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND Type of Position: Local consultant Sustainable finance expert Location: Ulaanbaatar, Mongolia Type of Contract: Individual contract Expected

More information

Guidelines for the management of TCfunded consultancy assignments. EBRD clients

Guidelines for the management of TCfunded consultancy assignments. EBRD clients Guidelines for the management of TCfunded consultancy assignments EBRD clients Definitions and Abbreviations Affiliate AICU Assignment CCPD Consultant(s) Commitment Number CRF CSU CV Donor ESP Experts

More information

Tender Specifications attached to the Invitation to tender

Tender Specifications attached to the Invitation to tender Ref. Ares(2015)3457155-20/08/2015 Tender Specifications attached to the Invitation to tender Brussels, 20/08/2015 Invitation to tender N SRB/NEG/1/2015 for the provision of legal advice for bridge financing

More information

Terms of Reference [COUNTRY] [PROJECT NAME] Pilot PPP/CONCESSION PROJECTS. Consulting Services

Terms of Reference [COUNTRY] [PROJECT NAME] Pilot PPP/CONCESSION PROJECTS. Consulting Services Terms of Reference [COUNTRY] [PROJECT NAME] Pilot PPP/CONCESSION PROJECTS Consulting Services I BACKGROUND 1. The Ministry of [ ] and the World Bank entered into an [AGREEMENT] signed on [DATE] for a period

More information

Assignment of Consultants

Assignment of Consultants Financial Cooperation Assignment of Consultants August 2016 Guidelines for the Assignment of Consultants in Financial Cooperation with Partner Countries Published by: KfW Bankengruppe Palmengartenstrasse

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 18.2.2016 COM(2016) 75 final 2016/0047 (NLE) Proposal for a COUNCIL DECISION amending Decision 2008/376/EC on the adoption of the Research Programme of the Research Fund for

More information

1. Title of the contract

1. Title of the contract Specifications Invitation to tender No VT/2007/055 Economic and social impact of the agreement concluded between social partners on certain aspects of the working conditions of mobile workers engaged in

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL RFP NUMBER: RFP 00/04/2018 DESCRIPTION: THE PROVISION OF EVENTS MANAGEMENT SERVICES PUBLICATION DATE: 08 April 2018 VALIDIY PERIOD: CLOSING DATE: 02 May 2018 CLOSING TIME: DELIVERY

More information

12 April, Introduction

12 April, Introduction INVITATION FOR EXPRESSION OF INTEREST TO ACT AS A FINANCIAL ADVISER TO THE HELLENIC REPUBLIC ASSET DEVELOPMENT FUND FOR THE PROVISION OF SERVICES REGARDING THE EXPLOITATION OF ITS SHAREHOLDING STAKES IN

More information

ECMWF Copernicus Procurement

ECMWF Copernicus Procurement ECMWF Copernicus Procurement Invitation to Tender CLARIFICATIONS Clarifications issued 28 November 2017 ITT Ref: COP_031 ISSUED BY: ECMWF Administration Department Procurement Section We are pleased to

More information

E&O INSURANCE POLICIES

E&O INSURANCE POLICIES STATE OF ALASKA Department of Administration 333 Willoughby Ave, Room 700 P.O. Box 110210 Juneau, AK 99811-0210 ITB 2017-0800-3694 Amendment #1 May 31, 2017 This amendment is being issued to answer questions

More information

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. If yes, please specify the relevant regulatory

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3909 YF Public Disclosure Authorized Development Credit Agreement (Transport Rehabilitation Project) Public Disclosure Authorized between SERBIA

More information

(CALL FOR PROPOSALS) FAST TRACK FEASIBILITY STUDIES

(CALL FOR PROPOSALS) FAST TRACK FEASIBILITY STUDIES Page 1 SPECIAL CONDITIONS OF TENDER FOR THE Integrated Applications Promotion (IAP) Programme (CALL FOR PROPOSALS) FAST TRACK FEASIBILITY STUDIES Page 2 INTRODUCTION For the purposes of this Call for Proposals

More information

New Homes Baseline and Market Characterization Evaluation Question & Answer July 19, 2016

New Homes Baseline and Market Characterization Evaluation Question & Answer July 19, 2016 New Homes Baseline and Market Characterization Evaluation Question & Answer July 19, 2016 1. Could you clarify the expected completion date for the project? Section 2.1 of the RFP lists August 31, 2017

More information

CSJU-Procedure 2.5. Guidelines for Members and Partners on Subcontracting

CSJU-Procedure 2.5. Guidelines for Members and Partners on Subcontracting CSJU-Procedure 2.5 Guidelines for Members and Partners on Subcontracting 03 October 2013 Revision History Table Version n Issue Date V. 01 19 November 2009 V. 02 03 October 2013 Clean Sky JU 2013 Please

More information

Letter of invitation of bids for appointment of Transaction Advisor for the selection of HSRP Vendor in the State of Madhya Pradesh

Letter of invitation of bids for appointment of Transaction Advisor for the selection of HSRP Vendor in the State of Madhya Pradesh 1 Letter of invitation of bids for appointment of Transaction Advisor for the selection of HSRP Vendor in the State of Madhya Pradesh Table of Contents 1. Letter of invitation.. 3-4 2. Data Sheet.. 5-6

More information

Interreg Alpine Space programme

Interreg Alpine Space programme Interreg Alpine Space programme Tender Document SEA of the Interreg Alpine Space Programme 2021-2027 European Territorial Cooperation Status: 9.4.2019 I. Context The Interreg Alpine Space Programme strives

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

How to Develop High-Quality Full Application Writing a Winning Proposal

How to Develop High-Quality Full Application Writing a Winning Proposal How to Develop High-Quality Full Application Writing a Winning Proposal Information and Training Workshop Presentations held at the Country Workshops in Moldova, Ukraine and Georgia Day 1 Day!One!!!! Workshop

More information

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation Office of the Auditor General of Norway Handbook for the Office of the Auditor General s Development Cooperation i Photo: The Office of the Auditor General of Norway Illustration: Lobo Media AS March 2009

More information

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) FAQ Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) CORRIGENDUM: In the first version of the Application Guide,

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT

EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT COMPLAINT MECHANISM COMPLIANCE REVIEW MONITORING REPORT I PARAVANI HYDROPOWER PROJECT, REQUEST NUMBER: 2012/01 November 2014 1 1 The report is prepared

More information

Austin Independent School District Contract and Procurement Services 1111 West 6th Street Suite A330 Austin, Texas

Austin Independent School District Contract and Procurement Services 1111 West 6th Street Suite A330 Austin, Texas Contract and Procurement Services 1111 West 6th Street Suite A330 Austin, Texas 78703-5399 March 22, 2016 REQUEST FOR QUALIFICATIONS The Austin Independent School District is soliciting Statements of Qualifications

More information

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist I. Introduction With the support of UNDP, the Single Project Implementation Unit (SPIU) of the Ministry of Disaster Management

More information

UNIVERSAL SERVICE AND ACCESS FINAL REPORT

UNIVERSAL SERVICE AND ACCESS FINAL REPORT UNIVERSAL SERVICE AND ACCESS FINAL REPORT 0 1 Contents INTRODUCTION... 2 Updates... 4 Electronic Communications Bill... 4 Electronic Communications (Universal Service and Access Fund) Regulations... 12

More information

Assignment of Consultants

Assignment of Consultants Financial Cooperation Assignment of Consultants August 2016 Guidelines for the Assignment of Consultants in Financial Cooperation with Partner Countries Published by: KfW Bankengruppe Palmengartenstrasse

More information

JASPERS Networking Platform

JASPERS Networking Platform JASPERS Networking Platform Supporting investments in Smart Grids in 2014-2020 Background and Introduction Massimo Marra, Senior Officer JASPERS Networking and Competence Center Brussels, 25 March 2015

More information

REQUEST FOR PROPOSAL FOR THE PROVISION OF EXTERNAL AUDIT SERVICES FOR THE THREE YEARS

REQUEST FOR PROPOSAL FOR THE PROVISION OF EXTERNAL AUDIT SERVICES FOR THE THREE YEARS REQUEST FOR PROPOSAL FOR THE PROVISION OF EXTERNAL AUDIT SERVICES FOR THE THREE YEARS 2019 2021 REFERENCE NUMBER: RFP/AUDIT01/2018 1 P a g e REQUEST FOR PROPOSAL (RFP) RFP/AUDIT01/2018 PROVISION OF EXTERNAL

More information

EUROPEAN INDUSTRY AND MONETARY POLICY The role of the EIB

EUROPEAN INDUSTRY AND MONETARY POLICY The role of the EIB EUROPEAN INDUSTRY AND MONETARY POLICY The role of the EIB EXECUTIVE SUMMARY June 29th 2016 EESC-2016-03071-00-00-TCD-TRA (ES) 1/6 EN EXECUTIVE SUMMARY Background to the project The Investment Plan for

More information

PROCUREMENT POLICY AND PROCEDURES 1. PURPOSE

PROCUREMENT POLICY AND PROCEDURES 1. PURPOSE PROCUREMENT POLICY AND PROCEDURES 1. PURPOSE This document sets out the policy and authorisation procedures that are required for the acquisition of all goods and services by London & Partners. Their purpose

More information

content/en/all/?uri=celex:32006r1893 (bilingual display is possible). Q14 In case of a team that is not yet organized under a legal structure, what

content/en/all/?uri=celex:32006r1893 (bilingual display is possible). Q14 In case of a team that is not yet organized under a legal structure, what Clarification Document to the Call for Expression of Interest R-FOF-RO 2016/03 to select Financial Intermediaries that will receive resources from the ESIF Regional Fund-of-Funds Romania to implement the

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL FOR APPOINTMENT OF CONSULTANT FOR PREPARATION OF DETAILED PROJECT REPORT FOR MIXED USE PROJECT AT SURYA NAGAR LAXMAN GHAR, BARETH GWALIOR (M. P.) MADHYA PRADESH HOUSING AND INFRASTRUCTURE

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of Reference GENERAL INFORMATION Title: Event Management Consultant Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports to: National Programme Manager Duty

More information

TERMS OF REFERENCE. Tender n DG EAC 02/04

TERMS OF REFERENCE. Tender n DG EAC 02/04 TERMS OF REFERENCE Annex 1 Tender n DG EAC 02/04 Study on the economic and cultural impact, notably on co-productions, of territorialisation clauses of state aids schemes for films and audiovisual productions

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

Supreme Audit Institutions Performance Measurement Framework. QUALITY ASSURANCE CHECKLIST FOR TERMS OF REFERENCE Draft version 1.1

Supreme Audit Institutions Performance Measurement Framework. QUALITY ASSURANCE CHECKLIST FOR TERMS OF REFERENCE Draft version 1.1 Supreme Audit Institutions Performance Measurement Framework QUALITY ASSURANCE CHECKLIST FOR TERMS OF REFERENCE Draft version 1.1 October 2014 INTOSAI-Donor Secretariat for the INTOSAI Working Group on

More information

MILLENNIUM CHALLENGE ACCOUNT NAMIBIA FUNDED BY THE UNITED STATES OF AMERICA THROUGH THE MILLENNIUM CHALLENGE CORPORATION REQUEST FOR PROPOSALS

MILLENNIUM CHALLENGE ACCOUNT NAMIBIA FUNDED BY THE UNITED STATES OF AMERICA THROUGH THE MILLENNIUM CHALLENGE CORPORATION REQUEST FOR PROPOSALS MILLENNIUM CHALLENGE ACCOUNT NAMIBIA FUNDED BY THE UNITED STATES OF AMERICA THROUGH THE MILLENNIUM CHALLENGE CORPORATION REQUEST FOR PROPOSALS MCAN/COM/RFP/1A02011 FOR TECHNICAL ASSISTANCE TO THE MINISTRY

More information

In accordance with this provision, we hereby present such a clarification document.

In accordance with this provision, we hereby present such a clarification document. JEREMIE Slovakia: Clarification of Call for Expression of Interest No. JER-005/2 to select Financial Intermediaries that will receive resources from the JEREMIE Holding Fund for Slovakia to implement the

More information

Evaluation and future development of the EIA system in Jordan

Evaluation and future development of the EIA system in Jordan MEDITERRANEAN ENVIRONMENTAL TECHNICAL ASSISTANCE PROGRAM Evaluation and future development of the EIA system in Jordan A report prepared under the METAP EIA Institutional Strengthening Project December

More information

GLOBAL TERMS OF REFERENCE FRAMEWORK CONTRACT SERVICES FOR THE IMPLEMENTATION OF EXTERNAL AID (SIEA) 2018 EUROPEAID/138778/DH/SER/MULTI CONTENTS

GLOBAL TERMS OF REFERENCE FRAMEWORK CONTRACT SERVICES FOR THE IMPLEMENTATION OF EXTERNAL AID (SIEA) 2018 EUROPEAID/138778/DH/SER/MULTI CONTENTS GLOBAL TERMS OF REFERENCE FRAMEWORK CONTRACT SERVICES FOR THE IMPLEMENTATION OF EXTERNAL AID (SIEA) 2018 EUROPEAID/138778/DH/SER/MULTI CONTENTS 1 BACKGROUND INFORMATION... 2 1.1 GENERAL INFORMATION...

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS

MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS Grant Agreement number: [insert number] [insert acronym] [insert call identifier of the master call] H2020 Model Grant Agreement: Multi-beneficiary General MGA: December 2013 ANNEX 5 MODEL FOR THE CERTIFICATE

More information

ANNEX VIII a STANDARD FORMATS AND TEMPLATES

ANNEX VIII a STANDARD FORMATS AND TEMPLATES ANNEX VIII a STANDARD FORMATS AND TEMPLATES STANDARD BID EVALUATION FORMAT FOR THE PROCUREMENT OF GOODS 1 Preface 1. This standard tender evaluation format for the procurement of Goods has been prepared

More information

Request for Proposals: Data Collection Services in Haiti

Request for Proposals: Data Collection Services in Haiti Request for Proposals: Data Collection Services in Haiti Project: RFP number: Funder: RFP Release Date: Deadline for Questions: Answers to Questions: Deadline for Proposals: Contact: LOKAL+ Program Evaluation

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE COMISSAO NACIONAL DE APROVISIONAMENTO Rua dos Direitos Humanos, Dili, Timor Leste REQUEST FOR PROPOSALS CONSULTING SERVICES FOR CONSTRUCTION SUPERVISION FOR THE UPGRADING

More information

UNICEF Moldova. Terms of Reference

UNICEF Moldova. Terms of Reference UNICEF Moldova Terms of Reference Individual Consultancy on Public Finance for Development of the National Action Plan for Gradual Implementation of the Sanitary and Hygiene Norms for Preschools Duration

More information

ENERGY SAVINGS PERFORMANCE CONTRACT. between THE CITY [\] / MUNICIPALITY [\] and [ESCO COMPANY]

ENERGY SAVINGS PERFORMANCE CONTRACT. between THE CITY [\] / MUNICIPALITY [\] and [ESCO COMPANY] ENERGY SAVINGS PERFORMANCE CONTRACT between THE CITY [\] / MUNICIPALITY [\] and [ESCO COMPANY] At [place], [day] [month] 2014 1 Pursuant to (i) Article 26 in relation to Article 27 of the Energy Efficiency

More information

JASPERS Advisory and capacity building support for projects and investment

JASPERS Advisory and capacity building support for projects and investment JASPERS Advisory and capacity building support for projects and investment Massimo Marra, Senior Officer JASPERS Networking and Competence Centre JASPERS-EPEC Seminar on Blending ESI Funds and PPPs Brussels,

More information

Contracting Process Step One Starting the Process. College needs goods or services. Determine if you need a contract or not

Contracting Process Step One Starting the Process. College needs goods or services. Determine if you need a contract or not ing Process Step One Starting the Process College needs goods or services Do you know what vendor you will use? Determine if you need a contract or not Research Vendors Do I need to do an RFP? RFP Process

More information

REQUEST FOR PROPOSAL. For

REQUEST FOR PROPOSAL. For REQUEST FOR PROPOSAL For APPOINTMENT OF CONSULTANT FOR PROJECT MANAGEMENT UNIT (PMU) FOR MADHYA PRADESH HOUSING AND INFRASTRUCTURE DEVELOPMENT BOARD AT BHOPAL MADHYA PRADESH HOUSING AND INFRASTRUCTURE

More information

Information Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support.

Information Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support. EUROPEAN COMMISSION Neighbourhood and Enlargement Negotiations A - STRATEGY AND TURKEY A.5 TURKEY Secretariat of the EU Facility for Refugees In Turkey Information Session on the Calls for Expression of

More information

Report on the annual accounts of the Bio-based Industries Joint Undertaking for the financial year Together with the Joint Undertaking s reply

Report on the annual accounts of the Bio-based Industries Joint Undertaking for the financial year Together with the Joint Undertaking s reply Report on the annual accounts of the Bio-based Industries Joint Undertaking for the financial year 2017 Together with the Joint Undertaking s reply 12, rue Alcide De Gasperi - L - 1615 Luxembourg T (+352)

More information

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms 2014-2021 Table of Contents 1. Introduction... 3 1.1 Objectives

More information

Selection of Consultants

Selection of Consultants Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized STANDARD REQUEST FOR PROPOSALS Selection of Consultants The World Bank Washington, D.C.

More information

INVITATION TO TENDER

INVITATION TO TENDER INVITATION TO TENDER To undertake an ex-ante assessment of the case for 2014-20 ERDF investment by Cheshire and Warrington and Stoke-on-Trent and Staffordshire LEPs into a new Urban Development Fund established

More information

Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2

Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2 CA-01-04-2018 Call for offers for the consultancy services Survey on environmental responsibility of small and medium enterprises (SME), Call 2 in scope of the LIFE project Baltic pilot cases on reduction

More information

IPA Projects A Glance on a Consultants Experiences

IPA Projects A Glance on a Consultants Experiences IPA Projects A Glance on a Consultants Experiences Christian Oberleitner Senior Consultant 1 THE SPECIALIST FOR PUBLIC CONSULTING DEPARTMENT THE SPECIALIST FOR PUBLIC CONSULTING Content KPC Short company's

More information

Official Journal of the European Union L 111/13

Official Journal of the European Union L 111/13 28.4.2007 Official Journal of the European Union L 111/13 COMMISSION REGULATION (EC, EURATOM) No 478/2007 of 23 April 2007 amending Regulation (EC, Euratom) No 2342/2002 laying down detailed rules for

More information

FORM I: CIQ CONFLICT OF INTEREST CERTIFICATION AND CONFLICT OF INTEREST QUESTIONNAIRE (CIQ) INSTRUCTIONS dated 6/29/2007

FORM I: CIQ CONFLICT OF INTEREST CERTIFICATION AND CONFLICT OF INTEREST QUESTIONNAIRE (CIQ) INSTRUCTIONS dated 6/29/2007 HOUSTON INDEPENDENT SCHOOL DISTRICT RFP NUMBER 16-10-48 RFP TEACHER AND STAFF DEVELOPMENT ADDENDUM NUMBER TWO April 8, 2017, This addendum is issued to explain, modify or correct the original Request for

More information

Framework agreements. Framework agreement. Figure 1: Call-offs over the term of a framework contract. Package / batch /

Framework agreements. Framework agreement. Figure 1: Call-offs over the term of a framework contract. Package / batch / Framework agreements The Standard for Infrastructure Procurement and Delivery Management includes provisions for framework agreements. Framework agreements have similarities with term service and transversal

More information

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment PMR Project Implementation Status Report (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Socialist Republic of Vietnam Reporting Period: From 08/20/2017 to 04/03/2018 Report Date:

More information

ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5

ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5 Appendix 4 to ESA ITT AO/1-8266/15/NL/MP Page 1/15 ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5 [COVER LETTER] From:... (Tenderer to insert name of the company/institute

More information

Request for Proposals COMPOSTING TECHNICAL ASSISTANCE

Request for Proposals COMPOSTING TECHNICAL ASSISTANCE Request for Proposals COMPOSTING TECHNICAL ASSISTANCE Release Date: September 19, 2014 Contact for Proposals: Ben Gauthier, ANR, DEC Waste Management and Prevention Division (802) 522-5080 benjamin.gauthier@state.vt.us

More information

ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5

ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5 Page 1 ESA TENDERING STANDARDS FOR EXPRESS PROCUREMENT ( EXPRO & EXPRO+ ) PROPOSAL TEMPLATE V5 [COVER LETTER] From:... (Tenderer to insert name of the company/institute submitting the tender) Date:...

More information

The Insurance Sector Education and Training Authority (INSETA)

The Insurance Sector Education and Training Authority (INSETA) The Insurance Sector Education and Training Authority (INSETA) Request for Bid: Development of a Better Business Toolkit for SMME brokerages Tender: IPO/13/2007 Date issued: 18 November 2007 Closure date:

More information

Keywords: recycling, lead acid battery, PPP, Jordan

Keywords: recycling, lead acid battery, PPP, Jordan Assessment of Sustainable Used Lead Acid Battery Collection and Recycling Scheme in Jordan G. Iliopoulos 1, M.Dimitropoulou 1, D.Bourkas 1, A.Bourka 1, V.Stergiou 1, 1 EPTA Environmental Consultants Engineers,

More information

REPUBLIC OF KENYA OFFICE OF THE ATTORNEY GENERAL AND DEPARTMENT OF JUSTICE REQUEST FOR PROPOSALS

REPUBLIC OF KENYA OFFICE OF THE ATTORNEY GENERAL AND DEPARTMENT OF JUSTICE REQUEST FOR PROPOSALS REPUBLIC OF KENYA OFFICE OF THE ATTORNEY GENERAL AND DEPARTMENT OF JUSTICE REQUEST FOR PROPOSALS CONSULTANCY SERVICES TO SUPPORT OAG & DOJ TO BE ISO 9001:2015 AND ISO/IEC 27001:2103 CERTIFIED TENDER NO.

More information

City of Forest Park Request for Proposals. Landscape Installation, 803 & 785 Forest Parkway, Forest Park Ga

City of Forest Park Request for Proposals. Landscape Installation, 803 & 785 Forest Parkway, Forest Park Ga City of Forest Park Request for Proposals Landscape Installation, 803 & 785 Forest Parkway, Forest Park Ga. 30297 Mandatory Pre-Proposal Conference at August 19, 2014 at 10:00 am Proposal Deadline September

More information

THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17

THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17 THE NATIONAL CREDIT REGULATOR SEPTEMBER 2017 TERMS OF REFERENCE FOR THE APPOINTMENT OF AN ADVERTISING AND MEDIA BUYING AGENCY RFP NUMBER: NCR445/09/17 DUE DATE: 3 OCTOBER 2017 1 SECTION 1 GENERAL TERMS

More information

Guide to Financial Issues relating to ICT PSP Grant Agreements

Guide to Financial Issues relating to ICT PSP Grant Agreements DG COMMUNICATIONS NETWORKS, CONTENT AND TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme Guide to Financial Issues relating to ICT PSP Grant Agreements Version

More information

FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN FOR ENERGY EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION

FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN FOR ENERGY EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION Call for Expert ASEAN Centre for FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION About ACE Established on 1 January

More information

ON STRATEGIC INVESTMENTS IN THE REPUBLIC OF KOSOVO. Based on Article 65 (1) of the Constitution of the Republic of Kosovo,

ON STRATEGIC INVESTMENTS IN THE REPUBLIC OF KOSOVO. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW No. 05/L-079 ON STRATEGIC INVESTMENTS IN THE REPUBLIC OF KOSOVO The Assembly of the Republic of Kosovo; Based on Article 65 (1) of the Constitution of the Republic of Kosovo, Approves LAW ON STRATEGIC

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT Advertised on behalf of: TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT POST TITLE: National Consultant to formulate the upgraded guideline packages of the District Development Fund (DDF) AGENCY/PROJECT

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL DIRECTIVE

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL DIRECTIVE EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, YYY COM(2007) AAA final 2007/BBB (CNS) Proposal for a COUNCIL DIRECTIVE amending Directive 2006/112/EC on the common system of value added tax,

More information

SPECIAL TENDER CONDITIONS FOR THE

SPECIAL TENDER CONDITIONS FOR THE Page 1 SPECIAL TENDER CONDITIONS FOR THE Integrated Applications Promotion (IAP) Programme (CALL FOR PROPOSALS) FEASIBILITY STUDIES Page 2 A. INTRODUCTION The following documents are available on http://emits.esa.int/

More information

REQUEST FOR PROPOSALS (RFP/UNDP/INDIA/2014/002)

REQUEST FOR PROPOSALS (RFP/UNDP/INDIA/2014/002) REQUEST FOR PROPOSALS Selection of Cluster Level Agencies (CLA) to support implementation of energy efficient production in small scale steel industry in India (RFP/UNDP/INDIA/2014/002) United Nations

More information

VAT. 1 General Questions. 1.1 What is Tax? 1.2 What is VAT?

VAT. 1 General Questions. 1.1 What is Tax? 1.2 What is VAT? VAT Home / Resources And Budget / VAT These responses to FAQs are intentionally simplified. If you are seeking more detailed information we recommend that you wait for further policy announcements by the

More information

TERMS OF REFERENCE FOR A JUNIOR CONSULTANT TO SUPPORT SOMALIA WORK PROGRAMME

TERMS OF REFERENCE FOR A JUNIOR CONSULTANT TO SUPPORT SOMALIA WORK PROGRAMME REQUEST FOR EXPRESSIONS OF INTEREST African Development Bank Group Eastern Africa Regional Development and Business Delivery Office (RDGE) Khushee Towers, Longonot Road Plot 11, Upper Hill P.O Box 4861-00200

More information