No.25/1/2014-APDRP Government of India Ministry of Power (Distribution Division) EFC MEMORANDUM. Proposal for Deendayal Upadhyaya Gram Jyoti Yojana

Size: px
Start display at page:

Download "No.25/1/2014-APDRP Government of India Ministry of Power (Distribution Division) EFC MEMORANDUM. Proposal for Deendayal Upadhyaya Gram Jyoti Yojana"

Transcription

1 No.25/1/2014-APDRP Government of India Ministry of Power (Distribution Division) EFC MEMORANDUM Date: 7th August Proposal identification 1.1 Title of the proposal. Proposal for Deendayal Upadhyaya Gram Jyoti Yojana 1.2 Name of the sponsoring agency (Ministry/ Department/ Autonomous Body/ Central PSE). Ministry of Power 1.3 Proposed duration of the proposal / Scheme. Proposal is for balance period of XII Five Year Plan (i.e to ) and XIII Plan. 1.4 Total cost of the proposal over the proposed duration. Total cost of the scheme is Rs Crore and requirement of GBS from Govt. of India is Rs Crore over the implementation period. Planning commission has allocated GBS of Rs 2500 Crores for Feeder Separation works under 12 th Five Year Plan which needs to be enhanced as per proposal. 1.5 Nature of scheme: Central Sector/ Centrally Sponsored/Additional Central Assistance Central Sector 2. Proposal Category 2.1 Please indicate which category the proposal belongs to: (a) Continuing scheme from past Plan periods and included in current Plan period. No (b) New Plan Proposal included in the current Plan period Yes. However, necessary GBS would require enhancement as per proposal. (c) New Plan Proposal not included in the current Plan period No 2.2 If proposal pertains to category 2.1 (a), then please indicate the benefits already accrued and expenditure already incurred. Page 1 of 24

2 2.2(a) Also for proposals belonging to category 2.1 (a),an evaluation report by an independent agency with comments of FA/IFD thereon may be provided along with following details as Annexure to EFC/PIB memo: 2.2(b) If there are changes proposed in the proposal belonging to category 2.1(a), please provide existing provisions and proposed changes against each component in tabular form along with financial implications due to the proposed changes: 2.3 If the proposal pertains to category 2.1 (c), please indicate whether inprinciple approval of Planning Commission has been obtained. 2.4 Please indicate in case of new Centrally Sponsored Scheme or Major change in ongoing CSS, whether States/UTs have been consulted and their consent obtained to implement the scheme with proposed sharing of funds. as proposed scheme is a Central Sector scheme. 3. Justification for the Proposal 3.1 The justification for taking up new / continuing the ongoing proposal may be provided. In rural areas of the country, the agricultural and non-agricultural load (domestic and non-domestic) is typically catered through common distribution network. Availability of power supply in rural areas is erratic in most parts of the country. Besides non-availability of adequate power, common distribution network for agricultural and non-agricultural load is also considered as one of the major constraints for supply of adequate reliable power to rural area. Distribution utilities, to mitigate the gap between supply and demand practise frequent load shedding in rural areas and in the process, non-agricultural consumers are also deprived of supply since they are fed from the same feeder. To overcome this situation, a number of States like Andhra Pradesh, Gujarat, Haryana, Karnataka, Madhya Pradesh, Maharashtra, Punjab, Rajasthan etc. have undertaken capital investment programs to separate the agricultural load from the non-agricultural (household & small commercial-primarily single phase) load in the rural areas. Feeder separation refers to supply of electricity to agricultural consumers and non-agricultural consumers (domestic and non-domestic) separately through dedicated feeders. This arrangement allows the distribution company to selectively control power supply to agricultural consumers as and when needed for effective Demand Side Management (DSM). The separation of feeders helps in flattening of the load curve by shifting the agricultural load to offpeak hours and thus helps in load management. Even though the States are incurring capital expenditure against these kinds of works, a continual infusion of funds is required for ensuring that the feeders remain separated and do not become mixed feeder in due course. Page 2 of 24

3 Besides separation of feeders, strengthening and augmentation of subtransmission and distribution infrastructure is also considered necessary to ensure reliable and quality power supply in rural areas. Further, metering at consumer end as well as at the distribution transformers and feeders is also a vital part in building a framework for energy accounting and identifying high loss pockets and initiating remedial measures towards reduction of losses. Keeping in view the huge capital investment requirement for separation of feeders, strengthening & augmentation of sub-transmission & distribution infrastructure including metering and also considering the poor financial health of the State owned DISCOMs / Power Deptt, it is proposed to extend financial support from Government of India for implementation of scheme. Implementation of scheme would result in improvement in quality & reliability of power supply which in turn would facilitate socio-economic development in rural areas. 3.2 The alternatives that have been considered before firming up the design of the proposal may be stated. (This should also include alternate modes of proposal delivery, e.g. outsourcing, PPP, etc. that have been considered). Distribution of power is a licensed business regulated by the State Electricity Regulatory Commissions. Further, almost all the distribution utilities are owned by the States except for few Private Distribution Companies, which shall not be eligible for financial support under the scheme. Keeping in view the present financial condition of State owned Discom/Dept., the proposed scheme is considered suitable. 3.3 Please state whether the proposal has objectives and coverage which overlap with projects/ schemes being implemented by the same or another agency (Ministry/ Department/ State government). In cases of overlap, please state why the proposal needs to be considered as a separate stand alone effort. There is no overlap with objectives and coverage of other projects / schemes being implemented in rural areas by Govt. of India. However, ongoing activities under RGGVY for providing access to electricity to rural households can be leveraged towards attainment of objectives of the proposed scheme. 4. Proposal Objectives and targets 4.1 The objectives of the proposal may be mentioned. These objectives should flow from the proposal justification. The main objectives of the scheme are as under: To separate agriculture and non-agriculture feeders in rural areas; To facilitate Discoms in the judicious rostering of supply to agricultural & nonagricultural consumers in rural areas; Strengthening and Augmentation of Sub Transmission & Distribution infrastructure in rural areas. Page 3 of 24

4 4.2 The specific targets proposed to be achieved of the proposal may be mentioned. These targets should be necessarily measurable. These should also be monitorable, against baseline data. The baseline may be indicated. Sr. Particulars Target No. 1. No. of feeders to be separated / laid Nos. 2. New Sub-stations 1620 Nos. 3. Augmentation of existing sub-stations 1615 Nos or 66 KV lines Kms 5. Installation of Distribution Transformers 2 Lakh 6. Installation of meters at consumer end / 1,19,10,800 distribution transformers / feeders The above parameters have been arrived at based on estimation. Actual parameters would be finalized based on DPRs to be formulated by the State Discoms/ Power Deptt. and approved by the proposed Monitoring Committee under the scheme. 4.3 The outcomes of the proposal to be achieved should be indicated. These outcomes should be in the form of measurable indicators which can evaluate the proposal on quarterly / half yearly / annual / plan basis. Sr. Expected Outcome No. 1. Improvement in hours of power supply 2. Reduction in peak load 3. Improvement in billed energy based on metered consumption Actual parameters shall be worked out based on DPRs to be approved by the proposed Monitoring Committee under the scheme. 4.4 Briefly explain the objectives of the other programmes / projects undertaken by Ministry / Dept which are in convergence with the objectives of proposed proposal. Ongoing activities under RGGVY for providing access to electricity to rural households can be leveraged towards attainment of objectives of the proposed scheme. 4.5 Please indicate whether the proposal is for current Plan only or will continue in next Plan also. The scheme will continue in next Plan also. 5. Gender Analysis of the Proposal 5.1 Briefly explain the specific objectives of the proposal relating only to women. The proposed scheme is gender neutral. Page 4 of 24

5 5.2 In case the proposal has gender components, please provide the following information in tabular form as shown below. Gender Component Component 1, 2,3 & so on % of total expenditure on this component 6. Proposal design 6.1 Briefly explain the proposal Design. This should include all components of the proposal Scope of works The illustrative list of works proposed to be undertaken in rural areas under the scheme is as follows: Physical separation of HT feeders for Agricultural and non-agricultural consumers Laying of new HT feeders and LT lines Virtual separation of feeders by way of reorientation of existing feeders and creation of other related infrastructure Creation of new Sub stations and augmentation of existing ones Laying of 66 KV and 33 kv lines and augmentation of existing lines. Installation of new distribution transformers including Specially Designed Transformers (SDTs) and augmentation of existing distribution transformers Procurement & installation of meters for feeders, distribution transformers & all class of consumers for new connection and for existing un-metered connections, replacement of faulty meters and conversion of electromechanical to static meters. Relocation of meters & replacement of service cables Laying of Aerial Bunched Cables (ABC) and service lines. Re-conductoring (replacement and up-gradation) of existing HT and LT feeders Completion of optical fibre missing links to connect all the 33 KV or 66 KV grid sub stations under the establishment of National Optical Fibre Network (NOFN). Other specific works for achieving the objectives of the scheme. Above works shall be eligible under the scheme provided proposed scope of works is not covered under any GoI program like R-APDRP/ RGGVY / NEF etc. The projects for which any other grant / subsidy from Government of India has already been received / proposed to be received shall not be eligible under this scheme Estimated cost The estimated cost of the proposed scheme is about Rs crore. Page 5 of 24

6 6.1.3 Eligible Utilities All State owned Discoms and Power Departments shall be eligible for financial assistance under the scheme Formulation of DPR and Project Appraisal Mechanism Discoms will prioritize Strengthening of rural infrastructural works considering specific network requirement and will formulate bankable DPRs (Detailed Project Reports) of the projects for coverage under the scheme. The DPRs shall be recommended by existing State Level Standing Committee (SLSC) constituted for RGGVY programme under the chairmanship of Chief Secretary (Scope of Committee shall be extended to cover Deendayal Upadhyaya Gram Jyoti Yojana) before submission to Nodal Agency. The SLSC shall ensure that there is no duplication of works while recommending the projects to Nodal Agency (REC). The projects shall be appraised and duly recommended by Nodal Agency before approval of Monitoring Committee chaired by Secretary (Power), Ministry of Power, Govt of India Project Management Consultant (PMC) A Project Management Consultant (PMC) shall be appointed by the utility for monitoring and ensuring timely implementation of the project. 100% grant shall be provided by GoI towards expenditure incurred on Project Management Consultant (PMC) as per provision in the scheme Execution Period Projects shall be completed within a period of 24 months from the date of issue of Letter of Award (LoA) by the utility. In case, the State owned Discoms / Power Deptt, are not able to complete the projects within stipulated time period due to circumstances beyond their control, the proposed Monitoring Committee shall be authorized to grant time extension based on merits on case to case basis Nodal Agency for the Scheme Rural Electrification Corporation Limited (REC) shall be the Nodal Agency for operationalization of the scheme. The Nodal Agency will be paid 0.5% of the total project cost as their fee for operationalization of the scheme Supporting/ Enabling activities of Ministry of Power A provision of 0.5% of the total project cost has been kept for the supporting/ enabling activities and associated expenses of Ministry of Power. Page 6 of 24

7 6.1.9 Funding pattern The funding mechanism is proposed as under: Agency Nature of support Quantum of support (Percentage of project cost) Special Category States # Other than Special Category States Govt of India Grant State / Discom Grant 10 5 Contribution Lender (FIs/ Banks) / Loan/ own fund State or Discom own fund Additional Grant from GOI on achievement of Grant 50% of total loan component/ own 50% of total loan component / own milestones based on fund (30%) i.e. fund (10%) of i.e. outcome parameters 15% 5% Maximum Grant by Grant 75% 90% GOI (including additional grant on achievement of milestones based on outcome parameters) Note: 100% grant shall be provided by GoI towards expenditure incurred on activities for bridging the missing links of National Optical Fibre Network (NOFN), Creation of Rural Electrification Data Hub at Rural Electrification Corporation & Project Management Consultant (PMC) as per provision in the scheme. # Special Category States (All North Eastern States including Sikkim, J&K, Himachal Pradesh, Uttrakhand) Tripartite/ Bipartite agreement: Suitable Tripartite agreement shall be executed among REC as Nodal Agency on behalf of Ministry of Power, State Government and Discom to ensure implementation of scheme in accordance with guidelines prescribed under the scheme. Bipartite agreement will be executed in case of State Power departments. Page 7 of 24

8 Release of fund by GoI: The grant support from GoI is proposed to be extended as per following milestones: Tranche no. Conditions for release of grant support by GoI 1 (i) Approval of projects by Monitoring Committee (ii) Bipartite / Tripartite agreement with Discoms, State Govt & Nodal Agency on behalf of MoP. 2 Placement of Letter of Award (LoA) by the utility 3 Utilisation of 90% of grant released by GOI (1st and 2nd Tranche) and 100% release of State/Discom contribution Release of Grant component of GOI 10% 20% 60% 4 After completion of works 10% Additional grant admissible against timely completion of projects i.e. 24 months from date of issue of Letter of Award (LoA) by the utility shall be released on achievement of milestones based on outcome parameters Monitoring Committee The projects shall be approved by Monitoring committee under the chairmanship of Secretary (Power). The committee shall comprise of representative from Ministry of Power, Ministry of Finance, Ministry of Rural Development, Ministry of Agriculture, Central Electricity Authority (CEA) & Planning Commission. Chairman & Managing Director, REC shall be the Member Secretary of the Committee. 6.2 In case the proposal is specific to any location, area and segment of population please state the basis for selection. Details regarding special physical features, technology, etc., may be given Please indicate whether the proposal is secured against natural/ man-made disasters like floods, cyclones, earthquakes, tsunamis, etc. If the proposal involves creation/ modification of structural and engineering assets or change in land use plans, disaster management concerns should be assessed. Not covered in the scope of scheme. Insurance etc. against any such disasters to be dealt by the respective State Government / Discoms. Page 8 of 24

9 6.4 In case of beneficiary oriented proposal, the mechanism for identification of the beneficiary and the linkage of beneficiary identification with UID numbers, on a voluntary / non-mandatory basis, may be indicated. 6.5 Wherever possible, the mode of delivery should involve the Panchayati Raj Institutions and Urban Local Bodies. Where this is intended, the preparedness and the ability of the Panchayats for executing the proposal may be indicated. If exceptions are to be made, the reasons may be explained. Projects under the scheme are to be implemented by the State owned Discoms / Power Deptt Whether the land required for the proposal is in possession of the agency. In case the proposal involves land acquisition or environmental clearances, the specific requirements and the status in this regard may be indicated. Under the scheme, cost of land; if any required; shall be borne by the State Government/Discom. The environment clearances involved, if any, in individuals projects would be dealt by respective State Government / Discom. 6.7 The legacy arrangements after the scheduled proposal duration may be mentioned. In case the proposal creates assets, arrangements for their maintenance and upkeep may be stated. (For example the proposal assets may be taken over and maintained by the State Government/ PRIs, ULBs). State owned Discoms/Power Deptt. are responsible for operation and maintenance of distribution network under their jurisdiction and shall also be responsible for upkeep of the assets created under the scheme. 6.8 Please indicate: Inter-linkages with other schemes mainly in terms of coverage, impact, outcomes, etc. There is no Inter-linkage with other schemes of Govt of India being implemented in rural areas in terms of coverage. However, ongoing activities under RGGVY for providing access to electricity to rural households would supplement the impact and outcomes in positive manner towards attainment of objectives of the proposed scheme. Steps taken towards convergence with other schemes to achieve the intended outcomes may also be stated. Ongoing activities under RGGVY for providing access to electricity to rural households shall be leveraged towards attainment of objectives of the proposed scheme. Steps taken towards convergence in flow of funds from other schemes. Page 9 of 24

10 7. Proposal cost 7.1 Please provide the proposal cost estimate for its scheduled duration along with a break-up of year-wise, component-wise expenses segregated into non-recurring and recurring expenses. COST ESTIMATE (Rs. in cr) SNo. Proposed Works Amount A Item of works proposed for partial funding by GOI 1 Feeder Separation/ New Feeders (16500 Nos. feeders and 24,750 associated works) 2 33 KV/66 KV Line (21900 Ckm) 1,515 3 Sub-station Works 33 KV or 66 KV (1620 new sub-station, 4,045 augmentation of 1615 existing sub-station) 4 LT Infrastructure works (LT lines with bare conductor/arial 5,350 Bunched cables & Distribution Transformers) 5 Metering at Feeders, distribution transformers & Consumers 6,450 end Sub-Total (A) 42,110 B Item of works proposed for 100% funding by GOI 7 Establishing Missing link of Optic fibre (Upto Sub Stations 280 under National Optic Fibre Network-NOFN) 8 Creation of Rural Electrification Data Hub at Rural 10 Electrification Corporation 9 Project Management Consultant 0.5% of total 211 cost of works [0.5% of A] Sub-Total (B) 501 Total Project Cost (A+B) 42,611 C Fee of Nodal Agency and provision for enabling activities for Ministry of Power 10 REC % of total cost of works (A) Provision for MoP for enabling % of total 211 cost of works (A) Sub-Total (C) 422 GRAND TOTAL (A+B+C) Rs 43,033 Crore Page 10 of 24

11 ESTIMATE FOR GBS REQUIREMENT Sl.No Particulars Other than Special Category States Special Category States Total Total Cost of Works proposed for partial funding by GOI Percentage of project cost proposed to be shared by GoI as Grant (including additional 75% 90% - grant on timely completion) Grant Component for works proposed for partial funding by GOI Total Cost of Works proposed for 100% funding by GOI Fee of Nodal Agency and provision for enabling activities for Ministry of Power Total GBS Requirement (3+4+5) YEAR-WISE PHASING OF EXPENDITURE Amount in Rs. Crore Year Expenditure Sub-Total (12th Plan) Sub-Total (13th Plan) Grand Total Say Crore 7.2 In case the land is to be acquired, the details of cost of land and cost of rehabilitation/resettlement may be provided. As indicated in para 6.6 above. 7.3 Estimated expenditure on proposal administration (including expenses on consultants, monitoring, evaluation, IEC, etc.) may be separately indicated. The project administration cost is included in the estimated cost of the scheme given above at Sr Page 11 of 24

12 7.4 The basis of these cost estimates along with the reference dates (it should not be more than six months old) for normative costing may be provided. Please indicate the firmness of the estimates, component wise, with the extent (+ / -) of the expected variation. The estimates have been prepared by CEA in consultation with States, REC & PFC based on assessment of works to be carried out and prevailing cost norms. 7.5 In case the proposal involves payout of subsidy, the year wise and component wise expected outgo, up to the last year of payout, may be indicated. The proposed year-wise plan for release of grant is as below: Amount in Rs. Crore Year Release of Grant Sub-Total (12th Plan) Sub-Total (13th Plan) Grand Total In case the proposal intends to create capital assets, employ specialised manpower or involves other activities that necessitate a Recurring Cost of Capital Expenditure (RCCE) (e.g., maintenance and upkeep costs of assets, salary costs of manpower, etc.) over the lifetime of the asset, such expenditures, on an annual basis, may be indicated in the proposal. Not in the scope of the proposed scheme and all such requirement is to be borne by concerned State owned Discom/ Power Deptt. 7.7 It may also be stated whether the agency which would be assigned this legacy responsibility has been consulted and has agreed to bear the continuing recurring expenditure. (e.g., the State governments may need to incur the maintenance and upkeep costs of assets created under Plan schemes). State owned Discoms/Power Deptt. are responsible for operation and maintenance of distribution network under their jurisdiction and shall also be responsible for upkeep of the assets created under the scheme. 7.8 The cost towards salary/ fees/ emoluments of the proposal human resources as being proposed should be indicated (procedure for seeking approval for human resource requirements is detailed at para-9 below). Page 12 of 24

13 Projects under the scheme will be implemented by State owned Discoms/Power Deptt through awarding the contract, which will take care cost towards salary / fees / emoluments of the human resources. 7.9 The component of the costs mentioned at , that will be shared by the state governments/pri/user Beneficiaries may be indicated. Total Cost of Scheme : Rs. 43,033 Crore Cost to be shared by GOI : Rs Crore Balance Cost to be shared by States / : Rs Crore Discoms 7.10 In the event of fund transfer being made to State Govts / local bodies or other organisations, grants for creation of capital assets may be indicated separately. Total grant amount from Govt. of India for creation of capital assets is Rs Crore. 8. Proposal: Financing 8.1 The source of financing for the proposal may be indicated. In case of proposal already included in the FYP, the specific earmarking may be mentioned. Total cost of the scheme is Rs Crore and requirement of GBS from Govt. of India is Rs Crore over the implementation period of scheme. Balance funds shall be contributed by the States/Discoms from their own resources and loan from FIs. Funding pattern has been detailed in Para above. 8.2 Whether the funding requirements have been fully tied up with Planning Commission may be indicated. The quantum of the Plan allocation may be indicated. Planning commission has allocated Rs 2500 crores (GBS) for Feeder Separation under 12 th Five Year Plan. Draft of EFC memo shall be sent to Planning Commission for enhancement of necessary budgetary support as per requirement of the scheme. 8.3 If there are gaps in the financing of the proposal, the sponsoring agency may indicate how such gaps in FYP as well as the Annual Plans will be addressed. 8.4 If external sources are intended, the sponsoring agency may indicate whether such funds have been tied up. In case firm commitment is not available, alternative plans for arranging funds may be indicated. Page 13 of 24

14 8.5 In case of partial allocation of funds for the proposal, then the components which may be removed / reduced may be indicated. Draft of EFC memo shall be sent to Planning Commission for enhancement of necessary budgetary support as per requirement of the scheme. 8.6 Please provide the following details in respect of project proposal: Debt-equity ratio along with justification. In case of, funding from internal resources (IR), availability of IR may be supported by projections and their deployment on various projects. Please indicate funding tie-ups for loans components both domestic and foreign, along-with terms and conditions of loan based on consent/ comfort letters. 9. Proposal: Human Resources 9.1 In case posts (permanent or temporary) are intended to be created, a separate proposal may be sent on file to Personnel Division of Department of Expenditure. Such proposals may be sent only after the main proposal is recommended by the appropriate appraisal body (SFC, EFC, etc.). Additional manpower will be required for administering the scheme at Ministry of Power. Team of one Director / Dy Secretary, one Under Secretary, one Section Officer, Two Assistants, one PS, one PA and two peons are proposed. Detailed proposal in this regard will be moved after appraisal by EFC. 9.2 In case outsourcing of services or hiring of consultants is intended, brief details of the same may be indicated. It may also be certified that the relevant GFR provisions will be followed while engaging the agency/ consultant In case additional manpower requirement, please indicate the phased requirement over the proposal timeline (i.e. year-wise break-up of the manpower requirement) The proposed additional manpower as indicted above at Sr. 9.1 will be required from approval of the proposed scheme till completion of the scheme. 10. Proposal viability 10.1 In case of proposals which have identified stream of financial returns, the financial internal rate of return may be calculated. The hurdle rate is considered at 12%. Page 14 of 24

15 10.2 In case of proposals where financial returns are not readily quantifiable (typically social development proposals), the measurable benefits/ outcomes may be indicated. Electricity has been recognized as an essential requirement for all facets of our life and considered to be one of the key drivers for economic growth and poverty alleviation. It is a critical infrastructure requirement for the socio-economic development of the country. Supply of electricity in rural areas; besides replacing kerosene which is commonly used as alternate source of lighting in rural areas; it is also expected to generate huge benefits in the area of education, health, employment generation, women empowerment, economic development etc Proposal implementation and monitoring 11.1 Implementing agency (s) may be indicated. State Owned Distribution Companies / State Power Deptt The administrative structure for implementing the proposal may be stated. Usually new structures / entities, etc. are, by and large, to be avoided. In case new structures are intended to be created for administering the scheme, the details of such structures and specific justification for the same may be provided. Such new structure should be proposed only if it is has been established after due analysis, that existing structures cannot be levered for the proposed/additional work. Projects under the scheme will be implemented by the State Owned Distribution Companies / State Power Deptt The completion schedule of the proposal indicating timelines of activities should be provided in PERT/Bar Chart along with critical milestones. Sl Major milestones No. 1. Receipt of approval of the CCEA 'Zero' date 2. Preparatory activities - formulation of detailed guidelines by Nodal agency in consultation with stakeholders and circulation to all concerned 3. Preparation of DPRs by the Discoms/Power Deptt. and submission to State Level Committee for its recommendations to REC for sanction under scheme 4. Appraisal by REC and submission of recommendations to the Monitoring Committee and Sanction of DPRs by the Monitoring Committee 5. Award of contracts by the Implementing Agencies Time frame for completion /Target date Within 2 months from the date of receipt of approval of the CCEA Within 3 month from the date of circulation of guidelines by REC Within 1 month from the date of receipt of recommendations by the State Level Committee Within 06 months from the date of sanction of projects by the Monitoring Committee 6. Implementation of projects Within 24 months from the date of award Page 15 of 24

16 11.4 Mode of implementation: Departmental/ Contract/ Turnkey contract/ EPC/ PPP, etc. with justification may be given. To be implemented by State owned Discoms/Power Deptt Nodal officer identified / appointed for being directly in charge and overseeing progress of the proposal may be indicated. Details about his status, past experience in executing similar proposals and balance tenure left for steering the proposal may also be mentioned. He/ She should normally be appointed for entire duration of the proposal. Rural Electrification Corporation Limited (REC) shall be the Nodal Agency for operationalization of the scheme The monitoring framework preferably on MIS for the proposal may be indicated. The arrangements for audit/social audit of the proposal may also be stated. At project level, the State owned Discom/Power Deptt. themselves along with PMC monitors implementation of individual projects. At State level, a State Level Standing Committee headed by the Chief Secretary of the State shall monitor progress of implementation of projects. REC, nodal agency of the scheme, shall also periodically review progress of implementation through its project offices and Corporate Office. The proposed Monitoring Committee under the Chairmanship of Secretary (Power), Government of India consisting of representatives from other Ministries shall also monitor implementation of the scheme. The audit of the scheme will be done as usual by the government audit team. 12. Proposal sensitivities/uncertainties 12.1 Any foreseeable constraints/ uncertainties which can affect the technical design, costing and implementation of the proposal may be indicated. The scheme involves execution of electrification works in rural area spread across various parts of countries at distant locations which require skilled/semi-skilled manpower and transportation of material like poles, conductor, transformers etc.. Mobilization of adequate manpower and sometimes transportation of material to distant locations may be difficult. Any delay in procurement process may delay implementation of projects under the scheme and result in cost overrun. Further the financial health of Discoms/ Power Deptt. to purchase power to cater rural demand & commitment of states in providing reliability and quality power plays a significant role. Since power is a regulated commodity and the scheme involves a part of funding as loan, approval of regulator for capital investment shall be required. Page 16 of 24

17 12.2 The likely impact of these constraints/uncertainties on the proposal parameters may be stated. In particular, the sensitivity of the proposal cost, proposal schedule and proposal viability towards the possible constraints/ uncertainties may be mentioned. Delay in implementation may result cost overrun. 13. Mandatory approvals / clearances: The details regarding the requirement of mandatory approvals / clearances of various local, state and national bodies and their availability may be indicated. 14. Consultations with the Public, State Governments, External Research Agencies, Think Tanks, etc To the extent possible and practicable, such consultations may be done by the Administrative Ministries. The draft Proposals may be placed on the web site of the sponsoring Ministries and comments invited from the general public. The draft proposals may be formulated / finalized taking into account such comments. Details in this regard may be indicated in the EFC /PIB memo. Draft EFC memo will be circulated for inter ministerial consultation. 15. Concurrence of Financial Advisor 15.1 Comments / Concurrence of Financial Adviser may be indicated along with reply of the Administrative Ministry. Comments of Financial Advisor and reply of the Ministry of Power are enclosed at Annexure-I. (Page 18 to 24). 16. Approvals: 16.1 Please indicate the specific points on which approval of EFC / PIB is sought. The approval is solicited for the following: a. Launch of Deendayal Upadhyaya Gram Jyoti Yojana (DUGJY) with total scheme cost of Rs. 43,033 Crore b. Allocation of GBS for Rs Crore for the scheme. (B.N. Sharma) Joint Secretary to the Government of India Tel. No.: b.narayan@nic.in Page 17 of 24

F. No. 1(1)PF- II/2011 Government of India Department of Expenditure (Plan Finance-II Division) OFFICE MEMORANDUM

F. No. 1(1)PF- II/2011 Government of India Department of Expenditure (Plan Finance-II Division) OFFICE MEMORANDUM F. No. 1(1)PF- II/2011 Government of India Department of Expenditure (Plan Finance-II Division) North Block, New Delhi, Dated: 31 st March, 2014 OFFICE MEMORANDUM Subject: Circulation of Revised formats

More information

STANDING COMMITTEE ON ENERGY MINISTRY OF POWER

STANDING COMMITTEE ON ENERGY MINISTRY OF POWER STANDING COMMITTEE ON ENERGY (211) SIXTEENTH LOK SABHA MINISTRY OF POWER DEMANDS FOR GRANTS 211 REPORT LOK SABHA SECRETARIAT NEW DELHI March 21Phalguna 1 (Saka) DRAFT REPORT STANDING COMMITTEE ON ENERGY

More information

06-Oct R E Division, Ministry of Power

06-Oct R E Division, Ministry of Power 06Oct2005 R E Division, Ministry of Power RURAL ELECTRIFICATION WING Arvind Jadhav Joint Secretary Rajeev Sharma Executive Director Vandana Jain Under Secretary Kiran Misra Section Officer 06Oct2005 R.E

More information

GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS

GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS (i) (ii) OF ALL SECTORS COSTING MORE THAN RS.100 CRORE AND LESS THAN RS.250 CRORE UNDER NHDP COSTING RS.250

More information

Guidelines for Formulation, Appraisal and Approval of

Guidelines for Formulation, Appraisal and Approval of Government of India Ministry of Finance Department of Economic Affairs Guidelines for Formulation, Appraisal and Approval of Central Sector Public Private Partnership Projects INFRASTRUCTURE Building for

More information

FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF )

FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF ) FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF ) Planning Commission was set up in March, 1950. A copy of the Resolution of Government of India has been given in Unit I of this document.

More information

CHAPTER-IV REFORMS IN THE CSS

CHAPTER-IV REFORMS IN THE CSS CHAPTER-IV REFORMS IN THE CSS 6. The analysis of the CSS in the previous Chapter has indicated the need for reforms. Suggestions on this are being mentioned in the following paragraphs: 6.1 6.1.1 It has

More information

IMPLEMENTATION OF DDUGJY

IMPLEMENTATION OF DDUGJY IMPLEMENTATION OF DDUGJY The MOP has stated that the following are the priority to submit the proposals under DDUGJY scheme. 1) Electrification of colonies (already submitted through online) 2) HVDS 3)

More information

OFFICE MEMORANDUM. Subject:- Administrative Approval of Central Sector Scheme "National Dairy Plan Phase-1 (NDP-1)"

OFFICE MEMORANDUM. Subject:- Administrative Approval of Central Sector Scheme National Dairy Plan Phase-1 (NDP-1) F. No.22-23l2011-DP Government of lrdia Ministry of ft{jrirulture Department of Animal Husbandry, Dairying & Fisheries Krishi Bhawan, New Delhi-11 0001 Dated the 16th March, 2012 OFFICE MEMORANDUM Subject:-

More information

Table of Content. S.No. Content Page. Office Memorandum dated regarding Guidelines for National Electricity Fund (Interest subsidy Scheme)

Table of Content. S.No. Content Page. Office Memorandum dated regarding Guidelines for National Electricity Fund (Interest subsidy Scheme) Table of Content S.No. Content Page 1 Office Memorandum dated 05.07.2012 regarding Guidelines for National Electricity Fund (Interest subsidy Scheme) 1-20 2 Office Memorandum dated 14.03.2012 regarding

More information

PlanPlus ( A tool for Decentralized and Integrated District Planning

PlanPlus (  A tool for Decentralized and Integrated District Planning PlanPlus (http://planningonline.gov.in) A tool for Decentralized and Integrated District Planning 1 TFC BRGF Planning currently done in silos (scheme-based) Funding NREGS Gram Panchayat Own Funds May not

More information

GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF PLANNING

GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF PLANNING GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF PLANNING No. PD (PPP) 3/2010-11 Dated Itanagar, the 12th April, 2011 To. The Principal Secretaryl Commissioner/Secretary, GOVT. OF ARUNACHAL PRADESH. Sub:

More information

Ujwal Discom Assurance Yojana

Ujwal Discom Assurance Yojana Ujwal Discom Assurance Yojana 9 th December, 2017 DFID s Technical Assistance Programme Supporting structural reforms in the Indian Power Sector The UK s Department for International Development (DFID)

More information

scheme code rf-1 Performance Award Scheme for Distribution Companies (Consideration year )

scheme code rf-1 Performance Award Scheme for Distribution Companies (Consideration year ) scheme code rf-1 Performance Award Scheme for Distribution Companies (Consideration year 2013-14) 1.0 Preamble This scheme has been formulated in which the awards are proposed to be given to the three

More information

BOON TO RURAL GUJARAT

BOON TO RURAL GUJARAT BOON TO RURAL GUJARAT :: P R E A M B L E :: All DISCOMs have mainly four categories of 11/22 KV feeders viz. Urban, Industrial, GIDC, Rural. Out of which, Rural feeders having mixed load of Agricultural

More information

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT Energy Department Government of Bihar 2012 ( 1 ) Table of Content 1. Objective 2. Title and Enforcement 3. Scope and Coverage 4. Nodal Agency 5. Classification

More information

The Right to Information Act, 2005

The Right to Information Act, 2005 (i) The Right to Information Act, 2005 Information regarding World Bank assisted ICDS Project Section: 4.(1) (b) Particulars of its organization, functions and duties; The Central Project Management Unit

More information

UDAY and Power Sector Debt:

UDAY and Power Sector Debt: UDAY and Power Sector Debt: DISCUSSION paper Assessing Efficiency Parameters and Impact on Public Finance Pinaki Chakraborty Lekha Chakraborty Manish Gupta Amandeep Kaur 1 1. Introduction With the introduction

More information

Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh. May 11, 2012

Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh. May 11, 2012 Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh May 11, 2012 1 ACHIEVEMENTS OF ELEVENTH PLAN (ECONOMY) Targets and Achievement Sector Target for Growth Expected

More information

ORISSA PUBLIC PRIVATE PARTNERSHIP POLICY-2007

ORISSA PUBLIC PRIVATE PARTNERSHIP POLICY-2007 ORISSA PUBLIC PRIVATE PARTNERSHIP POLICY-2007 PLANNING & CO-ORDINATION DEPARTMENT RESOLUTION No.12711 / PPP 38/2006 Dated 07 th August 2007 Sub: - ORISSA PUBLIC PRIVATE PARTNERSHIP (PPP) POLICY- 2007 1

More information

New and Renewable Energy Department Vallabh Bhavan, Bhopal

New and Renewable Energy Department Vallabh Bhavan, Bhopal New and Renewable Energy Department Vallabh Bhavan, Bhopal English Translation of Policy for implementation of Small Hydel-Power based Electricity Projects in Madhya Pradesh, 2011 (As Amended on 15th February

More information

Operational Guidelines for PRICE STABILISATION FUND (PSF)

Operational Guidelines for PRICE STABILISATION FUND (PSF) Operational Guidelines for PRICE STABILISATION FUND (PSF) Government of India Ministry of Agriculture Department of Agriculture & Cooperation Krishi Bhawan, New Delhi 26 th March, 2015 1 [[[ 1. Introduction

More information

Rural Road Connectivity in India

Rural Road Connectivity in India www.swaniti.in Rural Road Connectivity in India The 12th Five Year Plan (2012-17) identifies rural connectivity as one of the key priorities to achieve rural poverty alleviation and development. With over

More information

Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj

Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj 1 Panchayat Statistics Avg. population per GP National Average population per GP: 3,416 No. of PRIs in the country : 2,56,103 No. of Gram

More information

Bhopal: Dated 5 th May 2006

Bhopal: Dated 5 th May 2006 Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh

More information

14 th Finance Commission: Review and Outcomes. Economics. February 25, 2015

14 th Finance Commission: Review and Outcomes. Economics. February 25, 2015 February 25, 2015 Economics 14 th Finance Commission: Review and Outcomes The 14th Finance Commission (FFC) was constituted on 2nd January, 2013 and submitted its report on 15 th December, 2014. The recommendations

More information

F. No. 39/studies/4/10-NCM Government of India National Commission for Minorities

F. No. 39/studies/4/10-NCM Government of India National Commission for Minorities F. No. 39/studies/4/10-NCM Government of India National Commission for Minorities Subject: NOTICE INVITING PROPOSALS FOR RESEARCH STUDY Sealed offers are invited for carrying out a research study on "The

More information

District Rural Development Agency (DRDA)

District Rural Development Agency (DRDA) District Rural Development Agency (DRDA) The District Rural Development Agency (DRDA) has traditionally been the principal organ at the District level to oversee the implementation of different antipoverty

More information

THIRD PARTY INSPECTION AND MONITORING

THIRD PARTY INSPECTION AND MONITORING Toolkit for THIRD PARTY INSPECTION AND MONITORING 2 Third Party Inspection and Monitoring : Objectives Goal: To evolve a state level mechanism for Third Party Inspection and Monitoring of Projects sanctioned

More information

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF)

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF) Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF) PPP Cell Planning Department Government of Rajasthan Contents 1. The RIPDF and its Role 2 i. Background of the RIPDF ---------------------------

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

Total Sanitation Campaign GOI,

Total Sanitation Campaign GOI, Total Sanitation Campaign GOI, 2012-13 Launched in 1999, the Total Sanitation Campaign (TSC) is the Government of India's (GOI) flagship programme for providing universal access to sanitation facilities.

More information

Mending Power Sector Finances PPP as the Way Forward. Energy Market Forum

Mending Power Sector Finances PPP as the Way Forward. Energy Market Forum Mending Power Sector Finances PPP as the Way Forward Energy Market Forum AF Mercados EMI 11 th February 2011 Structure of the Presentation Current Status of Power Sector Generation Transmission Distribution

More information

Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL)

Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL) Government of India Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL) Published by The Secretariat for the Committee on Infrastructure Planning Commission,

More information

ROAD DEVELOPMENT IN INDIA

ROAD DEVELOPMENT IN INDIA ROAD DEVELOPMENT IN INDIA - 2010 This report is the most up-to-date and comprehensive review of the Indian road sector. The report provides: The latest status of projects, programmes and policies (as on

More information

Guidelines for the NER Textile Promotion Scheme (April March 2020)

Guidelines for the NER Textile Promotion Scheme (April March 2020) Government of India Ministry of Textiles Guidelines for the NER Textile Promotion Scheme (April 2017- March 2020) 1. Objectives The North East Region Textile Promotion Scheme (NERTPS) is an umbrella scheme

More information

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010 Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri

More information

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003

More information

ANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT

ANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT Financial Management Manual for Department of RWSS May 2008 ANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT

More information

CORPORATE SOCIAL RESPONSIBILITY POLICY (CSR POLICY)

CORPORATE SOCIAL RESPONSIBILITY POLICY (CSR POLICY) CORPORATE SOCIAL RESPONSIBILITY POLICY (CSR POLICY) Introduction APEPDCL, Visakhapatnam is i the leading Indian power utility spread across five districts in the southern state of Andhra Pradesh. It has

More information

Pradhan Mantri Awaas Yojana - Gramin (PMAY-G) Ministry of Rural Development Government of India

Pradhan Mantri Awaas Yojana - Gramin (PMAY-G) Ministry of Rural Development Government of India Pradhan Mantri Awaas Yojana - Gramin (PMAY-G) Ministry of Rural Development Government of India Presentation Plan 1 Erstwhile Indira Awaas Yojana (IAY) 2 Findings of Performance Audit of IAY by CAG 2014

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by

More information

Preamble. Objective. Target Beneficiaries

Preamble. Objective. Target Beneficiaries Preamble Khadi, the fabric of freedom, has been a source of livelihood to a large number of spinners, weavers and other artisans spread across the country living in the rural as well as urban areas. Though

More information

1,14,915 cr GoI allocations for Ministry of Rural Development (MoRD) in FY

1,14,915 cr GoI allocations for Ministry of Rural Development (MoRD) in FY BUDGET BRIEFS Vol 1/ Issue 9 Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), GoI, 218-19 HIGHLIGHTS Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) is a flagship

More information

No.14011/01/2015-SCD-V Government of India Ministry of Social Justice and Empowerment

No.14011/01/2015-SCD-V Government of India Ministry of Social Justice and Empowerment BY SPEEDPOST No.14011/01/2015-SCD-V Government of India Ministry of Social Justice and Empowerment To Shastri Bhavan, New Delhi -110001. Dated the 8 th September 2015 Principal Secretary/ Secretary, In-charge

More information

BIHAR STATE ELECTRICITY BOARD

BIHAR STATE ELECTRICITY BOARD BEFORE THE BIHAR ELECTRICITY REGULATORY COMMISSION PATNA CASE NO: Filing of the Review Petition for FY 2011-12 and Aggregate Revenue from Charges or Aggregate Revenue Requirement (ARR) & Tariff Petition

More information

CHAPTER-II HISTORICAL PERSPECTIVE

CHAPTER-II HISTORICAL PERSPECTIVE CHAPTER-II HISTORICAL PERSPECTIVE 2.1 The practice of providing Central Assistance to the States to finance development schemes had been in vogue even before the advent of Five Year Plans. On the termination

More information

UDAY Scheme: Perspective and Progress

UDAY Scheme: Perspective and Progress UDAY Scheme: Perspective and Progress Contact: Madan Sabnavis Chief Economist 91-022-67543489 Darshini Kansara Research Associate Darshini.Kansara@careratings.com 91-022-67543679 Mradul Mishra (Media Contact)

More information

GOVERNMENT OF MADHYA PRADESH

GOVERNMENT OF MADHYA PRADESH GOVERNMENT OF MADHYA PRADESH ACCOUNTANT GENERAL (ACCOUNTS AND ENTITLEMENTS) MADHYA PRADESH, GWALIOR 2 Preface The Annual Accounts of the State Government are prepared and examined under the directions

More information

Model Concession Agreement for Highways: An Overview

Model Concession Agreement for Highways: An Overview Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy

More information

DISCOMs, the weakest link in the Power value chain Can it be strengthened? A reality check

DISCOMs, the weakest link in the Power value chain Can it be strengthened? A reality check Impact analysis: DISCOMs, the weakest link in the Power value chain Can it be strengthened? A reality check... August 02, 2016 DISCOMs, the weakest link in the Power value chain Can it be strengthened?

More information

No. 4/25/2012-FR Planning Commission (Financial Resources Division)

No. 4/25/2012-FR Planning Commission (Financial Resources Division) No. 4/25/2012-FR Planning Commission (Financial Resources Division) ------------------ Subject: Estimation of Financial resources for the Annual Plan 2013-14 discussion with Chief Minister, Uttar Pradesh-

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case 1549 /2015 In respect of Petition for True Up of & Determination of Provisional ARR and Tariff for Under GERC (Multi Year

More information

Presentation on Implementation of Pradhan Mantri Fasal Bima Yojana and Unified Package Insurance Scheme

Presentation on Implementation of Pradhan Mantri Fasal Bima Yojana and Unified Package Insurance Scheme Presentation on Implementation of Pradhan Mantri Fasal Bima Yojana and Unified Package Insurance Scheme Ministry of Agriculture, Co-operation & Farmers Welfare Government of India Mumbai, 22nd March, 2016

More information

Planning and Budgeting Manual, 2015

Planning and Budgeting Manual, 2015 Oil and Natural Gas Corporation Limited Planning and Budgeting Manual, 2015 P a g e 1 Table of Contents 1. Introduction... 3 1.1. Objectives... 3 1.2. Importance of Budgetary Controls... 3 1.3. Advantages

More information

PROFORMA FOR RELEASE OF 2 ND INSTALMENT PROPOSAL UNDER INDIRA AWAAS YOJANA DURING THE YEAR NAME OF THE DISTRICT NAME OF THE STATE

PROFORMA FOR RELEASE OF 2 ND INSTALMENT PROPOSAL UNDER INDIRA AWAAS YOJANA DURING THE YEAR NAME OF THE DISTRICT NAME OF THE STATE PROFORMA FOR RELEASE OF 2 ND INSTALMENT PROPOSAL UNDER INDIRA AWAAS YOJANA DURING THE YEAR 2012-2013 NAME OF THE DISTRICT NAME OF THE STATE DOCUMENTS ATTACHED WITH THE PROPOSAL:- Sl. Documents/clarifications

More information

Agreement between the Department of Agriculture and Cooperation (DAC), Ministry of Agriculture, Government of India and the National Institute of Rural Development (NIRD), Hyderabad appointing NIRD as

More information

Memorandum of Understanding. Department of Public Enterprises Ministry of Heavy Industries & Public Enterprises Government of India

Memorandum of Understanding. Department of Public Enterprises Ministry of Heavy Industries & Public Enterprises Government of India Memorandum of Understanding Department of Public Enterprises Ministry of Heavy Industries & Public Enterprises Government of India 1 Outline of Presentation MoU Guidelines 2017-18 MoU Performance Evaluation

More information

1,07,758 cr GoI allocations for Ministry of Rural Development (MoRD) in FY

1,07,758 cr GoI allocations for Ministry of Rural Development (MoRD) in FY BUDGET BRIEFS Vol 10/ Issue 8 Pradhan Mantri Awaas Yojana Gramin (PMAY G) GoI, 2017-18 Pradhan Mantri Awaas Yojana - Gramin (PMAY - G) ) is Government of India s (GoI) flagship Housing for All scheme.

More information

Sunrise Andhra Pradesh Achieving Sustainable Development Goals by 2030

Sunrise Andhra Pradesh Achieving Sustainable Development Goals by 2030 Sunrise Andhra Pradesh Achieving Sustainable Development Goals by 2030 Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all. Towards Double

More information

GOVERNMENT OF KERALA

GOVERNMENT OF KERALA 183 GOVERNMENT OF KERALA Kerala Small Hydro Power Policy 2012 1. Order G.O.(P) 25/2012/PD Dated: Thiruvananthapuram, 03.10.2012 2. Title Kerala Small Hydro Power Policy 2012 3. Objective To increase the

More information

2. Role of Banks 2.1 Bank staff may help the poor borrowers in filling up the forms and completing other formalities so that they are able to get cred

2. Role of Banks 2.1 Bank staff may help the poor borrowers in filling up the forms and completing other formalities so that they are able to get cred Master Circular--Credit Facilities to Scheduled Castes (SCs) & Scheduled Tribes (STs) Banks should take the following measures to step up their advances to SCs / STs: 1. Planning Process 1.1 The District

More information

Distribution Tariff Determination and Rationalization

Distribution Tariff Determination and Rationalization Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 28 August, 2010 Forum of

More information

COAL DISTRIBUTION AND MARKETING

COAL DISTRIBUTION AND MARKETING Chapter 7 COAL DISTRIBUTION AND MARKETING ANNUAL REPORT 2017-18 Ministry of Coal Coal Distribution and Marketing Coal Distribution and Marketing Allocation of coal to power, cement and steel plants. The

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework Economic growth and trade expansion in recent years have enhanced the relevance of port sector as a critical element in globalisation of the Indian economy.

More information

Power Procurement Strategy

Power Procurement Strategy Power Procurement Strategy 01.03.16 IIT-Kanpur For Public Use POWER SECTOR OVERVIEW Source: Executive Summary of October 2015, CEA *including renewable generation Installed Capacity (All) Category Installed

More information

Rakesh Jha. Role of Credit Risk Guarantee Facility in Result Based Incentive model for Distributed Generation Projects

Rakesh Jha. Role of Credit Risk Guarantee Facility in Result Based Incentive model for Distributed Generation Projects Meghraj Capital Advisors Private Limited Infrastructure Consulting I Mergers & Acquisitions I Private Equity I Capital Markets Role of Credit Risk Guarantee Facility in Result Based Incentive model for

More information

There is no other scheme with overlapping in other Ministry/Departments of the Central or the State Govt.

There is no other scheme with overlapping in other Ministry/Departments of the Central or the State Govt. MEMORANDUM FOR EMPOWERED STEERING COMMITTEE (ESC) ON THE PROPOSAL OF GANGA KNOWLEDGE CENTRE UNDER NATIONAL GANGA RIVER BASIN AUTHORITY (NGRBA) PROGRAMME 1.0 STATEMENT OF PROPOSAL 1(a) The approval of the

More information

Note on ICP-CPI Synergies: an Indian Perspective and Experience

Note on ICP-CPI Synergies: an Indian Perspective and Experience 2 nd Meeting of the Country Operational Guidelines Task Force March 12, 2018 World Bank, Washington, DC Note on ICP-CPI Synergies: an Indian Perspective and Experience 1. Meaning and Scope 1.1 International

More information

CORPORATE SOCIAL RESPONSIBILITY POLICY

CORPORATE SOCIAL RESPONSIBILITY POLICY CORPORATE SOCIAL RESPONSIBILITY POLICY Kannur Airport use CSR to integrate economic, environmental and social objective with the Company s operations and growth. KANNUR INTERNATIONAL AIRPORT LIMITED CORPORATE

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS,

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS, Approach Paper for MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS, 2014 Issued By: Maharashtra Electricity Regulatory

More information

Rajiv Rinn Yojana (RRY)

Rajiv Rinn Yojana (RRY) Rajiv Rinn Yojana (RRY) Guidelines of Rajiv Rinn Yojana These guidelines supersede the earlier guidelines for Interest Subsidy Scheme for Housing the Urban Poor -2008 and earlier guidelines issued in September

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-20/2010 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS 1.1 Section 86(1) (e) of the Electricity Act 2003

More information

Agenda/ Background Papers

Agenda/ Background Papers Background: Agenda/ Background Papers NABARD, R.O. Jammu, vide communication bearing Ref. No. NB (J&K)/ mcid /2015-16 dated 28 May, 2015 intimated that SHG-Bank Linkage programme has grown exponentially

More information

OPERATIONAL GUIDELINES. Pradhan Mantri KIsan SAmman Nidhi (PM-KISAN)

OPERATIONAL GUIDELINES. Pradhan Mantri KIsan SAmman Nidhi (PM-KISAN) OPERATIONAL GUIDELINES Of Pradhan Mantri KIsan SAmman Nidhi (PM-KISAN) 1 Pradhan Mantri KIsan SAmman Nidhi (PM-KISAN) OPERATIONAL GUIDELINES 1. Scheme The Government with a view to augment the income of

More information

Implementation of Solar Based Projects in MP Dated 20 July, 2012

Implementation of Solar Based Projects in MP Dated 20 July, 2012 86 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects GOVERNMENT OF MADHYA PRADESH Implementation of Solar Based Projects in MP Dated 20 July, 2012 1. Title

More information

A STUDY ON DISTRICT RURAL DEVELOPMENT AGENCY WITH SPECIAL REFERENCE TO MADURAI DISTRICT P. NAGARAJAN

A STUDY ON DISTRICT RURAL DEVELOPMENT AGENCY WITH SPECIAL REFERENCE TO MADURAI DISTRICT P. NAGARAJAN A STUDY ON DISTRICT RURAL DEVELOPMENT AGENCY WITH SPECIAL REFERENCE TO MADURAI DISTRICT Synopsis of the thesis submitted to Madurai Kamaraj University for the award of the Degree of DOCTOR OF PHILOSOPHY

More information

Amendment to BRGF Guidelines Para 2.1 and 4.22 (O.M. No. N-11019/768/2010-BRGF dated )

Amendment to BRGF Guidelines Para 2.1 and 4.22 (O.M. No. N-11019/768/2010-BRGF dated ) Amendment to BRGF Guidelines Para 2.1 and 4.22 (O.M. No. N-11019/768/2010-BRGF dated 28.01.2011) Para Existing Para No. 2.1 Each Panchayat or Municipality within the backward district concerned will be

More information

1,07,758 cr GoI allocations for Ministry of Rural Development (MoRD) in FY

1,07,758 cr GoI allocations for Ministry of Rural Development (MoRD) in FY BUDGET BRIEFS Vol 10/ Issue 9 Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), GoI, 2017-18 HIGHLIGHTS Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) is a flagship

More information

Corporate Social Responsibility and Sustainability Policy of Indian Railway Finance Corporation Ltd (IRFC)

Corporate Social Responsibility and Sustainability Policy of Indian Railway Finance Corporation Ltd (IRFC) Corporate Social Responsibility and Sustainability Policy of Indian Railway Finance Corporation Ltd (IRFC) Introduction Indian Railway Finance Corporation (IRFC) is the dedicated funding arm of Indian

More information

EOI for Appointment of Audit Firms for conducting internal audit of REC Power Distribution Company Limited for the Financial Year

EOI for Appointment of Audit Firms for conducting internal audit of REC Power Distribution Company Limited for the Financial Year EOI for Appointment of Audit Firms for conducting internal audit of REC Power Distribution Company Limited for the Financial Year 2014-15 No.RECPDCL/ISO/2014-15/1630 Dated:11/12/2014 By RECPowerDistributionCompanyLimited

More information

ANALYSIS OF AGGREGATE TECHNICAL AND COMMERCIAL LOSSES OF APCPDCL

ANALYSIS OF AGGREGATE TECHNICAL AND COMMERCIAL LOSSES OF APCPDCL ANALYSIS OF AGGREGATE TECHNICAL AND COMMERCIAL LOSSES OF APCPDCL Mohsen Roshani Yasaghi, Depart of Management, Osmania Universiy, Hyderabad T Ravi Kumar Faculty Memebr, IBS- Hyderabad Abstract The Aggregate

More information

India: Public Private Partnerships in Highways Sector

India: Public Private Partnerships in Highways Sector India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most

More information

GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF URBAN DEVELOPMENT ARUNACHAL PRADESH CIVIL SECRETARIAT:ITANAGAR

GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF URBAN DEVELOPMENT ARUNACHAL PRADESH CIVIL SECRETARIAT:ITANAGAR 1 1. (1) These Rules may be called the Arunachal Pradesh Internal Earmarking of Budgets for Urban Poor Rules of 2011. (2) They shall come into force all over the State of Arunachal Pradesh on the date

More information

Memorandum of Understanding. Department of Public Enterprises Ministry of Heavy Industries & Public Enterprises Government of India

Memorandum of Understanding. Department of Public Enterprises Ministry of Heavy Industries & Public Enterprises Government of India Memorandum of Understanding Department of Public Enterprises Ministry of Heavy Industries & Public Enterprises Government of India 1 Outline of Presentation MoU Guidelines MoU Performance Evaluation 2017-18

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos.

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos. MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 TH Floor Metro Plaza, Bittan Market", Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2012-13 Petition Nos. 72/2011

More information

IDA assisted ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP)

IDA assisted ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP) IDA assisted ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP) Background The World Bank had been supporting the Government of India to improve nutritional status of children through

More information

Planning Commission (Financial Resources Division) ---- Brief for Annual Plan JAMMU & KASHMIR

Planning Commission (Financial Resources Division) ---- Brief for Annual Plan JAMMU & KASHMIR JAMMU & KASHMIR 5 th July 2013 Planning Commission (Financial Resources Division) ---- Brief for Annual Plan 2013-14 - JAMMU & KASHMIR A. Plan Performance of the State: Achievement of approved plan outlays

More information

No.6/1/2016-DCH/P&S GOVERNMENT OF INDIA MINISTRY OF TEXTILES OFFICE OF THE DEVELOPMENT COMMISSIONER FOR HANDLOOMS ***

No.6/1/2016-DCH/P&S GOVERNMENT OF INDIA MINISTRY OF TEXTILES OFFICE OF THE DEVELOPMENT COMMISSIONER FOR HANDLOOMS *** No.6/1/2016-DCH/P&S GOVERNMENT OF INDIA MINISTRY OF TEXTILES OFFICE OF THE DEVELOPMENT COMMISSIONER FOR HANDLOOMS *** Invitation for Expression of Interest (EOI) for Evaluation study of the implementation

More information

GOVERNMENT OF MADHYA PRADESH

GOVERNMENT OF MADHYA PRADESH 206 Compendium of State Government Policies on Renewable Energy Sector in India GOVERNMENT OF MADHYA PRADESH Wind Power Project Policy of Madhya Pradesh, 2012 (As Amended on 21 st February 2013) 1. Order

More information

Funding for a Brighter Tomorrow. Power Finance Corporation Limited A Navratna PSU

Funding for a Brighter Tomorrow. Power Finance Corporation Limited A Navratna PSU Power Finance Corporation Limited A Navratna PSU Performance Highlights Quarter/Year Ended (Standalone, Audited) 31 st March, 2017 Realignment with RBI s RRR norms PFC has been following MoP, GoI approved

More information

Corporate Social Responsibility (CSR) Policy

Corporate Social Responsibility (CSR) Policy Corporate Social Responsibility (CSR) Policy Bharat Heavy Electricals Limited New Delhi July, 2017 Revision-II Page 1 of 12 CONTENTS S. No. Section Page No. 1 CSR Overview, Vision, Mission, Objective,

More information

GUIDELINES OF INDIA MICROFINANCE EQUITY FUND

GUIDELINES OF INDIA MICROFINANCE EQUITY FUND GUIDELINES OF INDIA MICROFINANCE EQUITY FUND 1 CONTENTS 1. Objective - Page 3 2. Principal features - Page 3 3. Purpose - Page 3 4. Types of instruments - Page 3 5. Eligibility criteria - Page 4 6. Sanction

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

MEMORANDUM OF UNDERSTANDING. (Place) on the day of 2009 BETWEEN the Ministry of Rural Development

MEMORANDUM OF UNDERSTANDING. (Place) on the day of 2009 BETWEEN the Ministry of Rural Development MEMORANDUM OF UNDERSTANDING THIS MEMORANDUM OF UNDERSTANDING (MoU) is made at (Place) on the day of 2009 BETWEEN the Ministry of Rural Development (MoRD), Government of India represented by National Institute

More information

Rs Billion Short Term Debt Programme. (Series IX & X)

Rs Billion Short Term Debt Programme. (Series IX & X) CRISIL Limited CRISIL s RatingRationale Power Grid Corporation of India Limited OCTOBER 2005 Rs. 20 Billion Bonds Programme Rs. 6.50 Billion Short Term Debt Programme (Enhanced from Rs. 6 Billion) Rs.

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case 1624 /2016 In respect of Petition for True up of & Determination of Multi-Year ARR for to & Determination of final ARR for

More information

CORPORATE SOCIAL RESPONSIBILITY & SUSTAINABILITY POLICY

CORPORATE SOCIAL RESPONSIBILITY & SUSTAINABILITY POLICY CORPORATE SOCIAL RESPONSIBILITY & SUSTAINABILITY POLICY (w.e.f. 01.04.2014) MMTC Limited - Corporate Social Responsibility & Sustainability Policy 1. Short Title and Applicability This Policy shall be

More information

Section 1 OVERVIEW OF PROJECT DEVELOPMENT PROCESS

Section 1 OVERVIEW OF PROJECT DEVELOPMENT PROCESS Section 1 OVERVIEW OF PROJECT DEVELOPMENT PROCESS 1.1 Introduction Before the Sanctioning Authority can consider approving expenditure proposals, certain analysis needs to be carried out and presented

More information