Cambodia: Preparing the Strengthening of Public Financial Management for Rural Development Projects

Size: px
Start display at page:

Download "Cambodia: Preparing the Strengthening of Public Financial Management for Rural Development Projects"

Transcription

1 Technical Assistance Consultant s Report Project Number: TA 4988 CAM October 2008 Cambodia: Preparing the Strengthening of Public Financial Management for Rural Development Projects : October 2008 Prepared by Les Henning, Nihal Fernandopulle and Russell Leith Cambodia This consultant s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project s design.)

2 CONTENTS I. BACKGROUND AND INTRODUCTION 1 A. Objectives of the Technical Assistance 1 B. Implementation of the Technical Assistance 1 C. Rural Sector Description and Objectives 2 D. ADB Involvement in the Rural Sector 3 II. PUBLIC FINANCIAL MANAGEMENT REFORM 4 A. The Public Financial Management Reform Program (PFMRP) 4 B. PFMPR in Rural Development Ministries 6 C. ADB s Contribution to PFMRP 9 D. External Audit Function 9 E. Internal Audit Function 10 F. Inter-governmental Financial Relations 13 III. OTHER ACTIVITIES AND OUTPUTS 15 A. PFMRP Annual Retreat 15 B. Equipment Procurement 15 APPENDICES APPENDIX 1 LIST OF PERSONS MET 16 APPENDIX 2 22 Appendix 2A Summary of PFM Reform Program 23 Appendix 2B ADB Submission on Cambodia PFMRP, Stage 2 Framework 28 APPENDIX 3 Reviews of the Financial Management and Planning Functions of 32 MAFF, MRD and MOWRAM, APPENDIX 4 MAFF PFM Capacity Development Plan 92 APPENDIX 5 MOWRAM PFM Capacity Development Plan 133 APPENDIX 6 MRD PFM Capacity Development Plan 173 APPENDIX 7 NAA Draft Capacity Building and Training Plan for Loan Projects 213 APPENDIX 8 Assessment of International Audit Function in MOWRAM 224 APPENDIX 9 Assessment of International Audit Function in MAFF 264 APPENDIX 10 Assessment of International Audit Sub-Decree 290 APPENDIX Appendix 11A - Report on workshops held for the NAA on auditing loan projects 322 October 2008 Page i

3 CONTENTS I. BACKGROUND AND INTRODUCTION 1 A. Objectives of the Technical Assistance 1 B. Implementation of the Technical Assistance 1 C. Rural Sector Description and Objectives 2 D. ADB Involvement in the Rural Sector 3 II. PUBLIC FINANCIAL MANAGEMENT REFORM 4 A. The Public Financial Management Reform Program (PFMRP) 4 B. PFMPR in Rural Development Ministries 6 C. ADB s Contribution to PFMRP 9 D. External Audit Function 9 E. Internal Audit Function 10 F. Inter-governmental Financial Relations 13 III. OTHER ACTIVITIES AND OUTPUTS 15 A. PFMRP Annual Retreat 15 B. Equipment Procurement 15 APPENDICES APPENDIX 1 LIST OF PERSONS MET 16 APPENDIX 2 22 Appendix 2A Summary of PFM Reform Program 23 Appendix 2B ADB Submission on Cambodia PFMRP, Stage 2 Framework 28 APPENDIX 3 Reviews of the Financial Management and Planning Functions of 32 MAFF, MRD and MOWRAM, APPENDIX 4 MAFF PFM Capacity Development Plan 92 APPENDIX 5 MOWRAM PFM Capacity Development Plan 133 APPENDIX 6 MRD PFM Capacity Development Plan 173 APPENDIX 7 NAA Draft Capacity Building and Training Plan for Loan Projects 213 APPENDIX 8 Assessment of International Audit Function in MOWRAM 224 APPENDIX 9 Assessment of International Audit Function in MAFF 264 APPENDIX 10 Assessment of International Audit Sub-Decree 290 APPENDIX Appendix 11A - Report on workshops held for the NAA on auditing loan projects 322 October 2008 Page i

4 Appendix 11B Report on workshops held for Internal Audit in MAFF and MOWARM 325 Appendix 11C Timetable to develop internal audit manuals for MAFF and MOWARM 328 Appendix 11D Elements of internal audit work plans for MAFF and MOWARM 333 Appendix 11E MAFF and MOWRAM organizational structures 338 Appendix 11F Networking Arrangements between NAA and Internal Audit: TOR and 352 cost estimates APPENDIX 12 Cambodia Draft Law on Administration Management of Capital, 356 Provinces, Municipalities, Districts and Khans October 2008 Page ii

5 ABBREVIATIONS ADB AusAID CAP CARM D and D DPC EAP FMIS IFAPER IMF MAFF MOEYS MOI MEF MOWRAM MRD NAA NSDP PFM PFMPCRD PFMRP PPTA RGC RRP TA TORs WB Asian Development Bank Australian Agency for International Development Consolidated Action Plan Cambodia Regional Mission (ADB country office) Devolution and deconcentration Development Partners Committee External Advisory Panel Financial Management Information System Integrated Fiduciary Assessment and Public Expenditure Review International Monetary Fund Ministry of Agriculture Forestry and Fisheries Ministry of Education Youth and Sport Ministry of Interior Ministry of Economy and Finance Ministry of Water Resources and Meteorology Ministry of Rural Development National Audit Authority National Strategic Development Plan Public financial management Public Financial Management Program Cluster for Rural Development Public Financial Management Reform Program Project preparatory technical assistance Royal Government of Cambodia Report and Recommendation of the President (of the ADB) Technical assistance Terms of reference World Bank October 2008 Page iii

6 I. BACKGROUND AND INTRODUCTION A. Objectives of the Technical Assistance 1. The overall objective of the PPTA has been twofold: to assist RGC rural development ministries in planning to improve their public financial management (PFM) capacity particularly under PFMRP and, secondly, to assist ADB to design a program to aid those agencies in improving their PFM capacity. The activities of the PPTA have been directed at producing six main outputs: (i) an update on progress of the Public Financial Management Reform Program (PFMRP) during its Platform 1 implementation and during planning for Platform 2, (ii) review of progress in implementing PFM reforms in MAFF, MOWRAM and MRD, (iii) review of the implementation of the internal audit function in the three line ministries, (iv) review of the capacity of the NAA to carry out an effective external audit function, (v) training needs analyses of MAFF, MOWRAM, MRD and NAA to assess their need for PFM-related training and other skills development and (vi) preparation of capacity development plans for MAFF, MOWRAM, MRD to provide for PFM-related and other types of capacity development in those ministries. B. Implementation of the Technical Assistance 2. The PPTA (4988CAM: Preparing the Strengthening of Public Financial Management for Rural Development Project) was intended to be implemented between December 2007 and August However, because of delays in recruitment of consultants, the implementation period has been from March to September The executing agency for the project has been the MEF and the implementing agencies have been MAFF, MOWRAM, MRD and NAA. 4. The project commenced on 3 March Mr Les Henning, Public Financial Management Specialist/Team Leader, provided in-country inputs to the project from 3 March to 10 May and from 2 June to 30 August Mr Russell Leith, Institutional Development Specialist, provided inputs between 3 and 22 April, 14 May and 6 June, 17 June and 11 July and 24 July and 20 August Mr Nihal Fernandopulle, Audit Specialist, provided inputs between 6 and 20 April, 1 and 12 May, 11 June and 17 July and 28 July and 27 August National consultants Mr Ros Kheng, Budget Consultant, Mr Many Cheng, Capacity Development Consultant and Mr Nop Saravoan, Audit Consultant, have been employed continuously with the project since 10 February, 27 March and 5 May respectively. 5. A project inception report including work plan was submitted to the authorities and the ADB in early April 2008 and a mid-term report on progress to 30 June 2008 was submitted in early July. The PPTA team made a presentation of PPTA findings and recommendations to representatives of MEF, MAFF, MOWRAM, MRD and ADB in Phnom Penh on 26 August. 6. While accompanying ADB missions and during project interviews the project has met with a large number of officials from MEF, MAFF, MOWRAM, MRD and NAA and with other donor agencies. Team members have established good working relations with all of these officials and the project team is very grateful for the cooperation and assistance it has received. A list of persons met during the PPTA is included in Appendix 1 below. October 2008 Page 1

7 C. Rural Sector Description and Objectives 7. High economic growth rates since the mid-1990s have contributed to significant poverty reduction in Cambodia (from 47 per cent of the population in to 34.7 per cent in 2004 (latest figures available)). However, the impacts of growth have not been evenly spread and rural poverty at 39.2 per cent remained significantly higher than the national average in The RGC is committed to sustaining high rates of economic growth and in meeting its Millennium Development Goal (MDG) targets. As Cambodia s poverty reduction strategy, the National Strategic Development Plan (NSDP) builds on the MDG targets and outlines a strategy for reducing poverty through rural development. Of the NSDP s Rectangular Strategy s four key components there are two which directly affect rural development: (A) Enhancement of the Agricultural Sector by (i) improving productivity and diversifying the agricultural sector, (ii) land reform and mine clearance, (iii) fisheries reform and (iv) forestry reform and (B) Further Rehabilitation and Construction of Physical Infrastructure through (i) further construction of transport infrastructure and (ii) management of water resources and irrigation. Of the 43 high level development targets set in the NSDP , eight are directly in the rural development sector and are shown in the following table. Table 1: NSDP Targets Target ENHANCE AGRICULTURAL PRODUCTION AND PRODUCTIVITY Actual 2005 Target 2010 Paddy yield per hectare (tons) Irrigated land including supplemental irrigation (% of rice area) Land reform: land titles to farmers (% of total agricultural land) RURAL DEVELOPMENT Rural roads rehabilitated (kms-out of 28,000) 22,700 25,000 Safe drinking water access (% of rural population) Sanitation access (% of rural population) ENVIRONMENTAL SUSTAINABILITY Forest cover (% of total area) Fuel wood dependency October 2008 Page 2

8 9. The most challenging strategic goal for the rural sector, however, will be to reach the target of reducing poverty to below 25 percent of the total population by 2010, from 34.7 percent in Because, as indicated above, a higher proportion of the poor live in rural areas, meeting the NSDP poverty reduction goal by 2010 will require welltargeted and increasingly efficient public sector programs, as well as significant private investment. 10. A serious deficiency in Cambodia s public financial management system has been the low budget execution rate by ministries, i.e. rural ministries actual expenditures have frequently fallen significantly short of their approved budgets. For example, Ministry of Agriculture, Forestry and Fisheries spent only 90 percent of its current budget in 2003, although it increased its disbursement rate to 96.9 percent by Ministry of Rural Development increased its rate of current spending from 80.5 percent to 93.3 percent of approved budget over the same period and Ministry of Water Resources spending rate declined from 95.9 percent to 93.5 percent of budget over the same period. Poor PFM systems in line ministries have serious impacts on the efficiency and effectiveness of service delivery of line ministries programs and thus the attainment of poverty reduction goals. D. ADB Involvement in the Rural Sector. 11. From the resumption of ADB operations in1993 to the end of 2007, ADB had supported the agriculture and natural resources sectors with a total approved amount of $125.5 million (five loans, one grant project and 25 technical assistances (TAs)). This comprises approximately one quarter of the total assistance approved by ADB for Cambodia. At the end of 2007, continuing loans and grants (three project loans, one program loan and one project grant) for agriculture and natural resources totaled $83.59 million or 15.9 per cent of ADB s active portfolio in Cambodia. Also, in late 2007, the active TA portfolio in the agriculture and natural resources sector totaled nine projects for a total value of $7.05 million. October 2008 Page 3

9 II. PUBLIC FINANCIAL MANAGEMENT REFORM A. The Public Financial Management Reform Program (PFMRP) 12. PFMRP was adopted in December 2004 in response to observed weaknesses 1 (low budget execution rates, excessive payment arrears, fiduciary risks associated with cash-based transactions systems, low resource mobilization rates and poor control systems) in public financial management (PFM) 2. PFMRP was established as a 10-year reform program, based on a sequenced platform approach: Platform 1: Making the budget more credible in terms of timely and predictable delivery of funds (including improving the comprehensiveness of the budget; strengthening macro-fiscal and revenue forecasting and streamlining spending processes); Platform 2: Implementing effective financial accountability; Platform 3: Achieving a fully affordable policy agenda through policy-budget linkage; and Platform 4: Achieving effective program performance accountability. 13. Stage 1 of the program covered the period 2005 to 2007, with 2007 also being designated as a transition year for planning the changes needed to move to Stage 2 of the program. The methodology in Stage 1 of the PFMRP was to design and implement a series of activities (and related actions) that would contribute directly to meeting the objectives of Platform 1 as well as a set of activities which were deemed to be prerequisites for commencement of Platforms 2, 3 and 4 in later years. 14. Major outputs of Platform 1 of the program included (i) establishment of a revenue mobilization strategy, together with improved macro-fiscal planning, (ii) improved resource flows from improved revenue collection techniques in National Treasury (also assisted by strong economic growth), improved cash management (including consolidating several hundred government bank accounts into the Treasury Single Account) and increased use of the banking system (rather than cash) for government transactions, (iii) incorporation of off-budget revenues into the budget, (iv) implementation of a debt management function in MEF, (v) streamlining the expenditure commitments and payments system to improve budget holders ability to spend in line with budget provision, (vi) reduction in the stock of payment arrears and measures to avoid re-accumulation of arrears and (vii) implementation of revised procurement procedures. 15. Activities undertaken in Stage 1 as prerequisites for later platforms included (i) redesign of the chart of accounts and budget classification and (ii) initial design of a government-wide Financial Management Information System, (iii) introduction of an internal audit function, (iv) redesign of the budget cycle, introduction of program budgeting on a pilot basis in selected ministries, (v) investigating options for fiscal decentralization and (vi) completion of a PFM capacity development plan. 16. The PFMRP was reviewed by an independent External Advisory Panel in early As a result of the review, it was recognized at the annual PFMRP retreat in Siem 1 World Bank/ADB, Integrated Fiduciary Assessment and Public Expenditure Review, MEF, Public Financial Management Reform Program: Strengthening Governance in Cambodia through Enhanced Public Financial Management, 2004 October 2008 Page 4

10 Reap in April 2007 that, while not all activities proposed under Platform 1 had been fully completed, sufficient progress had been made for the overall objectives of Platform 1 to have been substantially achieved and for planning for Platform 2 to commence. 17. MEF prepared, in consultation with development partners, a framework for implementing Stage 2 of the PFMRP from 2008 to 2010 in the document Building on Improved Budget Credibility toward Achieving Better Financial Accountability (also known as the PFMRP Consolidated Action Plan Stage 2 (CAP2)), which outlines the proposed second stage and the second platform of the PFMRP. 18. The activities in Stage 2 are grouped in three main types; (i) continuing Platform 1 activities that need to be strengthened in Stage 2, (ii) Platform 2 activities that are to be implemented in Stage 2 and (iii) activities for later platforms (3 and 4) which need to be commenced in The continuing Platform 1 activities are (i) to further improve revenue policy and administration, (ii) debt management and (iii) cash and bank account management. The activities planned for Platform 2 are: (i) improving lines of accountability by clarifying roles, functions and responsibilities between levels of government and within spending agencies, (ii) improved instruments for encouraging responsible financial management including an incentives and sanctions regime, (iii) further completing implementation of the chart of accounts and the budget classification, (iv) improved budget implementation and financial management by further streamlining of the commitments and payments system and commencing implementation of the FMIS, (v) improved accounting, financial reporting and transparency by adoption of international accounting standards, quarterly and annual budget execution reporting and an improved budget document, (vi) completing the coverage and strengthening internal audit in line ministries, (vii) developing fiscal decentralization policy and strategy and (viii) building institutional capacity and motivational measures. Activities planned for Stage 2 as prerequisites for later platforms include (i) further integration of the recurrent and capital budgets, (ii) further inclusion of off-budget revenues and expenditures in the budget and (iii) further implementation of program budgeting. 20. The PPTA prepared a summary and comments on the PFMRP Stage 1 outcomes and activities proposed for Stage 2, a summary table of which can be found in Appendix 2A (full details can be found in Appendix 1 of the Mid Term Review). Also, the PPTA prepared the ADB s submission to the RGC on the CAP2 which is included as Appendix 2B. In the submission the ADB indicated that it strongly supported the proposed framework as a suitable basis for Stage 2 of the program, but suggested some options for strengthening the framework. These were (i) inclusion of specific internal audit training activities for line ministries, (ii) further clarification of line ministries intended involvement in internal audit, program budgeting and further reform of the commitments and payments system. Also, clarification was required on whether further action would be required in Stage 2 on certain Platform 1 activities which remained incomplete (further out-posting of financial controllers to line ministries, preparation of an IT strategy, additional public expenditure tracking surveys (PETS) and completion of government asset registers. 21. CAP2 was adopted as the framework for PFMRP Stage 2 at the annual program retreat in June 2008, with implementation to commence in late October 2008 Page 5

11 greater transparency of bidding opportunities. (All ministries will be required to participate in the further procurement reforms.) 27. Other Stage 2 activities in which MAFF, MOWRAM and MRD will participate are (i) improving accountability by defining appropriate financial responsibilities between management levels in ministries (and between levels of government), (ii) implementing the new economic and administrative classifications in the chart of accounts and budget classification by 2009 and the new functional classification by 2010, (iii) improved and more frequent budget reporting, (iv) further deepening of internal auditing procedures introduced in Platform 1 including MEF quality control of internal audit reports and (v) implementation of new financial arrangements at sub-national level pursuant to the deconcentration and devolution organic law passed in Further work will be undertaken in preparation for activities, which are to be fully implemented in Platforms 3 and 4 from 2011 to MRD and MAFF as pilot ministries for program budgeting will be required to review and amend their program structures and budgeting procedures in the light of lessons learned in Platform 1. All ministries will be required to bring donor-funded programs and projects into their budget preparation cycle to the greatest extent possible. 29. A major focus of Platform 2 will be capacity building in line ministries under the PFM capacity development plan prepared by the Economics and Finance Institute (EFI) of MEF in 2007 and approved by the Government as the blueprint for PFM capacity building until The plan provides for extensive (up to 8,000 participants across the public sector) training in 33 different PFM technical skills, (ii) broader skills development training (leadership, management), (iii) new human resources policies (accelerated advancement, job rotation, overseas scholarships and study tours). It is also proposed that the Merit Based Pay Initiative will become available to all line ministries to extend incentives to staff to improve their performance and to participate in the PFMRP. The proposed TAs to MAFF, MOWRAM, MRD and NAA under the proposed ADB program cluster should be designed to fit seamlessly with the PFM capacity development plan. 30. To assist the line ministries to prepare for PFMRP Stage 2 and for the ADB to design activities for its proposed rural development program cluster, the PPTA has carried out functional reviews of the finance and planning departments of MAFF, MOWRAM and MRD with the cooperation of the staffs of those ministries. The reviews, which are reported at Appendix 3, confirmed earlier findings such as those of the 2007 EAP that the take-up of PFM reforms in line ministries between 2005 and 2007 had been slight. 31. The main findings of the reviews were that (i) estimated receipts and expenditures of donor projects (which can comprise a large proportion of the resources available to the three ministries) were not being included in preparation of the ministries budgets, (ii) there was poor or non-existent coordination in including provincial departments budget estimates in the ministries budgets preparation, (iii) there was poor coordination between preparing the program and non-program budgets (MAFF and MRD), (iv) there was inadequate reporting of budget execution by provincial departments during the fiscal year, (v) accounting systems in the three ministries are rudimentary (although MAFF is introducing a commercial accounting package prior to its inclusion in the FMIS pilot in 2010), (vi) the internal audit function was not yet well developed in the two ministries (MAFF and MOWRAM) in which it had been introduced, (vii) although new procurement procedures had been introduced, fiduciary risks associated with public procurement by the ministries appeared to be still high and (viii) only a small, and probably inadequate, amount of PFM training had been provided to October 2008 Page 7

12 line ministries (in MOWRAM only three staff had attended PFM training provided by MEF during Stage 1). 32. The results of the reviews indicated that significant effort would be required in MAFF, MOWRAM and MRD for institutional and staff capacity building during PFMRP Stage 2. The reviews showed that there is a need for significant strengthening of PFM activities which were commenced in Platform 1 such as improving budget comprehensiveness (i.e. inclusion of off-budget revenue and expenditure items in the budget), procurement procedures, internal audit and implementation of the new chart of accounts, as well as the activities scheduled for Platform 2 such as improved accounting and budget execution reporting. The reviews also suggest that further effort will be required to consolidate program budgeting in the two ministries (MAFF and MRD) in which it has been piloted. There is a need for MAFF to engage with MEF in planning for introduction of FMIS. 33. To assist line ministries and ADB further in implementing PFM reforms, the PPTA prepared PFM capacity development plans for MAFF, MOWRAM and MRD, based on training needs assessments carried out in cooperation with the staffs of those respective ministries. 34. The methodology of the training needs assessments comprised three parts: (i) identification of the PFM training and other capacity development needs specified or implied in the PFMRP Stage 2 framework (CAP2) which included the PFM capacity development plan, (ii) by using the PFM Working Group in each ministry as a focus group in which middle to senior managers in the finance, planning and internal audit departments were asked to identify the development needs of their staff and themselves and (iii) a survey of the staff in the finance, planning and internal audit departments of the ministries to ascertain their views on their organization, their prior experience, training and qualifications and their perceived needs for their own development. The focus groups and surveys sought views on general skills development as well as focusing specifically on PFM training needs. Seventy-four respondents in MAFF, 33 in MOWRAM and 50 in MRD completed the survey questionnaire. 35. The responses, which are summarized in attachments to the capacity development plans for MAFF, MOWRAM and MRD, are included in Appendices 4, 5 and 6 respectively. The respondents indicated needs for a wide range of training in PFM topics which are to be provided in the EFI s proposed schedule of training as well as other activities not currently scheduled by EFI such as enhanced procurement and internal audit training. 36. The capacity development plans have matched the demand for training with the scheduled training program which EFI proposes to deliver between 2008 and The proposed plans allocate a proportion of training places to each ministry for all of the PFM and related courses which EFI proposes to offer. In addition, the plans propose training in other areas not presently covered by the EFI schedule. These additional courses include enhanced internal audit, enhanced procurement, program budgeting, commitments and payments system changes, preparing budget execution reports, monitoring and evaluation techniques and implementing devolution and deconcentration. The training plan for each ministry also includes proposed staff numbers to be trained, training modality and implementation period. Training of rural development ministry staff on these supplementary topics would be suitable for inclusion in the proposed ADB TA project. October 2008 Page 8

13 B. PFMRP in Rural Development Ministries 22. While much of the focus of Stage 1 was on activities in MEF, line ministries also had a major role in its implementation. The involvement of line ministries including MAFF, MOWRAM and MRD in Stage 1 has included (i) streamlining the commitments and payments system (by removing commitments requirements for salaries and nonprocurement purchasing and out-posting financial controllers to selected ministries), (ii) consolidation of ministries bank accounts to the Treasury Single Account in National Treasury to improve cash management and reduce fiduciary risks, (iii) reducing ministries payment arrears (which were paid out by MEF) to improve their ability to meet current year expenditures, (iv) deconcentration of procurement by introducing new purchasing procedures including raising the thresholds for line ministries to do their own procurement without prior MEF approval, (v) introduction of internal audit units in line ministries (units were set up in MAFF and MOWRAM but not MRD), (vi) introduction of program budgeting on a pilot basis in seven ministries (including MAFF and MRD, but not MOWRAM) and (vii) introduction of strategic budget plans in the budget preparation process as a first step to linking budget planning and policy priorities. 23. While there has been significant progress with the Platform 1 objective (improved budget credibility) (revenue out-turns are now within five per cent of budget estimates, MAFF s expenditure execution rate has increased from 94 to 97 per cent between 2005 and 2007, MRD s increased from 90 to 93 per cent and MOWRAM s from 89 to 93 per cent), many of the reforms particularly at line ministry level have had limited impact and may not be sustainable in the longer term without further reinforcement. 3 For example, while 23 of 35 budget-funded agencies have established internal audit units, it is unclear which, if any, are producing good quality audit reports, Further, despite efforts to rationalize the number of government bank accounts, ministries still hold a large number of accounts (about 1,800). (However, the rural development ministries hold only small numbers of accounts.) 24. In planning for PFMRP Stage 2, MEF has recognized the need for greater involvement of line ministries in the program in order to (i) meet the Platform 2 objective of increased financial accountability and (ii) strengthen the reforms, which were introduced in Platform 1. There will also be a need to commence or strengthen activities, which are prerequisites for Platform 3 and 4. The assistance to be provided under the proposed ADB program cluster will be directed at meeting these objectives. 25. MAFF, MOWRAM and MRD will be brought into PFMRP implementation more closely in Platform 2 by including them (along with representatives of all other line ministries) on the PFM Reform Committee, the high level group that sets the policy direction and oversights implementation of the program. Also, all line ministries will be required to prepare their own PFM Ministry Action Plan and a PFM Capacity Building Plan. 26. Further enhancements of Platform 1 activities which will be implemented between 2008 and 2010 will include (i) further improvement of revenue policy and collection including implementation of an oil and gas revenue policy (It is expected that ministries such as MAFF which have significant non-tax revenues should review and periodically adjust the rates of their fees and charges) and (ii) further improvements in public procurement including implementation of procurement rules and regulations and standard bidding documents, MEF ex-post monitoring of ministries procurements and 3 External Advisory Panel report, 2007 October 2008 Page 6

14 37. Other general development topics included in the training plans were business English, report and project proposal writing skills, project management, supervisory skills and basic and advanced IT packages. Consideration should also be given to including these topics in the ADB TA project or funding them from the project s resources. 38. The capacity development plans also identified other personal development measures which would be suitable for finance and planning staff of the three ministries. These include scholarship schemes offered by various development partners, study tours and in-country courses such as the Japan/ADB Public Policy Training Program. The capacity development plans also recommend that the members of the PFM Working Group in each ministry should be admitted to the Merit Based Pay Initiative (MBPI) as a first step in extending that scheme to line ministries. An option which should be considered in relation to MBPI is whether funding of the scheme in the three rural development ministries would be eligible expenditure in the ADB TA project. 39. The PPTA was requested by the PFM Working Group in MRD to assist it in preparing the PFM Ministry Action Plan (MAP), which is the mandatory strategic plan for PFM reform activity in the ministry from 2008 to Although this task was additional to the existing TORs and work plan of the PPTA, the Director SEGF agreed that the PPTA should remain flexible in meeting ministry requests for ad hoc assistance and, as this appeared to be a significant activity, ADB would be prepared to rearrange other less significant activities from the PPTAs TORs and work plan, if necessary, to accommodate it. In the event, a draft of MRD s MAP was prepared within existing project resources and can be found in Appendix 5 of the Mid Term Review. The draft has been submitted to MEF for comment and has been developed further with MRD staff, including discussion of a work plan to implement its various components. As well as assisting the ministry develop its internal audit function (see section 2.5 below) and its PFM capacity development plan (as detailed above), the project has advised the PFM Working Group in MRD on options for joining the MBPI. C. ADB s Contribution to PFMRP 40. ADB has contributed significantly since 2005 to activities of the Public Financial Management Reform Program (PFMRP) Platform 1. ADB provided assistance to the RGC in TA No. 2566CAM-Developing Capacity in Audit and Inspectorate Functions to establish the National Audit Authority (NAA). In TA No. 3634CAM Strengthening Public Financial Management, ADB assisted the Government in 2004 and 2005 to (i) set up an internal audit function, initially in MEF and (ii) strengthen the institutional structure of the NAA. Also, the project assisted MEF to establish a medium term expenditure framework and a macroeconomic forecasting capability. In TA No. 4441CAM-Support to Public Financial Management Program, ADB assisted MEF to establish a debt management function. This activity involved setting up a debt management office in the ministry, installation of a debt management database, preparation of debt management procedures and a manual and staff capacity building. PFM-related technical assistance (although not formally part of the PFMRP) was provided to MAFF in TA No. 4428CAM- Strengthening National Program Budgeting for the Agriculture Sector which prepared a program-based financial management system including a new chart of accounts, a monitoring and evaluation framework and manual and a financial training manual. D. External Audit Function 41. The National Audit Authority which was established under the Audit Law of 2000 is the supreme audit institution of Cambodia which reports directly to the National October 2008 Page 9

15 Assembly and Senate. In recognition of its independent status, the external audit function has not been formally included in the PFMRP. However, it has been acknowledged that external audit of the public accounts and performance and compliance auditing are essential to ensuring accountability over public resources (including donor-funded projects) and therefore effective service delivery to the rural development sector. 42. As indicated above, ADB has provided significant assistance for establishing and strengthening the external audit function in two TAs between 1999 and In recognition of its lack of experienced audit staff and its lack of capacity to undertake certain activities such as performance auditing, the NAA has requested the ADB to provide further assistance to strengthen its capacity. Accordingly, the outputs of this PPTA will be used in the preparation of the proposed TA to strengthen capacity in the NAA under the ADB program cluster. 43. A major output of this PPTA has been the preparation of an assessment of the capacity of the NAA (Appendix 2 in the Mid Term Review). The main findings of the assessment were review of (i) the audit law and sub-decree, (ii) NAA s relationship with the legislature and legislative committees, (iii) NAA s structure, staffing, processes and procedures and (iv) NAA s relationship with the internal audit and inspectorate functions. The report also includes terms of reference for a proposed peer review of NAA by another national audit institution. RGC agreement in 2008 to such a peer review proceeding has been included as a policy action trigger for sub-program 1 of the proposed ADB program cluster. The report includes conclusions and recommendations for reform of the NAA and for improving its institutional and staff capacity. 44. Another significant output has been the completion of a capacity building plan for NAA which is included at Appendix 7. The plan is intended to fit under the NAA s Strategic Development Plan and focuses particularly on training and capacity building for loan project audits. It proposes training for NAA staff in (i) RGC and donor procurement procedures and auditing of procurements, (ii) donor project financial management requirements, (iii) donor standard operating procedures, (iv) audit planning, (v) review and evaluation of internal controls including IT controls, (vi) loan arrangements and English language training to allow auditors to understand manuals etc. 45. Initial training was provided to NAA staff (including the Deputy Secretaries General) by the PPTA in July The workshops delivered 14 hours of contact time to 28 staff of the authority on the procedures for auditing loan projects. Further detail on the content of the training and the outcomes are shown in Appendix 11A. 46. The PPTA is assisting the NAA to undertake a pilot performance audit of an ADB development project for school construction in MOEYS (Second Education Sector Development Project: ADB Loan No. 2122CAM). As part of the pilot audit the consultants have been training the staff of the audit department responsible for loan projects in audit planning, determining audit objectives, developing the audit program, preparing internal control checklists and carrying out the audit. Training was also provided on the key features of the procurement, financial management and project management regulations. E. Internal Audit Function 47. An internal audit function was established in PFMRP Platform 1 as a prerequisite for achieving effective financial accountability which is the main thrust of October 2008 Page 10

16 PFMRP Platform 2. With ADB technical assistance, the Internal Audit Department in MEF was formed in 2005 by transfer of 20 staff from the General Inspections Department. Internal audit standards and a code of conduct were prepared by MEF and disseminated to line ministries. Some training in audit procedures was provided to line ministries by MEF. 48. The Audit Law of 2000 requires each ministry to establish an internal audit function in accordance with the sub-decree on internal audit (No. 40/ANK/BK of 2005). Internal audit units have been established in MAFF and MOWRAM and a draft subdecree to establish an internal audit function in MRD was approved by the Prime Minister in August The independent review by the External Advisory Panel (EAP) in early 2007 found that 19 ministries (subsequently increased to 24 of 35 budgetfunded agencies) had established internal audit units but that only seven were found to be operational. The EAP found that the capacity of these units to carry out internal audits effectively was low. The report cited the findings of a WB appraisal which identified (i) internal audit skills development, (ii) guidance on internal audit methodologies and (ii) acquisition of sufficient resources as major requirements of line ministry internal audit departments. 49. An effective internal audit function is essential in line ministries to strengthen internal controls processes to reduce fiduciary risks and to provide assurances to development partners and other stakeholders. In PFMRP Platform 2 it is intended to complete the coverage of internal audit to all line ministries and to strengthen capacity in all ministries in support of the Platform s main objective of increasing financial accountability. In continuation of its earlier assistance, the ADB program cluster will support a TA project to strengthen internal audit in MEF, MAFF, MRD and MOWRAM. 50. To support the preparation of that TA, the present PPTA has completed a number of outputs. Reviews of the internal audit capacity of MOWRAM and MAFF (shown at Appendices 8 and 9 respectively) have confirmed the view that capacity within the internal audit units is weak. 51. In the MOWRAM review it was found that, although the internal audit unit has a three year work plan and has produced five audit reports, its capacity to undertake audits at a professional standard remains low, due mainly to inexperience of the staff and lack of appropriate educational qualifications. Also there is no generally accepted auditing methodology in place and there are no internal audit procedures manuals. The report includes conclusions and recommendations for improving staff capacity and internal audit procedures, including a three year internal audit training plan which is at Annex E of the report. 52. The review of internal audit in MAFF reaches similar conclusions to the MOWRAM review. Generally, the capacity to undertake adequate internal audits is low and various measures to improve staff capacity and audit procedures will be required. The three year internal audit training plan outlined above is a generic plan and will be appropriate for MAFF and for MRD when its internal audit unit is established. 53. The PPTA assisted MAFF in undertaking a pilot audit of the payments cycle. The Agricultural Office of Steung Treng province was selected for the pilot audit. The internal audit department had scheduled to undertake this audit as part of its annual work plan for 2008 and the PPTA consultants assisted the audit team in executing this audit. The audit focused on evaluating the internal control systems relating to the payments system covering (i) repairs and maintenance of buildings and temples; (ii) accommodation expenses; and (iii) payments of subsidies to enterprises. These three October 2008 Page 11

17 items of expenditure represent over 50% of the total expenditure of the 2007 budget allocation for this province. 54. Audit objectives, audit programs and Internal Control Questionnaires were developed together with a detailed planning document. Several training sessions were conducted with the audit teams before the commencement of each phase of the field audit. 55. The PPTA prepared an assessment of the existing internal audit sub-decree which is included as Appendix 10. The assessment concluded that the internal audit sub-decree is adequate to enable the functioning of an effective and professional internal auditing activity in the public sector, as it has been based on the practices recommended by international internal auditing standards. The sub-decree can be strengthened further by introducing provisions to require the establishment of audit committees, permitting external appointments to the more senior positions in the ministry audit departments, permitting the use of short-term experts and contractors for specialized areas of internal audit, requiring an external assessment of the internal audit function once every five years and by requiring that the ministries develop and maintain proper auditing procedures manuals. 56. A two-day workshop on internal audit concepts and procedures was delivered to 33 audit staff of MAFF and MOWRAM in July Details of the training topics and the outcomes are also shown in Appendix 11B. 57. The PPTA prepared a report advising on the content which should be included in proposed internal audit procedures manuals for MAFF and MOWRAM. The report is included as Appendix 11C. Similarly, an outline of the elements which MAFF and MOWRAM will have to consider in preparing their annual internal audit work plans is included as Appendix 11D. The factors to be considered include: (i) the annual revenue and expenditure cycles, (ii) auditing of procurement, inventories and fixed assets, (iii) auditing of trading and semi-commercial operations (MAFF), (iv) efficiency and effectiveness of projects, (v) resettlement schemes (MOWRAM) and adequacy of disaster and emergency relief programs (MOWRAM). 58. The shortcomings in the current organizational structures of MAFF and MOWRAM s internal audit departments which were identified in the above reviews have been addressed in proposed new structures for the departments which are included in Appendix 11E. This appendix also includes proposed job descriptions for the various levels of audit staff in the two departments. Because of similarities in the functions of NAA and internal audit departments in line ministries there are risks of overlap and duplication occurring. For this reason, good coordination between these functions is essential and accordingly proposed arrangements for networking between the internal and external audit functions are outlined in Appendix 11F. 59. As indicated above, MRD proposes to establish a functional internal audit unit by the end of Sub-decree No 113 for establishing the internal audit department in MRD was approved by the Prime Minister on the 13 August A director and two deputy directors have since been appointed to IAD, although no other staff have yet been appointed. The department is not yet operational and the director has requested the assistance of the TA audit consultants to assist him during this initial stage of start up. 60. The project agreed with MRD s PFM Working Group that the domestic audit consultant will work with the Director of IAD during September 2008 to assist him to: October 2008 Page 12

18 Draft a Prakas for the IAD based on the requirements of the internal audit subdecree; Identify the key activities undertaken in the ministry; Draft a suitable organizational structure for the IA; Prepare an outline of the internal audit work plan; and Prepare position descriptions for each audit staff member 61. Advice was provided to the Director of IAD to increase awareness of the approach and purpose of internal audit and the techniques and methodologies that are used in modern internal auditing. The need to have a clear demarcation of responsibilities between the newly established internal audit function and the existing inspection function in MRD was also emphasized. F. Inter-governmental Financial Relations (Devolution and Deconcentration-D and D) 62. As the majority of Cambodia s poor live in rural areas, improving service delivery to rural communities is seen as an essential step for poverty alleviation. The 2003 IFAPER report noted that decentralization of service delivery responsibility is an essential part of public sector reform. Also, as noted by this project in the functional reviews of the three rural development ministries there is a lack of coordination between the central offices of the ministries and their provincial departments for budget planning and execution, thus detracting from the efficiency of service delivery in rural areas. 63. In PFMRP Platform 1 preparatory work on inter-governmental financial relations was commenced as a pre-requisite for reforms which were to be carried out in later platforms. In the 2007 EAP report progress was noted as (i) enactment in 2001 of a commune and sangkat organic law, (ii) setting up a Commune and Sangkat Fund (to receive central government funding equivalent to about 2.5 percent of recurrent expenditure each year) and (iii) establishment of a system of fiscal grants to communes and sangkats based on a simple fiscal equalisation formula. 64. However, the other levels of sub-national government (provinces, municipalities, districts, and khans) have lacked adequate legal mandates as to their institutional structures, roles and responsibilities (expenditure mandates) and revenue powers and sources. To this end, a devolution and deconcentration organic law was prepared and presented at a major conference in Sihanoukville. The PPTA consulted with the Development Partners D and D Working Group and the DPC on the draft law in March 2008 and prepared a summary and comments on the draft organic law (included at Appendix 12). As the law was introduced for passage to the National Assembly on 27 March 2008, there was no opportunity to engage the relevant ministries on the issues raised in the comments paper. 65. The organic law provides a clearly defined institutional basis for sub-national administrations. It legislates for expenditure responsibilities of the various levels of government to be determined and for a system of assigned revenue types (mostly nontax revenues), shared taxes (with the central government) and conditional and unconditional transfers from the central government to sub-national administrations, which are to be included in a law on the financial regime and asset management of subnational administrations. MEF has prepared drafts of the financial law, an early version of which was translated to English by the project team. October 2008 Page 13

19 66. However, the implementation provisions of the organic law have been deferred for inclusion in 32 further laws, decrees and sub-decrees. The National Committee on Deconcentration and Devolution (within MOI) with the assistance of high level officials from other ministries is currently working on developing these implementation arrangements, although it is unclear when these tasks will be completed. 67. The PFMRP Stage 2 framework provides for a detailed plan to be prepared to support initial implementation of the fiscal and financial provisions of the D and D organic law (Objective 27). Also, Objective 21 of the framework proposes that the budget holders and lines of accountability at the various levels of government be clearly defined as a basis for improving accountability. 68. Because further policy development has been delegated to the National Committee (and which went into abeyance during the period of the 2008 national elections), the PPTA has been unable to engage further with the authorities on D and D issues. However, after the National Committee has completed the assignment of expenditure roles and of revenue types to sub-national levels, line ministries will require considerable assistance to implement the new arrangements. Therefore, it is recommended that the TA on strengthening PFM reforms in the three rural development ministries remain flexible in responding to assistance needs for the new arrangements. October 2008 Page 14

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Country Partnership Strategy: Cambodia, 2014 2018 Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Lagging public sector management

More information

COUNTRY PAPER - CAMBODIA

COUNTRY PAPER - CAMBODIA COUNTRY PAPER - CAMBODIA Khin Song 1 September 2009 1 Deputy Director General, National Institute of Statistics, Cambodia I. BACKGROUND Since 1979, Cambodia had adopted a decentralized statistical structure.

More information

Cambodia: Water Resources Management Sector Development Program (Second Tranche)

Cambodia: Water Resources Management Sector Development Program (Second Tranche) Progress Report on Tranche Release Project Number: 38558-013 Loan Number: 2673 April 2017 Cambodia: Water Resources Management Sector Development Program (Second Tranche) This consultant s document report

More information

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program Concept Paper Project Number: 49041-002 January 2016 Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program This document

More information

REPORT 2015/174 INTERNAL AUDIT DIVISION

REPORT 2015/174 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/174 Audit of management of selected subprogrammes and related capacity development projects in the United Nations Economic and Social Commission for Asia and the Pacific

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE 1

SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Policy-Based Loan for Subprogram 3 of the Third Financial Sector Program (RRP CAM 42305) SECTOR ASSESSMENT (SUMMARY): FINANCE 1 1. Sector Performance, Problems, and Opportunities 1. Overall finance sector.

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

OFFICIALi\At,w. WUMEN4TS 2

OFFICIALi\At,w. WUMEN4TS 2 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIALi\At,w. WUMEN4TS 2 The World Bank 30th Floor, Siam Toer Telephone: (66) 0 26868300

More information

Public Financial Management and Pro-Poor Service Delivery

Public Financial Management and Pro-Poor Service Delivery Public Financial Management and Pro-Poor Service Delivery National Budget and Poverty Reduction Workshop December 8, 2005 Rob Taliercio, Senior Country Economist World Bank Cambodia Country Office Policy

More information

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization Technical Assistance Report Project Number: 42226 Capacity Development Technical Assistance (CDTA) September 2011 Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

More information

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT

PROGRAM FIDUCIARY SYSTEMS ASSESSMENT Sustainable Transport Infrastructure Improvement Program (RRP SOL 46499) A. Background and Information Sources PROGRAM FIDUCIARY SYSTEMS ASSESSMENT 1. Under the proposed program, country public financial

More information

ASIAN DEVELOPMENT BANK TAR:UZB 36498

ASIAN DEVELOPMENT BANK TAR:UZB 36498 ASIAN DEVELOPMENT BANK TAR:UZB 36498 TECHNICAL ASSISTANCE TO THE REPUBLIC OF UZBEKISTAN FOR DEVELOPMENT OF THE CAPITAL MARKET July 2003 CURRENCY EQUIVALENTS (as of 30 June 2003) Currency Unit sum SUM1.00

More information

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program Country Public Financial Management System Assessment Project Number: 49078 Loan Number(s): June 2015 Republic of Armenia: Seismic Safety Improvement Program ABBREVIATIONS ADS - Armenian Development Strategy

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

JORDAN. Terms of Reference

JORDAN. Terms of Reference JORDAN Terms of Reference Jordan: Strengthening municipal financial management systems to sustain service delivery in municipalities affected by the refugee crisis Assessment of Municipal Public Financial

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

Fiscal Policy for Development and its Budgetary Implications in Cambodia

Fiscal Policy for Development and its Budgetary Implications in Cambodia ESCAP High-level Policy Dialogue Ministry of Finance of the Republic of Indonesia International Economic Summit 2013 Eleventh Bank Indonesia Annual International Seminar Macroeconomic Policies for Sustainable

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION

INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H324-KH Public Disclosure Authorized Financing Agreement (Poverty Reduction and Growth Operation) Public Disclosure Authorized between KINGDOM OF

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

JOINT POLICY REFORM MATRIX, FY2016 FY2018

JOINT POLICY REFORM MATRIX, FY2016 FY2018 Building Macroeconomic Resilience Subprogram 2 (RRP TON 48361-002) JOINT POLICY REFORM MATRIX, FY2016 FY2018 Version: March 2017 I. SUPPORTING FISCAL RESILIENCE Fiscal strategy Partners: ADB, IMF, PFTAC,

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN UNITED NATIONS DEVELOPMENT PROGRAMME DESK REVIEW OF UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN Report No. 1310 Issue Date: 9 October 2014 Table of

More information

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context 8 Mauritania ACRONYM AND ABBREVIATION PRLP Programme Regional de Lutte contre la Pauvreté (Regional Program for Poverty Reduction) History and Context Mauritania s Poverty Reduction Strategy Paper (PRSP)

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

GUIDE TO THE NATIONAL BUDGET

GUIDE TO THE NATIONAL BUDGET ACKNOWLEDGEMENTS This Guide has been produced by the Budget Project of the NGO Forum on Cambodia in cooperation with the Economic Institute of Cambodia. The Guide benefited from the valuable feedback of

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:CAM 36593 TECHNICAL ASSISTANCE TO THE KINGDOM OF CAMBODIA FOR IMPROVING INSURANCE SUPERVISION December 2002 CURRENCY EQUIVALENTS (as of 3 December 2002) Currency Unit riel (KR)

More information

REPORT 2015/115 INTERNAL AUDIT DIVISION

REPORT 2015/115 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/115 Audit of the statistics subprogramme and related technical cooperation projects in the Economic Commission for Africa Overall results relating to effective management

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA. LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST

More information

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA PEFA Handbook Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA Second edition November 20, 2018 PEFA Secretariat Washington DC, USA Table of Contents PEFA ASSESSMENT HANDBOOK...

More information

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms Technical Assistance Report Project Number: 47137-004 Capacity Development Technical Assistance (CDTA) September 2016 Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance

More information

Kingdom of Cambodia Nation Religion King

Kingdom of Cambodia Nation Religion King Kingdom of Cambodia Nation Religion King STATISTICAL MASTER PLAN FOR CAMBODIA MID-TERM REVIEW Prepared by National Institute of Statistics November 2012 FOREWORD It is my great pleasure to introduce the

More information

To reduce emissions from your AFOLU sector, what critical challenges must be overcome?

To reduce emissions from your AFOLU sector, what critical challenges must be overcome? To reduce emissions from your AFOLU sector, what critical challenges must be overcome? Coordination of specific activity data/ information sharing Weak institutional and human capacity Finance Lack of

More information

Royal Government of Cambodia: Decentralized Public Service and Financial Management Sector Development Project, Subprogram 2

Royal Government of Cambodia: Decentralized Public Service and Financial Management Sector Development Project, Subprogram 2 Decentralized Public Service and Financial Management Sector Development Program, Subprogram 2 (RRP CAM 41392-023) Project Administration Manual Project Number: P41392-023 Loan and/or Grant Number(s):

More information

INTRODUCTION INTRODUCTORY COMMENTS

INTRODUCTION INTRODUCTORY COMMENTS Statement of Outcomes and Way Forward Intergovernmental Meeting of the Programme Country Pilots on Delivering as One 19-21 October 2009 in Kigali (Rwanda) 21 October 2009 INTRODUCTION 1. Representatives

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Institutional Strengthening for Aviation Regulation

Institutional Strengthening for Aviation Regulation Technical Assistance Report Project Number: 43429 Regional capacity development technical assistance (R-CDTA) December 2010 Institutional Strengthening for Aviation Regulation The views expressed herein

More information

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China Technical Assistance Report Project Number: 49401-001 Policy and Advisory Technical Assistance (PATA) April 2016 People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

More information

Public Financial Management

Public Financial Management UNITAR Mustofi Fellowship Hiroshima, Japan 18 22 February 2012! Index! Overview and Objectives! Limitations and Problems! Public Financial Systems! Financial Management System Boundaries! Framework! Government

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

PUBLIC SECTOR MANAGEMENT: SUMMARY SECTOR ASSESSMENT. 1. Sector Problems, Performance, and Opportunities

PUBLIC SECTOR MANAGEMENT: SUMMARY SECTOR ASSESSMENT. 1. Sector Problems, Performance, and Opportunities Country Partnership Strategy: Lao PDR, 2012 2016 PUBLIC SECTOR MANAGEMENT: SUMMARY SECTOR ASSESSMENT A. Sector Road Map 1. Sector Problems, Performance, and Opportunities 1. In many ways, Lao PDR s colonial

More information

Evaluation Study. Midterm Review Process. Operations Evaluation Department

Evaluation Study. Midterm Review Process. Operations Evaluation Department Evaluation Study Reference Number: SES:REG 2008-78 Special Evaluation Study Update December 2008 Midterm Review Process Operations Evaluation Department ABBREVIATIONS ADB Asian Development Bank BTOR back-to-office

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities State Accountability Revitalization Project (RRP INO 38354) Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

Public Expenditure and Financial Accountability Baseline Report. Central Provincial Government

Public Expenditure and Financial Accountability Baseline Report. Central Provincial Government Public Expenditure and Financial Accountability Baseline Report Central Provincial Government 1 Table of Contents Summary Assessment... 4 (i) Integrated assessment of PFM performance... 4 (ii) Assessment

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities Country Partnership Strategy: Indonesia, 2012 2014 SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2010 International Monetary Fund May 2010 IMF Country Report No. 10/138 November 2009 January 29, 2001 January 29, 2001 January 29, 2001 January 29, 2001 Maldives: Action Plan for PFM Reforms Based on

More information

MADAGASCAR PORTFOLIO REVIEW REPORT

MADAGASCAR PORTFOLIO REVIEW REPORT AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND MADAGASCAR PORTFOLIO REVIEW REPORT SOUTH REGION DEPARTMENT OCTOBER 2007 SCCD :N.A. i CURRENCY EQUIVALENTS (October 2007) UA1 = US$ 1.55665 UA1 = EURO 1.9786

More information

ASIAN DEVELOPMENT BANK TAR:INO 35144

ASIAN DEVELOPMENT BANK TAR:INO 35144 ASIAN DEVELOPMENT BANK TAR:INO 35144 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SUPPORT TO STATE AUDIT REFORM PROJECT May 2003 2 CURRENCY EQUIVALENTS

More information

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14 AFRICAN UNION GUIDELINES FOR COUNTRIES TO PREPARE FOR AND TO PARTICIPATE IN THE AFRICAN PEER REVIEW MECHANISM (APRM) Table of Contents I Introduction 1 II Core Guiding Principles 2-3 III The APR Processes

More information

INTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process

INTERNAL AUDIT DIVISION REPORT 2016/155. Audit of the United Nations Human Settlements Programme project management process INTERNAL AUDIT DIVISION REPORT 2016/155 Audit of the United Nations Human Settlements Programme project management process Established policies and procedures need to be further strengthened, particularly

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

REPORT 2016/030 INTERNAL AUDIT DIVISION. Audit of project management at the United Nations Institute for Training and Research

REPORT 2016/030 INTERNAL AUDIT DIVISION. Audit of project management at the United Nations Institute for Training and Research INTERNAL AUDIT DIVISION REPORT 2016/030 Audit of project management at the United Nations Institute for Training and Research Overall results relating to effective management of projects were initially

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

AUDIT UNDP AFGHANISTAN. Local Governance Project (Project No ) Report No Issue Date: 23 December 2016

AUDIT UNDP AFGHANISTAN. Local Governance Project (Project No ) Report No Issue Date: 23 December 2016 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP AFGHANISTAN Local Governance Project (Project No. 90448) Report No. 1745 Issue Date: 23 December 2016 Table of Contents Executive Summary i I. About the

More information

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017 Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Fiscal and Public Expenditure Management Program (Subprogram 2) (RRP INO 50168-002) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 A. Sector Performance,

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

SPECIFIC TERMS OF REFERENCE. EU contribution to 2012 Federal PEFA assessment in Pakistan

SPECIFIC TERMS OF REFERENCE. EU contribution to 2012 Federal PEFA assessment in Pakistan SPECIFIC TERMS OF REFERENCE EU contribution to 2012 Federal PEFA assessment in Pakistan FWC BENEFICIARIES 2009 - LOT 11: Macro economy, Statistics and Public finance management DCI-ASIE/2011/277245/1 1

More information

Validation Report Sustainable Development Strategies Group (SDSG), Independent Validator 20 January 2017

Validation Report Sustainable Development Strategies Group (SDSG), Independent Validator 20 January 2017 Validation of MAURITANIA Validation Report Sustainable Development Strategies Group (SDSG), Independent Validator 20 January 2017 1. BACKGROUND Mauritania borders Algeria, Senegal, and Mali in northwest

More information

REVENUE AND EXPENDITURE MANAGEMENT

REVENUE AND EXPENDITURE MANAGEMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TECHNICAL BRIEF REVENUE AND EXPENDITURE MANAGEMENT Nam Theun 2 Hydroelectric Project

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) Fax: (251-11)

P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) Fax: (251-11) AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) 5517700 Fax: (251-11) 5517844 www.au.int VACANCY ANNOUNCEMENT: FINANCE OFFICER TO WORLD BANK FUNDED PROJECTS

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

REPIM Curriculum Vitae Sharon Hanson-Cooper

REPIM Curriculum Vitae Sharon Hanson-Cooper RESEARCH ON ECONOMIC POLICY IMPLEMENTATION & MANAGEMENT FERNWOOD HOUSE, WEST WOODFOOT, SLALEY, HEXHAM, NE47 0DF, NORTHUMBERLAND, ENGLAND. TEL: 00 44 1434 673385 e mail: enquiries@repim.eu Name: SHARON

More information

New Zealand Vanuatu. Joint Commitment for Development

New Zealand Vanuatu. Joint Commitment for Development New Zealand Vanuatu Joint Commitment for Development 2 The Joint Commitment for Development between the Governments of New Zealand and Vanuatu establishes a shared vision for achieving long-term development

More information

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations INTERNAL AUDIT DIVISION REPORT 2015/041 Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations Overall results relating to the effective management of mine action

More information

FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS

FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS 42 FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS. FINANCIAL PLANNING AND BUDGETING - CENTRAL GOVERNMENT AND DEPARTMENTS BACKGROUND.1 This Chapter describes the results of our government-wide

More information

FISCAL STRATEGY PAPER

FISCAL STRATEGY PAPER REPUBLIC OF KENYA MACHAKOS COUNTY GOVERNMENT THE COUNTY TREASURY MEDIUM TERM FISCAL STRATEGY PAPER ACHIEVING EQUITABLE SOCIAL AND ECONOMIC DEVELOPMENT IN MACHAKOS COUNTY FEBRUARY2014 Foreword This Fiscal

More information

Maldives: Developing the Revenue Administration Management Information System

Maldives: Developing the Revenue Administration Management Information System Completion Report Project Number: 44414-012 Technical Assistance Number: 7946 July 2015 Maldives: Developing the Revenue Administration Management Information System This document is being disclosed to

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

Republic of the Philippines: Government-Owned and -Controlled Corporations Reform

Republic of the Philippines: Government-Owned and -Controlled Corporations Reform Technical Assistance Report Project Number: 39606 June 2006 Republic of the Philippines: Government-Owned and -Controlled Corporations Reform The views expressed herein are those of the consultant and

More information

QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY]

QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY] QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY] This questionnaire is designed to gather basic information on fiscal institutions and practices as a basis for review of a country's fiscal management system

More information

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment PMR Project Implementation Status Report (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Socialist Republic of Vietnam Reporting Period: From 08/20/2017 to 04/03/2018 Report Date:

More information

STAR Contribution to Indonesia PFM

STAR Contribution to Indonesia PFM State Accountability Revitalization (RRP INO 38354) STAR Contribution to Indonesia PFM Public financial management (PFM) includes all phases of the budget cycle, including the preparation of the budget,

More information

RURAL DEVELOPMENT & NATURAL RSOURCE MANAGEMENT: TRENDS, STRATEGY IMPLEMENTATION AND FRAMEWORK PERFORMANCE INDICATOR SYSTEM May 2, 2000

RURAL DEVELOPMENT & NATURAL RSOURCE MANAGEMENT: TRENDS, STRATEGY IMPLEMENTATION AND FRAMEWORK PERFORMANCE INDICATOR SYSTEM May 2, 2000 RURAL DEVELOPMENT & NATURAL RSOURCE MANAGEMENT: TRENDS, STRATEGY IMPLEMENTATION AND FRAMEWORK PERFORMANCE INDICATOR SYSTEM May 2, 2000 EXECUTIVE SUMMARY INTRODUCTION 1. President Estrada s Government has

More information

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006

Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 Attachment I: Results of Implementation of Joint 2006 Country Portfolio Performance Review Action Plan 2006 ISSUES BACKGROUND ACTIONS DEADLINE RESPONSIBLE STATUS as of 15 June 2008 1.1 With relevant capacity

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Mid Term Review of Project 00059714 Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Final Evaluation Report Date of Report: 8 August 2013 Authors of Report:

More information

Governance Assessment (Summary) Nepal

Governance Assessment (Summary) Nepal Governance Assessment (Summary) Nepal Country Partnership Strategy: Nepal, 2013 2017 A. Current State of Governance GOVERNANCE ASSESSMENT 1. Nepal is passing through a historic political transition. The

More information

LOAN AGREEMENT (Special Operations) (Third Financial Sector Program - Subprogram 3) between KINGDOM OF CAMBODIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Third Financial Sector Program - Subprogram 3) between KINGDOM OF CAMBODIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 3185-CAM(SF) LOAN AGREEMENT (Special Operations) (Third Financial Sector Program - Subprogram 3) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 18 DECEMBER 2014 CAM 42305 LOAN

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 26 May 2015 Original: English 2015 session 21 July 2014-22 July 2015 Agenda item 7 Operational activities of the United Nations for international

More information

CLIMATE CHANGE FINANCING FRAMEWORK

CLIMATE CHANGE FINANCING FRAMEWORK KINGDOM OF CAMBODIA NATION RELIGION KING 3 ROYAL GOVERNMENT OF CAMBODIA CLIMATE CHANGE FINANCING FRAMEWORK NATIONAL COUNCIL FOR SUSTAINABLE DEVELOPMENT AUGUST 2015 Contents I. THE RATIONALE FOR CLIMATE

More information

TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND. B. PROJECT NAME AND ID# China Social Security Reform Trust Fund

TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND. B. PROJECT NAME AND ID# China Social Security Reform Trust Fund November 22, 2003 TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND A. COUNTRY China B. PROJECT NAME AND ID# China Social Security Reform Trust Fund C. TECHNICAL ASSISTANCE SUMMARY The objective

More information