Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1464 SL Infrastructure Development Project (Transport)

Size: px
Start display at page:

Download "Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1464 SL Infrastructure Development Project (Transport)"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1464 SL Infrastructure Development Project (Transport) Region AFRICA Sector Roads and highways (52%); Ports, waterways and shipping (28%); Aviation (20%) Project ID P Borrower(s) REPUBLIC OF SIERRA LEONE Implementing Agency Ministry of Finance Sierra Leone Ministry of Transport and Communications Sierra Leone Republic of Sierra Leone Sierra Leone Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared May 6, 2005 Date of Appraisal May 9, 2005 Authorization Date of Board Approval September 22, Country and Sector Background During the period of civil unrest ( ) Sierra Leone s transport infrastructure suffered from widespread destruction and lack of maintenance. Seriously degraded roads left whole sections of the country and isolated communities cut off from the rest of the country, while the Port of Freetown and Freetown International Airport underwent successive rounds of destruction, endangering the country s economic lifelines to the outside world. Prior to the outbreak of hostilities, Sierra Leone had a National Transport Policy, which was developed with the support of the Bank under the Third Road Rehabilitation and Maintenance Project (RRMP 3). This Policy provided the foundation for a multi-donor supported Ten Year Transport Sector Investment Plan (1995), with the Bank playing a coordinating role through the Transport Sector Project (TSP). As the security situation stabilized in 2001, Bank and other donor programs were reoriented toward emergency reconstruction/rehabilitation on the road network and restoration of port and airport operations. Additionally, the TSP financed in 2002 the National Transport Strategy and Investment Plan (SLNTP), which updated the prioritized framework for immediate and longer term investments and lays out key sector policy reforms and strategies, focusing on support to the national reconstruction and poverty reduction programs. In December 2004, Sierra Leone produced its final Poverty Reduction Strategy Paper (PRSP). The pro-poor growth strategy focuses on putting to use under-utilized capacity in the agricultural

2 and mining sectors, expansion in manufacturing and services sectors, and higher public investment in infrastructure projects. Growth in agricultural production is strongly oriented toward food security, while parallel efforts are planned in export diversification and tourism. The PRSP recognizes the importance of accessibility and transport infrastructure for achieving the above goals. Moreover, the Food Security Strategy for Sierra Leone (September 2004) identifies poor road access as a key factor inhibiting marketing of food, and specifies improvement of both major and farm access/rural roads as a strategic measure to achieve the President s pledge that no Sierra Leonean should go to bed hungry. Primary and feeder road development are among the PRSP Poverty Reduction Indicators for Pillar # 2. In addition, divestiture and privatization in transport and shipping sectors form part of the PRSP strategy for redefining the role of government in the economy and creating opportunities for private sector development. As the country embarks on the implementation of this strategy, a number of issues specific to the transport sector stand out: Roads: The official public road network of Sierra Leone totals about 11,000 km, of which some 8,000 km are classified in the National Road System (NRS) and the remaining 3,000 is made up of local networks and unclassified roads and tracks. Although, even the most essential of the primary core network has deteriorated to the point certain sections are impassable in the rainy seasons. The Sierra Leone Roads Authority (SLRA) is in the process of bringing the core and feeder road networks up to a minimum functional standard. Faced with limited domestic and external funding, SLRA has identified a core primary network of about 2,000 km that will ensure basic access to the country s regions, complemented by feeder and local road networks, which link communities to the primary network. Despite current donor commitments on the main and feeder roads, there remain major gaps and under-funding on the core road network, which still has to be brought up to a fully accessible standard. At the same time, district linkages from the core road network on secondary and feeder roads are only partially covered by donor programs, with additional scattered community-based programs such as NaCSA designed to provide purely localized improvements not geared to overall connectivity to the main network. Government s focus on post-war emergency works led to the substantial deferment of the original sector policy of network planning and management by SLRA, with private-sector implementation of engineering and maintenance works. Rather, SLRA has been under constant pressure to allocate Independent Road Maintenance Fund resources (funded through road user charges) to emergency works implemented by force account. This has effectively precluded implementation of the annual maintenance programs, and has negatively impacted the development of private sector participation in road works. The situation is further aggravated by the current Road Maintenance Fund setup, in which the Fund is directly managed by SLRA, who finds itself with an inherent conflict of interest and under constant pressure to respond to the ad hoc emergency demands. In addition, the current emphasis on feeder roads by several donors is leading to the development of engineered roads for which there is no secure maintenance funding. To address the above issues, Government, through the SLNTP, developed an overall strategy for road network management, which focuses on filling in priority gaps in the core and feeder road networks, subject to funding, while providing basic access to isolated rural communities, in conjunction with community-based programs. The sector management issues are being

3 addressed through further rationalization of road sector institutions in conjunction with the National Commission for Privatization (NCP). Under PHRD-financed preparation studies, an agreed Road Sector Management Action Plan is being drafted, which is built around: i) refining the establishment of the Independent Road Maintenance Fund (through continued funding by Road User Charges plus any Government contributions) specifically for programmed road maintenance by priority, with the Fund managed and controlled by its own autonomous Board in lieu of the current SLRA management; ii) the funding of all emergency road maintenance works will be by separate Government funding of SLRA (with details drawn up under the Road Sector Management Action Plan Study); iii) the privatization of the existing SLRA Mechanical Services Unit (MSU) to an autonomous Mechanical Services entity such that the MSU is separated entirely from SLRA and free to operate as a commercial plant hire company; and iv) ultimately restructuring SLRA as a service provider/projects management agency, which plans and implements programmed maintenance works and development projects. Port: The TSP restored operations at the Port of Freetown after years of neglect and damage by civil unrest. This included physical investments in port infrastructure and equipment, and institutional support and assistance in moving toward a landlord port model. Although traffic has improved with increased ship calls, the Sierra Leone Port Authority (SLPA) has been plagued by inefficient operations, low maintenance and uncompetitive costs. In addition, further infrastructure and equipment are needed to address the medium to long term handling capacity of the port and to meet internationally recognized environmental, safety and security standards. Also, under the NCP supervision and with TSP support, the port s slipway is the process of being sold and ferry services are being concessioned. In addition, spurred by the President s June 2004 address (which expressed disappointment with port performance and calling for accelerated action) the Government has embarked on the concerted program to transform the port to full landlord status. This is being achieved through: (i) the introduction in January 2005 of a new General Manager, recruited from the Ghana Ports and Harbors Authority (GPHA); the aim being to achieve a clear break with past practices and introducing fresh management perspectives founded on the Ghana landlord port model; and (ii) the implementation of an Action Plan for the restructuring of SLPA and the privatization of the core activities, through the concessioning of the container terminal and issuing of licenses for the service providers for non-container (bulk handling) cargo. The Action Plan, formulated with funding through TSP, includes three components: (i) activities leading up the privatization; (ii) activities related to the restructuring of the SLPA; and (iii) definition of the economic and technical regulatory functions associated with the revised SLPA structure. These activities will be initially funded by a Project Preparation Facility (PPF). Linked to the above activities is the determination of appropriate investments in infrastructure and equipment, given the shifting responsibilities of the SLPA as a landlord entity and the desire to attract private investment, while providing adequate incentives to attract that investment. To this end, the PHRD grant has funded a technical, economic and environmental feasibility study for extending paving of the container stacking area, as well as identifying necessary safety and environmental equipment.

4 Airport: The TSP also supported SLAA in restoring commercial operations at Freetown (Lungi) International Airport. The Sierra Leone Airports Authority (SLAA) has an extremely competent management structure which has successfully managed development funds and revenues to address priority infrastructure and equipment needs. However, further infrastructure and equipment inputs are needed to meet internationally-accepted aircraft and passengers security and safety standards. SLAA also intends to pursue a quality improvement program with an emphasis on customer service, and is in dire need of an improved management information system (MIS), as well as training support. 2. Objective(s) The provision of sustainable access for Food Security and Poverty Reduction. 3. Rationale for Bank Involvement Given the PRSP orientation toward food security and intersectoral linkages, the Bank s intervention in the transport sector is focused on achieving accessibility through reliable road access to and from rural areas, as well as ensuring adequate and safe port and airport facilities for passengers, exports and imports. Reliable road access can only be achieved through a functioning core road network (with sustainable provisions for maintenance), from which secondary and feeder road links to the rural areas emanate. This basic accessibility is an essential precursor to the country s pro-poor economic growth and national integration strategies. With the above objectives in mind and in the context of the President s No one goes to bed hungry pledge, the project design team formulated a comprehensive project proposal, costed at approximately US$ 158 million. Taking account of other donor commitments in the sector, this proposal would include: (i) rehabilitation of four main roads (315 km), which would fill-in the remaining gaps/re-establish the most basic all weather core road network as the basis for country wide connectivity; (ii) extend the connectivity to the basic core network through rehabilitation/ upgrading of some 1,000 km of key primary gravel roads that link rural and food producing areas to the essential core network, markets input supply, etc.; and finally (iii) extend the connectivity to the most distant rural communities and agriculture development through rehabilitation of 400 km of additional secondary and feeder roads linking communities to the core road network. However, in view of the available funding for IDP (US$ 38 million), the project cannot cover the comprehensive network-wide rehabilitation envisaged in the comprehensive proposal. Thus, only a limited number of components of the comprehensive package is being funded under the project, focusing on two sections of the primary core road network (98 km) and prioritized gravel and feeder road links to the rural areas (about 400 km), combined with priority infrastructure and equipment requirements in the port and international airport, as well as institutional support in all three subsectors. The physical investments on the primary core road network have been identified in close coordination with other donor commitments, notably European Union (EU), Islamic Development Bank/Kuwait Fund, DFID and AfDB. On the secondary and feeder road networks, four target districts (provisionally Kailahun, Kono, Koinadougou and one other) have also been identified in conjunction with other donor commitments to: (i) address accessibility in the most

5 access poor districts identified in the Food Security Strategy; and (ii) complement the Banksupported National Social Action Project (NSAP), which is financing community level access improvements through NaCSA, so as to achieve connectivity to the main network and related services. Project interventions in the Port of Freetown have been selected to complement previous and ongoing operations by the World Food Program (WFP). Institutional support for road sector management will build on the continuing collaboration with EU-financed technical assistance to SLRA in the fields of road maintenance and financial management. The Bank s incremental contribution will be to fill some of the most important gaps in the country s stock of essential transport infrastructure assets. In addition, the Bank has historically held the unique position of engaging the Government and other donors in a sector-based dialogue aimed at establishing policy and institutional reforms. The project will benefit from Sierra Leone s participation in the Bank Sub-Saharan Africa Travel and Transport Program (SSATP), which promotes exchange of knowledge and experience in road sector management among 30 member countries in Sub Saharan Africa. The Country Assistance Strategy (CAS FY06-09) for Sierra Leone is presently under preparation and is scheduled for Board approval in May The CAS as drafted recognizes transport infrastructure, as a key element in promoting growth and employment generation, particularly in addressing the need to address youth unemployment. 4. Description Component A: Road Network. The project will finance the rehabilitation of two segments of the primary core road network, Bo-Kenema (63 km) and Makeni-Matatoka (35 km), as well as approximately 400 km in four access-poor districts (Kailahun, Kono, Koinadougou and one other), to be selected on a priority basis to provide access from the core primary network to the rural areas and achieve maximum impact on food security and poverty reduction. A key element of Government s strategy is to restore the essential links as a fundamental basis for poverty reduction, food security and national integration strategies. In the context of a PHRD-financed Road Sector Management Action Plan, the project will also continue to support reform and restructuring of the road sector, aimed at encouraging private sector participation and redefinition of Government s role away from force account works. This will include technical assistance and other support for the above-mentioned Action Plan, built around establishment of an Independent Road Maintenance Fund with an autonomous Board and reorganization of SLRA; together with a review of the management structure associated with user charge collection and business scope of SLRTA in their new roles. Component B: Freetown Port. In the context of an Action Plan for Privatization of the Port s Core Activities, financed under the previous Bank-financed Transport Sector Project (TSP), this project will finance the expansion of the paved container stacking area, as part of an incentive package for the concessioning of the port container handling operations; plus specialized equipment to meet internationally recognized environmental and safety standards (particularly related to navigational aids, oil spills, waste management and safety and security management). Through PPF financing, the project will support the implementation of the above mentioned Action Plan, involving: (i) concessioning the container terminal and licensing the bulk handling

6 operations; (ii) restructuring SLPA, including revision of legal status, staff reduction and social mitigation plan, development/management of the port s land holdings, establishing financial modeling of charges and tariffs and completion of the sale of slipway assets and concessioning of ferry services; and (iii) redefinition of the port s technical and regulatory functions in the context of its overall reform. The PPF supported activities are expected to extend into the first year of the project; the project also provides for additional institutional support to be identified during the course of the project on an as-needed basis. Component C: Freetown International Airport. The project will finance rehabilitation and improvements to the runway, taxiway and lighting to safely accommodate modern aircraft; and installation/upgrading of the water and electricity supplies for security, sanitation fire fighting and back-up supplies. The project will also finance support to SLAA s efforts to increase efficiency and competitiveness, through training and technical assistance. Component D: Project Coordination and Studies. The project will finance project management and coordination for the three sector-based components, through a Coordination and Monitoring Unit (CMU) of the Ministry of Transport and Communications (MOTC). This will include financial management, monitoring and performance indicators, environmental and social safeguard expertise and technical audit and procurement capacity. The project will also finance a Master Plan Study for the International Airport, as well as other studies to be identified. 5. Financing Source: ($m.) BORROWER/RECIPIENT 7.6* INTERNATIONAL DEVELOPMENT ASSOCIATION 38.0 Total 45.6 * including severance payments to displaced staff in SLPA restructuring. 6. Implementation The project will be managed by the Ministry of Transport and Communications (MOTC), through its Coordination and Monitoring Unit (CMU). Each implementing agency, that is, Sierra Leone Roads Authority (SLRA), Sierra Leone Ports Authority (SLPA) and Sierra Leone Airports Authority (SLAA) will be responsible for implementing and reporting on the components in their respective sectors. The CMU will be a lifeline link to funding for these agencies and will monitor their conformance with agreed action plans, available budget, Safeguards and other Bank requirements. Disbursements will be centralized through one special account managed by the CMU. Progress reports by each agency will follow a specified format and will be submitted to the CMU, who will transmit them to the Bank, with an Executive Summary. These arrangements will be laid out in a Memorandum of Understanding, signed by all the parties. 7. Sustainability The Government s commitment to and ownership of the project may be seen in the Cabinet s adoption of the National Transport Strategy and Investment Plan ( ), which serves as the basis for the road management strategy and sector reforms supported by the project. In

7 addition, the reforms in the port and road sectors are being implemented under the supervision of the National Commission for Privatization (NCP) and are included in the NCP s Work Plan. Moreover, the reform of the SLPA to a landlord port has been given strong impetus by the President s address of June 3, 2004 on the transformation of the SLPA. Critical to the sustainability of the project will be the establishment of the new Independent Road Maintenance Fund and the restructuring of SLRA on a solid footing. A second critical factor will be the engendering of a good working relationship between the Independent Road Maintenance Fund, SLRA and SLRTA and the minimizing of administrative costs. The project addresses these concerns in the design by placing a heavy emphasis on institutional support to these agencies, in collaboration with other donors. 8. Lessons Learned from Past Operations in the Country/Sector Physical investments and institutional support. The project design reflects one of the main conclusions of the 2002 National Transport Strategy and Investment Plan that physical investments by priority must be accompanied by secure maintenance funding and transparent management, if the benefits of these investments are not to be short-lived. For this reason, the project design includes a mix of prioritized infrastructure investments, institutional reform and capacity building. This approach has become all the more compelling, as the country emerges from the post-conflict emergency situation to one focused on achieving a stable physical and institutional environment, without which food security, access to markets and poverty reduction through economic growth cannot occur. Such considerations underline the project s support to road sector management reform, which aims to reverse the current vicious cycle, which starts with increased force account emergency works, preventing the carrying out of prioritized annual road maintenance programs with the stifling of a stable contracting environment for consultants and contractors. Quality of works. TSP experience has also revealed some shortcomings on quality control of works and services. As such, there is need to address quality assurance in future projects. Accordingly, the IDP design pays particular attention to promoting professional standards and instituting quality assurance provisions. A system of half yearly technical (and financial audits) will also provide independent verifications. Monitoring indicators. The proposed monitoring and evaluation indicators are to draw direct relationships between component results and expected outcomes. 9. Safeguard Policies (including public consultation) Safeguard Policies Triggered by the Project Yes No Environmental Assessment (OP/BP/GP 4.01) [X] [ ] Natural Habitats (OP/BP 4.04) [ ] [ ] Pest Management (OP 4.09) [ ] [ ] Cultural Property (OPN 11.03, being revised as OP 4.11) [ ] [ ] Involuntary Resettlement (OP/BP 4.12) [X] [ ] Indigenous Peoples (OD 4.20, being revised as OP 4.10) [ ] [ ]

8 Forests (OP/BP 4.36) [ ] [ ] Safety of Dams (OP/BP 4.37) [ ] [ ] Projects in Disputed Areas (OP/BP/GP 7.60) * [ ] [ ] Projects on International Waterways (OP/BP/GP 7.50) [ ] [ ] With regard to OP 4.01 (Environmental Assessment), the project was rated environmental category B. Environmental analyses have been carried out for each component as follows: (i) Environmental and Social Assessment and Management Plan for Bo-Kenema and Makeni- Matatoka Roads; (ii) Port Environmental Management Plan for Freetown Port; (iii) Environmental Impact Assessment and Environmental Management Plan for Freetown International Airport; and (iv) Environmental and Social Management Framework for the Feeder/Rural roads which have yet to be identified. With regard to OP 4.12 (Involuntary Resettlement), the Government has prepared a Resettlement Policy Framework for the feeder/rural roads. Although, it is not anticipated that project interventions will require land acquisition or will restrict access to natural or economic resources, this policy framework has been prepared to provide the appropriate guidance on resettlement and compensation, should the occasion arise. All safeguard documentation will be disclosed in country and in the Infoshop by May 9, The project components will include activities which have a positive impact on the environment and will also include mitigation measures for potential adverse impacts. Primary Road Network. No major environmental issues exist on the project-financed primary road investments, Makeni Matatoka and Bo - Kenema. These investments involve rehabilitation of existing paved alignments, which were constructed clear of the long established land settlements, with no stall holders or markets along the road alignments. An environmental analysis was carried out and an Environmental and Social Management Plan has been prepared. Feeder/Rural Roads. Since the location of the rural roads to be improved is not yet known, an Environmental and Social Policy Framework has been prepared, which lays out a procedural framework for implementing the environmental and social management process in the selection, planning and implementation of these subprojects. Although it is not anticipated that these investments will involve any resettlement, the Government has prepared a Resettlement Policy Framework, which will be applied in the event such issues arise. Port Component. An Environmental Assessment and Port Environmental Management Plan have been prepared. This includes sampling of the seabed to determine that no toxic materials will be dredged. In addition, an environmental audit will be prepared to establish baseline environmental conditions and operational framework, which will be incorporated into the concession. No significant environmental issues are anticipated on the project-financed port investments, as all the physical works are planned within the port s existing secure industrial area. As part of the Port reform supported by the Bank, consultations will be carried out with employees and workers who will potentially be made redundant under the privatization reform. * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties claims on the disputed areas

9 Freetown International Airport Component. An Environmental Impact Assessment and Management Plan have been prepared. No adverse environmental issues are anticipated on the project-financed airport investments. 10. List of Factual Technical Documents Feasibility Study Rehabilitation of 100km of Paved Roads Makeni-Matotoka (35km) & Bo- Kenema (65km) Draft Reports, Mouchel Parkman. Preliminary Draft Feasibility Report, March Final Environmental and Social Assessment and Management Report, March Technical Evaluation, Detailed Engineering Design, Preparation of Tender Documents : Upgrading of Lungi Airport Infrastructure Draft Revision B Reports, Mouchel Parkman Draft Feasibility and Design Report, January 2005 Environmental and Social Impact Assessment and Management Plan Final Report, January Port of Freetown Equipment Needs and Physical Expansion Feasibility Study (including Port Environmental Management Plan) Final Report, NIRAS, January nd Draft Final Road Sector Management Action Plan, Africon, January Contact point Contact: David Stephen Rudge Title: Task Team Leader Tel: (202) Fax: (202) Drudge@worldbank.org 11. For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) Web:

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector.

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector. Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing Region AFRICA Sector Railways (80%); Ports, waterways and shipping (5%); Aviation

More information

Project Name. Region. Date of Board Approval July 29, 2008

Project Name. Region. Date of Board Approval July 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: AB3458.: MAURITANIA:

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44690, IDA-H1910, IDA-H4050)

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44690, IDA-H1910, IDA-H4050) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44690, IDA-H1910,

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

Tanzania Health Sector Development APL II Region

Tanzania Health Sector Development APL II Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5049 Project Name Tanzania Health Sector Development APL II Region Africa Sector Health (80%), Non-compulsory health finance (10%), Central

More information

I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1

I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE 36184 Report No.: AB219 I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized Public Disclosure

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Bhutan Second Rural Access

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Health Sector Support Project

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Project Name. Railway Infrastructure Rehabilitation Project Region PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 65032 Project Name Railway Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Railways (100%) Project ID P120192

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Integrated Safeguards Data Sheet (Initial) Section I - Basic Information Date Prepared/Updated: 06/16/2003 A. Basic Project Data (from PDS) I.A.1. Project Statistics Country: EGYPT, ARAB REPUBLIC OF Project

More information

Sector-wide Health System and Social Development Support Project Region

Sector-wide Health System and Social Development Support Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1473 Country Mali Prpoject ID P093689 Project Name Sector-wide Health System and Social Development Support Project Region AFRICA Sector Health

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Transit Transport Co-ordination Authority

Transit Transport Co-ordination Authority Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1177 Project Name EAC

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA1417 PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No: PIDA1417 Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project ID Borrower(s)

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Implementing Agency Environmental Category PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 87961 IMPROVING

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader

More information

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA31584 Project Name

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA16636 Project Name

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: March 12, 2015 I. BASIC INFORMATION A. Basic Project Data Country: Project Name: Task Team Leader: Estimated Date of Approval:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) THE WORLD BANK GROUP._-- - = -InfoShop Date Prepared/Updated: 03/12/2003 Section I - Basic Information A. Basic Project Data Country: MOZAMBIQUE Project: Public Sector Reform Authorized to Appraise Date:

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1618 Economic Management Capacity Building Project.

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1618 Economic Management Capacity Building Project. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1618 Economic

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services.

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:

More information

Government of Peru Peru. PROVIAS Departamental Peru

Government of Peru Peru. PROVIAS Departamental Peru Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC19292 Project Name Road

More information

Public Disclosure Authorized. Loan/Credit amount($m): I IDA: 5.00 Board Date: September 7, 2004 Other financing amounts by source:

Public Disclosure Authorized. Loan/Credit amount($m): I IDA: 5.00 Board Date: September 7, 2004 Other financing amounts by source: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I - Basic Information Date ISDS Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC47357

More information

Please also refer to the PID of the parent project (Report No.: AB3812) disclosed on 04/29/2008

Please also refer to the PID of the parent project (Report No.: AB3812) disclosed on 04/29/2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4662 Additional

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second School Access and Improvement

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second School Access and Improvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Russia

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

Emergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement

Emergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 48043 Emergency

More information

Mauritius First Public Sector Performance Development Policy Loan Region

Mauritius First Public Sector Performance Development Policy Loan Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6561 Operation Name Mauritius

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. eghana Additional Financing

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. eghana Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name

More information

Sri Lanka: Crisis Response Small and Medium Enterprises Development Facility Project Region

Sri Lanka: Crisis Response Small and Medium Enterprises Development Facility Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5595 Project Name Sri

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC14882 Project Name Improved

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Project Name. Region Sector. Project ID Borrower(s) Implementing Agency. Republic of Madagascar Madagascar

Project Name. Region Sector. Project ID Borrower(s) Implementing Agency. Republic of Madagascar Madagascar Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

AFRICA. Investment Project Financing P Federal Ministry of Finance

AFRICA. Investment Project Financing P Federal Ministry of Finance Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA24330 Project Name

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Name Implementing Agency Environment Category Date PID Prepared Estimated Date of Approval Initiation Note Review Decision

More information

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I - Basic Information Date ISDS Prepared/Updated:

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619 Project

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE National Emergency Rural

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PY Energy Sector Strengthening

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC695 Project Name DO

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. First Governance and Competitiveness Development Policy Operation (DPO1) Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. First Governance and Competitiveness Development Policy Operation (DPO1) Region PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6864 Operation Name First Governance and Competitiveness Development Policy Operation (DPO1) Region AFRICA Sector Central government administration

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I. BASIC INFORMATION 1. Basic Project Data INTEGRATED SAFEGUARDS

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247 Country: Madagascar Project ID: P104049 Project Name:

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 13-Feb-2018

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 18-Sep-2013

More information

InfoShop. Integrated Safeguards Data Sheet (Updated) Date ISDS Prepared/Updated: 09/06/

InfoShop. Integrated Safeguards Data Sheet (Updated) Date ISDS Prepared/Updated: 09/06/ Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Updated) AWorhi dfrc

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06-Dec-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region Safeguard Policies: A Quick View Tbilisi April 1-3, 1 2008 The World Bank Europe & Central Asia Region 1 Why do we have the World Bank Safeguard Policies? Do no harm: protect people and environment from

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 04-Oct-2018

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 12/13/2006

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 12/13/2006 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/13/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: 111025

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC10930 Project Name Financial

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 21-Aug-2013

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132. Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 05/16/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6132 Country: Morocco Project ID: P125799 Project Name: Morocco

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated: 25-Apr-2018

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4286 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4286 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4286 Project Name ET-Road

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Beneficiaries Implementing Agency Report No. PID10910 India-Andhra Pradesh Economic Reform... Loan/Credit South Asia Poverty Reduction and Economic Management

More information

Afghanistan: Regional Airports Rehabilitation Project (Phase 1)

Afghanistan: Regional Airports Rehabilitation Project (Phase 1) Validation Report Reference Number: PVR 225 Project Number: 37136 Loan Number: 2105 December 2012 Afghanistan: Regional Airports Rehabilitation Project (Phase 1) Independent Evaluation Department ABBREVIATIONS

More information

2.2. Lessons learnt 2.3. Complementary actions 2.4. Donor coordination

2.2. Lessons learnt 2.3. Complementary actions 2.4. Donor coordination 2.2. Lessons learnt EDF projects have been implemented in Sierra Leone for three decades for the rehabilitation of both main and rural roads, providing valuable experience to the SLRA as well as the Commission

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Updated Project Information Document (PID) Report No: AB793. UGANDA - THIRD PHASE OF THE ROAD DEVELOPMENT PROGRAM Region.

Updated Project Information Document (PID) Report No: AB793. UGANDA - THIRD PHASE OF THE ROAD DEVELOPMENT PROGRAM Region. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: AB793 Project Name UGANDA - THIRD

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 05-Sep-2013

More information

CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER

CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER STEERING COMMITTEE ON THE POVERTY REDUCTION STRATEGY PAPER PERMANENT TECHNICAL SECRETARIAT OF

More information

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA798 Project Name TURKEY

More information