1 Concept Paper Title: Type of Project: Location: Quezon WASH Program and Pilot project in Maasin. Creation and strengthening of WAter, Sanitation and Hygiene mechanisms and partnerships between Government and Non-Government stakeholders. Infrastructure implementation by local stakeholders. Municipality of Quezon, Palawan Project Implementers: A Single Drop for Safe Water inc. Institute for the Development of Educational and Ecological Alternatives Project Stakeholders: Barangay Maasin Residents Municipality of Quezon LGU Funding Required: Php 1,500,000 Schedule: 12 months from release of funding Table of Contents 1. Relevance of the action 2. Description of the action and its effectiveness 3. Sustainability of the action 4. Current Situation in Maasin, Quezon 5. Project Implementation Schedule and Budget Prepared by: Kevin Lee Executive Director A Single Drop for Safe Water inc. April 27, 2010

2 1. Relevance of the action Currently 13 million Filipinos have limited or no access to safe water. This is not due to lack of water, but a lack of operating infrastructure to distribute and treat water. Infrastructure development projects have failed in significant numbers due to: Minimal advocacy to the general public of the importance of safe adequate water for health and poverty reduction, resulting in lack of community ownership and limited political will. Organizational and management issues resulting in operating associations failing. Minimal technical capacity by designers and those that are maintaining and operating the systems. Even though Local Government Units have a duty to provide Water and Sanitation services they typically do not have the resources (financial, technical or organizational) to provide these services. Typically Water and Sanitation projects are funder driven. This is supply driven aid where the community is consulted but don t participate in project design. Once system is installed there is little community ownership resulting in failure within 2 years due to neglect. Note that most residents have existing water sources which compete with the sources developed as systems. When payment or other investment is required for the new system residents revert to the old source as they do not see the return on investment. This program is designed to create demand through advocacy and participatory processes for the design of water/sanitation plans and projects. In addition to this demand creation there is a parallel effort to increase the capacity of local stakeholders to service that demand. Good governance (transparency and accountability) with multi sectoral participation along with partnerships between LGU s, Non- Government Organizations (NGO s) as well as Peoples Organizations (PO s) will allow communities to service Water and Sanitation needs that they identify. Solutions and infrastructure development will be issue based and not based on the capability of suppliers. Note that this is commonly referred to as WAter, Sanitation and Hygiene promotion or WASH. Water and Sanitation is identified as a priority need. Participation and cooperation between government and non government actors is also a priority. The following mechanisms fulfills these objectives LGU a Municipal WASH Task Force (MWTF) which is made up of LGU employees, ie. Municipal Planning and Development Coordinator, Medical Health Officer, Municipal Engineering Officer. This is formed by EO and headed by the Mayor to focus on WASH throughout the municipality Water and Sanitation Associations (WSA) these are peoples organizations that are formed to implement and manage WASH at the barangay level. These are formed based on the functionality of the association depending on the need it is servicing. Membership is from the community as a whole and can be in the form of a service provider (operating a level II or III water system) or a product provider (building and installing household water treatment systems, pump repair, dug well or rainwater harvesting system builders) Non-Government Organizations (NGO s) are vital partners in community development. The role of NGO s is to provide capacity building and support for the MWTF s and WSA s.

3 A Single Drop for Safe Water (ASDSW) would work with a Quezon based NGO, the Institute for the Development of Educational and Ecological Alternatives (IDEAS), and the Municipal Local Government Unit of Quezon to start a municipal wide WASH program, piloted in Barangay Maasin. A Single Drop for Safe Water inc. would manage the program and is a WASH based capacity building organization based in Palawan that would build the capacity of IDEAS, the Municipal LGU and the community so that the program can be replicated throughout the municipality. IDEAS role in the program is to provide qualified participants in the WASH and organizational trainings, coordination and mobilization of all stakeholders, formal and informal leaders as well as logistical coordination of all program related activities. When the program is completed there will be: An active Municipal WASH Task Force for the municipality of Quezon that is responsible for the coordination of WASH projects and increased capacity to facilitate WASH projects and services. A functional WSA in Barangay Maasin with the technical and organizational capacity to plan implement, and manage WASH services. The NGO, IDEAS will have increased WASH capacity to further support development efforts in Quezon and surrounding municipalities. Water and Sanitation projects completed in Maasin for the supply of WASH services An increase of awareness of the importance of WASH throughout the municipality Prioritization of WASH by the LGU of Quezon.

4 2. Description of the action and its effectiveness A Single Drop for Safe Water inc. worked with the Local Governance Support Program for ARMM (LGSPA) in 2008 and 2009 pioneering this governance approach to WASH. Worked in 31 municipalities with 7 NGO s. This resulted in building of capacity throughout ARMM and the MWTF s and WSA;s as well as the NGO s have been able to implement WASH projects outside of the program. This process has also been used in Sual, Pangasinan for the development and implementation of water systems and other WASH services in 3 barangays. This process has been successfully used for WASH projects in North Kabuntalan in Maguindanao and the municipality of Buhi in Camarines Sur is currently developing projects following this process. The steps are outlined below: Project Start up Orientation of the Municipal LGU, Barangay LGU and the community on the program approach Executive Order by Chief Executive forming the MWTF and selection of focal point people. Forming interim WSA for Barangay Maasin Scheduling of the trainings and coordinating logistics. WASH Planning Process Training for WASH inventory (WIn) o WIn is a participative inventory tool that includes the community in determining what exists o Current water sources o Current Sanitation and hygiene practices o Undeveloped sources o Disease out breaks o Participants IDEAS MWTF Interim WSA Barangay residents Training on WIn Data analysis, WASH situationer and Municipal WASH Planning o Analyze data from WIn o Construct a WASH Situationer o Create a Vision for WASH and then Goals, Objectives and strategies to get from the current situation to the vision. This would include many small steps and larger projects as required. Review of the Plan and Validation of the process. Engineering and Technical Training for qualified personal from IDEAS, MWTF and WSA. o Water and sanitation system design o Water treatment options o Can then feed this information back into the WASH planning process

5 Project Design From the planning process, projects will be identified for Water and Sanitation systems of hygiene promotion campaigns. IDEAS, MWTF and WSA trained on project design and proposal writing along with technical advice on proposed projects o Includes Technical Design Budgeting Scheduling Resource Mobilization Community and LGU counterparts Validate the proposal in the community Project Investment and Implementation Projects will be reviewed by all stakeholders and approved based on certain criteria such as: o Interim WSA will be transformed into working WSA for implementation and ongoing operation o Will include organizational and technical training for WSA, MWTF and IDEAS, to ensure that the systems will be sustainable. o Counterpart in the form of labor, materials, cash or other options must be provided by the community and LGU s o Projects must result from the planning and project design process. o This fund can also be used to leverage outside investors. Future Sustainability The MWTF can then replicate this process in the other barangays. Because the capacity development involves MWTF, IDEAS and WSA for Maasin these local resources can be used to develop a municipal WASH plan and projects in the other barangays Linkages will be created with provincial line agencies to promote the replication of this program in other municipalities. This is a step by step process. Each step has an output and the next step cannot proceed. Executive Order forming the MWTF including budget allocation Interim WSA WASH Inventory results and WASH Situationer WASH Plan Project Plan Project Proposal WSA Transformation Infrastructure Implementation As stated above, this process has been piloted in ARMM provinces of Mindanao and this project will build on the lessons learned. As shown above there are indicators all the way through the process. These indicators show commitment on the parts of all the stakeholders as well as their capacity improvements as they proceed through the process.

6 3. Sustainability of the action By building capacity within the community through the whole process the objective is to create and strengthen local mechanisms so that they can determine their own needs and solutions and have outside agencies invest in their community. Moving from supply driven aid to demand driven aid. There are tangible results WASH Infrastructure MWTF and WSA to keep WASH efforts running. MWTF able to replicate in other barangays and create a consolidated WASH effort. NGO with the ability to replicate the efforts in other municipalities and communities More community awareness of the needs for WASH services and the raising of WASH in the priority of LGU s Database and information center A network of WASH players. Most system and organizational failures are a result of finances. This program helps in two ways. Engineering and technical trainings to ensure that the most effective and efficient systems are designed. Reducing the capital costs involved makes resource mobilization simpler. Cost recovery systems are part of organizational development. Demand creation puts a value on the service supplied, The community pays the WSA for this service. Through transparency and accountability, the WSA can justify costs. They will also have the skills to properly supply the service. With advocacy efforts and the participatory nature of the data gathering process the general public will start to demand greater emphasis on WASH. They will start to understand the effects of WASH on poverty and education, both key issues for communities. Local Chief Executives will respond to this demand and by supporting the MWTF and the MWTF supporting the WSA s, WASH will become a priority issue.

7 4. Current Situation in Maasin, Quezon 381 Households (2010 residents) It is a mixture of coastal fisherfolk and upland farmers on subsistence incomes. o 8km from Poblacian o Indigenous Peoples, (IP s) represent about 75% of the population Current water sources are: o Dug Wells 245 hh o Shallow well hand pumps 16 hh o Deep well - 70 households o Level II spring development Currently services < 50 households Spring intake box is capturing only small part of spring Implemented first by LGU and then assisted by IDEAS to partially rehabilitate the system No functional organization managing system The LGU has limited WASH focus and capacity to implement WASH projects. There is no focal body on the LGU for WASH. Reported cases of water related issues include: o Skin diseases o Diarrhea outbreaks (2008 data) Morbidity rank 3 rd in ten leading causes of morbidity with 49 cases Mortality rank second with 1 casualty Sanitation: o Sanitary Toilets in 97 hh o Unsanitary Toilers in 258 hh o No toilets 26 hh

8 5. Project Implementation Schedule and Budget Schedule Project Funding Released Week 1 to 4 o Orientation Process and formation of MWTF and Interim WSA o EO for MWTF o MOA between ASDSW, IDEAS and Municipal LGU Week 4 to 8 o WASH Inventory o WASH Planning o Project Design Week 9 o Engineering Training Week 10 to 11 o Project Validation o Implementation Planning o Commitment of all stakeholders Week 11 to 20 o Completion of Design o Bidding and Purchasing o Technical trainings o Installation o WSA organizational training Week 32 on o Consolidation training (working with all stakeholders to ensure that services are being supplied and working on weaknesses) o Note there is ongoing evaluation and monitoring prior to consolidation and continuing after the consolidation o Working with MWTF on replication of process. Budget - 44php = $1US Honorariums and training fees o IDEAS 150,000 o ASDSW 420,000 Trainer expenses (per diem, materials travel) 150,000 Materials, skilled labor etc for Project Implementation 780,000 TOTAL Investment Required 1,500,000 Counterpart estimate o Hauling of Materials to site 30,000 o Accommodation of Trainers etc 50,000 o Participant food and expenses 40,000 o Local Transportation 10,000 o Labor for installation of Infrastructure (400 mandays) 80,000 o Budget for MWTF (50,000/yr) 50,000 o TOTAL 260,000 o GRAND TOTAL US$ $40,000 o 6 Additional Barangays o $30,000 x 6 $180,000 o Counterpart estimate ($5000x6) 30,000 TOTAL PROGRAM COSTS $250,000

CBMS Network Evan Due, IDRC Singapore

CBMS Network Evan Due, IDRC Singapore Community Based Monitoring System CBMS Network Evan Due, IDRC Singapore Outline of Presentation What is CBMS Rationale for Development of CBMS Key Features of CBMS Case Presentation: CBMS in the Philippines

More information

Session 2. Discussion: The MDGs Localization in the Philippines

Session 2. Discussion: The MDGs Localization in the Philippines Session 2. Discussion: The MDGs Localization in the Philippines National Economic and Development Authority Philippines 23 June 2014 Sub-regional Advocacy Workshop on MDGs for South East Asia Lao Plaza

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34149 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SECOND DECENTRALIZED HEALTH SERVICES PROJECT November 2001

More information

SWA collaborative behaviours in practice: Kabarole district, Uganda

SWA collaborative behaviours in practice: Kabarole district, Uganda SWA collaborative behaviours in practice: Kabarole district, Uganda Jane Nabunnya Mulumba Country Director, IRC 12 October, 2016 UNC Water and Health Conference Supporting water sanitation and hygiene

More information

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The

More information

Community-Based SME For Road Maintenance

Community-Based SME For Road Maintenance Community-Based SME For Road Maintenance Insights from the W.B and IADB-Peruvian Rural Roads maintenance contracts Project & Poverty Reduction Presented by Jacob Greenstein (EGAT) Scope of Presentation

More information

The Philippine Rural Development Project (PRDP) Terms of Reference for the Conduct of Mid-term Evaluation Study. 1. Background.

The Philippine Rural Development Project (PRDP) Terms of Reference for the Conduct of Mid-term Evaluation Study. 1. Background. The Philippine Rural Development Project (PRDP) Terms of Reference for the Conduct of Mid-term Evaluation Study 1. Background. The Philippine Rural Development Project (PRDP) is a World Bank assisted Project

More information

The Case of Quezon, Southern Palawan * Bernadette E. Mandap **

The Case of Quezon, Southern Palawan * Bernadette E. Mandap ** MIMAP Micro Impacts of Macroeconomic Adjustment Policies PHILIPPINES http://www.panasia.org.sg/mimapph Project Updates Vol. VII No. 4 December 2000 Prioritizing Needs Using the CBMS: The Case of Quezon,

More information

An Introduction. by Titon Mitra UNDP Philippines Country Director MCPI Annual Conference; 28 July 2016

An Introduction. by Titon Mitra UNDP Philippines Country Director MCPI Annual Conference; 28 July 2016 An Introduction by Titon Mitra UNDP Philippines Country Director 2016 MCPI Annual Conference; 28 July 2016 Poverty incidence 34.4% 25.8% 1991 2014 Children going to school 83.2% 95.2% SY 2006-2007 SY

More information

CASE STUDY 2: GENDER BUDGET INITIATIVE: THE CASE OF TANZANIA

CASE STUDY 2: GENDER BUDGET INITIATIVE: THE CASE OF TANZANIA CASE STUDY 2: GENDER BUDGET INITIATIVE: THE CASE OF TANZANIA Background This case illustrates the potential of collective action for influencing and gaining a seat at the negotiation table of governments

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda. Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda 21 July, 2017 Introduction: The Ministry of Water and Environment (MWE) is implementing

More information

BUDGET DRAFT 1 November 19, 2019

BUDGET DRAFT 1 November 19, 2019 BUDGET 2019 DRAFT 1 November 19, 2019 Executive summary For the consideration of our Mayor and Council, City of Lloydminster Administration is pleased to provide a first draft of the 2019 Municipal Budget.

More information

CBMS: The Philippine Perspective

CBMS: The Philippine Perspective CBMS: The Philippine Perspective HON. SECRETARY DOMINGO F. F. PANGANIBAN National Anti-Poverty Commission Republic of of the the Philippines 6 th Poverty and Economic Policy (PEP) Network General Meeting

More information

ANNA LIZA F. BONAGUA Bureau of Local Government Development Department of the Interior and Local Government Philippines

ANNA LIZA F. BONAGUA Bureau of Local Government Development Department of the Interior and Local Government Philippines South-South Exchange and Training Workshop on Extractive Industries and Sustainable Development October 6-8, 2015 Novotel, Ploenchit, Bangkok, Thailand Philippe Poverty Environment Initiative ANNA LIZA

More information

Summary of Terminal Evaluation

Summary of Terminal Evaluation Summary of Terminal Evaluation I. Outline of the Project Country: Republic of Zambia Issue/Sector: Water Resource and Disaster management Rural water supply Division in charge: Global Environment Department

More information

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council

More information

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 1. Introduction Having reliable data is essential to policy makers to prioritise, to plan,

More information

Building a Better Tomorrow

Building a Better Tomorrow Building a Better Tomorrow Investing in Ontario s Infrastructure to Deliver Real, Positive Change A Discussion Paper on Infrastructure Financing and Procurement February 2004 2 BUILDING A BETTER TOMORROW

More information

mechanism to pool and disburse funds in support of Inter Local Health Zone (ILHZ) cooperation priority activities

mechanism to pool and disburse funds in support of Inter Local Health Zone (ILHZ) cooperation priority activities 1. Objective 2. Define Common Health Trust Fund? 3. Funding Sources for ILHZ 4. Enumerate Legal basis of CHTF. 5. Sources of Funds for putting up a CHTF. 6. Disbursement and utilization of CHTF. 1 1 7.

More information

Gender Responsive Budgeting

Gender Responsive Budgeting Gender Responsive Budgeting The Bacolod City Experience by MS. CELIA MATEA R. FLOR City Councilor, Bacolod City, 1995-2004 and Atty. Andrea L. Si Bacolod City Administrator, 2001-2004 Outline: 1. Gender

More information

Steps In Implimentation of Water and Sanitation Software Activities

Steps In Implimentation of Water and Sanitation Software Activities MINISTRY OF WATER AND ENVIRONMENT DIRECTORATE OF WATER DEVELOPMENT Steps In Implimentation of Water and Sanitation Software Activities A Guide to District Local Governments July 2012 Contents FOREWORD...3

More information

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam Introduction & Overview What is the difference between Equity and Equality? What is GESI? Gender equality is about transforming

More information

Township of Perry Strategic Asset Management Policy

Township of Perry Strategic Asset Management Policy Township of Perry Strategic Asset Management Policy Purpose: The strategic asset management policy is to establish consistent standards and guidelines for management of the Township s assets. The policy

More information

ADB RELENDING FACILITIES FOR THE LOCAL GOVERNMENT UNITS. Local Government Unit Support Credit Program (LGUSCP)

ADB RELENDING FACILITIES FOR THE LOCAL GOVERNMENT UNITS. Local Government Unit Support Credit Program (LGUSCP) RELENDING FACILITIES FOR THE LOCAL GOVERNMENT UNITS Local Government Unit Support Credit Program (LGUSCP) Water District Development Project (WDDP) ADB Mindanao Basic Urban Services Sector (MBUSS) PROGRAM

More information

DEVELOPING A LOCAL GOVERNMENT TRANSPORT MASTERPLAN: CASE STUDY

DEVELOPING A LOCAL GOVERNMENT TRANSPORT MASTERPLAN: CASE STUDY DEVELOPING A LOCAL GOVERNMENT TRANSPORT MASTERPLAN: CASE STUDY Objectives of the case study J. Lebo, World Bank (1999) National or state rural planning processes are often top down, technically sophisticated

More information

EXPERIENCES IN PLANNING FOR NUTRITION AT THE LOCAL GOVERNMENT LEVEL

EXPERIENCES IN PLANNING FOR NUTRITION AT THE LOCAL GOVERNMENT LEVEL DNCC INITIATIVE Strengthening Leadership and Governance in Uganda September 2017 EXPERIENCES IN PLANNING FOR NUTRITION AT THE LOCAL GOVERNMENT LEVEL Planning in Uganda: A National Mandate The Government

More information

Leading Through Economic Uncertainty. Sarah Woodgate, City of Calgary

Leading Through Economic Uncertainty. Sarah Woodgate, City of Calgary Leading Through Economic Uncertainty Sarah Woodgate, City of Calgary Calgary: the current context Calgary has a strong economy, skilled workforce and currently targeted for continued growth. Yet the economy

More information

Date of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017

Date of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017 Request for Qualifications For Planning Services: Gee Creek Plateau Sub Area Plan City of Ridgefield, Washington Date of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017 Project Overview:

More information

Executive Summary of the National Report on the Implementation of the 2030 Agenda for Sustainable Development. Czech Republic

Executive Summary of the National Report on the Implementation of the 2030 Agenda for Sustainable Development. Czech Republic Office of the Government of the Czech Republic Sustainable Development Department Executive Summary of the National Report on the Implementation of the 2030 Agenda for Sustainable Development Czech Republic

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK - - 822 PH96 library IBC InternationalT/Vater RRPlPHI 27013, and Sanitation Centre Tel.: +31 70 30 689 80 Fax: +31 70 35 899 64 ASIAN DEVELOPMENT BANK REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE

More information

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT Title: Countries: Duration: Analysis and Advocacy for Child-Centred Budgeting Botswana, Lesotho, Namibia, South Africa and Swaziland 40 working days, spread

More information

Strengthening Multisectoral Governance for Nutrition Deborah Ash, Kavita Sethuraman, Hanifa Bachou

Strengthening Multisectoral Governance for Nutrition Deborah Ash, Kavita Sethuraman, Hanifa Bachou Strengthening Multisectoral Governance for Nutrition Deborah Ash, Kavita Sethuraman, Hanifa Bachou Components of Multisectoral Nutrition Governance National Level Enabling Environment for Nutrition Political

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

PROMOTING INCLUSIVE GROWTH: LOCAL PARTICIPATION AND GOVERNANCE. Francisco A. Magno, PhD De La Salle University

PROMOTING INCLUSIVE GROWTH: LOCAL PARTICIPATION AND GOVERNANCE. Francisco A. Magno, PhD De La Salle University PROMOTING INCLUSIVE GROWTH: LOCAL PARTICIPATION AND GOVERNANCE J Francisco A. Magno, PhD De La Salle University Jesse M. Robredo Institute of Governance Bottom-up Budgeting 1 Bottom-up Budgeting Citizens

More information

Establishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region

Establishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region Project Proposal: Establishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region by the GEF/UNDP/IMO Regional Programme on Partnerships in Environmental management for

More information

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( )

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( ) Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 23 October 2018 Original: English Agenda item 7 WFP/EB.2/2018/7-C/Add.1 Evaluation reports For consideration

More information

TERMS OF REFERENCE Project Mid Term Evaluation

TERMS OF REFERENCE Project Mid Term Evaluation 1. Project Summary Project Title: TERMS OF REFERENCE Project Mid Term Evaluation PIMS 2091 Coastal and Marine biodiversity conservation and sustainable use in the Con Dao islands region Project ID: 00049728

More information

Strategic Plan The Department of Finance

Strategic Plan The Department of Finance Strategic Plan 2014-2017 The Department of Finance Department of Finance 2009-10 Annual Report 1 Department of Finance P.O. Box 8700, Confederation Building St. John s, NL A1B 4J6 Telephone: 709.729.2950

More information

Guiding Principles for Project Design

Guiding Principles for Project Design Strengthening Operational Skills in Community Driven Development April 15-19, 2002 Washington, D.C. Guiding Principles for Project Design Community-Based Development in Northeast Brazil Luis Coirolo World

More information

Local Revenue Mobilization Initiative. LMRI overall goal. Overall Training objectives. 23-Jun-15

Local Revenue Mobilization Initiative. LMRI overall goal. Overall Training objectives. 23-Jun-15 Local Revenue Mobilization Initiative Local Revenues Concept and Legal Framework Session one 1 LMRI overall goal To improve revenue generation at the local level a more effective and efficient revenue

More information

Government of Peru Peru. PROVIAS Departamental Peru

Government of Peru Peru. PROVIAS Departamental Peru Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC2827 Latvia-Welfare Reform Project (@) Europe and Central Asia Social Sector Adjustment LVPA35807 Republic of Latvia

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

PDS-1. Planning & Development

PDS-1. Planning & Development PDS1 Planning & Development Table of Contents Departmental Overview Divisions Building Development Services Policy Planning Transportation Planning Urban Design Operating Budget Overview Capital Budget

More information

Internal Audit of the Lao People s Democratic Republic Country Office

Internal Audit of the Lao People s Democratic Republic Country Office Internal Audit of the Lao People s Democratic Republic Country Office March 2013 Office of Internal Audit and Investigations (OIAI) Report 2013/04 Audit of the Lao People s Democratic Republic Country

More information

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT Country Operations Business Plan: Philippines, 2014 2016 SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT A. Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance.

More information

Review of Implementation of National Nutrition Strategy by LGAs and MDAs

Review of Implementation of National Nutrition Strategy by LGAs and MDAs UNITED REPUBLIC OF TANZANIA Review of Implementation of National Nutrition Strategy by LGAs and MDAs FY2011/12, FY2012/13, FY2013/14, FY2014/15 3 September 2015 1 Outline of the presentation 1. Overview

More information

RURAL DEVELOPMENT & NATURAL RSOURCE MANAGEMENT: TRENDS, STRATEGY IMPLEMENTATION AND FRAMEWORK PERFORMANCE INDICATOR SYSTEM May 2, 2000

RURAL DEVELOPMENT & NATURAL RSOURCE MANAGEMENT: TRENDS, STRATEGY IMPLEMENTATION AND FRAMEWORK PERFORMANCE INDICATOR SYSTEM May 2, 2000 RURAL DEVELOPMENT & NATURAL RSOURCE MANAGEMENT: TRENDS, STRATEGY IMPLEMENTATION AND FRAMEWORK PERFORMANCE INDICATOR SYSTEM May 2, 2000 EXECUTIVE SUMMARY INTRODUCTION 1. President Estrada s Government has

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process City of Saint John Common Council Meeting Wednesday, July 18, 2012 Special Meeting of Council 1. Call to Order Prayer 9:30 a.m. Council Chamber 1.1 Strategic Decision Making; Council Priorities, Core Service

More information

Overview of the Community-Based Monitoring System (CBMS)

Overview of the Community-Based Monitoring System (CBMS) Overview of the Community-Based Monitoring System (CBMS) This work was carried out by the PEP-CBMS Network Coordinating Team of the Angelo King Institute for Economic and Business Studies with the aid

More information

SWA COLLABORATIVE BEHAVIOURS: COUNTRY PROFILES 2017

SWA COLLABORATIVE BEHAVIOURS: COUNTRY PROFILES 2017 SOUTH AFRICA SWA COLLABORATIVE BEHAVIOURS: COUNTRY PROFILES 2017 An introduction to the profiles In 2014, the Sanitation and Water for All (SWA) global partnership identified four Collaborative Behaviours

More information

cidb development through partnership August 2008 Update on the National Infrastructure Maintenance Strategy (NIMS)

cidb development through partnership August 2008 Update on the National Infrastructure Maintenance Strategy (NIMS) Update on the National Infrastructure Maintenance Strategy (NIMS) Key Government Initiatives in Support of Improving Infrastructure Maintenance August 2008 cidb development through partnership The National

More information

Implementation of SDGs in Nepal: Some Observations on Prioritization. Yuba Raj Khatiwada

Implementation of SDGs in Nepal: Some Observations on Prioritization. Yuba Raj Khatiwada Implementation of SDGs in Nepal: Some Observations on Prioritization Yuba Raj Khatiwada dryubaraj@gmail.com Background of SDGs Implementation Nepal builds 2030 Agenda for Sustainable Development on what

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity National Plan of Action on Nutrition 2010-2015 1 TABLE OF CONTENTS 1. Introduction 1 2. Plan of Action 3 3. Implementation

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 1 December 2015 Original: English For decision United Nations Children s Fund Executive Board First regular session 2016 2-4 February 2016 Item

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh 2 o o PROJECT DOCUMENT Creating Jobs: Capacity Building for Local Resourcebased Road Works in Selected Districts in NAD UNDP/ILO Project INS/51/071 Phase III Capacity Building for the Management of Road

More information

Assessment of Bottom-up Budgeting: FY 2015 Cycle

Assessment of Bottom-up Budgeting: FY 2015 Cycle Assessment of Bottom-up Budgeting: FY 2015 Cycle Rosario G. Manasan, Senior Research Fellow Presentation to the Quo Vadis Citizen Participation Conference 5 August 2015 Philippine Institute for Development

More information

Community Contracting in the Malawi Social Action Fund: Local Stakeholder Perspectives

Community Contracting in the Malawi Social Action Fund: Local Stakeholder Perspectives No. 163 July 2000 Community Contracting in the Malawi Social Action Fund: Local Stakeholder Perspectives The Malawi Social Action Fund (MASAF) is a quick-disbursing facility which routes money directly

More information

Economic and Social Council

Economic and Social Council United Nations E/ICEF/2011/AB/L.1 Economic and Social Council Distr.: Limited 6 December 2010 Original: English For action United Nations Children s Fund Executive Board First regular session 2011 8-11

More information

TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND. B. PROJECT NAME AND ID# China Social Security Reform Trust Fund

TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND. B. PROJECT NAME AND ID# China Social Security Reform Trust Fund November 22, 2003 TECHNICAL ASSISTANCE FUNDING PROPOSAL FOR ASEM TRUST FUND A. COUNTRY China B. PROJECT NAME AND ID# China Social Security Reform Trust Fund C. TECHNICAL ASSISTANCE SUMMARY The objective

More information

Private Fundraising: 2013 workplan and proposed budget

Private Fundraising: 2013 workplan and proposed budget Distr.: General E/ICEF/2013/AB/L.1 3 December 2012 Original: English For action United Nations Children s Fund Executive Board First regular session 2013 5-8 February 2013 Item 12 of the provisional agenda*

More information

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue Technical Assistance Report Project Number: 46429-001 Capacity Development Technical Assistance (CDTA) April 2013 Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal

More information

Introduction to the Disaster Risk Profile of Chittagong

Introduction to the Disaster Risk Profile of Chittagong Introduction to the Disaster Risk Profile of Chittagong subir Das Focal Person Youth Issue Young Power in Social Action (YPSA) Cell: +01716692292 Email: subir18bd@yahoo.com Chittagong at a Glance 2nd largest

More information

Summary of the Evaluation Study Results

Summary of the Evaluation Study Results Summary of the Evaluation Study Results 1. Outline of the Project Country: The Republic of the Philippines Sector: Solid Waste Management Office in Charge: JICA Philippine Office Project October 24, 2007

More information

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN

UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN UNDP Pakistan Monitoring Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN Approved Version April 2014 Contents Contents... 2 1. Key Elements of Results Based Management in

More information

Planning, Budgeting and Financing

Planning, Budgeting and Financing English Version Planning, Budgeting and Financing Post-Disaster Recovery and Reconstruction Activities in Khammouane Province, Lao PDR Developed under the Khammouane Development Project (KDP), Implemented

More information

DIRECTOR OF PARTNERSHIP DEVELOPMENT

DIRECTOR OF PARTNERSHIP DEVELOPMENT DIRECTOR OF PARTNERSHIP DEVELOPMENT Appointment Brief November 2016 WELCOME LETTER FROM THE EXECUTIVE DIRECTOR Thank you for your interest in the International Budget Partnership (IBP). Founded in 1997,

More information

Supplementary budget for the implementation of the medium-term strategic and institutional plan

Supplementary budget for the implementation of the medium-term strategic and institutional plan UNITED NATIONS HSP UN-Habitat Governing Council of the United Nations Human Settlements Programme Distr. General 10 April 2007 Original: English Twenty-first session Nairobi, 16-20 April 2007 Item 7 of

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 5. b Meeting Date: March 3, 2014 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Management Services Prepared by: Gus Bush, IT Manager City Manager Approvalll ~ SUBJECT: STATUS REPORT

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT Advertised on behalf of: TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT POST TITLE: National Consultant to formulate the upgraded guideline packages of the District Development Fund (DDF) AGENCY/PROJECT

More information

CHRISTIAN RELIEF & DEVELOPMENT ASSOCIATION

CHRISTIAN RELIEF & DEVELOPMENT ASSOCIATION CRDA CHRISTIAN RELIEF & DEVELOPMENT ASSOCIATION Rapid Assessment Report on: The Implications of the New Charities & Societies Legislation on NGOS and CSOs & Possible Coping Mechanisms By Befikadu Alemayehu

More information

NATIONAL DEVELOPMENT AGENCY PRESENTATION by Anthony Bouwer

NATIONAL DEVELOPMENT AGENCY PRESENTATION by Anthony Bouwer NATIONAL DEVELOPMENT AGENCY PRESENTATION by Anthony Bouwer 04 1 WHO IS NDA? The National Development Agency is an organization, created by Government through an Act of Parliament- Act 108 of 1998. The

More information

Expert meeting 2. Developing SSPARS and Integration into NSDS. Challenges & Best Practices

Expert meeting 2. Developing SSPARS and Integration into NSDS. Challenges & Best Practices Expert meeting 2 Developing SSPARS and Integration into NSDS Challenges & Best Practices Key Challenges: Background Decentralized statistical systems agriculture statistics produced under Ministry of Agriculture

More information

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES GEF/C.8/4 GEF Council October 8-10, 1996 Agenda Item 6 FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES RECOMMENDED DRAFT COUNCIL DECISION The Council reviewed document

More information

Call to Action for WASH in Schools

Call to Action for WASH in Schools Call to Action for WASH in Schools Action Point 4: Demonstrate Quality WASH in Schools Programs Results and Lessons from over 10 years of School Health and Nutrition programs Seung Lee, Sr. Director for

More information

Local Road Management Performance Assessment Manual

Local Road Management Performance Assessment Manual Local Road Management Performance Assessment Manual Revised Manual March 2015 Department of the Interior and Local Government Office of Project Development Services March 2015 Page1 Contents 1. Background...

More information

Scaling Up Nutrition Kenya Country Experience

Scaling Up Nutrition Kenya Country Experience KENYA Ministry of Health Scaling Up Nutrition Kenya Country Experience Terry Wefwafwa, Division of Nutrition, Ministry of Health Structure of presentation 1.Background Information 2.Status of SUN in Kenya

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

WEST BANK AND GAZA STRIP

WEST BANK AND GAZA STRIP WEST BANK AND GAZA STRIP SWA COLLABORATIVE BEHAVIOURS: COUNTRY PROFILES 2017 An introduction to the profiles In 2014, the Sanitation and Water for All (SWA) global partnership identified four Collaborative

More information

Ethiopian Civil Service University Training and Consultancy Division Training Schedule for the Year 2017/18(2010 E.C)

Ethiopian Civil Service University Training and Consultancy Division Training Schedule for the Year 2017/18(2010 E.C) Creating Impact Ethiopian Civil Service University Training and Consultancy Division Training Schedule for the Year 2017/18(2010 E.C) 1 P age 1. Introduction The establishment of Training and Consultancy

More information

State Secretariat for Planning, Science and Technology (SEPLAN)

State Secretariat for Planning, Science and Technology (SEPLAN) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID10306

More information

Japan PHRD Technical Assistance Program Application for Project Preparation Technical Assistance Grant FY Round 2

Japan PHRD Technical Assistance Program Application for Project Preparation Technical Assistance Grant FY Round 2 Public Disclosure Authorized Japan PHRD Technical Assistance Program Application for Project Preparation Technical Assistance Grant FY Round 2 Public Disclosure Authorized Public Disclosure Authorized

More information

TANAUAN CITY: Utilizing CBMS as a Tool for Strategic Planning and Resource Allocation

TANAUAN CITY: Utilizing CBMS as a Tool for Strategic Planning and Resource Allocation TANAUAN CITY: Utilizing CBMS as a Tool for Strategic Planning and Resource Allocation Presenter: HON. ANTONIO C. HALILI City Mayor, City Government of Tanauan Tanauan City Brief Profile Tanauan is a second

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2486. Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2486. Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT

PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT PERFORMANCE NING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT Contents 2 1. Approach to Performance improvement planning model 2. Data Entry and Forecasts 3. Module I: Performance Assessment 4. Module II:

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

CHF Sudan 2015 Standard Allocation. Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES

CHF Sudan 2015 Standard Allocation. Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES CHF Sudan 2015 Standard Allocation Project Proposal and Budget Guidelines: SUBMISSION OF CONCEPT NOTES Content 1. Eligibility criteria and allocation process 2. Creation of project Concept Note 3. Project

More information

REPUBLIC OF ZAMBIA. Ministry of National Development Planning

REPUBLIC OF ZAMBIA. Ministry of National Development Planning REPUBLIC OF ZAMBIA Ministry of National Development Planning Terms of References For Individual Local Consultant to Develop Guidelines and Procedures for a Comprehensive Framework for Public Investment

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

Design and Implementation Features of the National Household Targeting System in the Philippines

Design and Implementation Features of the National Household Targeting System in the Philippines Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PHILIPPINE SOCIAL PROTECTION NOTE June 2012 NO. 5 The Philippine Social Protection Note

More information

HOW TO ACCELERATE BY USING SOCIAL ACCOUNTABILITY TOOLS

HOW TO ACCELERATE BY USING SOCIAL ACCOUNTABILITY TOOLS HOW TO ACCELERATE BY USING SOCIAL ACCOUNTABILITY TOOLS Context Social Accountability approach Many governments around the world have acknowledged Right to Water and Sanitation as a basic human rights.

More information

Government of Belize Pilot Program for Climate Resilience Sub-Committee Meeting Washington, DC November 1, 2013

Government of Belize Pilot Program for Climate Resilience Sub-Committee Meeting Washington, DC November 1, 2013 Government of Belize Pilot Program for Climate Resilience Sub-Committee Meeting Washington, DC November 1, 2013 Overview Climate Impacts Transformational Shift Analysis and Consultation Moving Forward

More information

AHA Centre Executive (ACE) Programme 2017 Red Cross Red Crescent Induction October 2017 Semarang, Indonesia

AHA Centre Executive (ACE) Programme 2017 Red Cross Red Crescent Induction October 2017 Semarang, Indonesia AHA Centre Executive (ACE) Programme 2017 Red Cross Red Crescent Induction 09-14 October 2017 Semarang, Indonesia https://www.youtube.com/watch?v=7jej66w R1u4 1. Cash transfer programming in emergency