DECISION 2016 NSUARB 42 M07215 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT

Size: px
Start display at page:

Download "DECISION 2016 NSUARB 42 M07215 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT"

Transcription

1 DECISION 2016 NSUARB 42 M07215 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT IN THE MATTER OF AN APPLICATION for approval of NOVA SCOTIA POWER INC. S pre-tax WEIGHTED AVERAGE COST OF CAPITAL and ALLOWANCE FOR FUNDS USED DURING CONSTRUCTION RATES BEFORE: Roberta J. Clarke, Q.C., Panel Chair KulvinderS. Dhillon, P.Eng., Member Murray E. Doehler, CPA, CA, P.Eng., Member APPLICANT: NOVA SCOTIA POWER INC. Brian Curry, LL.B. INTERVENORS: CONSUMER ADVOCATE John Merrick, Q.C. William Mahody, Q.C. SMALL BUSINESS ADVOCATE E.A. Nelson Blackburn, Q.C. INDUSTRIAL GROUP Nancy G. Rubin, Q.C. Maggie A. Stewart, LL.B. FINAL SUBMISSIONS: February 26, 2016 DECISION DATE: April 12, 2016 DECISION: The Board establishes the method for the calculation of annual WACC and AFUDC rates.

2 -2- I INTRODUCTION [1] This is a decision of the Nova Scotia Utility and Review Board ( Board ) respecting an application ( Application ) by Nova Scotia Power Inc. ( NSPI ) for approval of its pre-tax Weighted Average Cost of Capital ( WACC ) and Allowance for Funds Used During Construction ( AFUDC ) rates. This Application was made on December 18, 2015, under the Public Utilities Act, R.S.N.S. 1989, c. 380 as amended ( Act ). [2] A notice of the proceeding was sent to those parties who expressed an interest in the Annual Capital Expenditure ( ACE ) Plan application for 2016, filed on November 12,2015. Notices of Intervention were filed by the Consumer Advocate ( CA ); the Small Business Advocate ( SBA ); and the Industrial Group. A timeline was established to accommodate Information Requests ( IRs ) and the filing of evidence by the formal intervenors. The Industrial Group, the SBA, and Board staff submitted IRs to which responses were received by January 27, On February 5, 2016, the CA and the SBA both confirmed that they would not be submitting evidence. A letter from NSPI, dated February 26, 2016, stated it would not be submitting rebuttal evidence. II BACKGROUND [3] The AFUDC represents the cost of financing the construction of plant and equipment. NSPI is allowed to include the financing costs in the value of the related plant and equipment. Once NSPI begins using the asset, AFUDC accumulation stops and its value is transferred into the Regulated Rate Base. Regulated Rate Base is the value of approved capital assets, construction work in progress, and certain other deferred expenses that will be recovered in the power rates.

3 -3- [4] In the 2013 ACE Plan Decision, the Board noted that NSPI had been charging an AFUDC rate without specific approval and ordered NSPI to use the rate that had been approved in the last general rate application ( GRA ). This rate was also used for the 2014 ACE Plan. In the 2015 ACE Plan proceeding, NSPI argued that adjustments were necessary to the AFUDC rate to match the cost actually being incurred. The Board agreed and reduced the rate to 7.19% only for AFUDC. [5] The third item in the Preliminary Issues List for the 2016 ACE Plan was 2016 AFUDC rate for capital purposes. In response to this issue, NSPI noted: On October 10, 2015 the Board directed NS Power to make a number of revisions in connection with its 2015 ACE Stakeholder Engagement Report (M06963), including the following: With reference to Section 8.0, the Board does not consider that any approval of AFUDC should be taken as approval of WACC for other purposes. Therefore, NSPI is to remove the last sentence from the first paragraph, i.e.: The AFUDC rate in the ACE Plan will be the updated projection of NS Power s WACC for the upcoming year. [NSPI Letter to Board, December 8, 2015, pp. 1-2] [6] On December 8, 2015, NSPI withdrew its request for approval of the AFUDC rate as part of the 2016 ACE Plan proceeding. A separate Application was made on December 18, 2015, for approval of both the AFUDC and WACC rates. The Application also requested approval of an interim rate, effective January 1,2016, pending the Board s decision. The Board responded as follows: The Board notes that no request for interim approval of an AFUDC rate was made in the 2016 ACE Plan application. The Board notes that this request now comes less than one month before the proposed effective date for the interim rate, i.e., January 1, The Board is not prepared to approve an interim rate, but is agreeable to holding a separate process to consider NSPI s application for approval of the single AFUDC/WACC rate, as requested. [Board Letter to NSPI, December 18, 2015, p. 1]

4 -4- [7] NSPI also uses the WACC rate for regulatory accounts. The regulatory accounts for 2015 were: Fuel Adjustment Mechanism 2012 Fixed Cost recovery Demand Side Management Streetlight Stranded Asset Renewable to Retail [Exhibit N-3, Response IR-5, p. 2] III APPLICATION [8] The Board generally approves AFUDC and WACC rates as a part of a GRA by NSPI. These rates are calculated on the basis of equity thickness, rate of return and the cost of long term and short term debt projected for the test years. The Board, in reviewing the current Application by NSPI, has used similar principles as it would have used during a GRA review. [9] The Application presented the calculation as follows: Nova Scotia Power Inc. Estimated Average Capital and Cost of Capital Years Ended December 31st Millions of Dollars 2018 Financial Outlook (1) 3 Opening 4 5 Estimated Cost of Capital 6 (2) Closing (3) Average Capital <4) Capital Ratio (5) Cost Pre-tax Factor (6) Cost After-tax Factor (7) Weighted Pre-tax Cost (8) Weighted After-tax Cost 7 Short-term debt $77.2 $106,3 $ o 2 56 o I 77% G 06Go 0 04 o 8 9 Long-term debt 2, , , l o 6.22*o 4 32*o 3 61 o Total debt $2,287.7 $2,316.2 $2, f,o 8 78 o 6 09*o 3 67*o 2.55 o Common equity 1, , , *o 9 00*0 3 56Cro 3 56 o Total $3,786.0 $3,826.2 $3, % 7.23% 6.11% Notes: 18 I) Figures presented reflect whole numbers which may cause $0 IM in rounding differences on some line items. 19 2) Pre-tax equity cost excludes the income tax gross-up factor 20 3) Average capital reflects average of year-end balances [Exhibit N-1, Appendix A, p. 1]

5 -5- [10] NSPI stated that this method is the same as used in past GRAs: In order to avoid the confusion of having separate rates for capital and non-capital deferrals and separate approval processes for each, NS Power requests approval of a single WACC/AFUDC rate of 7.23 percent, for both capital and non-capital matters effective as of the date of approval. The WACC/AFUDC rate would remain in place until such time as a new rate is approved by the Board. [Exhibit N-1,p.3] [11] In addition, for future adjustment, NSPI stated: Depending on the materiality of the changes in the estimated WACC rates, NS Power proposes that it would apply to the Board for any future adjustments to WACC and AFUDC around the same time as it applied for approval of its Annual Capital Expenditure Plan. In the absence of such an application, the previously approved rates would continue to apply. [Exhibit N-3, Response IR-6, p. 1] [12] No evidence was filed to challenge either the method of calculating WACC or the quantum of the various components. IV ANALYSIS AND FINDINGS a) WACC and AFUDC Formula [13] The AFUDC rate has historically been based upon the calculation of the WACC rate. In a GRA the two rates are set to be the same and are used to establish the financing cost portion of revenue requirement for rate making purposes. The Board finds that this relationship should be maintained. [14] The Board notes that NSPI has calculated WACC in accordance with the following formulae: WACC = CRst x Rst + CRlt x Rlt + CRe x Re and CRst + CRlt + CRe = RRB

6 -6- where: CRst = Capital Ratio for Short Term Debt CRlt= Capital Ratio for Long Term Debt CRe = Capital Ratio for Equity Rst = Short Term borrowing rate rounded to one basis point Rlt = Cost of Long Term Debt, presented as a rate, rounded to one basis point Re = Equity borrowing rate rounded to one basis point RRB = Regulated Rate Base b) Regulated Rate Base [15] In the 2012 GRA (2011 NSUARB 184), the Board accepted a Settlement Agreement which included a provision on the adjustment of Regulated Rate Base. Since that time, the Rate Base has changed to include such items as capital additions, as authorized through the ACE plan and other approval processes, and reduced by depreciation as well as changes in the other elements. [16] In response to Exhibit N-5, IR-8 Revised, NSPI provided the details of the general ledger balances that are built into the Regulated Rate Base. NSPI, in calculating this regulated rate base said: Regulated Capital spend excludes projects that have received special direction from the Board as they do not make up part of Regulated Capitalization. [Exhibit N-5, IR-8 Revised, Attachment 1, p.5] [17] No Intervenors filed evidence to challenge NSPI s calculations of the Regulated Rate Base as being $3,806.1 million for 2016.

7 -7- [18] The Board accepts NSPI s assurances that it has not included the cost of projects which the Board has not approved. For the purpose of this Application, the Board accepts NSPI s calculation of the average Regulated Rate Base as $3,806.1 million for c) Capital Ratio i) Equity Ratio [19] In 2015 NSPI had redeemed all of its preferred equity. The equity component now consists of common shares and retained earnings. In the Application, NSPI proposes: For purposes of determining WACC in 2016, NS Power proposes to utilize its projected common equity thickness of 39.5 percent... [Exhibit N-1, p. 8] [20] NSPI explained that increasing this ratio from that used in the GRA was to reflect the present financial position. This, according to NSPI, is within the range approved by the Board in the 2012 GRA: Return on Equity/Capital Structure 7. Treatment as follows: a. Capital Structure - rates will be set on 37.5% equity, NSPI may use a maximum actual equity of 40%, actual average equity will be used to calculate return on equity results. [Exhibit N-2, p. 1] [21] Since the 2012 GRA, the Board s currently approved method to calculate the revenue requirement uses an equity thickness of 37.5%.

8 -8- [22] The Board has considered NSPI s request and is not prepared to set a ratio that is different from that used in determining the revenue requirement in a GRA. The Board finds, for the purpose of calculating WACC for 2016, the equity percentage should be the same as had been established in the 2012 GRA. NSPI is directed to adjust the Equity Ratio to ii) Long Term Debt Ratio [23] The majority of the financing for the Regulated Rate Base comes from Long Term Debt, which by definition has maturities greater than one year. NSPI stated: NS Power can also access the debt capital markets and currently has a long-term debt portfolio of $2,060 million as of October 31, 2015, consisting of medium term notes and debentures. [Exhibit N-1, p. 6] [24] Over the past three years NSPI has accessed debt capital markets, borrowing tranches of $250 million, $300 million and $175 million, all with terms of 30 years. [25] In determining total Long Term Debt, NSPI included a forecasted issue planned for December, There are no repayments or new debt issues planned for The average of the Long Term Debt as calculated by NSPI is $2,210.3 million for [26] The Board considers the amount of Long Term Debt issued by NSPI can be easily predicted and occurs in large amounts. In keeping with the calculation of

9 -9- Regulated Rate Base, the amount for Long Term Debt will be the average of the opening and projected closing balances for the current year. This is the equivalent of adding one half of the net projected change in Long Term Debt to the balance as at the end of the previous year. This is the method used by NSPI in this Application. [27] The Board finds that the Long Term Debt Capital Ratio should be the amount of the Long Term Debt as calculated above divided by the Regulated Rate Base. [28] As calculated in the Application, the Board accepts the projected Long Term Debt of $2,210.3 million to be divided by the Regulated Rate Base of $3,806.1 million resulting in a Long Term Debt Ratio of for iii) Short Term Debt Ratio [29] NSPI s Short Term Debt is obtained, largely, through a commercial paper program. As explained by the Company: Commercial Paper is short-term debt issued to investors with maturities of anywhere from a day to less than one year. [ibid, p. 6] [30] The Company explained Commercial Paper is the lowest cost form of borrowing and: Participating in this market provides NS Power with flexibility in managing its cash flow, typically rolling over amounts of $20-$25 million daily. [ibid, p. 6] [31] The Board finds that it is prudent for NSPI to have access to short term financing for its various cash flow needs. The Board expects NSPI to manage its cash flow and financing structure in a manner that provides the lowest cost to its rate payers.

10 -10- [32] The Board finds the Short Term Debt Capital Ratio is the difference between one and the combined ratio financed by Equity and Long Term Debt. [33] As a result of the findings on Equity and Long Term Debt, the Short Term Ratio is for 2016 ( = 0.044). d) Rates i) Equity [34] In the Application, NSPI proposed using a Return on Equity of 9% which it said is:... in the middle of the UARB approved reasonable return on equity band of 8.75 per cent to 9.25 per cent and on which rates are set. [ibid, p. 8] [35] In the last GRA, the Board used a return on equity of 9% for the purposes of calculating the rate used in determining the revenue requirement. [36] The Board accepts NSPI s request to use a return of 9% on the equity component of the WACC for ii) Cost of Long Term Debt [37] The projected Cost of Long Term Debt is calculated by using the actual interest costs on the previous year s issued debt that remains outstanding at the end of the current year, plus the cost of any changes. There are no maturities or planned redemptions to occur in the current year. NSPI, when asked if any planned restructuring is to occur in 2016, stated:

11 -11 - Redeeming or buying back long-term debt issues is done at current market rates. For all existing debt which has a higher coupon relative to current rates, the premium required in order to redeem the issue when added to the principal of the original issue would eliminate any benefit available from a reduced coupon on the new debt security. As a result, no such analysis has been completed. [Exhibit N-3, Response IR-2, pp. 1-2] [38] When asked what rates may be for a new 30 year Long Term Debt issue, NSPI responded that they:...would be in a range of 4.30% to 4.50% should we require it. [Exhibit N-6, Revised Response IR-2(a), p. 1] [39] NSPI stated that the last three borrowings on the capital markets were at 4.15%, 4.50% and 3.61% respectively. [40] In calculating the Cost of Long Term Debt Rate, NSPI used a forecasted new debt rate of 4.80% [Exhibit N-3, IR-2, Attachment 1] for the December, 2015 issue. [41] NSPI calculated the total cost of long term debt, including interest and other debt related charges to be $137,387,784 for It was presented, in this Application, as a blended rate of 6.22%. [42] The Board directs NSPI to use the actual cost of the December, 2015 issue in determining the total Cost of Long Term Debt in the Compliance Filing. iii) Short Term Debt Interest Rate [43] NSPI has used a projected rate of 2.56% for the Short Term Debt interest rate in this Application. [44] In projecting the Short Term Debt interest rate, NSPI:

12 relies on forecasts of major financial institutions to develop its market projections. These independent external financial forecasts provide NS Power with an unbiased estimate of future market rates.... [Exhibit N-4, Response IR-1 (b), p. 1] [45] Historically, the projections have not proved accurate. The following table, prepared by the Board from information extracted from Exhibit N-3, IR-3, illustrates the variation: Projected Actual % 1.49% % 0.86% % 1.38% % 1.58% [46] There could be other possible short term interest projection models that may prove more accurate than that used by NSPI. However, it is important to be mindful of materiality in attempting to improve accuracy. As stated by NSPI:...a change of.01% in the WACC rate has a minor impact on results of the Company, approximately $10,000 on $100 million of capital over the course of a year.... [Exhibit N-3, Response IR-5, p. 1] [47] For example, if a short term debt interest rate of 1.00% were used, after taking into consideration the requested short term debt capital ratio, this would reduce the weighted pre-tax rate from 0.06% to 0.02%, as calculated by the Board. The difference of 0.04% would translate to a $40,000 adjustment per $100 million of capital to the financial statements of NSPI. [48] The Board notes that a difference of 0.04% in the rate of Short Term Debt is $40,000. The Board does not consider such a difference to be material for this Application. In future, the Board expects NSPI to develop a more accurate prediction model for the short term debt rate.

13 -13- [49] For the purposes of the calculation of the 2016 WACC, the Board accepts the use of 2.56% for the Short Term Debt interest rate. V CONCLUSION [50] The calculation of WACC/AFUDC is to be done in accordance with the principles outlined in this Decision. A Compliance Filing of the calculation is to be made on or before April 19, 2016, with intervenor comments on or before April 26, [51] The Board s Decision on this matter is only to determine the amount of capitalization of the financial elements for various accounts. It is not a supplement to, or support for, the determination of these financial elements in the calculation of revenue requirement in any future GRA. [52] NSPI is directed to file, annually, no later than November 30, the calculation of WACC/AFUDC, unless there is a general rate application in the same year, using the principles outlined in this Decision. [53] Upon receipt and acceptance of the Compliance Filing, the Board will issue an order accordingly. DATED at Halifax, Nova Scotia, this 12th day of April, Roberta? J. Clarki Kulvinder S. Dhillon Murray E. Doehler

DECISION 2016 NSUARB 201 M07703 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and -

DECISION 2016 NSUARB 201 M07703 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and - DECISION 2016 NSUARB 201 M07703 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF the NOVA SCOTIA POWER INCORPORATED 2017-2019 Fuel Adjustment Mechanism

More information

DECISION 2018 NSUARB 190 M08921 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT

DECISION 2018 NSUARB 190 M08921 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT DECISION 2018 NSUARB 190 M08921 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT IN THE MATTER OF AN APPLICATION by ALLSTATE INSURANCE COMPANY OF CANADA for approval to modify its

More information

DECISION 2018 NSUARB 35 M08344 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and -

DECISION 2018 NSUARB 35 M08344 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and - DECISION 2018 NSUARB 35 M08344 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION by HALIFAX REGIONAL WATER COMMISSION for an Order approving

More information

DECISION 2017 NSUARB 149 M07718 NOVA SCOTIA UTILITY AND REVIEW BOARD

DECISION 2017 NSUARB 149 M07718 NOVA SCOTIA UTILITY AND REVIEW BOARD DECISION 2017 NSUARB 149 M07718 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF the PUBLIC UTILITIES ACT and the MARITIME LINK ACT and the MARITIME LINK COST RECOVERY PROCESS REGULATIONS [lf\ - and

More information

IN THE MATTER OF THE PUBLIC UTILITIES ACT. -and-

IN THE MATTER OF THE PUBLIC UTILITIES ACT. -and- DECISION 2014 NSUARB 144 M06247 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT -and- IN THE MATTER OF AN APPLICATION by EFFICIENCY NOVA SCOTIA CORPORATION for Approval of

More information

DECISION 2016 NSUARB 73 M07147 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. and -

DECISION 2016 NSUARB 73 M07147 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. and - DECISION 2016 NSUARB 73 M07147 NOVA SCOTIA UTILITY AND REVIEW BOARD {*Y f IN THE MATTER OF THE PUBLIC UTILITIES ACT and - IN THE MATTER OF AN APPLICATION by HALIFAX REGIONAL WATER COMMISSION for approval

More information

Nova Scotia Utility and Review Board

Nova Scotia Utility and Review Board Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S. 1989, c.380, as amended and IN THE MATTER OF A PROCEEDING Concerning Sales of Renewable Low Impact Electricity Generated

More information

The following Statement of Compensation has been prepared in accordance with the Public Sector

The following Statement of Compensation has been prepared in accordance with the Public Sector NOVA SCOTIA UTILITY AND REVIEW BOARD Please Note: The following Statement of Compensation has been prepared in accordance with the Public Sector Compensation Disclosure Act (PSCDA). This compensation information

More information

DECISION 2013 NSUARB 154 M05419 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MARITIME LINK ACT. -and-

DECISION 2013 NSUARB 154 M05419 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MARITIME LINK ACT. -and- DECISION 2013 NSUARB 154 M05419 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MARITIME LINK ACT -and- IN THE MATTER OF AN APPLICATION by NSP MARITIME LINK INCORPORATED for approval of the Maritime

More information

For further assistance please feel free to contact the Board.

For further assistance please feel free to contact the Board. Please Note: The following Statement of Compensation has been prepared in accordance with the Public Sector Compensation Disclosure Act which requires inclusion of actual amounts paid during the year when

More information

Nova Scotia Utility and Review Board

Nova Scotia Utility and Review Board Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S., c.0, as amended -and- IN THE MATTER OF A Proceeding Concerning Sales of Renewable Low Impact Electricity Generated

More information

DECISION 2016 NSUARB 33 M06214 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE ELECTRICITY ACT. - and -

DECISION 2016 NSUARB 33 M06214 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE ELECTRICITY ACT. - and - DECISION 2016 NSUARB 33 M06214 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE ELECTRICITY ACT - and - IN THE MATTER OF a hearing concerning the Sale of Renewable Low-Impact Electricity generated

More information

Roberta J. Clarke, Q.C, Member

Roberta J. Clarke, Q.C, Member DECISION 2016 NSUARB 149 M07537 M07541 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT - and - IN THE MATTER OF APPLICATIONS by ZENITH INSURANCE COMPANY, NORTHBRIDGE PERSONAL INSURANCE

More information

DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT

DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION of the MUNICIPALITY OF THE COUNTY OF PICTOU, on behalf

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 23898-D01-2018 2019 Annual Performance-Based Regulation Rate Adjustment Filing December 20, 2018 Alberta Utilities Commission Decision 23898-D01-2018 2019 Annual Performance-Based Regulation Rate

More information

Part II Regulations under the Regulations Act

Part II Regulations under the Regulations Act Part II Regulations under the Regulations Act Printed by the Queen s Printer Halifax, Nova Scotia Vol. 34, No. 17 August 13, 2010 Contents Act Reg. No. Page Gaming Control Act Nova Scotia Gaming Foundation

More information

NOVA SCOTIA UTILITY AND REVIEW BOARD THE PUBLIC UTILITIES ACT REDACTED INFORMATION REQUESTS

NOVA SCOTIA UTILITY AND REVIEW BOARD THE PUBLIC UTILITIES ACT REDACTED INFORMATION REQUESTS M0 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT IN THE MATTER OF: -anda hearing into Nova Scotia Power Incorporated s 1-1 Fuel Stability Plan and Base Cost of Fuel Reset

More information

DECISION 2018 NSUARB 145 M08678 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT

DECISION 2018 NSUARB 145 M08678 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT DECISION 2018 NSUARB 145 M08678 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT IN THE MATTER OF AN APPLICATION by THE DOMINION OF CANADA GENERAL INSURANCE COMPANY for approval

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 58(2014)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 58(2014) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 58(2014) 1 IN THE MATTER OF the Electrical Power 2 Control Act, 1994, SNL 1994, Chapter E-5.1 (the 3

More information

DECISION 2017 NSUARB 65 M07903 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. -and-

DECISION 2017 NSUARB 65 M07903 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. -and- DECISION 2017 NSUARB 65 M07903 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT -and- IN THE MATTER OF AN APPLICATION by CAA INSURANCE COMPANY for approval to modify its rates and

More information

DECISION 2018 NSUARB 211 M08949 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. -and- THE WAWANESA MUTUAL INSURANCE COMPANY

DECISION 2018 NSUARB 211 M08949 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. -and- THE WAWANESA MUTUAL INSURANCE COMPANY DECISION 2018 NSUARB 211 M08949 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT -and- IN THE MATTER OF AN APPLICATION by THE W AW AN ESA MUTUAL INSURANCE COMPANY for approval to

More information

Part II Regulations under the Regulations Act

Part II Regulations under the Regulations Act Part II Regulations under the Regulations Act Printed by the Queen s Printer Halifax, Nova Scotia Vol. 39, No. 10 May 15, 2015 Contents Act Reg. No. Page Pension Benefits Act Pension Benefits Regulations

More information

Municipal Debenture Process

Municipal Debenture Process Section 3.5 Municipal Debenture Process Introduction The Municipal Government Act requires the provincial approval of municipal capital borrowing because if a municipality is unable to finance its debt,

More information

Before the Nova Scotia Utility and Review Board

Before the Nova Scotia Utility and Review Board Before the Nova Scotia Utility and Review Board In The Matter of The Public Utilities Act, R.S.N.S 1, c0, as amended And In The Matter of An Application by EfficiencyOne for approval of a Supply Agreement

More information

IN THE MATTER OF THE PUBLIC UTILITIES ACT. -and-

IN THE MATTER OF THE PUBLIC UTILITIES ACT. -and- DECISION 2014 NSUARB 84 M06030 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT -and- IN THE MATTER OF AN APPLICATION of the MUNICIPALITY OF THE COUNTY OF KINGS on behalf

More information

NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE CONSUMER PROTECTION ACT. - and-

NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE CONSUMER PROTECTION ACT. - and- SUPPLEMENTARY DECISION NSUARB-PD-10-01 2011 NSUARB 58 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE CONSUMER PROTECTION ACT - and- IN THE MATTER OF A HEARING respecting certain aspects of the

More information

DECISION 2017 NSUARB 188 M08325, M08326 and M08327 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT.

DECISION 2017 NSUARB 188 M08325, M08326 and M08327 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. DECISION 2017 NSUARB 188 M08325, M08326 and M08327 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT - and - IN THE MATTER OF APPLICATIONS by CO-OPERATORS GENERAL INSURANCE COMPANY,

More information

DECISION 2018 NSUARB 68 M08520 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. - and -

DECISION 2018 NSUARB 68 M08520 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. - and - DECISION 2018 NSUARB 68 M08520 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT - and - IN THE MATTER OF AN APPLICATION by FACILITY ASSOCIATION for approval to modify its rates for

More information

Final Collaborative Report. DSM Administrative Issues Analysis

Final Collaborative Report. DSM Administrative Issues Analysis Demand Side Management Final Collaborative Report DSM Administrative Issues Analysis Volume I of III A Joint Report of NSPI, UARB Staff and Consultants January 1, 00 1 1 1 1 1 1 1 1 0 1 0 TABLE OF CONTENTS

More information

BOARD OF COMMISSIONERS OF PUBLIC UTILITIES ORDER NO. P.U. 17(2012)

BOARD OF COMMISSIONERS OF PUBLIC UTILITIES ORDER NO. P.U. 17(2012) Newfoundland & Labrador BOARD OF COMMISSIONERS OF PUBLIC UTILITIES ORDER NO. P.U. 17(2012) IN THE MATTER OF the Electrical Power Control Act, 1994, SNL 1994, Chapter E-5.1 (the "EPCA") and the Public Utilities

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 2013-465 2014 Annual PBR Rate Adjustment Filing December 23, 2013 The Alberta Utilities Commission Decision 2013-465: 2014 Annual PBR Rate Adjustment Filing Application No. 1609923 Proceeding

More information

FACE OF POVERTY CONSULTATION A Faith-Based Coalition Working to Eliminate Poverty

FACE OF POVERTY CONSULTATION A Faith-Based Coalition Working to Eliminate Poverty FACE OF POVERTY CONSULTATION A Faith-Based Coalition Working to Eliminate Poverty Brief to the Nova Scotia Utility and Review Board 2015 Hearings on Payday Loans Basic Principles All major religions have

More information

RESERVE MEMBER Group Insurance Book

RESERVE MEMBER Group Insurance Book RESERVE MEMBER Group Insurance Book This Plan Description booklet is provided solely for the purpose of explaining the principles of the Plan. The booklet does not create or confer any contractual or other

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public

More information

EPCOR Energy Alberta GP Inc.

EPCOR Energy Alberta GP Inc. Decision 20633-D01-2016 EPCOR Energy Alberta GP Inc. 2016-2017 Regulated Rate Tariff Application December 20, 2016 Alberta Utilities Commission Decision 20633-D01-2016 EPCOR Energy Alberta GP Inc. 2016-2017

More information

Investor Presentation. TSX:HLC HLC.DB December 18, 2018

Investor Presentation. TSX:HLC HLC.DB December 18, 2018 Investor Presentation TSX:HLC HLC.DB December 18, 2018 Forward-Looking Statements This corporate presentation contains forward-looking information within the meaning of applicable securities laws. Forward-looking

More information

Re: Exposure Draft on Pension Accounting and Financial Reporting by Employers

Re: Exposure Draft on Pension Accounting and Financial Reporting by Employers October 4, 2011 Director of Research and Technical Activities Project No. E-34 Governmental Accounting Standards Board 401 Merritt 7, PO Box 5116 Norwalk, CT 06856-5116 director@gasb.org Re: Exposure Draft

More information

EPCOR Distribution & Transmission Inc.

EPCOR Distribution & Transmission Inc. Decision 22603-D01-2017 June 23, 2017 Alberta Utilities Commission Decision 22603-D01-2017 Proceeding 22603 June 23, 2017 Published by the: Alberta Utilities Commission Fifth Avenue Place, Fourth Floor,

More information

BOARD OF COMMISSIONERS OF PUBLIC UTILITIES

BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Newfoundland & Labrador BOARD OF COMMISSIONERS OF PUBLIC UTILITIES IN THE MATTER OF A GENERAL RATE APPLICATION FILED BY NEWFOUNDLAND POWER INC. DECISION AND ORDER OF THE BOARD ORDER NO. P.U. 18(2016) BEFORE:

More information

Decision The ATCO Utilities. Corporate Costs. March 21, 2013

Decision The ATCO Utilities. Corporate Costs. March 21, 2013 Decision 2013-111 Corporate Costs March 21, 2013 The Alberta Utilities Commission Decision 2013-111: Corporate Costs Application No. 1608510 Proceeding ID No. 1920 March 21, 2013 Published by The Alberta

More information

ORDER 2015 NSUARB 263 M07169 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and -

ORDER 2015 NSUARB 263 M07169 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and - ORDER 2015 NSUARB 263 M07169 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF THE REQUEST BY FOR APPROVAL OF THE MONTHLY CUSTOMER CHARGE FOR THE WHOLESALE

More information

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast Decision 20497-D01-2016 FortisAlberta Inc. 2014 PBR Capital Tracker True-Up and 2016-2017 PBR Capital Tracker Forecast February 20, 2016 Alberta Utilities Commission Decision 20497-D01-2016 FortisAlberta

More information

DECISION 2016 NSUARB 113 M07428 and M05042 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MOTOR CARRIER ACT.

DECISION 2016 NSUARB 113 M07428 and M05042 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MOTOR CARRIER ACT. DECISION 2016 NSUARB 113 M07428 and M05042 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MOTOR CARRIER ACT - and - IN THE MATTER OF THE APPLICATIONS of MURPHY SAILING TOURS LIMITED to amend

More information

ATCO Electric Ltd. Stage 2 Review of Decision D ATCO Electric Ltd Transmission General Tariff Application

ATCO Electric Ltd. Stage 2 Review of Decision D ATCO Electric Ltd Transmission General Tariff Application Decision 22483-D01-2017 Stage 2 Review of Decision 20272-D01-2016 2015-2017 Transmission General Tariff Application December 6, 2017 Alberta Utilities Commission Decision 22483-D01-2017 Stage 2 Review

More information

,(rv eterw. Gurnham, Q.C., Chair

,(rv eterw. Gurnham, Q.C., Chair ORDER M06733 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION for Approval of a Supply Agreement for electricity efficiency and conservation

More information

Q FINANCIAL REPORT

Q FINANCIAL REPORT Q3 2017 FINANCIAL REPORT Table of Contents 02 Section 1: Corporate Overview 04 Section 2: Financial Highlights and Recent Developments 10 Section 3: Consolidated Financial Results 13 Section 4: Segmented

More information

AltaLink Investment Management Ltd. And SNC Lavalin Transmission Ltd. et al.

AltaLink Investment Management Ltd. And SNC Lavalin Transmission Ltd. et al. Decision 3529-D01-2015 AltaLink Investment Management Ltd. And SNC Lavalin Transmission Ltd. et al. Proposed Sale of AltaLink, L.P Transmission Assets and Business to Mid-American (Alberta) Canada Costs

More information

Attachment B: Examples. Auction Notice California Cap-and-Trade Program and Québec Cap-and-Trade System Joint Auction of Greenhouse Gas Allowances

Attachment B: Examples. Auction Notice California Cap-and-Trade Program and Québec Cap-and-Trade System Joint Auction of Greenhouse Gas Allowances Attachment B: Examples Auction Notice California Cap-and-Trade Program and Québec Cap-and-Trade System Joint Auction of Greenhouse Gas Allowances This attachment provides information and examples of how

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2018)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2018) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public

More information

PRUDENTIAL PLC 6,000,000,000. Medium Term Note Programme. Series No: 37. Tranche No: 1

PRUDENTIAL PLC 6,000,000,000. Medium Term Note Programme. Series No: 37. Tranche No: 1 PRUDENTIAL PLC 6,000,000,000 Medium Term Note Programme Series No: 37 Tranche No: 1 USD 750,000,000 4.875 per cent. Fixed Rate Undated Tier 2 Notes Issued by PRUDENTIAL PLC Issue Price: 100% The date of

More information

Decision ATCO Gas General Rate Application Phase I Compliance Filing to Decision Part B.

Decision ATCO Gas General Rate Application Phase I Compliance Filing to Decision Part B. Decision 2006-083 2005-2007 General Rate Application Phase I Compliance Filing to Decision 2006-004 August 11, 2006 ALBERTA ENERGY AND UTILITIES BOARD Decision 2006-083: 2005-2007 General Rate Application

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22238-D01-2017 ENMAX Power Corporation 2016-2017 Transmission General Tariff Application December 4, 2017 Alberta Utilities Commission Decision 22238-D01-2017 ENMAX Power Corporation 2016-2017

More information

Auditor General of Nova Scotia

Auditor General of Nova Scotia 5161 George Street Royal Centre, Suite 400 Halifax, Nova Scotia B3J 1M7 Auditor General of Nova Scotia To the Board of Directors of the Nova Scotia Health Authority: Report on the Consolidated Financial

More information

DECISION 2015 NSUARB 64 M and- IN THE MATTER OF A HEARING respecting certain aspects of the Consumer Protection Act relating to payday loans

DECISION 2015 NSUARB 64 M and- IN THE MATTER OF A HEARING respecting certain aspects of the Consumer Protection Act relating to payday loans DECISION 2015 NSUARB 64 M06084 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE CONSUMER PROTECTION ACT -and- IN THE MATTER OF A HEARING respecting certain aspects of the Consumer Protection Act

More information

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 ORDER NUMBER G-48-19 IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 3421-D01-2015 Northeast Calgary Connector Pipeline January 16, 2015 The Alberta Utilities Commission Decision 3421-D01-2015: Northeast Calgary Connector Pipeline Application 1610854 Proceeding

More information

DECISION and Order E and Letter L-15-16

DECISION and Order E and Letter L-15-16 IN THE MATTER OF FortisBC Energy Inc. 2015 Price Risk Management DECISION and Order E-10-16 and Letter L-15-16 June 17, 2016 Before: D. A. Cote, Commissioner/Panel Chair B. A. Magnan, Commissioner R. D.

More information

FortisBC Inc. Annual Review of 2018 Rates Project No Final Order with Reasons for Decision

FortisBC Inc. Annual Review of 2018 Rates Project No Final Order with Reasons for Decision Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 February 13, 2018 Sent

More information

Evaluation of Financial Projections

Evaluation of Financial Projections Evaluation of Financial Projections Application to Amalgamate the Municipality of the County of Pictou, the Town of Pictou, the Town of New Glasgow, and the Town of Stellarton Levy Casey Carter MacLean

More information

Submission of ixbrl Financial Statements as part of Corporation Tax Returns. Part 41A-03-01

Submission of ixbrl Financial Statements as part of Corporation Tax Returns. Part 41A-03-01 Submission of ixbrl Financial Statements as part of Corporation Tax Returns Part 41A-03-01 Updated October 2017 This Instruction provides details of the obligations of certain Corporation Tax (CT) filers

More information

POWER. WHENEVER. WHEREVER. We'll be there. HAND DELIVERED. November 23, 2018

POWER. WHENEVER. WHEREVER. We'll be there. HAND DELIVERED. November 23, 2018 WHENEVER. WHEREVER. We'll be there. NEWFOUNDLANO=t POWER A FORTIS COMPANY HAND DELIVERED November 23, 2018 Board of Commissioners of Public Utilities P.O. Box 2100 120 Torbay Road St. John's, NL A1A 5B2

More information

2017 Earnings Webcast February 13, 2018

2017 Earnings Webcast February 13, 2018 2017 Earnings Webcast February 13, 2018 Presenting Today Bob Rowe, President & CEO Brian Bird, Vice President & CFO Forward Looking Statements During the course of this presentation, there will be forward-looking

More information

REPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 2008

REPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 2008 REPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 2008 February 19, 2009 The Honourable Mark Parent Minister of Labour and Workforce

More information

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS November 5, 2014 The following ( MD&A ) of FortisAlberta Inc. (the Corporation ) should be read in conjunction with the following: (i) the unaudited

More information

IRA Contribution Limits for 2018 Unchanged at $5,500 and $6,500; 401(k) Limits Do Change

IRA Contribution Limits for 2018 Unchanged at $5,500 and $6,500; 401(k) Limits Do Change Published Since 1984 ALSO IN THIS ISSUE IRA Contribution Limits for 2018 Page 1 IRA Contribution Deductibility Charts 2017 and 2018, Page 2 Roth IRA Contribution Charts for 2017 and 2018, Page 3 SEP and

More information

DECISION 2018 NSUARB 16 M08394 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT

DECISION 2018 NSUARB 16 M08394 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT DECISION 2018 NSUARB 16 M08394 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT IN THE MATTER OF AN APPLICATION by ECONOMICAL MUTUAL INSURANCE COMPANY for approval to modify its

More information

January 12, Minimum Wage Review Committee Report

January 12, Minimum Wage Review Committee Report January 12, 2012 Minimum Wage Review Committee Report Honourable Marilyn More Minister of Nova Scotia Labour and Advanced Education 5151 Terminal Road, 6th Floor Halifax, Nova Scotia B3J 2T8 Dear Minister

More information

NOVA SCOTIA SECURITIES COMMISSION

NOVA SCOTIA SECURITIES COMMISSION NOVA SCOTIA SECURITIES COMMISSION COMPANION POLICY 45-5O1CP TO RULE 45-501 STATUTORY LIABILITY FOR MISREPRESENTATIONS IN AN OFFERING MEMORANDUM UNDER CERTAIN EXEMPTIONS FROM THE PROSPECTUS REQUIREMENT

More information

Nova Scotia Utility and Review Board. Sections 3-6

Nova Scotia Utility and Review Board. Sections 3-6 Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S. 1989, c.380, as amended - and - IN THE MATTER OF an Application by Nova Scotia Power Incorporated for Approval of

More information

NOVA SCOTIA SECURITIES COMMISSION RULE (AMENDMENT) MUTUAL FUNDS -AND- AMENDMENTS TO NATIONAL INSTRUMENT AND-

NOVA SCOTIA SECURITIES COMMISSION RULE (AMENDMENT) MUTUAL FUNDS -AND- AMENDMENTS TO NATIONAL INSTRUMENT AND- NOVA SCOTIA SECURITIES COMMISSION RULE 81-1 02 (AMENDMENT) MUTUAL FUNDS AMENDMENTS TO NATIONAL INSTRUMENT 81-1 02 MUTUAL FUNDS -AND- -AND- CHANGES TO COMPANION POLICY 81-1 O2CP TO NATIONAL INSTRUMENT 81-1

More information

APPLICABLE FINAL TERMS

APPLICABLE FINAL TERMS APPLICABLE FINAL TERMS 16 September 2014 ÍSLANDSBANKI HF. Issue of ISK 1,140,000,000 Inflation linked Equal Principal Payment Covered Bonds including Covered Bonds with one payment of principal on maturity

More information

Submission of ixbrl Financial Statements as part of Corporation Tax Returns

Submission of ixbrl Financial Statements as part of Corporation Tax Returns Submission of ixbrl Financial Statements as part of Corporation Tax Returns Document last updated July 2018. This instruction provides details of the obligations of certain Corporation Tax (CT) filers

More information

SUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS

SUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS Filed: September, 006 EB-00-00 Page of 7 SUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS 6 7 8 9 0 This exhibit identifies chronologically, in Tables through below, Board directives

More information

Nova Scotia Utility and Review Board. Section 2

Nova Scotia Utility and Review Board. Section 2 Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S. 1989, c.380, as amended - and - IN THE MATTER OF an Application by Nova Scotia Power Incorporated for Approval of

More information

Before the Minnesota Public Utilities Commission State of Minnesota. Docket No. E002/GR Exhibit (LRP-2) Decoupling and Sales True-Up

Before the Minnesota Public Utilities Commission State of Minnesota. Docket No. E002/GR Exhibit (LRP-2) Decoupling and Sales True-Up Rebuttal Testimony and Schedule Lisa R. Peterson Before the Minnesota Public Utilities Commission State of Minnesota In the Matter of the Application of Northern States Power Company for Authority to Increase

More information

DECISION 2018 NSUARB 171 M08547 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. - and -

DECISION 2018 NSUARB 171 M08547 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. - and - DECISION 2018 NSUARB 171 M08547 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT - and - IN THE MATTER OF AN APPLICATION by TD INSURANCE GROUP for approval to modify its rates and

More information

Quarterly Management Report. First Quarter 2010

Quarterly Management Report. First Quarter 2010 Quarterly Management Report First Quarter 2010 INTERIM MANAGEMENT DISCUSSION and ANALYSIS For the Three Months Ended March 31, 2010 This interim Management Discussion and Analysis ( MD&A ) dated April

More information

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and BRITISH C OLUMBIA U TILITIES C OMMISSION O RDER NUMBER C-10-07 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Clarke Inc. Corporate Presentation. July 3, 2014

Clarke Inc. Corporate Presentation. July 3, 2014 Clarke Inc. Corporate Presentation July 3, 2014 Forward-Looking Statements This document may contain or refer to certain forward-looking statements relating, but not limited to, Clarke's expectations,

More information

Decision ATCO Utilities. Corporate Cost Allocation Methodology. September 20, 2010

Decision ATCO Utilities. Corporate Cost Allocation Methodology. September 20, 2010 Decision 2010-447 Corporate Cost Allocation Methodology September 20, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-447: Corporate Cost Allocation Methodology Application No. 1605473 Proceeding ID. 306

More information

THE DEFERRAL ACCOUNT BALANCES APPLICATIONS

THE DEFERRAL ACCOUNT BALANCES APPLICATIONS Before the Alberta Energy and Utilities Board in THE DEFERRAL ACCOUNT BALANCES APPLICATIONS Deferral Accounts Carrying Cost Evidence of William J. Demcoe Willbren & Co. Ltd. John D. McCormick J. D. McCormick

More information

Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows

Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows (This Indian Accounting Standard includes paragraphs set in bold type and plain type, which have equal authority. Paragraphs in bold type indicate

More information

STATE OF NEW HAMPSHIRE. In the Year of Our Lord Two Thousand Fifteen

STATE OF NEW HAMPSHIRE. In the Year of Our Lord Two Thousand Fifteen Proposed Amendment to SB 221 March 9, 2015 Draft STATE OF NEW HAMPSHIRE In the Year of Our Lord Two Thousand Fifteen AN ACT relative to electric rate reduction financing Be it Enacted by the Senate and

More information

Filing Guidelines for Ontario Power Generation Inc.

Filing Guidelines for Ontario Power Generation Inc. Ontario Energy Board Commission de l énergie de l Ontario EB-2009-0331 Filing Guidelines for Ontario Power Generation Inc. Setting Payment Amounts for Prescribed Generation Facilities Issued: July 27,

More information

Second Quarter. Third Quarter 2012

Second Quarter. Third Quarter 2012 Second Quarter 2014 Third Quarter 2012 Dear Shareholder: Fortis achieved second quarter net earnings attributable to common equity shareholders of $47 million, or $0.22 per common share, compared to $54

More information

MEMORANDUM. CAFR Changes

MEMORANDUM. CAFR Changes MEMORANDUM DATE: February 2, 2015 TO: Members of the Board of Retirement FROM: Brenda Shott, Assistant CEO, Finance and Internal Operations SUBJECT: GASB 67/68 Update Recommendation: Receive and file.

More information

HD Supply Holdings, Inc. Announces Fiscal 2016 Third-Quarter Results

HD Supply Holdings, Inc. Announces Fiscal 2016 Third-Quarter Results Investor Contact: Charlotte McLaughlin HD Supply Investor Relations 770-852-9100 InvestorRelations@hdsupply.com Media Contact: Quiana Pinckney, APR HD Supply Public Relations 770-852-9057 Quiana.Pinckney@hdsupply.com

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 23623-D01-2018 AltaGas Utilities Inc. 2017 Capital Tracker True-Up Application December 18, 2018 Alberta Utilities Commission Decision 23623-D01-2018 AltaGas Utilities Inc. 2017 Capital Tracker

More information

CEDIF OFFERING DOCUMENT

CEDIF OFFERING DOCUMENT 1a. How long will the application process take from the submission of the documents until receiving a letter of non-objection from the Director of Securities? The length of time varies widely between applicants

More information

Canadians Celebrate Tax Freedom Day on June 14

Canadians Celebrate Tax Freedom Day on June 14 June 2008 Market solutions to public policy problems Canadians Celebrate Tax Freedom Day on June 14 It is nearly impossible for ordinary Canadians to clearly know how much they really pay. Most Canadians

More information

Terms and conditions for warrants ( ) for the subscription of new shares in G5 Entertainment AB (publ.)

Terms and conditions for warrants ( ) for the subscription of new shares in G5 Entertainment AB (publ.) Terms and conditions for warrants (2015-2017) for the subscription of new shares in G5 Entertainment AB (publ.) The English version is an office translation of the Swedish version. In case of any inconsistency,

More information

FEDERAL TAX CERTIFICATE. Dated as of February 15, 2012 UNIFIED SCHOOL DISTRICT NO. 261, SEDGWICK COUNTY, KANSAS (HAYSVILLE)

FEDERAL TAX CERTIFICATE. Dated as of February 15, 2012 UNIFIED SCHOOL DISTRICT NO. 261, SEDGWICK COUNTY, KANSAS (HAYSVILLE) Gilmore & Bell, P.C. 01/17/2012 FEDERAL TAX CERTIFICATE Dated as of February 15, 2012 OF UNIFIED SCHOOL DISTRICT NO. 261, SEDGWICK COUNTY, KANSAS (HAYSVILLE) $2,225,000* GENERAL OBLIGATION REFUNDING BONDS

More information

REPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 2011

REPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 2011 REPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 211 Pension Regulation Division PO Box 2531 Halifax, Nova Scotia B3J 3N5 September

More information

Available In all territory served by the Company in the State of Wyoming.

Available In all territory served by the Company in the State of Wyoming. Available In all territory served by the Company in the State of Wyoming. First Revision of Sheet No. 95-1 Canceling Original Sheet No. 95-1 Applicable This Schedule shall be applicable to all retail tariff

More information

CONTENTS. Preface I-5 Foreword I-7 INTRODUCTION TO THE REVISED SCHEDULE VI TO THE COMPANIES ACT, 1956

CONTENTS. Preface I-5 Foreword I-7 INTRODUCTION TO THE REVISED SCHEDULE VI TO THE COMPANIES ACT, 1956 CONTENTS Preface I-5 Foreword I-7 1 INTRODUCTION TO THE REVISED SCHEDULE VI TO THE COMPANIES ACT, 1956 1.1 Presentation principles of corporate financial statements 1 1.1.1 Revised Schedule VI in the framework

More information

Returning Prolific Gold Mining Camp To Profitability JULY 2014 TSX / AIM: KGI

Returning Prolific Gold Mining Camp To Profitability JULY 2014 TSX / AIM: KGI Returning Prolific Gold Mining Camp To Profitability JULY 2014 KIRKLAND LAKE GOLD INC. CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS Cautionary Note Regarding Forward Looking Statements This presentation

More information

Killam Apartment REIT Investor Presentation November 2017

Killam Apartment REIT Investor Presentation November 2017 Killam Apartment REIT Investor Presentation November 2017 Cautionary Statement This presentation may contain forward-looking statements with respect to Killam Apartment REIT and its operations, strategy,

More information

Provincial Pre-Budget Submission

Provincial Pre-Budget Submission Provincial Pre-Budget Submission January 21st, 2009 1 EXECUTIVE SUMMARY The following pre-budget submission outlines advocacy areas for the Halifax Chamber of Commerce that are Provincial in scope. Based

More information

ALBERTA ENERGY AND UTILITIES BOARD

ALBERTA ENERGY AND UTILITIES BOARD re: CANADIAN WESTERN NATURAL GAS COMPANY LIMITED In the matter of an application by Canadian Western Natural Gas Company Limited for approval of a 199511996 winter period Gas Cost Recovery Rate and a 1996

More information