1 DECISION 2016 NSUARB 42 M07215 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT IN THE MATTER OF AN APPLICATION for approval of NOVA SCOTIA POWER INC. S pre-tax WEIGHTED AVERAGE COST OF CAPITAL and ALLOWANCE FOR FUNDS USED DURING CONSTRUCTION RATES BEFORE: Roberta J. Clarke, Q.C., Panel Chair KulvinderS. Dhillon, P.Eng., Member Murray E. Doehler, CPA, CA, P.Eng., Member APPLICANT: NOVA SCOTIA POWER INC. Brian Curry, LL.B. INTERVENORS: CONSUMER ADVOCATE John Merrick, Q.C. William Mahody, Q.C. SMALL BUSINESS ADVOCATE E.A. Nelson Blackburn, Q.C. INDUSTRIAL GROUP Nancy G. Rubin, Q.C. Maggie A. Stewart, LL.B. FINAL SUBMISSIONS: February 26, 2016 DECISION DATE: April 12, 2016 DECISION: The Board establishes the method for the calculation of annual WACC and AFUDC rates.
2 -2- I INTRODUCTION [1] This is a decision of the Nova Scotia Utility and Review Board ( Board ) respecting an application ( Application ) by Nova Scotia Power Inc. ( NSPI ) for approval of its pre-tax Weighted Average Cost of Capital ( WACC ) and Allowance for Funds Used During Construction ( AFUDC ) rates. This Application was made on December 18, 2015, under the Public Utilities Act, R.S.N.S. 1989, c. 380 as amended ( Act ). [2] A notice of the proceeding was sent to those parties who expressed an interest in the Annual Capital Expenditure ( ACE ) Plan application for 2016, filed on November 12,2015. Notices of Intervention were filed by the Consumer Advocate ( CA ); the Small Business Advocate ( SBA ); and the Industrial Group. A timeline was established to accommodate Information Requests ( IRs ) and the filing of evidence by the formal intervenors. The Industrial Group, the SBA, and Board staff submitted IRs to which responses were received by January 27, On February 5, 2016, the CA and the SBA both confirmed that they would not be submitting evidence. A letter from NSPI, dated February 26, 2016, stated it would not be submitting rebuttal evidence. II BACKGROUND [3] The AFUDC represents the cost of financing the construction of plant and equipment. NSPI is allowed to include the financing costs in the value of the related plant and equipment. Once NSPI begins using the asset, AFUDC accumulation stops and its value is transferred into the Regulated Rate Base. Regulated Rate Base is the value of approved capital assets, construction work in progress, and certain other deferred expenses that will be recovered in the power rates.
3 -3- [4] In the 2013 ACE Plan Decision, the Board noted that NSPI had been charging an AFUDC rate without specific approval and ordered NSPI to use the rate that had been approved in the last general rate application ( GRA ). This rate was also used for the 2014 ACE Plan. In the 2015 ACE Plan proceeding, NSPI argued that adjustments were necessary to the AFUDC rate to match the cost actually being incurred. The Board agreed and reduced the rate to 7.19% only for AFUDC. [5] The third item in the Preliminary Issues List for the 2016 ACE Plan was 2016 AFUDC rate for capital purposes. In response to this issue, NSPI noted: On October 10, 2015 the Board directed NS Power to make a number of revisions in connection with its 2015 ACE Stakeholder Engagement Report (M06963), including the following: With reference to Section 8.0, the Board does not consider that any approval of AFUDC should be taken as approval of WACC for other purposes. Therefore, NSPI is to remove the last sentence from the first paragraph, i.e.: The AFUDC rate in the ACE Plan will be the updated projection of NS Power s WACC for the upcoming year. [NSPI Letter to Board, December 8, 2015, pp. 1-2] [6] On December 8, 2015, NSPI withdrew its request for approval of the AFUDC rate as part of the 2016 ACE Plan proceeding. A separate Application was made on December 18, 2015, for approval of both the AFUDC and WACC rates. The Application also requested approval of an interim rate, effective January 1,2016, pending the Board s decision. The Board responded as follows: The Board notes that no request for interim approval of an AFUDC rate was made in the 2016 ACE Plan application. The Board notes that this request now comes less than one month before the proposed effective date for the interim rate, i.e., January 1, The Board is not prepared to approve an interim rate, but is agreeable to holding a separate process to consider NSPI s application for approval of the single AFUDC/WACC rate, as requested. [Board Letter to NSPI, December 18, 2015, p. 1]
4 -4- [7] NSPI also uses the WACC rate for regulatory accounts. The regulatory accounts for 2015 were: Fuel Adjustment Mechanism 2012 Fixed Cost recovery Demand Side Management Streetlight Stranded Asset Renewable to Retail [Exhibit N-3, Response IR-5, p. 2] III APPLICATION [8] The Board generally approves AFUDC and WACC rates as a part of a GRA by NSPI. These rates are calculated on the basis of equity thickness, rate of return and the cost of long term and short term debt projected for the test years. The Board, in reviewing the current Application by NSPI, has used similar principles as it would have used during a GRA review. [9] The Application presented the calculation as follows: Nova Scotia Power Inc. Estimated Average Capital and Cost of Capital Years Ended December 31st Millions of Dollars 2018 Financial Outlook (1) 3 Opening 4 5 Estimated Cost of Capital 6 (2) Closing (3) Average Capital <4) Capital Ratio (5) Cost Pre-tax Factor (6) Cost After-tax Factor (7) Weighted Pre-tax Cost (8) Weighted After-tax Cost 7 Short-term debt $77.2 $106,3 $ o 2 56 o I 77% G 06Go 0 04 o 8 9 Long-term debt 2, , , l o 6.22*o 4 32*o 3 61 o Total debt $2,287.7 $2,316.2 $2, f,o 8 78 o 6 09*o 3 67*o 2.55 o Common equity 1, , , *o 9 00*0 3 56Cro 3 56 o Total $3,786.0 $3,826.2 $3, % 7.23% 6.11% Notes: 18 I) Figures presented reflect whole numbers which may cause $0 IM in rounding differences on some line items. 19 2) Pre-tax equity cost excludes the income tax gross-up factor 20 3) Average capital reflects average of year-end balances [Exhibit N-1, Appendix A, p. 1]
5 -5- [10] NSPI stated that this method is the same as used in past GRAs: In order to avoid the confusion of having separate rates for capital and non-capital deferrals and separate approval processes for each, NS Power requests approval of a single WACC/AFUDC rate of 7.23 percent, for both capital and non-capital matters effective as of the date of approval. The WACC/AFUDC rate would remain in place until such time as a new rate is approved by the Board. [Exhibit N-1,p.3] [11] In addition, for future adjustment, NSPI stated: Depending on the materiality of the changes in the estimated WACC rates, NS Power proposes that it would apply to the Board for any future adjustments to WACC and AFUDC around the same time as it applied for approval of its Annual Capital Expenditure Plan. In the absence of such an application, the previously approved rates would continue to apply. [Exhibit N-3, Response IR-6, p. 1] [12] No evidence was filed to challenge either the method of calculating WACC or the quantum of the various components. IV ANALYSIS AND FINDINGS a) WACC and AFUDC Formula [13] The AFUDC rate has historically been based upon the calculation of the WACC rate. In a GRA the two rates are set to be the same and are used to establish the financing cost portion of revenue requirement for rate making purposes. The Board finds that this relationship should be maintained. [14] The Board notes that NSPI has calculated WACC in accordance with the following formulae: WACC = CRst x Rst + CRlt x Rlt + CRe x Re and CRst + CRlt + CRe = RRB
6 -6- where: CRst = Capital Ratio for Short Term Debt CRlt= Capital Ratio for Long Term Debt CRe = Capital Ratio for Equity Rst = Short Term borrowing rate rounded to one basis point Rlt = Cost of Long Term Debt, presented as a rate, rounded to one basis point Re = Equity borrowing rate rounded to one basis point RRB = Regulated Rate Base b) Regulated Rate Base [15] In the 2012 GRA (2011 NSUARB 184), the Board accepted a Settlement Agreement which included a provision on the adjustment of Regulated Rate Base. Since that time, the Rate Base has changed to include such items as capital additions, as authorized through the ACE plan and other approval processes, and reduced by depreciation as well as changes in the other elements. [16] In response to Exhibit N-5, IR-8 Revised, NSPI provided the details of the general ledger balances that are built into the Regulated Rate Base. NSPI, in calculating this regulated rate base said: Regulated Capital spend excludes projects that have received special direction from the Board as they do not make up part of Regulated Capitalization. [Exhibit N-5, IR-8 Revised, Attachment 1, p.5] [17] No Intervenors filed evidence to challenge NSPI s calculations of the Regulated Rate Base as being $3,806.1 million for 2016.
7 -7- [18] The Board accepts NSPI s assurances that it has not included the cost of projects which the Board has not approved. For the purpose of this Application, the Board accepts NSPI s calculation of the average Regulated Rate Base as $3,806.1 million for c) Capital Ratio i) Equity Ratio [19] In 2015 NSPI had redeemed all of its preferred equity. The equity component now consists of common shares and retained earnings. In the Application, NSPI proposes: For purposes of determining WACC in 2016, NS Power proposes to utilize its projected common equity thickness of 39.5 percent... [Exhibit N-1, p. 8] [20] NSPI explained that increasing this ratio from that used in the GRA was to reflect the present financial position. This, according to NSPI, is within the range approved by the Board in the 2012 GRA: Return on Equity/Capital Structure 7. Treatment as follows: a. Capital Structure - rates will be set on 37.5% equity, NSPI may use a maximum actual equity of 40%, actual average equity will be used to calculate return on equity results. [Exhibit N-2, p. 1] [21] Since the 2012 GRA, the Board s currently approved method to calculate the revenue requirement uses an equity thickness of 37.5%.
8 -8- [22] The Board has considered NSPI s request and is not prepared to set a ratio that is different from that used in determining the revenue requirement in a GRA. The Board finds, for the purpose of calculating WACC for 2016, the equity percentage should be the same as had been established in the 2012 GRA. NSPI is directed to adjust the Equity Ratio to ii) Long Term Debt Ratio [23] The majority of the financing for the Regulated Rate Base comes from Long Term Debt, which by definition has maturities greater than one year. NSPI stated: NS Power can also access the debt capital markets and currently has a long-term debt portfolio of $2,060 million as of October 31, 2015, consisting of medium term notes and debentures. [Exhibit N-1, p. 6] [24] Over the past three years NSPI has accessed debt capital markets, borrowing tranches of $250 million, $300 million and $175 million, all with terms of 30 years. [25] In determining total Long Term Debt, NSPI included a forecasted issue planned for December, There are no repayments or new debt issues planned for The average of the Long Term Debt as calculated by NSPI is $2,210.3 million for [26] The Board considers the amount of Long Term Debt issued by NSPI can be easily predicted and occurs in large amounts. In keeping with the calculation of
9 -9- Regulated Rate Base, the amount for Long Term Debt will be the average of the opening and projected closing balances for the current year. This is the equivalent of adding one half of the net projected change in Long Term Debt to the balance as at the end of the previous year. This is the method used by NSPI in this Application. [27] The Board finds that the Long Term Debt Capital Ratio should be the amount of the Long Term Debt as calculated above divided by the Regulated Rate Base. [28] As calculated in the Application, the Board accepts the projected Long Term Debt of $2,210.3 million to be divided by the Regulated Rate Base of $3,806.1 million resulting in a Long Term Debt Ratio of for iii) Short Term Debt Ratio [29] NSPI s Short Term Debt is obtained, largely, through a commercial paper program. As explained by the Company: Commercial Paper is short-term debt issued to investors with maturities of anywhere from a day to less than one year. [ibid, p. 6] [30] The Company explained Commercial Paper is the lowest cost form of borrowing and: Participating in this market provides NS Power with flexibility in managing its cash flow, typically rolling over amounts of $20-$25 million daily. [ibid, p. 6] [31] The Board finds that it is prudent for NSPI to have access to short term financing for its various cash flow needs. The Board expects NSPI to manage its cash flow and financing structure in a manner that provides the lowest cost to its rate payers.
10 -10- [32] The Board finds the Short Term Debt Capital Ratio is the difference between one and the combined ratio financed by Equity and Long Term Debt. [33] As a result of the findings on Equity and Long Term Debt, the Short Term Ratio is for 2016 ( = 0.044). d) Rates i) Equity [34] In the Application, NSPI proposed using a Return on Equity of 9% which it said is:... in the middle of the UARB approved reasonable return on equity band of 8.75 per cent to 9.25 per cent and on which rates are set. [ibid, p. 8] [35] In the last GRA, the Board used a return on equity of 9% for the purposes of calculating the rate used in determining the revenue requirement. [36] The Board accepts NSPI s request to use a return of 9% on the equity component of the WACC for ii) Cost of Long Term Debt [37] The projected Cost of Long Term Debt is calculated by using the actual interest costs on the previous year s issued debt that remains outstanding at the end of the current year, plus the cost of any changes. There are no maturities or planned redemptions to occur in the current year. NSPI, when asked if any planned restructuring is to occur in 2016, stated:
11 -11 - Redeeming or buying back long-term debt issues is done at current market rates. For all existing debt which has a higher coupon relative to current rates, the premium required in order to redeem the issue when added to the principal of the original issue would eliminate any benefit available from a reduced coupon on the new debt security. As a result, no such analysis has been completed. [Exhibit N-3, Response IR-2, pp. 1-2] [38] When asked what rates may be for a new 30 year Long Term Debt issue, NSPI responded that they:...would be in a range of 4.30% to 4.50% should we require it. [Exhibit N-6, Revised Response IR-2(a), p. 1] [39] NSPI stated that the last three borrowings on the capital markets were at 4.15%, 4.50% and 3.61% respectively. [40] In calculating the Cost of Long Term Debt Rate, NSPI used a forecasted new debt rate of 4.80% [Exhibit N-3, IR-2, Attachment 1] for the December, 2015 issue. [41] NSPI calculated the total cost of long term debt, including interest and other debt related charges to be $137,387,784 for It was presented, in this Application, as a blended rate of 6.22%. [42] The Board directs NSPI to use the actual cost of the December, 2015 issue in determining the total Cost of Long Term Debt in the Compliance Filing. iii) Short Term Debt Interest Rate [43] NSPI has used a projected rate of 2.56% for the Short Term Debt interest rate in this Application. [44] In projecting the Short Term Debt interest rate, NSPI:
12 relies on forecasts of major financial institutions to develop its market projections. These independent external financial forecasts provide NS Power with an unbiased estimate of future market rates.... [Exhibit N-4, Response IR-1 (b), p. 1] [45] Historically, the projections have not proved accurate. The following table, prepared by the Board from information extracted from Exhibit N-3, IR-3, illustrates the variation: Projected Actual % 1.49% % 0.86% % 1.38% % 1.58% [46] There could be other possible short term interest projection models that may prove more accurate than that used by NSPI. However, it is important to be mindful of materiality in attempting to improve accuracy. As stated by NSPI:...a change of.01% in the WACC rate has a minor impact on results of the Company, approximately $10,000 on $100 million of capital over the course of a year.... [Exhibit N-3, Response IR-5, p. 1] [47] For example, if a short term debt interest rate of 1.00% were used, after taking into consideration the requested short term debt capital ratio, this would reduce the weighted pre-tax rate from 0.06% to 0.02%, as calculated by the Board. The difference of 0.04% would translate to a $40,000 adjustment per $100 million of capital to the financial statements of NSPI. [48] The Board notes that a difference of 0.04% in the rate of Short Term Debt is $40,000. The Board does not consider such a difference to be material for this Application. In future, the Board expects NSPI to develop a more accurate prediction model for the short term debt rate.
13 -13- [49] For the purposes of the calculation of the 2016 WACC, the Board accepts the use of 2.56% for the Short Term Debt interest rate. V CONCLUSION [50] The calculation of WACC/AFUDC is to be done in accordance with the principles outlined in this Decision. A Compliance Filing of the calculation is to be made on or before April 19, 2016, with intervenor comments on or before April 26, [51] The Board s Decision on this matter is only to determine the amount of capitalization of the financial elements for various accounts. It is not a supplement to, or support for, the determination of these financial elements in the calculation of revenue requirement in any future GRA. [52] NSPI is directed to file, annually, no later than November 30, the calculation of WACC/AFUDC, unless there is a general rate application in the same year, using the principles outlined in this Decision. [53] Upon receipt and acceptance of the Compliance Filing, the Board will issue an order accordingly. DATED at Halifax, Nova Scotia, this 12th day of April, Roberta? J. Clarki Kulvinder S. Dhillon Murray E. Doehler
DECISION 2016 NSUARB 201 M07703 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and -
DECISION 2016 NSUARB 201 M07703 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF the NOVA SCOTIA POWER INCORPORATED 2017-2019 Fuel Adjustment Mechanism
More informationDECISION 2018 NSUARB 190 M08921 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT
DECISION 2018 NSUARB 190 M08921 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT IN THE MATTER OF AN APPLICATION by ALLSTATE INSURANCE COMPANY OF CANADA for approval to modify its
More informationDECISION 2018 NSUARB 35 M08344 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and -
DECISION 2018 NSUARB 35 M08344 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION by HALIFAX REGIONAL WATER COMMISSION for an Order approving
More informationDECISION 2017 NSUARB 149 M07718 NOVA SCOTIA UTILITY AND REVIEW BOARD
DECISION 2017 NSUARB 149 M07718 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF the PUBLIC UTILITIES ACT and the MARITIME LINK ACT and the MARITIME LINK COST RECOVERY PROCESS REGULATIONS [lf\ - and
More informationIN THE MATTER OF THE PUBLIC UTILITIES ACT. -and-
DECISION 2014 NSUARB 144 M06247 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT -and- IN THE MATTER OF AN APPLICATION by EFFICIENCY NOVA SCOTIA CORPORATION for Approval of
More informationDECISION 2016 NSUARB 73 M07147 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. and -
DECISION 2016 NSUARB 73 M07147 NOVA SCOTIA UTILITY AND REVIEW BOARD {*Y f IN THE MATTER OF THE PUBLIC UTILITIES ACT and - IN THE MATTER OF AN APPLICATION by HALIFAX REGIONAL WATER COMMISSION for approval
More informationNova Scotia Utility and Review Board
Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S. 1989, c.380, as amended and IN THE MATTER OF A PROCEEDING Concerning Sales of Renewable Low Impact Electricity Generated
More informationThe following Statement of Compensation has been prepared in accordance with the Public Sector
NOVA SCOTIA UTILITY AND REVIEW BOARD Please Note: The following Statement of Compensation has been prepared in accordance with the Public Sector Compensation Disclosure Act (PSCDA). This compensation information
More informationDECISION 2013 NSUARB 154 M05419 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MARITIME LINK ACT. -and-
DECISION 2013 NSUARB 154 M05419 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MARITIME LINK ACT -and- IN THE MATTER OF AN APPLICATION by NSP MARITIME LINK INCORPORATED for approval of the Maritime
More informationFor further assistance please feel free to contact the Board.
Please Note: The following Statement of Compensation has been prepared in accordance with the Public Sector Compensation Disclosure Act which requires inclusion of actual amounts paid during the year when
More informationNova Scotia Utility and Review Board
Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S., c.0, as amended -and- IN THE MATTER OF A Proceeding Concerning Sales of Renewable Low Impact Electricity Generated
More informationDECISION 2016 NSUARB 33 M06214 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE ELECTRICITY ACT. - and -
DECISION 2016 NSUARB 33 M06214 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE ELECTRICITY ACT - and - IN THE MATTER OF a hearing concerning the Sale of Renewable Low-Impact Electricity generated
More informationRoberta J. Clarke, Q.C, Member
DECISION 2016 NSUARB 149 M07537 M07541 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT - and - IN THE MATTER OF APPLICATIONS by ZENITH INSURANCE COMPANY, NORTHBRIDGE PERSONAL INSURANCE
More informationDECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT
DECISION 2017 NSUARB 101 M07809 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION of the MUNICIPALITY OF THE COUNTY OF PICTOU, on behalf
More informationAltaGas Utilities Inc.
Decision 23898-D01-2018 2019 Annual Performance-Based Regulation Rate Adjustment Filing December 20, 2018 Alberta Utilities Commission Decision 23898-D01-2018 2019 Annual Performance-Based Regulation Rate
More informationPart II Regulations under the Regulations Act
Part II Regulations under the Regulations Act Printed by the Queen s Printer Halifax, Nova Scotia Vol. 34, No. 17 August 13, 2010 Contents Act Reg. No. Page Gaming Control Act Nova Scotia Gaming Foundation
More informationNOVA SCOTIA UTILITY AND REVIEW BOARD THE PUBLIC UTILITIES ACT REDACTED INFORMATION REQUESTS
M0 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT IN THE MATTER OF: -anda hearing into Nova Scotia Power Incorporated s 1-1 Fuel Stability Plan and Base Cost of Fuel Reset
More informationDECISION 2018 NSUARB 145 M08678 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT
DECISION 2018 NSUARB 145 M08678 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT IN THE MATTER OF AN APPLICATION by THE DOMINION OF CANADA GENERAL INSURANCE COMPANY for approval
More informationNEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 58(2014)
NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 58(2014) 1 IN THE MATTER OF the Electrical Power 2 Control Act, 1994, SNL 1994, Chapter E-5.1 (the 3
More informationDECISION 2017 NSUARB 65 M07903 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. -and-
DECISION 2017 NSUARB 65 M07903 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT -and- IN THE MATTER OF AN APPLICATION by CAA INSURANCE COMPANY for approval to modify its rates and
More informationDECISION 2018 NSUARB 211 M08949 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. -and- THE WAWANESA MUTUAL INSURANCE COMPANY
DECISION 2018 NSUARB 211 M08949 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT -and- IN THE MATTER OF AN APPLICATION by THE W AW AN ESA MUTUAL INSURANCE COMPANY for approval to
More informationPart II Regulations under the Regulations Act
Part II Regulations under the Regulations Act Printed by the Queen s Printer Halifax, Nova Scotia Vol. 39, No. 10 May 15, 2015 Contents Act Reg. No. Page Pension Benefits Act Pension Benefits Regulations
More informationMunicipal Debenture Process
Section 3.5 Municipal Debenture Process Introduction The Municipal Government Act requires the provincial approval of municipal capital borrowing because if a municipality is unable to finance its debt,
More informationBefore the Nova Scotia Utility and Review Board
Before the Nova Scotia Utility and Review Board In The Matter of The Public Utilities Act, R.S.N.S 1, c0, as amended And In The Matter of An Application by EfficiencyOne for approval of a Supply Agreement
More informationIN THE MATTER OF THE PUBLIC UTILITIES ACT. -and-
DECISION 2014 NSUARB 84 M06030 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT -and- IN THE MATTER OF AN APPLICATION of the MUNICIPALITY OF THE COUNTY OF KINGS on behalf
More informationNOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE CONSUMER PROTECTION ACT. - and-
SUPPLEMENTARY DECISION NSUARB-PD-10-01 2011 NSUARB 58 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE CONSUMER PROTECTION ACT - and- IN THE MATTER OF A HEARING respecting certain aspects of the
More informationDECISION 2017 NSUARB 188 M08325, M08326 and M08327 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT.
DECISION 2017 NSUARB 188 M08325, M08326 and M08327 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT - and - IN THE MATTER OF APPLICATIONS by CO-OPERATORS GENERAL INSURANCE COMPANY,
More informationDECISION 2018 NSUARB 68 M08520 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. - and -
DECISION 2018 NSUARB 68 M08520 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT - and - IN THE MATTER OF AN APPLICATION by FACILITY ASSOCIATION for approval to modify its rates for
More informationFinal Collaborative Report. DSM Administrative Issues Analysis
Demand Side Management Final Collaborative Report DSM Administrative Issues Analysis Volume I of III A Joint Report of NSPI, UARB Staff and Consultants January 1, 00 1 1 1 1 1 1 1 1 0 1 0 TABLE OF CONTENTS
More informationBOARD OF COMMISSIONERS OF PUBLIC UTILITIES ORDER NO. P.U. 17(2012)
Newfoundland & Labrador BOARD OF COMMISSIONERS OF PUBLIC UTILITIES ORDER NO. P.U. 17(2012) IN THE MATTER OF the Electrical Power Control Act, 1994, SNL 1994, Chapter E-5.1 (the "EPCA") and the Public Utilities
More informationAltaGas Utilities Inc.
Decision 2013-465 2014 Annual PBR Rate Adjustment Filing December 23, 2013 The Alberta Utilities Commission Decision 2013-465: 2014 Annual PBR Rate Adjustment Filing Application No. 1609923 Proceeding
More informationFACE OF POVERTY CONSULTATION A Faith-Based Coalition Working to Eliminate Poverty
FACE OF POVERTY CONSULTATION A Faith-Based Coalition Working to Eliminate Poverty Brief to the Nova Scotia Utility and Review Board 2015 Hearings on Payday Loans Basic Principles All major religions have
More informationRESERVE MEMBER Group Insurance Book
RESERVE MEMBER Group Insurance Book This Plan Description booklet is provided solely for the purpose of explaining the principles of the Plan. The booklet does not create or confer any contractual or other
More informationNEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018)
NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public
More informationEPCOR Energy Alberta GP Inc.
Decision 20633-D01-2016 EPCOR Energy Alberta GP Inc. 2016-2017 Regulated Rate Tariff Application December 20, 2016 Alberta Utilities Commission Decision 20633-D01-2016 EPCOR Energy Alberta GP Inc. 2016-2017
More informationInvestor Presentation. TSX:HLC HLC.DB December 18, 2018
Investor Presentation TSX:HLC HLC.DB December 18, 2018 Forward-Looking Statements This corporate presentation contains forward-looking information within the meaning of applicable securities laws. Forward-looking
More informationRe: Exposure Draft on Pension Accounting and Financial Reporting by Employers
October 4, 2011 Director of Research and Technical Activities Project No. E-34 Governmental Accounting Standards Board 401 Merritt 7, PO Box 5116 Norwalk, CT 06856-5116 director@gasb.org Re: Exposure Draft
More informationEPCOR Distribution & Transmission Inc.
Decision 22603-D01-2017 June 23, 2017 Alberta Utilities Commission Decision 22603-D01-2017 Proceeding 22603 June 23, 2017 Published by the: Alberta Utilities Commission Fifth Avenue Place, Fourth Floor,
More informationBOARD OF COMMISSIONERS OF PUBLIC UTILITIES
Newfoundland & Labrador BOARD OF COMMISSIONERS OF PUBLIC UTILITIES IN THE MATTER OF A GENERAL RATE APPLICATION FILED BY NEWFOUNDLAND POWER INC. DECISION AND ORDER OF THE BOARD ORDER NO. P.U. 18(2016) BEFORE:
More informationDecision The ATCO Utilities. Corporate Costs. March 21, 2013
Decision 2013-111 Corporate Costs March 21, 2013 The Alberta Utilities Commission Decision 2013-111: Corporate Costs Application No. 1608510 Proceeding ID No. 1920 March 21, 2013 Published by The Alberta
More informationORDER 2015 NSUARB 263 M07169 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT. - and -
ORDER 2015 NSUARB 263 M07169 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF THE REQUEST BY FOR APPROVAL OF THE MONTHLY CUSTOMER CHARGE FOR THE WHOLESALE
More informationDecision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast
Decision 20497-D01-2016 FortisAlberta Inc. 2014 PBR Capital Tracker True-Up and 2016-2017 PBR Capital Tracker Forecast February 20, 2016 Alberta Utilities Commission Decision 20497-D01-2016 FortisAlberta
More informationDECISION 2016 NSUARB 113 M07428 and M05042 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MOTOR CARRIER ACT.
DECISION 2016 NSUARB 113 M07428 and M05042 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MOTOR CARRIER ACT - and - IN THE MATTER OF THE APPLICATIONS of MURPHY SAILING TOURS LIMITED to amend
More informationATCO Electric Ltd. Stage 2 Review of Decision D ATCO Electric Ltd Transmission General Tariff Application
Decision 22483-D01-2017 Stage 2 Review of Decision 20272-D01-2016 2015-2017 Transmission General Tariff Application December 6, 2017 Alberta Utilities Commission Decision 22483-D01-2017 Stage 2 Review
More information,(rv eterw. Gurnham, Q.C., Chair
ORDER M06733 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF AN APPLICATION for Approval of a Supply Agreement for electricity efficiency and conservation
More informationQ FINANCIAL REPORT
Q3 2017 FINANCIAL REPORT Table of Contents 02 Section 1: Corporate Overview 04 Section 2: Financial Highlights and Recent Developments 10 Section 3: Consolidated Financial Results 13 Section 4: Segmented
More informationAltaLink Investment Management Ltd. And SNC Lavalin Transmission Ltd. et al.
Decision 3529-D01-2015 AltaLink Investment Management Ltd. And SNC Lavalin Transmission Ltd. et al. Proposed Sale of AltaLink, L.P Transmission Assets and Business to Mid-American (Alberta) Canada Costs
More informationAttachment B: Examples. Auction Notice California Cap-and-Trade Program and Québec Cap-and-Trade System Joint Auction of Greenhouse Gas Allowances
Attachment B: Examples Auction Notice California Cap-and-Trade Program and Québec Cap-and-Trade System Joint Auction of Greenhouse Gas Allowances This attachment provides information and examples of how
More informationNEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2018)
NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public
More informationPRUDENTIAL PLC 6,000,000,000. Medium Term Note Programme. Series No: 37. Tranche No: 1
PRUDENTIAL PLC 6,000,000,000 Medium Term Note Programme Series No: 37 Tranche No: 1 USD 750,000,000 4.875 per cent. Fixed Rate Undated Tier 2 Notes Issued by PRUDENTIAL PLC Issue Price: 100% The date of
More informationDecision ATCO Gas General Rate Application Phase I Compliance Filing to Decision Part B.
Decision 2006-083 2005-2007 General Rate Application Phase I Compliance Filing to Decision 2006-004 August 11, 2006 ALBERTA ENERGY AND UTILITIES BOARD Decision 2006-083: 2005-2007 General Rate Application
More informationENMAX Power Corporation
Decision 22238-D01-2017 ENMAX Power Corporation 2016-2017 Transmission General Tariff Application December 4, 2017 Alberta Utilities Commission Decision 22238-D01-2017 ENMAX Power Corporation 2016-2017
More informationAuditor General of Nova Scotia
5161 George Street Royal Centre, Suite 400 Halifax, Nova Scotia B3J 1M7 Auditor General of Nova Scotia To the Board of Directors of the Nova Scotia Health Authority: Report on the Consolidated Financial
More informationDECISION 2015 NSUARB 64 M and- IN THE MATTER OF A HEARING respecting certain aspects of the Consumer Protection Act relating to payday loans
DECISION 2015 NSUARB 64 M06084 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE CONSUMER PROTECTION ACT -and- IN THE MATTER OF A HEARING respecting certain aspects of the Consumer Protection Act
More informationORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and
Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 ORDER NUMBER G-48-19 IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter
More informationATCO Gas and Pipelines Ltd. (South)
Decision 3421-D01-2015 Northeast Calgary Connector Pipeline January 16, 2015 The Alberta Utilities Commission Decision 3421-D01-2015: Northeast Calgary Connector Pipeline Application 1610854 Proceeding
More informationDECISION and Order E and Letter L-15-16
IN THE MATTER OF FortisBC Energy Inc. 2015 Price Risk Management DECISION and Order E-10-16 and Letter L-15-16 June 17, 2016 Before: D. A. Cote, Commissioner/Panel Chair B. A. Magnan, Commissioner R. D.
More informationFortisBC Inc. Annual Review of 2018 Rates Project No Final Order with Reasons for Decision
Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 February 13, 2018 Sent
More informationEvaluation of Financial Projections
Evaluation of Financial Projections Application to Amalgamate the Municipality of the County of Pictou, the Town of Pictou, the Town of New Glasgow, and the Town of Stellarton Levy Casey Carter MacLean
More informationSubmission of ixbrl Financial Statements as part of Corporation Tax Returns. Part 41A-03-01
Submission of ixbrl Financial Statements as part of Corporation Tax Returns Part 41A-03-01 Updated October 2017 This Instruction provides details of the obligations of certain Corporation Tax (CT) filers
More informationPOWER. WHENEVER. WHEREVER. We'll be there. HAND DELIVERED. November 23, 2018
WHENEVER. WHEREVER. We'll be there. NEWFOUNDLANO=t POWER A FORTIS COMPANY HAND DELIVERED November 23, 2018 Board of Commissioners of Public Utilities P.O. Box 2100 120 Torbay Road St. John's, NL A1A 5B2
More information2017 Earnings Webcast February 13, 2018
2017 Earnings Webcast February 13, 2018 Presenting Today Bob Rowe, President & CEO Brian Bird, Vice President & CFO Forward Looking Statements During the course of this presentation, there will be forward-looking
More informationREPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 2008
REPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 2008 February 19, 2009 The Honourable Mark Parent Minister of Labour and Workforce
More informationFORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS
FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS November 5, 2014 The following ( MD&A ) of FortisAlberta Inc. (the Corporation ) should be read in conjunction with the following: (i) the unaudited
More informationIRA Contribution Limits for 2018 Unchanged at $5,500 and $6,500; 401(k) Limits Do Change
Published Since 1984 ALSO IN THIS ISSUE IRA Contribution Limits for 2018 Page 1 IRA Contribution Deductibility Charts 2017 and 2018, Page 2 Roth IRA Contribution Charts for 2017 and 2018, Page 3 SEP and
More informationDECISION 2018 NSUARB 16 M08394 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT
DECISION 2018 NSUARB 16 M08394 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT IN THE MATTER OF AN APPLICATION by ECONOMICAL MUTUAL INSURANCE COMPANY for approval to modify its
More informationJanuary 12, Minimum Wage Review Committee Report
January 12, 2012 Minimum Wage Review Committee Report Honourable Marilyn More Minister of Nova Scotia Labour and Advanced Education 5151 Terminal Road, 6th Floor Halifax, Nova Scotia B3J 2T8 Dear Minister
More informationNOVA SCOTIA SECURITIES COMMISSION
NOVA SCOTIA SECURITIES COMMISSION COMPANION POLICY 45-5O1CP TO RULE 45-501 STATUTORY LIABILITY FOR MISREPRESENTATIONS IN AN OFFERING MEMORANDUM UNDER CERTAIN EXEMPTIONS FROM THE PROSPECTUS REQUIREMENT
More informationNova Scotia Utility and Review Board. Sections 3-6
Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S. 1989, c.380, as amended - and - IN THE MATTER OF an Application by Nova Scotia Power Incorporated for Approval of
More informationNOVA SCOTIA SECURITIES COMMISSION RULE (AMENDMENT) MUTUAL FUNDS -AND- AMENDMENTS TO NATIONAL INSTRUMENT AND-
NOVA SCOTIA SECURITIES COMMISSION RULE 81-1 02 (AMENDMENT) MUTUAL FUNDS AMENDMENTS TO NATIONAL INSTRUMENT 81-1 02 MUTUAL FUNDS -AND- -AND- CHANGES TO COMPANION POLICY 81-1 O2CP TO NATIONAL INSTRUMENT 81-1
More informationAPPLICABLE FINAL TERMS
APPLICABLE FINAL TERMS 16 September 2014 ÍSLANDSBANKI HF. Issue of ISK 1,140,000,000 Inflation linked Equal Principal Payment Covered Bonds including Covered Bonds with one payment of principal on maturity
More informationSubmission of ixbrl Financial Statements as part of Corporation Tax Returns
Submission of ixbrl Financial Statements as part of Corporation Tax Returns Document last updated July 2018. This instruction provides details of the obligations of certain Corporation Tax (CT) filers
More informationSUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS
Filed: September, 006 EB-00-00 Page of 7 SUMMARY OF BOARD DIRECTIVES AND UNDERTAKINGS FROM PREVIOUS PROCEEDINGS 6 7 8 9 0 This exhibit identifies chronologically, in Tables through below, Board directives
More informationNova Scotia Utility and Review Board. Section 2
Nova Scotia Utility and Review Board IN THE MATTER OF The Public Utilities Act, R.S.N.S. 1989, c.380, as amended - and - IN THE MATTER OF an Application by Nova Scotia Power Incorporated for Approval of
More informationBefore the Minnesota Public Utilities Commission State of Minnesota. Docket No. E002/GR Exhibit (LRP-2) Decoupling and Sales True-Up
Rebuttal Testimony and Schedule Lisa R. Peterson Before the Minnesota Public Utilities Commission State of Minnesota In the Matter of the Application of Northern States Power Company for Authority to Increase
More informationDECISION 2018 NSUARB 171 M08547 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT. - and -
DECISION 2018 NSUARB 171 M08547 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE INSURANCE ACT - and - IN THE MATTER OF AN APPLICATION by TD INSURANCE GROUP for approval to modify its rates and
More informationQuarterly Management Report. First Quarter 2010
Quarterly Management Report First Quarter 2010 INTERIM MANAGEMENT DISCUSSION and ANALYSIS For the Three Months Ended March 31, 2010 This interim Management Discussion and Analysis ( MD&A ) dated April
More informationIN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and
BRITISH C OLUMBIA U TILITIES C OMMISSION O RDER NUMBER C-10-07 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com TELEPHONE: (604) 660-4700 BC TOLL FREE:
More informationClarke Inc. Corporate Presentation. July 3, 2014
Clarke Inc. Corporate Presentation July 3, 2014 Forward-Looking Statements This document may contain or refer to certain forward-looking statements relating, but not limited to, Clarke's expectations,
More informationDecision ATCO Utilities. Corporate Cost Allocation Methodology. September 20, 2010
Decision 2010-447 Corporate Cost Allocation Methodology September 20, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-447: Corporate Cost Allocation Methodology Application No. 1605473 Proceeding ID. 306
More informationTHE DEFERRAL ACCOUNT BALANCES APPLICATIONS
Before the Alberta Energy and Utilities Board in THE DEFERRAL ACCOUNT BALANCES APPLICATIONS Deferral Accounts Carrying Cost Evidence of William J. Demcoe Willbren & Co. Ltd. John D. McCormick J. D. McCormick
More informationIndian Accounting Standard (Ind AS) 7 Statement of Cash Flows
Indian Accounting Standard (Ind AS) 7 Statement of Cash Flows (This Indian Accounting Standard includes paragraphs set in bold type and plain type, which have equal authority. Paragraphs in bold type indicate
More informationSTATE OF NEW HAMPSHIRE. In the Year of Our Lord Two Thousand Fifteen
Proposed Amendment to SB 221 March 9, 2015 Draft STATE OF NEW HAMPSHIRE In the Year of Our Lord Two Thousand Fifteen AN ACT relative to electric rate reduction financing Be it Enacted by the Senate and
More informationFiling Guidelines for Ontario Power Generation Inc.
Ontario Energy Board Commission de l énergie de l Ontario EB-2009-0331 Filing Guidelines for Ontario Power Generation Inc. Setting Payment Amounts for Prescribed Generation Facilities Issued: July 27,
More informationSecond Quarter. Third Quarter 2012
Second Quarter 2014 Third Quarter 2012 Dear Shareholder: Fortis achieved second quarter net earnings attributable to common equity shareholders of $47 million, or $0.22 per common share, compared to $54
More informationMEMORANDUM. CAFR Changes
MEMORANDUM DATE: February 2, 2015 TO: Members of the Board of Retirement FROM: Brenda Shott, Assistant CEO, Finance and Internal Operations SUBJECT: GASB 67/68 Update Recommendation: Receive and file.
More informationHD Supply Holdings, Inc. Announces Fiscal 2016 Third-Quarter Results
Investor Contact: Charlotte McLaughlin HD Supply Investor Relations 770-852-9100 InvestorRelations@hdsupply.com Media Contact: Quiana Pinckney, APR HD Supply Public Relations 770-852-9057 Quiana.Pinckney@hdsupply.com
More informationAltaGas Utilities Inc.
Decision 23623-D01-2018 AltaGas Utilities Inc. 2017 Capital Tracker True-Up Application December 18, 2018 Alberta Utilities Commission Decision 23623-D01-2018 AltaGas Utilities Inc. 2017 Capital Tracker
More informationCEDIF OFFERING DOCUMENT
1a. How long will the application process take from the submission of the documents until receiving a letter of non-objection from the Director of Securities? The length of time varies widely between applicants
More informationCanadians Celebrate Tax Freedom Day on June 14
June 2008 Market solutions to public policy problems Canadians Celebrate Tax Freedom Day on June 14 It is nearly impossible for ordinary Canadians to clearly know how much they really pay. Most Canadians
More informationTerms and conditions for warrants ( ) for the subscription of new shares in G5 Entertainment AB (publ.)
Terms and conditions for warrants (2015-2017) for the subscription of new shares in G5 Entertainment AB (publ.) The English version is an office translation of the Swedish version. In case of any inconsistency,
More informationFEDERAL TAX CERTIFICATE. Dated as of February 15, 2012 UNIFIED SCHOOL DISTRICT NO. 261, SEDGWICK COUNTY, KANSAS (HAYSVILLE)
Gilmore & Bell, P.C. 01/17/2012 FEDERAL TAX CERTIFICATE Dated as of February 15, 2012 OF UNIFIED SCHOOL DISTRICT NO. 261, SEDGWICK COUNTY, KANSAS (HAYSVILLE) $2,225,000* GENERAL OBLIGATION REFUNDING BONDS
More informationREPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 2011
REPORT OF THE SUPERINTENDENT OF PENSIONS ON THE ADMINISTRATION OF THE PENSION BENEFITS ACT FOR THE YEAR ENDING MARCH 31, 211 Pension Regulation Division PO Box 2531 Halifax, Nova Scotia B3J 3N5 September
More informationAvailable In all territory served by the Company in the State of Wyoming.
Available In all territory served by the Company in the State of Wyoming. First Revision of Sheet No. 95-1 Canceling Original Sheet No. 95-1 Applicable This Schedule shall be applicable to all retail tariff
More informationCONTENTS. Preface I-5 Foreword I-7 INTRODUCTION TO THE REVISED SCHEDULE VI TO THE COMPANIES ACT, 1956
CONTENTS Preface I-5 Foreword I-7 1 INTRODUCTION TO THE REVISED SCHEDULE VI TO THE COMPANIES ACT, 1956 1.1 Presentation principles of corporate financial statements 1 1.1.1 Revised Schedule VI in the framework
More informationReturning Prolific Gold Mining Camp To Profitability JULY 2014 TSX / AIM: KGI
Returning Prolific Gold Mining Camp To Profitability JULY 2014 KIRKLAND LAKE GOLD INC. CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS Cautionary Note Regarding Forward Looking Statements This presentation
More informationKillam Apartment REIT Investor Presentation November 2017
Killam Apartment REIT Investor Presentation November 2017 Cautionary Statement This presentation may contain forward-looking statements with respect to Killam Apartment REIT and its operations, strategy,
More informationProvincial Pre-Budget Submission
Provincial Pre-Budget Submission January 21st, 2009 1 EXECUTIVE SUMMARY The following pre-budget submission outlines advocacy areas for the Halifax Chamber of Commerce that are Provincial in scope. Based
More informationALBERTA ENERGY AND UTILITIES BOARD
re: CANADIAN WESTERN NATURAL GAS COMPANY LIMITED In the matter of an application by Canadian Western Natural Gas Company Limited for approval of a 199511996 winter period Gas Cost Recovery Rate and a 1996