INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Size: px
Start display at page:

Download "INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED Report No. P-739 This report was prepared for use within the Bank and its affiliated organizations. They do not accept responsibility for its accuracy or completeness. The report may not be published nor may it be quoted as representing their views. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE REPUBLIC OF KENYA FOR A THIRD HIGHWAY PROJECT AND ON PROPOSED AMENDMENTS TO DEVELOPMENT CREDIT 104 KE TO THE REPUBLIC OF KENYA September 10, 1969

2 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMEINT INTERNATIONAL DEVELOPMENT ASSOCIATION REPORT AND RECO1'GENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED BANK LOAN TO THE REPUBLIC OF KENYA FOR A THIRD HIGHWiAY PROJECT AND ON PROPOSED A1iENDNENTS TO DEVELOPMENT CREDIT 104 KE 1. I submit the following report and recommendations on a proposed loan in an amount in various currencies equivalent to US $23.5 million to the Republic of Kenya, and on proposed amendments to the Development Credit 104 KE. PART I - HISTORICAL 2. The present project has growm out of a preliminary loan application largely for feeder roads, received in April 1968, at the time the last road project in Kenya, Credit 120-KE, was being negotiated. Other components of the Government's road building program for have subsequently been added, at the initiative of the Bank or the Government. 3. The proposed project has been prepared by the Government, for certain elements with the assistance of consultants. The Bank's Permanent Hiission in East Africa provided general guidance and, for the settlement roads component, more detailed assistance. Appraisal took place in January 1969, and negotiations were held in Washington in July. Kenya was represented by 1Mr. R. J. Ouko, Permanent Secretary of the Miinistry of Works, Mr. S. Mbugia, Engineer-in-Chief, Mr. G. 14anners, Supernumerary, Chief Engineer (Roads), Mr. D. Powrie, Senior Superintending Engineer (Road Planning), and Ir. J. Gatuiria, Senior Finance Officer in the Ministry of Finance. 4. The proposed loan would be the first Bank loan to Kenya since it became an independent republic in December Two loans were extended prior to independence, with the guarantee of the United Kingdom, and subsequently nine IDA credits have been granted. All loans and credits have been made to the Government. The position as of August 31, 1969 was as follows:

3 Amounts in US $ ni-llion No. Year Purpose Bank IDA Undisbursed 256 KE 1960 Agriculture and Roads KE 1961 Land Settlement KE 1964 Tea Development IKE 1964 Highways KE 1965 Tea Roads KE 1966 Education KE 1967 Agricultural Roads KE 1967 Agricultural Credit KE 1968 Tea Development KE 1968 Highways KE 1968 Livestock Development Total (less cancellations) 9.5 of which has been repaid 42.6 to Bank and others 4.8 Total now outstanding 4.7 Amount sold 4.3 of which has been repaid 4.0 Total now held by.3 Bank and IDA Total undisbursed.9 20, The 1961 loan for land settlement (303-KE), reduced by $3.8 million from the original $8.4 million in June 1967 after a revision of the project, was reduced further by cancellation of $665,000 in May A land settlement project is, by nature, a particularly difficult undertaking and the difficulties in this case have been enhanced by administrative problems. The present closing date is September 30, 1969, and any balance undisbursed on that date will be cancelled. 6. The Agricultural Credit Project, 105-KE, has been hampered by management and staffing problems, which now are being tackled with energy by the Government, and there has been a sharp increase in loan approvals since the middle of The Smallholder Tea development project, 64-KE, is nearing complet-on,andthe lag in disbursement is due to the fact that deficits of the KTDA, against which disbursements are made, have been smaller than estimated. The Livestock Development project, Credit 129-KE, encountered difficulty in recruiting management officers; this problem has now been resolved and the Credit was declared effective May 1, A forest plantations loan in the amount of $2.6 million has been negotiated and will be presented to the Executive Directors in the near iature. A Second Education project has been appraised and should follow..ater in the year. In addition a number of other projects are under consideration, including a water supply project for Nairobi, an electric power project and an airport project.

4 -3- S. During negotiations, the Kenya Delegation informed the Bank of the Government's intention to file a request for financing purchases of road maintenance equipment. The role of the Bank Group in developing Kenya's road system lends importance to such a project, which also would provide for a thorough overhaul of maintenance administration. 10. In addition to the above loans and credits, the Bank has made four loans for cormon services in East Africa, three of them for railways and/or harbors and one for telecommunications. All four loans are guaranteed jointly and severally by Kenya, Tanzania and Uganda, with the United Kingdom also being a guarantor for the first loan for railways. Below is a summary statement of these loans as of August 31, Amounts in US $ million No. Year Borrower Purpose Bank Undisbursed 110-EA 1955 East African Railways Corporation 1/ 3/ Railways BAk 1966 East African Railwxays Corporation 2/ 4/ Railways East African Harbours Corporation 2/ 4/ Harbors 5.6 2,5 483-EA 1967 East African Posts and Telecommunica- Teleconmmunitions Corp. 2/ 4/ cations EA 1969 East African Harbours Corporation 4/ _/ Harbors Total (less cancellations) of which has been repaid to Bank and others 14.8 Total now outstanding 95.2 Amount sold: 23.8 of which has been repaid: Total now held by Bank Total undisbursed / Loan made originally to East Africa High Commission 2/ Loan made originally to East African Cormon Services Authority 3/ Guaranteed jointly and severally by the United Kingdom, Kenya, Tanzania and Uganda. / Guaranteed jointly and severally by Kenya, Tanzania and Uganda. 5/ This loan was signed on August 25, 1969, but is not yet effective.

5 11. TEo more Community projects are being processed, one for railways and another for teleconmunications in which Sweden may participate. 12. IFC has invested US $3.1 million in loans and shares in Kenya Hotel Properties Ltd. for hotels and game park lodges. Currently, the IFC is considering particip±i.ng writh the Government and other interested parties, in a pulp and paper mill which eventually would use pulpwood from plantations included in the forest plantations project proposed for Bank financing. PART II - DESCRIPTION OF THE PROPOSED LOAII 13. BCRROWER: The Republic of Kenya A1OUNIT: PURPCSE: AM4ORTIZATION: INTEREST RATE: CCI24ITMENT CHARGE: US $23.5 million equivalent in various currencies To finance the foreign exchange component of a high priority portion, costing $35.1 million, of the Government's road construction program for years including 10 years of grace, in semi-annual payments, beginning September 1, 1979 and ending September 1, % per annum 3/4 of 1% per annum ESTIMATED ECONOMIC RETURN: 15-18% on the four major categories of roads PART III - THE PROJECT 14. An appraisal report entitled "Appraisal of a Third Highway Project, Kenya,, (PTR-24a) on the proposed project is attached. The total cost of the project is $36.3 million. For the purpose of financing it is proposed to divide the project in two parts, Part I costing $35.1 million against which the proposed loan of $23.5 million would be made, and Part II costing $1.2 million, described in paragraph 15 below.

6 Fart I of the proposed project consists of: A. construction or reconstruction of: (i) (ii) (iii) (iv) five sections of trunk roads, totalling about 85 miles eighteen sections of feeder roads, totalling about 288 miles about 218 miles of roads in Phase II of the agricultural road program in the sugar-growing area of Miwani-Chemelil-Yuhoroni-Koru about 366 miles of tertiary roads in settlement areas B. engineering services in respect of: (i) detailed engineering of one trunk road included in A(i) and two feeder roads included in A(ii) (ii) investigation and engineering of required road improvements in settlement areas, including those in A(iv) (iii) (iv) supervision of all works listed under A above a study of the organization of the Ministry of Works and the implementation of its recommendations. 15. Part II of the proposed project consists of the portion of Phase II of the Government's agricultural road program for sugar-growing areas, which is not included in item A(iii) above. The Government requested that this portion be separated from the Third Highway Project and added to the project financed under Credit 10h-KE in order to enable the Government to util:ize a balance of $800,000 of Credit 104-KE not needed for completion of the original project. The Government expects that Part II would be completed by end May 1970, but that another 12 months would be needed to allow for the disbursement of the usual retention funds. The closing date of Credit 104-KE would, accordingly, be postponed from the present December 31, 1969 until May 31, Disbursements would be in respect of foreign expenditures. 16. The project as a whole will bring major benefits to agriculture and tourism. The various road sections in the project are widely dispersed, and in some cases sections constructed under earlier Bank/IDA projects will 'be improved to talce care of subsequent traffic growth; thus the project 'epresents a logical extension to the Bank Group's road financing in Kenya.

7 - 6 - I7. The Roads Branch of the Ministry of Works would have overall responsibility for executing the project. The Ministry has the capacity to undertake this task assuming continued reliance on expatriate engineers and the planned use of contractors. With Kenya's existing bilateral aid agreements, replacement of engineers whose contracts expire should not be difficult. Tertiary roads in settlement areas ($1.6 million of proposed loan) would be constructed by the Ministry's own forces since the nature of the work is not suited for execution on contract; two feeder roads ($0.4 million of proposed loan) would be constructed by extension of contracts awarded under Credit 120-KE, and the remaining work would be awarded to contractors on the basis of international competitive bidding. 18. The proposed loan would cover the foreign exchange component of Part I of the project, while the Government would provide the local currency. The loan proposed includes about $300,000 for financing of engineering services contracted to prepare the project and paid for by the time the loan is expected to be signed. Part I of the project would be physically completed by the end of 1972 and the closing date is set 12 months thereafter to provide time for payment of retention money. PART IV - LEGAL fistrumyents AND AUTHORITY 19. The Draft Loan Agreement between the Bank and the Republic of Kenya, and the Report of the Committee provided for in Article III, Section 4(iii) of the Articles of Agreemient and a Draft Resolution are being distributed to the Executive Directors separately. The Draft Loan Agreement conforms generally to the pattern of existing Bank and IDA Agreements for road development projects. There is only one exception, the requirement in Section 5.15 that "the Borrower shall take all necessary action to improve the operational efficiency of the sugar industry..." Tnis provision is directed at problems, largely of management, which fall outside the immediate scope of the proposed project but which could affect the economic return of the agricultural roads included in it. 20. In addition to the documents mentioned above, a draft amended Schedule (Description of Project) to Development Credit Agreement No. 104-KE, dated May 11, 1967, is distributed to the Executive Directors of the International Deve].opment Association. The amendment adds to the project description the roads colstituting Part II of the project described in paragraph 15 above.

8 - 7 - PART V - THE ECONOMY 21. An Economic Report entitled "Prospects for Economic Development in Kenya,, (Vol. II of AF-58b, dated August 31, 1967) was distributed to the Executive Directors early in September, 1967 (R67-148) and updating memorandum, "Recent Developments in the East African Community, Kenya, Tanzania and Uganda" (AF-74), was distributed to the Executive Directors in April 1968 (R68-52). 22. An economic mission visited Kenya in April/May this year to appraise the new Development Plan and its report was discussed with the Kenya Government at the end of August. The report will form the basic documentation for a meeting of the Consultative Group on East Africa which will be held in December. It will be distributed to the Executive Directors before the end of October. 23. The real growth of the Kenyan economy over the past five years has been high - just over 6 percent a year. This is a remarkable achievement in the face of falling export prices for its major export commodities, unfavorable weather conditions, disease afflicting certain crops, and restrictions imposed on Kenya's exports by Tanzania and Uganda. Thus, even when account is taken of Kenya's rapidly rising population (about 3 percent a year), there has been a significant increase in real income per capita since Other indicators of Kenya's recent economic development have been an increasing investmant rate (rising from 13.7 percent of GDP at market prices in 1964 to 19.5 percent in 1968) and a savings rate of around 20 percent. The balance of payments on current account has moved from surplus to deficit, but there has been an overall surplus despite losses resulting from the devaluation of sterling in Hence, Kenya's foreign exchange reserves have increased and in April 1969 they amounted to the equivalent of five months' imports. 25. Kenya's successful economic growfth in recent years has been due in considerable part to a pragmatic and well-directed development policy and this can be expected to continue. It has been assisted, however, by an "early start" in the development of manufacturing and of a range of services (banking, insurance, etc.) particularly when compared to the other countries in the East African Common Market. The uncertainty over the inplementation of the Common Market system has restrained investment in this sector and is one of the causes of the present high degree of liquidity in the economy. At the present time Kenya's problem is less one of finding resources for needed development projects than of following policies, internally and in relation to its Common Market partner states, which will encourage the maintenance of a high level of investment, particularly private investment.

9 The Development Plan incorporates a public expenditure program for the financial years 1969/70 through 1973/74 amounting to KE 180 millions, of which half will be financed from internal sources. The plan projects a growth rate of 7 percent a year at constant prices, wrhich is probably a little higher than is likely to be achieved. Gross fixed capital formation over the period is expected to amount to about K' 670 million at constant prices, of which about 60 percent would be generated in the private sector. This implies that investment would increase at an average rate of some 10 percent a year from 1968, compared with an annual growth rate of 14 percent between 1964 and In its draft report the economic mission estimated that the total foreign exchange gap over the plan would be slightly over KL 180 million which, allowing for the undisbursed part of loans already approved (KL 30 million) would leave some Kb 150 million to be financed. It is estimated that about Kb 80 million of this could be met by inflows of private capital, including both equity capital and suppliers' credits. At the end of 1968 Kenya's external public debt stood at $343.2 million. If Kenya's notional one-third share of the East African Community's external debt is included, the total amount is increased to $408 million, giving a debt service ratio of a little under 7 percent. The net overseas borrowing required to meet the foreign exchange gap projected in the new development plan would mean that the debt service ratio would increase to between 10 and 12 percent by 1974, depending upon the terms of assistance made available. 28. The assassination of the Minister of Economic Planning and Development in July, 1969 constituted a severe challenge to political stability and tribal balance in Kenya. General elections must be held, by mid 1970 and as the time draws near political differences can be expected to become sharper. However, the demonstration of the Government's ability to maintain order in recent months provides a basis for optimism regarding Kenya's political stability. In view of both political and economic prospects, Kenya can be considered creditworthy for the proposed loan. PART VI - COMPLIAiNCE WITH ARTICLES OF AGREEMENT 29. I am satisfied that the proposed loan would comply with the Articles of Agreement of the Bank.

10 PART VII - RECCIvYIENDATION 30. I recommend a) that the Executive Directors of the Bank approve the proposed loan; and b) that the Executive Directors of the Association approve: i) the proposed amendment to the Description of Project for Development Credit Agreement 104-KE, and ii) the postponement of the closing date for this Credit to May 31, Robert S. McNamara President Attachments

11 Basic Data Area: Total - 225,000 sq. miles = 582,750 square kilometres Land area - 219,800 sq. miles = 569,252 square kilometres Population: (mid-1968 estimate): million Rate of growth: 3.0 percent Population density: Total land area per sq. mile Arable land area - about 450 per sq. mile Literacy Rate 1968: 30 percent estimated Political Status: Republic since Independence on December 12, 1963 Member of the British Commonwealth & the Sterling Area * Gross Nifational Product at Factor Cost (1968): K 420 million - ($1,176 million) GNP per capita (l968) Ki 41.1 ($115.1) GDP (at factor cost) Growth Rate: Constant 1964 prices 6.3% 6.6% Current prices 6.8% 5.9% Investment & Savings: K MillJon * Gross Fixed Capital Formation Change in Stocks Gross Capital Formation 47.7i Balance of Goods and Non-Factor Services Gross Domestic Saving Net Factor Income Payments Gross National Saving 5544 _7960 Capital Formation as percentage of GDP at factor cost 15.5% 22.2% Gross Domestic Saving percentage of GDP at factor cost 20.4% 21.0% Gross National Saving percentage of GNP at factor cost 17.1% 19.0% * provisional figures

12 Balance of Payments: KX Million * Exports of Good & Non-Factor Services Imports of Goods & Non-Factor Services Balance of Goods & Non-Factor Services Net Factor Payments Net Transfers Balance of Payments on Current Account Net Private Long-Term Capital Inflow Net Public Long-Term Capital Inflow Net Short-Term Capital Movements Change in Reserves - Increase (-)/Decrease (+) Budget: K Million 1966/67 Current Revenue Current Expenditure Current Surplus 3.77 Capital Revenue 4.55 Balance 8.32 Capital Expenditure Overall Deficit -1 Financed by: Internal Grants & Loans 7.85 External Grants & Loans 7.98 Increase in Cash Balance 0.65 Foreign Exchange Reserves (April, 1969): Total: K 52 million ($146 million) Equivalent to: 5 months' imports External Debt (31 December 1968): $ thousand Including Disbursed Undisbursed Total Debt Outstanding 254, Kenya: Notional 1/3 share of East African Community Debt: 58,706 64,864 TOTAL 313, ,016 Total Debt Service Kenya: 17,799 Notional 1/3 share of East African Community Debt: 10,935 TOTAL DEBT SERVICE 28,734 Debt Service Ratio: 6.9%

COPY FILE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION. September 23, 1969 REPORT AND RECOMMENDATION

COPY FILE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION. September 23, 1969 REPORT AND RECOMMENDATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-742 This report was prepared for use within the Bank

More information

FIE, COY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FIE, COY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FIE, COY RESTRICTED Report No. P-548 This report was prepared for use within the Bank

More information

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PRESIDENT. Report No. P-819 REPORT AND RECOMMENDATION OF THE TO THE

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PRESIDENT. Report No. P-819 REPORT AND RECOMMENDATION OF THE TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-819 This report was prepared for use within the Bank

More information

FILE COPY Report No. P-769

FILE COPY Report No. P-769 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE COPY Report No. P-769 This report was prepared for use within the Bank

More information

F JIE CJtIY 1l Report No. P-605

F JIE CJtIY 1l Report No. P-605 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED F JIE CJtIY 1l Report No. P-605 This report was prepared for use within the

More information

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMEINT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMEINT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-720 This report was prepared for use within the Bank

More information

FILE cory Report No. p-79

FILE cory Report No. p-79 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE cory Report No. p-79 This report was prepared for use within the Bank

More information

FIlE COPY Report INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FIlE COPY Report INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FIlE COPY Report RESTRICTED No. p-479 This report was prepared for use within the Bank

More information

A'/2 7TJC INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE ON A PROPOSED DEVELOPMENT CREDIT FOR AN IRRIGATION REHABILITATION PROJECT

A'/2 7TJC INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE ON A PROPOSED DEVELOPMENT CREDIT FOR AN IRRIGATION REHABILITATION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized -7v 2_. RESTRICTED Report No. p-629 This report was prepared for use within the Bank

More information

FLE CO Y Report No. E P -7

FLE CO Y Report No. E P -7 Public Disclosure Authorized RESTRICTED FLE CO Y Report No. E P -7 This report was prepared for use within the Bank and its affiliated organizations. They do not accept responsibility for its accuracy

More information

FILE COPY Report OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN ISLAMIC REPUBLIC OF PAKISTAN FOR THE PAKISTAN WESTERN RAILWAY

FILE COPY Report OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN ISLAMIC REPUBLIC OF PAKISTAN FOR THE PAKISTAN WESTERN RAILWAY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY Report RESTR ICTED No. p-546 This report was prepared for use within the Bank

More information

RESTRICTED. Report No. P-224

RESTRICTED. Report No. P-224 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED This report was prepared for use within the Bank. In making it available to others, the Bank assumes no

More information

FALL REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE INSTITUTO NACIONAL DE OBRAS SANITARIAS (INOS)

FALL REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE INSTITUTO NACIONAL DE OBRAS SANITARIAS (INOS) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FALL PY RESTRICTED Report No. P-474 This report was prepared for use within the Bank

More information

FILE COPY Report No. P-88

FILE COPY Report No. P-88 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE COPY Report No. P-88 This report was prepared for use within -the Bank

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FLE c y Report RESTRICTED No. P-808 This report was prepared for use within the Bank

More information

FLE COPY P-67 RESTRICTED REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS A PROPOSED LOAN TO

FLE COPY P-67 RESTRICTED REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS A PROPOSED LOAN TO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FLE COPY This report is restricted to use within the Bank. P-67 RESTRICTED INTERNATIONAL

More information

FILE COPY. rthis report was prepared for use within the Bank. In making it R E S T R I C T E D. Report No.P-219

FILE COPY. rthis report was prepared for use within the Bank. In making it R E S T R I C T E D. Report No.P-219 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY rthis report was prepared for use within the Bank. In making it available to

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized,RESTRICTED Report No. p-777 This report was prepared for use within the Bank and its

More information

TABLE OF CONTENTS. Page. Statistical Bulletin, December 2008 INTRODUCTORY NOTES SUMMARISED ACCOUNTS OF THE BANKING SYSTEM

TABLE OF CONTENTS. Page. Statistical Bulletin, December 2008 INTRODUCTORY NOTES SUMMARISED ACCOUNTS OF THE BANKING SYSTEM TABLE OF CONTENTS Page INTRODUCTORY NOTES... 3 1. SUMMARISED ACCOUNTS OF THE BANKING SYSTEM 1.1 CENTRAL BANK OF KENYA 1.1.1 Assets... 10 1.1.2 Liabilities... 11 1.2 OFFICIAL RESERVES 1.2.1 Foreign Assets...

More information

RESTRICTED. Report No. P-241 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE

RESTRICTED. Report No. P-241 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized This report was prepared for use within the Bank. It may not be published nor may it

More information

FILE COPY INTERNATIONAL DEVELOPMENT ASSOCIATION EXECUTIVE DIRECTORS HIGHWAY PROJECT. June 4, 1970 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE

FILE COPY INTERNATIONAL DEVELOPMENT ASSOCIATION EXECUTIVE DIRECTORS HIGHWAY PROJECT. June 4, 1970 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-836 This report was prepared for use within the Bank

More information

TABLE OF CONTENTS Page INTRODUCTORY NOTES... 4

TABLE OF CONTENTS Page INTRODUCTORY NOTES... 4 TABLE OF CONTENTS Page INTRODUCTORY NOTES... 4 1. SUMMARISED ACCOUNTS OF THE BANKING SYSTEM 1.1 CENTRAL BANK OF KENYA 1.1.1 Assets... 10.1.1.2 Liabilities... 11 1.2 OFFICIAL RESERVES.1.2.1 Foreign Assets...

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2008 International Monetary Fund July 2008 IMF Country Report No. 08/226 Antigua and Barbuda: Statistical Appendix This Statistical Appendix for Antigua and Barbuda was prepared by a staff team of the

More information

FILE COPY Report No. P-29

FILE COPY Report No. P-29 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REST R I.CTE D FILE COPY Report No. P-29 This report was prepared for use within the

More information

FILE COPY R E S T R I C T E D. Report No. P-132

FILE COPY R E S T R I C T E D. Report No. P-132 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY R E S T R I C T E D This report was prepared for use within the Bank. In making

More information

KINGDOM OF LESOTHO SIXTH REVIEW UNDER THE THREE-YEAR ARRANGEMENT UNDER THE EXTENDED CREDIT FACILITY DEBT SUSTAINABILITY ANALYSIS

KINGDOM OF LESOTHO SIXTH REVIEW UNDER THE THREE-YEAR ARRANGEMENT UNDER THE EXTENDED CREDIT FACILITY DEBT SUSTAINABILITY ANALYSIS August 2, 213 KINGDOM OF LESOTHO SIXTH REVIEW UNDER THE THREE-YEAR ARRANGEMENT UNDER THE EXTENDED CREDIT FACILITY DEBT SUSTAINABILITY ANALYSIS Approved By Anne-Marie Gulde- Wolf and Chris Lane (IMF) Marcelo

More information

FILE COPY Report No. P-718 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS

FILE COPY Report No. P-718 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE COPY Report No. P-718 This report was prepared for use within the Bank

More information

ANGLO-AMERICAN DOCUMENTS. f. Statement by the President of the United States and the Prime Minister of Great Britain,

ANGLO-AMERICAN DOCUMENTS. f. Statement by the President of the United States and the Prime Minister of Great Britain, ANGLO-AMERICAN,A NT 0^ ' 4TE9 * Financial and Commercial Agreements DOCUMENTS f. Statement by the President of the United States and the Prime Minister of Great Britain, 2. Joint Statement on Commercial

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2004 International Monetary Fund May 2004 IMF Country Report No. 04/153 Barbados: Statistical Appendix This Statistical Appendix for Barbados was prepared by a staff team of the International Monetary

More information

Investor Briefing & Q Performance. April 2016

Investor Briefing & Q Performance. April 2016 Investor Briefing & Q1 2016 Performance April 2016 Presentation Outline 1. Macro-economic overview 2. Governance & leadership structure 3. Regional expansion and diversification 4. Digital bank 5. SME

More information

CONSULTATIVE GROUP MEETING FOR KENYA. Nairobi, November 24-25, Joint Statement of the Government of the Republic of Kenya and the World Bank

CONSULTATIVE GROUP MEETING FOR KENYA. Nairobi, November 24-25, Joint Statement of the Government of the Republic of Kenya and the World Bank CONSULTATIVE GROUP MEETING FOR KENYA Nairobi, November 24-25, 2003 Joint Statement of the Government of the Republic of Kenya and the World Bank The Government of the Republic of Kenya held a Consultative

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CREDIT NUMBER 374 AF CONFORMED COPY Public Disclosure Authorized Development Credit Agreement (Aviation Project) Public Disclosure Authorized BETWEEN KINGDOM OF AFGHANISTAN

More information

Monitoring the progress of graduated countries Cape Verde

Monitoring the progress of graduated countries Cape Verde CDP/RM Committee for Development Policy Expert Group Meeting Review of the list of Least Developed Countries New York, 16-17 January 2011 Monitoring the progress of graduated countries Cape Verde Background

More information

Document of v ff s The World Bank OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN WITH THE MAY 12, 1982

Document of v ff s The World Bank OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN WITH THE MAY 12, 1982 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of v ff s The World Bank FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF

More information

FILE COPY. Report. LJ- w R E S T R I C T E D

FILE COPY. Report. LJ- w R E S T R I C T E D Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized LJ- w FILE COPY R E S T R I C T E D Report This report was prepared for use within the

More information

Guarantee Agreement. (Third East African Railways Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 674 EA

Guarantee Agreement. (Third East African Railways Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 674 EA Public Disclosure Authorized LOAN NUMBER 674 EA CONFORMED COPY Public Disclosure Authorized Guarantee Agreement (Third East African Railways Project) BETWEEN Public Disclosure Authorized REPUBLIC OF UGANDA

More information

Kenya s IMF Standby Facility, & Cytonn Weekly #31/2018

Kenya s IMF Standby Facility, & Cytonn Weekly #31/2018 Kenya s IMF, & Cytonn Weekly #31/2018 Focus of the Week The International Monetary Fund (IMF) recently concluded their visit to Kenya where they were holding discussions with the Kenyan Government on the

More information

FILL CP INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT MALAYSIA REPORT AND RECOMMENDATION PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED TO

FILL CP INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT MALAYSIA REPORT AND RECOMMENDATION PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED TO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILL CP RESTRICTED Report No. P-589 This report was prepared for use within the Bank

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized I 4111k CREDIT NUMBER 119 KE Public Disclosure Authorized Development Credit Agreement (Second Kenya Tea Development Authority Project) Public Disclosure Authorized BETWEEN

More information

Item

Item Key Indicators for Asia and the Pacific 2010 POPULATION Total population a million; as of 1 July 8.6 8.8 9.0 9.5 10.0 10.5 11.0 11.6 12.1 12.3 12.5 12.7 12.9 13.1 13.3 13.5 13.6 13.8 14.0 14.2 Population

More information

FILE COPY Report INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FILE COPY Report INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY Report RESTRICTED No. P-588 This report was prepared for use within the Bank

More information

II. Macroeconomic Developments 2.1 Economic Growth. Overview QUARTERLY ECONOMIC BRIEF UNITED NATIONS DEVELOPMENT PROGRAMME ETHIOPIA.

II. Macroeconomic Developments 2.1 Economic Growth. Overview QUARTERLY ECONOMIC BRIEF UNITED NATIONS DEVELOPMENT PROGRAMME ETHIOPIA. QUARTERLY ECONOMIC BRIEF UNITED NATIONS DEVELOPMENT PROGRAMME ETHIOPIA Volume I, 2018 Overview Economic growth recovered from the impact of drought in 2015/16 and registered 10.9 percent annual growth

More information

PRESIDENT TO THE EXECUTIVE DIRECTORS ON PROPOSED LOANS TO

PRESIDENT TO THE EXECUTIVE DIRECTORS ON PROPOSED LOANS TO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FLE Ecopy Report RESTRICTED No. P-937 This report was prepared for use within the Bank

More information

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Report No. P-721 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE

FILE COPY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Report No. P-721 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY RESTRICTED Report No. P-721 This report was prepared for use within the Bank

More information

FILE CopY Report No. P-279

FILE CopY Report No. P-279 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized R E S T R I C T E D FILE CopY Report No. P-279 This report was prepared for use within

More information

Document of THE WORLD BANK FOR OFFICIAL USE ONLY MEMORANDUM AND RECOMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE

Document of THE WORLD BANK FOR OFFICIAL USE ONLY MEMORANDUM AND RECOMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of THE WORLD BANK FOR OFFICIAL USE ONLY MEMORANDUM AND RECOMMENDATION OF THE

More information

Project Agreement CONFORMED COPY LOAN NUMBER 1130 TU. (Corum-Cankiri Rural Development Project) BETWEEN

Project Agreement CONFORMED COPY LOAN NUMBER 1130 TU. (Corum-Cankiri Rural Development Project) BETWEEN Public Disclosure Authorized LOAN NUMBER 1130 TU CONFORMED COPY Public Disclosure Authorized Project Agreement (Corum-Cankiri Rural Development Project) Public Disclosure Authorized BETWEEN INTERNATIONAL

More information

FILE Copy Report LA- 3G -PD INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE

FILE Copy Report LA- 3G -PD INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE LA- 3G -PD Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE Copy Report RESTRICTED No. p-347 This report was prepared for use within

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION

INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY Report RESTRICTED No. P-846 This report was prepared for use within the Bank

More information

FILE copy INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A

FILE copy INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE copy R E5RESTRICTED Report No. P-371 This report was prepared for use within the

More information

TEXT OF AGREEMENT BEGINS ON PAGE 17

TEXT OF AGREEMENT BEGINS ON PAGE 17 TEXT OF AGREEMENT BEGINS ON PAGE 17 ANGLO-AMERICAN TRADE AND FINANCIAL NEGOTIATIONS The documents below, resulting from the trade and financial discussions between officials of the United States and United

More information

PERFORMANCE OF ECONOMY REPORT December 2017

PERFORMANCE OF ECONOMY REPORT December 2017 PERFORMANCE OF ECONOMY REPORT December 2017 MACROECONOMIC POLICY DEPARTMENT MINISTRY OF FINANCE PLANNING AND ECONOMIC DEVELOPMENT www.finance.go.ug TABLE OF CONTENTS LIST OF ACRONYMS... 3 HIGHLIGHTS...

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED CREDIT

INTERNATIONAL DEVELOPMENT ASSOCIATION REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE copy Report No. P-92 This report was prepared for use within the Bank

More information

Document of The World Bank OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE EXECUTIVE DIRECTORS ON A PROPOSED CREDIT TO THE

Document of The World Bank OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE EXECUTIVE DIRECTORS ON A PROPOSED CREDIT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY Document of The World Bank FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION

More information

Guatemala. 1. General trends. 2. Economic policy. In 2009, the Guatemalan economy faced serious challenges as attempts were made to mitigate

Guatemala. 1. General trends. 2. Economic policy. In 2009, the Guatemalan economy faced serious challenges as attempts were made to mitigate Economic Survey of Latin America and the Caribbean 2009-2010 161 Guatemala 1. General trends In 2009, the Guatemalan economy faced serious challenges as attempts were made to mitigate the impact of the

More information

FILE COPY' cn'clnxrin 'P

FILE COPY' cn'clnxrin 'P Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY' cn'clnxrin 'P ThRNEDT DIVISION ACIVE-S This report was prepared for use within

More information

FILE COPY. L -JV)-9 7/~9i~ P-66 RESTRICTED. This report is restricted to use within the Bank. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

FILE COPY. L -JV)-9 7/~9i~ P-66 RESTRICTED. This report is restricted to use within the Bank. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized L -JV)-9 7/~9i~ P-66 FILE COPY RESTRICTED This report is restricted to use within the

More information

Document of The World Bank International Finance Corporation FOR OFFICIAL USE ONLY OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS OF THE BANK AND TO THE

Document of The World Bank International Finance Corporation FOR OFFICIAL USE ONLY OF THE PRESIDENT TO THE EXECUTIVE DIRECTORS OF THE BANK AND TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE Copy Document of The World Bank International Finance Corporation FOR OFFICIAL USE

More information

The Development Status and Country Classification of Palau

The Development Status and Country Classification of Palau Board of Directors FOR OFFICIAL USE ONLY R280-05 17 October 2005 The Development Status and Country Classification of Palau 1. Attached for the consideration of the Board is a paper on the above subject.

More information

FILE COPY. FILE CO Y. XReport No. P-743 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. September 24, 1969 REPORT AND RECOMMENDATION OF THE

FILE COPY. FILE CO Y. XReport No. P-743 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. September 24, 1969 REPORT AND RECOMMENDATION OF THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY. FILE CO Y RESTRICTED XReport No. P-743 This report was prepared for use within

More information

Document of The World Bank FOR OFFICIAL USE ONLY OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE KINGDOM OF THAILAND

Document of The World Bank FOR OFFICIAL USE ONLY OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE KINGDOM OF THAILAND Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF THE PRESIDENT

More information

Loan Agreement. (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

Loan Agreement. (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and Public Disclosure Authorized LOAN NUMBER 3136-4 MOR Loan Agreement Public Disclosure Authorized (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and BANQUE MAROCAINE

More information

GOVERNMENT OF THE REPUBLIC OF TRINIDAD AND TOBAGO INFORMATION MEMORANDUM

GOVERNMENT OF THE REPUBLIC OF TRINIDAD AND TOBAGO INFORMATION MEMORANDUM GOVERNMENT OF THE REPUBLIC OF TRINIDAD AND TOBAGO INFORMATION MEMORANDUM TT$3,399.8 MILLION where SERIES 1 : TT$1,399.8 Million 6.60% Fixed Rate Bonds due 2027 and SERIES 2 : TT$1,000.0 Million 6.70% Fixed

More information

CONFORMED COPY CREDIT NUMBER 566 CE REPUBLIC OF SRI LANKA INTERNATIONAL DEVELOPMENT ASSOCIATION DATED JUNE 27, Public Disclosure Authorized

CONFORMED COPY CREDIT NUMBER 566 CE REPUBLIC OF SRI LANKA INTERNATIONAL DEVELOPMENT ASSOCIATION DATED JUNE 27, Public Disclosure Authorized Public Disclosure Authorized CREDIT NUMBER 566 CE CONFORMED COPY Public Disclosure Authorized Development Credit Agreement (Development Finance Corporation Project) BETWEEN Public Disclosure Authorized

More information

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4199 UG Public Disclosure Authorized Financing Agreement (Uganda Public Service Performance Enhancement Project) between Public Disclosure Authorized

More information

FILE COPY Report. No. P-82 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE

FILE COPY Report. No. P-82 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT REPORT AND RECOMMENDATIONS OF THE PRESIDENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FILE COPY Report R E ST R ICTE D No. P-82 This report was prepared for use within the

More information

L~ -I. CIRCULAThING COPY RSRCE TO RE RETURNED TO REPORTS DESK RESTRICTED. IN GENERAL FILES Report No. P-647

L~ -I. CIRCULAThING COPY RSRCE TO RE RETURNED TO REPORTS DESK RESTRICTED. IN GENERAL FILES Report No. P-647 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CIRCULAThING COPY RSRCE TO RE RETURNED TO REPORTS DESK RESTRICTED IN GENERAL FILES Report

More information

The World Bank s Partnership with Cameroon

The World Bank s Partnership with Cameroon Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank s Partnership with Cameroon NUMBER 006 ORIGINALLY PUBLISHED: JANUARY 2003 January 2016 Public Disclosure

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION INTERNATIONAL MONETARY FUND KENYA. Joint Bank-Fund Debt Sustainability Analysis - Update

INTERNATIONAL DEVELOPMENT ASSOCIATION INTERNATIONAL MONETARY FUND KENYA. Joint Bank-Fund Debt Sustainability Analysis - Update Public Disclosure Authorized INTERNATIONAL DEVELOPMENT ASSOCIATION INTERNATIONAL MONETARY FUND KENYA Public Disclosure Authorized Joint Bank-Fund Debt Sustainability Analysis - Update Prepared by the Staff

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 2785 VN Public Disclosure Authorized Development Credit Agreement (Payment System and Bank Modernization Project) between SOCIALIST REPUBLIC OF

More information

THE PRIME MINISTER ------- No. 71/2010/QD-TTg SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- Hanoi, November 09, 2010 DECISION PROMULGATING THE REGULATION ON PILOT INVESTMENT

More information

Preliminary Annual. National Accounts. Preliminary Annual National Accounts 2016

Preliminary Annual. National Accounts. Preliminary Annual National Accounts 2016 Preliminary Annual National Accounts 2016 Preliminary Annual National Accounts 2016 1 Mission Statement In a coordinated manner produce and disseminate relevant, quality and timely statistics that are

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE COPY Report No. P-697 This report was prepared for use within the Bank

More information

GOVERNMENT OF THE REPUBLIC OF TRINIDAD AND TOBAGO INFORMATION MEMORANDUM

GOVERNMENT OF THE REPUBLIC OF TRINIDAD AND TOBAGO INFORMATION MEMORANDUM GOVERNMENT OF THE REPUBLIC OF TRINIDAD AND TOBAGO INFORMATION MEMORANDUM TT$1,000 MILLION or such greater amount as the Government of Trinidad and Tobago may determine subject to a maximum of TT$1,500

More information

FOREIGN PRIVATE CAPITAL SURVEY REPORT 2013

FOREIGN PRIVATE CAPITAL SURVEY REPORT 2013 FOREIGN PRIVATE CAPITAL SURVEY REPORT 2013 P.O. Box CY342, Causeway, Harare Tel: (263-04) 706681/8 or (263-04) 703971/7 Fax: (263-04) 762494 E-mail: trade@zimstat.co.zw Website: www.zimstat.co.zw Published:

More information

FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN

FOR OFFICIAL USE ONLY REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No. P-3799-HO Public Disclosure Authorized Public Disclosure Authorized REPORT AND RECOMMENDATION OF THE PRESIDENT OF

More information

Long-Term Financial Integrity of the ADF

Long-Term Financial Integrity of the ADF Long-Term Financial Integrity of the ADF Discussion paper ADF-11 Replenishment : Second Consultation Meeting June 2007 Tunis, Tunisia AFRICAN DEVELOPMENT FUND TABLE OF CONTENTS 1. INTRODUCTION 1 2. FINANCIAL

More information

FILE CO-PY Report No. P-315

FILE CO-PY Report No. P-315 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE CO-PY Report No. P-315 This report was prepared for use within the Bank

More information

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA31584 Project Name

More information

About the Country. Doing Business Introduction

About the Country. Doing Business Introduction About the Country The Republic of ( ) is a country in Africa and a founding member of the East African Community (EAC) and shares border with Tanzania to the south and southwest, Uganda to the west, South

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND RWANDA. Joint IMF/World Bank Debt Sustainability Analysis

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND RWANDA. Joint IMF/World Bank Debt Sustainability Analysis INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND RWANDA Joint IMF/World Bank Debt Sustainability Analysis Prepared by the Staffs of the International Monetary Fund and the International

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized OFFIC;AL DOCUMENTS CREDIT NUMBER 1948 CE Public Disclosure Authorized Development Credit Agreement (Third Industrial Development Project) Public Disclosure Authorized between

More information

ESTABLISHING A LEGAL ENTITY IN KENYA

ESTABLISHING A LEGAL ENTITY IN KENYA ESTABLISHING A LEGAL ENTITY IN KENYA FACT PACK May 2017 Business Sweden in Kenya A FOREIGN COMPANY MAY CHOOSE TO OPERATE IN KENYA IN VARIOUS FORMS TYPE OF COMPANY SET UP IN KENYA Swedish-owned company

More information

DEVELOPMENT FUND FOR IRAQ UNAUDITED INTERIM STATEMENT OF CASH RECEIPTS AND PAYMENTS

DEVELOPMENT FUND FOR IRAQ UNAUDITED INTERIM STATEMENT OF CASH RECEIPTS AND PAYMENTS DEVELOPMENT FUND FOR IRAQ UNAUDITED INTERIM STATEMENT OF CASH RECEIPTS AND PAYMENTS 30 JUNE Ernst & Young Baghdad Office P.O. Box 6004 Baghdad Republic of Iraq Tel: +964 1 5430357 (4 Lines) Fax: +964 1

More information

FILE COPY Report No. P - 810

FILE COPY Report No. P - 810 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESTRICTED FILE COPY Report No. P - 810 This report was prepared for use within the Bank

More information

NATIONAL ACCOUNTS STATISTICS TO KINGDOM OF TONGA. May Price: T$25.00

NATIONAL ACCOUNTS STATISTICS TO KINGDOM OF TONGA. May Price: T$25.00 SDT: 35-07 KINGDOM OF TONGA NATIONAL ACCOUNTS STATISTICS 2001-02 TO 2009-10 May 2011 Statistics Department P.O. Box 149, Nuku alofa Government of Tonga Telephone: (676) 23-300 / 23-913 Email: dept@stats.gov.to

More information

BELIZE. 1. General trends

BELIZE. 1. General trends Economic Survey of Latin America and the Caribbean 2017 1 BELIZE 1. General trends The Belizean economy experienced a reversal of fortunes in 2016, with growth dropping to -0.8% from 2.9% in 2015. A sharp

More information

UNITED NATIONS ^^ abtp. t-/~r\kl /^ ka I r- A^SS^k LIMITED ^^^ ECONOMIC WW^SSI 3/CU.l4/CAP.2/iro 23. AND «x Zf 5 Deoemter 1967

UNITED NATIONS ^^ abtp. t-/~r\kl /^ ka I r- A^SS^k LIMITED ^^^ ECONOMIC WW^SSI 3/CU.l4/CAP.2/iro 23. AND «x Zf 5 Deoemter 1967 UNITED NATIONS ^^ abtp. t-/~r\kl /^ ka I r- A^SS^k LIMITED ^^^ ECONOMIC WW^SSI 3/CU.l4/CAP.2/iro 23 AND «x Zf 5 Deoemter 1967 '^ ' ^ ^ ^M^jtZjm Original! BNQLISH SOCIAL COUNCIL ^W^ EC0H0MEC COMMISSION

More information

Agriculture is the backbone of Uganda s economy and it directly and indirectly employs almost 70% of the labour force in the country.

Agriculture is the backbone of Uganda s economy and it directly and indirectly employs almost 70% of the labour force in the country. The population of the Republic of Uganda currently stands at 41.1 million inhabitants. (March 2018) Uganda is a presidential republic in which in which the President of Uganda is both the head of state

More information

of the PRESIDENT to the EXECUTIVE DIRECTORS on the PROPOSED LOAN and to the in the July 9, 1953

of the PRESIDENT to the EXECUTIVE DIRECTORS on the PROPOSED LOAN and to the in the July 9, 1953 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized P - 49 RESTRICTED This report is restricted to use within the Bank. INTERNATIONAL BANK

More information

IDBI Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3779 IN. Public Disclosure Authorized. (Industrial Pollution Prevention Project)

IDBI Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3779 IN. Public Disclosure Authorized. (Industrial Pollution Prevention Project) Public Disclosure Authorized LOAN NUMBER 3779 IN Public Disclosure Authorized IDBI Loan Agreement Public Disclosure Authorized (Industrial Pollution Prevention Project) between INTERNATIONAL BANK FOR RECONSTRUCTION

More information

IDA Terms (Effective as of April 1, 2016)

IDA Terms (Effective as of April 1, 2016) IDA Terms (Effective as of April 1, 2016) Grace Principal Repayments i/ Maturity b/ Period Year 7-20 Year 21-38 Acceleration Clause c/ Grants a/ NA NA NA NA NA Regular d/ 38 6 3.125% 3.125% Yes Blend e/

More information

External Position of the Egyptian Economy

External Position of the Egyptian Economy Central Bank of Egypt External Position of the Egyptian Economy During July / March 2004/05 Quarterly Report Volume No. (9) July 2005 Foreword The External Position of the Egyptian Economy Report is one

More information

IDA Terms (Effective as of January 1, 2017)

IDA Terms (Effective as of January 1, 2017) IDA Terms (Effective as of January 1, 2017) Please check IDA's website for the latest lending rate information; some rates might change as IBRD's spreads change. Grace Principal Repayments i/ Period Maturity

More information

SUMMARY OF THE PROGRAMME AND THE BONDS SECTION A INTRODUCTION AND WARNINGS

SUMMARY OF THE PROGRAMME AND THE BONDS SECTION A INTRODUCTION AND WARNINGS SUMMARY OF THE PROGRAMME AND THE BONDS Summaries are made up of disclosure requirements known as "Elements". These elements are numbered in Sections A E (A.1 E.7). This summary contains all the Elements

More information

The Country Classification of Tajikistan

The Country Classification of Tajikistan The Country Classification of Tajikistan A. Introduction 1. The Republic of Tajikistan became a regional developing memb,er country (DMC) of the Bank in April 1998, and is seeking Bank assistance to support

More information

El Salvador. 1. General trends. 2. Economic policy. Most macroeconomic indicators for El Salvador worsened in Real GDP increased by

El Salvador. 1. General trends. 2. Economic policy. Most macroeconomic indicators for El Salvador worsened in Real GDP increased by Economic Survey of Latin America and the Caribbean 2008-2009 173 El Salvador 1. General trends Most macroeconomic indicators for El Salvador worsened in 2008. Real GDP increased by 2.5%, two percentage

More information

Development Credit Agreement. (Management of the Petroleum Economy Project) between REPUBLIC OF CHAD. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Development Credit Agreement. (Management of the Petroleum Economy Project) between REPUBLIC OF CHAD. and INTERNATIONAL DEVELOPMENT ASSOCIATION Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3316 CD Public Disclosure Authorized Development Credit Agreement (Management of the Petroleum Economy Project) between REPUBLIC OF CHAD and Public

More information

Mauritius First Public Sector Performance Development Policy Loan Region

Mauritius First Public Sector Performance Development Policy Loan Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6561 Operation Name Mauritius

More information

R e p o r t N o. P-105

R e p o r t N o. P-105 This document was prepared for internal use in the Bank. In making it available to others, the Bank assumes no responsibility to them for the accuracy or completeness of the information contained herein.

More information