Government of Bihar (Energy Department) Proposed Annual Plan for 2012-13 The proposed outlay for the Annual Plan 2012-13 of the Energy Department is as follows. : (Rupees in lacs) Total proposed outlay for 2012-13 - 1867,86.60 Total proposed Earmarked for 2012-13 (a) RIDF 263,57.00 (b) EAP 6000.00 (c) BRGF 525,00.00-848,57.00 Total proposed remaining out lay for 2012-13(State Plan) - 101929.60 Annual Plan (2012-13) (Rupees in lacs) For BREDA Particulars Proposed Annual plan Amount And for Sinchai shour karnti yojna for other Solar light schemes, For Street Light, Solar Lantern & Solar Home light Sub Total: 1628.60 For BSEB State Plan (a) Generation (b) Distribution (c) Transmission (d) R-APDRP/APDRP Head wise Proposed Annual plan Amount 55978.00 28715.00 9201.00 6407.00 Sub Total: 100301.00 Total: 101929.60 JNP JS 11-02-11- Plan-2012-13
STATE PLAN A) Generation : (Rupees in lacs) sl.no. Particulars Proposed Annual plan for 2012-13 SCHEME : 1 Nabinagar TPS (3x660 MW) 15000.00 2 BTPS Extension (2x250 MW) Including Ganga water scheme. 25000.00 3 MTPS Extension (2x195 MW) 15978.00 Total ( Scheme ) 55978.00 B) Distribution : (Rupees in lacs) sl.no Particulars Proposed Annual plan for 2012-13 1 Replacement of Old & Damaged Conductor (Continuing Scheme) 5000.00 2 Scheme for Capacity Augmentation and installation of additional Power transformers in P.S.S. of distribution 4144.00 System (Continuing Scheme) 3 Replacement of burnt / damaged distribution transformers. 4993.00 (Continuing Scheme) 4 Scheme for Capacity Augmentation and installation of 4000.00 additional distribution transformers. (Continuing Scheme) 5 Replacement of burnt / damaged Power Transformers 5984.00 (Continuing Scheme) 6 Scheme for transfer of electrical connection given on Bansballa 996.00 system to Pole, conductor etc. 7 Installation of A.B. Switch in P.S.S. and D.S.S in 1416.00 distribution system 8 Construction of PSS at Narayanpur, Dist.Madhubani 490.00 (continuing Scheme) 9 Construction of PSS at Telhara Bazar, Bairgania, Saidpur, 1032.00 (continuing Scheme) 10 Construction of PSS at Chaksarwar.(continuing Scheme) 345.00 11 Construction of PSS at Jale,Dist. Dharbhanga. 315.00 (continuing Scheme) Total : 28715.00 JNP JS 11-02-11- Plan-2012-13
C) Transmission : (Rupees in lacs) sl.no Particulars Proposed Annual plan for 2012-13 1 Shifting of 132/33 KV Mithapur G.S.S. and R.K. Nagar 2236.00 33/11 KV P.S.S. from its existing place to Karbigahiya (on going Scheme) 2 Construction of transmission system for evacuation of power 2612.00 from KBUNL, Muzaffarpur 3 Construction of 132/33 Kv G.S.S. at following places with 1000.00 associated 132 KV lines at Jandaha, with associated line (On going Scheme) 4 Construction of 132/33 Kv G.S.S. at following places with 2253.00 associated 132 KV lines at Tehta & Imamganj (On going Scheme) 5 Construction of 132/33 Kv G.S.S. at following places with 100.00 associated 132 KV lines at Ekma (On going Scheme) 6 Construction of 2x100 MVA, 220/132 KV Bihta G.S.S. 500.00 7 Construction of 5 Nos. of 132 KV Bays at G.S.S. at 300.00 Sitamarhi, Bihta, Khagaul, Ara & Nawada 8 Construction of 10 Nos. of 33 KV Bays at Sitamarhi, Bihta, 200.00 Kaghaul, Ara, Nawada, and five other places. Total 9201.00 D) APDRP/RAPDRP : 1 Release of APDRP & R-APDRP part A funds 1407.00 (Ongoing scheme) 2 Release of R-APDRP part B funds 5000.00 Total 6407.00 JNP JS 11-02-11- Plan-2012-13
JNP JS 11-02-11- Plan-2012-13
BIHAR STATE ELECTRICITY BOARD, PATNA Proposed Annual Plan for 2012-13 GENERATION Bihar has only two Thermal Power Stations in the State Sector namely Barauni Thermal Power Station ( 2x110 MW) with the Bihar State Electricity Board and Muzaffarpur Thermal Power Station (2x110 MW) with the Kanti Bijlee Utpadan Nigam Ltd., joint venture of Bihar State Electricity Board and NTPC Ltd. All the units at these power stations had been under long shut down due to various defects/problems and financial crunch. However, based on decisions taken by the State Govt. and the Central Govt., restoration works of one unit at each was taken up and presently the generation obtainable from the Barauni Thermal Power Station Unit No- 6 is 60-70 MW and from Muzaffarpur Thermal Power Station Unit No - 2 is 70-80 MW. The demand of power in the state is around 2000 MW. The demand of power is met mainly from the Central Sector allocation which is presently 1726-1772 MW. In the light of the meager installed generation capacity and to meet the ever growing requirement, several steps have been taken to enhance power generation capacity both in the public sector and private sector. Under Backward Region Grants fund (BRGF) : (i) Generation : The scope of remaining works of R&M of 2x110 MW units at BTPS (Mechanical, Electrical & Civil Works) which were not included in 11th Five Year Plan has been included under BRGF and is proposed for 12th Five Year Plan amounting to Rs. 158 crores. A provision. of Rs 70.00 crs. has been made under BRGF in Annual Plan 2012-13. (ii) Transmission :- An estimated amount of Rs. 5875.91 crores will be required during 12 th Plan for expansion of G rids, Lines and Transmission sub-systems to meet the requirements of increased power flow which has been proposed under BRGF scheme. A provision. of Rs 341.8839 crs. has been made under BRGF in Annual Plan 2012-13.
(iii) Distribution :- Development of infrastructure development in distribution sector as well as separation of agriculture feeder has been proposed in 12th Five year Plan tots up to Rs. 2235.84 crores A provision. of Rs 447.00 crs. has been made under BRGF in Annual Plan 2012-13. Under State Plan :- (i) Nabinagar Super Thermal Power Project (3x660 MW) The Govt. of Bihar has set up a Joint Venture Company on 50:50 equity basis between Bihar State Electricity Board and N.T.P.C. Ltd., named as M/s Nabinagar Power Generating Co. Pvt. Ltd. The proposal is to set up 3x660 MW Thermal Power plant at Nabinagar in district Aurangabad, Bihar at an estimated cost of Rs. 12964.57 Crores. Provision of Rs. 300.00 Crs. has been made under State Plan to NPGCPL towards B.S.E.B. equity in the joint venture company under Annual Plan 2012-13 (ii) Barauni T.P.S. Extension (2x250 MW) The expansion of BTPS (2x250 MW) has been sanctioned by State Govt. under State Plan at a total project Cost is Rs. 3666 crs. The work is being done by M/s BHEL on turn-key basis and project activity consultant is M/s STEAG. Ganga water scheme is under progress for BTPS Extension at an estimated cost of Rs. 173.00 crores. A provision. of Rs 100.0 crs. has been made for BTPS extension alongwith Ganga water scheme under Annual Plan 2012-13. (iii) Muzaffarpur T.P.S. Extension (2 x 195 MW) The Muzaffarpur Thermal Power Station is now under a joint venture company of Bihar State Electricity Board and N.T.P.C. Ltd., named as M/s Kanti Bijlee Utpadan Nigam Ltd. (KBUNL). The proposal for extension of Muzaffarpur T.P.S. was initially for 2x250 MW. However, on account of the aviation clearance accorded, the proposal is now for 2x195 MW. The Project cost is Rs. 3345 crore and BTG Package work is being executed by BHEL. Provision of Rs. 159.78 Crs. has been made under State Plan to KBUNL towards B.S.E.B. equity in the joint venture company under Annual Plan 2012-13 2
Transmission:- (i) Karbigahiya G.S.S. 132/33 KV Mithapur G.S.S. and 33/11 KV R.K.Nagar PSS has to shift from its existing place and & new 132/33 KV GSS and 33/11 KV PSS is being constructed at Karbigahiya premises. So, for above wok an amount of Rs. 22.36 crores is proposed in Annual Plan 2012-13. (ii) MTPS Extension Project (2x195 MW) under which two unit of 195 MW each is being executed. So, for evacuation of power from new units is not possible unless transmission system is being constructed. A scheme for construction of transmission system amounting to Rs. 26.12 Crore to be executed for evacuation of power from KBUNL, Muzaffarapur and the accordingly same has been proposed in Annual Plan 2012-13. (iii) Construction of New G.S.S. Construction work of 4 nos. of new 132/33 KV G.S.S. at Jandaha, Tehta, Imamganj & Ekma with associated 132 KV lines is going under State Plan. A provision of Rs. 33.53 crores has been made towards this in Annual Plan 2012-13. (Sr. no. 3,4 & 5) (iv) Capacity Augmentation of 132/33 KV Bihta GSS and a new 2x100 MVA, 220/132/33 KV GSS at Bihta has to be constructed in 2012-13 & 2013-14. So, for executing the project an amount of Rs. 5.00 crores is proposed in Annual Plan 2012-13. (v) 5 Nos. of 132 KV Bays at GSS at Sitamarhi, Bihta, Khagaul, Ara & Nawada and 10 Nos. of 33 KV Bays at 10 different places has to be constructed for evacuation of power from new upcoming G.S.S. A Provision of total 5.00 Crore has been made under State Plan in Annual Plan 2012-13. (Sr. no. 6 & 7) 3
DISTRIBUTION : (i) Replacement of old/damaged conductors of Distribution lines : BSEB has estimated that for the replacement of old and damaged conductors during three years for which an amount of Rs.221 crs. is required. Of this amount, a sum of Rs. 50.00 crs. is required in Annual Plan 2012-13 as budget provision. (Sr. no. 1) (ii) Augmentation of Power Transformer and installation of additional D/S/S to meet the growing loads of the State :- It is seen that a nos. of Power transformers and distribution transformers in the state are heavily loaded/overloaded presently due to growth of loads. With the improvements in power availability and strengthening of transmission and distribution system, the capacity of existing running transformers are to be augmented and corresponding additional D/S/S have to be installed also to meet the requirement of increasing demand. For this, two scheme for augmentation of some existing running Power transformers and another for installation of D/S/S has been formulated respectively at a cost of Rs. 80.23 crores and Rs. 150.21 crores. provision has been made for Rs. 41.44 crores and Rs. 40.00 crores under Annual plan 2012-13. (Sr. no. 2 & 4) (iii)replacement of burnt/damaged Power & Distribution Transformers: In order to provide uninterrupted power supply to consumer, burnt power & distribution transformers have to be replaced in definite time. So, for this two schemes, one for replacement of burnt/damaged Power transformers has been made for three years amounting to Rs. 67.84 Crores and Rs. 77.93 Crores respectively. Provisions of Rs. 59.84 Crore and Rs. 49.93 Crores have been made on this account in Annual Plan 2012-13. (Sr. no. 3 & 5) (iv) Removal of Bans Balla connection :- A new scheme has been proposed for removal of existing 'Bans Balla' coonections in urban as well as rural areas, which are causing frequent break down of supply, burning of distribution transformer and occurrences of electrical accidents. The scheme provides extension of L.T. lines with overhead lines on PSC poles at the cost of Rs. 9.96 crore only. Provision of this amount has been made in Annual Plan 2012-13. (Sr. no. 6) 4
(v) Installation of A.B. switches in PSS and DSS :- There are few P.S.S. & D.S.S. in distribution system where A.B. switch is either not installed or damaged causing interruption in power supply and electrical accidents sometimes. In this respect a scheme for installation of A.B. switch has been prepared amounting to Rs. 14.16 crores and accordingly budget provision of the same has been made in Annual Pan 2012-13. (Sr. no.7) (vi) Construction of new P.S.S. :- At six different places namely (i) Narayanpur, Block- Jhanjharpur, distt.- Madhubani (ii) Telhara Bazar, Block- Ekangarsarai, Distt.- Nalanda (iii) Bairgania, Distt.- Sitamarhi. (iv) Saidpur, Block-Ben, distt- Nalanda. (v) Jamaalpur Chaksarvar, block- Athmalgola, Patna. (vi) Jaale, Distt. - Darbhanga new PSS has to be constructed in order to facilitate power supply and strengthening of distribution system. A sum of Rs. 21.82 crores is required in Annual Plan 2012-13 as budget provision. (Sr. no. 8,9,10 & 11) (D) R-APDRP Project Part-A & Part-B For covering 71 Towns having population of more than thirty thousand, fund to be provided by BSEB / Bihar Govt. is Rs. 59.10 Crores against total project cost of Rs. 253.68 Crs. proposed for R-APDRP, Part-A Strengthening of Distribution system is being done under R-APDRP Part-B scheme for 64 towns. Provisions of Rs. 10.00 Crores for APDRP and 4.07 crores for RAPDRP Part-A and Rs. 50.00 Crores for Part-B have been made in Annual Plan 2012-13. (E) Externally Aided Project (EAP) : EAP consists of targeted investments in strengthening of electrical distribution system of 7 towns in the state and Transmission system improvement. The total cost of the project is about Rs. 708.0 Crs., out of which 100.0 Crs has to be funded by BSEB/GOB and remaining by Asian Development Bank (ADB). The provision. of Rs. 60.00 Crs has been made under EAP in Annual Plan 2012-13 5
Annual Plan for Renewable Energy. Bihar Renewable Energy Development Agency. For Promotion and implementation of Non- Conventional-Sources of Energy program and schemes the provision of Rs. 16.2860 Crs. under State Plan has been made for Annula Plan 2012-13. In this program Solar lantern, solar Streat light, Solar Charging Station, Solar water pumping, Tharuhat Solar lantern distribution program schemes are to be taken. Out of total out-lay for Energy sector and amount of Rs. 16.2860 Crs. is being proposed for New and Renewable Energy Schemes during 2012-13 which are as follows :- Sl. no Name of the Schemes No Fund required in 2012-13 1 Solar lantern 10000 1.50 2 Solar street light 1000 0.96 3 Solar charging station 25 0.50 4 Solar water pumping 500 7.75 5 Tharhut solar lantern distribution 2000 0.60 6 Mushhar development program street light 1660 4.9760 Total 15185 16.2860 Crs Annual Plan for Hydro - Energy. Bihar State Hydroelectric Power-corporation Preparation of Annual Plan is to be taken up at a time when we are moving towards the 12 th five - year plan period, in the year 2012-13 total out-lay of Rs. 6356.87 lacs has been year-worked for RIDF loan to be given to Bihar State Hydro-electric Power Corporation for the following sanctioned schemes :- Sl. no Name of the Schemes Capacity Trench Location Project Cost Fund required in 2012-13 1 Katanya 2x1000 K.W RIDF-XIII W. Champaran 899.30 50.00 2 Barbal 2x800 KW RIDF-XIII W. Champaran 727.21 50.00 3 Mathauli 2x400 KW RIDF-XIII W. Champaran 497.32 90.00 4 Bathnaha 8.00 MW RIDF-XV Araria 6937.35 2000.00 5 Nirmali 7.00 MW RIDF-XVI Supaul 6561.89 2000.00 6 Dihari 3.3 MW RIDF-XVI Rohtas 1184.22 500.00 7 Dehra 1.00 MW RIDF-XVII Rohatas 1421.00 500.00 8 Sipha 1.00 MW RIDF-XVII Rohatas 1302.00 500.00 9 Ararghat 7.00 MW RIDF-XVIII Madhepura 6534.00 666.87 Total 26064.29 6356.87 6
7