Comments on CEPA s draft conclusions in relation to European transmission tariffs

Similar documents
European transmission tariff structures Cambridge Economic Policy Associates

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received

Draft. COMMISSION REGULATION (EU) No /

COMMISSION REGULATION (EU)

Austrian Power Grid Comments to ACER consultation

Grid Investments from a Nordic Perspective

The Nordic Market Model 10 Years of Experience

RESPONSE TO ACER'S CONSULTATION ON TARIFFS

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority.

Cross border participation in CRMs Presentation materials. 30 June 2015

SUMMARY OF THE ASSESSMENT OF THE COMMENTS FROM THE PUBLIC CONSULTATION OF REGARDING PRICE OF THE SERVICES OF ACCESS TO INTERCONNECTION LINES

Nordic bidding zones. Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers.

NordREG Activities 2008

20 years operation of the Nordic electricity market

We appreciate your feedback

Power Trading in the Coupled European Markets

Supporting document for the Danish TSO, Energinet, of the Nordic Capacity Calculation Region proposal for splitting long-term cross-zonal capacity

The current ETSO ITC Model and possible development


CID Methodology Explanatory note

PRICING ASPECTS OF FORWARD LOCATIONAL PRICE DIFFERENTIAL PRODUCTS

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU)

Work Programme Nordic Energy Regulators (NordREG)

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

South East Europe Electricity Market options paper

Table of Contents List of Figures...3 List of Tables...3 Definitions and Abbreviations...4 Introduction...7

How to avoid market manipulation lessons learnt in Norway. 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE

Report on Proposed principles for Common Balance Management

C2-102 COMMON NORDIC BALANCE MANAGEMENT. K.LINDSTRÖM FINGRID (Finland)

Jonathan Faull Director General, Financial Stability, Financial Services and Capital Markets Union European Commission 1049 Brussels

Measures to support the functioning of the Nordic financial electricity market

Treatment of Losses by Network Operators an ERGEG Position Paper for public consultation

EFET reaction 25 April 2017

Guidelines for improvement network regulation for enhancing the share of DG DSO revenues and incentives to integrate DG

Generation investment in a liberalised electricity market. 28 March 2008

Baltic Harmonised Imbalance Settlement Model Document

Nord Pool Spot s Market Surveillance focuses on insider trading and market manipulation according to REMIT Article 15

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2)

FINAL REPORT - STRUCTURE OF PARTICIPANT FEES IN AEMO S ELECTRICITY MARKETS 2016 FINAL REPORT

Mr. Heinz HILBRECHT Director DG TREN EC Rue de la Loi 200 BE-1049 BRUXELLES. 17 March Dear Mr. Hilbrecht,

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity

18 April 2016 Draft for consultation

System Operating Policies on Compensation between Elia and Nemo Link

Regulatory framework for crossborder redispatching and countertrading

Proposal of the Transmission System Operators of the Baltic. Capacity Calculation Region for the regional design of longterm

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018

The market setup in the Baltics explanation with examples

Managing Locational Price Risk: Options

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

Workshop on Regional Electricity Trade and Market Development

Congestion Management Guidelines. Compliance report

Work Programme 2007 Report 1/2007

Network Code on Forward Capacity Allocation

Congestion Revenue Rights Auction Efficiency Track 1B Draft Tariff Language

***I DRAFT REPORT. EN United in diversity EN. European Parliament 2016/0379(COD)

Scope and policy options for Framework Guidelines on Harmonised transmission tariff structures. -Public Hearing -

NordREG s status update to EMG July June Approved by NordREG Board

General Tax Principles

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E

EUROPEAN COMMISSION DIRECTORATE-GENERAL POR ENERGY

ACER Consultation Template. Tariff NC Article 26(5)

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

The North Seas Countries Offshore Grid Initiative

Contents 1. Introduction Executive Summary EAI Response Main Concerns Assumptions on Costs

FORTUMS RESPONSE TO ACER CONSULTATION ON FORWARD RISK-HEDGING PRODUCTS AND HARMONISATION OF LONG-TERM CAPACITY ALLOCATION RULES

ENTSO-E recommendations for Market Design Trilogue negotiations

Entrepreneurial Interconnectors: Safe Harbour Provisions

Available online at ScienceDirect. Energy Procedia 58 (2014 ) Renewable Energy Research Conference, RERC 2014

7 April ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

Report on regulation and the electricity market. Norway

EU Emission Trading - Better Job Second Time Around? ECEEE Summer Study La Colle sur Loup, France 5-9 June 2007

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT

Gas Market Modelling for the Quo Vadis Project 26 July, Budapest, Hungary. Memo on the Q&A session of the Workshop

CMP282: The effect Negative Demand has on Zonal Locational Demand Tariffs. CUSC Modification Proposal Form

View on the perspective on Regional Gas Market Development in Eastern Baltic Region

PUCT Staff Schedules Disconnect Workshop, Issues Questions

Order Minute Settlements

Methodology for assessment of the Nordic forward market

CEER Workshop on Power Losses European experiences in the treatment of losses / Summary of a survey among NRAs

Wholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia

16 July 2018 DRAFT VERSION for public consultation

The Model of Implicit Capacity Allocation in the Baltic States

Department of Economics Queen s University ECON 239: Development Economics Assignment # 3 Due Date: Wednesday, November 26, :30 am (in class)

The Concept of Baltic CoBA

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation

CROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES

DECISIONS. COUNCIL DECISION of 26 May 2014 on the system of own resources of the European Union. (2014/335/EU, Euratom)

Interconnector participation in Capacity Remuneration Mechanisms

MARCH A report for the. Australian Energy Market Commission

CMP222 User Commitment for Non- Generation Users Volume 1

Summary of Prior CAISO Filings and Commission Orders Concerning CAISO Market Redesign Efforts

British Bankers Association

Single Electricity Market

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON

MARI Project. BSG meeting 7/12. Manually Activated Reserves Initiative - Creating a European platform for the exchange of mfrr balancing energy

EAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules

State of play of capacity markets in Europe Eurelectric Conference 'Capacity markets - delivering security of supply in the IEM' 04 March 2015

Transcription:

July 2015 Frontier Economics 1 ACER commissioned CEPA to review harmonisation of transmission tariffs in Europe, and specifically to: assess whether increased harmonisation of electricity transmission tariff structures would be beneficial; and if this were the case; and to recommend the most appropriate policy option. CEPA presented their draft conclusions at an ACER workshop. In essence their work has concluded that: The status quo may potentially prevent the efficient least cost development of the European electricity system, though they note that they have found more evidence for distortions in relation to operational than investment decisions; In the short term, existing policies and specifically the requirements of Regulation 838/2010 should be sufficient to prevent potential negative effects, and in particular the removal of generation (G) charges or the imposition of a common generation:load (G:L) split would not be appropriate; and In the longer term, the establishment of a common set of principles for transmission tarification would be the most beneficial way forward, as they suggest the biggest problems stem from an absence of agreement on such principles. Energy Norway has asked Frontier Economics to comment on CEPA s findings, and in particular to: consider whether CEPA s suggestions for the short term are beneficial and whether they could be improved; and consider whether CEPA s suggestions for the longer term are appropriate. Short term: 838/2010 should be maintained and improved In general, we agree with CEPA s findings that the status quo arrangements are capable of resulting in inefficient outcomes in relation to both investment and

2 Frontier Economics July 2015 operational decisions 1. To address any potential distortions, 838/2010 provides ranges within which annual average transmission charges paid by producers in each Member State must fall (Annex A, Part B, paragraph 2). The range that applies to Denmark, Sweden and Finland also in practice applies to Norway, i.e. 0 to 1.2 /MWh. These ranges were not set with reference to a detailed study on cost reflectivity and hence do not necessarily represent a move in the direction of CEPA s long term vision. However, neither is there time in the short term for such a study. In this sense, we agree with CEPA that the maintenance of the ranges set out in 838/2010 would be a reasonable interim step this would at least ensure that bigger differences between tariffs faced by producers do not emerge, even if it will not lead to the progressive harmonization referred to in Regulation 714/2009 (Article 18(2)). We certainly agree that this would be preferable to the removal of G charges completely (generators are likely to contribute at least something to forward looking costs) or to the specification of a common G:L split (which would still leave the potential for large variances in absolute G charges, which is what matters from the perspective of creating distortions). However, we do not believe that CEPA has explored all of the options for improvement on the requirements set out in 838/2010. Specifically, we do not believe sufficient attention has been paid to the issue of exemptions from the charges constrained by 838/2010. Generic issues associated with exemptions As noted above, 838/2010 sets specific ranges for annual average transmission charges paid by producers. However, it also provides for explicit exemptions from these ranges, specifically for: charges paid by producers for physical assets required for connection to the system or the upgrade of the connection (para 2(1)); charges paid by producers related to ancillary services (para 2(2)); and specific system loss charges paid by producers (para 2(3)). It is not clear why these charges were exempted. It may be because it was assumed that charges for these items would be more likely to be cost-reflective, or it may be that it was felt difficult to estimate appropriate ranges for them. 1 We note that CEPA has found more evidence in relation to operational decisions. However, we would suggest that conclusions from the lack of evidence in relation to investment decisions are drawn with caution. We agree with CEPA that many wider factors (e.g. tax and subsidy policies) drive investment decisions. It is precisely for this reason that it is difficult to assess how investment decisions may have been different had tariffs been more harmonised, and hence why it is difficult to provide concrete evidence of investment based distortions. Given this, the lack of evidence should not be taken to be clear proof that the distortions do not exist.

July 2015 Frontier Economics 3 However, their existence provides a source of distortions that is not constrained by 838/2010. Ambiguities or differences in the definition of these excluded charges (or laxity in policing of their interpretation) provides scope for TSOs and NRAs to move costs which should more properly fall under harmonized charges into these charges (and vice versa). This should be a concern even in the short term. Issues of interpretation arise in each of the three exclusions set out in 838/2010. The definition of connection costs varies significantly around Europe. ACER itself, in Table 8 of their 2014 Opinion on producer transmission charges, presented evidence suggesting that the costs which were defined as required for connection to the system varied widely depending on whether a shallow or deep connection policy is adopted. Nine countries were reported as having a deep connection policy, where connection charges recovered some main system grid reinforcement costs, whereas 16 countries had a shallow connection policy, where such reinforcement costs were covered by the charges which are constrained by 838/2010. If one country has a shallow connection charging policy and locational transmission charges to reflect deep system reinforcement costs, and its neighbour has a deep connection charging policy and non-locational transmission charges, in principle it is possible for both to be cost reflective. However, if 838/2010 constrains the locational transmission charges of the first country but does not constrain the deep connection charges of the second, an outcome which is not consistent with a cost-reflective pattern of relative charges may result. The approach taken to defining ancillary services costs may also vary. Take as an example the provision of reactive power by generators (and potentially certain loads). The cost of this provision is frequently recovered through ancillary services charges. However, it is also possible for TSOs to invest in equipment (e.g. shunt capacitive compensation) to provide reactive power. Investments in network equipment may either be defined as part of average annual transmission charges and hence be constrained by 838/2010, or may be charged as ancillary services and be unconstrained. So again, if one country included reactive compensation equipment in transmission charges and these are constrained by the levels in 838/2010, but another country includes them in (unconstrained) ancillary services charges, the relative overall charges faced by producers may not be consistent with a cost reflective outcome. Finally, there is significant variance in the costs recovered relating to transmission losses. In many systems, the losses charge simply represents average transmission losses. However, in some systems, charges to generators are based on marginal transmission losses. Because of the way losses vary with line loading, marginal losses tend to be higher than average losses, meaning that

4 Frontier Economics July 2015 charges based on marginal losses will recover more than the average cost of losses. The surplus is typically used to reduce average annual transmission charges. Put another way, in some countries some part of the costs which are meant to be covered by the charges constrained by 838/2010 are recovered through high losses charges. So, within the constraints of 838/2010, for two otherwise identical countries, producers in a system with marginal losses charges could face higher grid costs than those in a system with average losses. Beyond these three exclusions, there is a fourth implicit exclusion from average annual transmission charges, namely the cost of congestion. In a number of countries, market splitting creates price zones for energy. Generators in export constrained price zones pay transmission charges, and also receive a lower price for their energy. One could say that they face a further charge related to the short run marginal cost of congestion on the grid, which is equal to the difference between zonal energy prices (or the difference between the system energy price and the zonal energy price where they are located). This charge is in many ways analogous to the difference between locational transmission charges which are present in some other systems, and which would be constrained by 838/2010. The revenue raised through these charges (the congestion rent between zones) is typically used to reduce average annual transmission charges. In some countries the rent may reduce the load component of annual transmission charges, and in others it may reduce both generation and load components. As with charges based on marginal losses, another way of putting this is that part of the costs which are meant to be covered by the charges constrained by 838/2010 are recovered through excluded charges. This means that the implementation of 838/2010 may result in outcomes not consistent with cost reflective charges. This can be seen by comparing, for example, a system with locational signals sent through transmission charges (which can be constrained by the ranges set out in Regulation 838/2010) with a system with zonal pricing sending within-country locational signals which are not constrained by any regulation. These explicit and implicit exclusions all create a potential for distortion. This is shown in Figure 1.

July 2015 Frontier Economics 5 Figure 1. Distortionary effect of exclusions from 838/2010 Price differential to import constrained zone Marginal less average losses Losses charges Cost of reactive compensation kit Losses charges Ancillary service charges Connection charges Annual average transmission charges to producers Total grid costs for producers Charges constrained by 838/2010 Additional charges likely to distort efficient outcomes Charges constrained by 838/2010 Total grid costs for producers Ancillary service charges Deep element of connection charges Connection charges Annual average transmission charges to producers COUNTRY A COUNTRY B Source: Frontier Economics In Figure 1 we show two countries, both of which have equal constrained levels of annual average transmission charges as defined by 838/2010. However, country B charges additional costs to producers through separate and unconstrained charges relating to connection charges, ancillary services, losses, and congestion. As a result, producers in country B pay significantly higher total grid-related charges than those in country A. Even if B s additional charges are cost reflective, the fact that 838/2010 constrains transmission charges in country A (which might otherwise have been higher) means that the relativity between charges in A and B can be inefficient. As CEPA suggests, the maintenance of 838/2010 is therefore a helpful necessary condition for the removal of distortions in the short term. However, it is not necessarily sufficient to generate the progressive harmonization required by Regulation 714/2009. Manifestation of these issues in Norway Some of the issues identified above apply to Norway. In particular, the losses and congestion aspects of grid charges in Norway are based on short run marginal costs. Hence: producers face charges related to marginal losses calculated weekly by the Norwegian TSO (marginal loss factor at the node to which the production is connected multiplied by the hourly spot price from Nordic power exchange Nord Pool ElSpot); and

6 Frontier Economics July 2015 producers in exporting zones face a price reduction resulting from a zonal spot price. Both of these aspects of grid related charges for producers result in surplus revenue (the difference between marginal and average losses valued at the spot price and the zonal congestion rent respectively). This surplus is used to reduce transmission revenue, which in turn reduces the charges levied by Statnett which are constrained by 838/2010. While Sweden also has marginal losses, these are valued on a different basis (the hourly spot price is not used) and they are capped at a different value (in Norway they are capped at 15%, whereas in Sweden they are capped at 8%). And Finland and Denmark have neither marginal losses nor zonal pricing, and so producers in those countries do not face these issues. In line with the logic set out by CEPA, this has the potential to cause distortions to efficient outcomes (because it has an impact on the equilibrium price on Nord Pool in each of the systems). The simple maintenance of the ranges set out in 838/2010 will not result in the removal or reduction of these distortions, or result in progressive harmonization in the Nordic area. In addition, the producer charge for some ancillary services cost in Norway 2 is a set charge per unit ( 0.25/MWh for all producers), with other costs being recovered through charges for being out of balance. At least the fixed variable charge is unlikely to be reflective of the incremental costs resulting from the injection of additional generation onto the system, not least since there is typically a large proportion of ancillary service costs which are a function of capacity rather than production. While this lack of cost reflectivity may not be an issue which is addressable in the short term, it again has the potential to cause distortions from efficient outcomes. Conclusions on the short term CEPA s conclusions for the short term appear to be reasonable, but perhaps do not go far enough. The maintenance of 838/2010 would still provide the freedom for TSOs and/or NRAs to use the provisions for exempted charges (and the failure to take into account charges related to congestion) to create a distorted playing field for producers. Within the framework of the current requirements of 838/2010, the situation would be improved if ACER or the EC took action to clarify, through guidelines or another interpretive document, the specific items which are permitted to be included in each of the exempted charges, and how cost-reflective levels of these charges could be assessed. This would reduce significantly the scope for TSOs 2 Statnett has stated that they would like this charge to recover as much as 50% of the system services costs (excluding ITC costs, and certain costs recovered via the balance settlement).

July 2015 Frontier Economics 7 and/or NRAs to implement different treatments of cost and hence the potential for inefficient outcomes. This could also help ensure that differences in producer charges reduce over time, rather than them simply getting no bigger. Long term: principles are necessary but not sufficient CEPA s recommendations for the long term are based on the conclusion that the biggest problems stem from the absence of a common set of principles for transmission tarification. It is clear that a common set of principles would be helpful. We agree with CEPA s suggestion that these principles should include: a definition of cost reflectivity; and an approach to cost recovery where cost reflective charges do not recover cost (ideally, through charging load which is less price sensitive than generation). To CEPA s suggested principles, we would add: simplicity: it is important that investors can understand the price signals which transmission tariffs are sending, otherwise there is a risk that they will not be able to respond (meaning that they are bearing risk for no real purpose); and predictability: it is important for investors to be able to predict with reasonable certainty the way in which regulated charges will evolve. If tariff solutions are not simple and predictable, the cost of capital which investors charge to be exposed to regulatory risk (volatility in transmission tariffs) will increase, and with it costs to customers overall. Any harmonized principles would have to be reasonably detailed. For example, consider the hypothetical principle that tariffs should be based on forward looking marginal costs. This can be argued to be consistent with economic principles associated with tariff setting, because it would ensure that grid users faced tariffs linked to the additional costs which their connection to and use of the grid caused. But this hypothetical principle is too ambiguous. As we have noted above, tariffs could be based on long run marginal costs or short run marginal costs and still be consistent with this principle. And, as has been seen in the debates associated with the TAR Network Code in the gas sector, multiple different methodologies can be argued to be consistent with long run marginal costs, even though they may produce markedly different tariff outcomes. Finally, we would argue that ACER and the EC need to go beyond harmonized principles. Under the existing Regulation, it is clear whether a given set of

8 Frontier Economics July 2015 charges is consistent with the Regulation 3. Any party wishing to check would have a simple calculation to perform. If the quantitative aspects of 838/2010 were removed and replaced with a set of principles, this would not be the case. This in turn would have two implications: market participants would have less transparency over the level of generator charges which they might expect. This would result in greater uncertainty as to the cost base of generation investments, and therefore a greater perception of risk for generation investors. This would eventually feed through to lower volumes of investments (with a threat to security of supply) and/or higher wholesale energy or capacity prices as investors charged more to bear this risk; and there would be fewer checks and balances on TSOs and regulators in defining generation tariffs. Assessing whether tariffs are based on incremental costs will not be a trivial undertaking, and so verifying whether charges have been set correctly will have a material cost. This may deter participants from attempting such verification, which may in turn allow TSOs and regulators to set tariffs in a way which is not consistent with the Regulation in order to provide an advantage to their own national generation assets or customers (unless verification efforts by the EC or some other authority stepped up to compensate). All these arguments point in the direction of the need for a more prescriptive Network Code, setting out both harmonized principles and details of harmonized tariff methodologies or charge levels. The implementation of such a Network Code could ensure that progressive harmonization and reducing differences between producer charges becomes a reality. Experience of the TAR Network Code in the gas sector suggests that agreeing such a prescriptive set of guidelines will be difficult. Hence, it may be that a regional approach to harmonization, which harmonises in a step-wise process regional practices may be a practical first step. 3 Although as we note above 838/2010 itself needs clarification as to the specific items that are permitted to be included in each of the exempted charges.

July 2015 Frontier Economics 9 Frontier Economics Limited in Europe is a member of the Frontier Economics network, which consists of separate companies based in Europe (Brussels, Cologne, London & Madrid) and Australia (Melbourne & Sydney). The companies are independently owned, and legal commitments entered into by any one company do not impose any obligations on other companies in the network. All views expressed in this document are the views of Frontier Economics Limited.